Plans (90) M EC2020-00768
OFFICE COPY RECEIVED
NOV 19 2020
CITY Or :.GARD
1
2 3 4 5
BUILDING DIVISION
DRAWING INDEX
MGA
GENERAL MYHRE GROUP ARCHITECTS
CS COVER SHEET 6503.23fi6000 t 503.236.750020 SW 5th Avenue,Suite 500 PeH Wanm Oregon
ro W204
G0.10 GENERAL NOTES, SYMBOLS&ABBREVIATIONS
G0.30 CODE SUMMARY, FIRE & LIFE SAFETY PLANS
G0.40 ASSEMBLY TYPESA�,
Qt
G0.50 ACCESSIBLE SITE/PUBLIC SPACE DETAILS C��� D '`C�,lj
G0.51 ACCESSIBLE SITE/PUBLIC SPACE DETAILS
RAYMOND R.
ARCHITECTURAL fri YANCEY
A1.10 ARCHITECTURAL SITE PLAN 04 3 2
D A2.10 FIRST FLOOR PLAN
A2.20 SECOND FLOOR PLAN
A2.50 ROOF PLAN 0
y A4.10 FIRST FLOOR REFLECTED CEILING PLAN
A5.10 ENLARGED FLOOR PLANS OF OR�G
�s A7.10 EXTERIOR ELEVATIONS
` ---� A9.10 INTERIOR ELEVATIONS & BUILDING SECTION
-- � CMYHRE GROUP ARGITECTS.M.
A10.10 STAIR PLANS AND SECTIONS
.. ;t Al2.10 DOOR &WINDOW TYPES & DETAILS &SCHEDULES "E GROOP0.9 ARE TME MO ME or
TO GROUP DUCED N ARD ARE NOT
M " REPRODUCED IH AHY Mg-tER,
E%CEPr `MTII THE PRIOR WRRTEN
APPROVAL OF"RE GROUP ARCHREOTS
r
fps
K
p,
OFFICE COPY
Cl F , ; ' CITY OF TIGARD..
j REVIEWED FOR CODE COMI'LLkNCE
,
Approvedt"jej]
4
-t } orc: [ 1
Pemdt#: in in -] G, St PERMIT
Address: coo �,.,S;�rE,cnr REVIEW SET
211 q: `
QhF Suite#:
C By: Date: ) 1- 1- Din
CONCEPTUAL RENDERING
JAPANESE INTERNATIONAL
BAPTIST CHURCH
JAPANESE INTERNATIONAL BAPTIST CHURCH
8500 SW SPRUCE ST.
TIGARD, OR 97223
8500 SW SPRUCE ST, TIGARD OR 97223
B
JURISDICTION : CITY OF TIGARD
REV DATE FILE
N
VICINITY MAP: N.T.S. PROPERTY DESCRIPTION: CONTACTS OWNER CONSULTANTS
TAX LOT NO: 1S123DB LOT 3700
ZONING R-12/R-25 CHURCH GENERAL CONTRACTOR CIVIL ENGINEER LANDSCAPE DESIGN
3 SW Taylors Ferry Rd JAPANESE INTERNATIONAL ESI CONSTRUCTION CES NW, INC ANDERSON ASSOCIATES
wNeiiei BAPTIST CHURCH &SUPPLY 13190 SW 68TH PARKWAY,
Ld
u
8500 SW SPRUCE ST 10875 SW HERMAN RD SUITE 150 2860 SE ASH ST
� TIGARD, OR 97223 TUALATIN, OR 97062 TIGARD, OR 97223 PORTLAND, OR 97214
3 P: 503.246.4680 P: 503.968.3118 P: 503.968.6655 P: 503.318.0549
a F: F: 503.968.6639 F: 503.968.2595 F:
a PIC: RY
v CONTACT: CONTACT: CONTACT: CONTACT:
O KENJI YOKOY ROGER BROCKWAY TONY WELLER DAVE ANDERSON PM: MN
kenyokoy@gmail.com roger@esigc.com tweller@cesnw.com dave@andersonassoc-la.net JC:
1 ti �r---ir
DRAWN BY:CR
L�
A SW Oak St m I_J�JL—JL� DEFERRED SUBMITTALS: UNDER SEPARATE COVER DESIGN-BUILD SUBMITTALS: JOB NO: 140360
PROJECT DLL NONE 1. MECHANICAL SYSTEMS. ARCHITECT STRUCTURAL ENGINEER
S� e St DATE: 4/08/2015
SW S nice gg
@o
LOCATION L I MYHRE GROUP ARCHITECTS LEWIS AND VAN VLEET INC.S
a''eryo N r�r 2. ELECTRICAL WORK. 620 SW 5TH AVENUE
SUITE 500 18660 SW BOONES FERRY RD
9draHw d fc� 3. PLUMBING. PORTLAND, OR 97204 TUALATIN, OR 97062
y w Qac P: 503.236.6000 P: 503.885.8605
5F: 503.236.7500 F: 503.885.1206 cs
4. METAL BUILDING STRUCTURE AND ENCLOSURE.
SW Pfaffle t
CONTACT: CONTACT:
RAY YANCEY GARY LEWIS COVER
RayY@myhregroup.com gjlewis@lvvi.com
SHEET
1 2 3 4 1 5
KEYNOTES <�> (NOT ALL KEYNOTES MAYBE USED ON THIS SHEET) FLOOR PLAN NOTES MGA
1. 42'x50' (BETWEEN SIDELINES), STANDARD HIGH SCHOOL DIMENSION BASKETBALL A. COORDINATE WITH CHURCH FOR SECURITY ACCESS CONTROLS AND KEYING. MYHRE GROUP ARCHITECTS
HALF COURT. HOOP AND BACKBOARD ASSEMBLY BY OWNER
B. FOR SPECIFIC WALL ASSEMBLY INFORMATION, SEE GO.40. 620 SW 5m Avenue,suite Soo Pan""a.Oie,,m 97 o
yhre.p
.m .can
2. CONCRETE WALKWAY, REFER TO CIVIL DRAWINGS 1503.236.6000 1503236.1500 AWw
3. FOLDING PARTITION WALL, BY OWNER C. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL REQUIREMENTS.
4. WALL MOUNTED DRINKING FOUNTAIN, REFER TO PLUMBING DRAWINGS D. SEE Al2.10 FOR DOOR SCHEDULE. D ARCS
5. COLUMNS PER STRUCTURAL, WRAP EXPOSED COLUMNS WITH GYP. E. SEE GO.50 SERIES FOR TYPICAL ADA REQUIREMENTS.
6. DOWNSPOUT, CONNECT TO STORMWATER SYSTEM PER CIVIL DRAWINGS RA ,�
YYMOND R.
7. LINE OF ROOF ABOVE
F. REFER TO DOOR AND WINDOW MANUFACTURERS'SPECIFICATIONS FOR ACTUAL
ANCEY
ROUGH OPENING SIZE. 3 2
8. LOW WALL TO UNDERSIDE OF STAIRS 0 r*
D 9. PARTIAL HEIGHT WALL AT 42"A.F.F. G. DIMENSIONS TO DOORS AND WINDOWS ARE AT CENTERLINE OF UNIT. L
10. WALL CENTERED ON GRIDLINE H. DOORS NOT DIMENSIONED TO BE LOCATED 6" FROM ADJACENT WALL, 9
11. FACE OF WALL TO ALIGN WITH GRIDLINE I. TYPICAL INTERIOR WALLS TO BE 1 A U.O.N. �L+ OF OR G
12. MOP SINK
13. WALL MOUNTED, ADA SINK 0 MYHRE GROUP ARCHITECTS.INC.
THESE IXUAINGS ARE THE PROPERTY OF
MYHRE14. GROUP ARCHITECTS AND E NOT
BLE WL KITCHEN SINK FINISH FLOOR PLAN NOTES D eE REED ANY MARANNER.
15. CASEWORK EXC BE EPR THE IN NMOR AM EN
APPROVAL OF MVHHE GROUP ARCHITECTS
16. ADA TOILET, REFER TO PLUMBING DRAWINGS A. INSTALL ALL FINISHES PER MANUFACTURER'S INSTRUCTIONS.
New outdoor 4 ton condensing unit on ground level 17. ADA GRAB BARS
Indoor evaporator head #1 18. WALL MOUNTED, FOLD DOWN DIAPER CHANGING STATION B. PREPARE ALL FLOOR AND WALL SURFACES FOR NEW FINISHES WHERE NOTED.
P PROVIDE FLOOR LEVELING, PER FLOOR MANUFACTURER PRE-APPROVED
19. LAVITORY SINK METHOD AND MATERIALS,AS REQUIRED TO INSURE PROPER INSTALLATION OF
Street screening wood fence. PRODUCT(S).
20. WALL MOUNTED URINAL
21. TOILET STALL PARTITION C. ALL FLOORING MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF
� DOORS SEPARATING ROOMS UNLESS NOTED OTHERWISE.
( A ) B C D D 1 02 F 22. LINE OF SKYLIGHT ABOVE
23. LINE OF WALL BELOW D. FINISHES IN ACCESSORY SPACES TO MATCH ADJACENT SPACES, UNLESS NOTED
OTHERWISE.
24. FURR OUT WALL TO CONCEAL COLUMN
24'-1 1/2" 24'-1 1/2" 20'-11" 5'-0" 9'-1" 4" 20'-11" 1 25. FLOOR ACCESS DOOR,ACUDOR FA-300, 24 X 36 WITH SURFACE MOUNT OPTION E. PAINT ALL LEVEL GYP.WALLS P-01 THROUGHOUT, UNLESS NOTED OTHERWISE.
F. PAINT ALL GYP CEILINGS THROUGHOUT P-02, UNLESS NOTED OTHERWISE.
5'-5" 3,'-," PERMIT
Refrigerant piping REVIEW SET
C
BX AX BX D C X AX BX
T T T C E
BX T - T T
1 N I - - _ _ _ - _ -
T \ In DN D X
0 - - - - - - - - - - - - - - - -
F \ 83 In
9 CX
N I 20'8" 5'-9' I 10.1 T
JAPANESE INTERNATIONAL
2 BAPTIST CHURCH
O \ TYP. �L F
A
11 El �E•% 1
_ 5 � c
io
fO 8500 SW SPRUCE ST.
2 - B X TIGARD, OR 97223
Q T \ MECH PLATFORM N 6 4
T in
to `° w
OA,
4 9.10 F_ -1 - - OPOEN - - F_ -1 - - 1 A
N L -1 BELOW L
- o
iv FUTURE w
10 SECONDFLOO R
� 201
3 _ T
(V
_ 5
TYP.
a I2 A ! B1 O
4 0 1x
0 0 i REV DATE FILE
EOV I STAIR. 1 CT S1 o q 08/19/2015 PLAN REVIEW 1
DN I D X
B B X I ie T
4
I-IT11 - zj °�
BX AX BX AX X C C X E
a - T T - T T T T D T DT
3 �
P I PIC: RY
0
PM: MN
v
3 JC:
Indoor evaporator head 2
DRAWN BY: CR
a A JOB NO: 140360
m
DATE: 4/08/2015
m
c
0
c m 21' 1/2" 15'-0" 16-6"
nN
A2 .20
(0174
� Q
0 L
SECOND FLOOR
m
o SECOND FLOOR PLAN PLAN
'v Al
a
not °' A2.20 1/8"=1'-0"
(n 0