Permit (4) CITY OF TIGARD ELECTRICAL RESTRICTED ENERGY PERMIT
COMMUNITY DEVELOPMENT Permit#: ELC2022-00505
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/28/2022
Parcel: 2S 112BD08500
Jurisdiction: Tigard
Site address: 14790 SW 79TH AVE
Project: Walker Subdivision: BRITTANY MEADOWS Lot: 21
Project Description: Adding(2)branch circuits for new shed.
Contractor: OWNER Owner: WALKER, PAIGE C
WALKER, MARY L
14790 SW 79TH AVE
TIGARD, OR 97224
PHONE: PHONE:
FAX:
FEES
Description Date Amount
Specifics: Branch Circuits wo/Purchase Service or 07/28/2022 $63.60
Feeder
12%State Surcharge-Electrical 07/28/2022 $7.63
Type of Use: SF
Class of Work: ALT
Total Number of Systems:
Audio&Stereo: N
Security Alarm: N
Garage Door Opener: N
HVAC: N
Vacuum System: N
Other: N
Other Desc: Total $71.23
Required Items and Reports(Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved pla . This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requi a you to ollow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 9 01-009 You y obtai cop he rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: Permittee Signature:
OWNER INSTALLATION ONLY
The installation is being made on property I own which is not intended for sale,lease or rent.
OWNER'S SIGNATURE: Date:
CONTRACTOR INSTALLATION ONLY
SIGNATURE OF SUPR.ELEC'N Date:
LICENSE NO.
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Electrical Permit Application
ceived
CI o Tigard ReS_
Date
City
• 13125 SW Hall Blvd.,Tigard,OR 97223 Review
Phone: 503.718.2439 Fax: 503.598.1960 ��'� at Related Permit#:
Inspection Line: 503.639.4175"' dy Date/By: Juris ® See Page 2 for
Internet: www.tigard-or.gov Notifted/Method: Supplemental Information
TYPE OF WORK JUL 10 PLANREVIEW
❑New construction R1 Addition/alteration/rept -TIGARD Please check all that apply(submit 2 sets of plans w/items checked):
�� ❑Service or feeder 400 amps or more El Building over three stories.
E]Demolition El Other: III V�S�ON where the available fault current ❑Marinas and boatyards.
CATEGORY OF CONSTRU exceeds 10,000 amps at 150 volts or ❑Floating buildings.
❑ 1-and 2-family dwelling ❑Commercial/industrial ❑Accessory building less to ground or exceeds 14,000 ❑Commercial-use agricultural
amps for all other installations. buildings.
❑Multi-family ❑Master builder ❑Other: ❑Fire pump. ❑Installation of 150 KVA or
JOB SITE INFORMATION AND LOCATION ❑Emergency system. larger separately derived
❑Addition of new motor load of system.
Job#: Job site address bUD IOOHPor more. ❑"A","E","1-2","1-Y,
City/State/ZIP: fC�e J�1'J t b� , C1-12Z ❑Six more residential units. occupancy.
�C ❑Health-care facilities. ❑Recreational vehicle parks.
Suite/bldg./apt.#: Project name: ❑Hazardous locations. ❑Supply voltage for more than
❑Service or feeder 600 amps or more. 600 volts nominal.
Cross street/directions to job site: 50"v*- 54Z F--05 enjo Lqpfi FEE SCHEDULE
Description I Qty. I Each ITotal
fi bIJ New residential single-or multi-family dwelling unit.
Subdivision: Lot#: Includes attached garage.
1,000 sq.ft.or less 168.54 4
Tax map/parcel#: Ea.add'I 500 sq.ft.or portion 33.92 1
DESCRIPTION OF WORK Limited energy,s residential
c L' t'— with above .ft. 75.00 2
J Get S l�—C> Limited energy,multi-family
75.00 2
residential(with above sq.ft.)
Renewable Energy ❑ See Page 2
PROPERTY OWNER ❑ TENANT Services or feeders installation,alteration,and/or relocation
Name: &I 11 LA>AA�CY 200 amps or less 100.70 2
c
Address: ( 201 amps to 400 amps 133.56 2
�'� D O t-t� +-L— �L 401 amps to 600 amps 200.34 2
City/State/ZIP: 1 c 0,A42--Z) 601 amps to 1,000 amps 301.04 2
Phone:(I" 5(CCf _�SFax:( ) Over 1,000 amps or volts 552.26 2
Temporary services or feeders installation,alteration,and/or
Email: '?,),*I( IAtJ'4. ,,.e.I-Y4 7 oo 1 C relocation
Owner installation:Th' installation is being made on property that I own which is not 200 amps or less 59.36 1
intended for sale,le re c 1 r in to ORS 447,449,670,a9d 701. 201 amps to 400 amps 125.08 2
Owner signature: Date: � Zv Z7% 401 amps to 599 amps 168.54 2
(3 APPLICANT ❑ CONTACT`P1kSON Branch circuits—new,alteration,or extension,per panel
A.Fee for branch circuits with
Business name: above service or feeder fee, 7.42 2
each branch circuit
Contact name: B.Fee for branch circuits without
service or feeder fee,first I 56.1 S 5i94 2
Address: branch circuit
City/State/ZIP: Each add'I branch circuit ( 7.42 2
Miscellaneous service or feeder not included
Phone:( ) Fax: :( ) Each manufactured or modular
67.84 2
dwelling,service and/or feeder
Email: Reconnect only 6784 2
CONTRACTOR Pump or irrigation circle 67.84 2
Business name: Sign or outline lighting 67.84 2
Signal circuit(s)or limited-energy
Address: panel,alteration,or extension. E3 See Page 2 2
City/State/ZIP: Each additional inspection over allowable in any of the above
Additional inspection(1 hr min) 66.25/hr
Phone:( ) Fax:( ) Investigation(1 hr min) 90.00/hr
Email: Industrial plant(I hr min) 78.18/hr
Inspections for which no fee is 90.00/hr
CCB Lic.: Electrical Lic.: Suprv.Lia: specifically listed '/z hr min
ELECTRICAL PERMIT FEES
Suprv.Electrician signature,required: Subtotal:
Print name: Date: ❑Plan Review Required(25%of permit fee):
State surcharge(12%of permit fee):
Authorized signature: TOTAL PERMIT FEE:
This permit application expires ifs permit is not obtained within 180
Print name: Date: days after it has been accepted as complete.
' Number of inspections allowed per permit.
I-\Building\Permits\ELC_PermiApp_ELRERE.doc Ret 06/17/2015 440-4615T(I I/05/CO"EB
Electrical Permit Application—City of Tigard
Page 2—Supplemental Information
Limited Energy Permit Fees: Renewable Energy Permit Fees:
RESIDENTIAL WORK ONLY: FEE SCMDUU
Fee for all residential systems combined: $75.00 oesc hon Each Total
y Renewable electrical energy systems:
Check Type of Work Involved: Skva orless 100.70 z
5.01 to 15 kva 133.56 2
❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 z
Wind generation systems in excess of 25 kva:
❑ Burglar Alarm 25.01 to 50 kva 301.04 2
50.01 to 100 kva 552.26 2
❑ Garage Door Opener* >100 kva(fee in accordance 552.26 2
with OAR 918-309-0040
❑ Heating,Ventilation and Air Conditioning Solar generation systems in excess of 25 kva:
System* Each additional kva over 25 7.42 3
❑ Vacuum Systems* >100 kva—no additional charge 0.0 3
Each additional inspection over allowable in any of the above:
❑ Other: Each additional inspection is 66.25/hr 1
charged at an hour) I hr min
Inspections for which no fee is 90.00/hr
specifically listed('h hr min
COMMERCIAL WORK ONLY: >E>EtcMCec, i O.Mff FEES
Subtotal(Enter on Page 1):
Fee for each commercial system: $75.00 * Number of inspections allowed per permit.
(SEE OAR 918-309-0000)
Check Type of Work Involved:
❑ Audio and Stereo Systems
❑ Boiler Controls
❑ Clock Systems
❑ Data Telecommunication Installation
❑ Fire Alarm Installation
❑ HVAC
❑ Instrumentation
❑ Intercom and Paging Systems
❑ Landscape Irrigation Control*
❑ Medical
❑ Nurse Calls
❑ Outdoor Landscape Lighting*
❑ Protective Signaling
❑ Other:
Total number of commercial systems:
*No licenses are required. Licenses are required for all
other installations
I.\Building\Permits\ELC_PemulApp_ELR_ERE doc Rev 06117/2015
Property Owner Statement g `-
p Y
Regarding Construction Responsibilities,'uL '2,8 Zx
Oregon Law requires residential construction permit applicants who are not licensdiviitp,h i �C"
Construction Contractors Board to sign the following statement before a building pklhc
issued. (ORS 701.325(2))
This statement is required for residential building, electrical, mechanical,and plumbing permits.
Licensed architect and engineer applicants, exempt from licensing under ORS 701.010(7), need not
submit this statement.This statement will be filed with the permit.
Please check the appropriate box:
7: 1 own, reside in, or will reside in the completed structure and my general contractor is:
Name CCB# Expiration Date
❑ I will inform my general contractor that all subcontractors who work on the structure must be
licensed with the Construction Contractors Board.
or
�❑ I will be performing work on property I own, a residence that I reside in, or a residence that I will
reside in. If I hire subcontractors, I will hire only subcontractors licensed with the Construction
Contractors Board. If I change my mind and hire a general contractor, I will select a contractor
who is licensed with the CCB and will immediately give the name of the contractor to the office
issuing this Building Permit.
I have read and understand the Information Notice to Homeowners About Construction Responsibilities,
and I hereby certify that the information on this homeowner statement is true and accurate.
-&I I t"o�k-'4-
Print Name ermit Applicant
ure of Permit Applicant Date
Permit#:
Address:
t,
R f
f•• •ff
f•
Issued by: Date:
This Copy for Permit Offices
Information Notice to Owners About
Construction Responsibilities
(ORS 701.325 (3))
Homeowners acting as their own general contractors to construct a new home
or make a substantial improvement to an existing structure, can prevent many problems
by being aware of the following responsibilities:
• Homeowners who use labor provided by workers not licensed by the Construction Contractors
Board, may be considered an employer, and the workers who provide the labor may be considered
employees. As an employer, you must comply with the following:
• Oregon's Withholding Tax Law: Employers must withhold income taxes from employee wages
at the time employees are paid. You will be liable for the tax payments even if you don't actually
withhold the tax from your employees. For more information, call the Department of Revenue at
503-378-4988.
• Unemployment Insurance Tax: Employers are required to pay a tax for unemployment insurance
purposes on the wages of all employees. For more information, call the Oregon Employment
Department at 503-947-1488.
• Oregon's Business Identification Number(BIN): is a combined number for both Oregon
Withholding and Unemployment Insurance Tax. To file for a BIN, call 503-945-8091 or go to
hfo://www.oregon.gov/DOR/BUS/docs/211-055.pdf for the appropriate forms.
• Workers Compensation Insurance: Employers are subject to the Oregon Workers Compensation
Law, and must obtain Workers Compensation Insurance for their employees. If you fail to obtain
Workers Compensation Insurance, you could be subject to penalties and be liable for all claim costs
if one of your workers is injured on the job. For more information, call the Workers Compensation
Division at the Department of Consumer and Business Services at 503-947-7815.
• Tax Withholding: Employers must withhold Social Security Tax and Federal Income Tax from
employee wages. You may be liable for the tax payment, even if you didn't actually withhold the tax.
For a Federal EIN number, call the IRS at 1-800-829-4933 or visit their website at www.irs.gov.
Other Responsibilities of Homeowners:
• Code Compliance: As the permit holder for a construction project, the homeowner is responsible
for notifying building officials at the appropriate times, so that the required inspections can be
performed. Homeowners are also responsible for resolving any failure to meet code requirements
that may be found through inspections.
• Property Damage and Liability Insurance: Homeowners acting as their own contractors should
contact their insurance agent to ensure adequate insurance coverage for accidents and omissions,
such as falling tools, paint overspray, water damage from pipe punctures, fire, or work that must be
redone. Liability Insurance must be sufficient to cover injuries to persons on the job site who are not
otherwise covered as employees by Workers Compensation Insurance.
• Expertise: Homeowners should make sure they have the skills to act as their own general
contractor, and the expertise required to coordinate the work of both rough-in and finish trades.
CONSTRUCTION CONTRACTORS BOARD
PO Box 14140, Salem, OR 97309-5052
Telephone: 503-378-4621 —Fax: 503-373-2007
Website Address:www.oreaon.gov/ccb
f/property_owner adopted 9-23-08 This Copy for Permit Applicant