Permit (2) CITY OF TIGARD BUILDING PERMIT
1114
I COMMUNITY DEVELOPMENT Permit#: BUP2022-00156
Date Issued: 6/28/2022
T f[. ;l lx,1P 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113BA00400
Jurisdiction: Tigard
Site address: 7632 SW DURHAM RD 100
Project: Avamere Home and Hospice Subdivision: None Lot: None
Project Description: New non-structural walls and light fixtures.
Contractor: WALEN CONSTRUCTION Owner: PORTLAND SW CENTER LLC
20915 SW 105TH AVE BY FELTON PROPERTIES INC
TUALATIN, OR 97062 ATTN: FELTON, MATT
520 SW 6TH AVE, STE 610
PORTLAND, OR 97204
PHONE: 503-718-6680 PHONE:
FAX:
FEES
Specifics:
Description Date Amount
Type of Use: COM 06/22/2022 $256.22
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations,
Demolition
Occupancy Grp: B Occupancy Load: 110 12%State Surcharge-Building 06/22/2022 $30.75
Dwelling Units: Plan Review 06/22/2022 $166.54
Stories: Height: ft DC Provision Review,COM TI-Ping 06/22/2022 $110.00
Bedrooms: Bathrooms: Plan Review-Fire Life Safety 06/22/2022 $102.49
Value: $11,500 Info Process/Archiving-Lg$2.00(over 06/22/2022 $6.00
11x17)
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $672.00
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtaip a S the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: erm ee Signature: f�
a 03.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.