Loading...
Report OFFICE COPY COMcheck Software Version COMcheckWeb 44 ril Interior Lighting Compliance Certif -IVED JUN112021 Project Information CITY OF TIGARD Energy Code: 90.1 (2019) Standard BUILDING DIVISION Project Title: Peloton at Washington Square p,IP LL o 7 /_ a p/3 s Project Type: Addition ✓� 93797/ WA- ' .SQ1 Construction Site: Owner/Agent: Designer/Contractor: 9355 SW Washington Square road One Peloton Thorson Baker and Associates Portland, Oregon 97223 441 Ninth Avenue, Sixth Floor 3030 W Streetsboro Road New York, New York 10001 Richfield, Ohio 44286 979-229-0987 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts/ft2 Watts 1-Main Sales(Retail:Sales Area) 1463 1.05 1536 Allowance: Other retail highlighting/Fix. ID: Cl 1097(a) 0.45 494(b) 2-Secondary Sales(Retail:Sales Area) 495 1.05 520 3-Trial Room 1 (Common Space Types:Office-Enclosed <=250 sq ft) 82 0.74 61 4-Trial Room 2 (Common Space Types:Office-Enclosed <=250 sq ft) 82 0.74 61 5-Trial Room 3 (Common Space Types:Office- Enclosed <=250 sq ft) 103 0.74 76 6-Trial Room 4 (Common Space Types:Office- Enclosed <=250 sq ft) 103 0.74 76 7-Storage closet(Common Space Types:Storage >=50- <=1000 sq.ft.) 55 0.43 24 8-Restroom (Common Space Types:Restrooms) 100 0.63 63 9-BOH (Common Space Types:Storage >=50- <=1000 sq.ft.) 426 0.43 183 I 10-Fitting Room (Retail:Dressing/Fitting Room) 47 0.51 24 Supplemental Allowed Watts(null) = 94 Total Allowed Watts= 3211 (a)Area claimed must not exceed the illuminated area permitted for this allowance type. (b)Allowance is(B x C)or the actual wattage of the fixtures given in Section 2, whichever is less. (c)Supplemental watts must be associated with retail merchandise highlighting fixtures. Supplemental watts are not included calculation of lighting complaince percentage. Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp /Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. 1-Main Sales (Retail:Sales Area) LED: D2: LED Downlight: Other: 1 22 18 396 LED: Cl: Linear Cove: Other: 1 147 4 588 LED: P3: Pendant Fixture: Other: 1 4 17 68 2-Secondary Sales (Retail:Sales Area) LED: D2: LED Downlight: Other: 1 11 18 198 LED: Cl: Linear Cove: Other: 1 32 4 128 LED: P3: Pendant Fixture: Other: 1 1 51 51 3-Trial Room 1 (Common Space Types:Office - Enclosed <=250 sq ft) LED: L7: Linear LED: Other: 1 24 4 96 Project Title: Peloton at Washington Square Report date: 06/07/21 Data filename: Page 1 of 6 A B C D E Fixture ID : Description / Lamp /Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. 4-Trial Room 2 (Common Space Types:Office - Enclosed <=250 sq ft) LED: L7: Linear LED: Other: 1 24 4 96 5-Trial Room 3 (Common Space Types:Office - Enclosed <=250 sq ft) LED: L7: Linear LED: Other: 1 30 4 120 6-Trial Room 4 (Common Space Types:Office - Enclosed <=250 sq ft) LED: L7: Linear LED: Other: 1 30 4 120 7-Storage closet (Common Space Types:Storage >=50 - <=1000 sq.ft.) LED: D2: LED Downlight: Other: 1 4 18 72 8-Restroom (Common Space Types:Restrooms) LED: D3: LED Downlight: Other: 1 4 14 56 LED: P4: Mirror Pendant: Other: 1 1 10 10 9-BOH (Common Space Types:Storage >=50 - <=1000 sq.ft.) LED: L5: LED Flat Panel: Other: 1 15 38 570 10-Fitting Room (Retail:Dressing/Fitting Room) LED: D2: LED Downlight: Other: 1 2 18 36 Total Proposed Watts = 2605 Interior Lighting PASSES: Design 16%better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2019) Standard requirements in COMcheck V. sion COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. ,/�/ Jeff D. Miterko, P.E. 6/9/2021 Name-Title Signature Date Project Title: Peloton at Washington Square Report date: 06/07/21 Data filename: Page 2 of 6 . (II COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 90.1 (2019) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.tD 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be 8.7 determined for the electrical systems ❑Not Observable [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 9.4.3, 9.7 calculations provide all information ❑Does Not [PR4]1 with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Additional Comments/Assumptions: L11High Impact(Tier 1) I Medium Impact(Tier 2) 3 Low Impact(Tier 3) ; Project Title: Peloton at Washington Square Report date: 06/07/21 Data filename: Page 3 of 6 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.lD_ j8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Space type is not private office, open office, or 1[EL10]2 20-Amp receptacles are controlled by ❑Does Not computer classroom. an automatic control device. ❑Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies Requirement will be met. [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In [Not Observable buildings with a digital control system ❑Not Applicable the energy use is transmitted to to control system and displayed graphically. 9.4.1.1 Automatic control requirements ❑Complies Requirement will be met. [EL1]2 prescribed in Table 9.6.1,for the ElDoes Not appropriate space type, are installed. Mandatory lighting controls(labeled ['Not Observable as 'REQ') and optional choice controls ❑Not Applicable (labeled as'ADD1' and 'ADD2')are implemented. 9.4.1.1a Independent lighting controls installed ❑Complies Requirement will be met. [EL2]2 per approved lighting plans and all ❑Does Not manual controls readily accessible and Not Observable visible to occupants. ❑Not Applicable 9.4.1.1b No lighting shall be automatically ❑Complies Exception: Manual on function would endanger safety and [EL26]2 turned on-restriced to manual. ❑Does Not security. ❑Not Observable ❑Not Applicable ------------------------------- 9.4.1.1c <= 50%of general lighting power ❑Complies Requirement will be met. [EL27]2 shall be allowed to be automatically ❑Does Not turned on. ❑Not Observable ❑Not Applicable 9.4.1.1d Bilevel lighting control- <= 50%of ❑Complies Requirement will be met. [EL28]2 general lighting controlled with one ❑Does Not intermediate step between full off and full on. ❑Not Observable ❑Not Applicable 9.4.1.1e Automatic daylight responsive ❑Complies Exception: Retail lighting. [EL29]2 controls for sidelighting >= 150 watts ❑Does Not controlled by photocontrols. ❑Not Observable ElNot Applicable j9.4.1.1f Automatic daylight responsive ❑Complies Exception: Requirement does not apply. [EL30]2 controls for toplighting >= 150 watts ❑Does Not controlled by photocontrols. DNot Observable ❑Not Applicable 9.4.1.1g Automatic partial OFF: lighting shall ❑Complies Requirement will be met. [EL31]2 be reduced >= 50%within 20 minutes ❑Does Not of zero occupancy. [Not Observable ❑Not Applicable 9.4.1.1h Automatic full OFF: lighting shall be ❑Complies Exception: General lighting and task lighting in spaces where [EL32]2 shut off within 20 minutes of zero ❑Does Not automatic shutoff would endanger the safety or security of occupancy. room or building occupants. ❑Not Observable ❑Not Applicable 9.4.1.1i Scheduled shutoff: all lighting shall be ❑Complies Requirement will be met. [EL33]2 shut off when scheduled to be ❑Does Not unoccupied. [Not Observable ❑Not Applicable 1 !High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Peloton at Washington Square Report date: 06/07/21 Data filename: Page 4 of 6 Section # Rough-in Electrical Inspection Complies? Comments/Assumptions & Req.IDI j I 9.4.1.3 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ['Not Observable separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) TiLow Impact(Tier 3) J Project Title: Peloton at Washington Square Report date: 06/07/21 Data filename: Page 5 of 6 . " Section � Final Inspection Complies? [ Comments/Assumptions &Req.^D 8.7.1 Furnished as-built drawings for LJComp|ies Requirement will Uemet. [F|15]3 electric power systems within]Odays []Does Not or system acceptance, []No,ObsemaU|e []Not Applicable 8J.2 Furnished O&M instructions for []Complies Requirement will be met. [R17]3 systems and equipment,othe []ooesmm � building owner o,designated representative. []mo'ObservaNe []wotxpp|icab|e � ---Interior installed lamp and fixture []Compx —� es ~~the Interior Lighting fixture schedule for values. � [n18]1 lighting power isconsistent with what []Dueswot is shown on the approved lighting plans, demonstrating pm' ed a�s []mot0bservaU|e are less than n/equal toallowed []mo,App|icab|e watts. 9.4.4 A,least 75%of all permanently []Complies Requirement will Uemet. [p120]/ installed lighting fixtures mdwelling []onesmm units have ^~ nx |m/W efficacyra ->~ 45 |m/Wtota| |uminaie efficacy. []motObservable []motApp|icaU|e Additional Comments/Assumptions: h k�nh Inpact(TlerI) Impact ] Low — Project Title: Pe|oton at Washington Square Report date: 06/ 7/2l Data filename: Page 6 or 6