Report N ,
OFFICE COPY
COMcheck Software Version 4.1.5.1
Afii rA
Interior Lighting Compliance Certificate
B1P1 O2/- Ov OG2-
Project Information /�/�
Energy Code: 90.1 (2016)Standard Q3 T O Sul l&4 S6?i - "
Project Title: SUNGLASS HUT
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
WASHINGTON SQUARE THORSON BAKER +ASSOCIATES
TIGARD, OR 3030 W STREETSBORO RD
RICHFIELD, OH 44286
330.659.6688
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
1-Sales Area(Retail:Sales Area) 859 1.22 1048
Allowance:Other retail highlighting/Fix. ID:e1/e2/e3 400(a) 0.45 180(b)
2-BOH(Common Space Types:Storage>=50-<=1000 sq.ft.) 108 0.46 50
3-Restroom(Common Space Types:Restrooms) 63 0.85 54
Supplemental Allowed Watts(null)= 497
Total Allowed Watts= 1828
(a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified.
(b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less.
(c)Supplemental watts must be associated with retail merchandise highlighting fixtures.
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Sales Area(Retail:Sales Area 859 soft)
Track lighting-Sales:e1/e2/e3:20W Track Heads-8A CL: Wattage based on current limiting 0 0 960 960
device capacity
Track lighting-Storefront:e1/e2/e3:20W Track Heads-2A CL: Wattage based on current 0 0 240 Exempt
limiting device capacity
Exemption:Retail Display Window
LED:m2/m3:2 Head Downlights:Other: 2 22 37 814
BOH (Common Space Types:Storage>=50-<=1000 sgft. 108 sgft.).
Linear Fluorescent:SS4:4 ft.Strip:48"T8 32W:Electronic: 1 2 17 34
Restroom(Common Space Tyoes:Restrooms 63 so.ft)
LED:A2L:2x2 Recessed:Other: 1 1 20 20
Total Proposed Watts= 1828
Project Title: SUNGLASS HUT Report date: 02/12/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 1 of 6
COMCHECK.cck
0.
Interior Lighting : Passes using retail merchandise highlighting supplemental watts.
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project -presented in this document is consistent with the
building plans, specifications, and other calculations submitted with th.• .•rmit application.The proposed interior lighting
systems have been designed to meet the 90.1 (2016)Standard requ. - .ents in COMcheck Version 4.1.5.1 and to comply with
any applicable mandatory requirements listed in the Inspection Ch• .t.
S,f-F it• Aiez Eer1(o Q.E . L � 7312%
Name-Title , Signature P' Date
PROFEsei
1 15587PE�g' �
OREGON
E p rd. : 1?.-I31/2Z
Project Title: SUNGLASS HUT Report date: 02/12/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 2 of 6
COMCHECK.cck
.
COMcheck Software Version 4.1.5.1
1 r i
Inspection Checklist
Energy Code: 90.it
1 (2016) Standard
Requirements: 20.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
8.4.1.1, calculations provide all information ElDoes Not
8.4.1.2, with which compliance can be
8.7 determined for the electrical systems ['Not Observable
[PR6]2 and equipment and document where ❑Not Applicable
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
9.4.3, 9.7 calculations provide all information ❑Does Not
[PR4]1 with which compliance can be ❑Not Observable
determined for the interior lighting
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/12/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 3 of 6
COMCHECK.cck
•
Section
Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Space type is not private office, open office, or
[EL10]2 20-Amp receptacles are controlled by ❑Does Not computer classroom.
an automatic control device.
❑Not Observable
ENot Applicable
8.4.3 New buildings have electrical energy ❑Complies Exception: Individual tenant spaces less than 10,000 ft2.
[EL11]2 use measurement devices installed. ❑Does Not
Where tenant spaces exist, each
tenant is monitored separately. In ENot Observable
buildings with a digital control system ENot Applicable
the energy use is transmitted to to
control system and displayed
graphically.
9.4.1.1 Automatic control requirements EComplies Requirement will be met.
[EL1]2 prescribed in Table 9.6.1,for the ❑Does Not
appropriate space type, are installed.
Mandatory lighting controls(labeled ❑Not Observable
as'REQ') and optional choice controls ❑Not Applicable
(labeled as'ADD1' and 'ADD2') are
implemented.
9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met.
[EL2]2 per approved lighting plans and all ❑Does Not
manual controls readily accessible and
visible to occupants. ENot Observable
❑Not Applicable
9.4.1.1f :Daylight areas under skylights and ,❑Complies Exception: Requirement does not apply.
[EL13]i roof monitors that have more than ❑Does Not
150 W combined input power for
general lighting are controlled by ['Not Observable
photocontrols. ❑Not Applicable
9.4.1.3 Separate lighting control devices for ❑Complies Requirement will be met.
[EL4]1 specific uses installed per approved ❑Does Not
lighting plans.
ENot Observable
❑Not Applicable
9.6.2 Additional interior lighting power ❑Complies Requirement will be met.
[EL8]i allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and Not Observable
separated from general lighting. ENot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2`.Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/12/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 4 of 6
COMCHECK.cck
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
8.7.1 Furnished as-built drawings for ❑Complies Requirement will be met.
[FI16]3 electric power systems within 30 days ❑Does Not
of system acceptance.
❑Not Observable
ENot Applicable
8.7.2 Furnished O&M instructions for ❑Complies Requirement will be met.
[FI17]3 systems and equipment to the ❑Does Not
building owner or designated
representative. Not Observable
❑Not Applicable
9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values.
[F118]1 lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts ['Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
9.4.4 At least 75%of all permanently ❑Complies Requirement will be met.
[F120]1 installed lighting fixtures in dwelling ❑Does Not
units have >= 55 Im/W efficacy or a
>= 45 Im/W total luminaire efficacy. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/12/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 5 of 6
COMCHECK.cck
Project Title: SUNGLASS HUT Report date: 02/12/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 6 of 6
COMCHECK.cck
. OFFICE COPY
IPACOMcheck Software Version 4.1.5.1
A4 Mechanical Compliance Certificate
Project Information /3C1f2 o2/- Od q 2_
Energy Code: 90.1 (2016)Standard
Project Title: SUNGLASS HUT
Location: Tigard, Oregon
Climate Zone: 4c
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
WASHINGTON SQUARE THORSON BAKER +ASSOCIATES
TIGARD, OR 3030 W STREETSBORO RD
RICHFIELD, OH 44286
330.659.6688
Mechanical Systems List
Quantity System Type&Description
1 AHU-1
Heating: 1 each-Central Furnace,Electric,Capacity= 17 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each-Hydronic Coil,Capacity=49 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 1 --Compliance(Motor nameplate HP method):Passes
Fans:
FAN 1 Supply,Constant Volume, 1400 CFM, 1.0 motor nameplate hp,80.0 fan efficiency grade
SYSTEM VERIFICATION REQUIRED.
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
design d to eet the 90.1 (2016) Standard requirements in COMch Version 4.1.5.1 and to comply with any applicable
man a ry equi s listed in the Inspection Checklist.
A l /r_________
N m -Title S. e D e
c�`t) PRD,rFs
<"�cacc,G1PFF.sfQ/-
E"
90092PE
OREGON ,�
241`N10 2���
-1NIE
EXPIRES: 613017.1
RENEWS:
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 1 of 10
COMCHECK.cck
i
COMcheck Software Version 4.1.5.1
Inspection Checklist
Energy Code: 90.1 (2016) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
6.4.4.2.1, calculations provide all information ❑Does Not
6.7.2 with which compliance can be
[PR2]1 determined for the mechanical ❑Not Observable
systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
8.4.1.1, calculations provide all information ❑Does Not
8.4.1.2, with which compliance can be
8.7 determined for the electrical systems ❑Not Observable
[PR6]2 and equipment and document where ❑Not Applicable
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
6.7.2.4 Detailed instructions for HVAC ❑Complies Exception: Requirement does not apply.
[PR5]1 systems commissioning included on ❑Does Not
the plans or specifications for projects ❑Not Observable
>=50,000 ft2.
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 2 of 10
COMCHECK.cck
Section
Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.7 Freeze protection and snow/ice ❑Complies Exception: Requirement does not apply.
[FO9]3 melting system sensors for future ❑Does Not
connection to controls.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 3 of 10
COMCHECK.cck
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: ❑Complies See the Mechanical Systems list
6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values.
[ME1]2 equipment labeled as meeting
90.1. ENot Observable
ENot Applicable
6.4.3.4.1 Stair and elevator shaft vents ;❑Complies Exception: Requirement
[ME3]3 have motorized dampers that • ,EDoes Not does not apply.
automatically close.
❑Not Observable
� ' '❑Not Applicable
6.4.3.4.2, Outdoor air and exhaust systems , „❑Complies Requirement will be met.
6.4.3.4.3 have motorized dampers that f- ❑Does Not
[ME413 automatically shut when not in
use and meet maximum leakage G Not Observable
rates. Check gravity dampers ❑Not Applicable
where allowed.
6.4.3.4.5 Enclosed parking garage ❑Complies Exception: Requirement
[ME39]3 ventilation has automatic ❑Does Not does not apply.
contaminant detection and
capacity to stage or modulate ❑Not Observable
fans to 50%or less of design ❑Not Applicable
capacity.
6.4.3.4.4 Ventilation fans >0.75 hp have '❑Complies Exception: HVAC systems
[ME5]3 automatic controls to shut off fan ElDoes Not intended to operate
when not required. ['Not Observable continuously.
❑Not Applicable
6.4.3.8 Demand control ventilation ?❑Complies Exception: Systems with a
[ME6]1 provided for spaces>500 ft2 and ❑Does Not design outdoor airflow less
>25 people/1000 ft2 occupant ❑Not Observable than 1200 cfm.
density and served by systems
with air side economizer, auto ❑Not Applicable
modulating outside air damper
control, or design airflow>3,000
cfm.
6.5,3.2.1 DX cooling systems >= 75 kBtu/h ❑Complies Exception: Requirement
[ME40]2 (>= 65 kBtu/h effective 1/2016) ❑Does Not does not apply.
and chilled-water and
evaporative cooling fan motor hp ❑Not Observable See the Mechanical Systems list
>= 1/3 designed to vary supply ❑Not Applicable for values.
fan airflow as a function of load
and comply with operational
requirements.
6.4.4.1.1 Insulation exposed to weather '❑Complies Requirement will be met.
[ME7]3 protected from damage. ❑Does Not
Insulation outside of the
conditioned space and associated ❑Not Observable
with cooling systems is vapor ❑Not Applicable
retardant.
6,4.4.1.2 '.HVAC ducts and plenums R- R- ❑Complies Requirement will be met.
[ME8]2 insulated per Table 6.8.2. Where ❑Does Not
ducts or plenums are installed in
or under a slab, verification may ❑Not Observable
need to occur during Foundation ❑Not Applicable
Inspection.
6.4.4.1.3 'HVAC piping insulation thickness. in. in. ❑Complies Exception: Requirement
[ME9]2 Where piping is installed in or ❑Does Not does not apply.
under a slab,verification may
need to occur during Foundation ENot Observable
Inspection. ❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 4 of 10
COMCHECK.cck
Section Mechanical Rou h-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
&Req.ID
6.4.4.1.4 Thermally ineffective panel ;❑Complies Exception: Requirement
[ME41]3 surfaces of sensible heating "' ❑Does Not does not apply.
panels have insulation >= R-3.5. � ;
❑Not Observable
, ` ❑Not Applicable
6.4.4.2.1 Ducts and plenums having r '❑Complies Requirement will be met.
[ME10]2 pressure class ratings are Seal ❑Does Not
Class A construction. ;
❑Not Observable
❑Not Applicable
6.8.1-15, Electrically operated DX-DOAS '❑Complies Exception: Requirement
6.8.1-16 units meet requirements per : ;❑Does Not does not apply.
[ME110)2 Tables 6.8.1-15 or 6.8.1-16.
❑Not Observable
IDNot Applicable
6.4.4.2.2 Ductwork operating >3 in. water `", ❑Complies Exception: Requirement
[ME11]3 column requires air leakage • "4„. a❑Does Not does not apply.
testing. ❑Not Observable
❑Not Applicable
6.5.2.2.1 Three-pipe hydronic systems ❑Complies Requirement will be met.
[ME50]2 using a common return for hot ❑Does Not
and chilled water are not used.
❑Not Observable
❑Not Applicable
6.5.2.3 Dehumidification controls "❑Complies Exception: Cooling capacity
[ME19]3 provided to prevent reheating, y ❑Does Not 40 kBtu/h.
recooling, mixing of hot and cold ; •
airstreams or concurrent heating Not Observable
and cooling of the same ,❑Not Applicable
airstream.
6.5.2.4.1 Humidifiers with airstream ❑Complies Exception: Requirement
[ME68]3 mounted preheating jackets have ;f❑Does Not does not apply.
preheat auto-shutoff value set to
activate when humidification is ,, ❑Not Observable
not required. • r ❑Not Applicable
6.5.2.4.2 Humidification system dispersion x '❑Complies Exception: Requirement
(ME69]3 tube hot surfaces in the i❑Does Not does not apply.
airstreams of ducts or air-
handling units insulated >= R- ❑Not Observable
0.5. ❑Not Applicable
6.5.2.5 Preheat coils controlled to stop 3,❑Complies Requirement will be met.
[ME70]3 heatc output whenever , , Ad.❑Does Not
mechanical cooling, including ~ `` .`; �'❑Not Observable
economizer operation, is active.
❑Not Applicable
6.5.2.6 Units that provide ventilation air ❑Complies Exception: Requirement
[ME106]3 to multiple zones and operate in • ❑Does Not does not apply.
conjunction with zone heating 443431
❑Not Observable
and cooling systems are ' ❑Not Applicable
prevented from using heating or
heat recovery to warm supply air
,above 60°F when representative
building loads or outdoor air
temperature indicate that most
zones demand cooling. ,
6.5.4.7 Chilled-water cooling coils '❑Complies Requirement will be met.
[ME107]3 provide a 15°F or higher ;43 ' b ❑Does Not
temperature difference between
cleaving and entering water ., ❑Not Observable
temperatures and a minimum of : ❑Not Applicable
57°F leaving water temperature
at design conditions
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 5 of 10
COMCHECK.cck
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.6 Motors for fans >= 1/12 hp and ❑Complies Exception: Requirement
[ME72]2 < 1 hp are electronically- ❑Does Not does not apply.
commutated motors or have a •
minimum motor efficiency of :Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.4 Parallel-flow fan-powered VAV air • ❑Complies .Exception: Requirement
[ME108]2 terminals have automatic • ❑Does Not does not apply.
controls to a)turn off the
terminal fan except when space ❑Not Observable
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control, either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum =❑Does Not
outdoor air rate or minimum
exhaust air rate required by ❑Not Observable
Standard 62.1, Standard 170, or ❑Not Applicable
applicable codes or accreditation
standards. Outdoor air ventilation
systems shall comply with one of
the following: a) design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b) dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c) system
includes exhaust air energy
recovery complying with Section •
6.5.6.1.
6.5.3.3 Multiple zone VAV systems with •❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ❑Does Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
❑Not Applicable for values.
6.5.4.2 HVAC pumping systems with >— ❑Complies Exception: Requirement
[ME25]3 3 control values designed for ❑Does Not does not apply.
variable fluid flow (see section �� ❑Not Observable
details). "'
❑Not Applicable
6.5.4.3, Fluid flow shutdown in pumping ❑Complies Requirement will be met.
6.5.4.3.1, systems to multiple chillers or +❑Does Not
6.5.4.3.2 boilers when systems are shut
[ME26]3 down. rr r � '❑Not Observable
itlDNot Applicable
6.5.6.1 Exhaust air energy recovery on ` -3❑Complies Exception: Requirement
[ME56]1 systems meeting Tables 6.5.6.1- !❑Does Not does not apply.
1, and 6.5.6.1-2.
❑Not Observable
❑Not Applicable
1 I High Impact(Tier 1) 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 6 of 10
COMCHECK.cck
Section Mechanical Rough-In Plans Verified Field Verified ,
# Inspection Value Value Complies. Comments/Assumptions
&Req.1D
6.5.6.2 Condenser heat recovery system ❑Complies Exception:Total installed
[ME31]3 that can heat water to 85°F or ❑Does Not heat capacity of water cooled
provide 60%of peak heat systems = 6 MMBtu/h of heat
rejection is installed for ['Not Observable rejection.
preheating of service hot water. ❑Not Applicable
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust <= the ❑Does Not
greater of criteria of supply flow, •
required ventilation rate, exhaust f Not Observable
flow minu the available transffer ' ` ❑Not Applicable
air(see section details).
6.5.7.2.1 Kitchen hoods >5,000 cfm have ❑Complies Exception: Requirement
[ME32]2 make up air>=50%of exhaust ❑Does Not does not apply.
air volume.
ENot Observable
❑Not Applicable
6.5.7.2.4 Approved field test used to ❑Complies Exception: Requirement
[ME49]3 evaluate design air flow rates j❑Does Not does not apply.
and demonstrate proper capture
and containment of kitchen ❑Not Observable
exhaust systems. '❑Not Applicable
6.5.8.1 Unenclosed spaces that are ❑Complies Exception: Requirement
[ME34]2 heated use only radiant heat. EDoes Not does not apply.
❑Not Observable
-' ❑Not Applicable
r,3
6.4.3.9 Heating for vestibules and air ❑Complies Exception: Requirement
[ME63]2 curtains with integral heating :❑Does Not does not apply.
include automatic controls that
shut off the heating system when ENot Observable
outdoor air temperatures>45F. ❑Not Applicable
Vestibule heating and cooling
systems controlled by a
thermostat in the vestibule with
heating setpoint <=60F and
cooling setpoint>= 80F.
6.5.10 Doors separating conditioned $ , ❑Complies Exception: Alteration
[ME73]3 space from the outdoors have , ,.❑Does Not project to existing building.
controls that disable/reset 1,'<
heating and cooling system when ❑Not Observable
open. ' Not Applicable
Additional Comments/Assumptions:
1 'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
it Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 7 of 10
COMCHECK.cck
Section
Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Space type is not private office, open office, or
[EL10]z 20-Amp receptacles are controlled by ❑Does Not computer classroom.
an automatic control device.
['Not Observable
❑Not Applicable
8.4.3 New buildings have electrical energy ❑Complies Exception: Individual tenant spaces less than 10,000 ft2.
[EL11]2 use measurement devices installed. ❑Does Not
Where tenant spaces exist, each
tenant is monitored separately. In ❑Not Observable
buildings with a digital control system ❑Not Applicable
the energy use is transmitted to to
control system and displayed
graphically.
10.4.1 Electric motors meet requirements ❑Complies Requirement will be met.
[EL9]2 where applicable. ❑Does Not
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 8 of 10
COMCHECK.cck
Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies Requirement will be met.
[FI3]3 deadband. ❑Does Not
['Not Observable
❑Not Applicable
6.4.3.2 Temperature controls have setpoint ❑Complies Requirement will be met.
[F120]3 overlap restrictions. ❑Does Not
['Not Observable
❑Not Applicable
6.4.3.3.1 HVAC systems equipped with at least ❑Complies Exception: Systems designed for continuous operation.
[FI21]3 one automatic shutdown control. ❑Does Not
❑Not Observable
❑Not Applicable
6.4.3.3.2 .Setback controls allow automatic ❑Complies Exception: Systems designed for continuous operation.
[F122]3 restart and temporary operation as ❑Does Not
required for maintenance.
❑Not Observable
❑Not Applicable
6.4.3.6 When humidification and ❑Complies Requirement will be met.
[F16]3 dehumidification are provided to a ❑Does Not
zone, simultaneous operation is
prohibited. Humidity control prohibits ['Not Observable
the use of fossil fuel or electricity to ❑Not Applicable
produce RH > 30%in the warmest
zone humidified and RH < 60% in the
coldest zone dehumidified.
6.7.2.1 Furnished HVAC as-built drawings ❑Complies Requirement will be met.
[F17)3 submitted within 90 days of system ❑Does Not
acceptance.
[Not Observable
❑Not Applicable
6.7.2.2 Furnished O&M manuals for HVAC ❑Complies Requirement will be met.
[F18]3 systems within 90 days of system ❑Does Not
acceptance.
❑Not Observable
❑Not Applicable
6.7.2.3 An air and/or hydronic system ❑Complies Exception: Requirement does not apply.
[F19]' balancing report is provided for HVAC ❑Does Not
systems serving zones >5,000 ft2 of
conditioned area. ['Not Observable
❑Not Applicable
6.7.2.4 HVAC control systems have been ❑Complies Requirement will be met.
[F110]1 tested to ensure proper operation, ❑Does Not
calibration and adjustment of controls.
❑Not Observable
❑Not Applicable
10.4.3 Elevators are designed with the ❑Complies Exception: Requirement does not apply.
[FI24]2 proper lighting, ventilation power, and ❑Does Not
standby mode.
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 9 of 10
COMCHECK.cck
Project Title: SUNGLASS HUT Report date: 02/22/21
Data filename: \\tbs-projects05\2020\2020-0971\Engineering\_Energy-Calcs\2020-0971 ELECTRICAL Page 10 of 10
COMCHECK.cck