Loading...
Report N , OFFICE COPY COMcheck Software Version 4.1.5.1 Afii rA Interior Lighting Compliance Certificate B1P1 O2/- Ov OG2- Project Information /�/� Energy Code: 90.1 (2016)Standard Q3 T O Sul l&4 S6?i - " Project Title: SUNGLASS HUT Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: WASHINGTON SQUARE THORSON BAKER +ASSOCIATES TIGARD, OR 3030 W STREETSBORO RD RICHFIELD, OH 44286 330.659.6688 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Sales Area(Retail:Sales Area) 859 1.22 1048 Allowance:Other retail highlighting/Fix. ID:e1/e2/e3 400(a) 0.45 180(b) 2-BOH(Common Space Types:Storage>=50-<=1000 sq.ft.) 108 0.46 50 3-Restroom(Common Space Types:Restrooms) 63 0.85 54 Supplemental Allowed Watts(null)= 497 Total Allowed Watts= 1828 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less. (c)Supplemental watts must be associated with retail merchandise highlighting fixtures. Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Sales Area(Retail:Sales Area 859 soft) Track lighting-Sales:e1/e2/e3:20W Track Heads-8A CL: Wattage based on current limiting 0 0 960 960 device capacity Track lighting-Storefront:e1/e2/e3:20W Track Heads-2A CL: Wattage based on current 0 0 240 Exempt limiting device capacity Exemption:Retail Display Window LED:m2/m3:2 Head Downlights:Other: 2 22 37 814 BOH (Common Space Types:Storage>=50-<=1000 sgft. 108 sgft.). Linear Fluorescent:SS4:4 ft.Strip:48"T8 32W:Electronic: 1 2 17 34 Restroom(Common Space Tyoes:Restrooms 63 so.ft) LED:A2L:2x2 Recessed:Other: 1 1 20 20 Total Proposed Watts= 1828 Project Title: SUNGLASS HUT Report date: 02/12/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 1 of 6 COMCHECK.cck 0. Interior Lighting : Passes using retail merchandise highlighting supplemental watts. Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project -presented in this document is consistent with the building plans, specifications, and other calculations submitted with th.• .•rmit application.The proposed interior lighting systems have been designed to meet the 90.1 (2016)Standard requ. - .ents in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Ch• .t. S,f-F it• Aiez Eer1(o Q.E . L � 7312% Name-Title , Signature P' Date PROFEsei 1 15587PE�g' � OREGON E p rd. : 1?.-I31/2Z Project Title: SUNGLASS HUT Report date: 02/12/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 2 of 6 COMCHECK.cck . COMcheck Software Version 4.1.5.1 1 r i Inspection Checklist Energy Code: 90.it 1 (2016) Standard Requirements: 20.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ElDoes Not 8.4.1.2, with which compliance can be 8.7 determined for the electrical systems ['Not Observable [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 9.4.3, 9.7 calculations provide all information ❑Does Not [PR4]1 with which compliance can be ❑Not Observable determined for the interior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/12/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 3 of 6 COMCHECK.cck • Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Space type is not private office, open office, or [EL10]2 20-Amp receptacles are controlled by ❑Does Not computer classroom. an automatic control device. ❑Not Observable ENot Applicable 8.4.3 New buildings have electrical energy ❑Complies Exception: Individual tenant spaces less than 10,000 ft2. [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ENot Observable buildings with a digital control system ENot Applicable the energy use is transmitted to to control system and displayed graphically. 9.4.1.1 Automatic control requirements EComplies Requirement will be met. [EL1]2 prescribed in Table 9.6.1,for the ❑Does Not appropriate space type, are installed. Mandatory lighting controls(labeled ❑Not Observable as'REQ') and optional choice controls ❑Not Applicable (labeled as'ADD1' and 'ADD2') are implemented. 9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met. [EL2]2 per approved lighting plans and all ❑Does Not manual controls readily accessible and visible to occupants. ENot Observable ❑Not Applicable 9.4.1.1f :Daylight areas under skylights and ,❑Complies Exception: Requirement does not apply. [EL13]i roof monitors that have more than ❑Does Not 150 W combined input power for general lighting are controlled by ['Not Observable photocontrols. ❑Not Applicable 9.4.1.3 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ENot Observable ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies Requirement will be met. [EL8]i allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and Not Observable separated from general lighting. ENot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2`.Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/12/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 4 of 6 COMCHECK.cck Section # Final Inspection Complies? Comments/Assumptions & Req.ID 8.7.1 Furnished as-built drawings for ❑Complies Requirement will be met. [FI16]3 electric power systems within 30 days ❑Does Not of system acceptance. ❑Not Observable ENot Applicable 8.7.2 Furnished O&M instructions for ❑Complies Requirement will be met. [FI17]3 systems and equipment to the ❑Does Not building owner or designated representative. Not Observable ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [F118]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ['Not Observable are less than or equal to allowed ❑Not Applicable watts. 9.4.4 At least 75%of all permanently ❑Complies Requirement will be met. [F120]1 installed lighting fixtures in dwelling ❑Does Not units have >= 55 Im/W efficacy or a >= 45 Im/W total luminaire efficacy. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/12/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 5 of 6 COMCHECK.cck Project Title: SUNGLASS HUT Report date: 02/12/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 6 of 6 COMCHECK.cck . OFFICE COPY IPACOMcheck Software Version 4.1.5.1 A4 Mechanical Compliance Certificate Project Information /3C1f2 o2/- Od q 2_ Energy Code: 90.1 (2016)Standard Project Title: SUNGLASS HUT Location: Tigard, Oregon Climate Zone: 4c Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: WASHINGTON SQUARE THORSON BAKER +ASSOCIATES TIGARD, OR 3030 W STREETSBORO RD RICHFIELD, OH 44286 330.659.6688 Mechanical Systems List Quantity System Type&Description 1 AHU-1 Heating: 1 each-Central Furnace,Electric,Capacity= 17 kBtu/h No minimum efficiency requirement applies Cooling: 1 each-Hydronic Coil,Capacity=49 kBtu/h No minimum efficiency requirement applies Fan System: FAN SYSTEM 1 --Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Constant Volume, 1400 CFM, 1.0 motor nameplate hp,80.0 fan efficiency grade SYSTEM VERIFICATION REQUIRED. Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been design d to eet the 90.1 (2016) Standard requirements in COMch Version 4.1.5.1 and to comply with any applicable man a ry equi s listed in the Inspection Checklist. A l /r_________ N m -Title S. e D e c�`t) PRD,rFs <"�cacc,G1PFF.sfQ/- E" 90092PE OREGON ,� 241`N10 2��� -1NIE EXPIRES: 613017.1 RENEWS: Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 1 of 10 COMCHECK.cck i COMcheck Software Version 4.1.5.1 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 6.4.4.2.1, calculations provide all information ❑Does Not 6.7.2 with which compliance can be [PR2]1 determined for the mechanical ❑Not Observable systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be 8.7 determined for the electrical systems ❑Not Observable [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 6.7.2.4 Detailed instructions for HVAC ❑Complies Exception: Requirement does not apply. [PR5]1 systems commissioning included on ❑Does Not the plans or specifications for projects ❑Not Observable >=50,000 ft2. ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 2 of 10 COMCHECK.cck Section Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.7 Freeze protection and snow/ice ❑Complies Exception: Requirement does not apply. [FO9]3 melting system sensors for future ❑Does Not connection to controls. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 3 of 10 COMCHECK.cck Section Mechanical Rough-In Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions & Req.ID 6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: ❑Complies See the Mechanical Systems list 6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values. [ME1]2 equipment labeled as meeting 90.1. ENot Observable ENot Applicable 6.4.3.4.1 Stair and elevator shaft vents ;❑Complies Exception: Requirement [ME3]3 have motorized dampers that • ,EDoes Not does not apply. automatically close. ❑Not Observable � ' '❑Not Applicable 6.4.3.4.2, Outdoor air and exhaust systems , „❑Complies Requirement will be met. 6.4.3.4.3 have motorized dampers that f- ❑Does Not [ME413 automatically shut when not in use and meet maximum leakage G Not Observable rates. Check gravity dampers ❑Not Applicable where allowed. 6.4.3.4.5 Enclosed parking garage ❑Complies Exception: Requirement [ME39]3 ventilation has automatic ❑Does Not does not apply. contaminant detection and capacity to stage or modulate ❑Not Observable fans to 50%or less of design ❑Not Applicable capacity. 6.4.3.4.4 Ventilation fans >0.75 hp have '❑Complies Exception: HVAC systems [ME5]3 automatic controls to shut off fan ElDoes Not intended to operate when not required. ['Not Observable continuously. ❑Not Applicable 6.4.3.8 Demand control ventilation ?❑Complies Exception: Systems with a [ME6]1 provided for spaces>500 ft2 and ❑Does Not design outdoor airflow less >25 people/1000 ft2 occupant ❑Not Observable than 1200 cfm. density and served by systems with air side economizer, auto ❑Not Applicable modulating outside air damper control, or design airflow>3,000 cfm. 6.5,3.2.1 DX cooling systems >= 75 kBtu/h ❑Complies Exception: Requirement [ME40]2 (>= 65 kBtu/h effective 1/2016) ❑Does Not does not apply. and chilled-water and evaporative cooling fan motor hp ❑Not Observable See the Mechanical Systems list >= 1/3 designed to vary supply ❑Not Applicable for values. fan airflow as a function of load and comply with operational requirements. 6.4.4.1.1 Insulation exposed to weather '❑Complies Requirement will be met. [ME7]3 protected from damage. ❑Does Not Insulation outside of the conditioned space and associated ❑Not Observable with cooling systems is vapor ❑Not Applicable retardant. 6,4.4.1.2 '.HVAC ducts and plenums R- R- ❑Complies Requirement will be met. [ME8]2 insulated per Table 6.8.2. Where ❑Does Not ducts or plenums are installed in or under a slab, verification may ❑Not Observable need to occur during Foundation ❑Not Applicable Inspection. 6.4.4.1.3 'HVAC piping insulation thickness. in. in. ❑Complies Exception: Requirement [ME9]2 Where piping is installed in or ❑Does Not does not apply. under a slab,verification may need to occur during Foundation ENot Observable Inspection. ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 4 of 10 COMCHECK.cck Section Mechanical Rou h-In Plans Verified Field Verified Inspection Value Value Complies? Comments/Assumptions &Req.ID 6.4.4.1.4 Thermally ineffective panel ;❑Complies Exception: Requirement [ME41]3 surfaces of sensible heating "' ❑Does Not does not apply. panels have insulation >= R-3.5. � ; ❑Not Observable , ` ❑Not Applicable 6.4.4.2.1 Ducts and plenums having r '❑Complies Requirement will be met. [ME10]2 pressure class ratings are Seal ❑Does Not Class A construction. ; ❑Not Observable ❑Not Applicable 6.8.1-15, Electrically operated DX-DOAS '❑Complies Exception: Requirement 6.8.1-16 units meet requirements per : ;❑Does Not does not apply. [ME110)2 Tables 6.8.1-15 or 6.8.1-16. ❑Not Observable IDNot Applicable 6.4.4.2.2 Ductwork operating >3 in. water `", ❑Complies Exception: Requirement [ME11]3 column requires air leakage • "4„. a❑Does Not does not apply. testing. ❑Not Observable ❑Not Applicable 6.5.2.2.1 Three-pipe hydronic systems ❑Complies Requirement will be met. [ME50]2 using a common return for hot ❑Does Not and chilled water are not used. ❑Not Observable ❑Not Applicable 6.5.2.3 Dehumidification controls "❑Complies Exception: Cooling capacity [ME19]3 provided to prevent reheating, y ❑Does Not 40 kBtu/h. recooling, mixing of hot and cold ; • airstreams or concurrent heating Not Observable and cooling of the same ,❑Not Applicable airstream. 6.5.2.4.1 Humidifiers with airstream ❑Complies Exception: Requirement [ME68]3 mounted preheating jackets have ;f❑Does Not does not apply. preheat auto-shutoff value set to activate when humidification is ,, ❑Not Observable not required. • r ❑Not Applicable 6.5.2.4.2 Humidification system dispersion x '❑Complies Exception: Requirement (ME69]3 tube hot surfaces in the i❑Does Not does not apply. airstreams of ducts or air- handling units insulated >= R- ❑Not Observable 0.5. ❑Not Applicable 6.5.2.5 Preheat coils controlled to stop 3,❑Complies Requirement will be met. [ME70]3 heatc output whenever , , Ad.❑Does Not mechanical cooling, including ~ `` .`; �'❑Not Observable economizer operation, is active. ❑Not Applicable 6.5.2.6 Units that provide ventilation air ❑Complies Exception: Requirement [ME106]3 to multiple zones and operate in • ❑Does Not does not apply. conjunction with zone heating 443431 ❑Not Observable and cooling systems are ' ❑Not Applicable prevented from using heating or heat recovery to warm supply air ,above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling. , 6.5.4.7 Chilled-water cooling coils '❑Complies Requirement will be met. [ME107]3 provide a 15°F or higher ;43 ' b ❑Does Not temperature difference between cleaving and entering water ., ❑Not Observable temperatures and a minimum of : ❑Not Applicable 57°F leaving water temperature at design conditions 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 5 of 10 COMCHECK.cck Section Mechanical Rough-In Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions & Req.ID 6.5.3.6 Motors for fans >= 1/12 hp and ❑Complies Exception: Requirement [ME72]2 < 1 hp are electronically- ❑Does Not does not apply. commutated motors or have a • minimum motor efficiency of :Not Observable 70%.These motors are also ❑Not Applicable speed adjustable for either balancing or remote control. 6.5.3.4 Parallel-flow fan-powered VAV air • ❑Complies .Exception: Requirement [ME108]2 terminals have automatic • ❑Does Not does not apply. controls to a)turn off the terminal fan except when space ❑Not Observable heating is required or if required ❑Not Applicable for ventilation; b)turn on the terminal fan as the first stage of heating before the heating coil is activated; and c)during heating for warmup or setback temperature control, either operate the terminal fan and heating coil without primary air or reverse the terminal damper logic and provide heating from the central air handler through primary air. 6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met. [ME109]2 rate is the larger of minimum =❑Does Not outdoor air rate or minimum exhaust air rate required by ❑Not Observable Standard 62.1, Standard 170, or ❑Not Applicable applicable codes or accreditation standards. Outdoor air ventilation systems shall comply with one of the following: a) design minimum system outdoor air provided < 135%of the required minimum outdoor air rate, b) dampers, ductwork, and controls allow the system to supply<=the required minimum outdoor air rate with a single set-point adjustment.,or c) system includes exhaust air energy recovery complying with Section • 6.5.6.1. 6.5.3.3 Multiple zone VAV systems with •❑Complies Exception: Requirement [ME42]3 DDC of individual zone boxes ❑Does Not does not apply. have static pressure setpoint reset controls. ❑Not Observable See the Mechanical Systems list ❑Not Applicable for values. 6.5.4.2 HVAC pumping systems with >— ❑Complies Exception: Requirement [ME25]3 3 control values designed for ❑Does Not does not apply. variable fluid flow (see section �� ❑Not Observable details). "' ❑Not Applicable 6.5.4.3, Fluid flow shutdown in pumping ❑Complies Requirement will be met. 6.5.4.3.1, systems to multiple chillers or +❑Does Not 6.5.4.3.2 boilers when systems are shut [ME26]3 down. rr r � '❑Not Observable itlDNot Applicable 6.5.6.1 Exhaust air energy recovery on ` -3❑Complies Exception: Requirement [ME56]1 systems meeting Tables 6.5.6.1- !❑Does Not does not apply. 1, and 6.5.6.1-2. ❑Not Observable ❑Not Applicable 1 I High Impact(Tier 1) 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 6 of 10 COMCHECK.cck Section Mechanical Rough-In Plans Verified Field Verified , # Inspection Value Value Complies. Comments/Assumptions &Req.1D 6.5.6.2 Condenser heat recovery system ❑Complies Exception:Total installed [ME31]3 that can heat water to 85°F or ❑Does Not heat capacity of water cooled provide 60%of peak heat systems = 6 MMBtu/h of heat rejection is installed for ['Not Observable rejection. preheating of service hot water. ❑Not Applicable 6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met. [ME100]2 with mechanical exhaust <= the ❑Does Not greater of criteria of supply flow, • required ventilation rate, exhaust f Not Observable flow minu the available transffer ' ` ❑Not Applicable air(see section details). 6.5.7.2.1 Kitchen hoods >5,000 cfm have ❑Complies Exception: Requirement [ME32]2 make up air>=50%of exhaust ❑Does Not does not apply. air volume. ENot Observable ❑Not Applicable 6.5.7.2.4 Approved field test used to ❑Complies Exception: Requirement [ME49]3 evaluate design air flow rates j❑Does Not does not apply. and demonstrate proper capture and containment of kitchen ❑Not Observable exhaust systems. '❑Not Applicable 6.5.8.1 Unenclosed spaces that are ❑Complies Exception: Requirement [ME34]2 heated use only radiant heat. EDoes Not does not apply. ❑Not Observable -' ❑Not Applicable r,3 6.4.3.9 Heating for vestibules and air ❑Complies Exception: Requirement [ME63]2 curtains with integral heating :❑Does Not does not apply. include automatic controls that shut off the heating system when ENot Observable outdoor air temperatures>45F. ❑Not Applicable Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <=60F and cooling setpoint>= 80F. 6.5.10 Doors separating conditioned $ , ❑Complies Exception: Alteration [ME73]3 space from the outdoors have , ,.❑Does Not project to existing building. controls that disable/reset 1,'< heating and cooling system when ❑Not Observable open. ' Not Applicable Additional Comments/Assumptions: 1 'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 it Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 7 of 10 COMCHECK.cck Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Space type is not private office, open office, or [EL10]z 20-Amp receptacles are controlled by ❑Does Not computer classroom. an automatic control device. ['Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies Exception: Individual tenant spaces less than 10,000 ft2. [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ❑Not Observable buildings with a digital control system ❑Not Applicable the energy use is transmitted to to control system and displayed graphically. 10.4.1 Electric motors meet requirements ❑Complies Requirement will be met. [EL9]2 where applicable. ❑Does Not [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 8 of 10 COMCHECK.cck Section Final Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies Requirement will be met. [FI3]3 deadband. ❑Does Not ['Not Observable ❑Not Applicable 6.4.3.2 Temperature controls have setpoint ❑Complies Requirement will be met. [F120]3 overlap restrictions. ❑Does Not ['Not Observable ❑Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ❑Complies Exception: Systems designed for continuous operation. [FI21]3 one automatic shutdown control. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.3.2 .Setback controls allow automatic ❑Complies Exception: Systems designed for continuous operation. [F122]3 restart and temporary operation as ❑Does Not required for maintenance. ❑Not Observable ❑Not Applicable 6.4.3.6 When humidification and ❑Complies Requirement will be met. [F16]3 dehumidification are provided to a ❑Does Not zone, simultaneous operation is prohibited. Humidity control prohibits ['Not Observable the use of fossil fuel or electricity to ❑Not Applicable produce RH > 30%in the warmest zone humidified and RH < 60% in the coldest zone dehumidified. 6.7.2.1 Furnished HVAC as-built drawings ❑Complies Requirement will be met. [F17)3 submitted within 90 days of system ❑Does Not acceptance. [Not Observable ❑Not Applicable 6.7.2.2 Furnished O&M manuals for HVAC ❑Complies Requirement will be met. [F18]3 systems within 90 days of system ❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.3 An air and/or hydronic system ❑Complies Exception: Requirement does not apply. [F19]' balancing report is provided for HVAC ❑Does Not systems serving zones >5,000 ft2 of conditioned area. ['Not Observable ❑Not Applicable 6.7.2.4 HVAC control systems have been ❑Complies Requirement will be met. [F110]1 tested to ensure proper operation, ❑Does Not calibration and adjustment of controls. ❑Not Observable ❑Not Applicable 10.4.3 Elevators are designed with the ❑Complies Exception: Requirement does not apply. [FI24]2 proper lighting, ventilation power, and ❑Does Not standby mode. [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 9 of 10 COMCHECK.cck Project Title: SUNGLASS HUT Report date: 02/22/21 Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 10 of 10 COMCHECK.cck