Loading...
Plans (14) M EC2021 -00152 was} sQ ea, ►RECF. , -0 Q'L MAR 0 8 i CITY OF 1 I. >, �( BUILDING DMS ON l / 0 3113E `l HEDF32OLE OFFICE CONFE2R E OFFICE OFFIC 324E sr/ f ®I i 1 0FFIC332E w W) I 1 CR j�L1 r C lA.EWCE . : w 5 PEN OFFICE R • 318 F331 CID PHONE Ay31 � 5 �D IT s� �4 ❑ ❑ cC C�o� — � OFFICE 11" TRAINING 327 U r f-� 328 \\oCS t In �1 I 1�L, Il�t� I �v\ a7 PHONE COPY — 34 \ti 326 330 tYt t sY OFFICE �y `6-� n 316 — ! \ OPEN OFFICE 6 1_I 333 ttt"'555111 ( FLITHIA CP 1 rySMOTORS, INC. \"\F - ---- � _ - y r� L-�r 181E ® 1 OFFICE V- 10 B�EgK 315 Q{ 29- _ ve WELLNESS l ��[~'� Y I ' OFFICE\ OOICE OFFICE 14� 314 �\ r� 337 \ _ _ 36 335 Project �Elm � �� n + DRIVEWAY FINANCE PHONE ❑ SUITE 301 ti 343 El G> TENANT F I OFFICE I — T IMPROVEMENT COFFEEtel„ 9020 SW WASHINGTON k KITCHEN CONFERENCE �� Uj Qa 3oiA�1 I 338 - r I SQUARE ROAD I_ >f 3os 3oa OFFICE/\ L�� 339 I TIGARD, OREGON 97223 LOBBY I [ U310 301 1 © I \r y OPEN 0E C� _- ©— —® �1� } �6` U 1HDLE COPY 34 AV EOFFI. MAIL COPY � --- - - �QU t s �`'`• 307— I ` ,✓ \� ' \ 11 \ C6ENCE 306 0 ! ❑I ❑ / Zt LOUNGE OFFICE OFFICE OFF CE HUDD HUDDLE i — � U F-30-5qL4 3 303 30 342 41 —� Fri ' � riI . 1 IT- THIRD FLOOR PLAN 1 .1 ua° = 1�-o° I Oregon Heating- & Air Conditioning Scone of Work Oregon Heating and Air Conditioning will perform the following scope of work: 1. Provide and install (1) new fan powered box. 2. Provide and install (1) new VAV box. 3. Provide and install air distribution as drawn. 4. No change of occupancy. REVISION SCHEDULE Equipment Schedule Delta Issued As Issue Date FPB301- 0-561 cfm. Existing. FPB302- 165-627 cfm. Existing. FPB303- 165-627 cfm. Existing. FPB304- 170-625 cfm. Existing. FPB305- 0-1156 cfm. Existing. FP13306- 0-1037 cfm. Existing. FPB307- 0-1344 cfm. Existing. FPB308- 384-1608 cfm. Existing. FPB309- 272-1173 cfm. Existing. FPB310- 0-1272 cfm. Existing. FPB311- 0-1203 cfm. Existing. FP13312- 0-1320 cfm. Existing THIRD PB313- 165-600 cfm. Trane VPEF. 277V 13.03MCA 15.0MOCP 3KW reheat. SHEET TITLE: VAV313- 0-1136 cfm. Existing. I - - - __- - -- -- -- --- -- - - -- - - - R FLOO VAV314- 0-740 cfm. Existing. PLAN AND VAV315- 0-250 cfm. Existing. : VAV316- 5-1180 cfm. Existing. f NOTES VAV317- 0-965 cfm. Existing. VAV318- 0-850 cfm. Existing. VAV319- 0-1020 cfm. Existing. V"320- 0-422 cfm. Existing. VAV321- 0-300 cfm. Existing. VAV322-60-200 cfm. Trane VCCF. 277/24V transformer. Cooling only. Mechanical General Notes: 1. Cooling equipment does not exceed the load of the calculated requirement. 2. All steel ducting will be 26 ga minimum galvanized. Flex per Mfg. DRAWN BY: SJR 3. Heating and cooling ducting to be designed to not exceed 0.5 we positive (supply) and 0.5 we I negative (return). CHECKED BY: MRT, PDK 4. Provide programmable thermostat. 5 degree deadband minimum. 7 day. Microprocessor. Set program for night energy savings. 5. Seal ducting with UL listed mastic or mastic tape. SHEET 6. Fan motor does not exceed allowable, first available above BHP. 7. Max leakage rate of OSA or exhaust dampers to be 4 cfm/sft @ 1.0 sp. 8. Provide 0 and M to building owner. M 1