Report (3) !emsr 2o?) - o0o q6 lyI 31-,l Sw 6S4.L ,AuE. CT ENGINEERING ADU NC IRO Nickerson St. Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)2R5-0618(F) asolomon@ctengineering.com BULLETIN Date: July 21, 2021 Number: CT-01 Project#: 20207 Project Name: River Terrace Area IV Attached: CT-01.1 to CT-01.3 Subject: MH 2S Triplex A (Unit ADU-2 (Window Revisions)) Drawings Affected: Fl (Foundation Plan), F2 (Lower Level Shear Plan), F3 (Upper Level Floor Framing Plan) Description/Action: This bulletin provides response to RFI's, design clarifications and/or variation requests for the `River Terrace Area IV' project located in Tigard, Oregon. See attached updated plans (CT-01.1, CT-01.2, CT-01.3) which have been revised to accommodate the window changes to Unit ADU-2. S�RUCTURA, �p PRoF f7l;N • 12 RO°cSL, 07/21/2021 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: July 21, 2021 Distribution: Contact Information: Dennis Gaudreault Taylor Morrison Frank Sandoval Taylor Morrison Sam Scott Taylor Morrison Amy Russell Taylor Morrison Elizabeth Erlandson Milbrandt Architects M:\20207 River Terrace 2S Triplex,TU Triplex,DL Triplex\CONSTRUCTION\Bulletins\20207_2021.07.21 CTO1 MI-I 2S Triplex AUnit Structural Engineers ADU-2(Window Revisions).doc ff CT-01.3 i P.T.6x6 POST GABLE 4x8 H �, TRUSS MN 2x LEDGER I 0 ^ Ov, (2)2x10 HDR (2)2x10 HDR I 3,, N t-0----f._ -----. '-- B J I GT 4x10 C o Cs90) ABOVE `i 1 S9.1 m SIM. I 1 11 3� D Ii ADU-2 1 (221300A) �. 4 1Y4x14 LVL FB,I EI HUCQ1.81/11-SDS - 1 14"RFPI-40 @ 19.2"O.C. _-_-..__.� i TYP.U.N.O. II\ / i 1 I--\----------`/ cc I x r -�i-`- = BEARING O 711---/- n IF .'............. C'i ——--TJ iL /� ` it WALL \/ IIII{{V__��� SIM I I I '- -__4 5:0 r STAIR HAIURt RAMING ABOVE It I 1 q . .. I I 1 j i S90 HUCQ1.81/11-SDS I ! \ 1 I' ,p..2 17-x14N It 1VCF I r xa D It i--100 7 ,„( (..) --) t' m... S9D- Ir ArrrSn � irk 77,1n;• -.,, ._ / o Q IYxl4 6 / I II 1 v iI ® 11 FIXTURE 772777rn7ir/n} I I I ABOVE �1Y4x14 LVL FB - 1,_=—) , L SIM. S90 I -' I i '1 C S90 SIM. o ,-I DI ' -Q t S - i BEARING WALL % HUCQ1.81/11-SDS Ii f I ♦ - n GT 4 SIM. i 0 TI ABOVE 59.1 SJSx16y GLB FB GT ABOVE 0 SIM. S91 1 x J yER A ~-- -I - m .r I' I "OPI = I I LOW ROOF TRUSSES o LOW ROO TRUSSES @ 24"O.C. x -4I O. . se Idal Nair '',,(2,2x10HDR IGABLE END TRUSS I MH 2S Triplex (A) L l UPPER LEVEL FLOOR FRAMING 6 ATTACH BOTT CHORD OF S91 GABLE END TRUSS TO TOP PLATE W/LTP4 @ 20"O.C. I ,11r+" wow,.«......o., 14'5 CT-01.1 MH 2S Triplex (A) o, CONC STEPSAS 4 NEEDED 10 MEEI AMr m PLAN P I Gx6 POST 9® FINISHED GRADE W/ABU66 r POST BASE 4'kIPLIN IH ® pq \• ♦J °J• SIHDI4R Mary ® , a'<-- L,0.1 560 pq b B r J 3 "CONC. r .. _-5THD34R�� Si'.0 - L ain PATIO a u I .-. ..01 SIM -T1Vi"l r I\I 71-,® SLAB ``5,‘,-I' \I I INSIALLCONTINUC I� 2/ OPERATED MECHAf r--�-------- STHD14R) -2l'i' h: .I -113A. I _.__ - IJ I VENIILATIONSYSI( I• l o THE CRAWLSPA 0 —�1 I 2.4 PONY -214" 1 I S60 WALL ' 18"SQ x 10' ��SIWI 1 DEEP FTG. 10 1 I i � W/(2)#4 BOIT. I 02 I r EI EW 1YP U O: I�l1�. r.-i•-��}�-.�a- , 4x8 HDR ®` v P6TN I I' J L J ® r-1 __ PT 4x.U.N0 1 i --T__ -�- - 4xB HQR�F#��-�.i , -� 1 1 IYP. .8.O I l 5 b, 5'd" rJ 5•_7y• L. J 5..7y. L rJ 5:-6y" L J 1 : 5'-/' ♦ + I I , 3 0"x24"x10"DEEP F a,, I o 1- W/(3)I#4 LONG WA i " I �1 ®LL Li (4)04 SHORT WAY BC 11 �� �� � II ,II �O® ,> JII, i "I 113/iI \ ®- . I �� � 1 iT III � I1 ®� c ..Cw --I r. I e 1- - I 1 ISTHD74R1 - i -A D -2 I 'I. PXCEAW1 1 I , ' - ' 'I II I (221300A). i3 'd � i I r - rT1 2xI PONY WALL SGd >°I I I IP'-I'-�t--,,w-.,. .}�- " '�"(.1z8 HDR WlBEARING I -J L_J IP 1 4x4 POST ,WALL ABOVE 1(34.1, I I 8' TYP.U.N.O. _ - I -�. I -IPA'1 ✓ } iN ,p 4x8 HDR r 1 h 1- 1 0 co • 1-M. I L J 1-._J I -11W IL_ • r.-l ( I SIM / iimin 11." I 1 4 11 • - •— 18 SQ.x10 DEEP FTG . I m I , r!HD74R SOD sr Dl.R!-_-' • l W/(2)#480FLEW - r Imo' I .,L_.--.4---- �.. 1, I? 70 TYP U.N O I y T`L • _ ` • I"' I _ N sG0 — £-S{L I I I HDUDUT� (- S'-1�" I 113/i' H 1 113/'' 0 1 2.1. o I 1 ® i * 34"ABOVE G.F.F. I 3X'ABOVE G.F.F. • I _ - /,/ //�-----� PER CIVIL ' PER CIVIL ✓ / „ -1'-V."MAX HT I I -I'-V,"MAX HTl '4x8 HDRr 1 r-.. i� T O.S. TO.S. N—-t—i —r- t---tLL i I 3,-I, ♦ ` 3'-Il 2'1. ` Z.-1. 7'2" ,I I' I I 3'-10314' JI 3'-1"/4` 1 I I I 1 SIM. a o I-113/."I1+I ", O r 51H014R1 I Alak O -,,.. ' 0 I1 1-FIXTURE VI `" M I1f1 FIXTURE I I I MP? 3Yz"CONC.SLAB ® 3""CONC k I - I I 211 SLAB 4 I TYP. SGA 208 I Mr IL —1 1 --� I I I ® 1I L1 4x8 HORr- 1 �i L I D' ,— 1—r Ji---�F.14-i--�L'�P 1- 36"SQ.x 10" I I 1 01 I' L_J I I DEEP FTG.W/ II BUNDLED 1: cQ 1 (4)u4 BOTT.EW ®® I I 111/4 G.F.F.PER CIVIL 3 12 1 STUDS L. I I I I ®® I--' i ' i IGFF.PERCIVILI StiU 1 ABOVE --------- �S�I LL r. STHD14R1. 10. I. r ® r m I. So 1 ® ^—I.I -_i 5 I I / i ' 4 ,J 03 1 11/+' ( 1 WSW 12x8 STRONG-WALL- I 3 m 1 W/(5)#4 LONG WAY& { .N. �` I (6)x4 SHORE WAY HOIL- 1 T-fi 4R1 — -II' IC 3' `2y11'6y;♦ R.-3.. D2 Mr IUy.. '. STHD14R1 I' IF 4' 0 ♦»xsaii5ukt 'a �.:.,, u..x.�..e.k• it r u iksa fsxbxaexY— 41iiiN sfANkxa511 ualUiuxxxelN.pat1.NA4LLxN AHa uaueuerae-5.ubau.•e,... CT-01.2 STHD14R1 lJ j 1 r. L,- P6TN s� ADU-2 _- - STHD1I4RJ- (221300A) 77) ..( Lfl ._.. 7..f HDUB } / STHD14R1—{ FT 111 ILA CO 0 1,4 . 1 .i STHDI4RJ— WSW 12x8 STRONG-WALL 0 STHD WRJ MH 2S Triplex (A) LOWER LEVEL SHEAR PLAN Bend Office (541) 330-9155 Geotechnical Office (503) 601-8250 c� Office (541) 345-0289 arlSOn Testing, Inc. Eugene Salem Office (503) 589-1252 Tigard Office (503) 684-3460 Daily Report of Proprietary Anchors Client: POLYGON NORTHWEST CO - ANGELA GRAJEWSKI Project: POLYGON AT ROSHAK RIDGE - LOT 165 ADU 2 CTI Job#: T1804799.CJ Address: 14134 SW 165TH AVE TIGARD Jurisdiction: TIGARD CTI representative D. MARTINI WABO SI 02176/AWS 08040991/ICC 8393966 was on site this date Jan. 27, 2022 to perform Special Inspection for: Permit MST2021-00096 DFS #(s) PO Number: SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent or client representative. Name: KALEB 1. MONITORED THE INSTALLATION OF (3EA) 5/8" X Com an TAYLOR MORRISON 24" 1554 GRADE 36 THREADED RODS, 7" MINIMUM P y EMBEDMENT, 3" MINIMUM EDGE DISTANCE AT THE 2. Inspection was "IBC" 17 Continuous 1 I Periodic FOUNDATION LEVEL OF EAST WALL. ***NOTE: WORK WAS PERFORMED IN LIEU OF SIMPSON PROPRIETARY ANCHORS STRAPPING. REQUIRES FOR APPROVAL YesNoN/A 1. Reviewed previous inspection reports? 2. Reviewed evaluation report? X Verified following items meet manufacturer's published installation instructions. REPORT SUMMARY 3. Verified minimum embedment depth of the anchors. X 1. Work inspected was: I x l Completed In progress 4.Verified installation of the anchors. X 2. Completed work inspected was not in compliance with 5. Verified anchor diameter. X I X Approved plans and specifications I I Shop drawings 6. Verified steel grade. X n 7. Verified hole diameter. I� RFI Design change I I Submittal n N/A X 8. Verified type of drill bit used. X Document #(s) SEE TEXT Dated: 01-27-2022 9. Verified hole cleaning method. X 3. Noncompliance item(s) were noted this date, details on 10. Verified adhesive application. X following page(s). I X I Yes I I No n N/A 11. Verified edge distance. X 12. Verified spacing. x 4. Noncompliance item(s) were reinspected this date, details 13. Verified installation torque. on following page(s). I I Yes I x I No I I N/A X nConform n Remain in progress Evaluation report number & date: ESR 2508, 7/2021 Report(s) findings were discussed and left with KALEB of TAYLOR MORRISON Name of product being installed AT XP Batch Number 1000208783 Expiration Date 2022-08-27 Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. nSee additional report page(s). E Distribute attachments. Page 1 of 2 Daily Report of Proprietary Anchors For: 01/2 7/2 0 2 2 CTI Job#: T1804799.CJ Project: POLYGON AT ROSHAK RIDGE - LOT 165 ADU 2 Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only.Information contained herein is not to be reproduced,except in full, without prior authorization from this office.Under all circumstances,the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared.No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter,please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING,INC. Keith Gauvin Project Manager DJM/AB CC: POLYGON NORTHWEST CO - ANGELA GRAJEWSKI TAYLORMORRISON_AP@ONLINECAPTURECENTER.COM • CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT FINAL/NCL ONLY X 8430 SW HUNZIKER ST,TIGARD OR-PO BOX 230997,TIGARD OR 97281 Page 2 of 2 51ctuCTURg4 V PROF CT ENGINEERING e.p c, 9 •GINFIP t j 180 Nickerson St. INC 41 IX Suite 302 Seattle,WA 98109 , ►"7G0N�,\ (206)285 4s12(v) 9, • 12, �Sc (206)285-0618(F) E < C F• RQg asolomon(cuctengineering.com BULLETIN 01/31/2022 Date: January 31,2022 Number: CT-03 Project#: 20207 Project Name: River Terrace Area IV Attached: None Subject: All Multiplex Lots/Plan Types—Concrete Adhesive Anchoring Systems for Post-Installed HDU Holdowns Drawings Affected: Holdown & Fastener Schedule Description/Action: This bulletin provides response to RFI's, design clarifications and/or variation requests for the 'River Terrace Area IV' project located in Tigard, Oregon. Holdown anchor bolts may be set in drilled holes with either epoxy or acrylic-based anchoring adhesives per the table below. For temperatures between 50 degrees and 110 degrees Fahrenheit, 'Simpson Strong-Tie SET-3G' Epoxy Adhesive System may be used. For temperatures between 0 degrees and 70 degrees Fahrenheit, 'Simpson Strong-Tie AT-XP' Acrylic Adhesive System may be used. Contact engineer for alternate products and/or temperature ranges. Note that STHD14 holdowns may be replaced with HDU5 holdowns unless noted otherwise by the engineer. SET-3G AT-XP MIN. HOLDOWN CL OF BOLT A307 ROD HOLE HOLE MIN. EDGE EMBED. MODEL TO F.O.S. DIAMETER DIAMETER DIAMETER DISTANCE DEPTH HDU2 1-5/16" 5/8" 3/4" 11/16" 1-3/4" 5-1/4" HDU2 1-5/16" 5/8" 3/4" 11/16" 2-3/4" 4-3/4" HDU4 1-5/16" 5/8" 3/4" 11/16" 1-3/4" 5-3/4" HDU4 1-5/16" 5/8" 3/4" 11/16" 2-3/4" 5-1/2" HDU5 1-5/16" 5/8" 3/4" 11/16" 1-3/4" 6-1/4" HDU5 1-5/16" 5/8" 3/4" 11/16" 2-3/4" 5-3/4" HDU8 1-3/8" 7/8" 1" 1" 1-3/4" 8" HDU8 1-3/8" 7/8" 1" 1" 2-3/4" 7-1/2" HDU11 1-3/8" 1" 1-1/8" 1-1/16" 2-3/4" 8-3/4" HDU14 1-9/16" 1" 1-1/8" 1-1/16" 2-3/4" 9-1/2" M:\20207 River Terrace 2S Triplex,TU Triplex,DL Triplex\CONSTRUCTION\Bulletins\20207_2022.01.31CTO3_All Multiplex Lots-Plan Types_Concrete Adhesive Anchoring Systems for Post-Installed HDU Holdowns.doc Structural Engineers CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: January 31, 2022 Distribution: Contact Information: Dennis Gaudreault Taylor Morrison Frank Sandoval Taylor Morrison Sam Scott Taylor Morrison Amy Russell Taylor Morrison Elizabeth Erlandson Milbrandt Architects M:\20207 River Terrace 2S Triplex,TU Triplex,DL Triplex\CONSTRUCTION\Bulletins\20207_2022.01.31_CT03_All Multiplex Lots-Plan Types_Concrete Adhesive Anchoring Systems for Post-Installed HDU Holdowns.doc Structural Engineers