Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (8)
M EC2021 -00215 OFFICE CQYY OFFICE COPY GENERAL NOTES SYMBOLS GENERAL NOTES - MECHANICAL EQUIPMENT TERMINALS 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE 4. MISCELLANEOUS DUCT FITTINGS (CONICAL TAKEOFFS, ETC.): 3. ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC WORK COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, WRAP WITH INSULATION FOR CONDENSATION CONTROL. OR READILY ACCESSIBLE MANUALLY OPERATED DAMPERS IN ALL EF-1 CIVIL, ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED OPENINGS TO THE OUTSIDE, EXCEPT FOR COMBUSTION AIR OPENINGS. TYPICAL EQUIPMENT DESIGNATION _ _ DIFFUSER/GRILLE TYPE, AND NUMBER _ ON A SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). 5. THE PIPING FOR ALL SPACE CONDITIONING AND SERVICE WATER HEATING 12x12 OR OR SIZE SYSTEMS SHALL BE INSULATED IN ACCORDANCE WITH TABLE 123-A. 4. THE LESSER OF THE MINIMUM RATE OF OUTDOOR AIR REQUIRED BY (EXHAUST FAN SHOWN) 400400 '-DESIGN CFM (WHERE APPLICABLE) SECTION 121(b)2, OR THREE COMPLETE AIR CHANGES SHALL BE 2. ELECTRICAL CHARACTERISTICS: REFER ELECTRICAL COORDINATION REQUIREMENTS SUPPLIED TO THE ENTIRE BUILDING DURING THE ONE-HOUR PERIOD Q ROOM THERMOSTAT OR DRAWINGS FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC.) IMMEDIATELY BEFORE THE BUILDING IS NORMALLY OCCUPIED. TEMPERATURE TRANSMITTER CEILING DIFFUSER (FLOW ARROWIREC'EN OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. 1. DUCTWORK: LOCATE AND COORDINATE THE EXACT LOCATION OF X � SHOWN ONLY IF AIRFLOW NOT 1 DUCTWORK WITH STRUCTURAL PLANS AND WITH THE GENERAL COMPLETION AND BALANCING DSD DUCT SMOKE DETECTOR SYMMETRICAL) MAR 3 0 '10V 3. CODES: COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR CITY PER THE APPLICABLE BUILDING, MECHANICAL, ENERGY, PLUMBING, FIRE, EQUIPMENT. COORDINATE WITH FRAMING CONTRACTOR TO ASSURE ALL VENTILATION SYSTEMS SHALL BE DOCUMENTED PER CALIFORNIA AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL AHJ. JOIST SPACES LINE UP WHEN DUCTWORK MUST PASS THROUGH SAFETY CODE (TITLE 8, SECTION 5142 (B) TO BE PROVIDING THE DUCTWORK CEILING RETURN/EXHAUST GRILLE $UILDINGDNI ION 1 DIFFERENT JOIST SPACES. MINIMUM REQUIRED VENTILATION RATE AS DETERMINED USING ONE OF ILS 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON THE FOLLOWING PROCEDURES: DUCT (1ST FIGURE = SIDE SHOWN, tn 8x12 FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING ALL CONTROLS 2ND FIGURE = SIDE NOT SHOWN) LINEAR DIFFUSER, CEILING OR WALL DUCTWORK, DAMPERS, EQUIPMENT, PIPING, ETC. 1. AIR BALANCING: ALL SPACE-CONDITIONING AND A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH STRUCTURAL. 1. THE THERMOSTATIC CONTROLS FOR HVAC SYSTEMS SHALL MEET VENTILATIONSYSTEMS SHALL BE BALANCED TO THE UP DOWN II MOUNTED (FLOW ARROWS SHOWN B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING, THE FOLLOWING REQUIREMENTS AS APPLICABLE: QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH ® DUCT SECTION, POSITIVE PRESSURE y ONLY IF AIRFLOW NOT SYMMETRICAL) LIGHTS, WALLS, FIRE SPRINKLER PIPING, AND OTHER TRADES WORK. THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) C. INCLUDE ADDITIONAL OFFSETS, ELBOWS, ROUTING, EQUIVALENT a) EACH SPACE CONDITIONING ZONE SHALL BE PROCEDURAL STANDARDS (1983) OR ASSOCIATED AIR DUCT SIZING EXCHANGE, RELOCATING, ETC. AS REQUIRED FOR A CONTROLLED BY AN INDIVIDUAL THERMOSTATIC BALANCE COUNCIL (AABC) NATIONAL STANDARDS (1989). UP DOWN � WALL SUPPLY GRILLE (SG) COMPLETE OPERATING MECHANICAL SYSTEM. CONTROL THAT RESPONDS TO THE TEMPERATURE �� DUCT SECTION, NEGATIVE PRESSURE D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE OWNER. WITHIN THE ZONE AND MEETS THE APPLICABLE 2. OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE WALL RETURN/EXHAUST GRILLE REQUIREMENTS OF SUBSECTION(b). MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL UP DOWN <A - (RG, EG) 5. MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE EXACT b) EACH THERMOSTATIC CONTROL REQUIRED BY DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE O LOCATION OF ALL MECHANICAL EQUIPMENT WITHIN THE STRUCTURE. SUBSECTION(a) SHALL BE CAPABLE OF BEING SET INSTALLING LICENSED C-20 MECHANICAL CONTRACTOR. { ROUND DUCT SECTION LOCALLY OR REMOTELY BY ADJUSTMENT OR `f" 6. EXHAUST OUTLETS: SOURCE-SPECIFIC FANS SHALL BE VENTED 3. OUTSIDE AIR MEASUREMENT: THE SYSTEM SHALL BE TRANSFER GRILLE (TG), DUCT CONNECTED, a SELECTION OF SENSORS TO CONTROL; TO OUTDOORS WITH A MINIMUM 3' CLEARANCE BETWEEN VENT EQUIPPED WITH A CALIBRATED LOCAL OR REMOTE DEVICE -�> -� WALL MOUNTED WITH OPTIONAL CFM CITY OF TIGAR OUTLETS AND BUILDING OPENINGS, AND 10' MINIMUM BETWEENCAPABLE OF MEASURING THE QUANTITY OF OUTSIDE AIR ON UP UP UP DUCT PENETRATION THRU FLOOR 50 1) COMFORT HEATING DOWN TO 55-F OR LOWER. SHOWN Approved............................... 2) COMFORT COOLING UP TO 85'F OR HIGHER. ] VENT OUTLETS AND MECHANICAL AIR INTAKES. A CONTINUOUS BASIS AND DISPLAYING THAT QUANTITY ON A READILY ACCESSIBLE DISPLAY DEVICE. OR ROOF Conditionally Approved.............. 7. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR ROOF 3) BOTH HEATING AND COOLING, THE THERMOSTATIC See Letter to:Follow..................[ I CONTROLS SHALL BE CAPABLE OF PROVIDING A 4. ANOTHER METHOD APPROVED BY THE ENERGY COMMISSION. VOLUME DAMPER Attached................( ]� CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. TRANSFER GRILLE, CEILING MOUNTED Permit Number:ryk-lf-Q-1 " 00Q9S TEMPERATURE RANGE OR DEAD BAND OF AT FSD FSD WITH FULL-SIZED LINED DUCT res. p� �LEAST 57 5'F WITHIN WHICH THE SUPPLY OF HEATING ADMINISTRATIVE REQUIREMENTS T 8. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF AND COOLING ENERGY TO THE ZONE IS SHUT OFF T FIRE/SMOKE DAMPER (� = HORIZ CONNECTION qB . Date: MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING OR REDUCED TO A MINIMUM. 1. THE PERSON WITH OVERALL RESPONSIBILITY OR THE PERSON DUCT, -� = VERT DUCT), �% FIXTURES FOR REMOVAL AND REPLACEMENT. RESPONSIBLE FOR THE INSTALLATION OF REGULATED MANUFACTURED 2-HR RATED, LION GENERAL 9. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: 2. EACH SPACE-CONDITIONING SYSTEM SHALL BE INSTALLED WITH DEVICES SHALL POST, OR MAKE AVAILABLE WITH THE BUILDING ARCHITECTURAL BACKGROUND VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT CONTROLS THAT COMPLY WITH ITEMS 1 AND 2 BELOW: PERMIT(S) ISSUED FOR THE BUILDING, THE INSTALLATION CERTIFICATE(S) FD FD FIRE DAMPER (- • = HORIZ (THIN LINE Iwo ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF FOR MANUFACTURED DEVICES REGULATED BY THE APPLIANCE ) MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE 1) ARE CAPABLE OF AUTOMATICALLY SHUTTING OFF THE EFFICIENCY REGULATIONS. SUCH INSTALLATION CERTIFICATES DUCT, VERT DUCT), L ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. SYSTEM DURING PERIODS OF NON-USE AND SHALL HAVE: SHALL BE MADE AVAILABLE TO THE ENFORCEMENT AGENCY FOR ALL �F� 2-HR RATED, LION NEW MECHANICAL WORK M a) AN AUTOMATIC TIME SWITCH CONTROL DEVICE APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL: (HEAVY LINE) "/ 10. DUCT SYSTEMS USED WITH BLOWER TYPE EQUIPMENT WHICH ARE COMPLYING WITH SECTION 119(c), WITH AN ACCESSIBLE a IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH THE 90' ELBOW, R/D OR R/W=1.5 - - MATCHLINE OR PROPERTY LINE uj PORTIONS OF A HEATING, COOLING, ABSORPTION, EVAPORATIVE COOLING ) O = N OR OUTDOOR AIR VENTILATION SYSTEM SHALL BE SIZED IN ACCORDANCE MANUAL OVERRIDE THAT ALLOWS OPERATION OF APPLIANCE EFFICIENCY REGULATIONS. THE SYSTEM FOR UP TO 4 HOURS; SECTION IDENTIFICATION WITH THE 2019 OREGON MECHANICAL SPECIALTY CODE. OR b) INCLUDE A STATEMENT INDICATING THAT THE INSTALLED DEVICES b) AN OCCUPANCY SENSOR; OR CONFORM TO THE APPLIANCE EFFICIENCY REGULATIONS AND PART SQUARE CORNER ELBOW WITH (DETAIL SIMILAR) Q U 11. HEATING AND COOLING EQUIPMENT AND SYSTEMS CAPACITY DO NO EXCEED TURNING VANES /A c) A FOUR-HOUR TIMER THAT CAN BE MANUALLY OPERATED. 6 AND THE REQUIREMENTS FOR SUCH DEVICES GIVEN IN THE U) L LL OREGON ENERGY EFFICIENCY SPECIALTY CODE. THE REPORTED EFFICIENCIES THE LOADS CALCULATED IN ACCORDANCE WITH SECTION 503.2.1 OF THE INDICATES DIRECTION OF CUTTING EXCEPTION: MECHANICAL SYSTEMS SERVING RETAIL STORES PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL M ENFORCEMENT AGENCY. PLANE W OF THE EQUIPMENT HAVE BEEN TESTED AND RATED IN ACCORDANCE WITH AND ASSOCIATED MALLS, RESTAURANTS, GROCERY STORES, � 90' TAKE-OFF OR TEE � UJ U THE APPLICABLE TEST PROCEDURE. THE EFFICIENCY HAS BEEN VERIFIED CHURCHES, AND THEATERS EQUIPPED WITH 7-DAY c) STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE LETTER INDICATES SECTION Q O THROUGH CERTIFICATION UNDER AN APPROVED CERTIFICATION PROGRAM OR, PROGRAMMABLE TIMERS. CONSTRUCTION OR INSTALLATION WAS PERFORMED. IF NO CERTIFICATION PROGRAM EXISTS, THE EQUIPMENT EFFICIENCY RATINGS 90' CONICAL TAKE-OFF - A - (N0. INDICATES DETAIL) Q ARE SUPPORTED BY DATA FURNISHED BY THE MANUFACTURER. 2) AUTOMATICALLY RESTART AND TEMPORARILY OPERATE 2. THE APPLICANT SHALL FILE ALL CERTIFICATES) OF ACCEPTANCE, C:] THE SYSTEM AS REQUIRED TO MAINTAIN: WITH THE ENFORCEMENT AGENCY PRIOR TO RECEIVING A FINAL M 3 M-3 SHEET NUMBER WHERE SECTION IS 12. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2019 OREGON MECHANICAL a) A SETBACK HEATING THERMOSTAT SETPOINT, IF THE SYSTEM OCCUPANCY PERMIT. THE SIGNER(S) SHALL BE ELIGIBLE UNDER DIVISION 3 45' LATERAL TAKE-OFF DRAWN L6 jg SPECIALTY CODE. PROVIDES MECHANICAL HEATING; AND OF THE BUSINESS AND PROFESSIONS CODE TO SIGN SUCH DOCUMENTS. SHEET NUMBER WHERE SECTION IS > L6 ( , INSULATION/LINING NOTES EXCEPTION: AREA WITH THE DESIGN WINTER OUTDOOR 3. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON(S) TRANSITION OR REDUCER (FOT= TAKEN o O� = TEMPERATURE OF GREATER THAN 32'F. RESPONSIBLE FOR BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT FLAT ON TOP, FOB=FLAT ON O O % ~ 1. ENERGY CODE: AS A MINIMUM, COMPLY WITH THICKNESSES AND b) A SETUP COOLING THERMOSTAT SETPOINT, IF THE OR CENTRALLY OPERATED BUILDINGS) AT OCCUPANCY THE FOLLOWING: BOTTOM) PIPING Z r TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. SYSTEM PROVIDES MECHANICAL COOLING. r EXCEPTION: AREA WITH THE DESIGN SUMMER OUTDOOR a) OPERATING INFORMATION: THE APPROPRIATE CERTIFICATES) OF ----C WYE FITTING CD CONDENSATE DRAINAGE W a 2. ALL AIR DISTRIBUTION SYSTEMS DUCTS AND PLENUMS SHALL BE TEMPERATURE OF LESS THAN 1007. COMPLIANCE AND A LIST OF THE FEATURES, MATERIALS, INSTALLED, SEALED AND INSULATED TO MEET THE REQUIREMENTS OF COMPONENTS, AND MECHANICAL DEVICES INSTALLED IN THE G NATURAL GAS SECTION 604 OF THE 2019 OREGON MECHANICAL SPECIALTY CODE. 3. THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN 'F. BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM 90' RECTANGULAR TAKE-OFF WITH SUPPLY-AIR AND RETURN-AIR DUCTS CONVEYING HEATED OR COOLED EFFICIENTLY. 45' TAPER D PIPE CAP AIR SHALL BE INSULATED TO A MINIMUM LEVEL OF R-8, UNLESS DUCTS 4. THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT b) MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE PIPE PLUG ARE IN A CONDITIONED SPACE. STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL. 90' DIVERGING RECTANGULAR TEE, ACTIONS SHALL BE CLEARLY STATED AND INCORPORATED ON A 2. EXTENT OF INTERNAL DUCT LINING: READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO EITHER RADIUS OR TURNING VANES It UNION A. GRILLE AND DIFFUSER BOXES AND BOOTS. VENTILATION IDENTIFYING THE OPERATION AND MAINTENANCE MANUAL. B. TRANSFER DUCTS. c) VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF PARALLEL FLOW BRANCH �I FLANGE 1. CONTROLS SHALL BE PROVIDED TO ALLOW OUTSIDE AIR DAMPERS OUTDOOR AIR AND RECIRCULATED AIR THAT THE VENTILATION CONNECTION, EITHER RADIUS OR ��� GATE VALVE OR BALL VALVE 3. EXTENT OF EXTERNAL DUCT INSULATION: OR DEVICES TO BE OPERATED AT THE VENTILATION RATES AS SYSTEMS ARE DESIGNED TO PROVIDE TO EACH AREA. --IL A. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACES, SPECIFIED IN THESE PLANS. �4 TURNING VANES �n BALL VALVE ARCHITECT/ ENGINEER OF RECORD MECHANICAL ROOMS, ELECTRICAL ROOMS, AND EQUIPMENT 4. CERTIFICATE OF OCCUPANCY AND ALL REQUIRED ACCEPTANCE DOCUMENTS ROOMS NOT SPECIFIED TO BE INTERNALLY LINED. 2. OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED SHALL BE SUBMITTED TO THE FIELD INSPECTOR DURING CONSTRUCTION. FLEXIBLE DUCT PRESSURE REDUCING VALVE (PRV) KEN MCCRACKEN, B. SUPPLY AIR ABOVE CEILINGS OR EXPOSED NOT WITH DAMPERS THAT AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL THESE FORMS -�l� ARCHITECT SPECIFIED TO BE INTERNALLY LINED. ARE REVIEWED AND APPROVED. , C. OUTDOOR AIR INTAKE. ROUND DUCT INDICATOR J BREAK IN PIPING OR DUCTWORK 6930 DESTINY DRIVE, #100 ROCKLIN, 5677 SCHEDULES SEQUENCE OF OPERATIONS ABBREVIATIONS Contac :A IA 9SAND Contacl:ARIANE SANDERS 707.655.4320 OCCUPIED AND UNOCCUPIED OPERATION ASANDERS@PMDGINC.COM DIFFUSER, GRILLE AND REGISTER SCHEDULE SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE AFF ABOVE FINISHED FLOOR THE TEMPERATURE CONTROL SYSTEM SHALL BE SET FOR AHJ AUTHORITY HAVING OCCUPIED AND UNOCCUPIED HOURS. DURING THE OCCUPIED JURISDICTION CONDENSING UNIT EVAPORATOR UNIT AH AIR HANDLING UNIT MANUFACTURER HOURS, THE SPACE SHALL BE MAINTAINED AT 72°F (ADI.) IN THE TAG LOCATION TYPE MATERIAL FINISH SIZE &MODEL NO. GENERAL REMARKS COOLING CAPACITY HEATING CAPACITY ELECTRIC ELECTRIC HEATER @ 240V ELECTRIC BTUH BRITISH THERMAL UNIT TAG MANUFACTURER MODEL NOMINAL WEIGHT TAG MANUFACTURER MODEL MOTOR, WEIGHT REMARKS COOLING MODE AND 70°F (ADI.) IN THE HEATING MODE. TITUS LAY-IN, AG-75, NARROW TEE BORDER TYPE TO TONS TOTAL(MBH) SENS. (MBH) SEER/EER TOTAL(MBH) HSPF/COP VOLTAGE MCA MOCP (LBS) CFM O.A. HP INPUT CAPACITY VOLTAGE MCA MOCP (LBS) DURING UNOCCUPIED PERIODS, THE SPACE TEMPERATURE SHALL PER HOUR OA CEILING SUPPLY ALUMINUM WHITE 24x24 OMNI-AA-NT FIT 9/16"FINELINE BEVEL CEILING GRID 1-5, 8, 10 (KW) (MBH) ° ° CFM CUBIC FEET PER MINUTE These drawings and speciricarbns are the confidential and propnetai,properly MAINTAIN 75-F (ADJ.) IN THE COOLING MODE AND 65-F (ADJ.) INCU CONDENSING UNIT o of JP Mogan Chase and snap not ee copied or repmdaced witho t wnnen aWhonzation. Tho aonhadfdoca,nannwa Msa,edf«ase on this peak EXHAUST/ LAY-IN, AG-75, NARROW TEE BORDER TYPE HP-4 CARRIER 25HCC548 4.0 47.5 36.7 15.0/12.5 46.5 8.7/3.80 208/1 28.5 40.0 260 AH-4 CARRIER FX4DNF049 600 200 0.75 10.0 31.4 208/1 52.8 60.0 85 7 THE HEATING MODE. COP COEFFICIENT OF site in co L1 CEILING RETURN ALUMINUM WHITE 24X24 TITUS 3FL-NT TO FIT 9/16" FINELINE BEVEL CEILING GRID 1-3, 8-11 site or atanatx n�.n`u a o`�nese drawings fa me,et suitable fnoe o,example on TITUS PERFORMANCE another project regakes the services of p.," sensed aahfiect, and © CEILING SUPPLY ALUMINUM WHITE 12X12 AG-75 1-5, 10 HP-5 CARRIER 25HCC548 4.0 47.5 36.7 15.0/12.5 46.5 8.7/3.80 208/1 28.5 40.0 260 AH-5 CARRIER FX4DNF049 1600 200 0.75 10.0 31.4 208/1 52.8 60.0 185 1 -7 engines. Rei�rodaaion of the contract dooanent,fa ease on another OMNI-AA AH-4 & AH-5: DIM DIMENSION prgect a not oathoamd. EXHAUST/ REMARKS DN DOWN O CEILING RETURN ALUMINUM WHITE 12x12 TITUS 350FL AG-75 1-3, 8-1 l 5. DAINTREE TO PROVIDE BUILDING ENERGY MANAGEMENT SYSTEM (BMS). EQUIPMENT SHALL BE PROVIDED WITH UPON RECEIVING A SIGNAL FROM THE TEMPERATURE CONTROL EA EXHAUST AIR I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1. PROVIDE WITH SECONDARY DRAIN PAN. ELECTROMECHANICAL CONTROLS ONLY; DAINTREE TO PROVIDE WI-FI COMMUNICATING THERMOSTATS. SYSTEM FOR OCCUPIED HOURS, THE RTU FAN SHALL ENERGIZE EER ENERGY EFFICIENCY RATIO SEAL " O CEILING SUPPLY ALUMINUM WHITE 18x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 2. SUSPEND FROM STRUCTURE WITH 3/8THREADED RODS WITH VIBRATION ISOLATORS. b. JPMC HAS A CARRIER CORPORATION NATIONAL ACCOUNT. REFER TO VENDOR CONTACTS SCHEDULE, SHEET AND REMAIN ON DURING OCCUPIED HOURS.THE TEMPERATURE p PRO 3. PROVIDE WITH DIVERSITECH MODEL CP-22 EXTERNAL CONDENSATE PUMP WHERE SLOPE IS INSUFFICIENT TO ROUTE A3.3.3 FOR SPECIFICATION, QUOTATION AND DELIVERY. CARRIER EQUIPMENT IS NOT REQUIRED. CONTROL SYSTEM SHALL MAINTAIN THE COOLING AND HEATING EF EXHAUST FAN �yE S, I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE EFF EFFICIENCY `� INF S, O CEILING RETURN ALUMINUM WHITE 18x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8-11, 13 TO NEAREST APPROVED RECEPTOR. 7. PROVIDE EQUIPMENT MANUFACTURERS COMMISSIONING SERVICE, INCLUDING MANUFACTURERS SETPOINTS. F,p O 4&j© 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 4. PROVIDE UNITS WITH MINIMUM MERV 8 FILTER. ESP EXTERNAL STATIC PRESSURE 15,423 REPRESENTATIVES TIME ON-SITE TO COMPLETE BAC-NET POINT ASSIGNMENTS AND INITIAL ZONE PROGRAMMING. EXH EXHAUST r CEILING SUPPLY ALUMINUM WHITE 24x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 F FAHRENHEIT OH CEILING RETURN ALUMINUM WHITE 244 TITUS FL-TZ-DF 1 'SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1-3, 8-11, 13 FC FAN COIL UNIT BORDER FOR NARROW TEE CEILING N FLR FLOOR O1-3,8, 11-13e CEILING SUPPLY ALUMINUM WHITE 30x4 TITUS FL-TZ-DF I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE BORDER FOR NARROW TEE CEILING FPM FEET PER MINUTE J� 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE FIELD VERIFY ALL CONDITIONS FPS FEET PER SECOND �RkQ ROg\S 3/29/21 OK CEILING RETURN ALUMINUM WHITE 30x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8-11, 13 FSD FIRE/SMOKE DAMPER G GAS R 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL ROBISON © CEILING SUPPLY ALUMINUM WHITE 36x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 GRD GRILLES, REGISTERS, VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO AND DIFFUSERS O 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL CEILING RETURN ALUMINUM WHITE 36x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8-11, 13 INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD HP HORSEPOWER, HEAT PUMP ENGINEERING, INC MODIFICATIONS DUE TO EXISTING CONDITIONS. HVAC HEATING, VENTILATING, AND I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 19401 40TH AVE W SURE 302,LVNNWOOD,WA 98036 ON CEILING SUPPLY ALUMINUM WHITE 48x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 AIR CONDITIONING TEL:206-364-3343 FAx:4268350098 © THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR IN INCH CONTACT:SHANE MCCLURE CEILING RETURN ALUMINUM WHITE 48x4 TITUS FL-TZ-DF 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1 3 8-1113 OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND KW KILOWATT BORDER FOR NARROW TEE CEILING ISSUE DATE DESCRIPTION 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL MBH THOUSAND BTU PER HOUR © CEILING SUPPLY ALUMINUM WHITE 60x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY MCA MINIMUM CIRCUIT AMPACITY ® THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE MOCP MAXIMUM OVER CURRENT CEILING RETURN ALUMINUM WHITE 60x4 TITUS FL-TZ-DF 1 SINGLE SLOT LINEAR DIFFUSER, DROP FACE BORDER FOR NARROW TEE CEILING 1 3 8 11 13 FINAL AND SHALL BE IMPLEMENTED AT CONTRACTOR'S COST. PROTECTION 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE MTD MOUNTED O CEILING SUPPLY ALUMINUM WHITE 72x4 TITUS FL-TZ-DF 1-3, 8, 11-13 BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF OSA OUTDOOR AIR BORDER FOR NARROW TEE CEILING LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR O 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT OBD OPPOSED BLADE DAMPER CEILING RETURN ALUMINUM WHITE 72x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8-11, 13 POC POINT OF CONNECTION ACCORDANCE WITH GOVERNING CODES. THE PLANS AND pRV PRESSURE REDUCING VALVE EXHAUST/ 1"SINGLE SLOT LINEAR DIFFUSER, BORDER 22 SPECIFICATIONS NOT WITHSTANDING,THE CONTRACTOR SHALL O WALL RETURN ALUMINUM WHITE 30x4 TITUS FL-10 OR EQUAL TO SURFACE MOUNT ON WALL 1-3, 9, 11, 13 ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT RA RETURN AIR 6"O DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN RD ROOF DRAIN O CEILING SUPPLY ALUMINUM BLACKPRICE ANR AIR NOZZLE WITH CORE 1, 3, INTENT. REF REFERENCE OPENING . RG RETURN GRILLE O CEILING SUPPLY ALUMINUM WHITE 48x6 TITUS FL-20 2 SINGLE SLOT LINEAR DIFFUSER, BORDER 160R EQUAL TO FIT NARROW TEE CEILING 1-3, 8, 11-13, 15 RPM REVOLUTIONS PER MINUTE 2"SINGLE SLOT LINEAR DIFFUSER, BORDER 16 OR SA SUPPLY AIR O CEILING RETURN ALUMINUM WHITE 48x6 TITUS FL-20 EQUAL TO FIT NARROW TEE CEILING 1-3,8, 11-13, 15 SMACNA SHEET METAL AND AIR 03/29/2021 SUBMITTAL SET CONDITIONING CONTRACTORS 1"SINGLE SLOT LINEAR DIFFUSER, BORDER 66 O CEILING SUPPLY ALUMINUM WHITE 72x4 TITUS FL-10 WITH HARD CEILING CLIP TO SURFACE MOUNT 1-3,8, 11-14 CHASE BANK GENERAL NOTES NATIONAL ASSOCIATION PROJECT INFORMATION BLOCK SP STATIC PRESSURE JOB # JPM21001.0 O CEILING RETURN ALUMINUM WHITE 72x4 TITUS FL-10 WITH HARD LINEAR DIFFUSER, BORDER 66 3 8 11 14 TYP TYPICAL DATE: 3/2/2021 WITH HARD CEILING CLIP TO SURFACE MOUNT CONTRACTOR SHALL COORDINATE FINAL LOCATION OF V VENT REMARKS THERMOSTATS, SWITCHES, FLOOR AND WALL RECEPTACLES, CARD WB WET BULB (TEMPERATURE) DRAWN BY: GH 1. COORDINATE WITH LIGHT FIXTURES AND OTHER CEILING DEVICES FOR EXACT LOCATIONS OF ALL AIR FIXTURES. READER, DOOR ACTUATOR,]-BOXES, ETC. WITH ARCHITECTURAL CHECKED BY: PR 2. COORDINATE FRAME STYLES WITH CEILING OR WALL SYSTEM FRAMING AND FINISH MATERIALS. PROVIDE GYPSUM BOARD / PLASTER FRAME TO SUPPORT AND/OR STRUCTURAL DRAWINGS PRIOR TO INSTALLATION. FIXTURE WITHIN GYPSUM CEILING. CONTRACTOR SHALL CONTACT THE ARCHITECT IN CASE OF ANY MODEL 3. N.C. VALUES FOR DIFFUSERS, GRILLES AND REGISTERS SHALL NOT EXCEED 25, WITH A ROOM ABSORPTION RATE OF IOdb. DISCREPANCIES AND AWAIT FOR A WRITTEN RESPONSE PRIOR TO DRAWING INDEX 4. PROVIDE BACK SIDE OF SUPPLY AIR FIXTURES WITH FACTORY-INSTALLED R-6 INSULATION BLANKET. PROCEEDING WITH THE WORK. DRAWING STANDARDS v20.2 5. PROVIDED DIRECTIONAL BLOW CLIPS (1-3) AS REQD. FOR DIRECTIONAL AIRFLOW CONTROL. M0.0 LEGEND, NOTES, SCHEDULES, 6. ONLY ACCEPTABLE MANUFACTURERS ARE TITUS, CARNES, OR TUTTLE 8. BAILEY. PRICE ONLY ACCEPTABLE MANUFACTURER FOR AIR NOZZLE DIFFUSER. SPECIFICATION SECTION 230593 EXPLICITLY REQUIRES A TEST 7. WHERE PLENUM RETURNS ARE UTILIZED, CONCEAL VISIBILITY TO PLENUM SPACE BY PROVIDE DUCT BOOT SECURED TO CEILING FRAMING OR OPTIONAL AND BALANCE REPORT WHICH MUST BE SUBMITTED TO THE dt DRAWNG INDEX SHEET TITLE OPPOSABLE BLADE DAMPERS FOR 2X2 RA GRILLES, AND 'FBR' RETURN HOODS AT LINEAR SLOT RA FIXTURES. WHERE RETURN AIR FLOW CONTROL IS REQUIRED, CONSTRUCTION TEAM AND ENGINEER OF RECORD. THE PROJECT PROVIDE OPTIONAL OPPOSABLE BLADE DAMPERS IN THE 2X2 GRILLES, AND 'FBBO' BLANK-OFFS IN THE LINEAR SLOT AIR FLOW IS NOT TO BE ADJUSTED BY WILL NOT BE ACCEPTED AS COMPLETE BY THE OWNER WITHOUT MO.1 MECHANICAL DETAILS RE-SIZING OF THE FIXTURE GRILLE AREA. THE EOR'S REVIEW AND ACCEPTANCE OF THAT REPORT. 8. "OR EQUAL"SUBSTITUTIONS PERMITTED. SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT OF RECORD BY THE PROCESS DEFINED IN THE PROJECT MANUAL. M2.0 MECHANICAL CONTROL PLAN LEGEND, NOTES, 9. EXHAUST GRILLES ARE TO BE DUCTED TO THE ROOF CENTRIFUGAL EXHAUST FAN SYSTEM, WHICH IS CONTROLLED BY 4-WAY SWITCH WIRING AT THE VARIOUS THE OWNER'S FACILITY MANAGER MUST BE INVITED TO SCHEDULES & DRAW LOCATIONS. MECHANICAL INSTALLER SHALL COORDINATE WITH THE ELECTRICIAN FOR EQUIPMENT AND CONTROL DEVICE PROVISION AND MECHANICAL AND ELECTRICAL SUBCONTRACTOR KICKOFF M2.1 MECHANICAL FLOOR PLAN INSTALLATION. MEETINGS,AND PERIODIC MEETINGS AND WALK-THROUGHS DRAWING INDEX 10. ALL SA, RA, AND EXHAUST FIXTURES IN 2X2 CEILING GRIDS SHALL BE 24"X 24" FULL FIXTURES. THE USE OF REDUCED VENT AREAS WITHIN LARGER PLATES TO INVOLVING MECHANICAL AND ELECTRICAL WORK. M2.2 MECHANICAL ROOF PLAN RESTRICT AIR FLOW IS NOT PERMITTED. AIR FLOW CONTROL 15 TO BE PROVIDED BY ADJUSTABLE DAMPERS WITHIN THE DUCTS OR BOOTS SERVING THE FIXTURES. SHEET NUMBER 11. SPECIFY EDGE DETAIL/ BORDER TYPE FOR COMPATIBILITY WITH GYPSUM BOARD CEILINGS WHERE REQUIRED. M3.0 ENERGY CODE COMPLIANCE 12. LINEAR SLOT FIXTURES SET IN GRID CEILINGS ARE INTENDED TO HAVE A CONTINUOUS, SEAMLESS APPEARANCE FOR THE FULL RUN OF THE NARROW CEILING GRID SPACING, WITHOUT VISUAL DIFFERENTIATION BETWEEN SA, RA, AND UNUSED PORTIONS OF THE RUN. PROVIDE OPTIONAL'FBR' RETURN HOODS AND P1.0 PLUMBING CONDENSATE PLAN 'FBBO' BLANK-OFFS AS REQUIRED. 13. PROVIDE FABRICATED SHEETMETAL PLENUM THE FULL LENGTH OF SLOT LINEAR DIFFUSER. M0 , 10 A O • O 14. PROVIDE TITUS (OR EQUAL) FBMC-10 MITERED CORNERS. '\Y/' 15. FLOWBAR DIFFUSER TYPE TO BE SPECIFIED IN PRIVATE OFFICES ONLY.SPECIFY SLOT DIFFUSER WIDTH AS REQUIRED TO MEET AIR DISTRIBUTION REQUIREMENTS IN THE HIGHEST-DEMAND OFFICE, AND APPLY THAT DIFFUSER THROUGHOUT ALL OFFICES. CWMM 20Y0,ROBIS011 ENGIEF7r K INC. GHMISEN F\J`EOROHICCWI0GD&_ VN BAW\424-1382 CHASE TOM I. GR\M\YG-G - NG76!S0*=ES.=05-20-2020 1805 18 GA GALV STEEL 0 OUTDOOR JACKETING HOOD WITH WATER- _ TO ELBOW TIGHT JOINTS. USE SS FASTENERS 45° FILL VOID WITH 1/2" (15 MM) j URETHANE FOAM ROUND ROD PIN INSULATION INSULATION STIFFEN BLADE AS . _. INSULATION (TYP) REQUIRED SUPPORT LIP INSULATION DUCT ROOF CURB � STAND-OFF DAMPER BLADE ASSEMBLY SECURE TO CURB, OUTSIDE END 6" JAZ" SS LAG BOLTS, HANDLE WITH BEARING i HANDLE WITH LOCKING Ul MIN 2 PER SIDE, LOCKING O QUADRANT SILICONE SEALANT QUADRANT IN HOLE PRIOR TO DAMPER BLADE INSERTING BOLT (TYP) DUCT INSIDE END L/IfflififI111111111111 < BEARING 1/8" (6 MM)CLEARANCE ALL SECTION AROUND SIDE ELEVATION ROOFING INSULATION ROOF DECK NOTES: O 0 PIPING 1. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS & FLASHING COLLAR AND ROUND DAMPERS. w SEALANT, FASTEN TO OPENING IN DECK a DECK TO MATCH CURB ID PIPING PENETRATION DETAIL NTSLE 13 MANUAL BALANCE DAMPER ISCANTS 1 2 M N W 00 � W N N a � a 00 W U Mvp < O o L � aoQ > p a � OOZ � � W a � H a � SCALE SCALE SCALE ^ NOT USED NTS 11 NOT USED NTS 10 NOT USED NTS l� ARCHITECT/ENGINEER OF RECORD KEN McCRACKEN, ARCHITECT 6930 DESTINY DRIVE, #100 ROCKLIN, CA 95677 Contact: 55.432 SANDERS NOTE: 7o7.ess.as2o "DURA-BLOK"SUPPORT SYSTEM ROOF ROOF CONTRACTOR SHALL VERIFY THROUGH ASANDERS@PMDGINC.COM MOUNTED r SECURE TO ROOF NON-DESTRUCTIVE MEANS ALL LOCATIONS PIPING STRUCTURE OF POST-TENSIONED TENDONS AND MILD \HANGER READED REINFORCED STEEL. NO REINFORCEMENT RODS SHALL BE CUT OR DAMAGED. WITH P 1000 NOTES: 4"MIN.A.F.R. STIFFENER SEISMIC FLEX DUCT BRACING CONNECTION These arawings and specifications are me confidential and proprietary property B-LINE FIG. B3060 1. SIZE HANGER AND CLAMP TO P 131 ADEQUATELY SUPPORT LOAD (REFER TO of BLOCKS SHAL of is nargan TheChase and shall not fit copied laminated reproduced on this ipecac B-LINE HANGER CATALOG). uthnrcofion. ion conirad dodat e n amofsuitbl far use use o a diff iec NOT BE USED AS PIPING site in cot.truton with its issue date and are not suitable en ee on a different site«at a titer,time. Use of thele drawin f«reference«exo le on another project reaulms the senates of popery icersed architects and SUPPORTS ON THE ROOF engineers. Reproduction of the contract documents f«reuse on another ` 2. FOR NFPA ROD SIZES USE 83170NF OR project isnot auth«¢ed. B-LINE FIG. B3170 f P. 46 SUBSTITUTEB3174. 3. FOR COPPER TUBING USE COPPER i \r —INSULATION PLATED OR PAINTED B3170CT, FELT LINED SEAL // JACKET WHERE B3170F, OR PLASTIC COATED HANGERS. RUBBER BASE �rLO PROFFS REQUIRED SUPPLY AIR DUCT RETURN AIR DUCT I Nei NOTES FLEX CONNECTION IAJ 15,423 17- 1. 1. SUPPORTS SHALL BE INSTALLED A MAXIMUM 8'-0"O.C. EQUIPMENT DRAIN PAN WITH AND AT EACH CHANGE OF DIRECTION OF PIPING. UNISTRUT CHANNEL WET SWITCH TO UNIT POWER CEILING N LOCKING NUTS e AND WASHERS SPRING VIBRATION ARK 4 ROe�S 3/29/21 MFR. MOUNTING RAIL ISOLATORS /� i i PIPE HANGING INSTALLATION SCALE 8 ROOF PIPE SUPPORT SCALE 7 NOT USED SCALE 6 FAN COIL UNIT HANGING SCALE 151 jWROBISONI NTS NTS NTS NTS LLL V 1 ENGINEERING, INC 19401 40TH AVE W SurrE 302,LYNNWOOD,WA 98036 TEL:206-364,3343 FAx:4258350098 CONTACT:SHANE MCCLURE ISSUE DATE DESCRIPTION NOTES. SECURE EQUIPMENT TO ALUMINUM SUPPORT RAIL: FILTER/DRYER • (4)14 GA.1 "HURRICANE STRAPS SIGHT GLASS AT TX 1. ALL MATERIALS AND ASSEMBLIES SHALL . RAIL BOLTS: ---------- VALVE SYSTEMS ONLY COMPLY WITH CONSTRUCTION MEET •• OPT. 1:2-3/8'x 3/4"LONG A307 STEEL GALV. - ROUND SHEET METAL SUPPLY DUCT ALUMINUM ASSOCIATION STANDARDS BOLTS AND NUTS FASTENED TO WEB OF DUCT, LENGTH AS (RECTANGULAR WASHER & NUT FOR CONSTRUCTION ALUMINUM STAND RAIL PROVIDE INVERTED TRAP Y REQUIRED. OR ROUND) •• OPT 2:3-10-16 x 3/4"HWH#3 SELF DRILLING ;' ALUM.EQUIPMENT SUPPORT RAIL 2. VIBRATION ISOLATION PADS SHALL BE HILTI KWIK-FLEX SCREWS TO WEB OF i 2-112" \` SLOPE LIQUID &SUCTION %K PRE-FABRICATED COMPONENTS ALUMINUM STAND RAIL. / CLAMP BY RAIL SYSTEM MFR. - DESIGNED FOR THAT PURPOSE AND LINES DOWN TOWARDS SHEET CLAMP SHALL PREVENT EQUIPMENT VIBRATION ALUMEQUIPMENT SUPPORT PEDESTAL EXTERIOR UNIT EXTERIOR UNIT SCHEDULED REFRIGERATION UNIT . METAL ELL TRANSMISSION TO THE BUILDING PRE-FAB. ROOF PORTAL-REFER TO \ STRUCTURE PRE-ENGINEERED PRE-FABRICATED / z ADHESIVE FLASHING BOOT BY ROOFER-REFER TO \ j \ j � ARCHITECTURAL DRAWINGS SUPPLEMENTAL STEEL OR j ALUMINUM PEDESTAL AND RAIL t ARCHITECTURAL DRAWINGS 3. ALUMINUM EQUIPMENT STAND 03/29/2021 SUBMITTAL SET BUILDING STRUCTURE SUPPORTS SHALL BE MANUFACTURED EQUIPMENT SUPPORT SYSTEM VERIFY LIQUID LIN MODEL WITH MFR'S.SELECTION CRITERIA ROOF DECK,INSULATION AND ROOFING MEMBRANE- BYPRECISIONALUMINUMPRoOucrs, �� PROJECT INFORMATION BLOCK I � i f REFER TO ARCHITECTURAL DRAWINGS 1 THERMAL EXPANSION INC.OF DEERFIELD BEACH,FLORIDA, i DEVICE JOB # JPM21001.0 SUCTION LINE, INSULATE WITH 3/4" 954480-6919,OR APPROVED EQUAL.UNIT ARMAFLEX OR APPROVED EQUAL DATE: 3/2/2021 VD SHALL -6 SIZED AND INSTALLED '+- RUBBER OR NEOPRENE VIBRATION ISOLATION PAD BY MECH.CONTRACTOR HANGER HANGER " e' AT EACH ATTAHMENT POINT — DISTRIBUTOR DRAWN BY: GH FLEX DUCT SHALL ACCORDING TO THE MANUFACTURERS ' SEISMIC STRAPS RODS BRACING NOT EXCEED 5'-0" C-CLAMP 41"MAX. LOAD CHARTS AND PRINTED I F----__---- IN LENGTH. INSTALLATION DETAILS. (TYPICAL) (TYPICAL) SECONDARY FRAMI AS READ.TO SUCTION TRAP MODEL 4. EQUIPMENT SUPPORT RAIL INSTALLER SUPPORT EQUIPMEW LOADING-REFER VOLUME CONTROLSHALL FIELD-VERIFY ROOF MATERIAL TO STRUCTURAL DINGS DRAWING STANDARDS v20.2 DAMPER (TYPICAL IN ALL THICKNESS AND CLEARANCES TO NOTES TAKE-OFFS TO DIFFUSERS). FOR UNITS EQUIPPED WITH UNLOADING SHEET TITLE ADJACENT EQUIPMENT AND COORDINATE METAL OR ALUM.EQUIPMENT SUPPORT SUPPORT UNIT POSITION AS REQUIRED- ADJUST RAIL WIDTH TO ALIGN WITH PEDESTAL BASE PLATE BOLTED TO ROOF REFER TO INSTALLATION MANUALS FOR EQUIPMENT SUPPORT POINTS-REFER TO STRUCTURE AS READ. TYPE COMPRESSORS USE A DOUBLE-SUCTION SEISMIC SUPPORTED AND ADJACENT EQUIPMENT / RISER SIZED IN ACCORDANCE WITH X EQUIPMNET MFR'S. INSTALLATION GUIDE \ MANUFACTURES INSTRUCTIONS. STRAPHANGER BRACING TRAPEZE HANGER ' MECHANICAL CEILING CEILING � RAFTERS-REFER TO STRUCTURAL AND (TYPICAL) 5. VERIFY COMPATIBILITY OF ALL METAL ALTERNATE:SUBSTITUTION OF MANUFACTURED OR ` ARCHITECTURAL DRAWINGS DIFFUSER-SEE SPECIFICATIONS COMPONENTS AND FASTENERS TO SHOP-FABRICATED CUSTOM HOT-DIP GALVANIZED 2. PROVIDE OPERATION AND MAINTENANCE DETAILS FOR TYPE AND ACCESSORIES. AVOID GALVANIC CORROSION OF STEEL SUPPORT RAIL SYSTEM IS ACCEPTABLE AND CLEARANCES AROUND ALL EQUIPMENT AS NOTES MECHANICAL EQUIPMENT OR SUPPORT SHOULD BE DETERMINED BASED ON REGIONALSYSTEMS SPECIFIED BY THE MANUFACTURER. PRODUCT AVAILABILITY AND COST ----- NTERIOR UNIT 1. NO POP RIVETS ALLOWED, USE SELF-TAPPING SWEET METAL SCREWS ONLY. 3. OUTDOOR UNIT SHALL BE EQUIPPED WITH ISOLATION VALVES. SHEET NUMBER SUPPLY AIR TERMINAL SCALE 4 TYPICAL DUCT HANGING SCALE 3 ROOFTOP EQUIPMENT SUPPORT RAIL SYSTEM SCALE 2 REFRIGERANT PIPING SCALE 1 NTS NTS NTS NTS mo , 1 ttnr�r tom. ROM" a IGNE94 c,W_ I DAINTREE MECHANICAL CONTROL: _ TYPICAL MECHANICAL EQUIPMENT ZONE FIGURE 1 : WGA100 (CAN BE USED WITHOUT SENSOR FOR SWITCHING UNE LOAD) I ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED/UNSWITCHED POWER.WSA 10 _ WIRELESS SENSOR ADAPTERS REQUIRE 24V POWER. REFER TO MFRS. FIGURE 1 WIN Nautrd Binary Input, (DIP Switch 4 or DIP Switch 5 On) 2. DURING INSTALLATION THE LAST 4 DIGITS OF THE IEEE ADDRESS FOR EACH WIRELESS COMPONENT RTU OR WIRLESS PROBE DUCT TEMP.SENSOR I Nock Hot 120-277V MUST BE RECORDED ON THE SHOP DRAWING SET CORRESPONDING TO THE LOCATION OF THE SPLIT-SYSTEM Low "w" COMPONENT. CONDENSING UNIT REMOTE TEMPERATUREUne 22Arc 3. FOR ANY SENSORS ATTACHED TO A WIRELESS SENSOR ADAPTER (WSA10) THE LAST 4 DIGITS OF THE SELF�OYVEREDCT FOR SENSORS AS INDICATED ON PLAN via WGA100 OCap EEE ADDRESS FOR THE RESPECTIVE WSA10 MUST BE RECORDED.THE SPECIFIC WSA10 PORT MUST Wh� ALSO BE RECORDED PER SENSOR. EQUIPMENT FAN POWER I �( \ �ch.d 4. DURING WIRELESS ADAPTER INSTALLATION FOLLOW THESE STEPS AS DEFINED IN THE DEVICE WIRED TOWGA100 DUCT T )) I 1 (( T 1 ((I T I I ((I T I I INSTALLATION GUIDE IN THE FOLLOWING ORDER. 120-277VAC A. CONFIRM WIRELESS ADAPTER DIP SWITCHES ARE SET CORRECTLY. Di s..o,• RM 24 WC Pe..r B. RESET ADAPTER (ALL ADAPTERS) tn TOEQUIPMFNT I DAINTREE THEFMUATWIREDTORTU 20,,.,,,, C. PERFORM PROPER TEST SUITE. DISTIBUTION PANEL J TERMINAL BLOCK VIA STANDARDS omtno 5. INSTALLER MUST BECOME FAMILIAR WITH THE PUBLISHED INSTALLATION GUIDES FOR THE PRODUCTS IN srr ae11w THE PROJECT SCOPE. DAINTREE INSTALLATION GUIDES CAN BE FOUND AT: WCaA1� CONDUCTORWIRING HTTPS://PRODUCTS.CURRENTBYGE.COM/CONTROL-SYSTEMS/WIRELESS-LIGHTING-CONTROLS 6. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROCUREMENT AND INSTALL OF DAINTREE AND RELATED COMPONENTS PERTAINING TO IT/DATA, LIGHTING, POWER AND HVAC. 7. HVAC CONTRACTOR SHALL FURNISH & INSTALL THE DUCT SMOKE DETECTOR IN THE DUCT.THE ELECTRICAL CONTRACTOR SHALL PROVIDE POWER TO THE DUCT SMOKE DETECTOR & PROVIDE THE WIRING INTERLOCK BETWEEN THE DUCT SMOKE DETECTOR AND THE RESPECTIVE HVAC UNIT.THE ELECTRICAL CONTRACTOR SHALL FURNISH & INSTALL THE REMOTE DUCT SMOKE DETECTOR TEST STATION AND WIRING. O 0 w a DAINTREE GENERAL NOTES: C19 C l. MOUNT ALL THERMOSTATS AND SENSORS ON WALL 44"ABOVE FINISHED FLOOR. 2. HVAC, LIGHTING AND POWER SHALL BE CONTROLLED AND MONITORED BY A WIRELESS NETWORKED ENERGY MANAGEMENT SYSTEM UTILIZING DAINTREE CONTROLSCOPE SOFTWARE AND OPEN, STANDARDS BASED CONTROLSCOPE CONNECTED HARDWARE. 3. THE DAINTREE SYSTEM WILL INCLUDE A COMMUNICATIONS INTERFACE IN ORDER TO NETWORK M FACILITY TO COMPANY WIDE SYSTEM NETWORK. ♦�/ 4. THE FOLLOWING SYSTEM WILL BE PROVIDED BY DAINTREE NETWORKS: A. SYSTEM INFRASTRUCTURE N L WIRELESS AREA CONTROLLER (WAC).THE WAC IS THE WIRELESS SYSTEM GATEWAY PROVIDED LU BY DAINTREE NETWORKS. IF MULTIPLE WACS ARE NECESSARY THEY CAN BE DAISY CHAINED VIA ETHERNET CABLE.WACS MUST BE POWERED WITH 120V RECEPTACLE. ii. A CELLULAR MODEM WILL PROVIDE ACCESS TO THE CONTROLSCOPE NETWORK.WAC(S) ARE CONNECTED TO THE CELLULAR MODEM. iii. AN UNINTERRUPTED POWER SUPPLY (UPS) WILL BE INSTALLED TO PROVIDE AN UNINTERRUPTED M De RECEPTACLE FOR WAC(S) AND CELLULAR MODEM. B. HVAC CONTROL I. WIRELESS THERMOSTATS (WTS10) WILL PROVIDE NETWORKED CONTROL OF ROOF TOP UNITS N = N VIA STANDARD 8 WIRE INTERFACE.THE THERMOSTATS WIRELESSLY COMMUNICATE WITH THE O SYSTEM BUT MUST BE WIRED TO RTU. O C4 WIRELESS SENSOR ADAPTERS (WSA10) CAN ACCOMODATE 4 THERMISTOR TYPE TEMPERATURE - — - pp SENSORS AND 2 LOW VOLTAGE (0-lOV) SENSORS AND SHALL PROVIDE CONTROL OF: N 1. 0-10V CT(S) OV - Q 2. PROBE DUCT TEMPERATURE SENSORS R R n IRE RK o 3. EXTERIOR TEMPERATURE SENSOR M U O iii. WIRELESS ROOM TEMPERATURE SENSORS PROVIDE MONITORING PER REQUIRED SPACE `-♦ Q Q INCLUDING ATM ROOM TEMPERATURE MONITORING. iv. WGA 100 (WIRELESS GENERAL PURPOSE ADAPTERS) PROVIDE ON/OFF CONTROL OF BASEBOARD HEATERS AND DUCT HEATERS. D v. WGA100 ADAPTER ALSO PROVIDES CONNECTION FOR LEAK SENSOR. n n C. INDOOR LIGHTING a Um I. CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA100-PM WIRELESS ADAPTERS. 0 ii. WIRELESS OCCUPANCY SENSORS SHALL BE INSTALLED TO PROVIDE COVERAGE IN DESIRED AREAS. O O 4%0 � Q04. iii. WIRELESS SWITCHES (WWD1) SHALL PROVIDE OVERRIDE CONTROL OF INTERIOR AND EXTERIOR LOADS. 111"Wess AL nM M ° nnn° D. EXTERIOR LIGHTING 110000AL G W i. CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA100-PM WIRELESS ADAPTERS IF LOADS ARE SINGLE POLE. IF EXTERIOR LIGHTING IS MULTI POLE AN AUXILIARY RELAY CAN BE USED. UJ 14 INTERIOR AND EXTERIOR LOADS MUST BE CONTROLLED BY SEPARATE ADAPTERS IN ORDER TO — — — ALLOW FOR SEPARATE CONTROL. low o — IV ii. LOW VOLTAGE OPEN LOOP PHOTOCELL SHALL BE INSTALLED TO CONTROL EXTERIOR LIGHTING. M4TS LIGHTING. E POWER MONITORING i. CTS WILL BE INSTALLED ON EACH PHASE OF MAIN POWER AND UTILITY GRADE MODBUS � `/ CONNECTED POWER MONITOR SHALL BE INSTALLED. 3 ii. SELF POWERED CTS WILL BE INSTALLED TO MONITOR RTU FAN POWER CONSUMPTION AND I\ DETECT FAULT. EACH SHALL BE WIRED TO WSA 10. F. IRRIGATION CONTROL INTEGRATION (WHEN REQUIRED) p� i. THE IRRIGATION SYSTEM WILL BE CONNECTED TO CONTROLSCOPE VIA CELLULAR MODEM. T L nnnn 5. ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED (UNSWITCHED POWER). uW W S NNW 6. THE DAINTREE SYSTEM DOES NOT SUPPORT CONTROL OF VAV/DAMPER BASED SYSTEMS.THE CARRIER ARCHITECT/ ENGINEER OF RECORD VAV SYSTEM SHALL BE STAND ALONE. CONTROL COMPONENTS MUST BE COMPATIBLE WITH CARRIER KEN McCRACKEN, WGA )J� ° �W nn n ° AND ARE NOT IN DAINTEE SCOPE. ARCHITECT K � W fW U 7. NOT USED. 66X� ° �� V O O gp@pq9 �O ° v nrcY,ile930•DESTINY 6",DRIVE, •Permitting e679�11 Ili g. FOR CARRIER VRF MODELS, PROVIDE 24V THERMOSTAT INTERFACE ACCESSORY TO BE DETERMINED 6930 DESTINY DRIVE, #100 FP ` BY CARRIER. VERIFY WITH MECHANICAL EQUIPMENT SCHEDULE, SPECIFICATIONS, AND MECHANICAL ROCKLIN, CA 95677 nn� nnnnM ENGINEER. Contact:ARIANE SANDERS 9. INSTALL WA100-PM FOR EF-1 CONTROL. CONFIGURE AS ON/OFF DEVICE TO ALLOW FOR MANUAL 707.655.4320 SWITCHING.WGA100 ADAPTER DOES NOT SUPPORT MANUAL SWITCHING.SEE MECHANICAL RCP ASANDERS@PMDGINC.COM FOR EF-1 SPECIFICS. 10. DUCTED SPLIT SYSTEMS SHALL BE CONTROLLED BY THE DAINTREE SYSTEM (WGA, CT, PRESSURE T WllUW W fW SENSOR, WSA, DUCT TEMP SENSOR, REMOTE TEMP SENSOR, AND THERMOSTAT. WGA S 11. ALL THERMOSTATS FOR THE MINI-SPLIT SYSTEMS SHALL BE HARD WIRED. MINI-SPLITS SHALL HAVE 24V 0 INTERFACE BY CONTRACTOR FROM MANUFACTURER FOR DAINTREE WIRELESS THERMOSTATS. 12. ECONOMIZER UNIT DAINTREE COMPATIBILITY: UNITS CONNECTED TO AN ECONOMIZER THAT IS NOT WN �4�1� INTEGRAL TO THE RTU SHALL HAVE MANUFACTURER'S CONTROLS AND CONTROL MODULE FOR me eaawinesana.pie=atbn.a,e me=onfiae iaiond xoo ataNaoaenv of JP Morgan Chase and mall not be copied«reproduced on this mitten MODS. ECONOMIZERS FULLY INTEGRATED WITH RTUS CAN BE CONTROLLED BY THE DAINTREE SYSTEM. omn«aonjun. me=amra=suedat.eandarwere wevareaf«ruse use onn�a�nt site in o cat.offer with its issue date and are not for efle ri user a different 13. DAINTREE DEVICE DIP SWITCH SETTINGS: IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR site th at a lose er e. use o mese drawn,pro r«reteen=e« amps on P3$ enofnad protect requires the services of properly Fcensetl architects and " 3 TO VERIFY EXACT DIP SWITCH SETTING PER MANUFACTURER'S CUT SHEET. engines . Repadadion of the is contract da uments f«reuse on gnome m project is notta Wh«ized. A WGA )LRIKE7 WS l (( NEETIMS WSA )/) �I1 \ 30 72 FP � ° mUme ROOM ,�� IN 6 AF44 1" T \ SITE SPECIFIC CONTROL NOTES. SEAL �p PROFF TS AHS / AI ss TS FI I ( T T M4 1. THE SUPPLY OF HEATING AND COOLING ENERGY TO EACH ZONE IS CONTROLLED BY INDIVIDUAL NFFI, %y /( \ _ _- THERMOSTATIC CONTROLS THAT RESPOND TO TEMPERATURE WITH THE ZONE. 15,423 y 2. THERMOSTATIC CONTROLS TO PROVIDE A TEMPERATURE RANGE OR DEADBAND OF AT LEAST 5°F Q r STANDAW8CONDUCTOR WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS CAPABLE OF BEING 30x r � 2 DUCT \ TSTAT WIRWG70AH-4& SHUT OFF OR REDUCED TO A MINIMUM. N WGA /\I A"TBtMNAL BLOCK FOR OPBd AREA HVAC COMROL 3. EACH HVAC SYSTEM HAS CONTROLS THAT VARY THE START-UPTIME OF THE SYSTEM TO JUST MEET THE e C ( WGA WQ��VIIQ u �l TEMPERATURE SET POINT AT TIME OF OCCUPANCY. �9Rk R RID 3/29/21 W V 4. EACH ZONE IS PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY THE 3/29/21 DAINTREE SYSTEM. i WSA 000 1T-/ ZIROBISON AH-5 - — __ TS WSA )11 3®� ��2 ENGINEERING, INC /l _ DAINTREE DEVICES KEY: g40, 4aTHA�EW343E302.AX42WOO51009B 036 - -- -- _ TEu 206-364-3343 FAX:4258350098 OT� CONTACT:SHANE MCC W RE ZONE BMS WIRELESS THERMOSTAT: WIRELESS GENERAL ADAPTER: ISSUE DATE DESCRIPTION C� DAINTREE NETWORKS#WTS10 WGA )11 DAINTREE NETWORKS#WGA100 ( T THERMOSTAT ADAPTER MAY BE /J GENERAL PURPOSE 15A LINE Y REQUIRED. VERIFY WITH UNIT RELAY MANUFACTURER. —] ) l WIRELESS SENSOR ADAPTER: 30 X X 72 ZONE BMS WIRED REMOTE TEMP. WSA )) DAINTREE NETWORKS#WSA10 TS SENSOR: BAPI#10K-2-R-Z-CG (WALL MOUNT) LEAK DETECTION SENSOR: DAINTREE#RBA-BA/LDT1-PS-BB; BMS EXTERIOR HARDWIRED LD PROVIDE AT ROOMS WITH TEMPERATURE SENSOR: BAPI WATER HEATERS, SUMP/ \ #BA/10K-2-O-BB2. PROVIDE EJECTOR PITS, OR THE LIKE 30 k x 72 OTS HARDWIRED EXTERIOR TEMPERATURE SENSOR WITH CURRENT TRANSFORMER: 03/29/2021 SUBMITTAL SET DIANTREE WGA100&WSA10 \ DAINTREE#CR9580-10-M WIRED PROJECT INFORMATION BLOCK 44 MOUNTED IN THE INTERIOR OF FP TO WGA100 SINGLE PHASE JOB # JPM21001.0 BUILDING FOR MONITORING. DATE: 3/2/2021 (� WALL-MOUNT SINGLE-RELAY DRAWN BY: GH 30 �� BMS WIRED DUCT TEMP. SENSOR: �OC2 OCCUPANCY SENSOR WITH CHECKED BY: PR TS DUCT BAPI #10K-2-D-4-BBX OR SIMILAR �Y COMBINED SWITCH: TS CC( DATA ROOM EXHAUST FAN IS WATTSTOPPER DSW-302 MODEL WSA CONTROLLED BY NON-DAINTREE PUSH-BUTTON LINE VOLTAGE DRAWING STANDARDS V20.2 -- HARDWIRED REVERSE 5/10/15/30-MINUTE TIMER THERMOSTAT PROVIDED BY T PROVIDED BY ELECTRICAL SHEET TITLE ELECTRICAL CONTRACTOR CONTRACTOR: WATTSTOPPER / o — — IN-DUCT SMOKE DETECTOR TEST TS-400 MECHANICAL \— TEST SENSORI..TCHES PROVID HARED B WIRE TO CONTROL PLAN ELECTRICAL CONTRACTOR. SHEET NUMBER MECHANICAL CONTROL PLAN SCALE J T 2020, ROBISON DWNEfl3111,INC. DUCT SIZE CFM RANGE KEYED NOTES: ' 1. CAP EXISTING SUPPLY AND RETURN DUCTWORK FROM EXISTING ROOFTOP UNIT PRIOR TO THIS _ 6" 0 0 - 100 CFM LOCATION SHOWN. REDISTRIBUTE EXCESS AIRFLOW PROPORTIONALLY AMONG EXISTING/NEW 8" 0 101 - 220 CFM SUPPLY DIFFUSERS &RETURN GRILLES. 2. PROVIDE NEW SUPPLY DIFFUSER &RETURN GRILLE FOR HALLWAY AND EXTENDED AREA. BALANCE 10,10 221 - 380 CFM PROPORTIONALLY WITH EXISTING SUPPLY DIFFUSERS&RETURN GRILLES FOR REDISTRIBUTION OF 12" 0 381 - 600 CFM EXCESS AIRFLOW. 14 0 601 900 CFM 3 EXISTING SUPPLY DIFFUSER/RETURN GRILLE TO REMAIN. REDISTRIBUTE EXCESS AIRFLOW PROPORTIONALLY. 16" 0 901 - 1300 CFM 4. SPLIT SYSTEM FAN COIL UNIT LOCATED ABOVE CEILING.SUSPEND UNIT FROM STRUCTURE. VERIFY 18" 0 1301 1800 CFM ADEQUATE CLEARANCE REQUIREMENTS. INSTALL FAN COIL UNIT SUCH THAT ALL MAINTENANCE PANELS ARE IN AN ACCESSIBLE LOCATION. VERIFY REQUIRED CLEARANCES AROUND UNIT FOR 20" 0 1800 - 2350 CFM MAINTENANCE. Ln 22" 0 2350 - 3000 CFM 5. EXISTING RESTROOM EXHAUST FAN TO REMAIN. 24" 0 3000 - 3800 CFM 6. EXISTING DUCT DROPS FROM EXISTING ROOFTOP UNIT TO REMAIN. FIELD VERIFY EXACT LOCATION. 7. PROVIDE 120 OUTSIDE AIR DUCT UP THRU ROOF TO WEATHER PROOF CAP.COORDINATE WITH 26" 0 3800 - 4700 CFM STRUCTURAL JOIST LAY OUT AND ALL OTHER TRADES. PROVIDE WITH CLASS 1 MOTORIZED DAMPER. D C� MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING O SYSTEM AS INDICATED ON THE DRAWINGS.ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN u_ SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL o FOR COMPLETE, FINISHED WORK,TESTED, AND READY FOR OPERATION. Q 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE w CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE ASSOCIATED AIR BALANCE COUNCIL(AABC),THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), OR THE TESTING,ADJUSTING,AND BALANCING BUREAU (TABS). BALANCE EACH SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5%OF REQUIREMENTS AND FURNISH A REPORT TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, BALANCED, AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY. AN AIR BALANCE TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL ♦- CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION.MINIMUM R-5 Q DU D ° " INSULATION IN UNCONDITIONED SPACE.INSULATE ALL ROUND DUCTS EXTERNALLY, EXCEPT EXHAUST 7 DUCTS, WITH 2"FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT o Q� �� o WITH 1"-THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND LIM DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. V) E 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6'-0". \_ O 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, (� F E FIRE,OR FIRE/SMOKE WALL, PARTITION,OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. J _ CN 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUAREO ' ` N 3 INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING a v (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTER I L 3 3 ��� THAN 24 GAUGE STEEL. 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. � /%LQ� H ° ° IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE E OCCUPIED SPACE. �- o 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS F AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST&BALANCE AGENCY. C Q - ___ 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS. PROVIDE N �/ ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. a $ B B 11. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' INSTRUCTIONS AND O Q 150 150 RECOMMENDATIONS. Q V -JED E CD B 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL O O � 01* 175 80 EQUIPMENT AND MATERIALS. � L-2 L2 L2 L•2 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE nn 5 L� FL2 ��P� DAPPLICOAPBLE ENERGY MENT AND FCODELAME SPREAD REQUIREMENTS. INSULATION R VALUES SHALL COMPLY Wll �VU W a E E R n 1 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 4,V ABOVE THE FLOOR, UNLESS OTHERWISE CA NOTED. a er77F7 C4 e nc e 5. INSTALL DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 16) IN SUPPLY AIR DUCTWORK cJ CONNECTED TO HEAT PUMP UNIT,WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT o ° ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE 3 A B Q� a DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY 150 9 THE MANUFACTURER. BN/I LZ 80 L"Z L"Z 80 1� 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. ° t AH44 80 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF 2 2 k .. lum I L L-2 42 THE STRUCTURE.COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS,WATER PIPING, A 4 PLUMBING VENTS,AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/M0.1 FOR b 150 A MORE INFORMATION. ARCHITECT/ENGINEER OF RECORD 0 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE mom 20X12 150 B25 �00 CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY KEN McCRACKEN, _7 ❑ PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY.ANY CHANGES RESULTING ARCHITECT L•2 L-2 FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S Architecture•Program Monc:S... *it•Permitting ' ❑ l2 L-2 L2 ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. 6930 DESTINY DRIVE, #100 B A B 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO ROCKLIN, CA 95677 B� 40 B� 11 125 150 A CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND Contact:ARIANE SANDERS 325 EQUIPMENT, ETC. 707.655.4320 E CD E G E CD ❑ C III20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE(1) ASANDERS@PMDGINC.COM L_2 L-2 L2 YEAR FROM DATE OF FINAL ACCEPTANCE.ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER ° �� O� INN NO ADDITIONAL COST TO THE OWNER. A 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL TOOLS,APPLIANCES,SURPLUS MATERIALS,AND SCRAP.ALL IDENTIFIED EXISTING EQUIPMENT TO BE 3 A A 150 REMOVED SHALL BE TURNED OVER TO THE OWNER. 400 4 400 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER,THE ITEMS These drawings and specifications are the confidemial and bropretar,property OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. of P mate.. chose one shell not nt copied or reproduced wn this written site in c tion. the contend tlwat can were pepored for use on this specific site in conjunction with its issue date and are not suitable fa use on a different L-2 J 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. s or of a latert� Usef theseaawfs far reference ooexipoother project rlea�es of gesrCacd 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE engineers. Reproduction of the contract docarnems far reuse on another Project ❑80 77111 INFORMATION ON MANUAL BALANCE DAMPER. ".a adha oed 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORK SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH SMACNA REQUIREMENTS. SEAL 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT �Ep PRrv- ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN I IV F�.,pS/O� ❑ ACCORDANCE WITH THE CURRENT BUILDING CODE. 15,423 v L-2 LLJ-2 2 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL r FAN COILS,CONDENSING UNITS, RTU'S,AND EXHAUST FANS. 28. ALL REFRIGERANT SHALL BE R-410A. NO R-22 SHALL BE USED. N to E C 29. ALL HVAC UNITS TO BE PROPERLY LABELED.ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED �q A AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1, FC-1, ETC.) 7jk D. Rpg�S NOTE' 3/29/21 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE DUCTWORK DRAWN IS FOR SCHEMATIC PURPOSES. IF ROUTING AND/OR IREQUIRED PRIOR TO OCCUPANCY. L 2 L 2 SIZES DO NOT WORK WITH EXISTING CEILING OBSTRUCTIONS, CONTACT Z3ROBISON ARCHITECT/ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. ENGINEERING, INC 19401 40TH AVE W SUITE 302.LYNNWOOD,WA 98036 TEL:206364.3343 FAX:4258350098 CONTACT:SHANE MCCLURE ISSUE DATE DESCRIPTION G L-2 L 2 -2] 11 3 A 400 CD L-2 L-2 L-2 3 03/29/2021 SUBMITTAL SET PROJECT INFORMATION BLOCK JOB# JPM21001.0 DATE: 3/2/2021 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS v20.2 SHEET TITLE MECHANICAL FLOOR PLAN SHEET NUMBER MECHANICAL FLOOR PLAN SCALE 4- 1 MIGHT 2020, ROUSON ENGINEERING. INC. KEYED NOTES: 1. NOT USED. _ 2. WEATHER PROOF ROOF CAP FOR OUTSIDE AIR INTAKE. COORDINATE WITH STRUCTURAL JOIST LAYOUT AND ALL OTHER TRADES. 3. PROPOSED LOCATION FOR SPLIT SYSTEM CONDENSING UNIT AND REFRIGERATION SUPPORT SYSTEM. PROVIDE CONDENSING UNITS WITH ROOFTOP EQUIPMENT SUPPORT RAIL SYSTEM AS SHOWN IN DETAIL 2/M0.1.ADJUST SUPPORT SYSTEM AS NEEDED FOR CONDENSING UNIT MOUNTING BETWEEN FLAT AND PITCHED ROOF. MAINTAIN MANUFACTURER'S CLEARANCE REQUIREMENTS BETWEEN UNITS. 4. OUTSIDE AIR INTAKES SHALL BE LOCATED AT LEAST 10 FEET AWAY FROM ALL EXHAUST AND PLUMBING VENTS. 5. REFRIGERATION LIQUID AND SUCTION LINES FROM ROOF MOUNTED CONDENSER UNITS, PENETRATE ROOF AND SEAL WEATHER-TIGHT. ROUTE DOWN TO ASSOCIATED FAN COIL UNIT. PROVIDE WITH PIPE Ln CURB AND CHASE WITH GOOSENECK. D C MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING SYSTEM AS INDICATED ON THE DRAWINGS. ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL FOR COMPLETE, FINISHED WORK,TESTED, AND READY FOR OPERATION. 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE O ASSOCIATED AIR BALANCE COUNCIL (AABC),THE NATIONAL ENVIRONMENTAL BALANCING BUREAU p (NEBB), OR THE TESTING, ADJUSTING, AND BALANCING BUREAU (TABB). BALANCE EACH SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5%OF REQUIREMENTS AND FURNISH A REPORT Q d TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, BALANCED, AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE � REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY. AN AIR BALANCE TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL (D6 - CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION. MINIMUM R-5 INSULATION IN UNCONDITIONED SPACE. INSULATE ALL ROUND DUCTS EXTERNALLY, EXCEPT EXHAUST Y DUCTS, WITH 2" FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT WITH 1"-THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. own\ 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND DAMPER.SEE DETAIL 4/MO.1 FOR MORE INFORMATION. C4 Uj 7 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6-0". (0 I 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, FIRE, OR FIRE/SMOKE WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTER L Uj THAN 24 GAUGE STEEL. C N T N 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. i IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE N OCCUPIED SPACE. O 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS L AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST& BALANCE AGENCY. JU U O 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS. PROVIDE Q ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. Q INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' INSTRUCTIONS AND RECOMMENDATIONS. Q _ ® 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL LL EQUIPMENT AND MATERIALS. N O 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE O Q DEVELOPMENT AND FLAME SPREAD REQUIREMENTS. INSULATION"R"VALUES SHALL COMPLY Q V APPLICABLE ENERGY CODE. O O 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR, UNLESS OTHERWISE � - - - - - _ \ NOTED. r p� 15. INSTALL DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 16) IN SUPPLY AIR DUCTWORK W CONNECTED TO HEAT PUMP UNIT. WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT i ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE - DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY C4 36 / 36 \ THE MANUFACTURER. / 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. MIN MIN \ 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF `/ \ THE STRUCTURE. COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS, WATER PIPING, HP-5 / (E)10-TON HP-4 \ PLUMBING VENTS, AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY. SEE DETAIL 3/M0.1 FOR 260 LBS ROOFTOP 260 LBS MORE INFORMATION. UNIT TO 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE 3 (E)ROOF 3 REMAIN 1 CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY DRAINS ) 5 I PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY. ANY CHANGES RESULTING 5pil �m FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S ARCHITECT/ ENGINEER OF RECORD OUTSIDE ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. AIR INTAKE i 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO KEN McCRACKEN, 1 _ ___-_ - _ ' CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND ARCHITECT EQUIPMENT, ETC. INSULATED REFRIGERANT LINES PIPE 2 ti�endedere• o<ntmnnenagemen.t•Permitting ABOVE ROOF-PROVIDE WITH SUPPORTS 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) \ YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED 6930 DESTINY DRIVE, #100 WEATHER-PROOF ALUMINUM (TYP.) / WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER ContacROCKLt: IANE 9SAND 5677 JACKET. (TYP.) \ 4 / AT NO ADDITIONAL COST TO THE OWNER. Conta 7.655.4320 SANDERS \ \ 707.655.4320 / 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL ASANDERS@PMDGINC.COM \ / TOOLS, APPLIANCES, SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO BE / REMOVED SHALL BE TURNED OVER TO THE OWNER. \ 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER,THE ITEMS \ OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. \ 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE INFORMATION ON MANUAL BALANCE DAMPER. Th.drawn,and!specification,amthe oonrweanoiand omprietory«oaedy of JP M«pan Chase and shall not be coped or reproduced without wnMe i outho25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORKsite onjun. me with its crdocat eandft am prepared f«useonto specfit site in conjunction with its issue dale and are not suitable f«use on hi tliliereat SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH SMACNA REQUIREMENTS. site or at a later time. use of these drawings t«reference or example on another p je t requies the services of property licensed! amhilecfs and 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT engineers. Reproduction of the contra onto re h f«muse on anoth« pf thetc ntraat doRd. ua ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN ACCORDANCE WITH THE CURRENT BUILDING CODE. 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL SEAL FAN COILS, CONDENSING UNITS, RTU'S, AND EXHAUST FANS. BRED PNOFFSS 28. ALL REFRIGERANT SHALL BE R-410A. NO R-22 SHALL BE USED. FFp �b - _ 29. ALL HVAC UNITS TO BE PROPERLY LABELED. ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED � 15,423 r AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1, FC-1, ETC. ) 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE N REQUIRED PRIOR TO OCCUPANCY. It,qRK Q RID 3/29/21 .�@3ROBISON ENGINEERING, INC 19401 40TH AvE W SUITE 302,LYNNWOOD,WA 98036 TEL:206-364,3343 FAx:4258350098 CONTACT:SHANE MCCLURE ISSUE DATE DESCRIPTION 03/29/2021 SUBMITTAL SET PROJECT INFORMATION BLOCK JOB # JPM21001.0 DATE: 3/2/2021 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS v20.2 SHEET TITLE MECHANICAL ROOF PLAN SHEET NUMBER MECHANICAL ROOF PLAN SCALE J 1/4"=1'-0" I M 2 0 2 dIEL NEF Ul x 0 section ' Section Section 0 Mechanical Rough-In Plans Verified j Field Verified , Mechanical Rough-In Plans Verified Field Verified , COMcheck Software Version 4.1.5.1 COMcheck Software Version 4.1.5.1 rX # Complies. CommentslAssumptions # Complies? Comments/Assumptions # Footing/Foundation Inspection Complies. Comments/Assumptions &R Inspection Value Value Inspection Value value < .ID 1 &Req.ID &Re .ID _ _ a_ -- __ - - - Inspection Checklist [ME4.1.4 Thermallyineffectiveheating ❑Complies 6.4.1.4, HVACd. Nor equipment Efficiency:_ Efficiency:_ ❑Complies 5eealues.Mechanical [F0917 melting msensdsnorfice ❑Complies Mechanical Compliance Certificate [ME41j3 surtaces of sensible heating ❑Does Not 6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values. [F0913 melting system sensors for future ❑Does Not � d panels have insulation>= R-3.5. [ME1]2 equipment labeled as meeting f ❑Not Observable 90.1. ❑Not Observable connection to controls. ❑Not Observable Energy Code: 90.1 (2016) Standard ❑Not Applicable ❑Not Applicable ❑Not Applicable Requirements: 0.0% Were addressed directly In the COMcheck software 6.4.4.2.1 Ducts and plenums having ❑Complies 6.4.3.4.1 Stair and elevator shaft vents ❑Complies Additional Comments/Assumptions: Project Information [ME10]1 pressure class ratings are Seal ❑Does Not [ME3]3 have motorized dampers that ❑Does Not Text in the"Comments/Assumptions"column is provided by the user in the COMcheck Requirements screen. For each 1 Class A construction. ❑Not Observable automatically close. []Not Observable requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception Energy Code: 90.1 (2016)Standard is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. ❑Not Applicable ❑Not Applicable Project Title: Chase Tigard 11 6.4.4.2.2 Ductwork operating>3 in.water ❑Complies 6.4.3.4.2, Outdoor air and exhaust systems ❑Complies section Location: Tigard,Oregon [MEll]3 column requires air leakage ❑Does Not 6.4.3.4.3 have motorized dampers that ❑Does Not # Plan Review Complies? Comments/Assumptions Climate Zone: 4c testing. [ME413 automatically shut when not in &R .tD []Not Observable ❑Not Observable .—. Project Type: Alteration use and meet maximum leakage 4.2.2, Plans,specifications,and/or ❑Complies []Not Applicable rates.Checkravi dampers ❑Not Applicable 9 tY Pe 6.4.4.2.1, calculations provide all information ❑Does Not 6.5.2.3 Dehumidification controls ❑Complies where allowed. 6.7.2 with which compliance can be [ME19]3 provided to prevent reheating, ❑Does Not 6.4.3.4.5 Enclosed parking garage ❑Complies [PR2]1 determined for the mechanical ❑Not Observable Construction Site: Owner/Agent: Designer/Contractor. recooling,mixing of hot and cold [ME39]3 ventilation has automatic ❑ systems and equipment and ❑Not Applicable 11666 SW Pacific Hwy WA Mark D.Robison airstreams or concurrent heating []Not Observable Does NotTigard.OR 97223 Robison Engineering,contaminant detection and document where exceptions to the 9 9 Bering,Inc. and coolingof the same �❑Not Applicable ❑Not Observable � 19401 40th Ave W,Suite 302 capacity to stage or modulate standard are claimed.Load airstream. fans to 50%or less of design ❑Not Applicable calculations per acceptable Lynnwood,WA 98155 M 6.5.2.4.1 Humidifiers with airstream ❑ 206-366-3343Complies capacity. engineering standards and mrobison@mbisonengineering.com `_r r [ME68]3 mounted preheating jackets have ❑Does Not 6.4.3.4.4 Ventilation fans>0.75 hp have ❑Complies handbooks. 9 9- tom preheat auto-shutoff value set to [ME5]3 automatic controls to shut off fan ❑Does Not 4.2.2, Plans,specifications,and/or ❑Complies activate when humidification is ❑Not Observable when not required. 8.4.1.1, calculations provide all information ❑Does Not LU� not required. ❑Not Applicable ❑Not Observable 8.4.1.2, with which compliance can be P Mechanical Systems List O m ^' 6.5.2.4.2 Humidification system dispersion ❑Complies []Not Applicable 8.7 determined for the electrical systems ❑Not Observable [ME69]3 tube hot surfaces in the ❑Does Not 6.4.3.8 Demand control ventilation ❑Complies [PR6j' and equipment and document where ❑Not Applicable Quantity System Type 6 Description O airstreams of ducts or air- [ME611 provided for spaces>500 ft2 and ❑Does Not exceptions are claimed.Feeder 2 HP-4&5/ AH-4&5 r , N ❑Nat Observable connectors sized in accordance with `/ 1 handling units insulated>= R- den ity and ft2 occupant Not Observable Split System Heat Pump 0.5. ❑Not Applicable density and served by systems ❑ approved plans and branch circuits � � ❑Not Applicable Heating Mode:Capacity=46 k6tu/h, with air side economizer,auto pp'cable sized for maximum drop of 3%. [MET 5 Preheat coils controlled to stop ❑Complies Proposed Efficiency=8.70 HSPF,Required Efficiency � LL [ME70j3 heat output whenever ❑Does Not cmodulating outside air damper peq cY=8.20 HSPF P 6.7.2.4 Detailed instructions for HVAC j❑Com Iles � � � mechanical coolin g control,or design airflow>3,000 [PRS]' systems commissioning Included on Cooling Mode: tientCapacity=470 SEE, U g,n,is act Y 9 Does Not Proposed Efficiency 15.00 SEER,Required Efficient 14.00 SEER economizer operation,is active ❑Not Observable cfm. the plans or specifications for projects pO cY q y' ❑Not Applicable 6.5.3.2.1 DX cooling systems>=75 kBtu/h ❑Complies see the Mechanical systems list >=50,000 ft2. :.❑Not Observable Fan System: None M O 6.5.2.6 Units that provide ventilation air ^` ❑Complies IME4012 (>=65 kBtu/h effective 1/2016) ❑Does Not for values. ❑Not Applicable `_+ Q 3 and chilled-water and SYSTEM COMPLIANCE REQUIREMENT UNKNOWN [ME706] to multiple zones and operate in -❑Does Not []Not Observable Additional Comments/Assumptions: Alteration details have not been specified CL conjunction with zone heating evaporative cooling fan motor hp P� and cooling systems are [-]Not Observable >=V4 designed to vary supply ❑Not Applicable Q ne prevented from using heating or ❑Not Applicable fan airflow as a function of load heat recovery to warm supply air and comply with operational Mechanical Compliance Statement W above 60°F when requirements.representative req . P Compliance statement: The proposed mechanical alteration project represented in this document is consistent with the building UNv i building loads or outdoor air 6.4.4.1.1 Insulation exposed to weather ❑Complies plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been temperature indicate that most [ME7]3 protected from damage. ❑Does Not designed to meet the 90.1(2016)Standard requirements in COMcheck Version 4.1.5.1 and to comply with any applicable Q zones demand cooling. Insulation outside of the V 6.5.3.3 Multiple zone VAV systems with ❑Complies See the Mechanical systems list conditioned space and associated ❑Not Observable mandatory requirements listed in the Inspection Checklist. '/? /)a [ME42]3 DDC of individual zone boxes ❑Does Not for values. with cooling systems is vapor ❑Not Applicable Marl( Robison - President (/ `. `� L� 3/23/21O O _%* have static pressure setpoint retardant. Name-Title Signature Date v ❑Not Observable reset controls. 6.4.4.1.2 HVAC ducts and plenums R- R- ❑Complies ❑Not Applicable [ME812 insulated per Table 6.8.2.Where ❑Does Not 6.5.4.2 HVAC pumping systems with>= ❑Complies ducts or plenums are installed in LU [ME25]3 3 control values designed for ❑Does Not or under a slab,verification may : ❑Not Observable variable fluid flow(see section need to occur during Foundation ❑Not Applicable 14 ❑Not Observable .details). Inspection. ❑Not Applicable 6.4.4.1.3 HVAC piping insulation thickness. _in. in. ❑Complies 6.5.6.1 Exhaust air energy recovery on ❑Complies [ME9]2 where piping is installed in or ❑Does Not [ME56]1 systems meeting Tables 6.5.6.1- ❑Does Not under a slab,verification may ❑Not Observable 1,and 6.5.6.1-2. ❑Not Observable need to occur during Foundation ❑Not Applicable Inspection. ❑Not Applicable 1 High Impact(Tier 1) Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) 111 High Impact(Ther 1) 12 ,Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) 111 High Impact(Tier 1) Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) 1 High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Chase Tigard 11 Report date: 032321 Project Title: Chase Tigard 11 Report date: 03/23/21 Project Ttle: Chase Tigard II Report date: 03/2321 Project Title: Chase Tigard II Report date: 03/23/21 Project Title: Chase Tigard 11 Report date: 03/23/21 Data filename: FA Pedro+McCracken\ Chase B nk \424-1633 Chase Tigard II Pacific Office Expansion-Tigard Page 5 of 9 Datafilename: F:\_Pedro+McCacken LChase Banks 424-1633 Chase Tigard 11 Pacific Office Expansion-Tigard Page 4 of 9 Data filename: F:\ Pedro+MCCracken\ Chase Banks\424-1633 Chase Tigard II Pacific Office Expansion- Tigard Page 3of 9 Dataflename: F\ Pedro+McCracken\ Chase Banks\424-1633 Chase Tigard II Pacific Office Expansion-Tigard Page 2of 9 Datafename: F:LPedro+McCracken\ Chase Banks\424-1633 Chase Tigard II Pacific Office Expansion-Tigard Page 1of 9 OR_Calcs\21-0323 Cha_e Tigard II-Mech.cck OR\Calcs\21-0323 Chase Tigard II-Mech.cck OR_\Caics\21-0323 Cha_e Tigard II-Mech.cck OR\Calcs\21-0323 Chase Tigard II-Mech.cck OR\Calcs\21-0323 Cha_e Tigard II-Mech.cck ARCHITECT/ENGINEER OF RECORD KEN McCRACKEN, ARCHITECT Ar Progiom Management• g Section section section 6930 DESTINY DRIVE, #100 # Final Inspection Compiles? Comments/Assumptions # Rough-In Electrical Inspection Complies? Comments/Assumptions # Mechanical Rough-In Plans Verified Field Verified Complies? Comments/Assumptions ROCKLIN, CA 95677 & R .ID & Req.ID, Inspection Value Yalue --_ &R .ID - Contact:ARIANE SANDERS -- 6.4.3.1.2 .Thermostatic controls have a 5°F ❑Complies 8.4.2 At least 50%of all 125 volt 15-and ❑Complies 6.5.7.2.1 Kitchen hoods>5,000 cfm have omplies 707.655.4320 [F13]3 deadband. ❑Does Not [EL1072 20-Amp receptacles are controlled by ❑Does Not [ME32]2 make up air>=50%of exhaust ❑Does Not ASANDERSOPMDGINC.COM ❑Not Observable an automatic control device. '❑Not Observable air volume. []Not Observable ❑Not Applicable _ ❑Not Applicable i. ❑Not Applicable 6.4.3.2 Temperature controls have setpoint ❑Complies 8.4.3 New buildings have electrical energy ❑Complies 6.5.7.2.4 Approved field test used to [ Complies [F12013 overlap restrictions. ❑Does Not [EL11]2 use measurement devices installed. ❑Does Not [ME49]3 evaluate design airflow rates - []Does Not ❑Not Observable', Where tenant spaces exist,each and demonstrate proper capture tenant is monitored separately.In ❑Not Observable and containment of kitchen ❑Not Observable ❑Not Applicable buildings with a digital control system ❑Not Applicable exhaust systems. ❑Not Applicable 6.4.3.3.1 HVAC systems equipped with at least []Complies the energy use is transmitted to to -- [F12113 one automatic shutdown control. ❑ control s stem and dis la ed 6.5.8.1 Unenclosed spaces that are ❑Complies Does Not y displayed [ME34]2 heated use only radiant heat. []Does Not graphically. []Not Observable mese Ooron and specificationsarethe pied or re,and ed ietory onoperty ❑Not Applicable 10.4.21 Electric motors meet requirements ❑Complies ',; []Not Observable of JP Moron chose and shall not ce copied or amd f oced on this .rntten [EL97 where applicable. ]Does Not 'r ❑Not Applicable site in conjunction the contract documents were prepared f«use on this specific 6.4.3.3.2 Setback controls allow automatic ❑Complies site in c t a later time its issue date and are not suitable n use on a different 3 ❑Not Observable' [ME66.4.3.9 Heating for vestibules and air []Complies site«of a later time. Use of these drawings f«reference«example on [FI22] restart and temporary operation as ❑Does Not [ME63]2 curtains with integral heating []Does Not arged regvres the se.vkex or r.opeM icenxed architects arw required for maintenance. ❑Not Applicable onotlsx q PP engineerz Reproduction of the conha i documents f«reuse on another []Not Observable. a -_ - include automatic controls that ❑Not Observable project a not outhorthed. ❑Not Applicable Additional Comments/Assumptions: shut off the heating system when outdoor air temperatures li 45F. ❑Not Applicable 6.4.3.5 Heat pump controls prevent ❑Com lies Vestibule heating and cooling [FI5]3 supplemental electric resistance heat []Does Not systems controlled by a - from coming on when not needed. thermostat in the vestibule with ❑Not Applicable ❑Not Observable. heating setpoint<=60F and SEAL cooling setpoint>=80F. Riff PRo 6.4.33❑ . . 6 When humidification and ❑Complies 6510 Doors separating conditioned .- ❑Complies I N SS [FI6] dehumidification are provided to a Does Not F zone,simultaneous operation is [ME73]n space from the outdoors have []Does Not prohibited.Humidity control prohibits ❑Not Observable controls that disable/reset ❑Not Observable 15,423 y the use of fossil fuel or electricity to ❑Not Applicable heatopening and cooling system when . ❑No[Applicable r produce RH>30%in the warmest zone humidified and RH<60%in the Additional Comments/Assumptions: 41 coldest zone dehumidified. 6.7.2.1 Furnished HVAC as-built drawings ❑Complies N [F17]3 'submitted within 90 days of system ❑Does Not e acceptance. ❑Not Observable 'llq SO ❑Not Applicable RK 0 Rpe\ 3/29/21 6.7.2.2 Furnished O&M manuals for HVAC ❑Complies [FI8]3 systems within 90 days of system Motes Not acceptance. jWR O B I S O N ❑Not Observable ❑Not Applicable 6.7.2.3 An air and/orhydronic system ❑Complies ENGINEERING INC [F1911 balancing report is provided for HVAC ❑Does Not systems serving zones>5,000 ft2 of conditioned area. ❑Not Observable ]9401 40TH AVE W SUITE 302,LYNNWOOD,WA 98036 ❑Not Applicable TEL:206364,3343 FAx:4258350098 CONTACT:SHANE MCCLURE 6.7.2.4 HVAC control systems have been ❑Complies [FI3011 tested to ensure proper operation, ❑Does Not ISSUE DATE DESCRIPTION calibration and adjustment of controls. ❑Not Observable ❑Not Applicable ,10.4.3 Elevators are designed with the ❑Complies [F1241' proper lighting,ventilation power,and ❑Does Not standby mode. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 31 11High Impact(Ther 1) , Medium Impact(Ther 2) 3 Low Impact(Ther 3) 1 High Impact(Ther 1) .,Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Chase Tigard 11 Report date: 0323/21 Project Title: Chase Tigard 11 Report date: 03/23/21 Project Title: Chase Tigard 11 Report date: 03/23/21 Project Title: Chase Tigard 11 Report date: 03/23/21 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1633 Chase Tigard 11 Pacific Office Expansion-Tigard Page 9 of 9 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1633 Chase Tigard 11 Pacific Office Expansion-Tigard Page Sof 9 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1633 Chase Tigard 11 Pacific Office Expansion-Tigard Page 7 of 9 Data filename: F:\_Pedro+McCracken\ Chase Banks\424-1633 Chase Tigard 11 Pacific Office Expansion-Tigard Page 6 of 9 OR\Calcs\21-0323 Chase Tigard 11-Mech.cck OR\Calcs\21-0323 Chase Tigard 11-Mech.cck OR\Calcs\21-0323 Chase Tigard 11-Mech.cck OR\Calcs\21-0323 Chase Tigard II-Mech.cck 03/29/2021 SUBMITTAL SET PROJECT INFORMATION BLOCK JOB # JPM21001.0 DATE: 3/2/2021 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS V20.2 SHEET TITLE ENERGY CODE COMPLIANCE SHEET NUMBER M3e0 HM#iT 2020, ROW411 ENi1ff13tN0, INC.