Report AfiCOMcheck Software Version 4.1.5.1
Interior Lighting Compliance Certificate
ie27 2s RECEIVED
Project Information �6'a Gtfi9-sCl2/Z ppR 1 '''''`
Energy Code: 90.1 (2016) Standard 4 1/ OF TIGa\B=)
Project Title: Warby Parker Washington Square Cr DwISnI\.
Project Type: Alteration SUILD'NG
Construction Site: Owner/Agent: Designer/Contractor:
9640 SW. Washington Sq Rd T Mobile Don Penn, P.E.
Space G11 Don Penn Consulting Engineer
Tigard, OR 97223 1301 Solana Blvd., Bldg. 1
Suite 1420
Westlake,TX 76262
817.410.2858
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
1-SALES(Retail:Sales Area) 1089 1.22 1329
2-EXAM/PRE EXAM(Healthcare Facility:Exam/Treatment) 180 1.68 302
3-MGR OFFICE(Common Space Types:Office-Enclosed) 54 0.93 50
4-BOH(Common Space Types:Storage>=50-<=1000 sq.ft.) 109 0.46 50
5-RR(Common Space Types:Restrooms) 64 0.85 54
6-WAIT ROOM(Common Space Types:Lobby-General) 47 1.00 47
Total Allowed Watts= 1833
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
SALES(Retail:Sales Area 1089 sq.ft.)
L3:L3:Globe Light:Other: 1 15 19 285
L8:Triple Downlight:Other: 2 21 18 378
L11:L11:Recessed Downlight:LED Panel 38W: 1 5 22 110
EM:EM:Other: 2 4 50 200
L-22:Other: 1 15 10 150
EXAM/PRE EXAM ( Healthcare Facility:Exam/Treatment 180 sq.ft.)
L11:L11:Recessed Downlight:LED Panel 38W: 1 5 22 110
EM:EM:Other: 2 2 50 100
MGR OFFICE (Common Space Types:Office-Enclosed 54 sq.ft.)
L7:L7:2 x 2 Panel:Other: 1 1 32 32
BOH (Common Space Types:Storage>=50-<=1000 sq.ft. 109 sq.ft.).
L7:L7:2 x 2 Panel:Other: 1 6 32 192
RR (Common Space Types:Restrooms 64 sq.ft.)
L7:L7:2 x 2 Panel:Other: 1 1 32 32
Project Title: Warby Parker Washington Square Report date: 04/01721
Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 1 of 7
Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck
j
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
WAIT ROOM (Common Space Types:Lobby-General 47 sq.ft.)
L11:L11:Recessed Downlight:LED Panel 38W: 1 1 22 22
EM:EM:Other: 2 1 50 50
Total Proposed Watts= 1661
nterior Lighting PASSES
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.1 and to comply with
any applicable mandatory requirements listed in the Inspection heckli .
P.s . 4(111'01A
Name- tTi le Signature Date
col) PROpk:o
ir_ srGINE%c9 /�2
188 E S.
\ O OREGON 2
40 JAMES
Exp.611.. ..
Project Title: Warby Parker Washington Square Report date: 04/01/21
Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 2 of 7
Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck
riftCOMcheck Software Version 4.1.5.1
i.
II Mechanical Compliance Certificate
Project Information
Energy Code: 90.1 (2016) Standard
Project Title: Warby Parker Washington Square
Location: Tigard,Oregon
Climate Zone: 4c
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
9640 SW. Washington Sq Rd T Mobile Don Penn, P.E.
Space Gil Don Penn Consulting Engineer
Tigard, OR 97223 1301 Solana Blvd., Bldg. 1
Suite 1420
Westlake,TX 76262
817.410.2858
Mechanical Systems List
Quantity System Type&Description
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.1 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
ter., 'QM%rb ?.�. ii1iI1•0tii
Name-Title Signature Date
�s o PR()rex,
kN(i►NEF9 /,D�Sr
irlti 96 s-
.
O OREGON Z
0
1/ 01/2.00 ems14,
Exp. IA %Itiv
Project Title: Warby Parker Washington Square Report date: 04/01/21
Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 3 of 7
Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck
lie COMcheck Software Version 4.1.5.1
Inspection Checklist
Energy Code: 90.1 (2016) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
4.2.2, Plans,specifications, and/or ❑Complies Requirement will be met.
8.4.1.1, calculations provide all information ['Does Not
8.4.1.2, with which compliance can be ❑Not Observable Location on plans/spec: E301
8.7 determined for the electrical systems
[PR6]Z and equipment and document where ❑Not Applicable
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
9.4.3, 9.7 calculations provide all information ❑Does Not
[PR4]i with which compliance can be [Not Observable Location on plans/spec: E-201, E-101
determined for the interior lighting
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3)
Project Title: Warby Parker Washington Square Report date: 04/01/21
Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 4 of 7
Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck
Section
Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
8.4.2 At least 50% of all 125 volt 15-and Complies Exception: Receptacles intended for 24 hour operation of
[EL1012 20-Amp receptacles are controlled by ❑Does Not equipment.
an automatic control device.
❑Not Observable
❑Not Applicable
8.4.3 New buildings have electrical energy ❑Complies Exception: Buildings 25,000 ft2.
[EL11]2 use measurement devices installed. ❑Does Not
Where tenant spaces exist, each
tenant is monitored separately. In ['Not Observable
buildings with a digital control system ❑Not Applicable
the energy use is transmitted to to
control system and displayed
graphically.
9.4.1.1 Automatic control requirements ❑Complies Requirement will be met.
[EL1]2 prescribed in Table 9.6.1,for the ❑Does Not
appropriate space type, are installed. Location on plans/spec: E-201
Mandatory lighting controls (labeled
as 'REQ') and optional choice controls ❑Not Applicable
(labeled as 'ADD1' and 'ADD2') are
implemented.
9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met.
[EL2]2 per approved lighting plans and all Does Not
manual controls readily accessible and ❑Not Observable Location on plans/spec: E-201
visible to occupants.
❑Not Applicable
9.4.1.1f Daylight areas under skylights and EComplies Exception: Requirement does not apply.
[EL13]1 roof monitors that have more than ❑Does Not
150 W combined input power for
general lighting are controlled by ❑Not Observable
photocontrols. ❑Not Applicable
9.4.1.3 Separate lighting control devices for ❑Complies Requirement will be met.
[EL4]1 specific uses installed per approved ❑Does Not
lighting plans. Location on plans/spec: E-201
❑Not Observable
❑Not Applicable
9.6.2 Additional interior lighting power ❑Complies Requirement will be met.
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is ❑Not Observable Location on plans/spec: E-201
automatically controlled and
separated from general lighting. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Warby Parker Washington Square Report date: 04/01/21
Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 5 of 7
Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
8.7.1 Furnished as-built drawings for ❑Complies Requirement will be met.
[F116]3 electric power systems within 30 days ❑Does Not
of system acceptance. "Not Observable Location on plans/spec: E111, E112, E301
❑Not Applicable
8.7.2 Furnished O&M instructions for ❑Complies Requirement will be met.
[F117)3 systems and equipment to the ❑Does Not
building owner or designated
representative. ❑Not Observable
❑Not Applicable
9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values.
[FI18]1 lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts [Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
9.4.4 At least 75% of all permanently ❑Complies Exception: Requirement does not apply.
[FI20]1 installed lighting fixtures in dwelling ❑Does Not
units have >= 55 Im/W efficacy or a
>= 45 Im/W total luminaire efficacy. ['Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Warby Parker Washington Square Report date: 04/01/21
Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 6 of 7
Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck
Project Title: Warby Parker Washington Square Report date: 04/01/21
Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 7 of 7
Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck