Plans M EC2021 -00593
OFFICE COPY
GENERAL NOTES ABBREVIATIONS SYMBOLS
GENERAL NOTES - MECHANICAL 3. ADJUSTMENTS: ALL EQUIPMENT, MOTORS, FANS GAS BURNERS, ACU AIR CONDITIONING UNIT EQUIPMENT DUCTWORK
AFF ABOVE FINISHED FLOOR EF-1
I V DRIVES, A ADJUSTED AN 6. RECTANGULAR DIVIDED FL W FITTINGS: USE GENERALLY EXCEPT TYPICAL EQUIPMENT DESIGNATION =
IGNITION DEVICES, DRI E , ETC. SHALL BE D0 E AHJ AUTHORITY HAVING Q DUCT (1ST FIGURE SIDE SHOWN,
1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE WORK BALANCED TO OPERATE AT SPECIFIED RATINGS AS REQUIRED BRANCHES TO TERMINALS; SMACNA HVAC FIG 2-5, TYPES 1, 2, 18x12
JURISDICTION (EXHAUST FAN SHOWN) 2ND FIGURE = SIDE NOT SHOWN)
COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, CIVIL, FOR THIS PROJECT SITE AND ACCOUNTING FOR ELEVATION ABOVE 4A, AND 4B. DO NOT USE TYPE 3. AHU AIR HANDLING UNIT JEFFREY A.WILLIAMSAi
ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED ON A SEA LEVEL. AP ACCESS PANEL DSD UP DOWN ARCHITECT
7. TURNING VANES: H.E.P. MANUFACTURER OR APPROVED HIGH
DUCT SMOKE DETECTOR DUCT SECTION, POSITIVE PRESSURE
SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). BDD BACKDRAFT DAMPER 1520o52ndAve. South
4. APPROVALS: MECHANICAL AND PLUMBING EQUIPMENT SHALL BE EFFICIENCY PROFILE AIRFOIL TYPE FOR RECTANGULAR SQUARE BHP BRAKE HORSEPOWER UP DOWN Suite 300
2. ELECTRICAL CHARACTERISTICS: REFER TO ELECTRICAL DRAWINGS
APPROVED FOR INSTALLATION IN THE PROJECT LOCATION AND THROAT ELBOWS. ACOUSTICAL TYPE FOR RETURN AIR MITERED BTUH BRITISH THERMAL UNIT ROOM THERMOSTAT OR DUCT SECTION, NEGATIVE Seattle, WA 98188
FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC. OF SHALL HAVE ALL CERTIFICATIONS AND RATINGS TO MEET ALL ELBOWS. PER HOUR T TEMPERATURE TRANSMITTER PRESSURE Phone 206.766.8300
ENERGY, POLLUTION, ENVIRONMENTAL, SEISMIC, ETC. CODES AND
MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. REGULATIONS. THE CONTRACTOR SHALL COORDINATE WITH HIS B. TAKEOFFS TO OPENINGS: CONICAL TYPE WITH VOLUME DAMPER C COMMON ROOM HUMIDISTAT OR HUMIDITY UP DOWN
CAP CAPACITY H D F
MANUFACTURE SUPPLIERS AND SHALL INCLUDE ALL COSTS FOR ROUND DUCT BRANCHES PER SMACNA HVAC FIG 2-6, CC COOLING COIL O TRANSMITTER RE FS
3. SHALL BEOPPER ETHE IAPPLICABLE BUILDING, MECHANICAL, ROUND DUCT SECTION PRO
MECHANICAL, ENE GY, REQUIRED TO MEET THESE REQUIREMENTS IN HIS BID. MINIMUM INLET DIAMETER 2 INCHES LARGER THAN DUCT SIZE. 45 CD CEILING DIFFUSERco CARBON MONOXIDE SENSOR UP UP UP INee %p"
PLUMBING, FIRE, AND HEALTH CODES AND REGULATIONS AS CFM CUBIC FEET PER MINUTE
DEGREE ENTRY FITTING FOR RECTANGULAR DUCT BRANCHES PER DUCT PENETRATION THRU FLOOR 15,423
5. FIRE PROTECTION: CONTRACTOR SHALL PROVIDE A FULLY SMACNA HVAC FIG 2-6.
ADOPTED BY THE LOCAL AHJ. OR ROOF
DESIGNED FIRE PROTECTION SPRINKLER SYSTEM IN COMPLIANCE CLG CEILING, COOLING so SMOKE DETECTOR m a
CO CLEANOUT
WITH NEPA AND LOCAL CODES. PROVIDE DESIGN, PERMITS, 9. FLEXIBLE CONNECTIONS: PROVIDE AT EACH DUCT CONNECTION COMB COMBUSTION TERMINALS
4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON MATERIALS, INSTALLATION, TESTING AND ALL OTHER FOR A TO FANS, PACKAGED HVAC EQUIPMENT, EXTERNALLY ISOLATED VOLUME DAMPER 0
CONT CONTINUE, CONTROL CD-12x12 CD-1�NUMBER OR
TYPE, AND ,1
FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING FULLY OPERATIONAL SYSTEM. LOCATION OF ALL PIPING TO BE AIR HANDLING UNITS, FAN COIL UNITS, AND SIMILAR EQUIPMENT. 400 OR 400 "*-DESIGN
OR SIZE FSD FIRE/SMOKE DAMPER (--♦ = q c, 20`ti ,
ALL DUCTWORK, DAMPERS, EQUIPMENT, PIPING, ETC. COP COEFFICIENT OF
COORDINATED WITH OTHER TRADES. EXCEPTION: EQUIPMENT IN CORRIDOR CEILING SPACES WHERE PERFORMANCE DESIGN CFM (WHERE APPLICABLE) Rk Q R00� Zp2
A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH FIRE RATING IS REQUIRED. CEILING DIFFUSER (FLOW ARROWS T FSD HORIZ DUCT, - 0 = VERT DUCT), ,6I
STRUCTURAL. 6. FIREPLACES: COORDINATE WITH THE GENERAL CONTRACTOR TO CWS CHILLED/CONDENSER WATER SHOWN FOR NON SYMMETRICAL 2-HR RATED, UON
B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING, SUPPLY FD FIRE DAMPER (---I = HORIZ
DETERMINE GAS FIREPLACE FLUE AND COMBUSTION AIR HVAC NOTES AIRFLOW)
LIGHTS, WALLS, FIRE SPRINKLER PIPING, AND OTHER TRADES DUCTWORK REQUIREMENTS PRIOR TO BIDDING. CWR CHILLED/CONDENSER WATER -T -=FD DUCT, oW = VERT DUCT), 2-HR
WORK. RETURN RATED, LON
1. ATTACHMENTS: AIR DISTRIBUTION OUTLETS AND LOUVERS SHALL / CEILING RETURN EXHAUST GRILLE
C. INCLUDE ADDITIONAL OFFSETS, ELBOWS, ROUTING, D DIAMETER RETURN/
EXHAUST
NOTES HAVE ALL REQUIRED ACCESSORIES AND ATTACHMENTS FOR A
EQUIVALENT DUCT SIZING EXCHANGE, RELOCATING, ETC. AS DB DRY BULB, DECIBEL
COMPLETE CONNECTION TO THE SPECIFIC TYPE OF STRUCTURE LINEAR DIFFUSER, CEILING OR WALL 90' ELBOW, R/D OR R/W=1.5 OBISON
REQUIRED FOR A COMPLETE OPERATING MECHANICAL SYSTEM.
1. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR FLANGES AT THAT THEY ARE BEING ATTACHED TO. THIS INCLUDES, BUT IS DIM DIMENSION MOUNTED (FLOW ARROWS SHOWN
D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE DISCH DISCHARGE ) ENGINEERING, INC
PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL NOT LIMITED TO, EXTERIOR BRICKS, GWB WALLS, GWB CEILING, � � FOR NON SYMMETRICAL AIRFLOW
OWNER. VALVES, AND OTHER COMPONENTS TO ALLOW DISASSEMBLY FOR ETC. DA EXHAUSTMAINTENANCE. UST AIR SQUARE CORNER ELBOW WITH 1940140TH AVE W.SUITE 302
-� ,
5. MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE LYNNWOOD,WA 98036
2. DUCTWORK: DUCTWORK SHALL BE SMOOTH SHEET METAL EAT ENTERING AIR TEMPERATURE WALL SUPPLY GRILLE (SG) TURNING VANES 206-364-3343
EXACT LOCATION OF ALL MECHANICAL EQUIPMENT WITHIN THE EER ENERGY EFFICIENCY RATIO
2. REDUCERS: PROVIDE AS REQUIRED FROM LINE PIPE SIZE TO (CLASS-1). DUCTWORK THROUGH FIRE RATED STRUCTURE AND
STRUCTURE. EQUIPMENT, TRAP, COIL, AND CONTROL VALVE CONNECTION FLOOR SHALL BE MIN. 26 GA. STEEL. MAXIMUM LENGTH OF EF EXHAUST FAN F� WALL RETURN/EXHAUST GRILLE 90' TAKE-OFF OR TEE
SIZES. FLEXIBLE DUCTS SHALL BE 5'-0", UNLESS OTHERWISE NOTED ON EFF EFFICIENCY (RG, EG)
6. ACCESS DOORS: COORDINATE WITH ARCHITECT AND LOCATE ALL EG EXHAUST GRILLE
ACCESS DOORS ON SHOP DRAWINGS PRIOR TO BEGINNING OF
DRAWINGS. DUCTWORK SIZES SHOWN ARE INSIDE CLEAR TRANSFER GRILLE (TG), DUCT
ELEC ELECTRIC
3. OFFSETS: PROVIDE FOR BRANCH LINES TO EQUIPMENT. I . �> ,
CONSTRUCTION. ACCESS DOORS IN FIRE RATED STRUCTURE DIMENSIONS. CONNECTEDWALL MOUNTED W ESP EXTERNAL STATIC PRESSURE 50 / 90' CONICAL TAKE-OFF
SHALL BE FIRE RATED. VERIFY ACCESS DOOR LOCATIONS WITH EXH EXHAUST OPTIONAL CFM SHOWN
4. DIELECTRIC UNIONS: PROVIDE AT CONNECTIONS OF DISSIMILAR 3. VOLUME DAMPERS: PROVIDE AN ACCESSIBLE MANUAL VOLUME �3 TRANSFER GRILLE, CEILING
GENERAL CONTRACTOR PRIOR TO BIDDING. EXT EXTERIOR, EXTERNAL
PIPE. DAMPER FOR EACH SUPPLY, RETURN, OSA, AND EXHAUST F FAHRENHEIT 3 MOUNTED WITH FULL-SIZED LINED 45' LATERAL TAKE-OFF
LOCATED AS FAR UPSTREAM AS POSSIBLE FROM THE FCU FAN COIL UNIT DUCT CONNECTION
7. RATED PENETRATION: DUCT PENETRATIONS THROUGH RATED
5. REFRIGERANT PIPING: PROVIDE SIZING & INSTALLATION IN OPENING,OPENING. PROVIDE A MANUAL VOLUME DAMPER FOR BRANCH PIPING TRANSITION OR REDUCER (FOT =
ENCLOSURES SHALL BE FIRE/SMOKE DAMPERED PER THE LATEST FLR FLOOR
STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. MAINS SERVING MORE THAN ONE OPENING. VOLUME DAMPERS IN �- FLAT ON TOP, FOB = FLAT ON
EDITION OF THE UNDERWRITERS LABORATORIES(UL) FIRE FPM FEET PER MINUTE CD CONDENSATE DRAINAGE
RESISTANCE WITH HOURLY RATINGS FOR THROUGH-PENETRATION NON-ACCESSIBLE CEILINGS SHALL HAVE A CONTROL ARM FOS FEET PER SECOND BOTTOM)
6. CONDENSATE DRAIN: PROVIDE A P-TRAP FOR EACH HVAC UNIT EXTENDED TO AN ACCESSIBLE LOCATION. G NATURAL GAS - STD. PRESSURE `o_
FIRE STOPS SYSTEM VOLUME #2, OR SHALL BE INSTALLED IN CONDENSATE PAN WITH PLUG TEES FOR CLEANING. CONDENSATE FSD FIRE/SMOKE DAMPER WYE FITTING a
STRICT ACCORDANCE WITH THE MANUFACTURER'S UL LISTINGS DRAINS SHALL BE DISCHARGED TO AN INDIRECT WASTE OR 4. SEISMIC: PROVIDE SEISMIC RESTRAINTS FOR MECHANICAL G GAS MPG NATURAL GAS - MEDIUM PRESSURE I'0
(3M OR EQUIVALENT). DETERMINE REQUIREMENTS WITH GENERALOUTSIDE. EQUIPMENT, PIPING, AND DUCTWORK PER SMACNA AND LOCAL GAL GALLONS ] PIPE CAP 0
CONTRACTOR PRIOR TO BID. REGULATIONS.
CGPM GALLONS PER MINUTE o
GRD PIPE PLUG GRILLES, REGISTERS, � � 90' RECTANGULAR TAKE-OFF WITH
INSULATION/LINING NOTES
�
8. EXHAUST OUTLETS: SOURCE-SPECIFIC FANS SHALL BE VENTED DIFFUSERS
5. FILTER CLEARANCE: PROVIDE ADEQUATE CLEARANCE FOR GWB GYPSUM WALLBOARD ��' UNION 45' TAPER
TO OUTDOORS WITH A MINIMUM 3' CLEARANCE BETWEEN VENT 1. ENERGY CODE: AS A MINIMUM, COMPLY WITH THICKNESSES AND CHANGING AIR FILTERS. HD HEAD ~
OUTLETS AND BUILDING OPENINGS, AND 10' MINIMUM BETWEEN TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. HORIZ HORIZONTAL FLANGE n
VENT OUTLETS AND MECHANICAL AIR INTAKES. 6. DUCTWORK AND PIPING OUTSIDE OF MECHANICAL ROOMS SHALL �a GATE VALVE OR BALL VALVE 90' DIVERGING RECTANGULAR TEE,
HP HORSEPOWER 2 PLAN NOTES BE CONCEALED, COORDINATE WITH THE GENERAL CONTRACTOR EITHER RADIUS OR TURNING VANES w
a
HPU HEAT PUMP UNIT
9. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR ROOF TO FUR-OUT AS REQUIRED. BALL VALVE
HPWR HEAT PUMP WATER RETURN
CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. 1. DUCTWORK SHALL BE METALLIC DUCTWORK HPWS HEAT PUMP WATER SUPPLY PRESSURE REDUCING VALVE (PRV) PARALLEL FLOW BRANCH
7. FIRE RATINGS: RATED FLOOR/CEILING JOINT SPACES HAVING �
10. EXPOSED PIPING: PROVIDE CHROME PLATING FOR EXPOSED 2. TEST AND BALANCE WORK SHALL BE PERFORMED BY AN HRU HEAT RECOVERY UNIT DUCTWORK INSIDE THEM SHALL BE FIRE/SMOKE PROTECTED TO �-HVAC HEATING, VENTILATING, TURNING VANES BREAK IN PIPING OR DUCTWORK CONNECTION, EITHER RADIUS OR o m
PIPING IN FINISHED ROOMS. INDEPENDENT TEST AND BALANCE AGENCY. PROVIDE (3) COPIES MAINTAIN THE 1-HOUR FLOOR/CEILING RATING PER LOCAL AND AIR CONDITIONING RL RAIN LEADER (RL)
OF TEST AND BALANCE REPORT TO OWNER. JURISDICTIONS. EXHAUST DUCTWORK PENETRATING THE 1-HOUR HVU HEATING & VENTILATION OL OVERFLOW RAIN LEADER (OL) ) FLEXIBLE DUCT
11. PENETRATIONS: PROVIDE ESCUTCHEON PLATES FOR EXPOSED ROOF/CEILING OR FLOOR/CEILING ASSEMBLY SHALL HAVE UNIT x
PIPING PENETRATIONS AND SHEET METAL FLASHING FOR 3. COORDINATE DUCTWORK WITH MISCELLANEOUS OBSTRUCTIONS IN ACCESSIBLE CEILING FIRE DAMPERS. ALTERNATIVELY, THE HWR HOT WATER RETURN I CHECK VALVE 0 ROUND DUCT INDICATOR m
EXPOSED DUCTWORK PENETRATIONS. CEILING SPACE. EXHAUST DUCTWORK SHALL BE ROUTED INSIDE A RATED SHAFT HWS HOT WATER SUPPLY it
12. SHAFT AND PLENUM CONNECTIONS: SEAL CONNECTIONS TO AIR 4. RESTROOM EXHAUST SHALL BE A MINIMUM OF 10' FROM ANY TO PROTECT THE CEILING/ROOF RATING PER THE LOCAL HX HEAT EXCHANGER ISSUE DATE: 05/25/2021
JURISDICTIONS. ID INDIRECT DRAIN, INSIDE
SHAFTS AIRTIGHT. PROVIDE AIRTIGHT SEAL AROUND MECHANICAL OUTSIDE AIR INTAKES. DIAMETER DRAWINGS ARE DIAGRAMMATIC, SHOWING THE GENERAL LOCATION, TYPE, LAYOUT,
PENETRATIONS IN AIR PLENUMS. 8. FIRESTOP: PIPE, DUCT AND CONDUIT PENETRATIONS THROUGH IN INCH AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALED FOR EXACT
5. ROUTE DUCTWORK UNDERNEATH JOISTS LON. RATED ASSEMBLIES SHALL BE FIRE AND SMOKE STOPPED PER KW KILOWATT J
13. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF MEASUREMENT. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. REFER TO
MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING 6. TRANSITION DUCT UNDER BEAMS AND DUCTS. FIELD VERIFY CODE. L LONG, LENGTH
FIXTURES FOR REMOVAL AND REPLACEMENT. AVAILABLE CEILING CAVITY DIMENSIONS. LB POUND MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS O
9. CORRIDOR THERMOSTAT: PROVIDE TAMPERPROOF THERMOSTATS MBH THOUSAND BTU PER HOUR AND INSTALLATION REQUIREMENTS. PROVIDE DUCTWORK, CONNECTIONS, ACCESSORIES, 0
IN CORRIDORS. DO NOT PROVIDE PLASTIC GUARDS TO MAKE THE MECH MECHANICAL OFFSETS, AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. d
14. CABLE TRAYS: DUCTWORK AND PIPING INSTALLED ADJACENT TO 7, COORDINATE MOUNTING HEIGHT OF DIFFUSERS WITH THERMOSTATS TAMPERPROOF. PROVIDE BLANK SECURABLE MCA MIN. CIRCUIT AMPACITY
ELECTRICAL CABLE TRAYS SHALL ALLOW MINIMUM ACCESS OF 6" ARCHITECTURAL PLANS. THERMOSTAT COVERS. MOCP MAX. OVER CURRENT
ABOVE AND TO THE SIDE OF CABLE TRAYS. PROTECTION
SHEET METAL NOTES THESE DRAWINGS ARE BASED ON THE FOLLOWING CODES: MTD MOUNTED O
15. MOTORS: COMPLY WITH ENERGY CODE ENFORCED BY AHJ FOR OSA OUTDOOR AIR O
MINIMUM EFFICIENCIES UNDER FULL LOAD. 1. REFERENCE: SMACNA HVAC DUCT CONSTRUCTION STANDARDS,METAL AND FLEXIBLE, CURRENT EDITION. OBD OPPOSED BLADE DAMPER
2012 INTERNATIONAL BUILDING CODE (IBC) OD OUTSIDE DIMENSION OR li
16. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: 2014 OREGON MECHANICAL SPECIALTY CODE (GMSC) D RAW I N G INDEX
VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT 2. CLEARANCE: COORDINATE DUCTWORK WITH MISCELLANEOUS ( ) DIAMETER
2014 OREGON PLUMBING SPECIALTY CODE OPSC
ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF OBSTRUCTIONS IN CEILING SPACE. 2014 OREGON ELECTRICAL SPECIALTY CODE (OESC) OPNG OPENINGP PUMP
Q Q
MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE 2014 OREGON ENERGY EFFICIENCY SPECIALTY CODE (OEESC) PD PRESSURE DROP, PUMPED INCLUDED IN SET V'
ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. 3. ROUND ELBOWS AND OFFSETS: FULL RADIUS (R/D = 1.5), DRAIN
5-PIECE SEGMENTED OR STAMPED. REFER TO SMACNA HVAC POC POINT OF CONNECTION }
COORDINATION REQUIREMENTS FIG 2-7, 3-3. DO NOT USE ANGLED OFFSET (TYPE 1). MITERED PRV PRESSURE REDUCING VALVE ~ N W
1. PIPING: COORDINATE WITH STRUCTURAL FOR EXACT LOCATION OF OFFSET (TYPE 2) MAY BE USED UP TO 30 DEGREE OFFSET PSIG POUNDS PER SQUARE LO oN
ANGLE. IN GAUGE
ALL STRUCTURAL FRAMING AND FOOTINGS AND FINALIZE THE RA RETURN AIR O
EXACT ROUTING OF ALL PIPES WITH STRUCTURAL AND AT THE 4, ROUND TEES AND LATERALS: CONICAL TEE PER SMACNA HVAC RD ROOF DRAIN w� �f. O F. m
SITE PRIOR AND DURING THE CONSTRUCTION. FIG 3-5; DO NOT USE STRAIGHT TEE; DO NOT USE CONICAL REF REFERENCE a o Q (� U) Y
SADDLE TAP FOR EXPOSED DUCTWORK IN FINISHED SPACES. RF RELIEF FAN DWG DESCRIPTION
� Z m
2. DUCTWORK: LOCATE AND COORDINATE THE EXACT LOCATION OF ~ O o_
90-DEGREE TEE WITH OVAL TO ROUND TAP, LATERAL, AND RG RETURN GRILLE M000 LEGEND, GENERAL NOTES, DRAWING INDEX X U F m
DUCTWORK WITH STRUCTURAL PLANS AND WITH THE GENERAL a� ¢ o' N o
45-DEGREE RECTANGULAR LEAD-IN PER SMACNA HVAC FIG 3-4. RPM REVOLUTIONS PER MINUTE F' W U Qa o
CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR SA SUPPLY AIR M001 MECHANICAL SCHEDULES, TABLES, CALCULATIONS AND DETAILS X N \ a o y 16- o
EQUIPMENT. COORDINATE WITH FRAMING CONTRACTOR TO ASSURE 5. RECTANGULAR ELBOWS AND OFFSETS: FULL RADIUS WHERE SCH SCHEDULE li / w w � Z
JOIST SPACES LINE UP WHEN DUCTWORK MUST PASS THROUGH SF SUPPLY FAN, SQUARE FOOT M101 EXISTING POOL AND SPA ROOM - DEMO MECHANICAL PLANS X Z
DIFFERENT JOIST SPACES. SPACE PERMITS, R/W = 1.5; OTHERWISE USE SQUARE CORNER w ' D o
ELBOW WITH TURNING VANES. SENS SENSIBLE M102 POOL CONVERSION - NEW MECHANICAL PLANS X O O 1 O m
SG SUPPLY GRILLE
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
CONTRACTOR SUBSTITUTIONS & REVISIONS PRE-CON MEETING NOTES SD SCREENED OPENING
SP STATIC PRESSURE
SS STAINLESS STEEL,
CONTRACTORS SHALL ATTEND A PRE-CONSTRUCTION MEETING WITH THE ENGINEER FOR THE SANITARY SEWER COURTYARD
CONTRACTOR SUBSTITUTIONS & REVISIONS: PLEASE SUBMIT PROPOSALS FOR SUBSTITUTIONS OR REVISIONS PURPOSE OF REVIEWING THE WORK PRIOR TO ORDERING ANY EQUIPMENT OR PERFORMING ANY SQ SQUARE 9Y MARRIOTT
FOR REVIEW AND APPROVAL PRIOR TO ORDERING MATERIAL OR DOING WORK. FOR EQUIPMENT THAT IS TG TRANSFER GRILLE
WORK. THE MEETING SHALL BE LOCATED AT THE PROJECT SITE ON A DATE AND TIME TO BE
SCHEDULED BY MANUFACTURER'S NAME AND CATALOG DESIGNATIONS, THE MANUFACTURER'S PUBLISHED TYP TYPICAL
MUTUALLY AGREED. THE MEETING WILL BE A WORKING SESSION. THE MEETING WILL BE FACILITATED
DATA AND/OR SPECIFICATION FOR THAT ITEM ARE CONSIDERED PART OF SPECIFICATION. ENGINEERING COSTS BY THE ENGINEER AND THE AGENDA WILL INCLUDE A DETAILED REVIEW OF THE PLANS AND UH UNIT HEATER OFFICE COPY
FOR REVISING MEP PLANS SHALL BE ADDRESSED IN THE COST ANALYSIS OF THE SUBSTITUTION LON UNLESS OTHERWISE NOTED
REVIEW OF CROSS CHECK WITH OTHER TRADES FOR COORDINATION ISSUES,
PROPOSAL. CONTRACTOR TO COORDINATE WITH ENGINEER AND DETERMINE ASSOCIATED DESIGN AND SPECIFICATIONS, V VENT '
PERMITTING COSTS. CONTRACTOR SHALL BE RESPONSIBLE FOR OTHER COSTS ASSOCIATED WITH UNFORESEEN PROPOSED PRODUCTS, REVIEW OF PLANNED MEANS AND METHODS,AND ON-SITE INVESTIGATION OF 4Y`OP VCA"`,
VENT VENTILATION, VENTILATOR
ISSUES RESULTING FROM SUBSTITUTIONS OR REVISIONS. FIELD CONDITIONS RELATIVE TO EXISTING CONDITIONS THAT COULD AFFECT THE WORK. PERSONS VTR VENT THRU ROOF +� �
ATTENDING THE MEETING SHALL BE KNOWLEDGEABLE OF THE PROJECT AND SHALL BE THE
SPECIFIC PERSONS INTENDED TO CONTINUE WITH THE PROJECT THROUGH TO COMPLETION. IF W WASTE, WATT, WIDE WB WET BULB (TEMPERATURE) ipIh �I PROJECT#: 2030
REQUIRED, REVISED PLANS WILL BE ISSUED THROUGH OFFICIAL CHANNELS. CHANGES IN THE BID
PRICE WILL BE DISCUSSED, BUT NO CHANGE ORDERS WILL BE ISSUED UNLESS PROCESSED THOUGH DRAWN BY: JN
OFFICIAL CHANNELS. IT SHALL BE UNDERSTOOD THAT THE ENGINEER HAS NO AUTHORITY TO ISSUE m���.-. 1 ten' ��
I `"' " �� "`"O"""*""' CHECKED BY: JMR
CHANGE ORDERS. q44- b4AC41 '24 �
Saito Int
THE FOLLOWING TRADES SHALL BE REPRESENTED FOR THE MINIMUM TIME INDICATED: "*"""" - Do -�z LEGEND, NOTES,DRAWING INDEX
MECHANICAL SHEET METAL 4 HOURS
PLUMBING/PIPING 4 HOURS
ELECTRICAL 4 HOURS VAUDITYOF PERMIT
SPRINKLER 2 HOURS 1HE ISSUANCE OFA PERMIT W
GENERAL CONTRACTOR ALL SESSIONS BASED ONCSANDOTHER U) M000
1MENTS AND OTHER
w
DATA SHALL NOT PREVENT
< THE CODE OFFICtAL
z CORRECTITION w
JOF 6W06-OSSC t05.4 d
SCHEDULES
JEFFREY A.WILLIAMSAI
ARCHITECT
SPLIT SYSTEM FAN COIL UNIT SCHEDULE - INDOOR UNIT OSA VENTILATION REQUIREMENTS 1520052nd Ave. South
Suite 300
ELECTRICAL DIMENSIONS, INCHES WEIGHT BASIS OF DESIGN CONNECTED HEAT OCCUPANTS, CFM Seattle, WA 98188
EQUIP NO. SERVICE MOUNTING AIRFLOW, CFM VOLTAGE L W H (LBS) {1)(2)(3)(4) RECOVERY BOX Q ROOM UNIT SERVED AREA, SF PEOPLE CFM/ SQ FT P OPLE CFM (AREA) CFM (OCC) CFM REQUIRED Phone 206.766.8300
FCU-1A 700 208V/1PH 9 40 14 26 LG LSN180HSV5 NEW EXERCISE ROOM FCU-1 1090 10 0.06 20 65 200 265 p PROF
EXERCISE WALL HP-1 �� FS
FCU-16 700 208V/1PH 9 40 14 26 LG LSN180HSV5 NEW INDOOR LOUNGE FCU-2 515 10 0.06 7.5 31 75 106 fitINfFQs/o
FCU-2 ACTIVITY ROOM WALL 450 208V/1PH 8 33 13 19 LG LSN120HSV5 HP-2 NEW ACTIVITY FCU-3 490 20 0.06 7.5 29 150 179 15,423
FCU-3 INDOOR LOUNGE WALL 450 208V/1PH 8 33 1 13 19 LG _SN120HSV5 HP-3 NOTES: (1 NEW OSA REQUIREMENTS ARE LESS THAN EXISTING OSA REQUIREMENTS THEREFORE OSA SYSTEM IS ADEQUATELY SIZED.
NOTES: 1 REFRIGERANT SHALL BE R-410A.
(2) INSTALL UNITS AS SHOWN AND AS RECOMMENDED BY THE MANUFACTURER IN COMPLIANCE WITH LOCAL CODES.
O
(4) PROVIDE CONDENSATE COORDINATE ROUTING OF REFRIGERANT LINES ON PLANS. 4RK q R�\ 19120`t�
(5) PROVIDE PROGRAMMABLE T-STAT. AUTOMATIC CONTROLS: SETBACK TO 55°F(HEAT) AND 85'F(COOL); 7-DAY CLOCK; 2-HOUR OCCUPANT OVERRIDE, 10-HOUR BACKUP.
. 01 1
2
SPLIT SYSTEM HEAT PUMP SCHEDULE - OUTDOOR UNIT ROBISON
EQUIP NO. SERVICE CAPACITY, TOTAL COOLING EER/ TOTAL HEATING HSPF ELECTRICAL DIMENSIONS, INCHES WEIGHT, BASIS OF DESIGN CONNECTED FAN ENGINEERING, INC
TONS CAPACITY, BTUH SEER CAPACITY, BTUH VOLTAGE MCA MOCP L W H LBS 1 2 3 4 COIL UNIT
19401 40TH AVE W,SUITE 302
HP-1 EXERCISE 3.0 36,000 11.0/18.0 40,000 10.0 208V/1PH 32 40 38 13 55 203 LG LUU369HV FCU-1A & 1B LYNNWOOD,WA 98036
206-364-3343
HP-2 ACTIVITY ROOM 1.0 12,000 12.5/22.7 13,600 11.4 208V/1PH 10 15 14 35 22 75 LG LSU120HSV5 FCU-2
HP-3 INDOOR LOUNGE 1.0 12,000 12.5/22.7 13,600 11.4 208V/1PH 10 15 14 35 22 75 LG LSU120HSV5 FCU-3
NOTES: 1 ARI LISTED WITH ALL STANDARD FEATURES, INSTALLATION ACCESSORIES AND COMPRESSOR SHORT CYCLING PROTECTION. FILTER DRIVER, REFRIGERANT LINE FILTER, LIQUID
SOLENOID VALVE, AND SAFETY PRESSURE SWITCHES. INSTALL REFRIGERANT TUBING AND LENGTH IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION.
(2) PROVIDE ALL REQUIRED ACCESSORIES FOR LOW-AMBIENT AND LONG-LINE APPLICATIONS. ACCESSORIES ALSO TO INCLUDE BACNET.
(3) ROUTING OF REFRIGERANT LINES FROM INDOOR TO OUTDOOR UNITS NOT SHOWN ON PLANS. CONTRACTOR TO FIELD COORDINATE ROUTING.
(4) REFRIGERANT SHALL 8E R-410A.
FAN SCHEDULE
O
ELECTRICAL WEIGHT, r
EQUIP NO. SERVICE MOUNTING/ DISCHARGE AIRFLOW, CfM ESP. IN WG VOLTAGE HP OPERATION LBS BASIS OF DESIGN
SF-1 EXERCISE/ACTIVITY ROOM INLINE 250 0.25 120V/1P FHP CONTINUOUS 25 GREENHECK CSP-A290
w
NOTES: 1 PROVIDE BACKDRAFT DAMPERS ON EXHAUST FANS. i
1- 0
R VD D C NTR L E . A A A Ar
N w
a ¢
ELECTRIC DUCT HEATER SCHEDULE � �
EQUIP NO. SERVICE MOUNTING/ DISCHARGE HEATING ELECTRICAL BASIS OF DESIGN (1)
BTU/HR. VOLTAGE INPUT KW I MCA IMOCP o 0
DH-1 COMMON SPACE INLINE 17,200 208V/1P 5 24 30 THERMOLEC TER-10-5208 at
NOTES: 1 INSTALL UNITS AS SHOWN AND AS RECOMMENDED BY THE MANUFACTURER IN COMPLIANCE WITH LOCAL CODES. a
ISSUE DATE: 05/25/2021
J
O
a
DETAILS o
On
� c
� m
m �
ANCHOR TO STRUCTURE (TYP) Q Z
STRUCTURET
0
U; am crU�
am
TYPICAL CU ¢ OF o v
SECURE T0� W a 0 d N o
STRUCTURE ' i_
J U) 0 It z
7�" CABLE AT 45 DEGREES TO Z Lu .
RESIST SWAY. PROVIDE ONE 3/e" ALL—THREAD ROD, -- - — O O It z
Lu 00
o F o
CABLE IN EACH DIRECTION TYP EACH CORNER. x�000000c FRAMING V V
INSULATED (REF STRUCTURAL)
REFRIGERANT LINES 24" MAX.
is a
SUPPLY `� FAN COIL UNIT RERTURN SECURE UNIT TO PAD COURTYARD
OUTLET
BY MARRIOTT
FLEX DUCT(6' MAX) DUCT
UNI-STRUT (TYP) SECURE UNI-STRUT 4" CONCRETE PAD NYLON TIE-STRAPS
-- - --
CEILING TO CABINET TYP GRADE / \
PROJECT#: 2030
DRAWN BY: JN
CHECKED BY: JMR
MECHANICAL
SCHEDULES, TABLES,
CALCULATIONS AND
FAN COIL SUPPORT DETAIL CONDENSING UNIT MOUNTING DIFFUSER CONNECTION DETAIL DETAILS
DETAIL 3 DETAIL r2 DETAIL w
a
SCALE: NONE M001 SCALE: NONE M001 SCALE: NONE M001 mool
z of
w w
u_
a
�V
JEFFREY A.WILLIAMSAI
ARCHITECT
4 2 x 3 0 EXHAUST Suite 52nd Ave. South
Suite 300
Seattle, WA 98188
LOUVER Phone 206.766.8300
24x24 MIN . 42x30 OSA LOUVER QED PROFFS
OSA LOU VER �� 15,23 '°�
2420 J J ARK 4 RO��,6IZp21
�V
ROBISON
(E)6x6 ENGINEERING, INC
19401 40TH AVE W,SUITE 302
( E ) P H R U - 1 I (E)8X8 LYNN&364 34 98036
206-364-3343
150 ( E ) H - 1 (E)48- 2
250
T
(E)48x26
3000
0
0
a
u
(E)48- 2
250
w
EXG. POOL (E)48- 2 w
AREA 250
E 18x6 E 1 x6
m N
15D 150 ' o �
ISSUE DATE: 05/25/2021
(E)48- 2
® 250 J
E 48- 2
p
— — 100 250 a
EXG. P 100 100 100 � �
SPA EQL IPM . (E)48- 2 O
ROVA 400
150 x E 48- 2 � <
00 -
(E)8x8 T
. II O
FO _
o
U) U
® 0
m � U
Lf. aU � No
a U) 01
E 12x12 � r Ln
3 Z x � � o z
,,( E ) TU - 2 250 !1Z o
0 � mo
V V 0 a � r � o
I
I
( E)IL 2 - 4
EXG. LXLRC15E OOM
0 E 14x14 COURTYARD
\ BY MARRIOTT
500
T
PROJECT#: 2030
DRAWN BY: JN
CHECKED BY: JMR
EXISTING POOL AND
SPA ROOM DEMO
MECHANICAL PLANS
EXISTING POOL AND SPA ROOM — DEMO w
MECHANICAL AN I CAL FLOOR PLAN M 101
Z w
SCALE: 1/4" = 1'-0" Il
�V
JEFFREY AMILLIAMSAI
ARCHITECT
15200 52nd Ave. South
Suite 300
Seattle, WA 98188
Phone 206.766.8300
(E) 24x24 OSA
D PRO23 F
�.� Ih14-e' o2
LOUVER
( E ) EF- 3 15,4 r
SF— 1 �Rk R RO �g TOO
DH - 1 ACTIVITY ROOM
STORAGE / f1ANICAL
00 ROBISON
SG- 1 FCU — 3 ENGINEERING, INC
19401 40TH AVE W,SUITE 302
75
00 LYNNWOOD,WA 98036
`J
SQ- 1 206364-3343
X175
EG- 1
170
HP - 1
0
0
c
HP - 2
W
N
FCU — JA °
a
HP - 3 N �
(r _
W LL
a tt
FITNESS ROOM
4 N N
z � INDOOR / � _; ;_
x Y X Y OUTDOOR
U-1 U) w U) LOUNGE
ISSUE DATE: 05/25/2021
FCU - 2
J
0
0
a
� 0
FCU - 113
SG- 1 SG- 1 0� �
275 125 Q Q
T
T m F-
T Q Z
0
cc
80
010
N O
ii w ¢ F O � U
aU � No
® E 12x12 = Z a 0 �� V
250 N
N V � pv z
E TU - 2 - 2 40 A2
0 0 w �
� � mo
/ 1 f1 Oa � i= � o
L ]=- =I�) ( E) TL 2 - 4c ABORATION ENTIRE SHEET REVISED
( E ) OSA s ACE
PLENUM COURTYARD
E 14x14
BY MARRIOTT
500
EXI STI N G
CORRIDOR
T
PROJECT#: 2030
DRAWN BY: JN
CHECKED BY: JMR
POOL CONVERSION -
NEW MECHANICAL
PLANS
POOL CONVERSION — NEW
M ECH AN I CAL FLOOR PLAN 2 M102
Z w
LL SCALE: 1/4" = 1'-0" o