Loading...
Plans (16) PLM2021 -00378 RECEIVED 21 r PLUMBING ABBREVIATIONS SEP o I ?AR PLUMBING FIXTURES AND EQUIPMENT ABBREV. DEFINITION BUILDING DIVISION FIXTURE CONNECTIONS AAV AIR ADMITTANCE VALVE MANUFACTURER & A/C ABOVE CEILING �A MI o o E�rr� MARK FIXTURE TYPE MODEL NO. REMARKS ABV ABOVE CW HW W V AD ACCESS DOOR A .Cr 1S CTUAI� C AFF ABOVE FINISHED FLOOR E.L. MUSTEE 63M, 1/2 DELTA FAUCET #28T9, W/VAC. BREAKER, WALL BRACE, INTEGRAL STOPS. FINAL HOOK-UPS BY P.C. PROVIDE B/F BELOW FLOOR MS MOP SINK 24"x24" 1/2" 3 2 HOOKS OR HANG-UP BRACKETS AT THE UTILITY SINK FOR THE STORAGE OF MOPS AND BROOMS. B/G BELOW GRADE 141 DEL PRADO BTUH BRITISH THERMAL UNITS PER HOUR co CLEANOUT LAKE OSWEGO, OREGON 97035 FS FLOOR SINK JONES STEPHEN$ _ 3" 2" PVC BODY, 12"x12" TOP, 9"x9" HALF GRATE, FLAT BOTTOM STRAINER CLG CEILING 503.636.7979 #559-093 CONN CONNECT(ION) 503.636.9898 - FAX CONT CONTINUATION glen@gamillerarchitecture.com HD HUB DRAIN N/A - - 2" 2" 3"x4" REDUCER TO RECEIVE INDIRECT WASTE CW DOMESTIC COLD WATER CONSULTANTS DN DOWN JONES STEPHENS AS EX EXISTING GW GREASE WASTE KEITH STEFAN MIKULKA,PE FCO FLOOR CLEAN OUT - PVC SPUD WITH 6" ROUND SCORIATED TOP W/ POLISHED BRONZE FINISH, ADJUSTABLE TOP. PROFESSIONAL ENGINEER #C60 NOTED -2222-- OREGON LICENSE NO.90971 PE EXP: 12/31/2022 FD FLOOR DRAIN 1827 POWERS FERRY ROAD SE,BUILDING 20,SUITE 100 50 GPM, 127 LB GREASE CAPACITY, MOLDED POLYETHYLENE GREASE INTERCEPTOR; ASME #2112.14.3; BOLTED, ATLANTA,GEORGIA 30339 GREASE SCHIER PRODUCTS AS HW HOT WATER --- 7701953-1443 FAX:Ino 953-9533 GI - - - GAS TIGHT ACCESS COVER, MINIMUM 450 LB RATED; BUILT IN FLOW CONTROL AND INLET/OUTLET FLOW ti INTERCEPTOR GB2 NOTED HWR HOT WATER RECIRCULATION ' DIFFUSERS; INLET/OUTLET SIZE TO MATCH CONNECTING PIPES (SEE FLOOR PLAN). IE INVERT ELEVATION J INSTANTANEOUS COMMERCIAL CONDENSING, DIRECT VENTED, TANKLESS WATER HEATER; NATURAL GAS; 199 MBH INPUT; 0.96 O/H OVERHEAD i SAL CONTRACTORS WH-1 WATER HEATER, RINNAI CU199i 3/4" 3/4" _ _ ENERGY FACTOR; 3.8 GPM AT 100•F RISE; WALL-MTD COMMERCIAL CONTROLLER (98-185F USER ADJUSTABLE) PLBG PLUMBING _+r----_____- /I r/ CONDENSING, DIRECT SET TO 140F; 0.4 GPM ACTIVATION; 0.26 GPM MIN; 120V/1PH; GROUNDED CORDSET; CONCENTRIC VENT AND -1------- VENT COMBUSTION AIR PIPE, FITTINGS AND ROOF TERMINATION. PRV PRESSURE REDUCING VALVE zD SAN OR S SANITARY TP TRAP PRIMER PLUMBING GENERAL NOTES PLUMBING LEGEND ENITAL /4D\ SYMBOL DESCRIPTION W WASTE _ 1. FIXTURES AND EQUIPMENT ARE INDICATED ON PLUMBING SHEETS FOR GENERAL REFERENCE ONLY, REFER TO ARCHITECTURAL DRAWINGS Ep PROF FOR EXACT LOCATIONS AND ELEVATIONS of ALL FIXTURES AND EQUIPMENT. KITCHEN FIXTURES AND EQUIPMENT ARE SCHEDULED ON --- DOMESTIC COLD WATER PIPING YCO YARD CLEAN OUT 2222 5��� Fss ARCHITECTURAL DRAWINGS. ALL ABBREVIATIONS MAY NOT APPEAR ON DRAWINGS. --� �� �NGINFFQ �O,L 2. ALL WORK SHALL BE BY LICENSED PLUMBER AND IN ACCORDANCE WITH APPLICABLE CODES. ---- HOT WATER PIPING Q 71 f 3. PLUMBING WATER (COLD AND HOT, 110•F & 140•F) PIPING UP TO 1" SHALL BE TYPE B PEX (WHERE APPROVED BY AUTHORITY HAVING SANITARY OR WASTE PIPING GENERAL NOTES. J JURISDICTION) WITH BRASS FITTINGS AND CRIMPED JOINTS, 100 PSIG RATED. PLUMBING PIPING 1-1/4" AND LARGER SHALL BE 1. VERIFY GAS SERVICE PRESSURE PRIOR TO BID. IF OREGON 0 SCHEDULE 40 CPVC WITH SOLVENT WELD JOINTS. INSULATE PIPING CONTINUOUSLY WITH ELASTOMERIC FOAM PIPE INSULATION (3/4" _ __ -- VENT PIPING SERVICE IS LOW PRESSURE (LESS THAN 2 PSI), �tt`j✓9v 12 FOR CW, 1" FOR HW AND HWR) EXCEPT WHERE OTHERWISE SPECIFIED, PROVIDE CONTINUOUS SEAL AROUND ALL SEAMS AND JOINTS RESIZE PIPE PER IFGC CHAPTER 4. K 1 rhg mil WITH INSULATION MANUFACTURER'S SEALING COMPOUND. PROVIDE 1/4-TURN BALL STOP VALVES AT FINAL CONNECTION TO FIXTURES, APPLIANCES, OR EQUIPMENT. ALL MATERIALS SHALL BE APPROVED FOR DOMESTIC WATER (POTABLE) SERVICE. GAS PIPING KEYED NOTES __ (60 MBH) p$-1821 4. SANITARY DRAINAGE AND VENT PIPING SHALL BE DWV PVC WITH SOLVENT WELD JOINTS. PIPING 2-1/2" AND SMALLER SHALL BE 19 CONNECTION TO EXISTING CONSTRUCTION 1 MECHANICAL GAS SHUT-OFF VALVE BELOW CEILING, r SLOPED AT MINIMUM 2 PERCENT, PIPING AND LARGER SHALL BE SLOPED AT MINIMUM 1 PERCENT. PROVIDE DRAINAGE PATTERN O INTERLOCK TO HOOD FP SYSTEM & EXHAUST FAN ON2 ROOF--\PSI) r FITTINGS. P See '7l8./ Slope. in tht '2021 O.p, S.C. PER IFGC TO DISABLE GAS WHEN THE FP SYSTEMI JERSEY MIKE'S SUBS T.I. tI -0 PRESSURE GAUGE ACTIVATES. GAS VALVE SHALL BE FULL SIZE OF LINE. 2 4 I 5. NATURAL GAS PIPING SHALL BE SCHEDULE 40 STEEL, ASTM A53, WITH MALLEABLE IRON FITTINGS AND THREADED JOINTS. PIPING CONCEALED BEHIND CLEANED, PRIMED AND WALLSPAINTED WTOR OHW2SCOATSHEXTERIOR GRA EE UVE ALL DVDRESSISTAN PAINT.JOINTS. G WHICH IS SUBJECT TO WEATHER SHALL BE -po-_ SHUT-OFF VALVE (TYPE AS SPECIFIED) O CONNPROVIECTION TO EQUIPMENT.SEDIMENT SEDIMENT JDTRAPIOSHALL �� _ '__= 11705 SW PACIFIC HWY. BE INSTALLED AFTER THE GAS COCK, AS CLOSE TO 7F -6 N AT4 TIGARD OREGON 6. TRAP PRIMERS SHALL BE PROVIDED FOR ALL FLOOR DRAINS AND HUB DRAINS, EXCEPT WHERE DRAIN RECEIVES A CONTINUOUS --pyo-- BALANCING VALVE (TYPE AS SPECIFIED) THE UNIT CONNECTION AS PRACTICAL, AND SHALL DISCHARGE AND WHERE LAHJ APPROVES INSTALLATION WITHOUT TRAP PRIMER. HAVE A REMOVABLE CAP FOR CLEANING. I I f y y 7. WATER PIPING ROUTED ABOVE CEILING AND IN EXTERIOR WALLS SHALL BE ROUTED ON HEATED SIDE OF BUILDING INSULATION -TSI- CHECK VALVE O3 PROVIDE GAS COCK, SEDIMENT TRAP, AND FLEXIBLE 3/4"G (2 PSI) ASSEMBLY. CONNECTION TO RANGE. SEDIMENT TRAP SHALL BE ON ROOF ---- r D4❑C BACKFLOW PREVENTER INSTALLED AFTER THE GAS COCK AND SHALL HAVE 1/2"G (2 PSI) -T T 8. PROVIDE SIGN DIRECTING ALL EMPLOYEES TO WASH HANDS. REMOVABLE CAP FOR CLEANING. DN THRU ROO , RTU-1 L j..l ROUTE A/C 2 4 (125 MBH) 9. SEAL AROUND EDGES OF ALL WALL-MOUNTED FIXTURES WITH APPROVED CAULK/SEALING COMPOUND. RELIEF VALVE O4 PROVIDE VENTLESS PRESSURE REGULATOR, SET ON OOF 135 B OWNER OUTLET PRESSURE PER APPLIANCE MANUFACTURER'S ------1 /-3/4"G (2 PSI) 3 OWNER- ON WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE BUILDING CODES AND STANDARDS ADOPTED BY THE AUTHORITY INSTRUCTIONS. GAS CONNECTION SIZE SHALL BE PER 2 4 ON ROOF HAVING JURISDICTION AND ALL APPLICABLE LOCAL ORDINANCES. �7 GAS COCK APPLIANCE MANUFACTURER'S INSTRUCTIONS. I 1 J l i r - 11. CONTRACTOR SHALL OBTAIN ALL PERMITS, LICENSES, INSPECTIONS, ETC., AND PAY ALL INCIDENTAL FEES, AS REQUIRED TO OBTAIN A STRAINER 5 CONTRACTOR SHALL COORDINATE PROPOSED GAS PERMIT AND A PERMANENT CERTIFICATE OF OCCUPANCY. DEMAND WITH UTILITY PROVIDER, REPLACE METER IF MBH) I J E,- ------ REQUIRED. ---2222-- J' 1/ "G 2? PSI) i 12. WORK SHALL BE COORDINATED WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS. CONFLICTS WHICH ARISE DUE �i UNION RTU-2 ON RO Fi L- -- -- MECHANICAL GAS TO LACK OF PROPER COORDINATION SHALL BE CORRECTED AT THE CONTRACTOR'S COST. GAS LOAD AND SIZING SUMMARY: ) SHUT-OFF VALVE -D PIPE REDUCER 1"G (2 PSI) ON ROOF (108 MBH BELOW CEILING 13. DESIGN INDICATED IS SCHEMATIC AND MAY NOT REFLECT ALL CONSTRAINTS IMPOSED BY ACTUAL PROJECT CONDITIONS. CONTRACTOR TO EXISTING TENANT - 1 SHALL VISIT SITE AND REVIEW CONSTRUCTION DOCUMENTS (INCLUDING ALL TRADES) TO FAMILIARIZE HIMSELF WITH THE PROJECT PRIOR 1. LOAD SUMMARY: GAS METER, APPROX. TO BID. CONTRACTOR'S BID SHALL INCLUDE ANY AND ALL COSTS REQUIRED TO REWORK THE DESIGN TO FIT WITHIN THE PHYSICAL PIPE END CAP 200 FT FROM THIS ] CONSTRAINTS WHILE ACHIEVING THE OVERALL DESIGN INTENT. SPACE HEATING (RTU-1,2) = 233 MBH POINT, FIELD VERIFY i 4 14. THE BASIS-OF-DESIGN PRODUCTS WERE USED TO DETERMINE DIMENSIONS, INSTALLATION AND ACCESS CLEARANCES, SUPPORTS, MAKE-UP HEATING (KSF-1) = 60 MBH O - ELECTRICAL SERVICE, CONNECTION ARRANGEMENTS, ETC. WHERE ALTERNATE PRODUCTS ARE PROVIDED, IT IS THE SOLE RESPONSIBILITY CLEANOUT WATER HEATING (WH-1) = 199 MBH 1/2"G (2 PSI) OF THE CONTRACTOR TO COORDINATE ALL REQUIREMENTS AND RECTIFY ANY CONFLICTS AT THE CONTRACTOR'S COST. COOKING (RANGE) = 135 MBH1"G (2 PSI) DN THRU ROOF, -DO P-TRAP TOTAL = 627 MBH ON ROOF ® ROUTE BELOW 15. ALL WORK SHALL BE INSTALLED TO AVOID CONFLICT WITH ELECTRICAL EQUIPMENT "DEDICATED SPACE" AS REQUIRED BY NEC AND CEILING 2. PIPE SIZING SUMMARY: LILJ Lff LOCAL ORDINANCES. COORDINATE LOCATIONS OF ALL ELECTRICAL GEAR (DISTRIBUTION PANELS, TRANSFORMERS, SWITCHGEAR, ETC.) i WITH ELECTRICAL CONTRACTOR PRIOR TO FABRICATION AND INSTALLATION. - CONTINUATION OF PIPING • 2.0 PSI INLET PRESSURE 16. CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL EQUIPMENT AND DEVICES WITH THE --Q- YARD CLEAN OUT 1.0 PSI PRESSURE DROP 325 FT TOTAL EQUIV. LENGTH i e v ELECTRICAL CONTRACTOR PRIOR TO ORDERING. - • IFGC TABLE 402.4(5) SCHEDULE 40 METALLIC 17. ALL MATERIALS AND EQUIPMENT SHALL BE SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO ORDERING. CONTRACTOR ASSUMES -4,3- GAS PRESSURE REGULATOR PIPE IS USED. -- LIABILITY AND COSTS FOR ANY PRODUCT WHICH IS ORDERED PRIOR TO RECEIPT OF APPROVED SUBMITTALS. 3. CONTRACTOR TO VERIFY PRESSURE AND PIPING ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS. 18. ALL MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE GUARANTEED FOR A MINIMUM PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE. LENGTHS ON SITE AND ADJUST PIPE SIZES IN ______ MARK DATE DESCRIPTION ADDITIONAL WARRANTY SHALL APPLY WHERE SPECIFIED. ACCORDANCE WITH IFGC CHAPTER 4. + + i 19. EQUIPMENT START-UP AND COMMISSIONING SHALL BE PERFORMED BY FACTORY-AUTHORIZED AGENTS ONLY. SUBMIT WRITTEN JOB NO.: 2102-05 START-UP PROCEDURES TO OWNER FOR APPROVAL PRIOR TO PERFORMANCE OF START-UP ACTIVITIES. FINAL REPORTS SHALL BE APPROVED BY OWNER. r2222-� r------ ® FILE: 2102-05 A1.2 LANDLORD SCOPE '+ ++ � •o 20. ALL PENETRATIONS OF FIRE AND/OR SMOKE RATED ASSEMBLIES SHALL BE FIRE STOPPED WITH UL-LISTED SYSTEM APPROVED FOR THE � BY: + 1 APPLICATION. THE FOLLOWING ITEMS ARE BY THE LANDLORD. THIS o PLAN CHECK NO. LIST IS FOR REFERENCE ONLY, THE CONTRACTOR 21. FLASH AND SEAL ALL PENETRATIONS OF BUILDING EXTERIOR, WALLS AND ROOF WITH APPROVED SEALANT. SHALL COORDINATE EXACT SCOPE OF LANDLORD PERMIT NO. WORK WITH FRANCHISEE AND WITH LANDLORD PRIOR r � +� �� DATE: 08/18/2021 22. ALL WORK INSTALLED WITHIN HVAC PLENUMS SHALL BE PLENUM RATED (25/50 FLAME SPREAD/SMOKE DEVELOPED) AND, WHERE TO BID. REQUIRED BY THE LAHJ, SHALL BE NON-COMBUSTIBLE. • NOT APPLICABLE ®copyright 2019 CSA MILLER ARCHITECTURE PC 23. ALL EQUIPMENT SHALL BE NEW EXCEPT FOR EQUIPMENT SPECIFICALLY NOTED AS EXISTING TO REMAIN. CONTRACTOR SHALL TEST SHEET TITLE EXISTING EQUIPMENT FOR PROPER OPERATION AND REPORT CONDITION TO OWNER. ALL UNREPORTED EQUIPMENT IS THE PLUMBING GENERAL RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED OR REPLACED IF NOT FUNCTIONAL AT THE DATE OF BENEFICIAL OCCUPANCY. NEW EQUIPMENT SHALL BE UL OR ETL LISTED AND LABELED. GAS-FIRED EQUIPMENT SHALL ALSO BE AGA OR CSA LISTED AND LABELED. INSTALL ALL EQUIPMENT PER THESE DOCUMENTS, MANUFACTURER'S RECOMMENDATIONS, AND CODE REQUIREMENTS FOR SPECIFIC APPLICATION. ' ^r 24. EXCEPT WHERE SPECIFIED OTHERWISE, MECHANICAL CONTRACTOR SHALL PROVIDE STARTERS AND ELECTRICAL DISCONNECTS FOR ALL CITY OF TIGARD 0F111-��-�- COPY EQUIPMENT FURNISHED UNDER THIS CONTRACT. Approved............................... Conditionally Approved.............. 25. PROVIDE PERMANENT LABELS FOR ALL EQUIPMENT, CONTROLS, AND PIPING. 1 SUPPLY FLOOR P See Letter to: Follow.................. [ ] Ahachcd................ [ ] 26. PROVIDE PRESSURE REDUCING VALVE IF LINE PRESSURE EXCEEDS 80 PSI, SET TO 60 PSI. P1.1 SCALE: 1/4" = 1'-0" Permit Number: AL1 t coil -'0372 Address: 11005 S.1✓- 44,L4rFre- By: Date: P 1 ■ 1 �-� �.1.o-ao2l All concepts, designs, arrangements, and data Indicated on these documents are the property of G. A. Miller Architecture PC and were created, evolved, and SHO=T OF developed for use on, and In connection with the specified project. None of such Ideas, designs, arrangements, or data shall be used by, or disclosed to any person, firm, or corporation for any purpose whatsoever without permission of Cs. A. Miller Architecture PC. GENERAL NOTES: KEYED NOTES: 1. CONTRACTOR H NTRACTOR SHALL CONFIRM EXISTING CONDITIONS PRIOR TO 10 PROVIDE E LAVATORY 1070 HANDTEMPERING VALVE, SET TO 110•F OUTLET, AT B 9A MIO I�F] 2. COORDINATE ALL MECHANICAL CONSTRUCTION WITH OTHERO VENTS SHALL BE MIN 10'-0" FROM ANY OUTDOOR AIR INTAKE. AF]1 ,�1.11 JFIF V r TRADES TO AVOID CONFLICTS. 3. CONFIRM LOCATIONS OF ALL EXISTING UTILITIES AND ADJUST O ROUTE FIXTURE/EQUIPMENT DRAIN TO HUB DRAIN (HD) OR FLOOR ROUTING OF TENANT SYSTEMS AS REQUIRED. SINK (FS) AS INDICATED, TERMINATE WITH 45-DEGREE CUT END AND AIR GAP MINIMUM 2 PIPE DIAMETERS. 141 DEL PRADO STIN LAVATORY TO REMAIN, STIN LAVATORY TO REMAIN, 4. EXISTING PLUMBING SERVICES (COLD WATER, HOT WATER, 04 PROVIDE WATER HAMMER ARRESTOR. LAKE OSWEGO, OREGON 97035 EXISTIN WATER CLOSET TO BE EXISTIN WATER CLOSET TO BE WASTE AND VENT) WHICH ARE NOT TO BE REUSED SHALL BE RELOCA ED, RECONNECT AS RELOC ED, RECONNECT AS 503.636.7979 REQUIR D, REFER TO ARCH PLANS REMOVED BACK TO ACTIVE MAINS AND CAPPED. THERE SHALL O PROVIDE ASSE 1022 BACKFLOW PREVENTER. REQUIR D, REFER TO ARCH PLANS 503.636.9898 - FAX BE NO "DEAD ENDS" LEFT IN PIPING SYSTEMS. - ---- 5. FLOOR SINKS SHALL BE SET AT LEADING EDGE OF O PROVIDE ASSE 1012 BACKFLOW PREVENTER. ------- glen�gamillerarchitecture.com :1 PIP FIXTURE/EQUIPMENT SERVED TO FACILITATE INSPECTION AND 07 AT OWNER'S OPTION, IF APPROVED BY AHJ, HUB DRAIN MAY BE CONSULTANTS - EXTEND AND CONNECT 4"W" --- RPZ BACKFLOW _ L. CLEANING. PROVIDED IN LIEU OF FLOOR SINK FOR INDIRECT WASTE. ' TO EXISTING SAN. MAIN _PREkTER KEITH STEFAN MIKULKA,PE B/F, FIELD VERIFY LOCATIO 6. HAND SINKS SHALL BE DIRECTLY CONNECTED TO THE SANITARY 08 COORDINATE LOCATION OF RPZ BACKFLOW PREVENTER WITH �08 PROFESSIONAL ENGINEER SYSTEM WHERE REQUIRED BY THE AUTHORITY HAVING AUTHORITY HAVING JURISDICTION. PIPE FULL SIZE RELIEF OUTSIDE, i OREGON LICENSE NO.90971PE EXP: 12/31/2022 1 , _ \ 1827 POWERS FERRY ROAD SE,BUILDING 20,SUITE 100 JURISDICTION. SPILL ON GRADE. RPZ BACKFLOW PREVENTER MAY BE OMITTED IF L ATLANTA,GEORGIA 30339 -t--- ------ i SUITE OR BUILDING IS ALREADY SERVED BY A RPZ BACKFLOW _ --- ------- i 1"GW (no )953-]443 FAX:(770)953-9533PREVENTER (CONTRACTOR FIELD VERIFY). ANY EXISTING RPZ TO BE 1/2"H&CW TO O -L GREASE TRAP SIZING REUSED SHALL BE TESTED AND CERTIFIED FOR PROPER OPERATION. -i \I 3-COMP SINK EXTEND AND CONNECT i'CW, l ® (2 SETS) TO EXIST. CW MAIN A/C,, 1 3"GW 3 GIVEN: 1/2 H&CW FIELD VERIFY LOCATION GENERAL CONTRACTOR - GIVEN: FLOW CONTRO LANDLORD SCOPE - INTEGRAL TO 1. ONE (1) THREE-COMPARTMENT SINK: ( I 3 4 CW THE FOLLOWING ITEMS ARE BY THE LANDLORD. THIS 1'CW 3 - 16"x2ON14" x3 = 7.8 CU. FT. = 58.5 GAL LIST IS FOR REFERENCE ONLY, THE CONTRACTOR 3/4"HW_/ SINK0 COMP ASSUME 75% FULL = 58.5 GAL x .75 = 43.8 GAL SHALL COORDINATE EXACT SCOPE OF LANDLORD I __ ASSUME 2 MINUTE DRAIN TIME WORK WITH FRANCHISEE AND WITH LANDLORD PRIOR MIN. FLOW RATING = 43.8 GAL / 2 MIN = 21.9 GPM TO BID. TJX J 2. ONE (1) ONE COMPARTMENT SINK: NOT APPLICABLE j /2"H&CW TO FD PRQ SINK v 16"x20"x14" x1 = 2.6 CU. FT. = 19.4 GAL N HAND SINK cc\�P fFSS ASSUME 75% FULL = 19.4 X .75 = 14.5 GAL I ��� �NGINFFR /Dy ASSUME 2 MINUTE DRAIN TIME ;> FCO O t 71 r MIN. FLOW RATING = 14.5 GAL / 2 MIN = 7.3 GPM ___ 1/4"CW TO I 3. ONE (1) MOP SINK: 5.0 GPM ALLOWANCE = 5.0 GPM BREAD OVEN I I OREGON ' rV� 4. TWO (2) HAND SINKS: 2.0 GPM EACH = 4.0 GPM O 4 i I �Fj�gN 12 20Nre ! I MIKV� 5. ONE (1) DRINK STATION FLOOR SINK: = 1.0 GPM -�- ---- � ti,"C JI I I Ove-Ig-21 Fn TOTAL DESIGN LOAD = 39.2 GPM 3/4 HW I ---- -- ----- I If�K I i GREASE INTERCEPTOR SIZED FOR 50 GPM 2"H&CW TO I -------- --I--- "cw EGGIE SINK _ I JERSEY MIKE'S SUBS T.I. I I 11705 SW PACIFIC HWY. / I EXTEND AND CONNECT 4"W BAG'IN- BOX I I ; TIGARD, OREGON V TO EXISTING SAN. MAIN r5Y4) r I B/F, FIELD VERIFY LOCATION CW �y� �O if1. L 3'VTR �4 HW I I +, r----- r r-------- TO HANDW 3-COMPI �\ z - ---_ _-____ ___�_ SINK OWNER- 3 ND 4 SINK I \� r --------- I I 3'VTR 1 4-CW _ --------- INK I I i \\ Z 3/4-CW r _ I L- --- -- TO 1� / � I L / I ----- FLOW CONTROL / 4Gw I� SINK /,� i \�� 304WH-1W INTEGRAL TO �,j I R3"VTR -- T 3oGV� 4 3"GW HAN Iimate.: CHROME PLATE BRASS FLOOR COVER �3 4 J SPECIFICATIONS MEMBRANE CLAMP FLOOR SLAB ON GRADE G Notes STAINLESS STEEL WATER CUT—OFF P 9 TOP VIEW CLAMPING RINGS ° _ ° 4_11 �� �� 1. 4"FPT inlet/outlet with 3"and 4" Iain end fittings. MASTIC E � F d 2. Unit weight-49 lbs.(wet weight 216 lbs.) 3. Capacities- Liquid:20 gal. @35 GPM- Grease:130 lbs.(17.8 gal.) 35' @50 GPM- Grease:127 lbs.(17.3 gal.) Outlet'A' Solids:1.8 gal. (Optional) PRE—MOLDED PIPE 141 DEL PRADO 4. Built-in flow control. FLASHING SAME SIZE AS SEWER AS REQUIRED FOR 5. For gravity drainage applications only. r DEPTH OF SEWER UP TO 4" MAXIMUM LAKE OSWEGO OREGON 97035 s. Do not use for pressure applications. °'o 0 0°'°'oma o o"0 0 00 a i P PP o°°°°°°°po °�o o°°o°° 7. Cover placement allows full access to tank for ° o °° n ° ° ° ° ° HUB AND SPIGOT 503.836.7979 proper maintenance. A o°°°°°°°°°o % % 8. A CAST IRON PIPE 8. Vent not required unless per local code. ° o 0 0°o BELOW FLOOR 503.838.9898 - FAX 9. Engineered inlet and outlet diffusers are °°°°°o° °o°°°°° removable to inspect/clean piping. 23' °° • — �°�°o t LONG SWEEP ELBOW AT glen@gamillerarchitecture.com 0 0 0 ° °o oatlet'B- SEAM FASTENING l0.lntegral air relief/anti-siphon. Inlet+ °° ° , c ° °° IN SEAM SEALANT END OR TURN OF RUN (standard) PLATE WITH HP CON8lATANT8 °°°°°°° o°o°° outlet foot FASTENER Engineer specification Guide °°°°1°O° o°°°o°o° must face this LAP SEALANT Schier Great Basin""grease interceptor model #GB2 °°o°o°°o\ o°o°o°o°o° direction in all COMBINATION WYE AND KEITH STEFAN MIKULKA,PE configurations shall be lifetime guaranteed and made in e. of °o 0 0 0 0 oe 0 0 0 0 0 0 0 97 J PROFESSIONAL ENGINEER seamless,rotationally-molded polyethylene. EIGHTH BEND IN RUN. Interceptor shall be furnished for above or below outlet*c* SANITARY OR STORM ENTER TOP OF PIPE OREGON LICENSE NO.90971PE EXP: 12/31/2022 rade installation.interceptor shall be certified to (optional) ..+ ::>.:;`.:;::..:; ;.s• '' -+. - 1827 POWERS FERRY ROAD SE,BUILDING 20,SUITE 100 9 P tz-7/t6' �..: :,• ;,. '•:•.:�•.;..:... ' . .....::•::-'.:.:_:..::: ::.::•:;.:, SEWER LINE ASME A112.14.3(type C)and CSA 8481.1,with field cut •?.t:.. . i,'•.;,:..;:,.^.;•..;` a"'; •1'a.:: :-',:'_;:.;r;:` ATLANTA,GEORGIA 30339 riser system,built-in flow control and three outlet ",:::.`%:a�-.5•::^' ' `�'.:�+.••.��� (770)953-1443 FAX:(770)953-9533 options.Interceptor flow rate shall be 35 or 50 GPM, DIRECTION Interceptor grease capacity shall be 130 lbs.@ 35 OF FLOW GPM or 127 lbs.@ 50 GPM.Cover shall provide water/gas-tight seal and have minimum 450 lbs. SECTION A-A GENERAL CONTRACTOR, load capacity. IN—SEAM SPLICING CEMENT Certified Performance of 4-rPt SeeNote#10 SEALANT LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, AT TURNS OF PIPE GREATER THAN 45 DEGREES, AT 50' INTERVALS Great BasinT"hydromechanical grease interceptors are inlet&outlet a 21-1/2"Cover ON STRAIGHT RUNS, AND WHERE SHOWN ON PLANS. third party performance-tested and listed by IAPMO to PROVIDE BACKFILL PER ARCHITECTURAL SPECIFICATIONS. ASME#A11214.3 and CSA 8481.1 grease interceptor 2 CONSULT LOCAL CODES FOR OTHER FCO REQUIREMENTS. standards and greatly exceed requirements for grease 5" separation and storage.They are compliant to the L Uniform Plumbing Code,the National Standard 3.3/4• 1 _ _ _ P3.1 SCALE: NONE FLOOR CLEANO Plumbing Code,the National Plumbing Code of Canada, and the International Plumbing Code. 8-3/4" 6-3/4'invert 3 OPOEngineered inlet Static water line P3.1 SCALE: NONE S���NDRD� NE ESs/� C ® and outlet diffuser R 71 r Rated Grease Capacites OREGON OUTLET END VIEW ✓ for Units Piped in Series 23 No.of Units Removal Efficiency ANCHOR TO BOTTOM OF TRUSS �S M1KV� in series 57.8% 99x• WITH CUP HANGERS HW 140'F CW Og Ig�2l GALVANIZED (IN) (IN) z 274 lbs. 80 lbs. IRON HANGER NOTE:Flow rate for 2 G62 units piped in ROD & HANGER series is 35 GPM only "Satisfies Miami DERMmen 99% JERSEY MIKE'S SUBS T1,efficiency requirements BALL VALVE, TYP. 11705 SW PACIFIC HWY. ~ N C �— e WATTS MMV ASSE 1070 MIXING TIGARD, OREGON MODEL NUMBER: DESCRIPTION:35/50 GPM Polyethylene Grease Interceptor VALVE WITH TEMPERATURE ADJUSTMENT G B�Z7W I IFE SIME GUARANTEEDZ GREASEINTERCEPTORSPART#:4065-001-OS DWG BY:B.Karrer DATE:4/10/2019 REV: ECO: WATER PIPING UNION, TYP. .. Page 4of4 INSULATE AS SPEC'D 16 GAUGE OWNERr GALVANIZED SHEET SHIELD TW 110'F GREASE (OUT) ITR PO D 4GENERAL PIPING HANGER P3.1 SCALE: NONE P3.1 SCALE: NONE J'57%*NTHERM0STATIC P3.1 SCALE: NONE CONCENTRIC VENT AND COMB AIR CHECK VALVE, TYP. DUCTS UP THRU ROOF WITH CONCENTRIC VENT TERMINATION KIT, SIZE AND INSTALL PER MANUFACTURER'S EXPANSION TANK RECOMMENDATIONS 6�� CW SUPPLY GAS SUPPLY EXPANSION TANK, EQUAL TO WATTS DET-5 0 o MARK DATE DESCRIPTION WASH RINSE SANITIZE COMPARTMENT COMPARTMENT COMPARTMENT JOB NO.: 2102-05 IWH --{ �—� HW (1407) SUPPLY FILE: 2102-05 A1.2 BY: PLAN CHECK NO. 1-1/2"W BALL VALVE, TYP. PERMIT NO. 0 0 DATE: 08/18/2021 UNION, TYP. YL— — — rj ®eopyriglTl. 2019 GA MILLER ARCHITECTURE PC VALVE GAS COCK SHEET TITLE 1-1/2"W, DRAIN VALVE, PLUMBING DETAILS TYP. OF 3 TYP 6 IS 2 PIPE DIAMETER 2 PIPE DIAMETER DIRT LEG W/REMOVABLE CAP AIR GAP AIR GAP 3—COMP SINK VEGGIE SINK 6INDIRECT WASTE DETAI 7 P3.1 SCALE: NONEP3.1 SCALE: NONE P3 . 1 All concepts, designs, arrangements, and data indicated on these documents are the proparty of G. A. Miller Architecture PG and were created, evolved, and SHEET OF developed for use on, and In connection with the specified project. None or such Ideas, designs, arrangements, or data shall be used by, or disclosed to any person, firm, or corporation for any purpose whatsoever without permission of G. A. Miller Architecture I