Loading...
Plans (36) BUP2021 -00276 OFFICE COPY RECENE WITH 1/4"GAP BETWEEN THE BOARD AND THE FLOOR TO PREVENT WICKING. 20 GA 3 5/8"METAL STUD BRACING TO ROOF GENERA TENANT IMPROVEMENT 0100 GENERAL REQUIREMENTS GENERAL DATA l o Zo2� A�7y� 7. COMPLY WITH USG GYPSUM CONSTRUCTION HANDBOOK AND MANUFACTURER'S RECOMMENDA. TI�3. C� STRUCTURE AT 10'-0"OC TO BUILDING STRUCTURE 8FINISH QUALITY: OF TIGAR J 2'-0" 2'-0" ABOVE FOR WALLS LONGER THAN 12'-0"WITHOUT 1. VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AND AT THE EXISTING BUILDING AND CIT`/ IVIS! #30$2 for I NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK AREA PROCESS TRADE NOMENCLATURE INTERSECTION WALLS. FASTEN EACH END WITH BUILDING D. MARTIN W.HANSON 1 #8 SHEET METAL SCREW 2. CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL EXISTING OFFICE/OTHER AREAS TAPE/2 FINISH COATS`/ SMOOTH FINISH TAPED(LEVEL 4) ( ) CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL.SUBMITTAL OF A PROPOSAL SHALL BE CONSIDERED USG'FIRST COAT" `SAND AFTER TAPE/FINISH COAT(S) PACTR U ST _ CONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE,AND RE FURTHER COMPENSATION SHALL BE DUE NOTE:AT EXTREMELY DARK ACCENT WALLS PROVIDE LEVEL 5 FINISH. SOUND INSULATION 4'CENTERED THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO PERFORM SUCH INSPECTION. (n OLA KAM $,OREGON �{ 3. BY SUBMITTING A PROPOSAL,CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE 9. FINISH EXPOSED INTERIOR GYPSUM BOARD WALLS AND CEILINGS SMOOTH STRAIGHT READY FOR FINISH AS 9 !�! _ OVER WALL EXAMINED THE SITE AND INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY TO COMPLETE THE WORK SHOWN ON PLANS. A� SUSPENDED CEILING DESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE LIMITED TO 09 53 00 SUSPENDED ACOUSTICAL CEILING F D� Tenant. ALL MATERIALS AND INSTALLATION,DISPOSAL OF EXCESS MATERIALS(USEABLE FINISH MATERIALS SHALL BE V, STORE RACO STYLE RECESSED REVEAL HEADER. LEFT IN THE TENANT SPACE AS NOTED ON PLANS),CLEANING AND ALL PREPARATION OF SUBSTRATE 1. COMPLY WITH CURRENT SEISMIC REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE. CONCEPT WALLS#1-487RDT SURFACES PRIOR TO INSTALLATION,AS WELL AS FINAL CLEAN UP. 2. FOLLOW MANUFACTURERS PRINTED INSTRUCTIONS FOR THE DELIVERYAND INSTALLATION OF CEILING A 4. IT IS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN EXISTING BUILDING SYSTEM, INCLUDING GRID,PANELS,AND HANGARS AND ACCESSORIES. PROJECT #21430 A VANTI MARKETPLACE 155 MTL. STUDS. STANDARDS FOR ALL EXISTING PRODUCTS AND SYSTEMS. UPON DISCOVERY OF A DISCREPANCY TO THIS 3. USE ALL PRODUCTS FROM ARMSTRONG WORLD INDUSTRIES,INC. INTENTION,THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY. 5/8" GYP. BIRD. BOTH SIDES 5. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. 4. INS ORDINATE CEILING WORK WITH INSTALLERS RELATED WORK INCLUDING BUT NOT LIMITED TO INSULATION,GYPSUM BOARD,LIGHT FIXTURES, MECHANICAL SYSTEMS,ELECTRICAL SYSTEMS AND FIRE 6. COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPET"WALK-OFF MATS"TO PROTECT EXISTING SPRINKLERS. CENTER LINE OF STUD CARPETS. 5. PRODUCTS: PROJECT NARRATIVE .50- v fl w 7. CONTRACTOR MAY SUBMIT ALTERNATE ROOFING CONTRACTOR TO BE REVIEWED AND APPROVED BY a. GRID-PRELUDE 24 XL 15/16'EXPOSED TEE(HEAVY DUTY) PROJECT CONSISTS OF REMODEL WORK TO 104 USABLE SF OF EXISTING OFFICE SPACE. w = PACTRUST PRIOR TO BID. w o b. TILES-ARMSTRONG FINE FISSURED#1732,24 x 24 x 5/8°W/ANGLED TEGULAR EDGE ^, WORK SHALL INCLUDE BUT NOT BE LIMITED TO SELECTIVE DEMOLITION, DRYWALL/METAL 1n 0 8. KEEP THE AREA OF WORK FREE OF GARBAGE AND DEBRIS ON A DAILY BASIS INCLUDING DOCK ACCESS W STUDS, SUSPENDED CEILINGS, DOORS/FRAMES, CABINETRY AND PAINTING. ALL WORK LL AREAS AND COMMON AREA. FLOORS TO BE SWEPT OR VACUUMED DAILY. c. ACCESSORIES-MANUFACTURERS'STANDARD STUDS, ADA REQUIREMENTS. - - - 3-1/2" BATT INSUL. IN SOUND ATTENUATION WALLS 9. PROVIDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS INCLUDING BUT NOT LIMITED TO 6. ALL TILE CUTS SHALL BE DONE WITH RAZOR SHARP KNIVES. CUT/TRIM TILE EDGE TO CREATE TEGULAR EDGE TO - - - COMMON CORRIDORS AND STAIRS,BUILDING ENTRANCES,SUITE ENTRANCES,ETC. THE CONTRACTOR WILL CONDITION SO THAT CEILING TILES LAY FLAT. BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING IMPROVEMENTS DUE TO CONSTRUCTION 7, IN EXISTING SPACES REPLACE WATER STAINED OR DAMAGED TILES. U L WORK INCLUDED BUT PERFORMED UNDER SEP. PERMIT BOTTOM TRACK. ACTIVITIES. 8. TUNE UP GRID SYSTEM TO WITHIN PLUS OR MINUS 0.5 INCHES OF LEVEL OVER THE ENTIRE SPACE. 10.PROVIDE TEMPORARY SANITARY FACILITIES. CONSTRUCTION WORKERS SHALL NOT USE BUILDING RESTROOM FACILITIES. 9. BENT OR DAMAGED T-BARS TO BE REPLACED. FIRE PROTECTION SPRINKLERING 11.STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DESIGNATED AT 10.REPAIR HOLES IN GRID FROM REMOVED WALLS. USE OF ARMSTRONG"BP ES-4"EXPANSION SLEEVE HEATING, VENTILATION &AIR CONDITIONING WORK FINISH FLOOR-TOP OF SLAB PRE-CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY OTHER ACCEPTABLE. ELECTRICAL WORK, BOTH LINE VOLTAGE AND LOW VOLTAGE COMMON BUILDING AREA BE USED FOR STORAGE. 09 62 00 SPECIALTY FLOORING O p (a:)PARTITION AND POWER PLAN 12.ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. 09 68 00 CARPET 13.CONFIRM SIZES OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF STRUCTURAL,MECHANICAL,A-1 1. CARPET PLANK(12"X 36"OR 18"X 36")SCALE 1/4" = l'-0" ELECTRICAL AND PLUMBING WORK PRIOR TO FRAMING OR CUTTING FOR INSTALLATION. a. INSTALL IN RANDOM ASHLAR PATTERN U.N.O. s WALL SECTION WITH SOUND INS. 14.LEAVE THE PROJECT CLEAN AND READY FOR OCCUPANCY. 2. USE SCHLUTER TRANSITIONS PER FLOOR TRANSITION DETAILS. � Y BUILDING INFORMATION TENANT INFORMATION „ _ „ 15.CLEAN ADJACENT EXTERIOR AREA, I.E.WALKS,EXTERIOR GLASS,ETC. 2 0 N A-1 SCALE 1 1 -� 09 9123 PAINTING i OWNER: PACIFIC REALTY ASSOCIATES, L.P. TENANT: 16.CLEAN ALL SUPPLY AND RETURN DIFFUSERS AT PROJECT COMPLETION. Q N 0) 15350 SW SEQUOIA PKWY#300 AVANT[ MARKETPLACE ITUPON COMPLETION OF THE PROJECT,THE CONTRACTOR MUST PROVIDE A DETAILED CLOSEOUT PACKAGE INTERIOR: O) PER INSTRUCTIONS INCLUDED IN THE CONSTRUCTION CONTRACT.RETENTION WILL BE HELP PER CONTRACT 1. WALLS: PORTLAND,ORE 97224 UNTIL THE COMPLETED CLOSEOUT PACKAGE IS RECEIVED AND HAS BEEN APPROVE BY THE CONSTRUCTION a. PRIME NEW DRYWALL WITH MILLER PAINT HIGH-BUILD"SUPER SEAL"PRIMER. w Q O i OCCUPANCY AREAS&LOADS: MANAGER,ARCHITECT,AND PROPERTY MANAGER. LJ O in 503 624-6300 PHONE USABLE 104 SF 1 OCC 18.IT IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDE A COMPLETE, b. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER PAINT � CO) n ( ) (PHONE) FUNCTIONING PROJECT INCLUDING ALL GENERAL,MECHANICAL AND ELECTRICAL CONSTRUCTION REQUIRED 1204-XX WITH A TIGHT ROLLER STIPPLE FINISH. RESTROOM FINISHES TO BE MILLER PAINT 170-5-XX S/G _ Z (503)624-7755(FAX) RENTABLE 116 SF LATEX ENAMEL. � g N N FF= TO FULFILL THAT INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED,REGARDLESS OF _ _ _ _ - WHETHER OR NOT SHOWN ON THE DRAWINGS. 2. GENERAL NOTES: co (JO BLDG.#: BLDG. B (ppC082) NUMBER OF EXITS REQUIRED \ i _ TYPICAL STUD 19.ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE NOTED"N.I.C.". b. KEEP ALL HARDWARE,HINGES,AND DOOR KNOBS CLEAN OF ALL PAINT SPLATTERS,DRIPS,OR ROLLER lLo w Ch (j B 1 EXITS 1 PROVIDED i \ 20"ALIGN"AS USED IN THESE DOCUMENTS,MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE SAME SPRAY. C � 0 O O CONST.TYPE.: II-B L_ - - -� PLANE,EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. c. ALL SURFACES TO BE SANDED BETWEEN COATS,PRIOR TO INSTALLATION OF NEXT COAT. c L0 0_ 21.SUBMIT SAMPLES OR DRAW DOWNS FOR ALL FINISHES REQUESTED TO THE ARCHITECT OF RECORD WITHIN d. DURING PROGRESS OF WORK,KEEP JOB SITE CLEAN OF ALL PAINT MATERIALS,RUBBISH,CANS,AND THIS BUILDING HOUSES MULTIPLE TENANTS INCLUDING THIS TENANT. THE EXISTING ((( H )�� TWO WEEKS OF PROJECT AWARD.SAMPLES SHOULD BE NO LARGER THEN 11 X 17 AND TAGED WITH RAGS AT THE END OF EACH DAY. BUILDING IS A FOUR STORY BUILDING OF 87,890 SF AND IS FULLY SPRINKLERED. EACH MANUFACTURES LABEL.PRODUCTS INSTALLED WITHOUT APPROVED SAMPLES ARE SUBJECT TO e. UPON COMPLETION OF WORK,CLEAN ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING DO REPLACEMENT AT CONTRACTOR COST.AN APPROVED SUBMITTAL DOES NOT CHANGE THE CONTRACTUAL FLOOR IS LESS THAN 23,000 SF ALLOWING FOR NON SEPARATED USE. TYPICAL TRACK REQUIREMENT TO PROVIDE THE SPECIFIED ITEMS UNLESS SPECIFICALLY NOTED AS A SUBSTITUTION BY THE AND SCRAPING,USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. _ CONTRACTOR AND SPECIFICALLY APPROVED BY THE ARCHITECT AS SUCH.REPLACE SUCH PRODUCTS AS f. PROTECT WORK OF OTHER TRADES. INSTALL STUDS WITH DIRECTED AT CONTRACTOR'S COST. CODE SUMMARY SAME DIMENSION (10" �� 0] �� g. PROVIDE"WET PAINT"SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. _ _ _ _ ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH STATE AND LOCAL CODE 22.THE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION SYSTEMS I` ' MIN.) FOR BRIDGING j . CONTRACTOR.ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER 12 00 00 FURNISHINGS 00 REQUIREMENTS THAT APPLY, INCLUDING BUT NOT LIMITED TO: I i I ALIGNMENT LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. COORDINATE 1. INSTALL BUILDING STANDARD ADDRESS AND/OR SUITE NUMBER LABELS TO ALL EXTERIOR DOORS. ) • INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER HEADS SHALL BE 2019 OREGON STRUCTURAL SPECIALTY CODE OSSC _ 0 ( ) _ _ 21 00 00 FIRE SUPPRESSION : DESIGN I BUILD CENTERED IN CEILING TILE(OR 2 x 2 MODULE OF A SECOND LOOK II TYPE OF CEILING TILE WHERE p- • 2019 OREGON MECHANICAL SPECIALTY CODE(OMSC) �..J APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE-APPROVED IN WRITING BY 1. ADJUST EXISTING SPRINKLERS THROUGHOUT SPACE AS REQUIRED BY CODE. SPRINKLER HEADS SHALL BE • 2017 OREGON PLUMBING SPECIALTY CODE (OPSC) THE ARCHITECT PRIOR TO INSTALLATION,SUBMITTALS MAY BE DELIVERED IN PDF FORMAT FOR REVIEW. CENTERED IN 2 X 2 CEILING TILE.LAYOUT OF SPRINKLERS BY CONTRACTOR. SPRINKLER LAYOUT IN ALL HARD • 2017 OREGON ELECTRICAL SPECIALTY CODE (OESC) ��+� 23.COOROINATE ALL CONSTRUCTION SEQUENCING WITH PACTRUST AND SCHEDULE ALL SERVICE EILINGA AREAS(GYPSUM BOARD/PLASTER)TO BE REVIEWED AND APPROVED BY ARCHITECT PRIOR TO ��` k POWDER DRIVEN INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS TO MINIMIZE INCONVENIENCE TO CURRENT TENANTS. • 2019 OREGON FIRE CODE (OFC) �iANCHORS AT 24"O.C. • ASCE-7-10 08 10 00 DOORS AND WINDOWS 23 00 00 HVAC : DESIGN/BUILD ICC/ANSI Al 17.1-2017 ��, (1)#10-16 SCREW 1. APPROVED DOOR,FRAME,AND HARDWARE SUPPLIERS INCLUDE: GAS METER • 2019 OREGON ENERGY EFFICIENCY SPECIALTY CODE �� PER STUD FLANGE a. BAXTER AND FLAMING. (503)225-0486 1. CONTRACTOR TO VERIFY GAS METER AND TAG METER WITH THE TENANTS ADDRESS OR SUITE NUMBER. METER IDENTIFICATION NUMBER AND TENANT ADDRESS INFORMATION SHALL BE GIVEN TO PACTRUST PRIOR AT WALLS WITH b. D&D DOOR (503)205-5533 TO TENANTS MOVE-IN. PROJECT LOCATION ACOUSTIC INSULATION, c. BENSON INDUSTRIES (503)907-2200 HVAC-BID PROCEDURE / (I)REFLECTED CEILING PLAN SET STUD TRACK IN A d. GRANT SUPPLY (360)887-0647 1. FOR BIDDING PURPOSES,THE HVAC CONTRACTOR WILL ASSUME THAT EXISTING HVAC EQUIPMENT IS IN / S•W. HAMPTON STREET J z CONTINUOUS BED OF 3. DOOR AND RELITE FRAMES SHALL BE ALPHA ALUMINUM PRODUCTS,INC.(AAP). SUBMITTAL REQUIRED PRIOR PROPER WORKING ORDER. � A-1 SCALE 1/4" = 1'-O" GSEALANT. TO ORDERING MATERIAL.NEW FRAMES TO BE FACTORY FINISH CUSTOM COLOR. 2. INVENTORY EXISTING RV.A.C.ROOFTOP UNITS AND SUBMIT TO ARCHITECT CONDITIONS REPORT OF EACH 4. FIELD VERIFY EXISTING DOOR, FRAME AND HARDWARE FINISH PRIOR TO ORDERING. ALL NEW DOORS, UNIT s WALL BASE DETAIL FRAMES AND HARDWARE TO MATCH EXISTING BUILDING STANDARDS. 3. LIST TONNAGE OF EACH UNIT. } 5. ALL INTERIOR DOORS SHALL BE SOLID CORE WOOD UNLESS NOTED OTHERWISE. HVAC-DESIGN PROCEDURE • •• •• 11• A-1 SCALE 3" = 1'-0" 6. DOOR HARDWARE SHALL BE SCHLAGE AL SATURN OR D RHODES SERIES U.N.O. 1. USE EXISTING ANDiOR NEW EQUIPMENT TO DESIGN MECHANICAL H.V.A.C.SYSTEM PER DESIGN STANDARDS CONSTRUCTION LEGEND 7. ALL DOOR HARDWARE SHALL BE INSTALLED WITH A5"BACKSET. LISTED BELOW. 8. DOOR FINISH SUBMITTAL:CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR DOOR FRAMES,DOOR 2. PRIOR TO AWARD OF CONSTRUCTION CONTRACT,H.V.A.C.CONTRACTOR SHALL SUBMIT TO ARCHITECT FOR HARDWARE AND DOORS AS WELL AS A CONTROL SAMPLE OF THE FINISHED DOOR SKIN W/STAIN AND FINISH REVIEW AND APPROVAL A FULL DESIGN SCHEMATIC FOR THE TENANT SPACE INCLUDING BOTH o EXISTING TO REMAIN APPLIED(IF NEW DOORS ARE BEING PROVIDED). BEFORE FINISHING OF DOORS IS COMMENCED ARCHITECT NEW/RENOVATED WORK AND SYSTEMS UNTOUCHED BY THE TENANT IMPROVEMENT AS APPLICABLE. N SHALL APPROVE CONTROL SAMPLE. FINISHED PRODUCT IS SUBJECT TO REJECTION BY ARCHITECT IF THIS INCLUDE THE FOLLOWING: EXISTING TO BE REMOVED PROCESS IS NOT FULLY ADHERED TO AND FIELD PRODUCT DOES NOT MATCH THE APPROVED CONTROL a. DUCTING AND SIZES SAMPLE. ern' A51 NEW STANDARD WALL WITH INS. 09 00 00 FINISHES b. SUPPLY AND RETURN LOCATIONS AND CFM AT EACH GRILL OR DIFUSER c. ROOF EQUIPMENT,SIZES AND LOCATIONS Am A GENERAL d. UNITS REQUIRING DUCTED SMOKE DETECTION m 1. REMOVE ALL EXISTING VCT,SHEET VINYL,ETC. IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PRIOR TO INSTALLATION OF NEW FLOORING. e. THERMOSTAT LOCATIONS AND ZONE/UNIT ASSOCIATED THEREWITH DUPLEX RECEPTACLE ROOF DECK 2. CLEAN,SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS.EXCLUDES LVT AND f. ANY SUPPLEMENTAL EXHAUST FANS OR SPECIAL SYSTEMS W V I I V OR BEAM SOME VCT APPLICATIONS.VERIFY WITH ARCHITECT PRIOR TO APPLYING WAX COATINGS. g. ZONE DIAGRAM r , FOURPLEX RECEPTACLE 3. EXISTING VCT TO REMAIN TO BE STRIPPED AND APPLY NEW WAX COATING. 26 00 00 ELECTRICAL: DESIGN/BUILD `) D,q RACO STYLE 4. CONTRACTOR TO PROVIDE 10%ATTIC STOCK FOR ALL FLOOR TILE PRODUCTS UNLESS DIRECTED Q -b' DEDICATED OUTLET OTHERWISE. GENERAL RECESSED REVEAL 1. ALL ELECTRICAL FEEDS TO OUTLETS,SWITCHES, ETC.MUST BE VERTICAL DROPS FROM ABOVE EXCEPT FOR J EXISTING ELECTRICAL TO REMAIN HEADER. CONCEPT SUSPENDED CLG ASSEMBLY 09 21 00 GYPSUM BOARD HORIZONTAL RUNS UNDER WINDOWS AND RECEPTACLES ON THE SAME STUD. /1 WALLS#1-487RDT GENERAL 2. ALL NEW ELECTRICAL DEVICES TO BE WHITE.NYLON COVER PLATES NOT ALLOWED. LL FLOOR MONUMENT W/SERVICES SHOWN 1. ALL GYPSUM BOARD WALLS: ONE LAYER 518"TYPE X GYPSUM WALLBOARD,EITHER AT RIGHT ANGLES OR PARALLEL TO FRAMING ON EACH SIDE OF METAL STUDS SPACED AT 24"O.C. FASTEN WITH 1°TYPES 3. REPLACE ALL NON-WHITE EXISTING ELECTRICAL DEVICES TO WHITE.NYLON COVER PLATES NOT ALLOWED. SPECIAL OUTLET 4. WHERE INDICATED-POWDER COAT ELECTRICAL COVER-COLOR#HFWR0358"PURE WHITE" w W �45° DRYWALL SCREWS 8'O.C.TO VERTICAL EDGES AND 12"O.C.TO TOP AND BOTTOM RUNNERS AND LLl 1 LOCATION MAP N / TEL DATA MUD RING WITH PULL STRING INTERMEDIATE STUDS.EACH SIDE AND OPPOSITE SIDES. ALL VERTICAL AND HORIZONTAL JOINTS 24"O.C.(OR ONE STUD SPACING), 5. PROVIDE LABELS AT EACH ELECTRICAL RECEPTACLE IDENTIFYING CORRESPONDING PANEL AND BREAKER. LO 'ti'.-✓r1.:}�.i:).�.i•-i".lJ/',`". :v -.,�4�n�Y����.Fv.1..�'Vrf'.'",'.j•.i Y. "`•`'�" 6. PROVIDE TYPEWRITTEN UPDATED SCHEDULE AT PANEL TO IDENTIFY CIRCUIT BREAKERS. Z LID e ELECTRICAL PANEL 2. ALL OFFICE GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND TWO FINISH COATS WITH SANDING BETWEEN 7 ELECTRICAL CONTRACTOR TO PROVIDE EMERGENCY LIGHTING IN EXIT PATH SHOWN ON PLAN EQUAL TO C) it A-1 NOT TO SCALE 20 GA 3 5/8" METAL STUD BRACING FINISH COATS(LEVEL 4 FINISH). PAINT AS INDICATED. POWER J-BOX TO ROOF STRUCTURE AT 10'-0" 3. ALL OTHER GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND ONE FINISH COAT WITH SANDING AFTER FINISH 1-FOOT CANDLE. LlJ OC W/(2)#8 SHEET METAL COAT(LEVEL 3 FINISH). PAINT AS INDICATED. 8. EXIT LIGHTS:LITHONIA EDGR-G-EL RECESSED MOUNT,GREEN LETTERS.(CLASS A BUILDINGS) F- N ® FLUSH MOUNT FLOOR MONUMENT W/POWER AND DATA SCREWS AT EACH END. BRACING 4. IN FINISHED SPACES FURR-0UT BUILDING COLUMNS AND EXTERIOR WALLS WITH 5/8"GYPSUM BOARD OVER 9. LOW VOLTAGE SYSTEMS(TELECOMMUNICATION AND DATA)BY FUTURE TENANT. 2 9 i r' METAL STUDS. IL 10.LIGHTING ENERGY MANAGEMENT IS REQUIRED IN ALL BUILDINGS. _ Q ' ' ° '° nY 2 X 2 LED BLT CEILING FIXTURE ?'� PROVIDE ACOUSTIC GASKETS WHERE WALL INTERSECTS ST UIETJOINT SHH WHEREWALL ERE T ------- ------------------ - - - - - } t: BETWEEN TO BE OPERPENDVIDED I(CULAR INTERSECTING 5 MEETS MULLION AND EMSEAL WHERE WALL MEETS GLAZING.COLOR SELECTED BY ARCHITECT. 11.00CUPANCY CONTROL DEVICES SHALLE LEVITON OR WATT STOP. L O Q DISTANCE f S INCANDESCENT LIGHT ON RHEOSTAT P. --------- - ------- RECESSED (TY ) WALLS OR HORIZONTAL BRACING 12.TEST ALL LIGHTING CONTROL SYSTEMS TO ENSURE THAT CONTROL DEVICES,COMPONENTS,EQUIPMENT _ _ -}--_ --�--( ' ;4. 6. AT ALL EXISTING WALLS, REMOVE ALL NAILS,SCREWS,FASTENERS,ETC.LEFT BY PREVIOUS TENANT AND AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND 7 CO 0 ------------- -- __--• -. BETWEEN WALLS EXCEEDS 12'-0" OC PATCH HOLES READY FOR PAINT. ` U � Z 1 t--� ® SUPPLY DIFFUSER SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE 7. REPAIR GYPSUM BOARD AT REMOVED ELECTRICAL RECEPTACLES OR DATA BOXES AND FINISH READY FOR IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. Q U U) g AREA O ! RETURN DUCT PAINT. 13.UNUSED DATA AND POWER BOXES ABOVE STANDARD HEIGHTAND NOT ABOVE EXISTING CASEWORK TO BE \ U O WOR ,--C Q THERMOSTAT 8. UPON REMOVAL OF WALL BASE,REMOVE RESIDUAL ADHESIVE AND PREP WALL TO PAINT READY CONDITION. REMOVED AND INFILL WITH GYP BOARD. 4// 0) 0 '-� ® WALL BRACING DETAIL WALL CONSTRUCTION MATERIALS 14 FROM THE RECEPTACE TO THE DISTRIBUTION BOARD.LEAVE PULL STRIREMOVE ALL UNUSED LOW VOLTAEINGS RING FROM THE BOELEPHONEX TO THE D DATSPA E ABOVE THE CEILING. A SECTION r _ EXHAUST FAN A-1 1. PROVIDE STUDS,TRACKS,BRACING,FASTENING AND OTHER ACCESSORIES NECESSARY FOR COMPLETE MAY BE LEFT T-� SCALE 3" = 1'-0" INSTALLATION. OVOLTAGE EXISTING NISH PWG AND INSTALL LANK COVER DILATE,FINISH TO MATCH SPECIFICATIONS.OTING LOW DATE: 7/13/21 TIDE SPRINKLER HEAD 2. FRAMING MEMBERS SHALL HAVE THE STRUCTURAL PROPERTIES INDICATED ON PLANS WHERE PHYSICAL STRUCTURAL PROPERTIES ARE NOT INDICATED,THEY SHALL BE AS NECESSARY TO WITHSTAND ALL IMPOSED OFFICE LIGHTING PERTM I / CONST s-� C) EXIT SIGN(LED RED) LIVE LOADS. DESIGN FRAMING IN ACCORDANCE WITH AIS[SG-673. 1. OFFICE LIGHT FIXTURES: LITHONIA LED FIXTURE.28LT2 40L ADP MVOLT GZ10 LP835. -�' 3. COLD-FORMED FRAMING SHALL BE GALVANIZED METAL CONFORMING TO ASTM A446/A 446 M GRADE A(33000 2. OFFICE EGRESS LIGHTING:ISOLITE MINI GENIE SERIES LED VERSION LMIGN NM SQ-CEILING AND WALL HORN/STROBE FIRE ALARM(CEILING MOUNT) . REVISION I �iN PSI G60. MOUNT. SEE PLAN FOR EGRESS PATH. USE OF ISOLITE INVERTER AS ALTERNATE TO BATTERY IS -� 4. PROVIDE THE LISTED GYPSUM BOARD PRODUCTS BY U.S.GYPSUM,GEORGIA PACIFIC,NATIONAL GYPSUM OR ACCEPTABLE. I i i I AN APPROVED EQUAL. 3. LIGHT SWITCHES:ACUITY CONTROLS PRE SET ALL PRIVATE OFFICE AND CONFERENCE ROOM SWITCHES TO I I 8 "VACANCY"AND TO TURN ON AT LAST DIM LEVEL.SET TIME-OUT TO MAXIMUM. 1. o 5. STANDARD GYPSUM BOARD SHALL BE TYPE'X',5/8"THICK WITH TAPERED EDGES CONFORMING TO ASTM ............... ----------------- - ---� C-36. a. STANDARD WALL SWITCH WITH OCCUPANCY SENSOR-USE WSD 2 '- --_ _---------- z __.-_.- � W LL o 6. WATER RESISTANT GYPSUM BOARD SHALL BE 5/8"THICK WITH TAPERED EDGES. CONFORMING TO ASTM b. WALL SWITCH WITH OCCUPANCY SENSOR AND DIMMING-USE WSXD ------- - ---------� C-630. c. WALL SWITCH WITH DIMMING AND CEILING MOUNTED OCCUPANCY SENSOR-USE SPOD 3. ii~ PROVIDE HC SIGNAGE FOR ALL �d 7. AT TOILET ROOMS USE 5/8"USG FIBERROCK BRAND AQUATOUGH INTERIOR PANEL FROM FLOOR -- 28 30 00 ELECTRONIC DETECTION AND ALARM a 2" NEW AND EXISTING HC RR'S TO 48"A.F.F.ON WALLS BEHIND OR ADJACENT TO PLUMBING FIXTURES. NO SUBSTITUTES. 4. KROY#2835207 BLACK(MEN) (EXCEPTION:EXCEPTION AT LOCATIONS TO RECEIVE PLASTIC LAMINATE OR TILE WAINSCOT.) GENERAL BUILDING PLAN - FIRST FLOOR Z •N KROY#2835209 BLACK(WOMEN) 8. AT TILE WAINSCOT LOCATIONS INSTALL CEMENT BACKER BOARD Y"THICK WITH SQUARE,REINFORCED, 1. FOR HORN/STROBE DEVICES USE-SYSTEM SENSOR"SPECTRALERT ADVANCE DEVICES,OR APPROVED J. I SMOOTH EDGES. PROVIDE DUROCK BRAND CEMENT BOARD OR APPROVED EQUAL. EQUAL. SCALE 1 ' =40' 9. INSTALL WATER-RESISTANT GYPSUM BOARD BEHIND WAINSCOT OF FRP,PLASTIC LAMINATE,ETC. 6 W MEN ADDITIONAL SWITCH 10.TRIM ACCESSORIES SHALL COMPLY WITH ASTM C-1047. 7 z GANG LOCATION I l.USE GEORGIA PACIFIC DENSGLAS GOLD ON EXTERIOR FACE OF EXTERIOR WALLS AND COAT WITH STO FINISH 'IN WAIL CONSTRUCTION EXECUTION OFFICE COPY 8- 1. FASTEN FRAMING MEMBERS TOGETHER BY WELDING OR BY USING SELF-DRILLING OR SELF-TAPPING CITY OF TIGARDI,•" FINISH MATERIALS 0 (9 SCREWS. WELDING SHALL CONFORM TO AWS D13 WELDING PROCEDURE. ELECTRODES AND SCREW DRAWN BY: ALL FINISHES MUST BE SUBMITTED TO PACTRUST PRIOR TO INSTALLATION. z = Z CONNECTIONS SHALL BE AS REQUIRED AND INDICATED IN THE DESIGN CALCULATIONS. DO NOT FIELD WELD REVIEWED FOR CODE COMPLiANCB _ :1 MATERIALS LIGHTER THAN 18 GA. R.M.T. ELECTRICAL w H ¢ z w A roved: CARPET PLANK TILE: 0 > U) (7 0 2. PROVIDE ACCURATELY ALIGNED RUNNERS AT TOP AND BOTTOM OF PARTITIONS. ANCHOR TRACKS AS rP Lu OUTLET OR W tO INDICATED IN THE DESIGN CALCULATIONS. BUTT WELD JOINTS IN TRACKS OR SPLICE WITH STUD INSERTS. OTC. CPT-1 MANNINGTON COMMERCIAL URBAN GRID COLLECTION J-BOX -i U) O U Z FASTENERS SHALL BE AT LEAST 3 INCHES FROM THE EDGE OF CONCRETE SLABS. VALIDITY OF PERMIT - SCAFFOLD/METRO 14215 0 = 2 x o THE ISSUANCE OF A PERMIT Pettt�it - j 18 X 36 RANDOM BRICK ASHLAR IN_/_DIRECTION .N 3. CUT STUDS SQUARE AND SET WITH FIRM BEARING AGAINST WEBS OF TOP AND BOTTOM TRACKS. POSITION ted' O = U �" STUDS VERTICALLY IN TRACKS AND SPACE AS INDICATED IN DESIGN. DO NOT SPLICE STUDS. PROVIDE AT BASED ON CONSTRUCTION AddKss ) akw BASE 7: - o LEAST TWO FULL HEIGHT KING STUDS AT DOORS AND OTHER OPENINGS 2 FEET WIDE OR LARGER. PROVIDE DOCUMENTS AND OTHER / RF FLEXCO 4"FLAT RUBBER BASE, 071 BLACK/BROWN,AT ALL CARPET AREAS. UNDERCUT DOOR AS ; b JACK STUDS OVER OPENINGS,AS NECESSARY,TO MAINTAIN INDICATED STUD SPACING. PROVIDE TRIPLE'` ►A907 �7 -T ( STUDS AT CORNERS, POSITIONED TO RECEIVE INTERIOR AND EXTERIOR FINISHES. FASTEN STUDS AT TOP '; DATA SHALL NOT PREVENT SWtC RC FLEX 4"COVE RUBBER BASE,071 BLACK/BROWN,AT ALL HARD SURFACES. o FLOOR FINISH CLEAR AND BOTTOM TRACKS BY WELDING OR SCREWING BOTH FLANGES TO THE TRACKS.PROVIDE LONG LEG THE CODE OFFICIAL FROM • $n _ Date: - f TRACK AT TOP OF WALL TO ALLOW FOR DEFLECTION WHERE WALL MEETS STRUCTURE ABOVE. REQUIRING THE CORRECTION PAINT: 4. REMOVE EXISTING FLOORING AT NEW WALLS UNLESS SPECIFICALLY INDICATED BY ARCHITECT. OF ERRORS.OS$C 10$.4 PT-1 MILLER 110-4-10 ACRO PURE ULTRA-LOW VOC 0017 LUNA MOON, SATIN LATEX. 5. INSTALL ALL INTERIOR AND EXTERIOR GYPSUM BOARD PRODUCTS AND ACCESSORIES AS REQUIRED FOR .-, a MOUNTING HEIGHTS THE PROJECT. SCALE 1/2" = l'-O" 6. AT TOILET ROOMS TO RECEIVE SHEET VINYL FLOORING, INSTALL THE GYPSUM BOARD(OR AUQATOUGH)