Loading...
Report AfiCOMcheck Software Version 4.1.5.1 Interior Lighting Compliance Certificate ie27 2s RECEIVED Project Information �6'a Gtfi9-sCl2/Z ppR 1 '''''` Energy Code: 90.1 (2016) Standard 4 1/ OF TIGa\B=) Project Title: Warby Parker Washington Square Cr DwISnI\. Project Type: Alteration SUILD'NG Construction Site: Owner/Agent: Designer/Contractor: 9640 SW. Washington Sq Rd T Mobile Don Penn, P.E. Space G11 Don Penn Consulting Engineer Tigard, OR 97223 1301 Solana Blvd., Bldg. 1 Suite 1420 Westlake,TX 76262 817.410.2858 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-SALES(Retail:Sales Area) 1089 1.22 1329 2-EXAM/PRE EXAM(Healthcare Facility:Exam/Treatment) 180 1.68 302 3-MGR OFFICE(Common Space Types:Office-Enclosed) 54 0.93 50 4-BOH(Common Space Types:Storage>=50-<=1000 sq.ft.) 109 0.46 50 5-RR(Common Space Types:Restrooms) 64 0.85 54 6-WAIT ROOM(Common Space Types:Lobby-General) 47 1.00 47 Total Allowed Watts= 1833 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. SALES(Retail:Sales Area 1089 sq.ft.) L3:L3:Globe Light:Other: 1 15 19 285 L8:Triple Downlight:Other: 2 21 18 378 L11:L11:Recessed Downlight:LED Panel 38W: 1 5 22 110 EM:EM:Other: 2 4 50 200 L-22:Other: 1 15 10 150 EXAM/PRE EXAM ( Healthcare Facility:Exam/Treatment 180 sq.ft.) L11:L11:Recessed Downlight:LED Panel 38W: 1 5 22 110 EM:EM:Other: 2 2 50 100 MGR OFFICE (Common Space Types:Office-Enclosed 54 sq.ft.) L7:L7:2 x 2 Panel:Other: 1 1 32 32 BOH (Common Space Types:Storage>=50-<=1000 sq.ft. 109 sq.ft.). L7:L7:2 x 2 Panel:Other: 1 6 32 192 RR (Common Space Types:Restrooms 64 sq.ft.) L7:L7:2 x 2 Panel:Other: 1 1 32 32 Project Title: Warby Parker Washington Square Report date: 04/01721 Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 1 of 7 Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck j A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. WAIT ROOM (Common Space Types:Lobby-General 47 sq.ft.) L11:L11:Recessed Downlight:LED Panel 38W: 1 1 22 22 EM:EM:Other: 2 1 50 50 Total Proposed Watts= 1661 nterior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory requirements listed in the Inspection heckli . P.s . 4(111'01A Name- tTi le Signature Date col) PROpk:o ir_ srGINE%c9 /�2 188 E S. \ O OREGON 2 40 JAMES Exp.611.. .. Project Title: Warby Parker Washington Square Report date: 04/01/21 Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 2 of 7 Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck riftCOMcheck Software Version 4.1.5.1 i. II Mechanical Compliance Certificate Project Information Energy Code: 90.1 (2016) Standard Project Title: Warby Parker Washington Square Location: Tigard,Oregon Climate Zone: 4c Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 9640 SW. Washington Sq Rd T Mobile Don Penn, P.E. Space Gil Don Penn Consulting Engineer Tigard, OR 97223 1301 Solana Blvd., Bldg. 1 Suite 1420 Westlake,TX 76262 817.410.2858 Mechanical Systems List Quantity System Type&Description Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. ter., 'QM%rb ?.�. ii1iI1•0tii Name-Title Signature Date �s o PR()rex, kN(i►NEF9 /,D�Sr irlti 96 s- . O OREGON Z 0 1/ 01/2.00 ems14, Exp. IA %Itiv Project Title: Warby Parker Washington Square Report date: 04/01/21 Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 3 of 7 Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck lie COMcheck Software Version 4.1.5.1 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans,specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ['Does Not 8.4.1.2, with which compliance can be ❑Not Observable Location on plans/spec: E301 8.7 determined for the electrical systems [PR6]Z and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 9.4.3, 9.7 calculations provide all information ❑Does Not [PR4]i with which compliance can be [Not Observable Location on plans/spec: E-201, E-101 determined for the interior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Warby Parker Washington Square Report date: 04/01/21 Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 4 of 7 Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50% of all 125 volt 15-and Complies Exception: Receptacles intended for 24 hour operation of [EL1012 20-Amp receptacles are controlled by ❑Does Not equipment. an automatic control device. ❑Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies Exception: Buildings 25,000 ft2. [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ['Not Observable buildings with a digital control system ❑Not Applicable the energy use is transmitted to to control system and displayed graphically. 9.4.1.1 Automatic control requirements ❑Complies Requirement will be met. [EL1]2 prescribed in Table 9.6.1,for the ❑Does Not appropriate space type, are installed. Location on plans/spec: E-201 Mandatory lighting controls (labeled as 'REQ') and optional choice controls ❑Not Applicable (labeled as 'ADD1' and 'ADD2') are implemented. 9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met. [EL2]2 per approved lighting plans and all Does Not manual controls readily accessible and ❑Not Observable Location on plans/spec: E-201 visible to occupants. ❑Not Applicable 9.4.1.1f Daylight areas under skylights and EComplies Exception: Requirement does not apply. [EL13]1 roof monitors that have more than ❑Does Not 150 W combined input power for general lighting are controlled by ❑Not Observable photocontrols. ❑Not Applicable 9.4.1.3 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. Location on plans/spec: E-201 ❑Not Observable ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is ❑Not Observable Location on plans/spec: E-201 automatically controlled and separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Warby Parker Washington Square Report date: 04/01/21 Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 5 of 7 Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck Section # Final Inspection Complies? Comments/Assumptions & Req.ID 8.7.1 Furnished as-built drawings for ❑Complies Requirement will be met. [F116]3 electric power systems within 30 days ❑Does Not of system acceptance. "Not Observable Location on plans/spec: E111, E112, E301 ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies Requirement will be met. [F117)3 systems and equipment to the ❑Does Not building owner or designated representative. ❑Not Observable ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts [Not Observable are less than or equal to allowed ❑Not Applicable watts. 9.4.4 At least 75% of all permanently ❑Complies Exception: Requirement does not apply. [FI20]1 installed lighting fixtures in dwelling ❑Does Not units have >= 55 Im/W efficacy or a >= 45 Im/W total luminaire efficacy. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Warby Parker Washington Square Report date: 04/01/21 Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 6 of 7 Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck Project Title: Warby Parker Washington Square Report date: 04/01/21 Data filename: R:\Warby Parker\Tricarico 2021\21-031-06.WP.Washington Square.Tigard.OR\Design\Energy Page 7 of 7 Calc\WP-Washington Square.Tigard,OR-Ashrae-90.1-2016.cck