Plans (11) M EC2021 -00586
Latimer HVAC
RECEIVED CCB#220839
JUL 2 1 2021
CITY OF TIGARD
BUILDING DIVISION
b•SOlOSSO'SUOUd 30
N011038HOO 31-119NI 18038
W083 TJ101330 3003 3H1
\
Latimer`' mer l ,\ / /�H C 1FJ3N3A3FJd NON IIVH 0
� r n V H0(INV S1N3W 00 000
HEATING.VENTILATION.AIR CONDITIONING Outside Air Ventilation N0110nUiSNO0 NO 3SV9
1IWH3d V d0 30NVfl 1 3H1
AZ RP RA VBZ EZ VOZ I11Wa3d =10 AlK 11bn
Room Code Max Ventilation Area Outdoor Exhaust Exhaust
Scope of Work Description/n Room Area Occupant Density Occupancy Factor Air Rate Breathing Zone Air Distribution Zone Outdoor Airflow Rate Airflow Occupancy Classification Air Distribution Configuration
umbers (SF) (People/1000 SF) (People) (CFM/Person) (CFM/SF) Ventilation (CFM) Effectiveness Airflow (CFM) (CFM) (CFM)
Latimer HVAC will perform the following scope of work: SIM1 322 0 0 0.3 96.6 0.8 120.75 0 Gym, stadium, arena (play area) Ceiling supply and ceiling return
1. Replace existing with new rooftop gaspack unit on existing curb. Use curb clips. SIM2 670 0 0 0.3 201 0.8 251.25 0 Gym, stadium, arena (play area) Ceiling supply and ceiling return
2. Provide (1) ceiling mount exhaust fan for kitchen area. SIM3 410 0 0 0.3 123 0.8 153.75 0 Gym, stadium, arena (play area) Ceiling supply and ceiling return (�--�-'�--�
3. Ducting and air dis' :tion modifications as drawn. open 320 15 7.5 0.12 74.4 0.8 93 0 Sales (except as below) Ceiling supply and ceiling return 17- 2 " ¢ mlea
AH1 1722 619 .#alp
Equipment Schedule Sim 4 540 0 0 0.3 162 0.8 202.5 0 Gym, stadium, arena (play area) Ceiling supply and ceiling return ;ssarppV
RTU1-. Existing 7.5-ton rooftop HP. 3000 cfm design. Sim 5 5401 0 0 0.3 162 0.8 202.5 0 Gym, stadium, arena (play area) Ceiling supply and ceiling return - V 11"342
RTU2-. Existing 5-ton rooftop HP. 1620 cfm design.
RTUI 1080 405 I -0Z0
RTU3-. New Carrier 50TCQD08A2A5. 7.5-ton package HP. 18.6KW electric supplementary heater.
kitchen 300 0 0 0 0 0.8 0 210 290 Kitchen (cooking) Ceiling supply and ceiling return y.
208/3/60- 68 MCA, 110 MOCP. 88,000 Btu cooling. 11.2 EER, 12.5 leer. 86Mbtu heating- COP 3.4. 3000 bar 300 100 7.5 0.18 279 0.8 348.75 0 Bar, cocktail lounges Ceiling supply and ceiling return
CFM. 885# net. 70# economizer, 200#curb adapter, 200# existing curb and duct. Gross- 1355# open 700 15 7.5 0.12 162.75 0.8 203.4375 0 Sales (except as below Ceiling supply and ceiling return aartvrlaw0a aan0 x03
P g
( P ) g PP Y g
AHI-. Existing air handler connected to 5-ton HP. Existing OSA. 1700 cfm design. men 105 0 0 0 0 0.8 0 100 120 Toilet room - public Ceiling supply and ceiling return �QUVDL .ti0 AMD '
EF1- Existing rooftop exhaust fan for restrooms- 240 cfm. women 105 0 0 0 0 0.8 0 100 120 Toilet room - public Ceiling supply and ceiling return d03 301:11:10
EFb Panasonic FV-30- 290 cfm @ 0.25sp. On switch. office 75 5 5 0.06 6.375 0.8 7.96875 0 Office space Ceiling supply and ceiling return
RTU2 1585 560
Mechanical General Notes: sim6 375 0 0 0.03 112.5 0.8 140.625 0 jGym, stadium, arena (play area) Ceiling supply and ceiling return _---
lounge 500 100 7.5 0.18 127.5 0.8 159.375 0 Bar, cocktail lounges Ceiling supply and ceiling return
1. Cooling equipment does not exceed the load of the calculated requirement. RTU3 875 300
2. All steel ducting will be 26 ga minimum galvanized. Flex per Mfg. TOTAL 1884 530
3. Heating and cooling ducting to be designed to not exceed 0.5 we positive (supply) and 0.5 we negative FJO
9 OSW
(return).
4. Provide programmable thermostat. 5 degree deadband minimum. 7 day. Microprocessor. Set program for - a34N311b'
0 V 1V 1VN01S
night energy savings. d(1S 3181at1V
5. Seal ducting with UL listed mastic or mastic tape. Ventilation Requirements-based on 2019 OMSC table 403.3 A V
6. Fan motor does not exceed allowable, first available above BHP. -10 VH31V/111OV
7. Confirm smoke detectors on all units over 2000 cfm AH1- 313(3 3)IOINS
8. Provide 0 and M to building owner. SA= 1700 cfm OI1VAI LOV 3H I ,
RA= 1400 cfm -
OSA= 300 cfm
RTU 1- Ir-
SA
SA = 3000 cfm Z t U
RA = 2350 cfm
OSA =650 cfmLU
O °1
Iu 3
r a ::3 oc
RTU2- C
® 2 C•, SA= 1620 cfm Z C< CL `
RA= 1320 cfm Z w r- ~
.oD
LLL / n CEJ OSA= 300 cfm t
.4 ` LL N
o �>
RTU3- Ln
Q SA = 3000 cfm ti I O
RA= 2350 cfm
OSA= 650 cfm CD
e-I
SUBMITTAL REVIEW
❑X NO EXCEPTIONS TAKEN ❑ REVISE AND RESUBMIT
❑ MAKE CORRECTIONS NOTED ❑ SUBMIT SPECIFIED ITEM
CHECKING IS ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE
PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION IN THE CONTRACT
DOCUMENTS.ANY ACTION SHOWN ABOVE IS SUBJECT TO THE REQUIREMENTS OF THE
PLANS AND SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR: DIMENSIONS WHICH
SHALL BE CONFIRMED AND CORRELATED AT THE JOB SITE; FABRICATION PROCESSES
AND TECHNIQUES OF CONSTRUCTION; COORDINATION OF THEIR WORK WITH THAT OF
ALL OTHER TRADES;AND SATISFACTORY PREFORMANCE OF THEIR WORK.
ORANGEWALLstudios architecture + planning
240 N Broadway Suite 308, Portland, OR 97227
BY: J. Erwin (OWS) DATE: 07/13/2021 I M0.0
- -
CID
co
XLatimer HVAC
Latimer HVAC CCB#220839
W HEATING•VENTILATION•AIR CONDITIONING
W
! � Legend
_ - - - - --- - -- - ' ® - Supply Diffuser
- - - - - - - - - - -- -- --- -- - - --- - - - - --- - I - -- - - ---- - 0 - -- - -- - - - - -- - - -- - - - --- - - - - - ---- 2
- I Supply diffuser spiral
JANITOR
Air
ir
104 - Return Grill
A - Thermostat
SIM 2 � SIM 1 (NJ ��CPM `��KITCHEN ROOFTOP MIENS
(I I
105 ACCESS RES ROOM ® - Exhaust fan
- - _ 7 - r CL-2 103
i +,o' -o" Existing
—p—
Ll
t' FAI
�N) U I9<1 ►CMD - +8E)6„ ICE) I I - - - - -
� j � <I �ISupply duct
IUL - �I - - 19 - - - -
UI L J I III - Return duct
III WOMENS
m CL , Ca) Lu'
W A4 (E) TELCO RESTROO�A - Neck size/ CFM
� � �. : I w°w III + 3'-0" ZQ
= L ° ct 2 III I 102
Volume dampers
z ` BAR iE,Ck' �� ,Z � J 06 ( E
PARTY RISER
- - — - -- - -- - _�
-ROOM-
0
ROOM - - — — - - - ----- - - -- - --- - -- --- - - - - - - - - - -- -
I 107 OFFICE
� -�
Z .� '� — - — — I 2 101
uj
uj I ti
Lu
Z
V CL-2
0
W NI-� � � �y� ids i j°" ! w Q
A'4�
( 1 V o
\7 (k) lbw Z
Q �
II — o a �
_ m to °
SIM3 SII °[ 7 Z < oo
til ° J I j i 1 I\ ' I`� — — — -- — — — -- — — w (D I- g
IL I v L I I <Nj ZZ I Q Z
_ — — — — - — — — - - - - c
!Cu I y I ����I Al / Z ° c=n a
tui _ � tgns w W Z a
(NI � -(Rep)4i�) �N 1-
n,M QOCj;vL� LL
lJc" J O
° � N
Q IO
I m
` III Hill IAI)
II . IIII N
I n � �� Iw uu
L_.
III
CL-2 A401
L I I � w
1:-
ILII 12-
y r-AA 00 i
F] F]
tell
® LOUNGE 5'-o°
SIM 4 SIM 5 100
i I I I
i� Rod — — c4) ivy _ �I i z,N O Va -� -- — -
I
SUBMITTAL REVIEW
® NO EXCEPTIONS TAKEN ❑ REVISE AND RESUBMIT
MAKE CORRECTIONS NOTED ❑ SUBMIT SPECIFIED ITEM
- - -- - ---- — I- -
CHECV4G IS ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE
PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION IN THE CONTRACT
j DOCUMENTS.ANY ACTION SHOWN ABOVE IS SUBJECT TO THE REQUIREMENTS OF THE
PLANS AND SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR: DIMENSIONS WHICH
SHALL BE CONFIRMED AND CORRELATED AT THE JOB SITE; FABRICATION PROCESSES /
AND TECHNIQUES OF CONSTRUCTION; COORDINATION OF THEIR WORK WITH THAT OF Ham,!�e,
ALL OTHER TRADES;AND SATISFACTORY PREFORMANCE OF THEIR WORK.
ORANGEWALLstudios architecture + planning
240 N Broadway Suite 308, Portland, OR 97227
H __
PLAN 240
J. Erwin (OWS) DATE: 07/13/2021 M 1 •�