Loading...
Plans (6) M EC2021 -00802 t� PECEiVED �w CO E05ENCE OCT 7 2011 CITY OF TIGAHu ? 3UILDING DIVISION ytY PHON I 204 • 6 (Z�fy 2�3 sp°'�� � � Oregon Heating— 9 J �I S• IPHONPHON� ! b~: Air Conditioning 203 't, OFFICE ` ( ti BREAK 1 OFFICE COPT( OPEN OFFICE CITY OF TIGARDti vw2t 217 VPuI I REVIEWED POR CODE COMPLIANCE Approve&" I OTC: I I OFFICE � � I _ Permit #: n2P� dna l- nd S 4a I 207 ( I Address: L)0Q0 2 I sQ� Suite#: 2rjp l ❑ I ��, C6 — LOBBY Br. Date: Ld p VALIDITY OF PERMIT J THE ISSUANCE OF A PERMIT CONFERENCE / Q ty' BASED ON CONSTRUCTION r� I �`�J"� L CUMENTS AND OTHER OAOTA SHALL NOT PREVENT ILL o o THE CODE OFFICIAL FROM p� Z I REQUIRING ER ORS, OSOSC 105.4 CORRECTION OFFICE I ®t^►" L Project L- IZ SD LITHIA DRIVEWAY COPY SUITE 250 f OFFICE spy 213 ti TENANT IMPROVEMENT WELLNESS IT 9020,SW WASHINGTON �- 214 215 SQUARE ROAD ! SCfi C< TIGARD, OREGON 97223 dFFICE O� D% \I° vku� �•�0212 E ,PPE 2OFFICE C 5f REVISION SCHEDULE Delta Issued As Issue Date 1 PARTIAL SECOND FLOOR PLAN Scope of Work Mechanical General Notes: GRD schedule Oregon Heating and Air Conditioning will perform the following scope of work: 1. Cooling equipment does not exceed the load of the calculated requirement. 1. Provide and Install (1) AC system. 2. All steel ducting will be 26 ga minimum galvanized. Flex per Mfg. TAG #: =PARI Module Size 2. Provide and install (1) fan powered VAV box. 3. Heating and cooling ducting to be designed to not exceed 0.5 we positive(supply) and 0.5 we LD124x24 See plans negative (return). SDI24x24 See plans 3. Ducting and air distribution as drawn. 4. Provide programmable thermostat. 5 degree deadband minimum. 7 day. Microprocessor. Set SD2 program for night energy savings. 12x12 See plans Equipment Schedule 5. Seal ducting with UL listed mastic or mastic tape. RG124x24 Plenum boot ACI-. Mitsubishi PUY-Al2NKA7- 1 ton. 208/1/60, 11 MCA, 25 MOCP. 12,000 Btu 6. Fan motor does not exceed allowable, first available above BHP. RG224x24 12" Cooling, 19.1 Seer. 15KW strip heat. 92#. 7. Max leakage rate of OSA or exhaust dampers to be 4 cfm/sft @ 1.0 sp. DFC1-. PKA-Al2NKA7- 1 ton powered off AC1. 12,000 Btu cooling. 33#. 8. Provide 0 and M to building owner. FPB211, FPB210, FPB209, FPB208-. Existing. - DRAWN BY: VAV220, VAV219, VAV218-. Existing. FPB212-. Trane VPEF08- 900CFM max 277/1/60, 21.6 MCA 25 MOCP, 5KW strip heat. 120# SHEET: M11so OHAC CCB # 137653