Plans (46) BUP2021 -00105
0100 00 GENERAL DATA 3. COLD-FORMED FRAMING SHALL BE GALVANIZED METAL CONFORMING TO ASTM A446/A 446 M GRADE A(33000 c. 8 TONS AND ABOVE MUST HAVE POWER EXHAUST. A r 1'"I♦�� ��pV
PSI)G60. TENANT IMPROVEMENT ll.)) FCLA
'9'Q .GENERAL REQUIREMENTS d. 1 1/2 THRU 4-TON OSA INTAKE WITH DAMPER.t. VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AND AT THE EXISTING BUILDING AND 4. PROVIDE THE LISTED GYPSUM BOARD PRODUCTS BY U.S.GYPSUM,GEORGIA PACIFIC,NATIONAL GYPSUM OR g, ALL UNITS TO MEET OR EXCEED CURRENT ENERGY EFFICIENCY CODE REQUIREMENTS.AN APPROVED EQUAL.
NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK. 10.DISTRIBUTION DUCTWORK: ��5. STANDARD GYPSUM BOARD SHALL BE TYPE'X',5/8'THICK WITH TAPERED EDGES CONFORMING TO ASTM2. CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL EXISTING C-36. a. SPIRAL DUCT PERMITTED ONLY IF EXPOSED.CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL.SUBMITTAL OF A PROPOSAL SHALL BE CONSIDERED Or ANSONCONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE,AND NO FURTHER COMPENSATION SHALL BE DUE 6. WATER RESISTANT GYPSUM BOARD SHALL BE 5/8"THICK WITH TAPERED EDGES. CONFORMING TOASTM b. 26 GAUGE OR TO SMACNA STANDARDS WHERE DUCT IS CONCEALED ABOVE A CEILING. RECEIVED
THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO PERFORM SUCH INSPECTION. C-630. c. WRAP CONCEALED SUPPLY DUCTWORK IN NON-CONDITIONED AND SEMI-CONDITIONED SPACE WITH3. BY SUBMITTING A PROPOSAL,CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE 7. AT TOILET ROOMS USE 5/8"USG FIBERROCK BRAND AQUATOUGH INTERIOR PANEL FROM FLOOR MINIMUM R4.2 INSULATION WITH FSK BARRIER. OREGONEXAMINED THE SITE AND INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY TO COMPLETE THE WORK TO 48`A.F.F.ON WALLS BEHIND OR ADJACENT TO PLUMBING FIXTURES. NO SUBSTITUTES. d. HANGERS 12 GAUGE WIRE OR 18-GAUGE 1'WIDE STRAP. EXPOSED DUCT MUST HAVE ALL THREAD AcTIRUST 7 FDESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE LIMITED TO (EXCEPTION: EXCEPTION AT LOCATIONS TO RECEIVE PLASTIC LAMINATE OR TILE WAINSCOT.) A?R 2 7 70V ALL MATERIALS AND INSTALLATION, DISPOSAL OF EXCESS MATERIALS(USEABLE FINISH MATERIALS SHALL BE + " HANGERS AND FULL DIAMETER STRAP UP TO 18"0. LARGER THAN 18"MUST HAVE SADDLE TYPE CLAMP.
LEFT IN THE TENANT SPACE AS NOTED ON PLANS),CLEANING AND ALL PREPARATION OF SUBSTRATE 8. AT TILE WAINSCOT LOCATIONS INSTALL CEMENT BACKER BOARD h THICK WITH SQUARE,REINFORCED, e. BRANCH DUCTS SHALL BE PLUMB AND SQUARE(NO OCTOPUS). TEES SHALL BE MAXIMUM OF 45 �/pSURFACES PRIOR TO INSTALLATION,AS WELL AS FINAL CLEAN UP. SMOOTH EDGES. PROVIDE DUROCK BRAND CEMENT BOARD OR APPROVED EQUAL. DEGREES. ■ enant: CITY N TIGARDOFQ�
4. IT IS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN EXISTING BUILDING 9. INSTALL WATER-RESISTANT GYPSUM BOARD BEHIND WAINSCOT OF FRP,PLASTIC LAMINATE,ETC. f. EACH BRANCH DUCT TO HAVE BALANCE DAMPER IN Y BRANCH. BUILDING DIVISION �y .1�]G
INTENTION,ON THE CONTRACTOR SHALL CTS AND SYSTEMS. UPON
IMMEDIATELY.OOVERY OF A DISCREPANCY TO THIS 10.TRIM ACCESSORIES SHALL COMPLY WITH ASTM C-1047. g. ALL DISTRIBUTION DUCT WORK TO BE INSTALLED MIN.24"ABOVE FINISH CEILING. PROJECT #2 1 GJO
11.USE GEORGIA PACIFIC DENSGLAS GOLD ON EXTERIOR FACE OF EXTERIOR WALLS AND COAT WITH STO FINISH 11•FLEX DUCT WILL BE NO LONGER THAN V FROM RIGID DUCT DOWN TO DIFFUSER. ^A
5. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. SYSTEM. RI VERS WE HOMES
6. COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPET"WALK-OFF MATS"TO PROTECT EXISTING WALL CONSTRUCTION EXECUTION 12.DIFFUSERS: . ` . ` VV
CARPETS. t. FASTEN FRAMING MEMBERS TOGETHER BY WELDING OR BY USING SELF-DRILLING OR SELF-TAPPING a. SUSPENDED CEILING SYSTEM(T-BAR)-PERFORATED FACE ADJUSTABLE CURVED BLADES-DESIGN
7. ALL ROOF PENETRATIONS FROM ABANDONED EQUIPMENT TO BE REMOVED. PATCH AND REPAIR ROOF AND SCREWS. WELDING SHALL CONFORM TO AWS D13 WELDING PROCEDURE. ELECTRODES AND SCREW TITUS PCS SUPPLY AND TITUS PAR RETURN OR APPROVED EQUAL.
ROOF MEMBRANE TO MATCH THE EXISTING ROOF. CONNECTIONS SHALL BE AS REQUIRED AND INDICATED IN THE DESIGN CALCULATIONS. DO NOT FIELD WELD b. GYPSUM BOARD CEILING;SUPPLY-CURVED BLADE W/OBD DESIGN TITUS 250;RETURN-BAR TYPE- }/
8. ALL ROOF WORK TO BE COORDINATED WITH PACTRUST PROPERTY MANAGEMENT AND BE PERFORMED BY MATERIALS LIGHTER THAN 18 GA. DESIGN TITUS 350;EXHAUST-METAL OR ALUMINUM-1/2"x 1/2"EGG CRATE DESIGN TITUS 50F. PROJECT NARRATIVE BUILDING INFORMATION TENANT INFORMATION U
PACTRUST APPROVED ROOFING COMPANIES. APPROVED COMPANIES INCLUDE: 2. PROVIDE ACCURATELY ALIGNED RUNNERS AT TOP AND BOTTOM OF PARTITIONS. ANCHOR TRACKS AS c. ALL SUPPLY REGISTERS TO HAVE MANUAL VOLUME DAMPERS LOCATED IN DUCT AT OR NEAR CLOSEST OWNER: PACIFIC REALTY ASSOCIATES, L.P. TENANT: RIVERSIDE HOMES
INDICATED IN THE DESIGN CALCULATIONS. BUTT WELD JOINTS IN TRACKS OR SPLICE WITH STUD INSERTS. WYE BRANCH. PROJECT CONSISTS OF REMODEL WORK TO 1,922 USABLE SF/2,189 RENTABLE SF OF }•
a. ARROW ROOFING, 503-460-2767 15350 SW SEQUOIA PKWY#300
FASTENERS SHALL BE AT LEAST 3 INCHES FROM THE EDGE OF CONCRETE SLABS. d. CLEAN OR REPLACE ALL SUPPLY AND RETURN AIR GRILLS AND THEIR HOUSINGS AT PROJECT EXISTING OFFICE SPACE. '
b. ROOF TOPPERS,360-574-7248 3. CUT STUDS SQUARE AND SET WITH FIRM BEARING AGAINST WEBS OF TOP AND BOTTOM TRACKS. POSITION COMPLETION. PORTLAND, OR 97224 OCCUPANCY AREAS&LOADS:
c. GOT YOU COVERED ROOFING,503-975-9136 STUDS VERTICALLY IN TRACKS AND SPACE AS INDICATED IN DESIGN. DO NOT SPLICE STUDS. PROVIDE AT WORK SHALL INCLUDE BUT NOT BE LIMITED TO B 1,922 SF 13 OCC U
LEAST TWO FULL HEIGHT KING STUDS AT DOORS AND OTHER OPENINGS 2 FEET WIDE OR LARGER. PROVIDE 13.THERMOSTAT: ALL EXISTING MERCURY TYPE THERMOSTATS TO BE REPLACED. NEW THERMOSTATS TO BE
10.CONTRACTOR MAY SUBMIT ALTERNATE ROOFING CONTRACTOR TO BE REVIEWED AND APPROVED BY JACK STUDS OVER OPENINGS,AS NECESSARY,TO MAINTAIN INDICATED STUD SPACING. PROVIDE TRIPLE HONEYWELL COMMERCIAL GRADE WSIONPRO 8000 TOUCH SCREEN MODEL TS822OU1003 WHERE POSSIBLE. • SELECTED DEMO OF EXISTING NON STRUCTURAL WALLS (503)624-6300 (PHONE) L
PACTRUST PRIOR TO BID. APPROVED SUBSTITUTE: TOTAL-LINE SIGNATURE COMMERCIAL THERMOSTAT MODEL NO.P374.2800 -7 DAY (503)624-7755(FAX) NUMBER OF EXITS REQUIRED
STUDS AT CORNERS,POSITIONED TO RECEIVE INTERIOR AND EXTERIOR FINISHES. FASTEN STUDS AT TOP • NON STRUCTURAL DRYWALL/METAL STUDS WALLS
11.VERIFY WITH BUILDING OWNER ANY ROOF WARRANTY REQUIREMENTS. AND BOTTOM TRACKS BY WELDING OR SCREWING BOTH FLANGES TO THE TRACKS.PROVIDE LONG LEG PROGRAMMABLE WITH LOCKOUT FUNCTION-AUTO CHANGEOVER ONLY. OR SHALLNT AT ADA HEIGHT(MAY B 1 EXITS
REQUIRE CHANGING HEIGHT AT'REPLACEMENT'LOCATIONS). CONTRACTOR SHALL PROGRAM
TRACK AT TOP OF WALL TO ALLOW FOR DEFLECTION WHERE WALL MEETS STRUCTURE ABOVE. • PLUMBING
12.KEEP THE ROOF FREE OF DEBRIS(I.E.NAILS,SCREWS,BOTTLES,ETC.)AT ALL TIMES. THERMOSTATS AND BALANCE SYSTEM. BLDG.#: PCC BLDG. 17 (pCC241)
13.ALL ROOF PENETRATIONS FOR ELECTRICAL,LOW VOLTAGE,GAS PIPING, ETC.SHALL BE SLEEVED THROUGH 4. REMOVE EXISTING FLOORING AT NEW WALLS UNLESS SPECIFICALLY INDICATED BY ARCHITECT.
14.THERMOSTAT LOCATIONS TO BE REVIEWED BY ARCHITECT PRIOR TO INSTALLATION. • DOORS/FRAMES AND PAINTING C O
A LEAD ROOF JACK,CLAMPED WITH A STAINLESS STEEL CLAMP AND SEALED WITH VULKEM 921 5. INSTALL ALL INTERIOR AND EXTERIOR GYPSUM BOARD PRODUCTS AND ACCESSORIES AS REQUIRED FOR 15.HVAC TESTING. • ELECTRICAL DISTRIBUTION CONST. TYPE.: II-B Q O
POLYURETHANE SEALANT. SILICONE SEALANT NOT PERMITTED. THE PROJECT. ��//��
14.KEEP THE AREA OF WORK FREE OF GARBAGE AND DEBRIS ON A DAILY BASIS INCLUDING DOCK ACCESS 6. AT TOILET ROOMS TO RECEIVE SHEET VINYL FLOORING, INSTALL THE GYPSUM BOARD(OR AUQATOUGH) a. CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES,COMPONENTS, • LIGHTING v/ k
EQUIPMENT AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH THIS BUILDING HOUSES VARIOUS TENANTS INCLUDING THIS TENANT. THE EXISTING
AREAS AND COMMON AREA. FLOORS TO BE SWEPT OR VACUUMED DAILY. WITH 1/4"GAP BETWEEN THE BOARD AND THE FLOOR TO PREVENT WICKING. ALL WORK TO MEET ADA REQUIREMENTS. C
APPROVED PLANS AND SPECIFICATIONS. BUILDING IS A THREE (3)STORY BUILDING OF 64,689 SF AND IS FULLY SPRINKLERED.
15.13ROVIDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS INCLUDING BUT NOT LIMITED TO 7. COMPLY WITH USG GYPSUM CONSTRUCTION HANDBOOK AND MANUFACTURER'S RECOMMENDATIONS. b. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN THERE IS FRONTAGE ON ALL FOUR SIDES OF AT LEAST 60 FEET. cu
COMMON CORRIDORS AND STAIRS,BUILDING ENTRANCES,SUITE ENTRANCES,ETC. THE CONTRACTOR WILL 8. FINISH QUALITY: ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. WORK INCLUDED BUT PERFORMED UNDER SEP. PERMIT f1 V
BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING IMPROVEMENTS DUE TO CONSTRUCTION
ACTIVITIES. AREA PROCESS TRADE NOMENCLATURE c. A COMPLETE COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND N
16.PROVIDE TEMPORARY SANITARY FACILITIES. CONSTRUCTION WORKERS SHALL NOT USE BUILDING OFFICE/OTHER AREAS TAPE/2 FINISH COATS`/ SMOOTH FINISH TAPED(LEVEL 4) FILED WITH PACTRUST. FIRE PROTECTION SPRINKLERING ALLOWABLE AREA Q 0)
16.PROJECT CLOSE OUT DOCUMENTS REQUIRED: HEATING,VENTILATION &AIR CONDITIONING WORK O O7
RESTROOM FACILITIES. USG"FIRST COAT" 'SAND AFTER TAPE/FINISH COAT(S) B 23,000 SF BASE AREA � � �
17.STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DESIGNATED AT NOTE:AT EXTREMELY DARK ACCENT WALLS PROVIDE LEVEL 5 FINISH. a. AutoCAD FILE SHOWING AS-BUILT INFORMATION. PLUMBING o C7 O to
PRE-CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY OTHER ELECTRICAL WORK, BOTH LINE VOLTAGE AND LOW VOLTAGE 69,000 SF 300/o INCREASE FOR MULTI STORY W 0 Oto
COMMON BUILDING AREA BE USED FOR STORAGE. 9. FINISH EXPOSED INTERIOR GYPSUM BOARD WALLS AND CEILINGS SMOOTH STRAIGHT READY FOR FINISH AS b. ELECTRONIC PDF FILE OF THE AutoCAD FILE ABOVE. 46,000 SF 200% INCREASE FOR SPRINKLERS � 00 p
SHOWN ON PLANS. c. HARD COPY OF AutoCAD FILE ABOVE. 17,250 SF 75% INCREASE FOR FRONTAGE ?> Z 4 4iB.ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. 09 53 00 SUSPENDED ACOUSTICAL CEILING d. OPERATIONS MANUALS FOR ALL EQUIPMENT, INCLUDING T-STATS. 155,250 SF TOTAL ALLOWABLE AREA � U) Q N N
19.CONFIRM SIZES OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF STRUCTURAL,MECHANICAL, J CO co
ELECTRICAL AND PLUMBING WORK PRIOR TO FRAMING OR CUTTING FOR INSTALLATION. 1. IN EXISTING SPACES REPLACE WATER STAINED OR DAMAGED TILES. e. COLORED ZONE MAP WITH THERMOSTAT LOCATIONS INDICATED. co O F-
LO
.-.
201EAVE THE PROJECT CLEAN AND READY FOR OCCUPANCY. 2. TUNE UP GRID SYSTEM TO WITHIN PLUS OR MINUS 0.5 INCHES OF LEVEL OVER THE ENTIRE SPACE. 17, CODE SUMMARY � 0 0 0
21.CLEAN ADJACENT EXTERIOR AREA, I.E.WALKS, EXTERIOR GLASS,ETC. 3. BENT OR DAMAGED T-BARS TO BE REPLACED. 18.LIGHT SWITCHES:ACUITY CONTROLS PRE SET ALL PRIVATE OFFICE AND CONFERENCE ROOM SWITCHES TO ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH STATE AND LOCAL 0_
22.FILL ALL PAPER AND SOAP DISPENSERS IN RESTROOMS AND BREAK AREAS. 4. REPAIR HOLES IN GRID FROM REMOVED WALLS. USE OF ARMSTRONG"BP ES4"EXPANSION SLEEVE "VACANCY"AND TO TURN ON AT LAST DIM LEVEL.SET TIME-OUT TO MAXIMUM. CODE REQUIREMENTS THAT APPLY, INCLUDING BUT NOT LIMITED TO:
ACCEPTABLE. a. STANDARD WALL SWITCH WITH OCCUPANCY SENSOR-USE WSD • 2019 OREGON STRUCTURAL SPECIALTY CODE OSSC
23.CLEAN ALL SUPPLY AND RETURN DIFFUSERS AT PROJECT COMPLETION. ( ) I`
09 68 00 CARPET b. WALL SWITCH WITH OCCUPANCY SENSOR AND DIMMING-USE WSXD
24.UPON COMPLETION OF THE PROJECT,THE CONTRACTOR MUST PROVIDE A DETAILED CLOSEOUT PACKAGE • 2019 OREGON MECHANICAL SPECIALTY CODE(GMSC)
PER INSTRUCTIONS INCLUDED IN THE CONSTRUCTION CONTRACT.RETENTION WILL BE HELP PER CONTRACT 1. CARPET PLANK(12"X 36"OR 18"X 36") c. WALL SWITCH WITH DIMMING AND CEILING MOUNTED OCCUPANCY SENSOR-USE SPOD • 2017 OREGON PLUMBING SPECIALTY CODE(OPSC)
UNTIL THE COMPLETED CLOSEOUT PACKAGE IS RECEIVED AND HAS BEEN APPROVE BY THE CONSTRUCTION a. INSTALL IN RANDUM ASHLAR PATTERN U.N.O. 26 00 00 ELECTRICAL : DESIGN/BUILD • 2017 OREGON ELECTRICAL SPECIALTY CODE(OESC) 'O
MANAGER,ARCHITECT,AND PROPERTY MANAGER. 4. USE SCHLUTER TRANSITIONS PER FLOOR TRANSITION DETAILS. GENERAL • 2019 OREGON FIRE CODE (OFC) m
25.IT IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDE A COMPLETE, 09 91 23 PAINTING 1. ALL ELECTRICAL FEEDS TO OUTLETS,SWITCHES, ETC.MUST BE VERTICAL DROPS FROM ABOVE EXCEPT FOR • ASCE-7-10
FUNCTIONING PROJECT INCLUDING ALL GENERAL,MECHANICAL AND ELECTRICAL CONSTRUCTION REQUIRED O
F
TO FULFILL THAT INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED,REGARDLESS OF INTERIOR: HORIZONTAL RUNS UNDER WINDOWS AND RECEPTACLES ON THE SAME STUD. • ICC/ANSI A117.1-2017 N
WHETHER OR NOT SHOWN ON THE DRAWINGS. 1. WALLS: 2. ALL ELECTRICAL FEEDS TO OUTLETS AND DATA BELOW WINDOW SILLS TO BE ROUTED THROUGH BUILDING • 2019 OREGON ENERGY EFFICIENCY SPECIALTY CODE 1
26.ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE NOTED"N.I.C.". SHELL WALLS. DO NOT FEED FROM PERPENDICULAR INTERIOR PARTITIONS. It
a. PRIME NEW DRYWALL WITH MILLER PAINT HIGH-BUILD"SUPER SEAL"PRIMER. N
27."ALIGN"AS USED IN THESE DOCUMENTS,MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE SAME 3. ALL NEW ELECTRICAL DEVICES TO BE WHITE.NYLON COVER PLATES NOT ALLOWED. U
PLANE,EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. b. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER PAINT 4. REPLACE ALL NON-WHITE EXISTING ELECTRICAL DEVICES TO WHITE.NYLON COVER PLATES NOT ALLOWED. U
120-4-XX WITH A TIGHT ROLLER STIPPLE FINISH. RESTROOM FINISHES TO BE MILLER PAINT 170-5-XX SIG CL
28.DO NOT DISASSEMBLE SETS OF CONSTRUCTION DRAWINGS.DRAWINGS ARE INTERRELATED. LATEX ENAMEL. 5. PROVIDE LABELS AT EACH ELECTRICAL RECEPTACLE IDENTIFYING CORRESPONDING PANEL AND BREAKER.
21.SUBMIT SAMPLES OR DRAW DOWNS FOR ALL FINISHES REQUESTED TO THE ARCHITECT OF RECORD WITHIN 2. DOORS AND FRAMES: 6. PROVIDE TYPEWRITTEN UPDATED SCHEDULE AT PANEL TO IDENTIFY CIRCUIT BREAKERS.
TWO WEEKSPROJECT AWARD.SAMPLES SHOULD LARGER THEN 11 X 17 AND WITH
MANUFACTURES LABEL.PRODUCTS INSTALLED WITHOUT APPROVED
PPROVED SAMPLES ARE SUBJECTJECT a. NEW HOLLOW METAL-PRIME,SAND,AND FINISH WITH TWO COATS OF SEMI-GLOSS OIL.SPRAY OR 7. ELECTRICAL CONTRACTOR TO PROVIDE EMERGENCY LIGHTING IN EXIT PATH SHOWN ON PLAN EQUAL TO
REPLACEMENT AT CONTRACTOR COST.AN APPROVED SUBMITTAL DOES NOT CHANGE THE CONTRACTUAL ROLLED APPLICATION. 1-FOOT CANDLE.
REQUIREMENT TO PROVIDE THE SPECIFIED ITEMS UNLESS SPECIFICALLY NOTED AS A SUBSTITUTION BY THE b. EXISTING HOLLOW METAL-SAND, FILL IMPERFECTIONS WITH BONDO,SAND AND PRIME PATCHES WITH 8. EXIT LIGHTS:LITHONIA EDGR-G-EL RECESSED MOUNT,GREEN LETTERS.
CONTRACTOR AND SPECIFICALLY APPROVED BY THE ARCHITECT AS SUCH.REPLACE SUCH PRODUCTS AS ALKYD PRIMER,AND FINISH WITH SEMI-GLOSS OIL ENAMEL.SPRAY OR ROLLED APPLICATION
DIRECTED AT CONTRACTOR'S COST. 9. LOW VOLTAGE SYSTEMS(TELECOMMUNICATION AND DATA)BY FUTURE TENANT.
c. WOOD-PRIME WITH ALKYD OIL UNDER-COATER,SAND,FILL ALL FASTENING HOLES WITH PAINTER'S
22.SUBMIT COMPLETE SHOP DRAWINGS FOR MILLWORK,SPECIAL SYSTEMS,MECHANICAL,ELECTRICAL AND PUTTY,CAULK ALL CRACKS IN CASINGS AND BETWEEN JAMBS AND WALLS USING DAP LATEX CAULK, 10.LIGHTING ENERGY MANAGEMENT IS REQUIRED IN ALL BUILDINGS.
PLUMBING SYSTEMS(INCLUDING FIRE PROTECTION SYSTEMS). SUBMIT A MINIMUM OF TWO COPIES OF ALL AND FINISH WITH SATIN OIL ENAMEL. 11.00CUPANCY CONTROL DEVICES SHALL BE LEVITON OR WATT STOP.
SHOP DRAWINGS FOR REVIEW AND APPROVAL TO THE ARCHITECT RECORD.ARCHITECT WILL RETAIN ONE d. WOOD-STAIN,SEAL AS REQUIRED,AND VARNISH WITH SATIN VARNISH. 12.TEST ALL LIGHTING CONTROL SYSTEMS TO ENSURE THAT CONTROL DEVICES,COMPONENTS,EQUIPMENT
COPY AND ONE COPY WILL BE RETURNED TO THE CONTRACTOR.SUBMITTALS MAYBE DELIVERED IN PDF AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND BUILDING LOCATION
FORMAT FOR REVIEW. 3. CEILINGS: SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE
237HE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION SYSTEMS a. EXISTING GYP BOARD/PLASTER-SAND,SPACKLE ALL IMPERFECTIONS,SPOT PRIME AND FINISH TO IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS.
CONTRACTOR.ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER ACHIEVE UNIFORM COVERAGE WITH MILLER PAINT 6200 OR 4480.
LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. COORDINATE 13.REMOVE ALL UNUSED DATA AND POWER BOXES AND INFILL WITH GYP BOARD. EXCEPTION-UNUSED DATA
INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER HEADS SHALL BE b. NEW GYP BOARD/PLASTER -PRIME WITH SUPER SEAL AND FINISH TO ACHIEVE UNIFORM COVERAGE BOXES UNDER WINDOW SILLS TO REMAIN. ALL BLANK COVER PLATES TO FINISH SPECIFICATIONS.
CENTERED IN CEILING TILEOR 2 x 2 MODULE OF A SECOND LOOK II TYPE OF CEILING TILE WHERE WITH MILLER PAINT 6200 OR 4480. cu+unx
( 14,REMOVE ALL UNUSED LOW VOLTAGE WIRING(TELEPHONE AND DATA)FROM THE RECEPTACLE TO THE To Klw eD ft.eur�+
APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE-APPROVED IN WRITING BY 4. GENERAL NOTES: DISTRIBUTION BOARD. LEAVE PULL STRINGS FROM THE BOX TO THE SPACE ABOVE THE CEILING. A SECTION
THE ARCHITECT PRIOR TO INSTALLATION.SUBMITTALS MAY BE DELIVERED IN PDF FORMAT FOR REVIEW. a. KEEP ALL HARDWARE,HINGES,AND DOOR KNOBS CLEAN OF ALL PAINT SPLATTERS,DRIPS,OR ROLLER OF THE EXISTING LOW VOLTAGE WIRE MAY BE LEFT IN LIEU OF A PULL STRING. +Z +3 +s
24.COORDINATE CONSTRUCTION SEQUENCING WITH PACTRUST AND SCHEDULE ALL SERVICE 1. OFFICE LIGHT FIXTURES: LITHONIA LED FIXTURE.2BLT2 40L ADP MVOLT GZ10 LP835.
SPRAY. OFFICE LIGHTING 3
IN R T MINIMIZE INCONVENIENCE TO CURRENT TENANTS.
INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS 0 i� I�t
b. ALL SURFACES TO BE SANDED BETWEEN COATS,PRIOR TO INSTALLATION OF NEXT COAT. �"'""�'•"7
08 10 00 DOORS AND WINDOWS14
c. DURING PROGRESS OF WORK,KEEP JOB SITE CLEAN OF ALL PAINT MATERIALS,RUBBISH,CANS,AND 2. OFFICE EGRESS LIGHTING: ISOLITE MINI GENIE SERIES LED VERSION LMIGN NM SQ-CEILING AND WALL
1. RE-USE EXISTING DOORS,HARDWARE,AND FRAMES WHERE POSSIBLE. RAGS AT THE END OF EACH DAY. MOUNT. SEE PLAN FOR EGRESS PATH.USE OF ISOLITE INVERTER AS ALTERNATE TO BATTERY IS �""^w +�
2. APPROVED DOOR,FRAME,AND HARDWARE SUPPLIERS INCLUDE: d. UPON COMPLETION OF WORK,CLEAN ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING ACCEPTABLE. 8 o p� \ FAM
AND SCRAPING,USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. 3. LIGHT SWITCHES:ACUITY CONTROLS PRE SET ALL PRIVATE OFFICE AND CONFERENCE ROOM SWITCHES TO o .0 0 C-J
a. BAXTER AND FLAMING. (503)225-0486 I - o� ^^^^"'
"VACANCY"AND TO TURN ON AT LAST DIM LEVEL.SET TIME-OUT TO MAXIMUM.
e. PROTECT WORK I OTHER TRADES s s s
b. D&D DOOR (503)205-5533 � � �° + 9?
k. STANDARD WALL SWITCH WITH OCCUPANCY SENSOR-USE WSD �s�
f. PROVIDE`WET PAINT"SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. � a
c. BENSON INDUSTRIES (503)907-2200 I
10 44 16 FIRE EXTINGUISHERS I. WALL SWITCH WITH OCCUPANCY SENSOR AND DIMMING-USE WSXD ,m",.g 1
14
d. GRANT SUPPLY (360)887-0647 +o )
1 FIRE EXTINGUISHER 2A10 BC (WALL MOUNTED OR IN SEMI RECESSED CABINET AS INDICATED ON PLAN) m. WALL SWITCH WITH DIMMING AND CEILING MOUNTED OCCUPANCY SENSOR-USE SPOD
3. DOOR AND RECITE FRAMES SHALL BE ALPHA ALUMINUM PRODUCTS,INC.OR APPROVED. SUBMITTAL
REQUIRED PRIOR TO ORDERING MATERIAL.NEW FRAMES TO BE FACTORY FINISH CUSTOM COLOR. 2. FIRE EXTINGUISHER CABINET: JL INDUSTRIES ACADEMY SERIES MODEL#C1027V10. 28 30 00 ELECTRONIC DETECTION AND ALARM -- -�
IL
4. ALL INTERIOR DOORS SHALL BE SOLID CORE WOOD UNLESS NOTED OTHERWISE. 12 00 00 FURNISHINGS GENERAL FOR HORN/STROBE DEVICES USE'SYSTEM SENSOR"SPECTRALERT ADVANCE DEVICES,OR APPROVED U)5. DOOR HARDWARE SHALL BE SCHLAGE AL SATURN OR D RHODES SERIES U.N.O. 1. PROVIDE ROLLER BLINDS AT ALL EXTERIOR WINDOWS. 1. EQUAL. � LOCATION MAP Z W
6. ALL DOOR HARDWARE SHALL BE INSTALLED WITH A 2 3/4"BACKSET. a. MARIAK CONTRACT CHAIN OPERATED CLUTCH ROLLER SHADES 2. ALL FIRE ALARM WORK BY VENDERS LISTED BELOW:(This note Is for buildings pcc240 and 241 TI's only.) NOT TO SCALE
7. DOOR FINISH SUBMITTAL:CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR DOOR FRAMES,DOOR b. NO HEAD BOX U.N.O. O
POINT MONITOR
BUILDING REMODEL: .
HARDWARE AND DOORS AS WELL AS A CONTROL SAMPLE OF THE FINISHED DOOR SKIN W1 STAIN AND FINISH a. N
APPLIED(IF NEW DOORS ARE BEING PROVIDED). BEFORE FINISHING OF DOORS IS COMMENCED ARCHITECTc. FABRIC-MARIAK ECONOSCREEN-3%COLOR-903 GRAY/BLACK U.N.O. b. FIRE PANEL REPLACEMENT:POINT MONITOR. AREA OF WORK O W M
SHALL APPROVE CONTROL SAMPLE. FINISHED PRODUCT IS SUBJECT TO REJECTION BY ARCHITECT IF THIS 21 00 00 FIRE SUPPRESSION : DESIGN/BUILD c. SERVICE CALLS:POINT MONITOR. Z
PROCESS IS NOT FULLY ADHERED TO AND FIELD PRODUCT DOES NOT MATCH THE APPROVED CONTROL 2
SAMPLE, 1. ADJUST EXISTING SPRINKLERS THROUGHOUT SPACE AS REQUIRED BY CODE. SPRINKLER HEADS SHALL BE d. QUARTERLY TESTING:STANLEY. + W
CENTERED IN 2 X 2 CEILING TILE. LAYOUT OF SPRINKLERS BY CONTRACTOR. SPRINKLER LAYOUT IN ALL HARD U
B. ALL INTERIOR GLAZING SHALL BE TEMPERED. CEILING AREAS(GYPSUM BOARD/PLASTER)TO BE REVIEWED AND APPROVED BY ARCHITECT PRIOR TO FIRE ALARM MONITORING:STANLEY.
a. IN ALPHA ALUMINUM CLEAR ANODIZED PRODUCTS USE GRAY SEALS.MATCH IF EXISTING.ALL OTHER INSTALLATION. Q F Q N
CONDITIONS USE BLACK. 2. IN NEW CEILING GRID SYSTEMS OVER 144 SF PROVIDE FLEXIBLE HEADS FOR MINIMUM SEISMIC MOVEMENT.
09 00 00 FINISHES NO OOPS RINGS ALLOWED. ' 0 O)
GENERAL 23 00 00 HVAC : DESIGN/BUILD I® D_ m O
1. REMOVE ALL EXISTING VCT,SHEET VINYL,ETC.IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PRIOR HVAC-BID PROCEDURE FW 'Ar' W W
TO INSTALLATION OF NEW FLOORING. 1. FOR BIDDING PURPOSES,THE HVAC CONTRACTOR WILL ASSUME THAT EXISTING HVAC EQUIPMENT IS IN '' O+ O U)> d
2. CLEAN,SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS.EXCLUDES LVi AND PROPER WORKING ORDER. � W U > Z
SOME VCT APPLICATIONS.VERIFY WITH ARCHITECT PRIOR TO APPLYING WAX COATINGS. 2. INVENTORY EXISTING H.V.A.C.ROOFTOP UNITS AND SUBMIT TO ARCHITECT A CONDITIONS REPORT OF EACH V U) g
3. EXISTING VCT TO REMAIN TO BE STRIPPED AND APPLY NEW WAX COATING. UNIT _ _ _ _ _ _ > LL O I-
4. SUBMIT ONE SAMPLE OR DRAW DOWN NO LARGER THEN 11 X 17 FOR THE FOLLOWING: 3. LIST TONNAGE OF EACH UNIT. Q L O
a. FLOOR COVERINGS, BASE AND TRANSITION STRIPS HVAC-DESIGN PROCEDURE
ago_
b. PLASTIC LAMINATES 1. USE EXISTING AND/OR NEW EQUIPMENT TO DESIGN MECHANICAL H.V.A.C.SYSTEM PER DESIGN STANDARDS ,t
c. ALL NATURAL WOOD(INCLUDING DOORS AND CASEWORK) LISTED BELOW. DATE. 4/22/2.1 1
d. PAINT 2 PRIOR TO AWARD OF CONTRACT,H.V.A.C.REVIEW AND APPROVAL A FULL DEISIGN ON SCHEMATIC T
ATIC FO HE TENANCN
TENANT CONTRACTOR
INCLUDING BOSHALL SUBMIT TO THCHITECT FOR CONST.
e. TILE,MARBLE,GRANITE,STONE,GROUT AND SCHLUTER TRIMS NEW/RENOVATED WORK AND SYSTEMS UNTOUCHED BY THE TENANT IMPROVEMENT AS APPLICABLE.
f. TOILET PARTITIONS INCLUDE THE FOLLOWING:
REVISION
5. FINISH FLOORING TO EXTEND UNDER ALL NEW CASEWORK. a. DUCTING AND SIZES
6. PROVIDE A TRANSITION STRIP WHERE EVER TWO DIFFERENT FLOOR MATERIALS MEET PER TRANSITION b. SUPPLY AND RETURN LOCATIONS AND CFM AT EACH GRILL OR DIFUSER � BUILDING PLAN
STRIP DETAILS. c. ROOF EQUIPMENT,SIZES AND LOCATIONS Z� 11.
7. PROVIDE SCHLUTER METAL TRIM AT ALL EXPOSED EDGES OF TILE(EXCEPT AT BULLNOSED EDGE) d. UNITS REQUIRING DUCTED SMOKE DETECTIONA-O NOT TO SCALE
2'
8. CONTRACTOR TO PROVIDE 10%ATTIC STOCK FOR ALL FLOOR TILE PRODUCTS UNLESS DIRECTED e. THERMOSTAT LOCATIONS AND ZONE/UNIT ASSOCIATED THEREWITH
OTHERWISE. f. ANY SUPPLEMENTAL EXHAUST FANS OR SPECIAL SYSTEMS 3.
09 2100 GYPSUM BOARD g. ZONE DIAGRAM
OFFICE COPY a
GENERAL HVAC DESIGN STANDARDS CITY OF TIGARDt
1. ALL GYPSUM BOARD WALLS: ONE LAYER 5/8"TYPE X GYPSUM WALLBOARD,EITHER AT RIGHT ANGLES OR THE FOLLOWING ARE MINIMUM DESIGN STANDARDS: 5.
PARALLEL TO FRAMING ON EACH SIDE OF METAL STUDS SPACED AT 24"O.C. FASTEN WITH 1"TYPE S REVIEWED FOR CODE COMPLIANCE
DRYWALL SCREWS 8"O.C.TO VERTICAL EDGES AND 12"O.C.TO TOP AND BOTTOM RUNNERS AND 1. 350 SQUARE FOOT PER TON(UNLESS OTHERWISE APPROVED IN WRITING BY PACTRUST).
INTERMEDIATE STUDS. STAGGER ALL VERTICAL AND HORIZONTAL JOINTS 24"O.C.(OR ONE STUD SPACING), 2. ADDRESS LOADS BY SPECIFIC LOCATION AND USE,AS WELL AS CRITERIA PROVIDED TO PACTRUST BY Approved: 6.
EACH SIDE AND OPPOSITE SIDES. TENANT PRIOR TO CONSTRUCTION:
2. ALL OFFICE GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND TWO FINISH COATS WITH SANDING BETWEEN a. EXTERIOR EXPOSURE AREAS OTCs - 7.
FINISH COATS(LEVEL 4 FINISH). PAINT AS INDICATED. Permit#: (D,In�i�a I - Q ' Q`/ $'
3. ALL OTHER GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND ONE FINISH COAT WITH SANDING AFTER FINISH b. INTERIOR AREAS,SIZE AND USE 131
COAT(LEVEL 3 FINISH). PAINT AS INDICATED. c. CONFERENCE/TRAINING ROOMS Address: 16,3 S;n S ce 6.®t c_
4. IN FINISHED SPACES FURR-OUT BUILDING COLUMNS AND EXTERIOR WALLS WITH 5/8"GYPSUM BOARD OVER d. COMPUTER/SERVER AND TELEPHONE ROOMS TO HAVE PROVISION FOR LOW AMBIENT OPERATION Suite#:
METAL STUDS. AND 24-HOUR USE.VERIFY NEED FOR A SEPARATE SPLIT SYSTEM TO MAINTAIN TEMPERATURE.
5. PROVIDE ACOUSTIC GASKETS WHERE WALL INTERSECTS STOREFRONT.QUIETJOINT SHH WHERE WALL 3. SYSTEM DESIGN CRITERIA-SIZE ZONES FOR 3-5 TON UNITS BASED ON USE 8 EXPOSURE CRITERIA. B Date: ��'` -� �� r�-�..�� DRAWN BY:
Br.
R.M.T.
MEETS MULLION AND EMSEAL WHERE WALL MEETS GLAZING.COLOR SELECTED BY ARCHITECT. PACKAGED OR SPLIT SYSTEM EQUIPMENT GREATER THAN 5 TONS SHALL BE SPLIT INTO MULTIPLE ZONES. 13�.•iJ�L'
6. AT ALL EXISTING WALLS, REMOVE ALL NAILS,SCREWS,FASTENERS,ETC.LEFT BY PREVIOUS TENANT AND VAV OR WATER SOURCE HEAT PUMP SYSTEMS GREATER THAN 3 TONS SHALL BE SPLIT INTO MULTIPLE
ZONES.
PATCH HOLES READY FOR PAINT.
4. ALL ENCLOSED ROOMS OR OFFICES TO HAVE DUCTED SUPPLY&RETURN GRILLES.
7. REPAIR GYPSUM BOARD AT REMOVED ELECTRICAL RECEPTACLES OR DATA BOXES AND FINISH READY FOR
PAINT. 5 UNITS:
LENNOX,T SPECIAL OWRITTEN CARRIER
R-7 1/ FROM PACTRUST./INIT SIZE. ANY UNIT IN EXCESS OF 71/2 VALIDITY OF PERMIT
8. UPON REMOVAL OF WALL BASE, REMOVE RESIDUAL ADHESIVE AND PREP WALL TO PAINT READY CONDITION. 6. HVAC UNITS EQUAL TO OR GREATER THAN 5-TONS TO HAVE DUCT SMOKE DETECTORS AND BE CONNECTED THE ISSUANCE OF A PERMIT
WALL CONSTRUCTION MATERIALS TO A MONITORING STATION WITHIN THE BUILDING.
BASED ON CONSTRUCTION
1. PROVIDE STUDS,TRACKS,BRACING,FASTENING AND OTHER ACCESSORIES NECESSARY FOR COMPLETE 7. SEISMICALLY ATTACH UNIT TO CURB IN CODE-APPROVED METHOD. DOCUMENTS AND OTHER
INSTALLATION. 8. ECONOMIZER TO MEET CODE AND AS FOLLOWS: DATA SHALL NOT PREVENT
2. FRAMING MEMBERS SHALL HAVE THE STRUCTURAL PROPERTIES INDICATED ON PLANS WHERE PHYSICAL
STRUCTURAL PROPERTIES ARE NOT INDICATED,THEY SHALL BE AS NECESSARY TO WITHSTAND ALL IMPOSED a. 6 TONS AND ABOVE MUST HAVE ECONOMIZER. THE CODE OFFICIAL FROM
LIVE LOADS. DESIGN FRAMING IN ACCORDANCE WITH AISI SG-673. b. BAROMETRIC RELIEF ON 5-7 1/2 TON UNITS. REQUIRING THE CORRECTION
OF ERRORS. OSSC 105.4
BUILDING DEPARTMENT USE
CONSTRUCTION LEGEND
•�+ EXISTING TO REMAIN V #3082
-------- EXISTING TO BE REMOVED V MARTIN W.HANS0
EO. ED. X ED. 3 NEW WALL WITH INSULATIONRAA p '
♦ ��LA KAM S,OREGON
DUPLEX RECEPTACLE '9
'-� OFFICE OF
OFFICE OFFICE OFFICE
FOURPLEX RECEPTACLE
DEDICATED OUTLET
WI,,JJ��,, 50
C EXISTING ELECTRICAL TO REMAIN
0
NE-5-DE' NEWS' RELOCATE e' / FLOOR MONUMENT W/SERVICES SHOWN
4A/ AI III PF\O '• II \ F. RECITE WIDE MUM
♦ ♦ O 3•a• 1•a• ra• 1•-0•
r,xs.__
m@ SPECIAL OUTLET
}Y
CONFERENCE r•_____T_ _.T_ I R F 4 TEUDATA MUD RING WITH PULL STRING U
ELECTRICAL PANEL W
G
10 cqp }_Y
L_____1_____1____ J 33O RELOWTE4 JO POWER J-BOX "
FULL HEIGHT BMG D 0 OPEN OFFICE WIDE RECITE
GLABB IN ALPHA FRNAE OFFICE / 1
303 kk 3oe ® FLUSH MOUNT FLOOR MONUMENT WI POWER AND DATA V
® 2 X 2 LED BLT CEILING FIXTURE
RECESSED INCANDESCENT LIGHT ON RHEOSTAT(TYP.)
RECPT Tdbv
:5tkA
301 SUPPLY DIFFUSER
ti,
O 0
RETURN DUCT
THERMOSTATON
® ® EXHAUST FAN cu2 C14d
o " TILE SPRINKLER HEAD Q N
00)
e EXIT SIGN(LED RED) X
pl�f HORN/STROBE FIRE ALARMLLI0 O LLo
C/) 0ccoo �
_
3: Z44 II
(a)DEMO PLAN 2� (s)PARTITION AND POWER PLAN z� o g �
(a)DEMO
A-2 SCALE 1/8" = V-0" A-2 SCALE 1/8" = 1'-0" ch it 0 0
Lo
m
v
m
0
N
M
1
II
n U
CL
II
1" 36" 36" 36" 36"
II
II
q'sjt
PL-2
-- Yom® ----I -I ------ _____ I -I ------ -------
ADJI. HI ELF- N
-- --- ADJ.SHELF
- -- ----- --
PL-2 Ito1 a
PL-3
1" 36" 36" 36" 36"
_ �2
LL—
PL-2 F
YDI YQI \ d
°' ^a == ADJ SHELF_=== -====ADJ SHELF`--- ------- -------
® DN ®
ON
PL-2
loM4
'v PL-2 P-LAM BASE
VJ
LLI
2 DEMO CEILING PLAN z� 4 REFLECTED CEILING PLAN 2 5 CABINET ELEVATION OPEN OFFICE 303 0 w04
A-2 SCALE 1/8" = 1'-0" A-2 SCALE 1/8" = V-0" A-2 SCALE 1/2" = 1'-0" T z
y U
W wav
~ Q N
FINISH MATERIALSp o in
ALL FINISHES MUST BE SUBMITTED TO PACTRUST PRIOR TO INSTALLATION. w O
CARPET PLANK TILE: Ld_ OU � Z
CPT-1 MANNINGTON COMMERCIAL URBAN GRID COLLECTION W U U)
SCAFFOLD / METRO 14215 > LL- o g
18 X 36 RANDOM BRICK ASHLAR IN NORTH / SOUTH DIRECTION Lo a `Lo W
LUXURY VINYL TILE
LVT MOHAWK GROUP MATUTO PLUS STONE C0135 DATE: 4/22/21
926A AGREEABLE GREY STONE CONST.
DOOR DATADOOR SCHEDULE FRAME DATA HARDWARE REVISION
BASE
FIRE RATING REMARKS MARK RF FLEXCO 4" FLAT RUBBER BASE, 071 BLACK/ BROWN, AT ALL CARPET AREAS.
MARK DOOR SIZE THK CORE VENEER IFINISH HAND MANUF. FINISH DEPTH ACTION MANUFACTURER FINISH FUNCTION I RC FLEXCO 4" COVE RUBBER BASE, 071 BLACK/ BROWN, AT ALL HARD SURFACES.
302A T-O"x 9'-0" 1 3/4" SC QRTD AFRICAN MAHOGANY WALNUT-60101 (LIGHT) Right ALPHA ANDD. ALUMN 4 7/8" LEVER LATCH ALX10S 626 SATIN CHROME SCHLAGE FULL LITE KIT 302A 1.
304 T-0"x 9'-0" 1 3/4" SC QRTD AFRICAN MAHOGANY WALNUT-60101 (LIGHT) Right ALPHA ANDD. ALUMN 4 7/8" LEVER LATCH ALX10S 626 SATIN CHROME SCHLAGE FULL LITE KIT 304 PAINT: 2
305 T-0" x 9'-0" 1 3/4" SC QRTD AFRICAN MAHOGANY WALNUT-60101 (LIGHT) Left ALPHA ANDD. ALUMN 4 7/8" - LEVER LATCH ALX10S 626 SATIN CHROME SCHLAGE RELOCATED DOOR AND FRAME 305 PT-1 MILLER 110-4-10 ACRO PURE ULTRA-LOW VOC 0017 LUNA MOON, SATIN LATEX.
306 T-0" x 9'-0" 1 3/4" SC QRTD AFRICAN MAHOGANY WALNUT-60101 (LIGHT) Right ALPHA ANDD. ALUMN 4 7/8" LEVER LATCH ALX10S 626 SATIN CHROME SCHLAGE RELOCATED DOOR AND FRAME 306 3'
LAMINATE:
307 3'-0"x 9'-0" 1 3/4" SC QRTD AFRICAN MAHOGANY WALNUT-60101 (LIGHT) Left ALPHA ANOD. ALUMN 4 7/8" -- LEVER LATCH ALX10S 626 SATIN CHROME SCHLAGE RELOCATED DOOR AND FRAME 307 4.
308 3'-0"x 9'-0" 13/4' SC QRTD AFRICAN MAHOGANY WALNUT-60101 (LIGHT) Right ALPHA ANDD. ALUMN 4 7/8" LEVER LATCH ALX10S 626 SATIN CHROME SCHLAGE -- 308 PL-1 FORMICA 5882-58 CITADEL WARP ALL FACES
310 3'-0"x 9'-0" 1 3/4" SC QRTD AFRICAN MAHOGANY WALNUT- 60101 (LIGHT) Right ALPHA ANDD. ALUMN 4 7/8" LEVER/ LOCK SCHLAGE 626 SATIN CHROME AL53S EXISTING -ADD VENT GRILL AT BASE 310 PL-2 (COLOR T.B.D.) 5•
PL-3 (COLOR T.B.D.) 6
CAB PULLS 626 SATIN CHROME
FINISH SCHEDULE COUNTERTOP ALTERNATE: 7
WALLS CEILINGS SOLID SURFACE COUNTERS
s.
RM# NAME FLOOR BASE NORTH EAST SOUTH WEST MATERIAL HEIGHT REMARKS RM# SSC PENTAL QUARTZ BQ300P ALPINE POLISHED COUNTER, B.S. AND SELF-EDGE
301 RECPT E-CPT 4" RF E-PGWB ----- E-PGWB E-PGWB E-SAT 9'4" 301 DRAWN BY:
302 CONFERENCE E-CPT 4" RF E-PGWB E-PGWB PGWB E-PGWB E-SAT 9'-0" SCHLUTER DOORS, HARDWARE AND FRAMES R.M.T.
302 SCHIENEAE30 DOORS SOLID CORE
303 OPEN OFFICE E-CPT 4" RF PGWB PGWB PGWB E-PGWB E-SAT 9'-0" 303 FINISH QUARTER SLICE, AFRICAN MAHOGANY, 70284-A WALNUT STAIN
304 OFFICE E-CPT 4" RF E-PGWB E-WW-PGWB PGWB PGWB E-SAT 9'-0" 304 CPT LVT MFGR PACIFIC ARCHITECTURAL WOOD PRODUCTS, INC.
305 OFFICE E-CPT 4" RF PGWB E-WW-PGWB PGWB PGWB E-SAT 9'-0" 305 CARPET TO LVT DETAIL ADDRESS 714 NE 55TH AVENUE, PORTLAND, OR 97213
306 OFFICE E-CPT 4" RF PGWB E-WW-PGWB E-PGWB PGWB E-SAT 9'-0" - 306
CONTACT DENNIS BRYANT PHONE: (503) 284-0024 FAX: (503) 284-0107
307 OFFICE E-CPT 4" RF E-PGWB E-WW-PGWB E-PGWB PGWB E-SAT 9'-0" 307 HARDWARE SATIN CHROME
308 OFFICE E-CPT 4" RF PGWB PGWB E-PGWB E-PGWB E-SAT 9'-0" 308 FRAMES CLEAR ANODIZED
309 BREAK E-LVT E-4" RC E-PGWB E-PGWB E-PGWB E-PGWB E-SAT 9'-01, 309 FLOOR TRANSITION DETAILS A� 2
310 I.T. E-LVT E-4" RC E-PGWB E-PGWB E-PGWB E-PGWB E-SAT 9'-0" 310 CONTRACTOR TO PROVIDE BUILDING STANDARD BLINDS AT ALL EXTERIOR GLASS.
DETAIL GENERAL NOTES: 2'
FC'LA
90REGO�o
1. FOR WALLS UP TO 14'-0"TALL, USE 3625125-30 MTL. STUDS@ 24"O.C. UNLESSCALLED OUT OTHERWISE IN DETAIL. USE 362T125-30 MTL.TRACK. v 2. FOR WALLS OVER 14'-0"TALL, USE 6005125-33 MTL. STUDS @ 16"O.C. UNLESS 18 CALLED OUT OTHERWISE IN DETAIL. USE 600T125-33 MTL. TRACK.3. ALL WALLS:ATTACH BOTTOM TRACK TO FLOOR WITH POWDER DRIVEN TYPICAL STUDoppTT2pq p C4NCI�ALLS WITN'ACOUSTIC INSULATION, SET BOTTOM TRACK IN BED OF SEALANT. wPROVIDE HC SIGNAGE FOR ALL
5. FOR WALL FINISHES, FLOOR FINISHES AND WALL BASE TYPE, REFER TO a 2" NEW AND EXISTING HC RR'S
PROJECT FINISH SCHEDULE. KROY#2835207 BLACK(MEN)
/ KROY#2835209 BLACK(WOMEN)
TYPICAL TRACK PROJECT #21250
POWDER DRIVEN ANCHORS INSTALL STUDS WITH 47
STRUCTURAL SUPPORTING CALCS: SAME
MIN.) FOR BRIDGING �� `+++ z O `" ADDITIONAL SWITCH
GANG LOCATION
1. POWERS 0.300 HEAD(3/4" EMBED)0.145 SHANK DIAMETER ALIGNMENT ; a - Q
ALLOWABLE SHEAR=70 LBS o v V
2. 12'-0"TALL WALL WITH CODE REQUIRED 5 PSF MINIMUM LATERAL(WIND) w C7
LOAD SHEAR= 5 PSF* 12'-0"/2 =30 PLF z \
r"+�+ POWDER DRIVEN = x J +r
3. ANCHORS AT 16"O/C �� `++�+ I 0 ~
SHEAR=30 PLF* 16"112"=40 LBS ANCHORS AT 24"O.C. O \ ELECTRICAL > H F S2 U
♦ w OUTLET OR w U) cn
4. UNITY CHECK + PER
#10-16 SCREW J-BOX rn O of z
�� PER STUD FLANGE 2 of u
40 LBS/70LES =0.57< 1.00K ` O xitolui
0
5. ANCHORS AT 24"O/C AT WALLS WITH 41C'4 \ o x U ~
SHEAR=30 FLIP*24"/ 12"=60 LBS ACOUSTIC INSULATION, '9 $o ~ 0
SET STUD TRACK INA R
4
6. UNITY CHECK UNDERCUT DOOR AS r� v o rn
o REQUIRED TO CLEAp
60 lbs/70 lbs =0.86 < 1.0 OK CONTINUOUS BED OF FLOOR FINISH 0 0
cn
SEALANT.
1 GENERAL NOTES 5 WALL BASE DETAIL s MOUNTING HEIGHTS
0
A-3 SCALE 1" = 1'-0" A-3 SCALE 3" = 1'-0" - SCALE 1/2" = 1'-0" = Q N
Orn
20 GA 3 5/8" METAL STUD BRACING TO ROOF 2 Q 0'
STRUCTURE AT 10'-0"OC TO BUILDING STRUCTURE W O p Lo
2'-0" 2'-0" ABOVE FOR WALLS LONGER THAN 12'-0"WITHOUT M h
INTERSECTION WALLS. FASTEN EACH END WITH � z
44
(1)#8 SHEET METAL SCREW 6" fl6' U) N N
ol
840 FULL LITE KIT WHERE SPECIFIED p
SOUND INSULATION 4'CENTEREDO z of / FRAME TO MATCH DOOR M M M
A�N— J /
Ell OVER WALL ROOF DECK w o "V Lo
d Lo Lo
7777� SUSPENDED CEILING OR BEAM
RACO STYLE RECESSED REVEAL HEADER.
CONCEPT WALLS#1487RDT RACO STYLE4xv /
MTL. STUDS. RECESSED REVEAL p�
HEADER. CONCEPT SUSPENDED CLG ASSEMBLY
5/8" GYP. BIRD. BOTH SIDES WALLS#1487RDT a ADDITIONAL SWITCH m
m w
Z = o GANG LOCATION
a w CENTER LINE OF STUD O
sv
O ILL z
3-1/2" BATT INSUL. IN SOUND ATTENUATION WALLS 7� 20 GA 3 5/8" METAL STUD BRACING = x U r ? n
TO ROOF STRUCTURE AT 10'-0" 1 \ ELECTRICAL w I ¢ w
OC W/(2)#8 SHEET METAL O OUTLET OR J 0Z
BOTTOM TRACK. r ;> SCREWS AT EACH END. BRACING J-BOX
LL
TO BE PROVIDED WHERE DISTANCE "N \ 0 W 0
BETWEEN PERPENDICULAR INTERSECTING �a p x
FINISH FLOOR-TOP OF SLAB a'. F WALLS OR HORIZONTAL BRACING `4 m co ~ 4
BETWEEN WALLS EXCEEDS 12'-0"OC c m v °'
2 WALL SECTION WITH SOUND INS. 6 WALL BRACING DETAIL 10 MOUNTING HEIGHTS
A-3 SCALE 1" = 1'-0" A-3 SCALE 3" = 1'-O" - SCALE 1/2" = 1'-0"
3
m
F
EXISTING u
GLAZING
EMSEAL QUIETJOINT SHG COATED
THREE SIDES
W
RACO STYLE RECESSED REVEAL TRACK, U.1
04
o
CONCEPT WALLS#1487RDT CENTER ON O z
WINDOW MULLION AND SECURED BY GYP
w
BOARD. NO SCREWS IN WINDOW WALL
SYSTEM ALLOWED
a V
wav
EXISTING WINDOWSILL 0 ~ Q N
WALL STUD FLUSH WITH WINDOW SILL O rn
' SMOOTH FIN. GYP BD. OVER D
METAL STUDS
�' o no
UJ 3�' z
U �
> FL a
tn
7 WINDOW CLOSURE AT GLAZING aco oLo
A-3 SCALE 3" = 1'-0" DATE: 4/22/21
CONST.
REVISION
1.
2.
3.
4.
5.
6.
7.
8.
DRAWN BY: