Loading...
Plans 6'-1" � I 1' .� �" t o �, 15 '� New wall construction: T —� 3-0 4x3 slid- , " c - 2x6 DF#2 stud wall construction @ 16" OC if3n 3 exterior sheathed w/ 15/32 APA OSB/PLY, ;- 7 (see S pages 5-10 shear wall for nailing, and E IS holdown call-outs and locations) (E) North elev wall \ en - _ El' ti -Header: (2) 2x8 UON C line to remain 00I q .2 .3 -Wall Height: 8'-0 ht i`d 2 2022 �I a' o c E o a 8 - �t t Y r�r TIGAH�i ou_ New attached r Interior wall const: 3UILDING DIVISION N j - 2x4 DF#2 stud wall const @ 16" OC *i 2 car garage 6x7 00 rr (E) elec panel to ��'' 16 -' OH door `V Interior finishes: - o, walls/ceiling: 1/2 gyp board, taped Z, become sub-panel - _- �■ - - a` t iv\ \ ^ and painted. M ��i� I I (N) Elec - -c Flooring: carpet/wood/tile/vinyl �, t j 3 0I Down I N � Im � � in , �. N I I panel a . .orb r 3 — N �� All dimensions are to rough framing only. All i i , - Co E Y interior finishes need to be factored separately .. �' ' i i )' G o when determining final finishes. all dimensions w.. .... `'.,. 4x�slimmer N \ Q ), _ •�• � c need to be field verified, and site adjustments 3x4 temp (N) elec meter location —� � a .o may be needed. 32'-6 1/2" y' A/App ;t,. Bathroom walls/ceiling: green board, i VG'C plans taped painted. ha4'1 ' on 3nb Garage door/portal-frame hdr schedule: N FLB3/Portal-frame 1 - (2) 1-3/4" x 14" Versa-lam 2800, New wail construction IMIIIIIIIMMIMIIIMME 1 sistered w/ (5) 12d @ 16" OC vertical to horiz placement. Existing wall constructionFLB4/Portal-frame 2 - (2) 2x12 DF#2, 7 (N) 1st Floor plan sistered w/ (5) 12 d @ 16" OC vertical to horiz placement. 7Scale: 1/16":1' Exisitng bearing wall construction 26'-3" �p Gravity-paths: '� Add squash �� blocks to inside 8'_O" Point load from above 6'-1" 4'-3" of rim A Post load gravity path (2) 2x ■) ��,( 641 ' Window ' �� \ spacing trimmer- (2) 2x6 DF#2 1� —�COP 95 CFM mech fan w/timer F '� 03 'V Floor Beam Schedule: a� CITY OF TTGAD (E) ref bcted FLB1 (dropped) - (4) 1-3/4" x 11-1/4" Versa-lam 3100, ,./1 Ell FOR CODE COMPLIANCE1 1st f bor- below _ sistered w/ (5) 12d @ 16" OC vertical to horiz placement. (A N. FL62 (dropped) - (2) 1-3/4" x 9-1/2" Versa-lam 2800, : co = $, �� t \ sistered w/ (5) 12 d @ 16" OC vertical to horiz placement. N FLB5 (flash) - (1) 1-3/4" x 11-7/8" Versa-lam 2800 •- FLB6 (f lash) - (1) 1-3/4" x 11-7/8" Versa-lam 2800 Perim - t C° FLB7 (flash) - (1) 1-3/4' x 11-7/8" Versa-lam 2800 j'A6Sad2" / _ N rt p; v p�C�0N1 �O'1C I ` in X`��� .0' o 77 - � - 2nd floor framing notes: N / Add squash � Fl oor joists: LP series 36A 11.875 @ 16" OC conn w/ (3) 12d _ ^° ring-shank to TOW, and (1) thru rim into top cord. 3/4"x4'x8' APA � � m m .- �_ - � blacks to ins de � A � _� � (FLB5) � of rim ao T&G substrate over top of joist, conn w/ const adhesive and 12d a C ring-shank 6/12. Rim board: 1-1/4"x11-7/8" Timberstrand set to TOW "in' �/ = -- — = — \— to bldg-line conn w/ 12d @ 16" OC aligned over stud lay-out and � �' 10-1 8-0 toe nailed to TOW, clipsto inside ofrim to OC. ' " ' " 9 w/ A35 TOW @ 48 „ > , 10-4 -i Scale: 1/8:1' N s 4x4 slider temp Hdr- (3) 2x8 sistered Construction Notes: w/(5) 12d @ 16" OC 14'-2" iir SD SD - interconnected smoke detectors 2x4 SH 8c0" 11'-2" /26'-3" CM w/ battery back up / t / CD - Carbon-monoxide detector w/ 5'-3" 5'-0" 3'-6" 8'-0" 4x4 8'-0" battery back up. A' / windows - sliders \ / _ o N \ i New wall construction: Q F � = V. 3-0 4x3 slid- -Pry - - 2x6 DF#2 stud wall construction @ 16" OC U ``� \ 9 T j 3 exterior sheathed w/ 15/32 APA OSB/PLY, T F office / i E (see S pages 5-10 shear wall for nailing, and _ , ^� .o holdown call-outs and locations) Cr) `O O Linen M - a -Header: (2) 2x8 UON - Co m 01 . o -Wall Height: 8'-0 ht _r; _ N a u - in d \ y CB N •hed I r Interior wall const: N -a �, age 6x7 I T - 2x4 DF#2 stud wall const @ 16" OC (E) 1 story C': \ co N ' eo 16'-4" OH door `v Interior finishes: Closet New 2nd floor addition � \ N _._ _. walls/ceiling: 1/2 gyp board, taped - \ I over new garage iv \ \ and painted. M pIlr 6'-1" ev C \ N (N) Elec = Flooring: carpet/wood/tile/vinyl \ N ...._ t� panel • •orj � All dimensions are to rough framing only. All "'\ 4'-6�� p A ► 3_0 ' 4x5 slider egress i` -F.,,`"\ °o interior finishes need to be factored se aratel pan3x4 to I 1 i''' w/44' max sill ht p Y .t \-- --\ \ 4x�der \ 4 \ when determining final finishes. all dimensions - 8'-0" :r location o IL I need to be field verified, and site adjustments 18'-0 �f4" 8'-0" a 8 may be needed. Meter '- 8'-0" 1/2" / / Bathroom walls/ceiling: green board, 32'-6 5/8" / / (L - 11taped painted. N 28°°, New wall construction 8 (N) 2nd Floorplan N horiz placement. k Existing wall construction I Scale: 1/16":1' >horiz placement. 5 Scale: 1/16":1' . Exlsitng bearing wall construction Ann efficiencymetope: Exterior w —U f1,E812.2I lntecmrlis(Craning,and / Gravity-paths:aths: V �gs�---u-0.03 -�de.and > +p fat }lags- -C-0 /k-%9,and e 8'-0" Point toad from above Reined rr' .t1 ?8,anc3. / / Post load gravity path (2) 2x ■ W wr d .3n,and Window spacing trimmer- (2) 2x6 DF#2 u-fi.�;o '' i 95 CFM mech fan w/timer 1S_r�t nsty i tailedlidding rcacY or aion3 su r 3E F > , 1c s > 1> ateu trtc m t pirnary rxd PAP a :. Floor Beam Schedule tlr at ajtttnc d xniiu. hit FLB 1 (dropper) - 1-1 -3f 4" x 11-1/4" Versa-lam 3100, Fig s . u t slrutl �reswsta s h it d unit(t �tt t ornc t � 3 s 11 be 16" icieritzy mow 14 1 ps ham opacity the d pimp - stste+ed w/ (.R) 12d OC vertical to horiz placement. �d ignl*wail- kg seto Banal r Y:tt ti,ttt� - .p " h rr�ay b far 11 . t l 1 P 'to with wed a 2 1-3/4 x 9-1/2 Versa-lam 2800 co FLB2 (drapl ) " t" } } no wt zn al heaters are instate in the buillding and backup rnsisrani hest i allc vur sl 9n.a sist+et��/f�� 12 d � 6" Q�vertical to horiz placement. ', n: 1 -3 " " x €4/18" Versa-late 2800 ( 1\cl i .. FLB5 (f ttsh)= - FLB6 (fbsh)-(1) 1-3i4'` x i 14718' fersa,lam 2800 O i-VG✓P11 x l re-- , 1 j cM I F (f listt) (1 -3 ` x 11- ;6;' 2800