Plans 6'-1" � I
1' .� �" t o �, 15 '� New wall construction:
T —� 3-0 4x3 slid- , " c - 2x6 DF#2 stud wall construction @ 16" OC
if3n 3 exterior sheathed w/ 15/32 APA OSB/PLY,
;- 7 (see S pages 5-10 shear wall for nailing, and
E IS holdown call-outs and locations)
(E) North elev wall \ en - _ El' ti
-Header: (2) 2x8 UON C
line to remain 00I q .2 .3 -Wall Height: 8'-0 ht i`d 2 2022
�I a' o c
E o a 8 - �t t Y r�r TIGAH�i
ou_ New attached r Interior wall const: 3UILDING DIVISION
N j - 2x4 DF#2 stud wall const @ 16" OC
*i 2 car garage 6x7 00
rr (E) elec panel to ��'' 16 -' OH door `V Interior finishes: -
o, walls/ceiling: 1/2 gyp board, taped
Z, become sub-panel - _- �■ - -
a` t iv\ \ ^ and painted. M
��i� I I (N) Elec
- -c Flooring: carpet/wood/tile/vinyl �,
t j 3 0I Down I N
� Im � � in ,
�. N I I panel a . .orb r 3 —
N �� All dimensions are to rough framing only. All
i i , - Co E Y interior finishes need to be factored separately
.. �' ' i i )' G o when determining final finishes. all dimensions
w.. .... `'.,. 4x�slimmer N \ Q ),
_ •�• � c need to be field verified, and site adjustments
3x4 temp (N) elec meter location —� � a .o may be needed.
32'-6 1/2" y' A/App ;t,.
Bathroom walls/ceiling: green board,
i VG'C plans taped painted.
ha4'1 ' on 3nb Garage door/portal-frame hdr schedule: N
FLB3/Portal-frame 1 - (2) 1-3/4" x 14" Versa-lam 2800, New wail construction
IMIIIIIIIMMIMIIIMME
1 sistered w/ (5) 12d @ 16" OC vertical to horiz placement. Existing wall constructionFLB4/Portal-frame 2 - (2) 2x12 DF#2,
7 (N) 1st Floor plan sistered w/ (5) 12 d @ 16" OC vertical to horiz placement.
7Scale: 1/16":1' Exisitng bearing wall construction
26'-3" �p
Gravity-paths: '�
Add squash ��
blocks to inside 8'_O" Point load from above
6'-1" 4'-3" of rim A Post load gravity path (2) 2x ■) ��,(
641
' Window
' �� \ spacing trimmer- (2) 2x6 DF#2 1�
—�COP 95 CFM mech fan w/timer F '�
03
'V
Floor Beam Schedule: a�
CITY OF TTGAD (E) ref bcted FLB1 (dropped) - (4) 1-3/4" x 11-1/4" Versa-lam 3100, ,./1
Ell FOR CODE COMPLIANCE1 1st f bor- below _ sistered w/ (5) 12d @ 16" OC vertical to horiz placement. (A
N. FL62 (dropped) - (2) 1-3/4" x 9-1/2" Versa-lam 2800,
: co
= $, �� t \ sistered w/ (5) 12 d @ 16" OC vertical to horiz placement.
N FLB5 (flash) - (1) 1-3/4" x 11-7/8" Versa-lam 2800
•- FLB6 (f lash) - (1) 1-3/4" x 11-7/8" Versa-lam 2800
Perim - t C° FLB7 (flash) - (1) 1-3/4' x 11-7/8" Versa-lam 2800 j'A6Sad2"
/ _ N rt p; v p�C�0N1 �O'1C I
` in X`���
.0' o 77 - � - 2nd floor framing notes:
N
/ Add squash �
Fl oor joists: LP series 36A 11.875 @ 16" OC conn w/ (3) 12d
_ ^° ring-shank to TOW, and (1) thru rim into top cord. 3/4"x4'x8' APA
� � m m .- �_ - � blacks to ins de �
A � _� � (FLB5) � of rim ao
T&G substrate over top of joist, conn w/ const adhesive and 12d
a C ring-shank 6/12. Rim board: 1-1/4"x11-7/8" Timberstrand set to TOW
"in' �/
= -- — = — \— to bldg-line conn w/ 12d @ 16" OC aligned over stud lay-out and
� �' 10-1 8-0 toe nailed to TOW, clipsto inside ofrim to OC.
' "
' " 9
w/ A35 TOW @ 48
„ > , 10-4
-i
Scale: 1/8:1'
N s
4x4 slider temp
Hdr- (3) 2x8 sistered
Construction Notes: w/(5) 12d @ 16" OC 14'-2"
iir
SD SD - interconnected smoke detectors 2x4 SH 8c0" 11'-2"
/26'-3" CM w/ battery back up / t
/
CD - Carbon-monoxide detector w/ 5'-3" 5'-0" 3'-6" 8'-0" 4x4
8'-0" battery back up. A' / windows - sliders
\
/
_
o N \ i New wall construction: Q F � = V.
3-0 4x3 slid- -Pry - - 2x6 DF#2 stud wall construction @ 16" OC U ``�
\ 9 T
j 3 exterior sheathed w/ 15/32 APA OSB/PLY, T F office / i
E (see S pages 5-10 shear wall for nailing, and _ ,
^� .o holdown call-outs and locations) Cr) `O O Linen
M - a -Header: (2) 2x8 UON - Co
m 01 . o -Wall Height: 8'-0 ht _r; _
N a u - in d \ y CB N
•hed I r Interior wall const: N -a �,
age 6x7 I T - 2x4 DF#2 stud wall const @ 16" OC (E) 1 story C': \ co
N
' eo
16'-4" OH door `v Interior finishes: Closet New 2nd floor addition �
\ N
_._ _. walls/ceiling: 1/2 gyp board, taped - \ I over new garage
iv \ \ and painted. M pIlr 6'-1" ev
C \
N
(N) Elec = Flooring: carpet/wood/tile/vinyl \
N ...._ t�
panel
• •orj � All dimensions are to rough framing only. All "'\ 4'-6�� p A ► 3_0 ' 4x5 slider egress i`
-F.,,`"\ °o interior finishes need to be factored se aratel pan3x4 to I 1 i''' w/44' max sill ht
p Y .t \-- --\ \
4x�der \ 4 \ when determining final finishes. all dimensions - 8'-0"
:r location o IL I need to be field verified, and site adjustments 18'-0 �f4"
8'-0" a 8 may be needed. Meter
'-
8'-0"
1/2" / / Bathroom walls/ceiling: green board, 32'-6 5/8" / /
(L -
11taped painted.
N
28°°, New wall construction 8 (N) 2nd Floorplan N
horiz placement.
k Existing wall construction I Scale: 1/16":1'
>horiz placement.
5
Scale: 1/16":1' . Exlsitng bearing wall construction Ann efficiencymetope:
Exterior w —U f1,E812.2I lntecmrlis(Craning,and
/ Gravity-paths:aths: V �gs�---u-0.03 -�de.and
> +p fat }lags- -C-0 /k-%9,and
e 8'-0" Point toad from above Reined rr' .t1 ?8,anc3.
/ / Post load gravity path (2) 2x ■ W wr d .3n,and
Window spacing trimmer- (2) 2x6 DF#2 u-fi.�;o
'' i 95 CFM mech fan w/timer 1S_r�t nsty i tailedlidding rcacY or aion3 su r 3E
F
> , 1c s
> 1> ateu trtc m t pirnary rxd PAP a :.
Floor Beam Schedule tlr at ajtttnc d xniiu. hit
FLB 1 (dropper) - 1-1
-3f 4" x 11-1/4" Versa-lam 3100, Fig s . u t slrutl �reswsta s h it d unit(t �tt t ornc t � 3 s 11 be
16" icieritzy mow
14 1 ps ham opacity the d
pimp
- stste+ed w/ (.R) 12d OC vertical to horiz placement. �d ignl*wail-
kg seto Banal r Y:tt ti,ttt�
- .p " h rr�ay b far 11 . t l 1 P 'to with wed a
2 1-3/4 x 9-1/2 Versa-lam 2800
co FLB2 (drapl ) " t" } } no wt zn al heaters are instate in the buillding and backup rnsisrani hest i allc vur sl 9n.a
sist+et��/f�� 12 d � 6" Q�vertical to horiz placement.
', n: 1 -3 " " x €4/18" Versa-late 2800 ( 1\cl
i .. FLB5 (f ttsh)=
- FLB6 (fbsh)-(1) 1-3i4'` x i 14718' fersa,lam 2800 O i-VG✓P11 x l re--
, 1 j cM I F (f listt) (1 -3 ` x 11- ;6;' 2800