Loading...
Plans (50) FPS2021 -00073 — — RECEIVED JUN 15 2011 CITY OF TIGARD z BUILDING DIVISION STEEL SAMMY SCREW AND ROD STEEL SAMMY SIDEWINDER AND ROD n �r°o`'K�Y z s I 0 Z PURLINl� W �— Z PURLIN SAMMY SIDEWINDER 3/8" - SAMMY SCREW All 3/8" = Thrja ! All - RozzThread = _Rod SWIVEL RING - PIPE � SWIVEL RING PIPE GENERAL NOTES 0 1. SYSTEM DESIGNEDAND INSTALLED PER NFPA-13, 2016 Ed. 2. HANGERS SHALL BE PER NFPA-13, UL LISTED AND/OR FM APPROVED 2 3. SCHEDULE 40 PIPE TO BE USED FOR THREADED FITTINGS ° F 4. SCHEDULE 10 OR FLOW PIPE TO BE USED WITH GROOVED FITTINGS N 5. ALL WIRING, PAINTING AND PATCHING BY OTHERS CM W 6. INSTALL SEISMIC EXPANSION RINGS FOR ANY SPRINKLER HEADS AT LAY-IN-TILE CEILINGS 41 LL 7. IT IS THE OWNER'S RESPONSIBILITY TO PROVIDE ADEQUATE HEATTO PREVENT WET SPRINKLER V) a PIPE FROM FREEZING C.aftonallyApproved..............................[ J o V) 0 8. MAIN DRAINS, AUXILLARY DRAINS AND INSPECTOR'S TESTS ARE TO BE PROVIDEDAND INSTALLED for only the work as described in: z IN ACCORDANCE WITH NFPA-13 PEFMT NO._ 14',0,5_021-0007-3x 9. ALL SYSTEM CONTROL VALVES SHALL BE OF THE INDICATING TYPE WITH TAMPER SWITCHES Leherto: . [ ) 0 a Y (WIRING BY OTHERS) Attach............... . .............[ ] e Job Address:/ /S0 ge PKWI a — 10. ALL SPRIGS, DROPS AND ARMOVERS ARE 1" SCH. 40 PIPE U.N.O. Z(�J a EL 11. ALL OUTLETS FROM MAINS ARE WELDED U.N.O. 12. RIGID COUPLINGS SHALL BE INSTALLED ON ALL GROOVED LINES U.N.O. 0 13 . SPRINKLER SYSTEMS WILL BE MONITORED BYAN OFF-SITE CENTRAL STATION INCLUDING FLOW o s SWITCHES AND TAMPER SWITCHES ON CONTROL VALVES (BY OTHERS) 14. THE EDGE OF ANY JOIST, BRACING, PIPES, E.Q. BRACING, HANGERS, LIGHTS LESS THAN 1 FT. m W WIDE, ETC., TO BE LOCATED MINIMUM OF 1'-2" HORIZONTALLY AWAY FROM ESFR SPRINKLERS o 0 15. OBSTRUCTIONS SUCH AS LIGHTS OVER 1 FT WIDE TO BE LOCATED MINIMUM OF 2'-0" ai >_ HORIZONTALLY AWAY FROM ESFR SPRINKLER HEADS � 16. BRANCH LINE HANGERS TO BE LESS THAN 6" FROM TOP OF PIPE TOATTACHMENT POINT U.N.O. � x o D PARlFP� PREACTIONDETAIL 17. MAINTAIN A MINIMUM OF 36" FROM TOP OF STORAGE TO ESFR SPRINKLER DEFLECTOR LLJ D N.T.S. � m uj W m O LL 0 z ¢ N N W W J = m co s7 r zJY V Z Q z = N cu - — ELECT. U Lu > J W W� = 236 1 Lu C4 I m ELEV. = OFFICE � SERVER � 4) 0 J _ _ ¢ 235 `"� ao ERVER �� 3 RM. � � 3 ,RAREA OF WORK 23s 4-0 a o I' l � O11/2" DOUBLE INTERLOCK MAILL •+' N a No �IY2N PRE-ACTION CABINET 21VVO + mm 31 0 p ' ,''ry -- < N 4) V)� � LL N O 1 `gym d� rn � 1�6 OFFICE o c, m 0 H r r N ti _ ° N I-- a Q tV m-t 1— ut in 2" x 1%" Mechanical Tee �a PAR o supply new Preaction system �A' II AUTOMATIC 11 MAIL RM FIRE PROTECTION SYSTEMS, INC. Nis SECOND FLOOR KEY PLAN N X u Lu m SCALE:1/18'=1'-t7' I 0 SY( ST EI1AS 9� co PROSEG�\� CONF. ROOM SCOPEOF WORK. 19435 SW 129th AVENUE .I TUALATIN,OR 97062 (503)692-9284 PROVIDING A COMPLETE 1'/z" DOUBLE INTERLOCK PRE-ACTION SYSTEM AT FAX: (503)692-1186 THE NEW SERVER ROOM 235 ON THE SECOND FLOOR. SUPPLY WILL BE OR CCB#0067534 L.I. �• PROVIDED FROM EXISTING 2" BRANCH LINE ABOVE. THE DOUBLE INTERLOCK WA CCB#AFPSYI'091BZ SECOND FLOOR SERVER ". PRE-ACTION SYSTEM (CABINET) IS LOCATED IN MAIL ROOM 219. INSTALLING SCALE: 114"=1'-0" N 2 PENDENT HEADS IN SERVER ROOM 235 SUPPLIED FROM THE DOUBLE DRAWN BY: Ken Molinari INTERLOCK PRE-ACTION SYSTEM. ALL ELECTRICAL WIRING BY OTHERS. DATE: 06.14.2021 AHJ: City of Tigard SHEET: FP1of 1 AFP. PROJECT#: 21093