Loading...
Plans (11) M EC2020-00427 GENERAL NOTES SYMBOLS GENERAL NOTES - MECHANICAL EQUIPMENT TERMINALS _ 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE 4. MISCELLANEOUS DUCT FITTINGS (CONICAL TAKEOFFS, ETC.): 3. ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC WORK COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, WRAP WITH INSULATION FOR CONDENSATION CONTROL. OR READILY ACCESSIBLE MANUALLY OPERATED DAMPERS IN ALL EF-1 CIVIL, ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED OPENINGS TO THE OUTSIDE, EXCEPT FOR COMBUSTION AIR OPENINGS. TYPICAL EQUIPMENT DESIGNATION �iDIFFUSER/GRILLE TYPE, AND NUMBER 5. THE PIPING FOR ALL SPACE CONDITIONING AND SERVICE WATER HEATING 400 x12 OR 400 OR SIZE ON A SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). SYSTEMS SHALL BE INSULATED IN ACCORDANCE WITH TABLE 123-A. 4. THE LESSER OF THE MINIMUM RATE OF OUTDOOR AIR REQUIRED BY (EXHAUST FAN SHOWN) 400 400 ��DESIGN CFM (WHERE APPLICABLE) 2. ELECTRICAL CHARACTERISTICS: REFER SECTION 121(b)2, OR THREE COMPLETE AIR CHANGES SHALL BE ROOM THERMOSTAT OR T COORDINATION REQUIREMENTS SUPPLIED TO THE ENTIRE BUILDING DURING THE ONE-HOUR PERIOD DRAWINGS FOR ELECTRICAL CHARACTERISTICS ELECTRICAL STICS (VOLTAGES, ETC.) O TEMPERATURE TRANSMITTER T CEILING DIFFUSER (FLOW ARROWS OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. 1. DUCTWORK: LOCATE AND COORDINATE THE EXACT LOCATION OF IMMEDIATELY BEFORE THE BUILDING IS NORMALLY OCCUPIED. X � SHOWN ONLY IF AIRFLOW NOT DUCTWORK WITH STRUCTURAL PLANS AND WITH THE GENERAL COMPLETION AND BALANCINGDSD DUCT SMOKE DETECTOR SYMMETRICAL) 3. CODES: COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR PER THE APPLICABLE BUILDING, MECHANICAL, ENERGY, PLUMBING, FIRE, EQUIPMENT. COORDINATE WITH FRAMING CONTRACTOR TO ASSURE ALL VENTILATION SYSTEMS SHALL BE DOCUMENTED PER CALIFORNIA AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL AHJ. JOIST SPACES LINE UP WHEN DUCTWORK MUST PASS THROUGH SAFETY CODE (TITLE 8, SECTION 5142 (B) TO BE PROVIDING THE DUCTWORK CEILING RETURN/EXHAUST GRILLE DIFFERENT JOIST SPACES. MINIMUM REQUIRED VENTILATION RATE AS DETERMINED USING ONE OF ILS 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON THE FOLLOWING PROCEDURES: 18x12 DUCT (1ST FIGURE = SIDE SHOWN, Ln FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING ALL CONTROLS r 2ND FIGURE = SIDE NOT SHOWN) LINEAR DIFFUSER, CEILING OR WALL DUCTWORK, DAMPERS, EQUIPMENT, PIPING, ETC. 1. AIR BALANCING: ALL SPACE-CONDITIONING AND A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH STRUCTURAL. 1. THE THERMOSTATIC CONTROLS FOR HVAC SYSTEMS SHALL MEET VENTILATIONSYSTEMS SHALL BE BALANCED TO THE UP DOWN II MOUNTED (FLOW ARROWS SHOWN B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING, THE FOLLOWING REQUIREMENTS AS APPLICABLE: QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH ® DUCT SECTION, POSITIVE PRESSURE y ONLY IF AIRFLOW NOT SYMMETRICAL) LIGHTS, WALLS, FIRE SPRINKLER PIPING, AND OTHER TRADES WORK. THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) C. INCLUDE ADDITIONAL OFFSETS, ELBOWS, ROUTING, EQUIVALENT a) EACH SPACE CONDITIONING ZONE SHALL BE PROCEDURAL STANDARDS (1983) OR ASSOCIATED AIR DUCT SIZING EXCHANGE, RELOCATING, ETC. AS REQUIRED FOR A CONTROLLED BY AN INDIVIDUAL THERMOSTATIC BALANCE COUNCIL (AABC) NATIONAL STANDARDS (1989). UP DOWN WALL SUPPLY GRILLE (SG) COMPLETE OPERATING MECHANICAL SYSTEM. CONTROL THAT RESPONDS TO THE TEMPERATURE DUCT SECTION, NEGATIVE PRESSURE D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE OWNER. WITHIN THE ZONE AND MEETS THE APPLICABLE 2. OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE WALL RETURN/EXHAUST GRILLE REQUIREMENTS OF SUBSECTION(b). MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL UP DOWN F� (RG, EG) b EACH THERMOSTATIC CONTROL REQUIRED BY DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE 5. MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE EXACT ) o LOCATION OF ALL MECHANICAL EQUIPMENT WITHIN THE STRUCTURE. SUBSECTION(a) SHALL BE CAPABLE OF BEING SET INSTALLING LICENSED C-20 MECHANICAL CONTRACTOR. ROUND DUCT SECTION o LOCALLY OR REMOTELY BY ADJUSTMENT OR w 6. EXHAUST OUTLETS: SOURCE-SPECIFIC FANS SHALL BE VENTED 3. OUTSIDE AIR MEASUREMENT: THE SYSTEM SHALL BE TRANSFER GRILLE (TG), DUCT CONNECTED CES SELECTION OF SENSORS TO CONTROL; a D TO OUTDOORS WITH A MINIMUM 3' CLEARANCE BETWEEN VENT EQUIPPED WITH A CALIBRATED LOCAL OR REMOTE DEVICE a OUTLETS AND BUILDING OPENINGS, AND 10' MINIMUM BETWEEN CAPABLE OF MEASURING THE QUANTITY OF OUTSIDE AIR ON UP UP UP DUCT PENETRATION THRU FLOOR �3 WALL MOUNTED WITH OPTIONAL CFM w VENT OUTLETS AND MECHANICAL AIR INTAKES. 1) COMFORT HEATING DOWN TO 55-F OR LOWER. A CONTINUOUS BASIS AND DISPLAYING THAT QUANTITY ON A 0 m OR ROOF 50 SHOWN a JUN 15 2020 2) COMFORT COOLING UP TO 85-F OR HIGHER. READILY ACCESSIBLE DISPLAY DEVICE. 4 7. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR ROOF 3) BOTH HEATING AND COOLING, THE THERMOSTATIC 2 CITY OFTIGARD CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. CONTROLS SHALL BE CAPABLE OF PROVIDING A 4. ANOTHER METHOD APPROVED BY THE ENERGY COMMISSION. IFVOLUME DAMPER TRANSFER GRILLE, CEILING MOUNTED BUILDING DIVISION TEMPERATURE RANGE OR DEAD BAND OF AT FSD SD �� I I -� WITH FULL-SIZED LINED DUCT 8. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF LEAST 5'F WITHIN WHICH THE SUPPLY OF HEATING ADMINISTRATIVE REQUIREMENTS S FIRE/SMOKE DAMPER (-A = HORIZ CONNECTION MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING AND COOLING ENERGY TO THE ZONE IS SHUT OFF --� FIXTURES FOR REMOVAL AND REPLACEMENT. OR REDUCED TO A MINIMUM. 1. THE PERSON WITH OVERALL RESPONSIBILITY OR THE PERSON DUCT, = VERT DUCT), Ivy T RESPONSIBLE FOR THE INSTALLATION OF REGULATED MANUFACTURED 2-HR RATED, LION GENERAL 9. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: 2. EACH SPACE-CONDITIONING SYSTEM SHALL BE INSTALLED WITH DEVICES SHALL POST, OR MAKE AVAILABLE WITH THE BUILDING ARCHITECTURAL BACKGROUND \\ LU VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT CONTROLS THAT COMPLY WITH ITEMS 1 AND 2 BELOW: PERMIT(S) ISSUED FOR THE BUILDING, THE INSTALLATION CERTIFICATE(S) FD FD FIRE DAMPER (--4 = HORIZ (THIN LINE) H ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF FOR MANUFACTURED DEVICES REGULATED BY THE APPLIANCE VERT DUCT= MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE 1) ARE CAPABLE OF AUTOMATICALLY SHUTTING OFF THE EFFICIENCY REGULATIONS. SUCH INSTALLATION CERTIFICATES DUCT, ) NEW MECHANICAL WORK OFFICE COPY. ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. SYSTEM DURING PERIODS OF NON-USE AND SHALL HAVE: SHALL BE MADE AVAILABLE TO THE ENFORCEMENT AGENCY FOR ALL 2-HR RATED, LION CITY OF TIGARD,, a) AN AUTOMATIC TIME SWITCH CONTROL DEVICE APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL: (HEAVY LINE) M 10. DUCT SYSTEMS USED WITH BLOWER TYPE EQUIPMENT WHICH ARE a IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH THE 90- ELBOW, R/D OR R/W=1.5 - - MATCHLINE OR PROPERTY LINE REVMVED FOR CODE COMYLIAN PORTIONS OF A HEATING, COOLING, ABSORPTION, EVAPORATIVE COOLING COMPLYING WITH SECTION ALLOWS , WITH AN ACCESSIBLE ) J OR OUTDOOR AIR VENTILATION SYSTEM SHALL BE SIZED IN ACCORDANCE MANUAL OVERRIDE THAT ALLOWS OPERATION OF APPLIANCE EFFICIENCY REGULATIONS. J = M Approvcd- ) I am THE SYSTEM FOR UP TO 4 HOURS; SECTION IDENTIFICAl10N O 14 N OTC: I I WITH THE 2019 OREGON MECHANICAL SPECIALTY CODE. OR b) INCLUDE A STATEMENT INDICATING THAT THE INSTALLED DEVICES b) AN OCCUPANCY SENSOR; OR CONFORM TO THE APPLIANCE EFFICIENCY REGULATIONS AND PART SQUARE CORNER ELBOW WITH (DETAIL SIMILAR) O r , CNI pcm►it#: - 11. HEATING AND COOLING EQUIPMENT AND SYSTEMS CAPACITY DO NO EXCEED c) A FOUR-HOUR TIMER THAT CAN BE MANUALLY OPERATED. 6 AND THE REQUIREMENTS FOR SUCH DEVICES GIVEN IN THE TURNING VANES V 1 / -� ' THE LOADS CALCULATED IN ACCORDANCE WITH SECTION 503.2.1 OF THE INDICATES DIRECTION OF CUTTING N Q � O," �� �J.i.�-+- EXCEP11ON: MECHANICAL SYSTEMS SERVING RETAIL STORES PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL suite$k OREGON ENERGY EFFICIENCY SPECIALTY CODE. THE REPORTED EFFICIENCIES ENFORCEMENT AGENCY. PLANE Dates � O � OF THE EQUIPMENT HAVE BEEN TESTED AND RATED IN ACCORDANCE WITH AND ASSOCIATED MALLS, RESTAURANTS, GROCERY STORES, � 90' TAKE-OFF OR TEE � I , Ix THE APPLICABLE TEST PROCEDURE. THE EFFICIENCY HAS BEEN VERIFIED CHURCHES, AND THEATERS EQUIPPED WITH 7-DAY c) STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE LETTER INDICATES SECTION Z Q O THROUGH CERTIFICATION UNDER AN APPROVED CERTIFICATION PROGRAM OR, PROGRAMMABLE TIMERS. CONSTRUCTION OR INSTALLATION WAS PERFORMED. (NO. INDICATES DETAIL) Q IF NO CERTIFICATION PROGRAM EXISTS, THE EQUIPMENT EFFICIENCY RATINGS 90' CONICAL TAKE-OFF A C ARE SUPPORTED BY DATA FURNISHED BY THE MANUFACTURER. 2) AUTOMATICALLY RESTART AND TEMPORARILY OPERATE 2. THE APPLICANT SHALL FILE ALL CERTIFICATE(S) OF ACCEPTANCE, CIg THE SYSTEM AS REQUIRED TO MAINTAIN: WITH THE ENFORCEMENT AGENCY PRIOR TO RECEIVING A FINAL M-3 M-3 SHEET NUMBER WHERE SECTION IS 12. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2019 OREGON MECHANICAL a) A SETBACK HEATING THERMOSTAT SETPOINT, IF THE SYSTEM OCCUPANCY PERMIT. THE SIGNER(S) SHALL BE ELIGIBLE UNDER DIVISION 3DRAWN 45' LATERAL TAKE-OFF H SPECIALTY CODE. PROVIDES MECHANICAL HEATING; AND OF THE BUSINESS AND PROFESSIONS CODE TO SIGN SUCH DOCUMENTS. SHEET NUMBER WHERE SECTION IS 14 Q INSULATION/LINING NOTES EXCEPTION: AREA WITH THE DESIGN WIN TER OUTDOOR TAKEN Q � ,,nn TEMPERATURE OF GREATER THAN 327. 3. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON(S) TRANSITION OR REDUCER (FOT= V 1. ENERGY CODE: ASA MINIMUM, COMPLY WITH THICKNESSES AND b) A SETUP COOLING THERMOSTAT SETPOINT, IF THE RESPONSIBLE FOR BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT - FLAT ON TOP, FOB=FLAT ON PIPING O 440 F__r TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. SYSTEM PROVIDES MECHANICAL COOLING. OR CENTRALLY OPERATED BUILDINGS) AT OCCUPANCY THE FOLLOWING: BOTTOM) z EXCEPTION: AREA WITH THE DESIGN SUMMER OUTDOOR a) OPERATING INFORMATION: THE APPROPRIATE CERTIFICATE(S) OF WYE FITTING CD CONDENSATE DRAINAGE W NJ 2. ALL AIR DISTRIBUTION SYSTEMS DUCTS AND PLENUMS SHALL BE TEMPERATURE OF LESS THAN 1007. COMPLIANCE AND A UST OF THE FEATURES, MATERIALS, 14 INSTALLED, SEALED AND INSULATED TO MEET THE REQUIREMENTS OF COMPONENTS, AND MECHANICAL DEVICES INSTALLED IN THE G NATURAL GAS SECTION 604 OF THE 2019 OREGON MECHANICAL SPECIALTY CODE. 3. THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN T. BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM � 90' RECTANGULAR TAKE-OFF WITH SUPPLY-AIR AND RETURN-AIR DUCTS CONVEYING HEATED OR COOLED EFFICIENTLY. 45' TAPER 7 PIPE CAP a AIR SHALL BE INSULATED TO A MINIMUM LEVEL OF R-8, UNLESS DUCTS 4. THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT b) MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE PIPE PLUG ARE IN A CONDITIONED SPACE. STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL. ACTIONS SHALL BE CLEARLY STATED AND INCORPORATED ON A 90' DIVERGING RECTANGULAR TEE, VALIDITY OF PERMIT 2. EXTENT OF INTERNAL DUCT LINING: READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO EITHER RADIUS OR TURNING VANES �I,- UNION THE ISSUANCE OFA PERMIT A. GRILLE AND DIFFUSER BOXES AND BOOTS. VENTILATION IDENTIFYING THE OPERATION AND MAINTENANCE MANUAL. �411.4 II BASED ON CONSTRUCTION B. TRANSFER DUCTS. ��r-- FLANGE DOCUMENTS AND OTHER 1. CONTROLS SHALL BE PROVIDED TO ALLOW OUTSIDE AIR DAMPERS c) VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF PARALLEL FLOW BRANCH DATA DOCUMENTS OT AND OT PREVENT 3. EXTENT OF EXTERNAL DUCT INSULATION: OR DEVICES L BE OPERATED AT THE VENTILATION RATES E OUTDOOR AIR AND RECIRCULATED AIR THAT THE VENTILATION CONNECTION, EITHER RADIUS OR �a GATE VALVE OR BALL VALVE THE CODE OFFICIAL FROM A. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACES, SPECIFIED IN THESE PLANS. SYSTEMS ARE DESIGNED TO PROVIDE TO EACH AREA. TURNING VANES n REQUIRING THE CORRECTION MECHANICAL ROOMS, ELECTRICAL ROOMS, AND EQUIPMENT 4. CERTIFICATE OF OCCUPANCY AND ALL REQUIRED ACCEPTANCE DOCUMENTS BALL VALVE ARCHITECT/ENGINEER OF RECORD OF ERRORS. OSSC 105.4 ROOMS NOT SPECIFIED TO BE INTERNALLY LINED. 2. OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED SHALL BE SUBMITTED TO THE FIELD INSPECTOR DURING CONSTRUCTION. FLEXIBLE DUCTPRESSURE REDUCING VALVE (PRV) KEN MCCRACKEN, B. SUPPLY AIR ABOVE CEILINGS OR EXPOSED NOT WITH DAMPERS THAT AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL THESE FORMS _44 SPECIFIED TO BE INTERNALLY LINED. ARE REVIEWED AND APPROVED. ROUND DUCT INDICATOR BREAK IN PIPING OR DUCTWORK ARCHITECT C. OUTDOOR AIR INTAKE. -rry h..r.... _ ^•qram Idanagemenl•Pp,milt ing 100 SCHEDULES SEQUENCE OF OPERATIONS ABBREVIATIONS 6930 DESTINY DRIVE, ROCKLIN, CA 956777 Conlact:ARIANE SANDERS 707.655.4320 DIFFUSER, GRILLE AND REGISTER SCHEDULE SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE OCCUPIED AND UNOCCUPIED OPERATION AFF ABOVE FINISHED FLOOR ASANDERS@PMDGINC.COM THE TEMPERATURE CONTROL SYSTEM SHALL BE SET FOR AHJ AUTHORITY HAVING OCCUPIED AND UNOCCUPIED HOURS. DURING THE OCCUPIED JURISDICTION CONDENSING UNIT EVAPORATOR UNIT AH AIR HANDLING UNIT MANUFACTURER HOURS, THE SPACE SHALL BE MAINTAINED AT 72°F (ADJ.) IN THE TAG LOCATION TYPE MATERIAL FINISH SIZE &MODEL NO. GENERAL REMARKS COOLING CAPACITY HEATING CAPACITY ELECTRIC ELECTRIC HEATER @240V ELECTRIC BTUH BRITISH THERMAL UNIT TAG MANUFACTURER MODEL NOMINAL WEIGH TAG MANUFACTURER MODEL MOTOR, WEIGHT REMARKS COOLING MODE AND 70°F (ADJ.) IN THE HEATING MODE. TONS CFM O.A. (KW) CAPACITY PER HOUR OA CEILING SUPPLY ALUMINUM WHITE 24x2q TITUS LAY-IN, AG-75, NARROW TEE BORDER TYPE TO 1-5,8, 10 TOTAL(MBH) SEMS.IMBH) SEER/EER TOTAL(MBHI HSPF/COP VOLTAGE MCA MOCP (LBS) HP (KW) IMBHI VOLTAGE MCA MOCP (LBS) DURING UNOCCUPIED PERIODS, THE SPACE TEMPERATURE SHALL CFM CUBIC FEET PER MINUTE OMNI-AA-NT FIT 9/16" FINELINE BEVEL CEILING GRIDMAINTAIN 75°F (ADJ.) IN THE COOLING MODE AND 65°F (ADJ.) IN CU CONDENSING UNIT These drawings and specifications are the confidential and proprietary prope,ty EXHAUST/ LAY-IN, AG-75, NARROW TEE BORDER TYPE HP-1 CARRIER 25HCC548 4.0 47.5 36.7 15.0/12.5 46.5 8.7/3.80 208/1 28.5 40.0 260 AH-1 CARRIER FX4DNF049 1600 200 0.75 10.0 31.4 208/1 52.8 60.0 185 1 -7 THE HEATING MODE. of JP Morgan Chase and shall not be copied!or reprotlucetl without wntten B CEILING RETURN ALUMINUM WHITE 24x24 TITUS 3FL-NT TO FIT 9/16" FINELINE BEVEL CEILING GRID 1-3,8-11 COP COEFFICIENT OF prepared f«use on this specific athn conjun. the contract issue dat can were TITUS PERFORMANCE ite io conja Wer with edoteandareneo far farareanample on site th r a bier time. Use of these Aof , f«reference«exam le on © CEILING SUPPLY ALUMINUM WHITE 12x12 AG-75 1-5, 10 HP-2 CARRIER 25HCC548 4.0 47.5 36.7 15.0/12.5 46.5 8.7/3.80 208/1 28.5 40.0 260 AH-2 CARRIER FX4DNF049 600 200 0.75 10.0 31.4 208/1 52.8 60.0 85 7 AH-1, AH-2, & AH-3: engineers. . ect ruches of the m propen is far r se on as fm OMNI-AA DIM DIMENSION engineers. Reprotlamion of the contract documents f«reale on another EXHAUST/ DN DOWN project h not authored. OD CEILING RETURN ALUMINUM WHITE 12x12 TITUS 350FL AG-75 1-3,8-11 HP-3 CARRIER 25HCC548 4.0 47.5 36.7 15.0/12.5 46.5 8.7/3.80 208/1 28.5 40.0 260 AH-3 CARRIER FX4DNF049 1600 200 0.75 10.0 31.4 208/1 52.8 60.0 185 1 -7 UPON RECEIVING A SIGNAL FROM THE TEMPERATURE CONTROL EA EXHAUST AIR V SINGLE SLOT LINEAR DIFFUSER, DROP FACE SYSTEM FOR OCCUPIED HOURS, THE RTU FAN SHALL ENERGIZE OE CEILING SUPPLY ALUMINUM WHITE 18x4 TITUS FL-TZ-DF 1-3,8, 11-13 iREMARKS 5. DAINTREE TO PROVIDE BUILDING ENERGY MANAGEMENT SYSTEM (BMS). EQUIPMENT SHALL BE PROVIDED WITH AND REMAIN ON DURING OCCUPIED HOURS. THE TEMPERATURE EER ENERGY EFFICIENCY RATIO BORDER FOR NARROW TEE CEILING ( I EF EXHAUST FAN SEAL . PROVIDE WITH SECONDARY DRAIN PAN. ELECTROMECHANICAL CONTROLS ONLY; DAINTREE TO PROVIDE WI-FI COMMUNICATING THERMOSTATS. CONTROL SYSTEM SHALL MAINTAIN THE COOLING AND HEATING EFF EFFICIENCY PROFF I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE ED O CEILING RETURN ALUMINUM WHITE 18x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8-11, 13 2. SUSPEND FROM STRUCTURE WITH 3/8"THREADED RODS WITH VIBRATION ISOLATORS. 6. JPMC HAS A CARRIER CORPORATION NATIONAL ACCOUNT. REFER TO VENDOR CONTACTS SCHEDULE, SHEET SETPOINTS. I N4- rd� I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE© 3. PROVIDE WITH DIVERSITECH MODEL CP-22 EXTERNAL CONDENSATE PUMP WHERE SLOPE IS INSUFFICIENT TO ROUTE A3.3.3 FOR SPECIFICATION, QUOTATION AND DELIVERY. CARRIER EQUIPMENT IS NOT REQUIRED. ESP EXTERNAL STATIC PRESSURE F,f, O 2 CEILING SUPPLY ALUMINUM WHITE 24x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING I-3,8, 11-13 TO NEAREST APPROVED RECEPTOR. EXH EXHAUST 441 15,423 y 4. PROVIDE UNITS WITH MINIMUM MERV 8 FILTER. 7. PROVIDE EQUIPMENT MANUFACTURERS COMMISSIONING SERVICE, INCLUDING MANUFACTURERS F FAHRENHEIT a: OH CEILING RETURN ALUMINUM WHITE 24x4 TITUS FL-TZ-DF I 'SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1-3,8-11, 13 REPRESENTATIVES TIME ON-SITE TO COMPLETE BAC-NET POINT ASSIGNMENTS AND INITIAL ZONE PROGRAMMING. FC FAN COIL UNIT BORDER FOR NARROW TEE CEILINGFLR FLOOR O 1"SINGLE SLOT LINEAR DIFFUSER, N ON J CEILING SUPPLY ALUMINUM WHITE 30x4 TITUS FL-TZ-DF DROP FACE 1-3, 8, 11-13 FPM FEET PER MINUTE BORDER FOR NARROW TEE CEILING e OK COND CEILING RETURN ALUMINUM WHITE 30x4 TITUS FL-TZ-DF 1 SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1-3,8-11, 13 EXHAUST FAN SCHEDULE SPLIT SYSTEM COOLING ONLY UNIT SCHEDULE FIELD VERIFY ALL CONDITIONS FSD FRE/SMOKEFPS FEET PER EDAAMPER �gRKQ Ft00XS BORDER FOR NARROW TEE CEILING6/12/20 V SINGLE SLOT LINEAR DIFFUSER, DROP FACE CFM ELECTRICAL EFFICIENCY DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL G GAS © CEILING SUPPLY ALUMINUM WHITE 36x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 TAG SERVICE LOCATION CFM SP DRIVE MAX MOTOR ELECTRICAL WEIGHT MODEL NO. REMARKS WEIGHT GRD GRILLES, REGISTERS, VISIT THE SITE PRIOR TO BIDDING NS AWARD OF CONTRACT TO R O B I S O N WG RPM HP TAG SERVICE LOCATION LOW/MED/HIGH VOLT QS Hz SEER EER MANUFACTURER&MODEL (LBS) REMARKS AND DIFFUSERS I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE V {7} HZ (LBS) INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL O CEILING RETURN ALUMINUM WHITE 36x4 TITUS FL-TZ-DF 1-3, 8-11, 13 HP HORSEPOWER, HEAT PUMP BORDER FOR NARROW TEE CEILING RESTROOM/ GREENHECK FC-1 ATM ROOM WALL 188/238/305 208 1 60 19.0 11.2 CARRIER 40MHHCl2-3 20 1,2,3,4,5 INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE EF-1 JANITOR/ ROOF 550 0.25 DIRECT 1550 1/15 115 1 60 50 G-090-D 1, 2, 3, FC-2 DATA ROOM WALL 188/238/305 208 1 60 19.0 11.2 CARRIER 40MHHCl2--3 20 1,2,3,4,5 4 MODIFICATIONS DUE TO EXISTING CONDITIONS. HVAC HEATING, VENTILATING, AND ENGINEERING, INC O CEILING SUPPLY ALUMINUM WHITE 48x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 BREAK ROOM AIR CONDITIONING 19401 40TH AVE W SURT 302.LYNNWOOD.WA 98036 I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR IN INCH TEL:206-364-3343 FAx:4258350098 © CEILING RETURN ALUMINUM WHITE 48x4 TITUS FL-TZ-DF 1-3,8-11, 13 REMARKS NOM. COOLING ELECTRICAL WEIGHT OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND KW KILOWATT CONTACT:GRANT HANSEN BORDER FOR NARROW TEE CEILING TOTAL SENS. CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL MBH THOUSAND BTU PER HOUR ISSUE DATE DESCRIPTION I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1. PROVIDE WITH THE FOLLOWING: 2. INTERLOCK FAN OPERATION WITH OCCUPANCY SENSORS IN ROOMS SERVED. TAG SERVICE LOCATION TONS V. O Hz MCA MOCP MANUFACTURER&MODEL (LBS) REMARKS © CEILING SUPPLY ALUMINUM WHITE 60x4 TITUS FL-TZ-DF 1-3, 11-13 MBH MBH COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY MCA MINIMUM CIRCUIT AMPACITY BORDER FOR NARROW TEE CEILING A. CLASS 1 MOTORIZED DAMPER REFER TO ELECTRICAL DRAWINGS FOR CONTROLS. CU-I ATM ROOM ROOF 1.0 I1.5 9.1 20LLI 60 I1.0 15.0 CARRIER 38MHRBC12AA3 55 1,2 THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE B. DISCONNECT SWITCH MOCP MAXIMUM OVER CURRENT I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 3. PROVIDE VARIABLE SPEED CONTROLLER DIRECT DRIVE FAN. T & B FINAL AND SHALL BE IMPLEMENTED AT CONTRACTOR'S COST. PROTECTION ® CEILING RETURN ALUMINUM WHITE 60x4 TITUS FL-TZ-DF 1-3,8-11, 13 C. SUPPORT BRACKETS AND ISOLATOR CU-2 DATA ROOM ROOF 1.0 I1.5 9.1 208 1 60 I1.0 15.0 CARRIER 38MHRBC12AA3 SS 1,2 BORDER FOR NARROW TEE CEILING CONTRACTOR SHALL MARK BALANCED POSITION ON CONTROLLER. 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE D. FLEXIBLE CONNECTION REMARKS MTD MOUNTED OS CEILING SUPPLY ALUMINUM WHITE 72x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, b, 11-13 E. EXHAUST GRILLE MATCHING TYPICAL 4. PROVIDE 4-WAY CONTROL CIRCUIT BY ONE OCCUPANCY SENSOR IN BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF OSA OUTDOOR AIR R.A. GRILLE SPECIFICATION EACH RESTROOM, ONE OCCUPANCY SENSOR IN THE JANITOR CLOSET, 1. PROVIDE THERMAL OVERLOAD PROTECTION. LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR OBD OPPOSED BLADE DAMPER O CEILING RETURN ALUMINUM WHITE 72x4 TITUS FL-TZ-DF 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 2. PROVIDE LIQUID LINE SPECIALTIES INCLUDING FILTER DRIER,SIGHT GLASS,TXV, SOLENOID VALVE, 24V 1 ph BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT POC POINT OF CONNECTION T BORDER FOR NARROW TEE CEILING 1-3, 8-11. 13 AND ONE TIMER SWITCH IN THE LOUNGE. CONTROL WIRE BY CONTROLS CONTRACTOR. ACCORDANCE WITH GOVERNING CODES. THE PLANS AND PRV PRESSURE REDUCING VALVE OU WALL EXHAUST/ ALUMINUM WHITE 30x4 TITUS FL-10 1"SINGLE SLOT LINEAR DIFFUSER 1-3, 9, 11, 13 3. DAINTREE TO PROVIDE BUILDING ENERGY MANAGEMENT SYSTEM (BMS). EQUIPMENT SHALL BE PROVIDED WITH SPECIFICATIONS NOT WITHSTANDING,THE CONTRACTOR SHALL RA RETURN AIR RETURN ELECTROMECHANICAL CONTROLS ONLY; DAINTREE TO PROVIDE WI-FI COMMUNICATING THERMOSTATS. ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT RD ROOF DRAIN 6„0 4. PROVIDE WITH DIVERSITECH MODEL CP-22 EXTERNAL CONDENSATE PUMP LOCATED ON WALL NEXT TO FAN COIL. DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN Q 6/8/20 Planning comments O CEILING SUPPLY ALUMINUM WHITE PRICE ANR AIR NOZZLE WITH CORE Q 1, 3, 8 REF REFERENCE OPENING 5. FAN COIL UNIT POWERED BY CONDENSING UNIT. INTENT. RG RETURN GRILLE1Q 6/2/20 Proto 20.2 Updates O CEILING SUPPLY ALUMINUM WHITE 48x6 TITUS FL-20 2 SINGLE SLOT LINEAR DIFFUSER, BORDER 160R 1-3, 8, 11-13, 15 RPM REVOLUTIONS PER MINUTE EQUAL TO FIT NARROW TEE CEILING 4130/20 Issued for Bid 2"SINGLE SLOT LINEAR DIFFUSER, BORDER 16 OR SA SUPPLY AIR XO CEILING RETURN ALUMINUM WHITE 48x6 TITUS FL-20 1-3, 8, 11-13, 15 SMACNA SHEET METAL AND AIR 4/20/20 Submittal Set EQUAL TO FIT NARROW TEE CEILING CONDITIONING CONTRACTORS O WITHHSINGRDCEE SLOT LNGCLIINEAR ITOSUR, ACEM 66 CHASE BANK GENERAL NOTE 4/10/21 8MATI INFORMATION Y ew Set CEILING SUPPLY ALUMINUM WHITE 72x4 TITUS FL-10 WITH HARD CEILING CLIP TO SURFACE MOUNT 1-3, 8, 11-14 NATIONAL ASSOCIATION PROJECT INFORMATION BLOCK 1"SINGLESLOT LINEAR DIFFUSER, BORDER 66 SP STATIC PRESSURE O CEILING RETURN ALUMINUM WHITE 72x4 TITUS FL-10 WITH HARD CEILING CLIP TO SURFACE MOUNT 1-3, 8, 11-14 TYP TYPICAL JOB# JPM19015.0 CONTRACTOR SHALL COORDINATE FINAL LOCATION OF V VENT DATE: 2/25/2020 REMARKS THERMOSTATS, SWITCHES, FLOOR AND WALL RECEPTACLES, CARD WB WET BULB (TEMPERATURE) DRAWN BY: GH 1. COORDINATE WITH LIGHT FIXTURES AND OTHER CEILING DEVICES FOR EXACT LOCATIONS OF ALL AIR FIXTURES. READER, DOOR ACTUATOR,]-BOXES, ETC. WITH ARCHITECTURAL 2. COORDINATE FRAME STYLES WITH CEILING OR WALL SYSTEM FRAMING AND FINISH MATERIALS. PROVIDE GYPSUM BOARD / PLASTER FRAME TO SUPPORT AND/OR STRUCTURAL DRAWINGS PRIOR TO INSTALLATION. CHECKED BY: PR FIXTURE WITHIN GYPSUM CEILING. CONTRACTOR SHALL CONTACT THE ARCHITECT IN CASE OF ANY 3. N.C. VALUES FOR DIFFUSERS, GRILLES AND REGISTERS SHALL NOT EXCEED 25, WITH A ROOM ABSORPTION RATE OF IOdb. DISCREPANCIES AND AWAIT FOR A WRITTEN RESPONSE PRIOR TO DRAWING INDEX MODEL 4. PROVIDE BACK SIDE OF SUPPLY AIR FIXTURES WITH FACTORY-INSTALLED R-6 INSULATION BLANKET. PROCEEDING WITH THE WORK. 5. PROVIDED DIRECTIONAL BLOW CLIPS (1-3) AS REQD. FOR DIRECTIONAL AIRFLOW CONTROL. MO.0 LEGEND, NOTES, SCHEDULES, DRAWING STANDARDS V20.2 6. NOT USED. 7. WHERE PLENUM RETURNS ARE UTILIZED, CONCEAL VISIBILITY TO PLENUM SPACE BY PROVIDE DUCT BOOT SECURED TO CEILING FRAMING OR OPTIONAL & DRAWING INDEX OPPOSABLE BLADE DAMPERS FOR 2X2 RA GRILLES, AND'FBR' RETURN HOODS AT LINEAR SLOT RA FIXTURES. WHERE RETURN AIR FLOW CONTROL IS REQUIRED, SHEET TITLE PROVIDE OPTIONAL OPPOSABLE BLADE DAMPERS IN THE 2X2 GRILLES, AND'FBBO' BLANK-OFFS IN THE LINEAR SLOT AIR FLOW IS NOT TO BE ADJUSTED BY MO.1 MECHANICAL DETAILS RE-SIZING EQUAL" THE FIXTURE IONSPRMITTEAREA. M2.0 MECHANICAL CONTROL PLAN LEGEND NOTES 8. "OR EQUAL"SUBSTITUTIONS PERMITTED. SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT OF RECORD BY THE PROCESS DEFINED IN THE PROJECT MANUAL. � p , 9. EXHAUST GRILLES ARE TO BE DUCTED TO THE ROOF CENTRIFUGAL EXHAUST FAN SYSTEM, WHICH IS CONTROLLED BY 4-WAY SWITCH WIRING AT THE VARIOUS SCHEDULES, & DRAW LOCATIONS. MECHANICAL INSTALLER SHALL COORDINATE WITH THE ELECTRICIAN FOR EQUIPMENT AND CONTROL DEVICE PROVISION AND M2.1 MECHANICAL FLOOR PLAN INSTALLATION. DRAWING INDEX 10. ALL SA, RA, AND EXHAUST FIXTURES IN 2X2 CEILING GRIDS SHALL BE 24"X 24"FULL FIXTURES. THE USE OF REDUCED VENT AREAS WITHIN LARGER PLATES TO M2.2 MECHANICAL ROOF PLAN RESTRICT AIR FLOW IS NOT PERMITTED. AIR FLOW CONTROL IS TO BE PROVIDED BY ADJUSTABLE DAMPERS WITHIN THE DUCTS OR BOOTS SERVING THE FIXTURES. 11. SPECIFY EDGE DETAIL/ BORDER TYPE FOR COMPATIBILITY WITH GYPSUM BOARD CEILINGS WHERE REQUIRED. M3.0 ENERGY CODE COMPLIANCE SHEET NUMBER 12. LINEAR SLOT FIXTURES SET IN GRID CEILINGS ARE INTENDED TO HAVE A CONTINUOUS,SEAMLESS APPEARANCE FOR THE FULL RUN OF THE NARROW CEILING GRID SPACING, WITHOUT VISUAL DIFFERENTIATION BETWEEN SA, RA, AND UNUSED PORTIONS OF THE RUN. PROVIDE OPTIONAL TBR' RETURN HOODS AND 'FBBO' BLANK-OFFS AS REQUIRED. 13. PROVIDE FABRICATED SHEETMETAL PLENUM THE FULL LENGTH OF SLOT LINEAR DIFFUSER. M0 , 10 A O • O 14. PROVIDE TITUS (OR EQUAL) FBMC-10 MITERED CORNERS. '\Y/1 15. FLOWBAR DIFFUSER TYPE TO BE SPECIFIED IN PRIVATE OFFICES ONLY.SPECIFY SLOT DIFFUSER WIDTH AS REQUIRED TO MEET AIR DISTRIBUTION REQUIREMENTS IN THE HIGHEST-DEMAND OFFICE, AND APPLY THAT DIFFUSER THROUGHOUT ALL OFFICES. CUPYWff 207D, ROM M 00*BMIC, M 'OUTDOOR JACKETING 18 GA GALV STEELHOOD WITH WATER- ' TO ELBOW TIGHT JOINTS. USE _ SS FASTENERS 45° FILL VOID WITH 1/2" (15 MM) INSULATION j URETHANE FOAM ROUND ROD PIN INSULATION--___. STIFFEN BLADE AS INSULATION (TYP) REQUIRED SUPPORT LIP INSULATION DUCT ROOF CURB � STAND-OFF DAMPER BLADE ASSEMBLY SECURE TO CURB, OUTSIDE END 6" SS LAG BOLTS, HANDLE WITH BEARING 1 HANDLE WITH LOCKING MIN 2 PER SIDE, LOCKING o QUADRANT ul I SILICONE SEALANT QUADRANT IN HOLE PRIOR TO DAMPER BLADE INSERTING BOLT (TYP) DUCT INSIDE END BEARING 1/8" (6 MM) CLEARANCE ALL SECTION AROUND SIDE ELEVATION ROOFING INSULATION ROOF DECK NOTES: LL O PIPING 0 1. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS& w iY FLASHING COLLAR AND ROUND DAMPERS. a SEALANT, FASTEN TO OPENING IN DECK ut DECK TO MATCH CURB ID a PIPING PENETRATION DETAIL ISCANTS 13 MANUAL BALANCE DAMPER NTS 112 M 41 N W Ln H H LUJ 3.p CV NVaua 0o Q L U mz < 0 W 0. Coil DC Wa %0 > 0Z � %0 - Z � WA4 � azo = y SCALE SCALE SCALE Q NOT USED NTS 11 NOT USED NTS 10 NOT USED NTS ARCHITECT/ENGINEER OF RECORD KEN McCRACKEN, ARCHITECT T­ �1­1- "I T!F114 6930 DESTINY DRIVE, #100 ROCKLIN, CA 95677 "DURA-BLOK"SUPPORT NOTE: Coni707.655 43pct:ARIANE SANDERS SYSTEM ROOF ROOF CONTRACTOR SHALL VERIFY THROUGH ASANDERS@PMDGINC.COM MOUNTED SECURE TO ROOF NON-DESTRUCTIVE MEANS ALL LOCATIONS PIPING STRUCTURE OF POST-TENSIONED TENDONS AND MILD "THREADED REINFORCED STEEL. NO REINFORCEMENT HANGER RODS SHALL BE CUT OR DAMAGED. PIOOO NOTES: 4"MIN.A.F.R. ROD STIFFENER SEISMIC FLEX DUCT BRACING CONNECTION 1. SIZE HANGER AND CLAMP TO the a drawings and sped atgns are the confidential and proprietary property B-LINE FIG. B3060 ADEQUATELY SUPPORT LOAD (REFER TO of JP Mangan Chase and shaft not be copiM or reproduced wnhoot w,nten P. 131 B-LINE HANGER CATALOG WOODEN BLOCKS SHAL )• NOT BE USED AS PIPING site in n. the contract Issue date were prepared f«use on itis special site in conjunction akvnm its¢sue date and are not fa reference I«use on a example on SUPPORTS ON THE ROOF sne«r a tits tom. use of those bavnngs for reference ar exampe on another prgect requves the services of properly Ncensetl architects and 2. FOR NFPA ROD SIZES USE B3170NF OR � eWineea. Reproduction of the contract documents f«reuse on anomer B-LINE FIG. 83170 SUBSTITUTEB3174. proiect6not autitsi P.46 3. FOR COPPER TUBING USE COPPER i INSULATION PLATED OR PAINTED B317OCT, FELT LINED t,\ JACKET WHERE B3170F, OR PLASTIC COATED HANGERS. RUBBER BASE SEAL SUPPLY AIR DI CT RETURN AIR DUCT Rip PROFFS ` y / REQUIRED 1.91 1 NOTES FLEX CONNECTION I NFF,ps'o2 15,423 v 1. SUPPORTS SHALL BE INSTALLED A MAXIMUM 8'-0"O.C. r AND AT EACH CHANGE OF DIRECTION OF PIPING. UNISTRUT CHANNEL EQUIPMENT DRAIN PAN WITH WET SWITCH TO UNIT POWER CEILING N LOCKING NUTS AND WASHERS a SPRING RATION MFR. MOUNTING RAIL ISOLATORS �qRk R ROBS 6/12/20 PIPE HANGING INSTALLATION SCALE 8 ROOF PIPE SUPPORT SCALE 7 NOT USED SCALE 6 FAN COIL UNIT HANGING NTS L SCALE NTS jWROBISON NTS NTS ENGINEERING, INC 19401 40TH AVE W SUITE 302,LYNNWOOD,WA 98036 TEL 206-364-3343 FAx:4258350098 CONTACT:GRANT HANSEN ISSUE DATE DESCRIPTION FILTER/DRYER SIGHT GLASS AT TX VALVE SYSTEMS ONLY ROUND SHEET METAL SUPPLY DUCT DUCT, LENGTH AS (RECTANGULAR WASHER & NUT PROVIDE INVERTED TRAP i REQUIRED. OR ROUND) l l SLOPE LIQUID &SUCTION _ LINES DOWN TOWARDS EXTERIOR UNIT 20 6/8/20 Planning comments SHEET CLAMP EXTERIOR UNIT �� 0 6/2/20 Proto 20.2 Updates METAL ELL PRE-FAB. ROOF PORTAL- REFER TO 4/30/20 Issued for Bid SUPPLEMENTAL STEEL OR ARCHITECTURAL DRAWINGS 4/20/20 Submittal Set 44 BUILDING STRUCTURE LIQUID LIN 4/10/20 80 % Review Set THERMAL EXPANSION \ PROJECT INFORMATION BLOCK DEVICE �—SUCTION LINE, INSULATE WITH 3/4" JOB# JPM19015.0 ARMAFLEX OR APPROVED EQUAL DATE: 2/25/2020 VD UTOR FLEX DUCT SHALL HANGER HANGER DISTRIBI SEISMIC STRAPS RODS CST DRAWN D GH BRACING NOT EXCEED 5'-0" C-CLAMP 41"MAX. CHECKED BY: PR (TYPICAL) IN LENGTH. (TYPICAL) SUCTION TRAP MODEL DAMPER (T P CAOLNN ROLL NOTES DRAWING STANDARDS v20.2 TAKE-OFFS TO DIFFUSERS). 1. FOR UNITS EQUIPPED WITH UNLOADING TYPE COMPRESSORS USE ADOUBLE-SUCTION SHEET TITLE SEISMIC RISER SIZED IN ACCORDANCE WITH CEILING CEILING STRAPHANGER BRACING TRAPEZE HANGER MANUFACTURES INSTRUCTIONS. MECHANICAL DIFFUSER-SEE SPECIFICATIONS 2. PROVIDE OPERATION AND MAINTENANCE DETAILS FOR TYPE AND ACCESSORIES. CLEARANCES AROUND ALL EQUIPMENT AS NOTES INTERIOR UNIT SPECIFIED BY THE MANUFACTURER. 1. NO POP RIVETS ALLOWED, USE SELF-TAPPING SWEET METAL SCREWS ONLY. 3. OUTDOOR UNIT SHALL BE EQUIPPED WITH ISOLATION VALVES. SHEET NUMBER SUPPLY AIR TERMINAL SCALE NTS 4 TYPICAL DUCT HANGING SNTS CALE 3 NOT USED NTS SCALE 2 REFRIGERANT PIPING NTS SCALE 1 Mo • 1 COPYRIGHT 2020, ROBISON ENGINEERING NC. GHMSEN F.VEORot11CMACKEN\91A5E BANi OIASE MAN 1. CR\owc\uG-1 - DET,li 05-29-201)lace DAINTREE MECHANICAL CONTROL: _ DESIGN-INTENT EXHAUST FAN CONTROL DIAGRAM TYPICAL MECHANICAL EQUIPMENT ZONE FIGURE 1 : WGA100CAN BE USED WITHOUT SENSOR FOR SWITCHING UNE LOAD ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED/UNSWITCHED POWER.WSA10 ' 00 (CAN WIRELESS SENSOR ADAPTERS REQUIRE 24V POWER. EXHMW DIAGRAM SYMBOLS REFER TO MFRS.FIGURE 9 White Neutral Binary Input, (DIP Switch 4 or DIP Switch 5 On) 2. DURING INSTALLATION THE LAST 4 DIGITS OF THE IEEE ADDRESS FOR EACH WIRELESS COMPONENT TYFWA 81110113LECIIIIIII111IT 111110LEFOLE OCCLFAWY 8BOM MrCH RDCFMM LF4L nBaWJ FM& RTU OR WIRLESS PROBE DUCT TEMP.SENSOR Nack Hot 120-277V MUST BE RECORDED ON THE SHOP DRAWING SET CORRESPONDING TO THE LOCATION OF THE (All SWAYPRBWS.Io."NNMKNHartrax�NMML WMLT satizartaun epamMrTl wmilifrrl o yuw SPLITSYSTEM Lo eta" COMPONENT. awacurooarwrYeemrn umea+usorasara+seaia °01'�W0 °' T°9M �N UNIT REMOTE TEMPERATURE �e ® e,,,,`- ; �kc 3. FOR ANY SENSORS ATTACHED TO A WIRELESS SENSOR ADAPTER (WSA10) THE LAST 4 DIGITS OF THE LOUNGE— SENSORS AS INDICATED ON PLAN vdt ' EEE ADDRESS FOR THE RESPECTIVE WSA10 MUST BE RECORDED.THE SPECIFIC WSA10 PORT MUST M WGA100 0 w�.e JANITORS ALL GENDER ALL GENDER I SF1F POVVEREDCT FOR / �`�"9 >~: ALSO BE RECORDED PER SENSOR. CLOSET RESTROOM RESTROOM EQUIPMENT FAN POWER I ( 14AMG ®RED �� 4. DURING WIRELESS ADAPTER INSTALLATION FOLLOW THESE STEPS AS DEFINED IN THE DEVICE n \ \ / / sntatw❑ ❑ ■ ❑ WIREDTOWGA100 DUCT T I I T I T T oa277vAc INSTALLATION GUIDE IN THE FOLLOWING ORDER. / \ \ \ A. CONFIRM WIRELESS ADAPTER DIP SWITCHES ARE SET CORRECTLY. o-- - - - I B. RESET ADAPTER (ALL ADAPTERS) D, =&S� z4Yoc ti RED 24 VDC Fowey Output C. PERFORM PROPER TEST SUITE. A M.FKr - - '°0L1°� TO EWIPMENT DAINTREE THERMOSTAT WIRED TO RTU 24%GCconnm� _ _ — DIST18l1ilON PANEL J TERMINAL THERMOSTATWIR DD 8 Twee 5. INSTALLER MUST BECOME FAMILIAR WITH THE PUBLISHED INSTALLATION GUIDES FOR THE PRODUCTS IN BLOCKVIA BLUE actM n .taeiee .Rn olF eea tmv _ - - — - - - - — - - — THE PROJECT SCOPE. DAINTREE INSTALLATION GUIDES CAN BE FOUND AT: aWAYcnairwro�l — WGA1� CONDUCTORWIRING �.wt HTTPS://PRODUCTS.CURRENTBYGE.COM/CONTROL-SYSTEMS/WIRELESS-LIGHTING-CONTROLS 6. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROCUREMENT AND INSTALL OF DAINTREE AND RELATED COMPONENTS PERTAINING TO IT/DATA, LIGHTING, POWER AND HVAC. DAINTREE GENERAL NOTES: 1. MOUNT ALL THERMOSTATS AND SENSORS ON WALL 44"ABOVE FINISHED FLOOR. UL 0 2. HVAC, LIGHTING AND POWER SHALL BE CONTROLLED AND MONITORED BY A WIRELESS NETWORKED w ENERGY MANAGEMENT SYSTEM UTILIZING DAINTREE CONTROLSCOPE SOFTWARE AND OPEN, Y a STANDARDS BASED CONTROLSCOPE CONNECTED HARDWARE. w 3. THE DAINTREE SYSTEM WILL INCLUDE A COMMUNICATIONS INTERFACE IN ORDER TO NETWORK a. FACILITY TO COMPANY WIDE SYSTEM NETWORK. 4. THE FOLLOWING SYSTEM WILL BE PROVIDED BY DAINTREE NETWORKS: A. SYSTEM INFRASTRUCTURE i. WIRELESS AREA CONTROLLER (WAC).THE WAC IS THE WIRELESS SYSTEM GATEWAY PROVIDED BY DAINTREE NETWORKS. IF MULTIPLE WACS ARE NECESSARY THEY CAN BE DAISY CHAINED VIA ETHERNET CABLE.WACS MUST BE POWERED WITH 120V RECEPTACLE. ii. A CELLULAR MODEM WILL PROVIDE ACCESS TO THE CONTROLSCOPE NETWORK.WAC(S) ARE CONNECTED TO THE CELLULAR MODEM. iii. AN UNINTERRUPTED POWER SUPPLY (UPS) WILL BE INSTALLED TO PROVIDE AN UNINTERRUPTED RECEPTACLE FOR WAC(S) AND CELLULAR MODEM. N W B. HVAC CONTROL B A1. WIRELESS THERMOSTATS (WTS10) WILL PROVIDE NETWORKED CONTROL OF ROOF TOP UNITS VIA STANDARD 8 WIRE INTERFACE.THE THERMOSTATS WIRELESSLY COMMUNICATE WITH THE �A SYSTEM BUT MUST BE WIRED TO RTU. Y ii. WIRELESS SENSOR ADAPTERS (WSA10) CAN ACCOMODATE 4 THERMISTOR TYPE TEMPERATURE SENSORS AND 2 LOW VOLTAGE (0-IOV) SENSORS AND SHALL PROVIDE CONTROL OF: 1. 0-10V CT(S) 2. PROBE DUCT TEMPERATURE SENSORS O T N 3. EXTERIOR TEMPERATURE SENSOR i iii. WIRELESS ROOM TEMPERATURE SENSORS PROVIDE MONITORING PER REQUIRED SPACE O INCLUDING ATM ROOM TEMPERATURE MONITORING. iv. WGA 100 (WIRELESS GENERAL PURPOSE ADAPTERS) PROVIDE ON/OFF CONTROL OF BASEBOARD HEATERS AND DUCT HEATERS. N Q V. WGA100 ADAPTER ALSO PROVIDES CONNECTION FOR LEAK SENSOR. C. INDOOR LIGHTING Z i. CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA100-PM WIRELESS ADAPTERS. Q O WIRELESS ROOM ii. WIRELESS OCCUPANCY SENSORS SHALL BE INSTALLED TO PROVIDE COVERAGE IN DESIRED AR TEMP SENSOR AREAS. � 0 �) iii. WIRELESS SWITCHES (W WD1) SHALL PROVIDE OVERRIDE CONTROL OF INTERIOR ANDCC EXTERIOR LOADS. D. EXTERIOR LIGHTING y WPC's CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA100-PM WIRELESS ADAPTERS IF LOADS W Q Q I PCs 6 ARE SINGLE POLE. IF EXTERIOR LIGHTING IS MULTI POLE AN AUXILIARY RELAY CAN BE USED. Q WmFSSOUTSDE PCs a PCs 5 INTERIOR AND EXTERIOR LOADS MUST BE CONTROLLED BY SEPARATE ADAPTERS IN ORDER TO > apWWd3m ROOM _ AillARTEMPSBN90R c"%j!\ V AF-2 ALLOW FOR SEPARATE CONTROL. AM 7BAP SENSOR E) 11ii. LOW VOLTAGE OPEN LOOP PHOTOCELL SHALL BE INSTALLED TO CONTROL EXTERIOR �_- LIGHTING. E. POWER MONITORING U 74AH. i. CTS WILL BE INSTALLED ON EACH PHASE I MAIN POWER AND UTILITY GRADE MODBUSzAH-2 CONNECTED POWER MONITOR SHALL BE INSTALLED.f�OR WIRELESS ROOM SBF POWERED CT FOR P ii. SELF POWERED CTS WILL BE INSTALLED TO MONITOR RTU FAN POWER CONSUMPTION AND nn�p ART.STAT FAN POWER Yom 10 { 1 DETECT FAULT. EACH SHALL BE WIRED TO WSA10. f1� �oUUV( � WGA DROV m 10 )� F. IRRIGATION CONTROL INTEGRATION (WHEN REQUIRED) REUTR I'N 02 RF-27RE 0� ,))FG2 Dn�n >)) AH,* L THE IRRIGATION SYSTEM WILL BE CONNECTED TO CONTROLSCOPE VIA CELLULAR MODEM. - 5. ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED (UNSWITCHED POWER). WIRELESS MPERATPROBE UCTSUPPLY WRgg$ROOM 6. THE DAINTREE SYSTEM DOES NOT SUPPORT CONTROL OF VAV/DAMPER BASED SYSTEMS.THE CARRIER EXHAUST IITC FC:-2 TEIAPERATURESENSOR ARTBNPSENSOR VAV SYSTEM SHALL BE STAND ALONE. CONTROL COMPONENTS MUST BE COMPATIBLE WITH CARRIER TIMEt SWIIICH AND ARE NOT IN DAINTEE SCOPE. A" T OS 0LTJ -- fuI � 7. NOT USED. 0 � OS _ OS � - �OO�B,I ',7Ell � 8. FOR CARRIER VRF MODELS, PROVIDE 24V THERMOSTAT INTERFACE ACCESSORY TO BE DETERMINED ��Q�� BY CARRIER.VERIFY WITH MECHANICAL EQUIPMENT SCHEDULE, SPECIFICATIONS, AND MECHANICAL ARCHITECT/ENGINEER OF RECORD WALLMOUNIrED WIRBESS ROOM OCCWANM — — — — ENGINEER. OCCUPANCY AR TEMP SENSOR AF 3 q SENSOR AW3 YV�RaMROOM ROOM KEN McCRACKEN, SENSOR M�p 9. INSTALL WA 100-PM FOR EF-1 CONTROL. CONFIGURE AS ON/OFF DEVICE TO ALLOW FOR MANUAL WG=dL�L _ ) �i ,r— I SWITCHING. WGA 100 ADAPTER DOES NOT SUPPORT MANUAL SWITCHING.SEE MECHANICAL RCP ARCHITECT FOR EF-1 SPECIFICS. �-rr.,ite tr l .gru� Iy'L'ner r•Julna WRELES3 PROBE DUCT SUPPLY ((1 &VGA SELF POWERED CT FOR 10. THE DAINTREE SYSTEM HUMIDITY AND TEMP SENSORS DOES NOT SUPPORT CONTROL OF 6930 DESTINY DRIVE, #100 TEMPERATURE SENSOR FAN POWER.WRETO VAV/DAMPER BASED SYSTEMS.THEY ARE ONLY FOR MONITORING. ROCKLIN, CA 95677 WGA 0-10V INF'Uf Contact:ARIANE SANDERS -- _ _ ----Z24 i y��LI� 707.655.4320 °0000 Il W ASANDERS@PMDGINC.COM �i wram aooM A�s� i \' 1 . SITE SPECIFIC CONTROL NOTES: � ONO 1. THE SUPPLY OF HEATING AND COOLING ENERGY TO EACH ZONE IS CONTROLLED BY INDIVIDUAL THERMOSTATIC CONTROLS THAT RESPOND TO TEMPERATURE WITH THE ZONE. 2. THERMOSTATIC CONTROLS TO PROVIDE A TEMPERATURE RANGE OR DEADBAND OF AT LEAST 5oF WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS CAPABLE OF BEINGThese drawings ands andshotnot thepiedor reroauce!l and h far,fiho Properly SHUT OFF OR REDUCED TO A MINIMUM. of R,H«gan There and thea net nt copied or repmda se on this wdtten site in imlion. The contract documents were Prepared for ase on a specific 3. EACH HVAC SYSTEM HAS CONTROLS THAT VARY THE START-UP TIME OF THE SYSTEM TO JUST MEET THE site inconjanctionwith its eaedate and ore hot suitable for areonadikerent �`+., site or at a Inter time. Use of these drawing,for reference or exornple on AW1 ROOM AH-1 TEMPERATURE SET POINT AT TIME OF OCCUPANCY. another Project reaunes the services of popeRy licensed architeels and MM nr�nn���ppp np�pp engineen. Reproduction of the contmct documents f«reuse on onofha- CQUW IIIN/l,11N1�1G�1L� SELFPOWEREDCTFOR Q 11 AR TCMP SENSOR 4. EACH ZONE IS PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY THE pmjeO is hot outhonz . [Roof 40 im. C FAN POWER.WRETO� t no DAINTREE SYSTEM. 0 c�J WGAO-IUVlpUT j °v`r WIRELESS PROBE DUCT (<t COMMUMV WALL SUPPLY TEMPERATURE SEAL SE.ISOR ES PROF TSTA�c8 TO A&Z DAINTREE DEVICES KEY: �R INFF Px, OPEN TE MAC CO K FOR AH-1((t �� ���� 15,42 � y FGl WREtESSROOM ANTWIREUIRIS R-STAT FC-11 71 WIRELESS WALL DIMMER ® 1)) WIRELESS ADAPTER IWAPM >)) N AR TEMP SENSOR FIERE (W W D 1) (WA100-PM) WIRELESS GENERAL WGA )) �qRK R ROBS 6/12/20 ADAPTER (WGA 100) p���JT ROOM WIRELESS PIR �g �)) (WOS2-CM-E) WIRELESS SENSOR Z3ROBISON WSA10 ))) ccs � ADAPTER (WSA10) ENGINEERING, INC WIREIM ROOM LOW VOLTAGE OPEN 19401 40TH AVE W SUITE 302,LYNNWOOD,WA 98036 T AIR TEMP SENSOR 1)) i LOOP PHOTOCELL OL PS WIRELESS TEMP TEL:206-364-3343 FAx:4268350098 _. CONTACT:GRANT HANSEN SENSOR ��) ISSUE DATE DESCRIPTION WIRELESSTSTAT TEMPERATURE —� J I THERMOSTAT WTS10 )�) SENSOR LEAK DETECTION CELLULAR �(( ))� SENSOR MODEM CURRENT TRANSFORMER DUCT SMOKE PUSH-BUTTON 6/8/20 Planning comments DE � — Q DETECTOR TEST � TEST TIMER SWITCH BY — T 6/2/20 Prato 20.2 Updates KEY SWITCHES - ELECTRICIAN 4/30/20 Issued for Bid HARDWIRE TO SENSOR 4/20/20 Submittal Set U) WIRELESS 4/10/20 80% Review Set WALL MOUNTED O OUTSIDE AIRPROJECT INFORMATION BLOCK OCCUPANCY TEMPERATURE FO—TS] JOB# JPM19015.0 SENSOR 0 SENSOR DATE: 2/25/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS V20.2 SHEET TITLE MECHANICAL CONTROL PLAN SHEET NUMBER MECHANICAL CONTROL PLAN1 SCALE CWYIOMT 2020. ROBISON DOGNEOMG. NC. G1ANSEN r.\_PMlI0+M CRAa"\_ ASB SAWS\424-1382 0105E 7M,MD 1. OR\PWG\M2-0- OMTROL RLAKIM 05-29-21120 1007 KEYED NOTES: _ 1. 24 GAUGE GALVANIZED STEEL EXHAUST DUCT UP TO EXHAUST FAN ON ROOF.COORDINATE WITH ' STRUCTURAL JOIST LAY OUT AND ALL OTHER TRADES.TRANSITION AS REQUIRED. _ 2. NOT USED. 3. ATM&DATA ROOMS ARE NOT OCCUPIED. FOR ELECTRICAL AND STORAGE EQUIPMENT ONLY.THESE ROOMS DO NOT NEED TO BE DIRECTLY VENTILATED. 4. SPLIT SYSTEM FAN COIL UNIT LOCATED ABOVE CEILING.SUSPEND UNIT FROM STRUCTURE. VERIFY ADEQUATE CLEARANCE REQUIREMENTS. INSTALL FAN COIL UNIT SUCH THAT ALL MAINTENANCE PANELS ARE IN AN ACCESSIBLE LOCATION. VERIFY REQUIRED CLEARANCES AROUND UNIT FOR MAINTENANCE. 5. UNDERCUT DOOR A MINIMUM 1". 6. SPLIT SYSTEM WALL MOUNTED DUCTLESS FAN COIL UNIT WITH CONDENSATE PUMP MOUNTED ON WALL NEXT TO UNIT.COORDINATE ACTUAL INSTALLATION LOCATION IN FIELD WITH OWNER. tn 7. PROVIDE 120 OUTSIDE AIR DUCT UP THRU ROOF TO WEATHER PROOF CAP. COORDINATE WITH STRUCTURAL JOIST LAY OUT AND ALL OTHER TRADES. PROVIDE WITH CLASS 1 MOTORIZED DAMPER. MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING SYSTEM AS INDICATED ON THE DRAWINGS.ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL FOR COMPLETE, FINISHED WORK,TESTED,AND READY FOR OPERATION. o LL 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE it ASSOCIATED AIR BALANCE COUNCIL (AABC),THE NATIONAL ENVIRONMENTAL BALANCING BUREAU a (NEBB), OR THE TESTING, ADJUSTING, AND BALANCING BUREAU (TABB). BALANCE EACH SUPPLY, UJ RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5%OF REQUIREMENTS AND FURNISH A REPORT a TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, BALANCED, o A AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY.AN AIR BALANCE TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION. MINIMUM R-5 M INSULATION IN UNCONDITIONED SPACE. INSULATE ALL ROUND DUCTS EXTERNALLY, EXCEPT EXHAUST DUCTS, WITH 2"FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT WITH 1"-THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. W 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6'-0". 16. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, Iwo 25 25 _ - - u / FIRE, OR FIRE/SMOKE WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE Uj IF] L500 O L500 INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING O14 N T X W (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTER = 8$ 12$ 175 175 THAN 24 GAUGE STEEL. O (V PCs (� p�� 6 10$ X 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. U U o IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE IN Q �y O% o L500 L500 225 Tal M OCCUPIEDSPACE. 5 75 A X 12$ 8$ / 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS 300 r AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST&BALANCE AGENCY. Z Q O o -410. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS.PROVIDE J J DO ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. LU U 11. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' INSTRUCTIONS AND o B 6$ L2 L-z 100 6$ 16x10 22x12 AH-2 22x12 12x8 1 5�LB RECOMMENDATIONS. Lz 125 125 6 8 N JAN. 6"F O L500 Lsoo 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL 8$ e e80. M T EQUIPMENT AND MATERIALS. %0 t ^ f TCS B o DQ Q 135 g$ 270 0 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE Z Q Gov� DEVELOPMENT AND FLAME SPREAD REQUIREMENTS. INSULATION"R"VALUES SHALL COMPLY O 10$ 300 p 10$ 124 APPLICABLE ENERGY CODE. L2 L-2 120 -� 6$ 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR, UNLESS OTHERWISE Z r A A B 80 6 P 00 1'FBBO 0D 500 5DD V NOTED. Uj b 100 100 3 0 200 °° -__ _= °_ - ^• 75 15. INSTALL DUCT MOUNTED SMOKE DETECTORS FURNISHED BY DIVISION 16 IN SUPPLY AIR DUCTWORK a 1'FBBO 200 CFM OSA �- 1'FBBO (� p 004 � O ��� CONNECTED TO HEAT PUMP UNIT. WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT Z H>D L _ 215 220 �p 215 - \ 's / ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE OLM �� DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY /w 150 Ho - rr ,� 22x12 12X10 s [N V THE MANUFACTURER. Y/ 200 CFM 0 A 75 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. L500 6'FBB L-= L500 5rFBB0 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF L-2 $$ [6:2 L-2 T T ----- -- $$ 1rFBB0 R THE STRUCTURE. COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS,WATER PIPING, L�C4 250 10$ 250 ,0$ 165 V PLUMBING VENTS,AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/MO.1 FOR 8$ 10$ 75 MORE INFORMATION. 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE 250 j70 260 �OO OO� � CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY 10$ LSoo L500 L500 ARCHITECT/ ENGINEER OF RECORD + PROBLEMS CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY.ANY CHANGES RESULTING 12$ 1rFBBO C4 1'FBBO FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S 6$ ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. KEN MCCRACKEN, 8$ 8$ 75 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO ARCHITECT •` ` N 200 CFM OSA S ,� CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND Architecture•Program Management•Permitting A - 10$ o EQUIPMENT, ETC. 6930 DESTINY DRIVE, #100 200 " L.5W 6'FBBO 0D 265 L500 L500 0�D ROCKLIN, CA 95677 x �8 FBB 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) t0 O -"- �- `-- --- Contact:ARIANE SANDERS L 11 t 2rFBBO 4 YEAR FROM DATE OF FINAL ACCEPTANCE.ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED d;� O 6'FBBO WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER 707.655.4320 _ AT NO ADDITIONAL COST TO THE OWNER. ASANDERsc PMDGINc.coM 42 e I e 250 14x10 22x12 ,AM-11 22x12 14x8 !; 150 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL 12$ 10$ M - TOOLS, APPLIANCES,SURPLUS MATERIALS,AND SCRAP.ALL IDENTIFIED EXISTING EQUIPMENT TO BE 250 500 500 10$ 500 8$ 8$ p REMOVED SHALL BE TURNED OVER TO THE OWNER. 1 FBBO - L_ 10$ - - - 150 8$ 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS,OR BETWEEN EITHER,THE ITEMS II --_ r ' 2'FBBO P (� � T P 2"FBBO L! L� ti O 175 10$ 250 t80 r ¢r¢ OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. L 12x12 12x12 8 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. 4 1'6"FBBO ' mese drawings specification arethe ecoperdemminmprop witho MopWy _ o o - 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE of th Morgan Chase and t doall not et aapied or shad f a use without price, B 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o authorization. the conhad documents were prepared for ase on this specific 450 8$ INFORMATION ON MANUAL BALANCE DAMPER. srfe in conjunction e its Issue these dre ein not ar reference use exampefeon 9 11 111W 00 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORK enganoineeher rs Reproduction oject requires of the ontract dlocanhonerty ts for reuse onohomedr Project is not au hotmd. SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH SMACNA REQUIREMENTS. L-19 L-11 1�1 L-2 - X 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT L5D0 O d 175 OD �� -C4 ) ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS C 8$ 8$ C L500 SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN SEAL P 150 A r.150r. ACCORDANCE WITH THE CURRENT BUILDING CODE. BRED PROF�rS 150 8$ 12$ 27 FAN HANKCOILS, L CONT UNITS,LL PROVIDE D EXHAUST FATE INFO TO THE FACILITY MANAGER FOR ALL I NFF�Psio2 15,423 y L-11 L-ii L-tt 8 28. ALL REFRIGERANT SHALL BE R-410A. NO R-22 SHALL BE USED. r O O O L500 ❑ IN W29. ALL HVAC UNITS TO BE PROPERLY LABELED.ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED + P N AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1, FC-1, ETC.) N 175 150 150 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE P s UL REQUIRED PRIOR TO OCCUPANCY. k D. ROra - - � 6/12/20 L500__ g@IROBISON N ENGINEERING, INC 1 I 19401 40TH AVE W SUITE 302,LYNNWOOD,WA 98036 TEL:206-364-3343 FAx:4258350098 CONTACT:GRANT HANSEN LSDo ISSUE DATE DESCRIPTION - - - J NOTE: DUCTWORK DRAWN IS FOR SCHEMATIC PURPOSES. IF ROUTING AND/OR SIZES DO NOT WORK WITH EXISTING CEIUNG OBSTRUCTIONS, CONTACT Q2 6/8/20 Planning comments ARCHITECT/ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. Q 6/2/20 Prato 20.2 updates 4/30/20 Issued for Bid 4/20/20 Submittal Set 4/10/20 80% Review Set PROJECT INFORMATION BLOCK JOB# JPM19015.0 DATE: 2/25/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS V20.2 SHEET TITLE MECHANICAL FLOOR PLAN SHEET NUMBER MECHANICAL FLOOR PLAN SCALE 1/4"=V-0' M2 , 1 COPYPoCHT 2020, RODSON ENMEERl INC. GHANSEN F:\3EDRO+MCCRAC1(ENVCHASE BANKS\424-1382 CHASE T"M II, OR\DWG\M2-1 - FLOOR PLANAWD 06-01-2020 10:17 KEYED NOTES: _ 1. ROOF MOUNTED EXHAUST FAN. MAINTAIN A MINIMUM 10'-0"FROM ANY OUTSIDE AIR INTAKE OPENING. 2. WEATHER PROOF ROOF CAP FOR OUTSIDE AIR INTAKE. COORDINATE WITH STRUCTURAL JOIST LAYOUT AND ALL OTHER TRADES. 3. PROPOSED LOCATION FOR SPLIT SYSTEM CONDENSING UNIT AND REFRIGERATION SUPPORT SYSTEM. DEMO EXISTING ROOFTOP UNIT AND PROVIDE CONDENSING UNIT PLATFORM. MAINTAIN MANUFACTURER'S CLEARANCE REQUIREMENTS BETWEEN UNITS. 4. OUTSIDE AIR INTAKES SHALL BE LOCATED AT LEAST 10 FEET AWAY FROM ALL EXHAUST AND PLUMBING VENTS. 5. REFRIGERATION LIQUID AND SUCTION LINES FROM ROOF MOUNTED CONDENSER UNITS, PENETRATE ROOF AND SEAL WEATHER-TIGHT. ROUTE DOWN TO ASSOCIATED FAN COIL UNIT. PROVIDE WITH PIPE CURB AND CHASE WITH GOOSENECK. Ln MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING SYSTEM AS INDICATED ON THE DRAWINGS. ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL FOR COMPLETE, FINISHED WORK,TESTED, AND READY FOR OPERATION. 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE O ASSOCIATED AIR BALANCE COUNCIL (AABC),THE NATIONAL ENVIRONMENTAL BALANCING BUREAU LL (NEBB), OR THE TESTING, ADJUSTING, AND BALANCING BUREAU (TABB). BALANCE EACH SUPPLY, w RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5%OF REQUIREMENTS AND FURNISH A REPORT n� TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, BALANCED, W AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY.AN AIR BALANCE LL /� TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL B A CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION. MINIMUM R-5 INSULATION IN UNCONDITIONED SPACE, INSULATE ALL ROUND DUCTS EXTERNALLY, EXCEPT EXHAUST DUCTS, WITH 2" FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT M WITH 1"-THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. ♦_ 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND qq DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE C-O". C4 UJ- 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, FIRE, OR FIRE/SMOKE WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. g 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE _ 1 INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTER Uj THAN 24 GAUGE STEEL. 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. O a Z N IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE O OCCUPIED SPACE. U 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS Q {� AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST & BALANCE AGENCY. 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS. PROVIDE U 1= - - ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. M Z Q O 11. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' INSTRUCTIONS AND ♦_ RECOMMENDATIONS. 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL LU j3 EQUIPMENT AND MATERIALS. 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE L LU 1 Q DEVELOPMENT AND FLAME SPREAD REQUIREMENTS. INSULATION"R"VALUES SHALL COMPLY `lll APPLICABLE ENERGY CODE. Z Q 00 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR, UNLESS OTHERWISE O *40 NOTED. 15. INSTALL DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 16) IN SUPPLY AIR DUCTWORK CONNECTED TO HEAT PUMP UNIT. WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT LU Mj ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE 14 DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY cc z 2 THE MANUFACTURER. IME 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF THE STRUCTURE. COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS, WATER PIPING, PLUMBING VENTS, AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/M0.1 FOR MORE INFORMATION. 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY EF-1 \ PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S 4"VTR 0 HP-2 / HP-1 CU-2 CU-1 ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. ARCHITECT/ENGINEER OF RECORD F_ -260 LBS- - - -/�260iBS- 5 LBS 55 LBS �\ 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO 3 3 \ CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND KEN McCRACKEN, CONDENSING UNIT \ EQUIPMENT, ETC. ARCHITECT 0/ PLATFORM \ 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) 4iciale HP-3 SEE STRUCTURAL \ YEAR FROM DATE OF FINAL ACCEPTANCE.ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED 260 LBS / � 6930 DESTINY DRIVE, #100 \ WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER ROCKLIN, CA 95677 \ 3 AT NO ADDITIONAL COST TO THE OWNER. Contact:ARIANE SANDERS 0,INSULATED REFRIGERANT LINES 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL 707.655.4320 I TOOLS, APPLIANCES,SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO BE ASANDERS@PMDGINC.COM ABOVE ROOF-PROVIDE WITH REMOVED SHALL BE TURNED OVER TO THE OWNER. WEATHER-PROOF ALUMINUM L UTSIDE JACKET. (TYP.) I D IR INTAKE I 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER, THE ITEMS OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. PIPE SUPPORTS ) 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. (TYP.) 5 2 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE 4 / INFORMATION ON MANUAL BALANCE DAMPER. IDesed.ings and specifiodions are the confidential and prapnetary property \ / 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORKof JP Horgan Chase and shall not be copied or reproduced whom written \ / SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH SMACNA REQUIREMENTS. aWho imtion. The contrail dodateean are et pared f«ousese on sperent site in cat. ester with its issue date and are not suitable t«use on a different \ � site«al a later lime. Ilse of these dawings f«reference«example on 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT another project requires the services of property Icensed architects and \ / ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS engineers. Repodaaron op tis no a`en�ead nbems for mum on gnome SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN / ACCORDANCE WITH THE CURRENT BUILDING CODE. C4 ) 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL \ i FAN COILS, CONDENSING UNITS, RTILI AND EXHAUST FANS. SEAL �0 PROF 28. ALL REFRIGERANT SHALL BE R-410A. NO R-22 SHALL BE USED. R I Ne 0> 29. ALL HVAC UNITS TO BE PROPERLY LABELED. ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED2 15,423 y AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1, FC-1, ETC. ) � r 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE 4pREQUIRED PRIOR TO OCCUPANCY. N �igRk R ROB\S 6/12/20 j_x 5 RUROBISON ENGINEERING, INC 19401 40TH AVE W SUITE 302,LYNNWOOD,WA 98036 TEL:206364-3343 FAX:4258350098 CONTACT:GRANT HANSEN ISSUE DATE DESCRIPTION 6 7 0 6/8/20 Planning comments 0 6/2/20 Proto 20.2 Updates 4/30/20 Issued for Bid 4/20/20 Submittal Set 4/10/20 80% Review Set PROJECT INFORMATION BLOCK JOB# JPM19015.0 DATE: 2/25/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS V20.2 SHEET TITLE MECHANICAL ROOF PLAN SHEET NUMBER MECHANICAL ROOF PLAN SCALE 1/4"=1'-0' M 2 0 2 COPYRIGHT 2020, ROBISON ENGINEERING, INC. GHANSEN F:\_PEDRO+HCCRA0(EN\_0HASE BANNS\421-1382 CHASE TIGARD II, Oft\DWG\N2-2 - ROOF PLAIII 05-29-2020 10:10 KI 9. Off-hour controls. Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or programmable control system. Plans reference page/section: Exception(s): ❑ Zones that will be operated continuously. Requirements Specific To: CU-1, 2 / FC-1, 2 : _ Zones with a full HVAC load demand not exceeding 6,800 Btu/h 2 kW and having a readily accessible manual shutoff switch. 1. Equipment meets minimum efficient Split System: 13.00 SEER COMeheck Software Version 4.1 .1 .0 ❑ 9 ( ) 9 Y ® Y P Y Plans reference page/section: M2.0 ❑ 2. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Mechanical CompIiance Certificate ® 10-Shutoff damper controls. Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. Exception(s): Exception(s): ❑ Where energy recovery systems are prohibited by the International Mechanical Code. ❑ Gravity dampers shall be permitted for outside air intake or exhaust airflows of 300 cfm or less. ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. Plans reference a e/section: M0.0 Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy.P 9 ❑ P 9 9Y P T e 1 kitchen exhaust hoods. SeCtlOn Project Information Li11.Freeze Protection and Snow melt system controls. Freeze protection systems, such as heat tracing of outdoor piping and heat ❑ YP exchangers, including self-regulating heat tracing, include automatic controls capable of shutting off the systems when outdoor air ❑ Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F (18°C). Energy Code: 2014 Oregon Energy Efficiency Specialty Code temperatures meet code criteria. ❑ Systems requiring dehumidification that employ series-style energy recoverycoils wrapped around the cooling coil when the Project Title: Chase Tigard 11 Plans reference page/section: evaporative coil is located upstream of the exhaust air stream. Project Type: Alteration ❑ 12.Separate air distribution systems. Zones with special process temperature requirements and/or humidity requirements are served by ❑ Systems exhausting toxic, flammable, paint exhaust, corrosive fumes, or dust. Construction Site: Owner/Agent: Designer/Contractor: separate air distribution systems from those serving zones requiring only comfort conditions; or shall include supplementary control ❑ Laboratory fume hood systems that include qualifying features. 11686 SW Pacific Hwy WA Mark D. Robison provisions so that the primary systems may be specifically controlled for comfort purposes only. Tigard, OR 97223 Robison Engineering, Inc. Exception(s): Plans reference page/section: 19401 40th Ave W, Suite 302 ❑ [503.2.4.8 +1 Zones requiring only comfort heating or comfort cooling that are served by a system primarily used for process Lynnwood, WA 98155 temperature and humidity control. Generic Requirements: Must be met by all systems to which the requirement is applicable: 206-366-3343 mrobison@robisonengineering.com o 1. Calculation of heating and cooling loads. Design loads are determined in accordance with the procedures described in the LL Plans reference page/section: XI o ASHRAE/ACCA Standard 183. Alternatively, design loads have been determined by an approved equivalent computation procedure. Lu 13.Humidity control. Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative Section 2: General Information humidity in excess of 30 percent. Where a humidity control device is used for dehumidification, it is set to prevent the use of fossil fuel ® 2. Cooling equipment economizers: The total capacity of all cooling equipment without economizers must be less than 240 kBtu/h. This Lu or electricity to reduce relative humidity below 60 percent. project lists 0 kBtu/h capacity without economizers. That portion of the equipment serving dwelling units and guest rooms is not Building Location (for weather data): Tigard, Oregon a Exception(s): included in determining the total capacity of units without economizers. Climate Zone: 4c ❑ Hospitals, process needs, archives, museums, critical equipment, and other non-comfort situations with specific humidity requirements outside this range. Plans reference page/section: M0,0 Section 3: Mechanical Systems List Plans reference page/section: 03. Equipment and system sizing. Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance Quantity System Type & Description 14.Humidity control. Where a humidity control device exists it is set to maintain a deadband of at least 10% relative humidity where no F-11n 503.2.1.Section o active humidification or dehumidification takes place. Ex with ith S n( 3 HP-1, 2, 3/AH-1, 2, 3 (Single Zone) . Split System Heat Pump Exception(s): Heating Mode: Capacity = 46 kBtu/h, ❑ Required standby equipment and systems provided with controls and devices that allow such systems or equipment to operate Proposed Efficient 8.70 HSPF, ❑ Heating for dehumidification is provided with heat recovery or heat pumping and the mechanical cooling system efficiency is 10 p y = Required Efficiency = 7.70 HSPF LU 9 Capacity automatically only when the primary equipment is not operating. Cooling Mode: Ca acit 47 kBtu/h, percent higher than required in section 503.2.3, HVAC equipment performance requirements. = ❑ Multiple units of the same equipment type with combined capacities exceeding the design load and provided with controls that Proposed Efficiency = 15.00 SEER, Required Efficiency: 13.00 SEER Y Plans reference page/section: have the capability to sequence the operation of each unit based on load. Fan System: None Inn ® 15.Ventilation. Ventilation, either natural or mechanical, is provided in accordance with Chapter 4 of the International Mechanical Code. M0.0 2 CU-1, 2/ FC-1, 2 (Single Zone) : �- Where mechanical ventilation is provided, the system has the capability to reduce the outdoor air supply to the minimum required b Plans reference page/section: I 1 P Y P Y PP Y 4 Y Cooling: 1 each - Split System, Capacity = 11 kBtu/h, Air-Cooled Condenser, Unknown Economizer CL W Chapter 4 of the International Mechanical Code. M 4. HVAC Equipment Performance Requirements. Reported efficiencies have been tested and rated in accordance with the applicable test Proposed Efficiency = 19.00 SEER, Required Efficiency: 13.00 SEER Plans reference page/section: O = N M0,0 procedure. The efficiency has been verified through certification under an approved certification program or, if no certification program Fan System: None exists, the equipment efficiency ratings are supported by data furnished by the manufacturer. N ❑ 16.Demand controlled ventilation (DCV). DCV is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 f:2 ® 5. Thermostatic Controls. The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that Section 4: Requirements Checklist O for multiple zone systems. respond to temperature within the zone. N Q ILL � ExceptSyste: M2 0 In the following requirements, blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks 00 I 1 Systems with energy recovery complyingwith Section 503.2.6 Plans reference page/section: V I� ❑ Y 9Y rY identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in M Q O Spaces less than 750 ft2 (69.7 m2)where an occupancy sensor turns the fan off, closes the ventilation damper, or closes the M 6. Heat pump supplementary heat. Heat pumps having supplementary electric resistance heat have controls that, except during defrost, the plans/specs the requirement can be verified as being satisfied. \�/ zone damper when the space is unoccupied. prevent supplementary heat operation when the heat pump can meet the heating load. Requirements Specific To: HP-1, 2, 3 / AH-1, 2, 3 : W C ` Plans reference page/section: Plans reference page/section: M0.0 M 1. Equipment meets minimum efficiency: Heat Pump: 7.70 HSPF 13.00 SEER 3 2. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a Ll 17.Kitchen hoods. Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. recove ® Exception(s): 7. Set point overlap restriction. Where used to control both heating and cooling, zone thermostatic controls provide a temperature range minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. W Q Q ❑ Where hoods are used to exhaust ventilation air that would otherwise be exhausted by other fan systems. or deadband of at least 5°F (2.8°C) within which the supply of heating and cooling energy to the zone is capable of being shut off or Exception(s): Q reduced to a minimum. Ll Where energy recovery systems are prohibited by the International Mechanical Code. Z CO ❑ Kitchen exhaust systems that include exhaust air energy recovery complying with section 503.2.6. Exception(s): O ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. Z Plans reference page/section: ❑ Thermostats requiring manual change over between heating and cooling modes. LJ Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. r 18.Enclosed parking garage ventilation controls. In Group S-2, enclosed parking garages used for storing or handling automobiles employs Plans reference page/section: M2.0 L] Type 1 kitchen exhaust hoods. W ❑ � automatic carbon monoxide sensing devices. ❑ Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F (18°C). Z ® 8. Optimum Start Controls. Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set LJSystems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the point at time of occupancy. evaporative coil is located upstream of the exhaust air stream. a Plans reference page/section: M2.0 ❑ Systems exhausting toxic, flammable, paint exhaust, corrosive fumes, or dust. ❑ Laboratory fume hood systems that include qualifying features. Project Title: Chase Tigard II Report date: 04/14/20 Project Title: Chase Tigard II Report date: 04/14/20 Project Title: Chase Tigard II Report date: 04/14/20 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1382 Chase Tigard 11, OR\Calcs\20-0414 Chase Tigard II - Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1382 Chase Tigard II, OR\Calcs\20-0414 Chase Tigard 11 - Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1382 Chase Tigard 11, OR\Calcs\20-0414 Chase Tigard 11 - ARCHITECT/ ENGINEER OF RECORD Mech.cck Page 3 of 5 Mech.cck Page 2 of 5 Mech.cck Page 1 of 5 KEN McCRACKEN, ARCHITECT Architecture-Prograr :gement-Peimifting Plans reference page/section: Plans reference page/section: 6930 DESTINY DRIVE, #100 ROCKL5677 29.AI1 air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than 19.Duct and plenum insulation and sealing. All supply and return air ducts and plenums are insulated with the specified insulation. When Contact: IA 9SAND Contact:ARIANE SANDERS or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. located within a building envelope assembly, the duct or plenum is separated from the building exterior or unconditioned or exempt 707.655.4320 Exception(s): spaces by a minimum of R-8 insulation. All ducts, air handlers and filter boxes are sealed. Joints and seams comply with Section 603.9 ASANDERS@PMDGINC.COM Systems where the function of the supply air is for purposes other than temperature control, such as maintaining specific humidity of the International Mechanical Code. ❑ Y PP Y P P P 9 P tY levels or supplying an exhaust system. ExceptWhen: ❑ When located within equipment. Plans reference page/section: ❑ When the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15°F (8°C). ❑ 30.Series fan-powered terminal unit fan motors. Fa-I motors for series fan-powered terminal units are electronically-commutated motors ® 20.Low-pressure duct systems. All longitudinal and transverse joints, seams and connections of low-pressure supply and return ducts are and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes installed in ofJPMorgan Chase a a shall nare e theconfidentialor:ep�w�wijho trw°iter, aufhonzation. The contract documents were prepared To,use on this specific conditions. accordance with the manufacturer's installation instructions. site in conjunction with it,issue date and are not suitable far use on a different Exception($): site or of a later time. use of these bowing$far reference or exampe on another proect reaures the services of properly icensed architects and Plans reference page/section: engineers. Reproduction of the contract documents for reuse on another ❑ Continuously welded and locking-type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. prgecta not authorized. ❑ 31.Hot Gas Bypass Limitation. For cooling systents <= 240 kBtu/h, maximum hot gas bypass capacity is no more than 50% total cooling pressure classification. capacity. Plans reference page/section: M0.0 SEAL Plans reference page/section: ❑ 21.Medium-pressure duct systems. All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance BRED PROFESS with Section 503.2.7. Pressure classifications specific to the duct system are clearly indicated on the construction documents. NE- 0 3 Section 5: Compliance Statement15,42y Plans reference page/section: � - Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, ❑ 22.High-pressure duct systems. Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7. In addition, ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. N specifications and other calculations submitted with this permit application. The proposed mechanical alteration project has been designed e o to meet the 2014 Oregon Energy Efficiency Specialty Code, Chapter 8, requirements in COMcheck Version 4.1.1.0 and to comply with the Plans reference page/section: �qRK 0 R00\S� mandatory requirements in the Requirements Checklist. 6/12/20 M 23.Air system balancing. Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the �,. ✓jam 4/14/20 requirements of IMC 603.17. Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable Ro SO i N Mark Robison - President volume fans with motors 10 horsepower. Name - Title Signature Date . M00 Plans reference page/section: ENGINEERING, INC 19401 40TH AVE W SUITE 302,LYNNWOOD.WA 98036 Section 6: Post Construction Compliance Statement ® 24.Manuals. The construction documents require that an operating and maintenance manual be provided to the building owner by the TEL 206-364-3343 FAx:425-8350098 mechanical contractor. See long description for specifications. CONTACT:GRANT HANSEN ❑ HVAC record drawings of the actual installation, system capacities, calibration information, and performance data for each equipment Plans reference page/section: M0.0 ISSUE DATE DESCRIPTION provided to the owner. ❑ HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. ❑ 25.Air System Design and Control. Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions ❑ Written HVAC balancing and operations report provided to the owner. of Sections 503.2.10.1 through 503.2.10.2. The above post construction requirements have been completed. Plans reference page/section: ® 26.Allowable fan floor horsepower. Each HVAC system at fan system design conditions does not exceed the allowable fan system motor nameplate hp (Option 1)or fan system bhp (Option 2) as shown and calulated in requirement details. Principal Mechanical Designer-Name Signature Date Exception($): Hospital and laboratory systems that utilize flow control devices on exhaust and/or return to maintain space pressure relationships 02 6/8/20 Planning comments necessary for occupant health and safety or environmental control shall be permitted to use variable volume fan power limitation. Oj 6/2/20 Prato 20.2 Updates ❑ Individual exhaust fans with motor nameplate horsepower of 1 hp or less. 4/30/20 Issued for Bid Plans reference page/section: M0.0 4/20/20 Submittal Set 4/10/20 80 % Review Set ❑ 27.Motor nameplate horsepower. For each fan, the selected fan motor is no larger than the first available motor size greater than the brake PROJECT INFORMATION BLOCK horsepower (bhp). Exception($): JOB# JPM19015.0 For fans less than 6 bhp, where the first available motor larger than the brake horsepower has a nameplate rating within 50 DATE: 2/25/2020 percent of the bhp, selection of the next larger nameplate motor size is allowed. DRAWN BY: GH For fans 6 bhp and larger, where the first available motor larger than the bhp has a nameplate rating within 30 percent of the bhp, CHECKED BY: PR selection of the next larger nameplate motor size is allowed. MODEL Plans reference page/section: M0.0 DRAWING STANDARDS v20.2 ❑ 28.Large Volume Fan Systems. Fan systems over 8,000 (7 m3/s) cfm without direct expansion cooling coils that serve single zones reduce airflow based on space thermostat heating and cooling demand. A two-speed motor or variable frequency drive reduces airflow to a SHEET TITLE maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical Code, whichever is greater. Exception(s): ENERGY CODE ❑ Systems where the function of the supply air is for purposes other than temperature control, such as maintaining specific humidity COMPLIANCE levels or supplying an exhaust system. SHEET NUMBER Project Title: Chase Tigard II - Report date: 04/14/20 Project Title: Chase Tigard II Report date: 04/14/20 • O Data filename: F:\_Pedro+McCracken\ Chase Banks\424-1382 Chase Tigard II, OR\Calcs\20-0414 Chase Tigard II - Mech.cck Page 5 of 5 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1382 Chase Tigard 11, OR\Calcs\20-0414 Chase Tigard II - Mech.cck Page 4 of 5 COPYRIGHT 2020, ROWON ENGINEERING, INC. GHANSEN F:\_PMR0+4CCRACKEN\-CHASE BANKS\424-1382 CHASE TIGARD II, OR\DNG\A13-0 - ENERGY CODE COHPUANCE.DMG 05-29-2020 10:11