Loading...
Plans trySCOPE OF WORK RECEN ED fe Of Your Building 1. RELKOCATE AND/OR ADD PENDENT FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENTS. MCKINSTRY CO,LLC JUN 0 9 2022 2 FIRE�AC'OR SR RTEM ERATURE INKLERS ARE TRATINGCSEEXILEGENDFlRE SPRINKLERS.INCLUDING RESPONSE TYPE, 3. ALL AREAS OUTSIDE SCOPE OF WORK ARE TO REMAIN AS IS AND UNAFFECTED BY TENANT PORTLAND: • TIGARD IMPROVEMENT. CI..�� 16790 NE MASON STREET BUILt)INGDNISION GENERAL NOTES SUITE 100 4\ 1. THE FIRE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED.INSTALLED.HUNG,BRACED AND PORTLAND,OR 97230 TESTED IN ACCORDANCE WIT4 N.`PA-13(2013 EDITION). 503-331-0234 2. AL MATERIALS SHALL BE NEW AND U.L.LISTED. fflL • • z 3. WHERE SUBJECT TO FREEZING CONO�TIONS,IT IS THE OWNERS.RESPONSIBILITY TO PROVIDE HEATING i ADEQUATE TO PREVENT THE FREEZING OF WATER-FILLED PIPE THROUGHOUT AREAS WHERE WET-PIPE www.mckinstry.com FRE SPRINKLER SYSTEMS ARE INSTALLED;tNCLUOING ENCS LO FOR DRY PIPE,PREACTION.AND DELUGE FIRE SPRINKLERS SYSTEMS AND ALL OTHER VALVES CONTROLLING WATER SUPPLIES TO SPRINKLER SYSTEMS. PROJECT: ! 4. THE FIRE PROTECTION CONTRACTOR SHALL NOT BE RESPONSIBLE FOR THE ABILITY OF THE STRUCTURE F_/F�l7 • y TO ADEQUATELY SUPPORT THE FIRE SPRINKLER SYSTEM. ��Ia n Suite / • i 5. ALL ELECTRICAL,PAINTING OF PIPE,FURRING,CUTTING,OR PATCHING SHALL BE BY OTHERS. 5, NEW AND RELOCATED UPRIGHT FIRE SPRINKLER HEADS SHALL BE INSTALLED ON BE ON i'SCHEDULE 40 ARM-OVERS,PENDENT FIRE SPRINKLER HEADS SHALL BE INSTALLED ON; SCHEDULE 40 ARM-OVERS (jO I'FLEXIBLE FIRE SPRINKLER DROPS 7. NEW MAINS AND BRANCH ONES SHALL MATCH THE EXISTING PIPE SIZING SCHEDULE WHERE HYDRAULIC CALCULATIONS ARE NOT REQUIRED. • • • #'*. • 8. FIRE SPRINKLER HEADS HAVE BEEN ADDED AND RELOCATED TO ACCOMMODATE TENANT IMPROVEMENTS. I AREAS OUTSIDE THE SCOPE OF WORK ANO/OR NOT IN CONTRACT SHALL REMAIN AS IS, 9. THE OWNER IS RESPONSIBLE FOR THE PERIODIC INSPECTION,TESTING,AND MAINTENANCE OF THESE - ,- FIRESPRINKLER SYSTEMS IN ACCORDANCE WITH THE REQUIREMENTS OF NEPA 25(LATEST EDITION.) • y` THIS WORK SHALL BE DONE BY QUALIFIED PERSONNEL STARTING AFTER THE WARRANTY PERIOD HAS EXPIRED.THE COMPANY THAT DESIGNED AND INSTALLED THIS SYSTEM IS THE BEST QUALIFIED TO PROVIDE THE ONGOING LONG TERM TESTING,SERVICING,AND MAINTENANCE OF THIS SYSTEM(S). b2-Q7 • TY 10220 SW Greenburg Rd • '` • ' _..._.. Tigard, OR 97223 I _ srRucruRE MNGER REGISTRATION: B—ED STAIN STEEL HOSE E • 1 P BRAW',D1E \I•x PRMOVER • , , , �M!JUIFTABUE HUB OFFICE COPY C SUSPEIOED CRIl� REDIFFD WHERE FLEIELE TYPE SRwxLER9 FRE NETALLFD' • FLEXIBLE SPRINKLER HEAD DETAIL ISSUES: CITY OF TIGARD No DATE DESCRIPTION Approved................................................... Contitionally Approved..............................I l For only the work as described in: • PERMIT NO. BIOS -2-- n� l os' See Letter to: Follow.................................� ] Attach..................................I ] Job Address: /v #c.4 DESIGNED: BY: T ()ate: i DRAWN: AF ro CHECKED: JOB NO: • SHEET TITLE: FIRE SPRINKLER SCHEDULE Fire Sprinkler SYMBOL QUANIM MAKE MODEL SIN RESP. K-Factor THRD TEMP COLOR TYPE NOTE •R 7 RASCO G5-56 RA3415 QR/SR 5.6 1/2" 155 Chrome Concealed Carie► • • �A 1 RASCO G5-56 RA3415 QR/SR 5.6 1/2" 155 Chrome Concealed white Cover 8 TOTAL NUMBER OF SPRINKLERS FOR THESE PLANS SHEET NUMBER: FP-101