Loading...
Plans (87) M EC2020-00309 GENERAL NOTES SYMBOLS GENERAL NOTES - MECHANICAL EQUIPMENT TERMINALS _ 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE 4. MISCELLANEOUS DUCT FITTINGS (CONICAL TAKEOFFS, ETC.): 3. ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC ' WORK COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, WRAP WITH INSULATION FOR CONDENSATION CONTROL. OR READILY ACCESSIBLE MANUALLY OPERATED DAMPERS IN ALL EF-1 r OPENINGS TO THE OUTSIDE, EXCEPT FOR COMBUSTION AIR OPENINGS. TYPICAL EQUIPMENT DESIGNATION CD-12x12 CD_1�� ER/GRILLE TYPE, AND NUMBER CIVIL, ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED OR SI _ ON A SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). 5. THE PIPING FOR ALL SPACE CONDITIONING AND SERVICE WATER HEATING (EXHAUST FAN SHOWN OR OR SIZE SYSTEMS SHALL BE INSULATED IN ACCORDANCE WITH TABLE 123-A. 4. THE LESSER OF THE MINIMUM RATE OF OUTDOOR AIR REQUIRED BY ) 400 400 ��DESIGN CFM (WHERE APPLICABLE) SECTION 121(b)2, OR THREE COMPLETE AIR CHANGES SHALL BE 2. ELECTRICAL CHARACTERISTICS: REFER TO ELECTRICAL T COORDINATION REQUIREMENTS SUPPLIED TO THE ENTIRE BUILDING DURING THE ONE-HOUR PERIOD ROOM THERMOSTAT OR DRAWINGS FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC.) IMMEDIATELY BEFORE THE BUILDING IS NORMALLY OCCUPIED. TEMPERATURE TRANSMITTER CEILING DIFFUSER (FLOW ARROWS OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. 1. DUCTWORK: LOCATE AND COORDINATE THE EXACT LOCATION OF xSHOWN ONLY IF AIRFLOW NOT DUCTWORK WITH STRUCTURAL PLANS AND WITH THE GENERAL COMPLETION AND BALANCING DSD DUCT SMOKE DETECTOR SYMMETRICAL) 3. CODES: COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR PER THE APPLICABLE BUILDING, MECHANICAL, ENERGY, PLUMBING, FIRE, EQUIPMENT. COORDINATE WITH FRAMING CONTRACTOR TO ASSURE ALL VENTILATION SYSTEMS SHALL BE DOCUMENTED PER CALIFORNIA DUCTWORK AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL AHJ. JOIST SPACES LINE UP WHEN DUCTWORK MUST PASS THROUGH SAFETY CODE (TITLE 8, SECTION 5142 (B) TO BE PROVIDING THE CEILING RETURN/EXHAUST GRILLE DIFFERENT JOIST SPACES. MINIMUM REQUIRED VENTILATION RATE AS DETERMINED USING ONE OF Ln I✓✓�JJJ 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON THE FOLLOWING PROCEDURES: 18x12 DUCT (1ST FIGURE = SIDE SHOWN, FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING ALL CONTROLS 2ND FIGURE = SIDE NOT SHOWN) LINEAR DIFFUSER, CEILING OR WALL DUCTWORK, DAMPERS, EQUIPMENT, PIPING, ETC. 1. AIR BALANCING: ALL SPACE-CONDITIONING AND A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH STRUCTURAL. 1. THE THERMOSTATIC CONTROLS FOR HVAC SYSTEMS SHALL MEET VENTILATIONSYSTEMS SHALL BE BALANCED TO THE UP DOWN MOUNTED (FLOW ARROWS SHOWN B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING, THE FOLLOWING REQUIREMENTS AS APPLICABLE: QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH ONLY IF AIRFLOW NOT SYMMETRICAL) LIGHTS, WALLS, FIRE SPRINKLER PIPING, AND OTHER TRADES WORK. THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) ® i� DUCT SECTION, POSITIVE PRESSURE C. INCLUDE ADDITIONAL OFFSETS, ELBOWS, ROUTING, EQUIVALENT a) EACH SPACE CONDITIONING ZONE SHALL BE PROCEDURAL STANDARDS (1983) OR ASSOCIATED AIR UP DOWN WALL SUPPLY GRILLE (SG) DUCT SIZING EXCHANGE, RELOCATING, ETC. AS REQUIRED FOR A CONTROLLED BY AN INDIVIDUAL THERMOSTATIC BALANCE COUNCIL (AABC) NATIONAL STANDARDS (1989). COMPLETE OPERATING MECHANICAL SYSTEM. CONTROL THAT RESPONDS TO THE TEMPERATURE �� DUCT SECTION, NEGATIVE PRESSURE D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE OWNER. WITHIN THE ZONE AND MEETS THE APPLICABLE 2. OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE WALL RETURN/EXHAUST GRILLE REQUIREMENTS OF SUBSECTION(b). MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL UP DOWN (RG, EG) oe 5. MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE EXACT b) EACH THERMOSTATIC CONTROL REQUIRED BY DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE 0 ILL LOCATION OF ALL MECHANICAL EQUIPMENT WITHIN THE STRUCTURE. SUBSECTION(a) SHALL BE CAPABLE OF BEING SET INSTALLING LICENSED C-20 MECHANICAL CONTRACTOR. ROUND DUCT SECTION w OFFICE COPY LOCALLY OR REMOTELY BY ADJUSTMENT OR 6. EXHAUST OUTLETS: SOURCE-SPECIFIC FANS SHALL BE VENTED 3. OUTSIDE AIR MEASUREMENT: THE SYSTEM SHALL BE TRANSFER GRILLE (TG), DUCT CONNECTED, CITY OF TIGARD„ TO OUTDOORS WITH A MINIMUM 3 CLEARANCE BETWEEN VENT SELECTION OF SENSORS TO CONTROL; EQUIPPED WITH A CALIBRATED LOCAL OR REMOTE DEVICE -� WALL MOUNTED WITH OPTIONAL CFM w OUTLETS AND BUILDING OPENINGS, AND 10' MINIMUM BETWEEN 1 COMFORT HEATING DOWN TO 55-F OR LOWER. CAPABLE OF MEASURING THE QUANTITY OF OUTSIDE AIR ON UP UP UP DUCT PENETRATION THRU FLOOR 50 SHOWN a REVIEWED FOR CODE COMPLIAN VENT OUTLETS AND MECHANICAL AIR INTAKES. ) A CONTINUOUS BASIS AND DISPLAYING THAT QUANTITY ON A � � m OR ROOF Approved: �) 2) COMFORT COOLING UP TO 85'F OR HIGHER. READILY ACCESSIBLE DISPLAY DEVICE. ` (� OTC: I ) 7. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR ROOF 3) BOTH HEATING AND COOLING, THE THERMOSTATIC •.m. ty ED CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. CONTROLS SHALL BE CAPABLE OF PROVIDING A 4. ANOTHER METHOD APPROVED BY THE ENERGY COMMISSION. VOLUME DAMPER TRANSFER GRILLE, CEILING MOUNTED APR 22 2020 Pcnmit #: YY� G _ TEMPERATURE RANGE OR DEAD BAND OF AT �> ` ' ` -� WITH FULL-SIZED LINED DUCT Address: 8. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF LEAST 5'F WITHIN WHICH THE SUPPLY OF HEATING ADMINISTRATIVE REQUIREMENTS FSD FSD FIRE/SMOKE DAMPER (-A = HORIZ CONNECTION T1'O TIGARD I I - -.J; (��D1V `,?A1 Suite #: MECHANICAL WORK PROVIDE CLEARANCES OVER LIGHTING DUCT, = T DUCT), FIXTURES FOR REMOVAL AND COOLING ENERGY TO THE ZONE IS SHUT OFFWIVERDU ) AL AND REPLACEMENT. OR REDUCED TO A MINIMUM. 1. THE PERSON NTH OVERALL RESPONSIBILITY OR THE PERSON By- Date: _ _ RESPONSIBLE FOR THE INSTALLATION OF REGULATED MANUFACTURED 2-HR RATED, LION GENERAL 9. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: 2. EACH SPACE-CONDITIONING SYSTEM SHALL BE INSTALLED WITH DEVICES SHALL POST, OR MAKE AVAILABLE WITH THE BUILDING ARCHITECTURAL BACKGROUND VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT CONTROLS THAT COMPLY WITH ITEMS 1 AND 2 BELOW: PERMIT(S) ISSUED FOR THE BUILDING, THE INSTALLATION CERTIFICATE(S) FD FD FIRE DAMPER -4 = HORIZ ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF FOR MANUFACTURED DEVICES REGULATED BY THE APPLIANCE ( (THIN LINE) MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE 1 ARE CAPABLE OF AUTOMATICALLY SHUTTING OFF THE EFFICIENCY REGULATIONS. SUCH INSTALLATION CERTIFICATES T- DUCT, VERT DUCT), 0 ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. SYSTEM DURING PERIODS OF NON-USE AND SHALL HAVE: SHALL BE MADE AVAILABLE TO THE ENFORCEMENT AGENCY FOR ALL 2-HR RATED, LION NEW MECHANICAL WORK a) AN AUTOMATIC TIME SWITCH CONTROL DEVICE APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL: (HEAVY LINE) 10. DUCT SYSTEMS USED WITH BLOWER TYPE EQUIPMENT WHICH ARE - - W >_ PORTIONS OF A HEATING, COOLING, ABSORPTION, EVAPORATIVE COOLING COMPLYING WITH SECTION 119(c), WITH AN ACCESSIBLE a) IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH THE J90' ELBOW, R/D OR R/W=1.5 MATCHLINE OR PROPERTY LINE MANUAL OVERRIDE THAT ALLOWS OPERATION OF APPLIANCE EFFICIENCY REGULATIONS. M OR OUTDOOR AIR VENTILATION SYSTEM SHALL BE SIZED IN ACCORDANCE THE SYSTEM FOR UP TO 4 HOURS; SECTION IDENTIFICATION Q Q i N WITH THE 2019 OREGON MECHANICAL SPECIALTY CODE. OR b) INCLUDE A STATEMENT INDICATING THAT THE INSTALLED DEVICES SQUARE CORNER ELBOW WITH (DETAIL SIMILAR) W b AN OCCUPANCY SENSOR; OR CONFORM TO THE APPLIANCE EFFICIENCY REGULATIONS AND PART LU N TURNING VANES O VALIDITY QF PERMIT 11. HEATING AND COOLING EQUIPMENT AND SYSTEMS CAPACITY DO NO EXCEED C) A FOUR-HOUR TIMER THAT CAN BE MANUALLY OPERATED. 6 AND THE REQUIREMENTS FOR SUCH DEVICES GIVEN IN THE INDICATES DIRECTION OF CUTTING THE ISSUANCE OF A PERMIT THE LOADS CALCULATED IN ACCORDANCE WITH SECTION 503.2.1 OF THE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL PLANE OREGON ENERGY EFFICIENCY SPECIALTY CODE. THE REPORTED EFFICIENCIES EXCEPTION: MECHANICAL SYSTEMS SERVING RETAIL STORES /�A BASED ON CONSTRUCTION ENFORCEMENT AGENCY. 90' TAKE-OFF OR TEE DCCuMt=NTS AiVD OTHER OF THE EQUIPMENT HAVE BEEN TESTED AND RATED IN ACCORDANCE WITH AND ASSOCIATED MALLS, RESTAURANTS, GROCERY STORES, DATA SHALL No RF.=VENT THE APPLICABLE TEST PROCEDURE. THE EFFICIENCY HAS BEEN VERIFIED CHURCHES, AND THEATERS EQUIPPED WITH 7-DAY c) STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE LETTER INDICATES SECTION M Z Q O O THE CODE OFFICIAL FROM THROUGH CERTIFICATION UNDER AN APPROVED CERTIFICATION PROGRAM OR, PROGRAMMABLE TIMERS. CONSTRUCTION OR INSTALLATION WAS PERFORMED. (NO. INDICATES DETAIL) REOUIRIING THE CORRECTION IF NO CERTIFICATION PROGRAM EXISTS, THE EQUIPMENT EFFICIENCY RATINGS 2) AUTOMATICALLY RESTART AND TEMPORARILY OPERATE 2. THE APPLICANT SHALL FILE ALL CERTIFICATE(WIES OF ACCEPTANCE, 90' CONICAL TAKE-OFF A Uj r OF ERRORS. OSSC 105.4 ARE SUPPORTED BY DATA FURNISHED BY THE MANUFACTURER. THE SYSTEM AS REQUIRED TO MAINTAIN: NTH THE ENFORCEMENT AGENCY PRIOR TO RECU RECEIVING A FINAL M-3 M-3 SHEET NUMBER WHERE SECTION IS 12. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2019 OREGON MECHANICAL a) A SETBACK HEATING THERMOSTAT SETPOINT, IF THE SYSTEM OCCUPANCY PERMIT. THE SIGNER(S) SHALL BE ELIGIBLE UNDER DIVISION 3 45' LATERAL TAKE-OFF DRAWN H SPECIALTY CODE. PROVIDES MECHANICAL HEATING; AND OF THE BUSINESS AND PROFESSIONS CODE TO SIGN SUCH DOCUMENTS. SHEET NUMBER WHERE SECTION IS Q INSULATION/LINING NOTES EXCEPTION: AREA WITH THE DESIGN WINTER OUTDOOR TAKEN > z H . 3. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSONTRANSITION OR REDUCER (FOT=S) Q TEMPERATURE OF GREATER THAN 32'F. RESPONSIBLE FOR BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT -� FLAT ON TOP, FOB=FLAT ON Pill-lis b) A SETUP COOLING THERMOSTAT SETPOINT, IF THE PIPING O Z 0 1. ENERGY CODE: AS A MINIMUM, COMPLY WITH THICKNESSES AND OR CENTRALLY OPERATED BUILDINGS) AT OCCUPANCY THE FOLLOWING: BOTTOM) TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. SYSTEM PROVIDES MECHANICAL COOLING. EXCEPTION: AREA WITH THE DESIGN SUMMER OUTDOOR a) OPERATING INFORMATION: THE APPROPRIATE CERTIFICATES) OF WYE FITTING CD CONDENSATE DRAINAGE Uj NJ 44 N 2. ALL AIR DISTRIBUTION SYSTEMS DUCTS AND PLENUMS SHALL BE TEMPERATURE OF LESS THAN 100T. COMPLIANCE AND A LIST OF THE FEATURES, MATERIALS, INSTALLED, SEALED AND INSULATED TO MEET THE REQUIREMENTS OF COMPONENTS, AND MECHANICAL DEVICES INSTALLED IN THE G NATURAL GAS cc z SECTION 604 OF THE 2019 OREGON MECHANICAL SPECIALTY CODE. 3. THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN T. BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM 90' RECTANGULAR TAKE-OF; WITH SUPPLY-AIR AND RETURN-AIR DUCTS CONVEYING HEATED OR COOLED EFFICIENTLY. 45' TAPER 7 PIPE CAP CITY OF TIGARD Q � AIR SHALL BE INSULATED TO A MINIMUM LEVEL OF R-8, UNLESS DUCTS 4. THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT _ Approved P annin 90DIVERGING RECTANGULAR TEE, ARE IN A CONDITIONED SPACE. STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL. b) MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE ' PIPE PLUG ACTIONS SHALL BE CLEARLY STATED AND INCORPORATED ON A Date: 2. EXTENT OF INTERNAL DUCT LINING: READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO EITHER RADIUS OR TURNING VANES UNION VENTILATION IDENTIFYING THE OPERATION AND MAINTENANCE MANUAL. InIt18IS: A. GRILLE AND DIFFUSER BOXES AND BOOTS. �i FLANGE B. TRANSFER DUCTS. c) VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF PARALLEL FLOW BRANCH 1. CONTROLS SHALL BE PROVIDED TO ALLOW OUTSIDE AIR DAMPERS OUTDOOR AIR AND RECIRCULATED AIR THAT THE VENTILATION CONNECTION, EITHER RADIUS OR GATE VALVE OR BALL VALVE 3. EXTENT OF EXTERNAL DUCT INSULATION: OR DEVICES TO BE OPERATED AT THE VENTILATION RATES AS SYSTEMS ARE DESIGNED TO PROVIDE TO EACH AREA. A. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACES, SPECIFIED IN THESE PLANS. TURNING VANES BALL VALVE MECHANICAL ROOMS, ELECTRICAL ROOMS, AND EQUIPMENT 4. CERTIFICATE OF OCCUPANCY AND ALL REQUIRED ACCEPTANCE DOCUMENTS ARCHITECT/ENGINEER OF RECORD ROOMS NOT SPECIFIED TO BE INTERNALLY LINED. 2. OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED SHALL BE SUBMITTED TO THE FIELD INSPECTOR DURING CONSTRUCTION. FLEXIBLE DUCT PRESSURE REDUCING VALVE (PRV) B. SUPPLY AIR ABOVE CEILINGS OR EXPOSED NOT WITH DAMPERS THAT AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL THESE FORMS SPECIFIED TO BE INTERNALLY LINED. ARE REVIEWED AND APPROVED. C. OUTDOOR AIR INTAKE. 0ROUND DUCT INDICATOR S - BREAK IN PIPING OR DUCTWORK MAM SCHEDULES SEQUENCE OF OPERATIONS ABBREVIATIONS DESIGN OCCUPIED AND UNOCCUPIED OPERATION AFF ABOVE FINISHED FLOOR A r c h i t e c t u r a l DIFFUSER, GRILLE AND REGISTER SCHEDULE PACKAGED HEAT PUMP ROOFTOP UNIT SCHEDULE THE TEMPERATURE CONTROL SYSTEM SHALL BE SET FOR AHJ AUTHORITY HAVING Solutions Group - - - - - JURISDICTION COOLING CR. HEATING CAP. MINIMUM OUTSIDE OCCUPIED AND UNOCCUPIED HOURS. DURING THE OCCUPIED MANUFACTURER CFM TONS MOTOR (BTU/HR) ABTX/HEAT RATING EXT.SP AIR ELECTRICAL AH AIR HANDLING UNIT DWG.' HOURS, THE SPACE SHALL BE MAINTAINED AT 72°F (ADJ.) IN THE REF.TAG LOCATION TYPE MATERIAL FINISH SIZE &MODEL NO. GENERAL REMARKS TAG SERVICE TYPE I MAX @ ARI WEIGHT o BTUH BRITISH THERMAL UNIT 19120 SE 34TH STREET, SUITE 115 U WG MAKE/MODEL NOTES COOLING MODE AND 70-F (ADJ.) IN THE HEATING MODE. BHP TOTAL SENSIBLE TOTAL EFFICIENCY CONDITIONS CFM V. 0 Hz MCA MOCP LBS PER HOUR TITUS LAY-IN, AG-75, NARROW TEE BORDER TYPE TO @ 208V _ DURING UNOCCUPIED PERIODS, THE SPACE TEMPERATURE SHALL VANCOUVER WA 98683 OA CEILING SUPPLY ALUMINUM WHITE 24x24 1-5,8, 10 - - -" - - - - -- CFM CUBIC FEET PER MINUTE ' OMNI-AA-NT FIT 9/16"FINELINE BEVEL CEILING GRID 15.8 SEER MAINTAIN 75°F (ADJ.) IN THE COOLING MODE AND 65°F (ADJ.) IN RTU-1 LOBBY/OFFICES M2.1 CLNG/HTNG 1600 4.0 1.0 47,000 37,200 46,000 4.9 KW 8.1 HSPF 0.5 245 208 3 60 47.0 50.0 750 CARRIER 50HCQA05 lO 20 CU CONDENSING UNIT These tlror;fan Chase and shall no be copl fidenre rand eproduced! wtuypmpay EXHAUST/ LAY-IN, AG-75, NARROW TEE BORDER TYPE 12.8 EER THE HEATING MODE. of..t m.fion Chose and mmi not be cop"ed or seprotlu se on om pee BO CEILING ALUMINUM WHITE 24x24 TITUS 3FL-NT 1-3,8-11 --- - - COP COEFFICIENT OF outha conjunction The confrs swe dame n were prepomtl for use a speciAc RETURN TO FIT 9/16" FINELINE BEVEL CEILING GRID 15.8 SEER site o o t n ktmn Wim Its s a f the and are not f.rete for o e on o mrferem RTU-2 BACK AREA/ OFFICES M2.1 CLNG/HTNG 1600 4.0 1.0 47,000 37,200 46,000 4.9 KW 8.1 HSPF 0.5 245 208 3 60 47.0 50.0 750 CARRIER 50HCQA05 lO 20 PERFORMANCE ae a pi o lata tme. Use of these tla N g Fo ree e e a example o TITUS 12.8 EER © CEILING SUPPLY ALUMINUM WHITE 12x12 OMNI-AA AG-75 1-5. 10 - uu -- -. - --+-� --- - ---- RTU-1 pa RTU-2• another projetl requires the services of pmpeRy licensed prchitech and L - -- --- - ------- DIM DIMENSION engineers Reprotlud'xn of the confrad tlocumenh for reuse on protha REMARKS project is not puthor®d. EXHAUST/ 4 PROVIDE WITH LOW AND HIGH PRESSURE 9 PROVIDE THERMAL OVERLOAD PROTECTION. 14 NOT USED. 20 UNIT TO HAVE CONTROLS THAT, EXCEPT DURING DN DOWN OD CEILING ALUMINUM WHITE 12x12 TITUS 350FL AG-75 1-3,8-i 1 � � 0 UPON RECEIVING A SIGNAL FROM THE TEMPERATURE CONTROL RETURN EA EXHAUST AIR 1 JPMC HAS A CARRIER CORPORATION SWITCHES. DEFROST, PREVENT SUPPLEMENTARY HEAT SYSTEM FOR OCCUPIED HOURS, THE RTU FAN SHALL ENERGIZE 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 10 PROVIDE CONDENSER COIL HAIL GUARD OPERATING WHEN THE HEAT PUMP CAN MEET EER ENERGY EFFICIENCY RATIO SEAL O NATIONAL ACCOUNT. REFER TO VENDOR 15 PROVIDE UNITS WITH MINIMUM MERV 8 FILTER. AND REMAIN ON DURING OCCUPIED HOURS. THE TEMPERATURE E CEILING SUPPLY ALUMINUM WHITE 18x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8, 11-13 OS PROVIDE THRU-THE-BASE SINGLE POINT GRILLEWER CONNECTIONS WITH . CONTACTS SCHEDULE,SHEET A3.3.3 FOR THE HEATING LOAD. EF EXHAUST FAN OF CEILING RETURN ALUMINUM WHITE 18x4 TITUS FL-TZ-DF 1 SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1-3,8-11, 13 SPECIFICATION, QUOTATION AND FAOCTORY MOU NED STARTER. 1 I PROVIDE UNITS WITH CONDENSER COIL 16 PROVIDE WITH FACTORY SUPPLIED POWERED CONTROL SYSTEM SHALL MAINTAIN THE COOLING AND HEATING EFF EFFICIENCY BRED PROFESS BORDER FOR NARROW TEE CEILINGDELIVERY. O O SETPOINTS. NE DISCONNECT TO BE PROVIDED BY PROTECTIVE COATING IF WITHIN 15 MILES OF SERVICE OUTLET. ESP EXTERNAL STATIC PRESSURE I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE F,p oy © CEILING SUPPLY ALUMINUM WHITE 24x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, B, 11-13 O PROVIDE CURB ADAPTER TO FIT EXISTING DIVISION 26. SALT WATER AND EVAPORATOR COIL EXH EXHAUST 15,423 ROOF CURB. PROTECTIVE COATING IF WITHIN 5 MILES OF 17 NOT USED. F FAHRENHEIT I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE O6 PROVIDE WITH CONSTANT VOLUME SALT WATER. FC FAN COIL UNIT O CEILING RETURN ALUMINUM WHITE 24x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8-11. 13 OUTSIDE AIR INTAKE. 3O DAINTREE TO PROVIDE BUILDING ENERGY 18 CHASE TO CONFIRM IF BURGLAR BARS ARE FLR FLOOR N O 410 CEILING SUPPLY ALUMINUM WHITE 30x4 TITUS FL-TZ-DF BORDER SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1 3 8 11-13 MANAGEMENT SYSTEM (BMS). EQUIPMENT 12 PROVIDE EYEAR COMPRESSOR AND HEAT REQUIRED. FPM FEET PER MINUTE SINGLEORNARROWTEECEI , DR O7 PROVIDE FILTERS ROVE AGENAT CY. BEAR THE LABEL EXCHANGER WARRANTY. FIELD VERIFY ALL CONDITIONS qR �c� SHALL BE PROVIDED WITH FPS FEET PER SECOND � 49 I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE ELECTROMECHANICAL CONTROLS ONLY; OF AN APPROVED AGENCY. O CEILING RETURN ALUMINUM WHITE 30x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8-1 1, 13 13 UNIT SHALL BE U.L TESTED AND CERTIFIED IN 19 PROVIDE EQUIPMENT MANUFACTURER'S FSD FIRE/SMOKE DAMPER K R ROB 4/13/20 DAINTREE TO PROVIDE WI-FI ® PROVIDE CONDENSATE PIPE DRAIN PER ACCORDANCE WITH ANSI 221.47. START-UP SERVICE. G GAS © 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE COMMUNICATING THERMOSTATS. MANUFACTURER'S RECOMMENDATIONS. DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL GRD GRILLES, REGISTERS,CEILING SUPPLY ALUMINUM WHITE 36x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8, 11-13 VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO RIROBISON INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL AND DIFFUSERS I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE HP HORSEPOWER, HEAT PUMP O CEILING RETURN ALUMINUM WHITE 36x4 TITUS FL-TZ-DF 1-3,8-11, 13 BORDER FOR NARROW TEE CEILING INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD HVAC HEATING, VENTILATING, AND ENGINEERING, INC I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE MODIFICATIONS DUE TO EXISTING CONDITIONS. O CEILING SUPPLY ALUMINUM WHITE 48x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8, 11-13 EXHAUST FAN SCHEDULE SPLIT SYSTEM COOLING ONLY UNIT SCHEDULE AIR CONDITIONING 1940140TH AVE W SUITE 302,LYNNWOOD,WA 98036 THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR IN INCH TEL:206-364,3343 FAx:4258350098 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE CONTACT':GRANT HANSEN © CEILING RETURN ALUMINUM WHITE 48x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8 11, 13 TAG SERVICE LOCATION CFM SP DRIVE MAX MOTOR ELECTRICAL WEIGHT MODEL NO. REMARKS CFM ELECTRICAL EFFICIENCY WEIGHT OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND KW KILOWATT I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE WG RPM HP V O HZ (LBS) TAG SERVICE LOCATION LOW/MED/HIGH VOLT O Hz SEER EER MANUFACTURER&MODEL (LBS) REMARKS CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL MBH THOUSAND BTU PER HOUR ISSUE DATE DESCRIPTION OO CEILING SUPPLY ALUMINUM WHITE 60x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8, 11-13 FC-1 ATM ROOM WALL 188/238/305 208 1 60 19.0 11.2 CARRIER 40MHHCl2-3 20 1,23,4,5 COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY MCA MINIMUM CIRCUIT AMPACITY RESTROOM/ GREENHECK THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE MOCP MAXIMUM OVER CURRENT 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE EF-1 JANITOR/ ROOF 550 0.25 DIRECT 1550 1/15 115 1 60 50 G-090-D 1,2,3,4 FC-2 DATA ROOM WALL 188/238/305 208 1 60 19.0 11.2 CARRIER 40MHHC12-3 20 1,23,4,5 FINAL AND SHALL BE IMPLEMENTED AT CONTRACTOR'S COST. PROTECTION ® CEILING RETURN ALUMINUM WHITE 60x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8 11, 13 BREAK ROOM MTD MOUNTED V SINGLE SLOT LINEAR DIFFUSER, DROP FACE COOLING ELECTRICAL BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF OS CEILING SUPPLY ALUMINUM WHITE 72x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8, OSA OUTDOOR AIR 11-13 REMARKS NOMLOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1. PROVIDE WITH THE FOLLOWING: 2. INTERLOCK FAN OPERATION WITH OCCUPANCY SENSORS IN ROOMS SERVED. TAG SERVICE LOCATION TONS TOTAL SENS. V. 0 Hz MCA MOCP MANUFACTURER&MODEL (LBS) REMARKS BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT OBD OPPOSED BLADE DAMPER O CEILING RETURN ALUMINUM WHITE 72x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8-11, 13 A. CLASS I MOTORIZED DAMPER MBH MBH ACCORDANCE WITH GOVERNING CODES. THE PLANS AND POC POINT OF CONNECTION EXHAUST/ B. DISCONNECT SWITCH 3. PROVIDE VARIABLE SPEED CONTROLLER DIRECT DRIVE FAN. T&B CU-1 ATM ROOM ROOF 1.0 11.5 9.1 208 1 60 11.0 15.0 CARRIER 38MHRBC12AA3 55 1,2 SPECIFICATIONS NOT WITHSTANDING,THE CONTRACTOR SHALL PRV PRESSURE REDUCING VALVE O WALL RETURN ALUMINUM WHITE 30x4 TITUS FL-10 1"SINGLE SLOT LINEAR DIFFUSER 1-3, 9, 11, 13 C. SUPPORT BRACKETS AND ISOLATOR CONTRACTOR SHALL MARK BALANCED POSITION ON CONTROLLER. CU-2 DATA ROOM ROOF 1.0 1 11.5 1 9.1 1208 1 1 160 111.0 115.0 1 CARRIER 38MHRBCI2AA3 55 1,2 ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT RA RETURN AIR RD ROOF DRAIN 6„O D. FLEXIBLE CONNECTION 4. PROVIDE 4-WAY CONTROL CIRCUIT BY ONE OCCUPANCY SENSOR IN REMARKS DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN REF REFERENCE O CEILING SUPPLY ALUMINUM WHITE OPENING PRICE ANF AIR NOZZLE WITHOUT CORE 1,3,8 E. EXHAUST GRILLE MATCHING TYPICAL EACH RESTROOM, ONE OCCUPANCY SENSOR IN THE JANITOR CLOSET, 1. PROVIDE THERMAL OVERLOAD PROTECTION. INTENT. RG RETURN GRILLE 2"SINGLE SLOT LINEAR DIFFUSER, BORDER 16 OR R.A. GRILLE SPECIFICATION AND ONE TIMER SWITCH IN THE LOUNGE. 2. PROVIDE LIQUID LINE SPECIALTIES INCLUDING FILTER DRIER, SIGHT GLASS,TXV,SOLENOID VALVE,24V 1 ph RPM REVOLUTIONS PER MINUTE O CEILING SUPPLY ALUMINUM WHITE 48x6 TITUS FL-20 EQUAL TO FIT NARROW TEE CEILING 1-3,8, 11-13, 15 4-13-20 PERMIT SUBMISSION CONTROL WIRE BY CONTROLS CONTRACTOR. SA SUPPLY AIR O 2"SINGLE SLOT LINEAR DIFFUSER, BORDER 16 OR 3. DAINTREE TO PROVIDE BUILDING ENERGY MANAGEMENT SYSTEM (BMS). EQUIPMENT SHALL BE PROVIDED WITH SMACNA SHEET METAL AND AIR 4-3-20 90%SET CEILING RETURN ALUMINUM WHITE 48x6 TITUS FL-20 EQUAL TO FIT NARROW TEE CEILING 1-3,8, 11-13, 15 ELECTROMECHANICAL CONTROLS ONLY; DAINTREE TO PROVIDE WI-FI COMMUNICATING THERMOSTATS. CONDITIONING CONTRACTORS CHASE BANK GENERAL NOTE 3-20-20 PLANNING O CEILING SUPPLY ALUMINUM WHITE 48x4 TITUS FL-10 I"SINGLE SLOT LINEAR DIFFUSER, BORDER 66 1-3,8, 11-14 4. PROVIDE WITH DIVERSITECH MODEL CP-22 EXTERNAL CONDENSATE PUMP LOCATED ON WALL NEXT TO FAN COIL. NATIONAL ASSOCIATION WITH HARD CEILING CLIP TO SURFACE MOUNT5. FAN COIL UNIT POWERED BY CONDENSING UNIT. SP STATIC PRESSURE PROJECT INFORMATION BLOCK I"SINGLE SLOT LINEAR DIFFUSER, BORDER 66 TYP TYPICAL JOB# JPM19010.0 ZO CEILING RETURN ALUMINUM WHITE 48x4 TITUS FL-10 WITH HARD CEILING CLIP TO SURFACE MOUNT 1-3, 8, 11-14 CONTRACTOR SHALL COORDINATE FINAL LOCATION OF V VENT DATE: 1/20/2020 REMARKS THERMOSTATS,SWITCHES, FLOOR AND WALL RECEPTACLES, CARD WB WET BULB (TEMPERATURE) DRAWN BY: GH I. COORDINATE WITH LIGHT FIXTURES AND OTHER CEILING DEVICES FOR EXACT LOCATIONS OF ALL AIR FIXTURES. READER, DOOR ACTUATOR,]-BOXES, ETC. WITH ARCHITECTURAL 2. COORDINATE FRAME STYLES WITH CEILING OR WALL SYSTEM FRAMING AND FINISH MATERIALS. PROVIDE GYPSUM BOARD/PLASTER FRAME TO SUPPORT AND/OR STRUCTURAL DRAWINGS PRIOR TO INSTALLATION. CHECKED BY: PR FIXTURE WITHIN GYPSUM CEILING. CONTRACTOR SHALL CONTACT THE ARCHITECT IN CASE OF ANY 3. N.C.VALUES FOR DIFFUSERS,GRILLES AND REGISTERS SHALL NOT EXCEED 25, WITH A ROOM ABSORPTION RATE OF IOdb. DISCREPANCIES AND AWAIT FOR A WRITTEN RESPONSE PRIOR TO DRAWING INDEX MODEL 4. PROVIDE BACK SIDE OF SUPPLY AIR FIXTURES WITH FACTORY-INSTALLED R-6 INSULATION BLANKET. PROCEEDING WITH THE WORK. 5. PROVIDED DIRECTIONAL BLOW CLIPS (1-3) AS READ. FOR DIRECTIONAL AIRFLOW CONTROL. MO.O LEGEND, NOTES, SCHEDULES, DRAWING STANDARDS v20.1 6. NOT USED. DRAWING INDEX 7. WHERE PLENUM RETURNS ARE UTILIZED, CONCEAL VISIBILITY TO PLENUM SPACE BY PROVIDE DUCT BOOT SECURED TO CEILING FRAMING OR OPTIONAL & SHEET TITLE OPPOSABLE BLADE DAMPERS FOR 2X2 RA GRILLES,AND 'TBR' RETURN HOODS AT LINEAR SLOT RA FIXTURES. WHERE RETURN AIR FLOW CONTROL IS REQUIRED, M0.1 MECHANICAL DETAILS PROVIDE OPTIONAL OPPOSABLE BLADE DAMPERS IN THE 2X2 GRILLES,AND 'FBBO' BLANK-OFFS IN THE LINEAR SLOT AIR FLOW IS NOT TO BE ADJUSTED BY RE-SIZING OF THE FIXTURE GRILLE AREA. M2.0 MECHANICAL CONTROL PLAN LEGEND, NOTES, 8. "OR EQUAL"SUBSTITUTIONS PERMITTED. SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT OF RECORD BY THE PROCESS DEFINED IN THE PROJECT MANUAL. 9. EXHAUST GRILLES ARE TO BE DUCTED TO THE ROOF CENTRIFUGAL EXHAUST FAN SYSTEM, WHICH IS CONTROLLED BY 4-WAY SWITCH WIRING AT THE VARIOUS SCHEDULES, & DRAW LOCATIONS. MECHANICAL INSTALLER SHALL COORDINATE WITH THE ELECTRICIAN FOR EQUIPMENT AND CONTROL DEVICE PROVISION AND M2.1 MECHANICAL FLOOR PLAN INSTALLATION. M2.2 MECHANICAL ROOF PLAN DRAWING INDEX 10. ALL SA, RA, AND EXHAUST FIXTURES IN 2X2 CEILING GRIDS SHALL BE 24"X 24" FULL FIXTURES. THE USE OF REDUCED VENT AREAS WITHIN LARGER PLATES TO RESTRICT AIR FLOW IS NOT PERMITTED. AIR FLOW CONTROL IS TO BE PROVIDED BY ADJUSTABLE DAMPERS WITHIN THE DUCTS OR BOOTS SERVING THE FIXTURES. 11. SPECIFY EDGE DETAIL/ BORDER TYPE FOR COMPATIBILITY WITH GYPSUM BOARD CEILINGS WHERE REQUIRED. M3.0 ENERGY CODE COMPLIANCE SHEET NUMBER 12. LINEAR SLOT FIXTURES SET IN GRID CEILINGS ARE INTENDED TO HAVE A CONTINUOUS,SEAMLESS APPEARANCE FOR THE FULL RUN OF THE NARROW CEILING GRID SPACING, WITHOUT VISUAL DIFFERENTIATION BETWEEN SA, RA, AND UNUSED PORTIONS OF THE RUN. PROVIDE OPTIONAL'FBR'RETURN HOODS AND 'FBBO' BLANK-OFFS AS REQUIRED. 13. PROVIDE FABRICATED SHEETMETAL PLENUM THE FULL LENGTH OF SLOT LINEAR DIFFUSER. A A 0 •0 14. PROVIDE TITUS (OR EQUAL) FBMC-10 MITERED CORNERS. M 15. FLOWBAR DIFFUSER TYPE TO BE SPECIFIED IN PRIVATE OFFICES ONLY.SPECIFY SLOT DIFFUSER WIDTH AS REQUIRED TO MEET AIR DISTRIBUTION REQUIREMENTS IN THE HIGHEST-DEMAND OFFICE, AND APPLY THAT DIFFUSER THROUGHOUT ALL OFFICES. OOPYMMT tom, ROBISON DO FEW.W_ GHMSEN R\_P DR0+MOWA0 EN\_CHASE BANKS\424-1380 MASE 11GA90 3 CREENNAY- MGM, OR\DMtG\$D--O- NOTES&SD OFAFSDNB 04-13-202D 13:12 OUTDOOR JACKETING 18 GA GALV STEELHOOD WITH WATER- _ TO ELBOW TIGHT JOINTS. USE SS FASTENERS 450 / FILL VOID WITH 1/2" (15 MM) INSULATION INSULATION URETHANE FOAM ROUND ROD PIN STIFFEN BLADE AS INSULATION (TYP) REQUIRED SUPPORT LIP INSULATION DUCT ROOF CURB DAMPER BLADE ASSEMBLY / SECURE TO CURB, STAND-OFF OUTSIDE END 6" }2" SS LAG BOLTS, HANDLE WITH BEARING I HANDLE WITH LOCKING MIN 2 PER SIDE, LOCKING 0 QUADRANT tn SILICONE SEALANT QUADRANT IN HOLE PRIOR TO DAMPER BLADE INSERTING BOLT (TYP) DUCT INSIDE END U till 11111)U 11 lit]11 1 BEARING 1/8"(6 MM)CLEARANCE ALL JUVU11111111 < SECTION AROUND SIDE ELEVATION ROOFING INSULATION ROOF DECK NOTES: OLL PIPING o 1. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS& w Of FLASHING COLLAR AND ROUND DAMPERS. a SEALANT, FASTEN TO OPENING IN DECK w DECK TO MATCH CURB ID a PIPING PENETRATION DETAIL ISCANTSLE SCALE 13 MANUAL BALANCE DAMPER NTS 12 qrm 0011111% Cp W ccH NOTES: L L W > 1. SET ROOF CURB ON STRUCTURAL STEEL-SHIM DEAD LEVEL. SECURE O awj oC N ROOF CURB TO METAL DECK AND A/C UNIT TO ROOF CURB. O � N 2. TRANSITION TO CONNECTION SIZES IN DUCT RISE, REFER TO PLANS FOR SIZES. N y 3. 1"ACOUSTIC LINED IN SUPPLY AND RETURN DUCTS FROM FAN J DISCHARGE TO POINT INDICATED ON MECHANICAL DRAWINGS(10'-0" O MIN.). DUCT SIZES INDICATED ON PLAN ARE EXTERIOR AND INCLUDE Q O LINING. i 5 6 4. REFER TO STRUCTURAL DRAWINGS FOR JOIST LOCATIONS,SIZES, W 1w AND DIRECTION. L N 4 6 LU 2 q 5. INSULATED ROOF CURB. 6. FLEXIBLE CONNECTION -TYPICAL. > Z Q h W a (A z a - SCALE SCALE SCALE Q NOT USED NTS 11 PACKAGED ROOFTOP UNIT NTS 10 NOT USED NTS ARCHITECT/ENGINEER OF RECORD PMI "DURA-BLOK"SUPPORT DESIGN SYSTEM ROOF MOUNTED Architectural PIPING Solutions Group NOTES. 4"MIN.A.F.R. 19120 SE 34TH STREET, SUITE 115 VANCOUVER, WA 98683 1. SIZE HANGER AND CLAMP TO B-LINE FIG. B3060 These dra n P 131 ADEQUATELY SUPPORT LOAD (REFER TO WOODEN BLOCKS SHALL ngs and speciticatxxs are the contidentnl and proprietary Property B-LINE HANGER CATALOG). NOT BE USED AS PIPING of a M«ga Chase a d snon not be copied«mproda ad without w inen authori conjunction the with its l documents were prep«etl for use on a iffen c site in conjuncfxn with its issue tlate a�«e not suitable fa use on a dinerenl 2. FOR NFPA ROD SIZES USE B3170NF OR SUPPORTS ON THE ROOF site«r a into nme. use ai mase tlof W p en man nae«exampleon another project rfirre. the ifiese ra «opertr licensed! «c min and engihe Reproduction of the conhact documents for reuse on another B-LINE FIG. B3170 SUBSTITUTEB3174. project is not outher¢ed. f P. 46 3. FOR COPPER TUBING USE COPPER i INSULATION PLATED OR PAINTED B317OCT,FELT LINED JACKET WHERE B3170F, OR PLASTIC COATED HANGERS. RUBBER BASE SEAL REQUIRED REO 1 NOFFSs Ne F �02 NOTES 15,423 y 1. SUPPORTS SHALL BE INSTALLED A MAXIMUM 8'-O"O.C. oafr AND AT EACH CHANGE OF DIRECTION OF PIPING. 10 N �qRK D. ROBS 4/13/20 PIPE HANGING INSTALLATION SCALE 8 ROOF PIPE SUPPORT SCALE 7 NOT USED SCALE 6 NOT USED SCALE ROBISON NTS NTS NTS NTS ENGINEERING, INC 19401 40TH AvE W SUITE 302,LYNNWOOD,WA 98036 TEL:206-364,3343 FAx:4258350096 CONTACT:GRANT HANSEN ISSUE DATE DESCRIPTION FILTER/DRYER SIGHT GLASS AT TX VALVE SYSTEMS ONLY ROUND SHEET METAL SUPPLY DUCT DUCT, LENGTH AS (RECTANGULAR WASHER &NUT PROVIDE INVERTED TRAP REQUIRED. OR ROUND) -4 SLOPE LIQUID &SUCTION SHEET CLAMP LINES DOWN TOWARDS v EXTERIOR UNIT EXTERIOR UNIT METAL ELL PRE-FAB. ROOF PORTAL-REFER TO 4-13-20 PERMIT SUBMISSION \ SUPPLEMENTAL STEEL OR ARCHITECTURAL DRAWINGS 4-3-20 90%SET BUILDING STRUCTURE LIQUID LIN 3-20-20 PLANNING THERMAL EXPANSION PROJECT INFORMATION BLOCK DEVICE SUCTION LINE, INSULATE WITH 3/4" JOB# JPM19010.0 VD ARMAFLEX OR APPROVED EQUAL DATE: 1/20/2020 FLEX DUCT SHALL HANGER HANGER DISTRIBUTOR SEISMIC STRAPS RODS DRAWN BY: GH BRACING NOT EXCEED 5-0" C-CLAMP 41"MAX. IN LENGTHCHECKED BY: PR . (TYPICAL) (TYPICAL) SUCTION TRAP MODEL VOLUME CONTROL DAMPER (TYPICAL IN ALL NOTES DRAWING STANDARDS v20.1 TAKE-OFFS TO DIFFUSERS). UNITS EQUIPPED WITH UNLOADING SEISMIC TYPE COMPRESSORS USE A DOUBLE-SUCTION SHEET TITLE RISER SIZED IN ACC CEILING CEILING STRAP HANGER BRACING TRAPEZE HANGER MANUFACTURES INSTRUCTIONS. ITH (TYPICAL) MECHANICAL DIFFUSER-SEE SPECIFICATIONS 2. PROVIDE OPERATION AND MAINTENANCE DETAILS FOR TYPE AND ACCESSORIES. CLEARANCES AROUND ALL EQUIPMENT AS NOTES SPECIFIED BY THE MANUFACTURER. INTERIOR UNIT 1. NO POP RIVETS ALLOWED, USE SELF-TAPPING SWEET METAL SCREWS ONLY. 3. OUTDOOR UNIT SHALL BE EQUIPPED WITH ISOLATION VALVES. SHEET NUMBER SUPPLY AIR TERMINAL SCALE SCALE TYPICAL DUCT HANGING SCALE 3 NOT USED SCALE 2 REFRIGERANT PIPING SCALE 1 NTS NTS NTS NTS n O • COPYRWT 2M, ROBWN ENGINEERING, INC. ' v ' GNANSEN F:\_P0ROHI0MAD04\_C IASE SAWS\424-1380 Mk% MAM t(2A OMAY— Wiffl, OR\ON'G\YD-1 — DETABSDMG 04-13-2020 13:13 DAINTREE MECHANICAL CONTROL: _ DESIGN-INTENT EXHAUST FAN CONTROL DIAGRAM TYPICAL MECHANICAL EQUIPMENT ZONE FIGURE 1 : WGA 100 (CAN BE USED WITHOUT SENSOR FOR SWITCHING UNE LOAD) 1. ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED/UNSWITCHED POWER.WSA10 WIRELESS SENSOR ADAPTERS REQUIRE 24V POWER. EXHAUST SAM SYMBOLS A\ REFER TO MFRS.FIGURE 1 WhRe Nwtrd Binary Input, (DIP Switch 4 or DIP Switch 5 On) 2. DURING INSTALLATION THE LAST 4 DIGITS OF THE IEEE ADDRESS FOR EACH WIRELESS COMPONENT .,. lrnrxwaafcvrrwaaaeaoarwcv+�roa�wna M ®"A"N=F A RTU OR WIRLEW PROBE DUCTiEW SENSOR eat Na 120-2rry MUST BE RECORDED ON THE SHOP DRAWING SET CORRESPONDING TO THE LOCATION OF THE � swtrpelelauarumgawnaTmawmKunaur►uzaRs" V0WMT"M""j oCl�� ltw• COMPONENT. otw cxa�roca�Ar�euonumn�lsa�sowaw�a O°"'+aOW°K °""N°1°�"FT°'�ee1 CONDENSNG UNR REMOTE TEMPERATURE +' gA 3. FOR ANY SENSORS ATTACHED TO A WIRELESS SENSOR ADAPTER (WSA10) THE LAST 4 DIGITS OF THE - - - - - - - - �— - - - - - — — — — — — — —LOUNGEi SENSORS AS INDICATED ON PLAN Vol .^w � IEEE ADDRESS FOR THE RESPECTIVE WSA10 MUST BE RECORDED.THE SPECIFIC WSAlO PORT MUST A4TORS ALL .�, ALL . SELF-POWERED FOR / wtrrty �� i3: WGA100 OIlk" ALSO BE RECORDED PER SENSOR. a08Er �S7i100M RESTROOM �� EQUIPMENT FAN POWER I t (( 1 / / 1" ��ched 4. DURING WIRELESS ADAPTER INSTALLATION FOLLOW THESE STEPS AS DEFINED IN THE DEVICE ❑UN ❑ ❑ ❑ rz] WIREDTOWGA10O \ DUCT T J 1 T I T I 1 I T I lone INSTALLATION GUIDE IN THE FOLLOWING ORDER. / \ TTT \ TTT 1zo 2rn�c A. CONFIRM WIRELESS ADAPTER DIP SWITCHES ARE SET CORRECTLY. 4 B. RESET ADAPTER ALL ADAPTERS) Swr>: RW 24 VDC Power Output E4UIPMENT DAINTREE T}ERMOSTAT WIRED TO RTU �a 2C, C. PERFORM PROPER TEST SUITE. A00.wR. A1II.rCr. Am.wM. A001.lOfr. DISTTO EON PANEL J DAINTREE R EE THEMBLOCK VIASTANDARDS �� 5. INSTALLER MUST BECOME FAMILIAR WITH THE PUBLISHED INSTALLATION GUIDES FOR THE PRODUCTS IN Ln - - - - - - - - — - - - — - — _ �_ each 010bW °M" DP THE PROJECT SCOPE. DAINTREE INSTALLATION GUIDES CAN BE FOUND AT: VIIGA100 CONDUCTORWIRINIG otwk m high, Mottled With I HTTPS://PRODUCTS.CURRENTBYGE.COM/CONTROL-SYSTEMS/WIRELESS-LIGHTING-CONTROLS 4aWwa1culrwrWlo b. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROCUREMENT AND INSTALL OF DAINTREE AND RELATED COMPONENTS PERTAINING TO IT/DATA, LIGHTING,POWER AND HVAC. DAINTREE GENERAL NOTES: 1. MOUNT ALL THERMOSTATS AND SENSORS ON WALL 44"ABOVE FINISHED FLOOR. LL 0 0 2. HVAC, LIGHTING AND POWER SHALL BE CONTROLLED AND MONITORED BY A WIRELESS NETWORKED LU ENERGY MANAGEMENT SYSTEM UTILIZING DAINTREE CONTROLSCOPE SOFTWARE AND OPEN, Of STANDARDS BASED CONTROLSCOPE CONNECTED HARDWARE. w 3. THE DAINTREE SYSTEM WILL INCLUDE A COMMUNICATIONS INTERFACE IN ORDER TO NETWORK a FACILITY TO COMPANY WIDE SYSTEM NETWORK. 4. THE FOLLOWING SYSTEM WILL BE PROVIDED BY DAINTREE NETWORKS: A. SYSTEM INFRASTRUCTURE L WIRELESS AREA CONTROLLER (WAC). THE WAC IS THE WIRELESS SYSTEM GATEWAY PROVIDED BY DAINTREE NETWORKS. IF MULTIPLE WACS ARE NECESSARY THEY CAN BE DAISY CHAINED VIA ETHERNET CABLE. WACS MUST BE POWERED WITH 120V RECEPTACLE. ii. A CELLULAR MODEM WILL PROVIDE ACCESS TO THE CONTROLSCOPE NETWORK.WAC(S) ARE CONNECTED TO THE CELLULAR MODEM. iii. AN UNINTERRUPTED POWER SUPPLY (UPS) WILL BE INSTALLED TO PROVIDE AN UNINTERRUPTED RECEPTACLE FOR WAC(S) AND CELLULAR MODEM. Uj B. HVAC CONTROL Q Ai. WIRELESS THERMOSTATS (WTS10) WILL PROVIDE NETWORKED CONTROL OF ROOF TOP UNITS VIA STANDARD 8 WIRE INTERFACE. THE THERMOSTATS WIRELESSLY COMMUNICATE WITH THE SYSTEM BUT MUST BE WIRED TO RTU. ii. WIRELESS SENSOR ADAPTERS (WSA10) CAN ACCOMODATE 4 THERMISTOR TYPE TEMPERATURE SENSORS AND 2 LOW VOLTAGE (0-1 OV) SENSORS AND SHALL PROVIDE CONTROL OF: 1. 0-1 OV CT(S) no 2. PROBE DUCT TEMPERATURE SENSORS O N 3. EXTERIOR TEMPERATURE SENSOR W iii. WIRELESS ROOM TEMPERATURE SENSORS PROVIDE MONITORING PER REQUIRED SPACE OIL N INCLUDING ATM ROOM TEMPERATURE MONITORING. iv. WGA100 (WIRELESS GENERAL PURPOSE ADAPTERS) PROVIDE ON/OFF CONTROL OF J N BASEBOARD HEATERS AND DUCT HEATERS. v. WGA100 ADAPTER ALSO PROVIDES CONNECTION FOR LEAK SENSOR. J a C. INDOOR LIGHTING M Z Q o O I. CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA100-PM WIRELESS ADAPTERS. i ii. WIRELESS OCCUPANCY SENSORS SHALL BE INSTALLED TO PROVIDE COVERAGE IN DESIRED AREAS. IU iii. WIRELESS SWITCHES (WWDI) SHALL PROVIDE OVERRIDE CONTROL OF INTERIOR AND U EXTERIOR LOADS. N D. EXTERIOR LIGHTING I. CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA100-PM WIRELESS ADAPTERS IF LOADS Uj ARE SINGLE POLE. IF EXTERIOR LIGHTING IS MULTI POLE AN AUXILIARY RELAY CAN BE USED. INTERIOR AND EXTERIOR LOADS MUST BE CONTROLLED BY SEPARATE ADAPTERS IN ORDER TO Z Q ALLOW FOR SEPARATE CONTROL. WWAM ROOM ii. LOW VOLTAGE OPEN LOOP PHOTOCELL SHALL BE INSTALLED TO CONTROL EXTERIOR AR TEMP SENSOR LIGHTING. Z E. POWER MONITORING r i. CTS WILL BE INSTALLED ON EACH PHASE OF MAIN POWER AND UTILITY GRADE MODBUS N �9 CONNECTED POWER MONITOR SHALL BE INSTALLED. ii. Z SELF POWERED CTS WILL BE INSTALLED TO MONITOR RTU FAN POWER CONSUMPTION AND DETECT FAULT. EACH SHALL BE WIRED TO WSA10. F. IRRIGATION CONTROL INTEGRATION (WHEN REQUIRED) Z i. THE IRRIGATION SYSTEM WILL BE CONNECTED TO CONTROLSCOPE VIA CELLULAR MODEM. �� _ __ _ 5. ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED(UNSWITCHED POWER). DIA. I' V 6. THE DAINTREE SYSTEM DOES NOT SUPPORT CONTROL OF VAV/DAMPER BASED SYSTEMS.THE CARRIER 1)) R� 1 VAV SYSTEM SHALL BE STAND ALONE. CONTROL COMPONENTS MUST BE COMPATIBLE WITH CARRIER I (RTU-ROOM `I M1(�t ]l` AND ARE NOT IN DAINTEE SCOPE. SBFF'OWE!®CTFOit PC-1 nCj 7. NOT USED. I FAN POWER.WIRE TO WRR38S ROOM WGAO-lOV ROUT AR1E SENSOR 8. FOR CARRIER VRF MODELS, PROVIDE 24V THERMOSTAT INTERFACE ACCESSORY TO BE DETERMINED ARCHITECT/ENGINEER OF RECORD BY CARRIER. VERIFY WITH MECHANICAL EQUIPMENT SCHEDULE,SPECIFICATIONS,AND MECHANICAL WRB.BS PROBED= ENGINEER. SUPPLY TEMPERATURE O SB'aOR 9. INSTALL WA100-PM FOR EF-1 CONTROL. CONFIGURE AS ON/OFF DEVICE TO ALLOW FOR MANUAL SWITCHING. WGA100 ADAPTER DOES NOT SUPPORT MANUAL SWITCHING.SEE MECHANICAL RCP I FOR EF-1 SPECIFICS. 10. THE DAINTREE SYSTEM HUMIDITY AND TEMP SENSORS DOES NOT SUPPORT CONTROL OF VAV/DAMPER BASED SYSTEMS. THEY ARE ONLY FOR MONITORING. DESIGN ESI ^ N OArchitectural 454XP190 SITE SPECIFIC CONTROL NOTES: Solutions Group T 1)) 1. THE SUPPLY OF HEATING AND COOLING ENERGY TO EACH ZONE IS CONTROLLED BY INDIVIDUAL THERMOSTATIC CONTROLS THAT RESPOND TO TEMPERATURE WITH THE ZONE. 19120 SE 34TH STREET, SUITE 115 7F SWRµGt WRBBSOURDE 2, THERMOSTATIC CONTROLS TO PROVIDE A TEMPERATURE RANGE OR DEADBAND OF AT LEAST 5OF VANCOUVER, WA 98683 AR TEMPS OR WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS CAPABLE OF BEING Them drowTgand speclGcafibra are the confidential and ampdetW property �19 SHUT OFF OR REDUCED TO A MINIMUM. or JP Anagan Cha.old shall not be copied or reproduced without written oufhonontion. The contract documents were prepared far use on this speciic 3. EACH HVAC SYSTEM HAS CONTROLS THAT VARY THE START-UP TIME OF THE SYSTEM TO JUST MEET THE site o cat a aten wtn its issue dote one oro not suitable roc use on o different on site a of a lata time. Use of these tlrpwirgy to reference w example on RTU 2 TEMPERATURE SET POINT AT TIME OF OCCUPANCY. angir waled equine: of Ices or documents rxeasad architect and 0 engineers. Ret mc,uron the fine contract documents tar reuse on another 3M 4. EACH ZONE IS PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY THE project is not outnorued. WA OCCUPANCY I® WIRELESS RSA DAINTREE SYSTEM. O %�J\J WRBBS—0.1 SENSOR M2 AN TEMP SENSOR ARTEMPSB�OR 0 SEAL E PROFF Lq L2 A 1>) DAINTREE DEVICES KEY: �R I NF�1P 0 I O � 15,423 r I M2 I SBF POWERED Cr FOR I FAN POWER.WRETO L_IoHROOrf wcAaIOVIJT Z24 WIRELESS WALL DIMMER ® ))) WIRELESS ADAPTER WAPM >) N I� (WWD1) / (WA100-PM) WIRELEN AR7EWPSENSSOOR j WIRELESS�A� EFL1) WIRELESS GENERAL WGq �l �qRk Q RpS SENSOR ROOF) WIRELESS PIR l ADAPTER (WGA 100) / 4/13/20 OS j�l (WOS2-CM-E) / WIRELESS SENSOR � ,93ROBISON 36x54 ADAPTER (WSA10) ENGINEERING, INC LOW VOLTAGE OPEN OL PS 19401 40TH AVE W SUrrE 302,LYNNWOOD,WA 98036 LOOP PHOTOCELL WIRELESS TEMP TEL:20Fr3643343 FAHANSE 3350098 CONTACT:GRANT HANSEN Nyy��MqN® SENSOR )�) ISSUE DATE DESCRIPTION n2O FC-2 SENSOR WIRELESS TSTAT )1 TEMPERATURE RC OMAN o THERMOSTAT WTS10 ) SENSOR AT STANDARD S COIDUCTOlt RTU-2 EUA FOR L LEAK DETECTIONTSTATWRINI 70RIU-1S OPEN AREA HVAC CONROL SENSOR CELLULAR (( )� SENSOR W11 EESSRROM IS, OS OS MODEM CURRENT 0 R1U 2 3 TRANSFORMER IN-DUCT SMOKE PUSH-BUTTON WALLMOUNI® U DETECTOR TEST —® TEST TIMER SWITCH BY —b T 0-1 SENSOR KEY SWITCHES - ELECTRICIAN a-13-zo PERMIT SUBMISSION HARDWIRE TO SENSOR 4-3-20 90%SET C0 WIRELESS 3-20-20 PLANNING 4 WALL MOUNTED O OUTSIDE AIRPROJECT INFORMATION BLOCK OCCUPANCY =1TEMPERATURE OTS ))� JOB# JPM19010.0 SENSOR U) SENSOR DATE: 1/20/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS v20.1 SHEET TITLE MECHANICAL CONTROL PLAN Z SHEET NUMBER MECHANICAL CONTROL PLAN SCALE 1 1/4"-1'-0. M200 COPM%ff 2020. ROBIS011 MEWA ac. "M F.\_P ROHIOCRAaaVAlA4 RAWS\424-1780 CRAB 71CIJr0 It WMWAY- 1M,M0, OR\DWG\N2-0 - MW RM RAKOW 04-13-2020 1.114 KEYED NOTES: _ 1. 12x12 EXHAUST DUCT UP TO EXHAUST FAN ON ROOF. CONNECT DUCTWORK TO EXISTING DUCT DROP AS SHOWN. _ 2. NOT USED. 3. ATM & DATA ROOMS ARE NOT OCCUPIED. FOR ELECTRICAL AND STORAGE EQUIPMENT ONLY.THESE ROOMS DONOT NEED TO BE DIRECTLY VENTILATED. SU 4. EXISTING SUPPLY AIR DUCT AND RETURN AIR DUCT UP THRU ROOF TO PACKAGED ROOFTOP UNIT. CONNECT DUCTWORK TO EXISTING DUCT DROP AS SHOWN. 5. UNDERCUT DOOR A MINIMUM 1". 6. SPLIT SYSTEM WALL MOUNTED DUCTLESS FAN COIL UNIT WITH CONDENSATE PUMP MOUNTED ON WALL NEXT TO UNIT. COORDINATE ACTUAL INSTALLATION LOCATION IN FIELD WITH OWNER. 7. AIR NOZZLE DIFFUSER TO BE MOUNTED IN LOCATION SHOWN ALIGNED WITH LIGHT FIXTURE.IF BUILDING CONDITIONS OBSTRUCT MOUNTING LOCATION, CONTACT THE ARCHITECT/ENGINEER tn TO EXPLORE OTHER ALTERNATIVES. MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING SYSTEM AS INDICATED ON THE DRAWINGS.ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL FOR COMPLETE, FINISHED WORK,TESTED,AND READY FOR OPERATION. 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE 0 CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE ❑ ASSOCIATED AIR BALANCE COUNCIL (AABC), THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), OR THE TESTING, ADJUSTING,AND BALANCING BUREAU (TABB).BALANCE EACH SUPPLY, a RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5%OF REQUIREMENTS AND FURNISH A REPORT LU TO THE CONSTRUCTION MANAGER. THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, BALANCED, 0- �ja AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE D lUJ A REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY.AN AIR BALANCE TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION.MINIMUM R-5 INSULATION IN UNCONDITIONED SPACE. INSULATE ALL ROUND DUCTS EXTERNALLY, EXCEPT EXHAUST DUCTS, WITH 2"FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT 00m` WITH 1"-THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND W DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6-C'. 0 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, FIRE,OR FIRE/SMOKE WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. M 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE ♦�/ INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTER O N THAN 24 GAUGE STEEL. 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. O LL. N IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE U UJ OCCUPIED SPACE. N H 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST&BALANCE AGENCY. O O 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS.PROVIDE Q p ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. V - V V - V - V 1 1. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS'INSTRUCTIONS AND W f , Q 75 75 75 V 75 75 RECOMMENDATIONS. V N P L"1 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL L N 150 170 05 O LttO 100 $O S EQUIPMENT AND MATERIALS. LU 300 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE ,vn 80 L 80 NL DEVELOPMENT AND FLAME SPREAD REQUIREMENTS. INSULATION"R"VALUES SHALL COMPLY > Z O O O APPLICABLE ENERGY CODE. O ~ 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR,UNLESS OTHERWISE �r 14x12 12x12 - - - �� NOTED. 6 a f 14x12 14x 2 10x8 15. INSTALL DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 16) IN SUPPLY AIR DUCTWORK N f Jr- Il�0 CONNECTED TO HEAT PUMP UNIT. WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT L-ow - - - - ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE 1'6"FBBO / 4 � � � DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY � ISL T THE MANUFACTURER. / \ > 7 p 270 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. / / / / O 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF N P 80 / (r�� / / THE STRUCTURE. COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS,WATER PIPING, 150 170 / L500 1 FBBO ❑ Y, A PLUMBING VENTS, AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/M0.1 FOR 80 80 M / / / (� 250 MORE INFORMATION. 135 / / / 250 O 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY.ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S ARCHITECT/ENGINEER OF RECORD L 410 L500 / L -000 B ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. \ 200 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO \ J T CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND J 2T EQUIPMENT,ETC. _ _ A _10 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) cV YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED DESIGN N P 1'FBBO L50D L5W 1'FBBO O 850 WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER p - -- --- -- AT NO ADDITIONAL COST TO THE OWNER. PMI 4 150 170 , 1 M T 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL Architectural 80 80 115 270 125 5 TOOLS,APPLIANCES, SURPLUS MATERIALS, AND SCRAP.ALL IDENTIFIED EXISTING EQUIPMENT TO BE Solutions Group 4 ap REMOVED SHALL BE TURNED OVER TO THE OWNER. 0 / / 00 N 80 o N 80 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER,THE ITEMS g L-0OD 200 FBBOLSoo 2'FBBO 200 LSoo OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. 19120 SE 34TH STREET, SUITE 115 -"4.4_- --- � --- � 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. VANCOUVER, WA 98683 14x12 12X10 100 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE ThesedrovA o and: iecor�aethe eonedenr�°nd;xgxetonwoae,N INFORMATION ON MANUAL BALANCE DAMPER. of Jr t+o,eon Chow and shot not Ce copied or reproduced wiuwnt w ften auth iiion. The contract documen were wepored fa use on this specific sib in conjunction w ih issue date and are not wit°de for use on a d f(ment 12X10 18x12 12X10 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORKsib a of a Iota tine. Use of these tluwv for reference a exmmple on - - - - - - SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH$MAGNA REQUIREMENTS. °"°tha P<°i°� reaulra ttb services d property f eased arenneeb and L 3'FBBO erginearc Raproducfian agte�ct 5a�hacl�enh fa reuse on anoMa N P 60 p 5 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT 2'FBBOT5_ ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS 150 170 T ,� SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN $0 80 I 100 270 00 o ACCORDANCE WITH THE CURRENT BUILDING CODE. SEAL 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL QED PROFFS FAN COILS, CONDENSING UNITS, RTU'S,AND EXHAUST FANS. ,dF I N S , 10 2'FBBO 5o0 80 28. ALL REFRIGERANT SHALL BE R-41 OA. NO R-22 SHALL BE USED. FFP �Oy 00 15,423 v N TO-0A 29. ALL HVAC UNITS TO BE PROPERLY LABELED.ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED r 150 AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1,FC-1,ETC.) 40 _j 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE N X141 0 W" 0 I REQUIRED PRIOR TO OCCUPANCY. e 2'FBBO - - - - - ❑ '� 100 6 200 3 ROBISON 500 sF 6 ENGINEERING, INC 19401 40TH AVE W SUITE 302,Lr Nwom,WA 98036 t0 TEL 206-3643343 FAx:4258350098 B B 5❑ CONTACT:GRAM HANSEN 450 ❑ ❑ g_ ISSUE DATE DESCRIPTION 250 A 75 1'6"FBB0 1'6"FBBO a w wo �� Bo i m a 4 4-13-20 PERMIT SUBMISSION 4-3-20 90%SET 3-20-20 PLANNING PROJECT INFORMATION BLOCK JOB# JPM19010.0 DATE: 1/20/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS V20.1 SHEET TITLE MECHANICAL FLOOR PLAN Z �:v SHEET NUMBER MECHANICAL FLOOR PLAN SCALE CO moff 2020. "Sm ENONEEIBN& RIG MMSEN F &WICS\424-1780 OMSE MAM&MIDWAY- 1Mk%, 3?%D=\112-1 - FLOOR P WIM A-13-2020 13:15 KEYED NOTES: _ 1. ROOF MOUNTED EXHAUST FAN. MAINTAIN A MINIMUM 10'-0" FROM ANY OUTSIDE AIR INTAKE ' OPENING. _ 2. ROOF MOUNTED PACKAGED UNIT. DEMO EXISTING PACKAGED UNIT AND PLACE UNIT ON EXISTING ROOF CURB WITH CURB ADAPTER. REUSE EXISTING DUCT DROPS.FURNISH AND INSTALL ALL TEMPERATURE CONTROL WIRING FROM THE UNIT TO CONTROL DEVICES.UNIT SHALL HAVE ALL FILTERS REPLACED AND ALL COILS CLEANED WITH APPROVED METHODS.ALL COIL FINNS SHALL BE COMBED AS STRAIGHT AS POSSIBLE. ALL THIS WORK SHALL BE PERFORMED AFTER CONSTRUCTION AND PRIOR TO C.O. 3. PROPOSED LOCATION FOR SPLIT SYSTEM REMOTE ROOF MOUNTED CONDENSER UNITS AND REFRIGERATION SUPPORT SYSTEM. 4. OUTSIDE AIR INTAKES SHALL BE LOCATED AT LEAST 10 FEET AWAY FROM ALL EXHAUST AND PLUMBING VENTS. tn 5. REFRIGERATION LIQUID AND SUCTION LINES FROM ROOF MOUNTED CONDENSER UNITS,PENETRATE ROOF AND SEAL WEATHER-TIGHT. ROUTE DOWN TO ASSOCIATED FAN COIL UNIT.PROVIDE WITH PIPE CURB AND CHASE WITH GOOSENECK. MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING SYSTEM AS INDICATED ON THE DRAWINGS. ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL FOR COMPLETE, FINISHED WORK,TESTED,AND READY FOR OPERATION. O 1L 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE w CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE ASSOCIATED AIR BALANCE COUNCIL (AABC), THE NATIONAL ENVIRONMENTAL BALANCING BUREAU a (NEBB), OR THE TESTING, ADJUSTING, AND BALANCING BUREAU (TABB).BALANCE EACH SUPPLY, a RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5% OF REQUIREMENTS AND FURNISH A REPORT C B A TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE,BALANCED, AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY.AN AIR BALANCE TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION.MINIMUM R-5 qq INSULATION IN UNCONDITIONED SPACE. INSULATE ALL ROUND DUCTS EXTERNALLY,EXCEPT EXHAUST DUCTS, WITH 2" FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT WITH I' THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. Q 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6-0 . Lo 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, M FIRE, OR FIRE/SMOKE WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. C LU 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING O N (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTERUJ THAN 24 GAUGE STEEL. O N 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. c Q UJ C IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE / OCCUPIED SPACE. 00 j / 1 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS Q O O / \ I AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST&BALANCE AGENCY. \ 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS.PROVIDE Z O \ ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. ( , / \ II. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS'INSTRUCTIONS AND N / \ RECOMMENDATIONS. L LU 14 / 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL / I EQUIPMENT AND MATERIALS. z Q N 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE RTU_I( I DEVELOPMENT AND FLAME SPREAD REQUIREMENTS. INSULATION"R"VALUES SHALL COMPLY O O ~ II .0750TONS .+ APPLICABLE ENERGY CODE. Q LBSI 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR,UNLESS OTHERWISE LLI NJ r NOTED. N / 15. INSTALL DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 16) IN SUPPLY AIR DUCTWORK Z r / CONNECTED TO HEAT PUMP UNIT. WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT \ / ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE a \ / DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY \ THE MANUFACTURER. \ / 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. �1/ \ / CU-2 CU-1 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF THE STRUCTURE. COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS,WATER PIPING, \\ / PLUMBING VENTS,AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/M0.1 FOR iAk MORE INFORMATION. CONDENSING UNIT 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE PLATFORM CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY ARCHITECT/ENGINEER OF RECORD - - SEE STRUCTURAL PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY.ANY CHANGES RESULTING INSULATED FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHTTO THE ENGINEER'S REFRIGERANT LINES ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. ABOVE ROOF- 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO DEMISING WALL / PROVIDE WITH CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND BELOW // \ PIPE SUPPORTS 5 WEATHER-PROOF EQUIPMENT, ETC. / \ (TYP.) ALUMINUM FM / \ JACKET. (TYP.) 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE(1) DESIGN \ YEAR FROM DATE OF FINAL ACCEPTANCE.ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED \ WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER / \ AT NO ADDITIONAL COST TO THE OWNER. Architectural / \ 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL Solutions Group / TOOLS, APPLIANCES, SURPLUS MATERIALS,AND SCRAP.ALL IDENTIFIED EXISTING EQUIPMENT TO BE ( REMOVED SHALL BE TURNED OVER TO THE OWNER. 19120 SE 34TH STREET, SUITE 115 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER,THE ITEMS 2 OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. VANCOUVER, WA 98683 RTU-2 I 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. These da I 75 TONS ( tiny and specif h ll not be confidmfi reproduced! without properly � 750 LBS of JP Margin Chase and shall not be copied a mproduoed wimaat.,riven 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE oatnormfan. The aonhacf documents.prepared for usem this specilk site in conjunction with its issue date and am not suitable for use on a different 4 EF-1 INFORMATION ON MANUAL BALANCE DAMPER. site or at a toter time. use of mese drawings for reference or example on / 50 LB anomer project m i s the services of properly licensed architects and 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORK engin Reproduction of the cmtsact documents kx reale m another SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH SMACNA REQUIREMENTS. project is not aulboded. \ / O 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT \ ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS \ SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN SEAL \ ACCORDANCE WITH THE CURRENT BUILDING CODE. RED PROcFs \\ / 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL 1 NFF� 0 \ // FAN COILS, CONDENSING UNITS, RTU'S,AND EXHAUST FANS. 15,423 y 28. ALL REFRIGERANT SHALL BE R-41 OA. NO R-22 SHALL BE USED. � r 29. ALL HVAC UNITS TO BE PROPERLY LABELED.ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED N AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1,FC-1,ETC.) 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE e \ / ROOF REQUIRED PRIOR TO OCCUPANCY. D. R08 4/13/20 / HATCH \ / ROBISON ENGINEERING, INC 4°VTR 19401 40'iH AVE W SUriE 302,LYNNWOOD,WA 98036 O 3 TEL206 CONTAcGRANT HNS�350098 r: ISSUE DATE DESCRIPTION 4 4-13-20 PERMIT SUBMISSION 4-3-20 90%SET 3-20-20 PLANNING PROJECT INFORMATION BLOCK JOB# JPM19010.0 DATE: 1/20/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS v20.1 SHEET TITLE MECHANICAL ROOF PLAN Z SHEET NUMBER MECHANICAL ROOF PLAN SCALE �� . � 1/4'=V-10" COPmipFr 20M ROMN DMEMs, W_ GMSE 1 F:\JEDR0+WMAClml\_aUSE BAN(5\424-1750 a1A%ncaro!ORE MY- TOM, CR\PWGM12-2- Roof KM.DNC 04-13-2020 13:55 Plans reference page/section: M2.0 ❑ Laboratory fume hood systems that include qualifying features. _ ® 9. Off-hour controls. Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or Plans reference page/section: programmable control system. COMcheck Software Version 4.1 .1 .0 _ Exception(s): Requirements Specific To: CU-1, 2 / FC-1, 2 : ❑ Zones that will be operated continuously. ® 1. Equipment meets minimum efficiency: Split System: 13.00 SEER Mechanical Complianee C e rt i f i c ate ❑ Zones with a full HVAC load demand not exceeding 6,800 Btulh (2 kW)and having a readily accessible manual shutoff switch. ❑ 2. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a M20 minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. . Plans reference page/section: Exception(s): ® 10.Shutoff damper controls. Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. ❑ Where energy recovery systems are prohibited by the International Mechanical Code. Exception(s): ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. Section 1 : Project Information ❑ Gravity dampers shall be permitted for outside air intake or exhaust airflows of 300 cfm or less. ❑ Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. Energy Code: 2014 Oregon Energy Efficiency Specialty Code Ul Plans reference page/section: MO.O ❑ Type 1 kitchen exhaust hoods. Project Title: Chase Tigard & Greenway ❑ 111.Freeze Protection and Snow melt system controls. Freeze protection systems, such as heat tracing of outdoor piping and heat ❑ Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F (18°C). Project Type: Alteration exchangers, including self-regulating heat tracing, include automatic controls capable of shutting off the systems when outdoor air ❑ Systems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the Construction Site: Owner/Agent: Designer/Contractor: temperatures meet code criteria. evaporative coil is located upstream of the exhaust air stream. 12100 SW Scholls Ferry Rd. WA Mark D. Robison Plans reference page/section: ❑ Systems exhausting toxic, flammable, paint exhaust, corrosive fumes, or dust. Tigard, OR 97223 Robison Engineering, Inc. 19401 40th Ave W, Suite 302 ❑ 12.Separate air distribution systems. Zones with special process temperature requirements and/or humidity requirements are served by ❑ Laboratory fume hood systems that include qualifying features. Lynnwood, WA 98155 separate air distribution systems from those serving zones requiring only comfort conditions; or shall include supplementary control 206-366-3343 provisions so that the primary systems may be specifically controlled for comfort purposes only. Plans reference page/section: mrobison@robisonengineering.com 0 Exception(s): w ❑ [503.2.4.8 +] Zones requiring only comfort heating or comfort cooling that are served by a system primarily used for process Generic Requirements: Must be met by all systems to which the requirement is applicable: Section 2: General Information a temperature and humidity control. El 1. Calculation of heating and cooling loads. Design loads are determined in accordance with the procedures described in the w ASHRAEIACCA Standard 183. Alternatively, design loads have been determined by an approved equivalent computation procedure. Building Location (for weather data): Tigard, Oregon a Plans reference pageisection: Climate Zone: 4c ❑ 13.Humidity control. If a system is equipped with a means to add or remove moisture to maintain spec humidity levels in a zone or ® 2. Cooling equipment economizers: The total capacity of all cooling equipment without economizers must be less than 240 kBtu/h. This zones, a humidity control device is provided. project lists 0 kBtu/h capacity without economizers. That portion of the equipment serving dwelling units and guest rooms is not Section 3: Mechanical Systems List included in determining the total capacity of units without economizers. Plans reference page/section: uantit System TyW& Description ❑ 14.Humidity control. Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative Plans reference page/section: MO.O 111111M �� humidity in excess of 30 percent. Where a humidity control device is used for dehumidification, it is set to prevent the use of fossil fuel 2 RTU-1, 2 (Single Zone) : Single Package Heat Pump or electricity to reduce relative humidity below 60 percent. 3. Equipment and system sizing. Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance Heating Mode: Capacity =46 kBtu/h, UJ Exception(s): with Section 503.2.1. Proposed Efficiency= 8.10 HSPF, Required Efficiency= 7.70 HSPF Exception(s): Cooling Mode: Capacity= 47 kBtu/h, ❑ Hospitals, process needs, archives, museums, critical equipment, and other non-comfort situations with specific humidity Proposed Efficiency = 15.80 SEER, Required Efficiency: 13.00 SEER Q requirements outside this range. ❑ Required standby equipment and systems provided with controls and devices that allow such systems or equipment to operate Fan System: None IME im automatically only when the primary equipment is not operating. cn Plans reference page/section: ❑ Multiple units of the same equipment type with combined capacities exceeding the design load and provided with controls that 2 CU-1, 2 / FC-1, 2 (Single Zone) : � W >_ have the capability to sequence the operation of each unit based on load. Cooling: 1 each -Split System, Capacity = 11 kBtu/h, Air-Cooled Condenser, Unknown Economizer LI 15.Humidity control. Where a humidity control device exists it is set to maintain a deadband of at least 10% relative humidity where no Proposed Efficiency = 19.00 SEER, Required Efficiency: 13.00 SEER 0 a W N active humidification or dehumidification takes place. MO.O Fan System: None O N Exception(s): Plans reference page/section: 6L ❑ Heating for dehumidification is provided with heat recovery or heat pumping and the mechanical cooling system efficiency is 10 ® 4. HVAC Equipment Performance Requirements. Reported efficiencies have been tested and rated in accordance with the applicable test Section 4: Requirements Checklist N 1 h N percent higher than required in section 503.2.3, HVAC equipment performance requirements. procedure.The efficiency has been verified through certification under an approved certification program or, if no certification program Q J exists, the equipment efficiency ratings are supported by data furnished by the manufacturer. J Plans reference page/section: ® 5. Thermostatic Controls. The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that In the following requirements, blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks O O respond to temperature within the zone. identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in ® 16.Ventilation. Ventilation, either natural or mechanical, is provided in accordance with Chapter 4 of the International Mechanical Code. the planslspecs the requirement can be verified as being satisfied. _ 1 Where mechanical ventilation is provided, the system has the capability to reduce the outdoor air supply to the minimum required by Plans reference page/section: M2.0 , U V o Chapter of the International Mechanical Code. Requirements Specific To: RTU-1, 2 : H 6. Heat pump supplementary heat. Heat pumps having supplementary electric resistance heat have controls that, except during defrost, Plans reference a elsection: M0.0 ® ® 1. Equipment meets minimum efficiency: Heat Pump: 7.70 HSPF 13.00 SEER14 P 9 prevent supplementary heat operation when the heat pump can meet the heating load. ® 2. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a La , n ❑ 17.Demand controlled ventilation (DCV). DCV is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2 Plans reference page/section: MO.O minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. > Z Q N V for multiple zone systems. Exception(s): O Exception(s): M 7. Set point overlap restriction. Where used to control both heating and cooling, zone thermostatic controls provide a temperature range ❑ Where energy recovery systems are prohibited by the International Mechanical Code. O Z LJ❑ Systems with energy recovery complying with Section 503.2.6 or deadband of at least 5°F (2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or reduced to a minimum. ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. LU NJC4 zone damper when the space is unoccupied. � r Spaces less than 750 ft2 (69.7 m2)where an occupancy sensor turns the fan off, closes the ventilation damper, or closes the Exception(s): L] Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. r L] Thermostats requiring manual change over between heating and cooling modes. L] Type 1 kitchen exhaust hoods. y Z Plans reference page/section: Plans reference page/section: M2.0 LlCooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F (180C). ❑ 18.Kitchen hoods. Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. ❑ Systems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the Exception(s): ® 8. Optimum Start Controls. Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set evaporative coil is located upstream of the exhaust air stream. %#M/ point at time of occupancy. ❑ Systems exhausting toxic, flammable, paint exhaust, corrosive fumes, or dust. Project Title: Chase Tigard & Greenway Report date: 03/27/20 Project Title: Chase Tigard & Greenway Report date: 03/27/20 Project Title: Chase Tigard & Greenway Report date: 03/27/20 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1360 Chase Tigard & Greenway-Tigard, OR\Calcs\20-0320 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1360 Chase Tigard & Greenway - Tigard, OR\Calcs\20-0320 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1360 Chase Tigard & Greenway- Tigard, OR\Calos\20-0320 ARCHITECT/ENGINEER OF RECORD Mech.cck Page 3 of 5 Mech.cck Page 2 of 5 Mech.cck Page 1 of 5 nqrA ❑ 29.Large Volume Fan Systems. Fan systems over 8,000 (7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce ❑ Where hoods are used to exhaust ventilation air that would otherwise be exhausted by other fan systems. airflow based on space thermostat heating and cooling demand. A two-speed motor or variable frequency drive reduces airflow to a ❑ Kitchen exhaust systems that include exhaust air energy recovery complying with section 503.2.6. Ilwavi maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical DESIGN Code, whichever is greater. Plans reference page/section: Exception(s): ❑ 19.Enclosed parkinggarage ventilation controls. In Group S-2, enclosed parkinggarages used for storing or handling automobiles employs Architectural ❑ Systems where the function of the supply air is for purposes other than temperature control, such as maintaining specific humidity automatic carbon monoxide sensing devices. Solutions Group levels or supplying an exhaust system. Plans reference page/section: Plans reference page/section: ® 20.Duct and plenum insulation and sealing. All supply and return air ducts and plenums are insulated with the specified insulation. When 19120 SE 34TH STREET, SUITE 115 ❑ 30.AII air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than located within a building envelope assembly, the duct or plenum is separated from the building exterior or unconditioned or exempt VANCOUVER, WA 98683 or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. spaces by a minimum of R-8 insulation. All ducts, air handlers and filter boxes are sealed. Joints and seams comply with Section 603.9 These dravnai,s and specifications are the confidenlb and propablany properly Exception(s): of the International Mechanical Code. of,P ,argon Chase and shall not be copied!or reproduced without P tttten outhcrizaton. The contract documents were prepared for use on this s ific Exeeptlon(s): site in conjunction with its issue date and are not suitable for use on a different site a at a alter tone. Use of these dial for reference a example an ❑ Systems where the function of the supply air is for purposes other than temperature control, such as maintaining specific humidity ❑ When located within equipment. another project reouirse the services of properly licensed architects and levels or supplying an exhaust system. ° ° engineers. Reproduction of the project iontactot ddiccurall fu reuse on another ❑ When the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15*F (80C). Plans reference page/section: M 21.Low-pressure duct systems. All longitudinal and transverse joints, seams and connections of low-pressure supply and return ducts are ❑ 31.Series fan-powered terminal unit fan motors. Fan motors for series fan-powered terminal units are electronically-commutated motors securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes installed in SEAL D ffiPRO F and have a minimum motor efficiency of 70 percent when rated in accordance with the manufacturer's installation instructions. , rdance with NEMA Standard MG 1-2006 at full load rating F I N S Exception(s): F 0 conditions. 1A � Continuous/ welded and locking-type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w. 15,423 _ ❑ Y 9 tYPe 9 1 P 9 P 9• 7- Plans reference page/section: pressure classification. ❑ 32.Hot Gas Bypass Limitation. For cooling systems<= 240 kBtu/h, maximum hot gas bypass capacity is no more than 50% total cooling Plans reference pagelsection: MO.O N capacity. e o ❑ 22.Medium-pressure duct systems. All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance � Plans reference page/section: with Section 503.2.7. Pressure classifications specific to the duct system are clearly indicated on the construction documents. 9Rk Q R0B\5 4/13/20 Plans reference page/section: Section 5: Compliance Statement ❑ 23.High-pressure duct systems. Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7. WROBISON In addition, ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. ENGINEERING, INC Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, Plans reference page/section: 19401 40TH AVE W SUITE 302,LVNNwooD,WA 98036 specifications and other calculations submitted with this permit application. The proposed mechanical alteration project has been designed TEL:206-3643343 FAX:425e350098 to meet the 2014 Oregon Ener Efficiency Specialty Code, Chapter 8, requirements in COMcheck Version 4.1.1.0 and to comply with the 24.Air system balancing. Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the CONTACT:GRANT HANSEN 9 9Y Y P tY P 9 P Y mandatory requirements in the Requirements Checklist. requirements of IMC 603.17. Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable ISSUE DATE DESCRIPTION /) a volume fans with motors 10 horsepower. Mark Robison - President 3/27/20 Plans reference page/section: MO.O Name- Title Signature Date ® 25.Manuals. The construction documents require that an operating and maintenance manual be provided to the building owner by the mechanical contractor. See long description for specifications. Section 6: Post Construction Compliance Statement Plans reference page/section: MO.O ❑ HVAC record drawings of the actual installation, system capacities, calibration information, and performance data for each equipment ❑ 26.Air System Design and Control. Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions provided to the owner. of Sections 503.2.10.1 through 503.2.10.2. ❑ HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. Plans reference page/section: Written HVAC balancing and operations report provided to the owner. ❑ 4-13-20 PERMIT SUBMISSION ® 27.Allowable fan floor horsepower. Each HVAC system at fan system design conditions does not exceed the allowable fan system motor 4-3-20 90%SET The above post construction requirements have been completed. nameplate hp (Option 1) or fan system bhp (Option 2) as shown and calulated in requirement details. Exception(s): 1 3-20-20 PLANNING Principal Mechanical Designer-Name Signature Date ❑ Hospital and laboratory systems that utilize flow control devices on exhaust and/or return to maintain space pressure relationships PROJECT INFORMATION BLOCK necessary for occupant health and safety or environmental control shall be permitted to use variable volume fan power limitation. JOB# JPM19010.0 ❑ Individual exhaust fans with motor nameplate horsepower of 1 hp or less. DATE: 1/20/2020 Plans reference page/section: MO.O DRAWN BY: GH CHECKED BY: PR ® 28.Motor nameplate horsepower. For each fan, the selected fan motor is no larger than the first available motor size greater than the brake horsepower (bhp). MODEL Exception(s): ❑ For fans less than 6 bhp, where the first available motor larger than the brake horsepower has a nameplate rating within 50 DRAWING STANDARDS V20.1 percent of the bhp, selection of the next larger nameplate motor size is allowed. ❑ For fans 6 bhp and larger, where the first available motor larger than the bhp has a nameplate rating within 30 percent of the bhp, SHEET TITLE selection of the next larger nameplate motor size is allowed. Plans reference pagelsection: MO.O ENERGY CODE COMPLIANCE SHEET NUMBER Project Title: Chase Tigard & Greenway Report date: 03/27/20 Project Title: Chase Tigard & Greenway Report date: 03/27/20 \ •O Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1360 Chase Tigard&Greenway-Tigard, OR\Calcs\20-0320 Mech.cck Page 5 of 5 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1360 Chase Tigard &Greenway- Tigard, OR\Calc �\Y/� s\20-0320 Mech.cck Page 4 of 5 00PYRRHT 2020,ROBI M IXDEMGN INC. CHAHSEN F\3EDRO+1I0MA0(81\_CHASE BAWS\424-1760 CHASE WAM 3 Gill- TI MO, DR\OM N111l- all CODE CMPA4DED11113 04-13-2020 13:17 I ulO u- 0 w SIGHT UNE FROM EXLSTNG as PUBLIC SDEWALK _\ Y / w a PROPOSED ROOFTOP L APR 2 2 2020 mus NG BURDWd, CITY OF T1GARD �j OUTLINE otIIH svn r- *' rS10N ap W o M W > oN I I PARLOr 0Va � N IWG N H o^• SW SCHOLIS FERRY ROAD M Z O O k LU U a H cc ; WQ � � 0 Z � o J � — Zo WQw- U) Z F- N IIF a - Z V MECHANICAL SCREENING DETAILS - SECTION B SCALE ARCHITECT/ENGINEER OF RECORD KEN McCRACKEN, ARCHITECT Architecture•Program Management•Permiffing 19120 SE 34TH STREET,SUITE 115 VANCOUVER, WA 98683 Contact:ELIZABETH COLE (614)212-4330 ecole@pmdginc.com lhem drawtrdg.r sPePiRPPRPIS ore Hie confMerRd PrM PrPPrieIW Plq—IY of 1P Mcmm chose P s l mt ee Copied m reproduced vAMwiA wrillen PWhomorim. The cmhad locum was PrePv to use m M'¢sPecTic Sita M cmlVn1C�t.iIXl w ih B dote PIM Q rot vitOd¢I...Po. QINBRnt Ate t Pt P ed t. ttSB Ot ttIPS@ dlPWp tQ RtR61CB Q®TPp m e,p pmje p r mfw the services a( PrPPeIN ric fa archReck PrM erpiriaea Reproducron of the conhacf documenk Fa reuse m aroMx project 6 not PURa®G SEAL REQ PROFFS NFF ` , 1p 15,423 y Elf r N SIGHT UNE FROM EXISTING PROPOSED ROOFTOP e O PUBLIC SIDEWALK EQUIPMENT qRK R R08\ 5/14/20 E WNG BUILDING OUTLINE OBISON OURNE ENGINEERING, INC 19401 40TH AvE W Surre 302,LYNNWOOD,WA 98036 i TEL'206-364,3343 FAx:4258350098 CONTACT:GRAFrr HANSEN ISSUE DATE DESCRIPTION PARKING LOT C/nr Da erOvecl b BARD 4-30-20 BID SET SW 121ST AVE a riipc 4-13-20 PERMIT SUBMISSION initials: -2- 4-3-20 90%SET 3-20-20 PLANNING PROJECT INFORMATION BLOCK JOB# JPM19010.0 DATE: 1/20/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS v20.1 SHEET TITLE MECHANICAL SCREENING DETAILS SHEET NUMBER MECHANICAL SCREENING DETAILS - SECTION A SCALE M4 , 0 4 • O COPYRIGHT 2020, RONSON ENGINEERING, INC. GHANS81 F:\-PEDR0+MCCRA0REN\- ASE BANKS\424-1360 CHASE TIGARD k GREENWAY- RGARD, CR\oWG\M4-0 - SCREENING OETARSDWG 05-14-2020 15.22 Ln O LL qrm W K a LL W LL /m% ap W Ln H L L W W NU.N J 1ZECEIVED 0 � im MAY 18 2020 m Z 0 = O CITY OF TIGARD 3UIt.DING DIVISION' W H 0 a y > WQN0 ZDC) O Z o W J a Z N Q — V ARCHITECT/ ENGINEER OF RECORD KEN McCRACKEN, ARCHITECT Archifectore•Program Management•Permitting 19120 SE 34TH STREET,SUITE 115 VANCOUVER, WA 98683 SIGHT LINE FROM EXISITING PUBLIC SIDEWALK Contact:ELIZABETH COLE 16141212-4330 ecole@pmdginc.com PROPOSED ROOFTOP EQUIPMENT EXISTING BUILDING OUTLINE These JP mon e'nc n and� N not be coped or naiareao�aaa�� ,.watt prop"Y she 1.¢atbn. the conlraal a currents were prepared for rae on IMs specific she io conjunction vrilh its usue fate and are rsol suitable for use on a dple on on th at a bier lime. Use of these Qawirgs for reference a example on another project re to the services of docurn icaaer ac an an aM engineav Reprefuclbn of the cenfracl a,eed. nh fa reuse on another pIC1BCl S net aVtllaR2f. SEAL ARC ti KENNETH J. M RACKE � • 9 AM S, WA n,9TF license#5599 PARKING LOT OF SW SCHOLLS FERRY ROAD 04113120 KJM/2568 2 MECHANICAL SCREENING DETAILS - SECTION B ISSUE DATE DESCRIPTION A5.1 .4 118"=1' o° ,gpprITY FTI@gRD oved Date: P1 nning Initials: SIGHT LINE FROM EXISITING PUBLIC SIDEWALK PROPOSED ROOFTOP EQUIPMENT 4-30-20 BID SET 4-13-20 PERMIT SUBMISSION 4-3-20 90%SET EXISTING BUILDING OUTLINE 3-20-20 PLANNING PROJECT INFORMATION BLOCK JOB # JPM19010.0 DATE: 1/20/2020 DRAWN BY: DA CHECKED BY: EC MODEL DRAWING STANDARDS v20.1 SHEET TITLE MECHANICAL PARKING LOT SCREENING DETAILS SW 12151 AVE SHEET NUMBER 1 MECHANICAL SCREENING DETAILS - SECTION A A5 * 1 4 APPROVED OFFICE COPY REVISION GENERAL NOTES SYMBOLS GENERAL NOTES - MECHANICAL EQUIPMENT TERMINALS 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE 4. MISCELLANEOUS DUCT FITTINGS (CONICAL TAKEOFFS, ETC.): 3. ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC WORK COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, WRAP WITH INSULATION FOR CONDENSATION CONTROL. OR READILY ACCESSIBLE MANUALLY OPERATED DAMPERS IN ALL EF-1 CIVIL, ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED 5. THE PIPING FOR ALL SPACE CONDITIONING AND SERVICE WATER HEATING OPENINGS TO THE OUTSIDE, EXCEPT FOR COMBUSTION AIR OPENINGS. TYPICAL EQUIPMENT DESIGNATION CD-12x12 OR CD-1.�DI FUSER/GRILLE TYPE, AND NUMBER _ ON A SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). SYSTEMS SHALL BE INSULATED IN ACCORDANCE WITH TABLE 123-A. 4. THE LESSER OF THE MINIMUM RATE OF OUTDOOR AIR REQUIRED BY (EXHAUST FAN SHOWN) 400 400 �_ SECTION 121(b)2, OR THREE COMPLETE AIR CHANGES SHALL BE DESIGN CFM (WHERE APPLICABLE) 2. ELECTRICAL CHARACTERISTICS: REFER RI ELECTRICAL T ROOM THERMOSTAT OR COORDINATION REQUIREMENTS SUPPLIED TO THE ENTIRE BUILDING DURING THE ONE-HOUR PERIOD O TEMPERATURE TRANSMITTER ( ^ DRAWINGS FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC.) � CEILING DIFFUSER FLOW ARROWS W OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. 1. DUCTWORK: LOCATE AND COORDINATE THE EXACT LOCATION OF IMMEDIATELY BEFORE THE BUILDING IS NORMALLY OCCUPIED. X � SHOWN ONLY IF AIRFLOW NOT r. ° DUCTWORK WITH STRUCTURAL PLANS AND WITH THE GENERAL COMPLETION AND BALANCING DSD DUCT SMOKE DETECTOR SYMMETRICAL) jt1 3. CODES: COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR F' PER THE APPLICABLE BUILDING, MECHANICAL, ENERGY, PLUMBING, FIRE, EQUIPMENT. COORDINATE WITH FRAMING CONTRACTOR TO ASSURE ALL VENTILATION SYSTEMS SHALL BE DOCUMENTED PER CALIFORNIA ~ AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL AHJ. JOIST SPACES LINE UP WHEN DUCTWORK MUST PASS THROUGH SAFETY CODE (TITLE 8, SECTION 5142 (B) TO BE PROVIDING THE DUCTWORK �- CEILING RETURN/EXHAUST GRILLE DIFFERENT JOIST SPACES. MINIMUM REQUIRED VENTILATION RATE AS DETERMINED USING ONE OF tn 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON THE FOLLOWING PROCEDURES: 18>02 DUCT (1ST FIGURE = SIDE SHOWN, FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING ALL CONTROLS 2ND FIGURE = SIDE NOT SHOWN) LINEAR DIFFUSER, CEILING OR WALL DUCTWORK, DAMPERS, EQUIPMENT, PIPING, ETC. 1. AIR BALANCING: ALL SPACE-CONDITIONING AND A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH STRUCTURAL. 1. THE THERMOSTATIC CONTROLS FOR HVAC SYSTEMS SHALL MEET VENTILATIONSYSTEMS SHALL BE BALANCED TO THE UP DOWN MOUNTED (FLOW ARROWS SHOWN B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING, THE FOLLOWING REQUIREMENTS AS APPLICABLE: QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH ® �� DUCT SECTION, POSITIVE PRESSURE y ONLY IF AIRFLOW NOT SYMMETRICAL) LIGHTS, WALLS, FIRE SPRINKLER PIPING, AND OTHER TRADES WORK. THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) �� C. INCLUDE ADDITIONAL OFFSETS, ELBOWS, ROUTING, EQUIVALENT a) EACH SPACE CONDITIONING ZONE SHALL BE PROCEDURAL STANDARDS (1983) OR ASSOCIATED AIR CONTROLLED BY AN INDIVIDUAL THERMOSTATIC UP DOWN -� WALL SUPPLY GRILLE (SG) DUCT SIZING EXCHANGE, RELOCATING, ETC. AS REQUIRED FORA BALANCE COUNCIL (AABC) NATIONAL STANDARDS (1989). COMPLETE OPERATING MECHANICAL SYSTEM. CONTROL THAT RESPONDS TO THE TEMPERATURE DUCT SECTION, NEGATIVE PRESSURE D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE OWNER. WITHIN THE ZONE AND MEETS THE APPLICABLE 2. OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE WALL RETURN/EXHAUST GRILLE REQUIREMENTS OF SUBSECTION(b). MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL UP DOWN F� (RG, EG) 5. MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE EXACT b) EACH THERMOSTATIC CONTROL REQUIRED BY DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE O LOCATION OF ALL MECHANICAL EQUIPMENT WITHIN THE STRUCTURE. SUBSECTION(a) SHALL BE CAPABLE OF BEING SET INSTALLING LICENSED C-20 MECHANICAL CONTRACTOR. ROUND DUCT SECTION U_ LOCALLY OR REMOTELY BY ADJUSTMENT OR 6. EXHAUST OUTLETS: SOURCE-SPECIFIC FANS SHALL BE VENTED 3. OUTSIDE AIR MEASUREMENT: THE SYSTEM SHALL BE TRANSFER GRILLE (TG), DUCT CONNECTED, SELECTION OF SENSORS TO CONTROL; a TO OUTDOORS WITH A MINIMUM 3' CLEARANCE BETWEEN VENT EQUIPPED WITH A CALIBRATED LOCAL OR REMOTE DEVICE �� WALL MOUNTED WITH OPTIONAL CFM OUTLETS AND BUILDING OPENINGS, AND 10' MINIMUM BETWEEN 1) COMFORT HEATING DOWN TO 55'F OR LOWER. CAPABLE OF MEASURING THE QUANTITY OF OUTSIDE AIR ON UP UP UP DUCT PENETRATION THRU FLOOR 50 a- W VENT OUTLETS AND MECHANICAL AIR INTAKES. CL 2) COMFORT COOLING UP TOO 5 F HIGHER. A CONTINUOUS BASIS AND DISPLAYING THAT QUANTITY ON A m OR ROOF SHOWN READILY ACCESSIBLE DISPLAY DEVICE. 7. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR ROOF 3) BOTH HEATING AND COOLING, THE THERMOSTATIC CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. CONTROLS SHALL BE CAPABLE OF PROVIDING A 4. ANOTHER METHOD APPROVED BY THE ENERGY COMMISSION. VOLUME DAMPER IF TRANSFER GRILLE, CEILING MOUNTED TEMPERATURE RANGE OR DEAD BAND OF ATFSD FSD WITH FULL-SIZED LINED DUCT 8. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF LEAST 5'F WITHIN WHICH THE SUPPLY OF HEATING ADMINISTRATIVE REQUIREMENTS FIRE SMOKE DAMPER --t = HORIZ CONNECTION MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING AND COOLING ENERGY TO THE ZONE IS SHUT OFF T / ( d' FIXTURES FOR REMOVAL AND REPLACEMENT. OR REDUCED TO A MINIMUM. 1. THE PERSON WITH OVERALL RESPONSIBILITY OR THE PERSON DUCT, = VERT DUCT), RESPONSIBLE FOR THE INSTALLATION OF REGULATED MANUFACTURED 2-HR RATED, UON GENERAL 9. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: 2. EACH SPACE-CONDITIONING SYSTEM SHALL BE INSTALLED WITH DEVICES SHALL POST, OR MAKE AVAILABLE WITH THE BUILDING ARCHITECTURAL BACKGROUND W LU VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT CONTROLS THAT COMPLY WITH ITEMS 1 AND 2 BELOW: PERMIT(S) ISSUED FOR THE BUILDING, THE INSTALLATION CERTIFICATE(S) FD FD FIRE DAMPER (--4 = HORIZ (THIN LINE ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF FOR MANUFACTURED DEVICES REGULATED BY THE APPLIANCE T ) Q MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE 1) ARE CAPABLE OF AUTOMATICALLY SHUTTING OFF THE EFFICIENCY REGULATIONS. SUCH INSTALLATION CERTIFICATES T DUCT, - * = VERT DUCT), ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. SYSTEM DURING PERIODS OF NON-USE AND SHALL HAVE: SHALL BE MADE AVAILABLE TO THE ENFORCEMENT AGENCY FOR ALL 2-HR RATED, LION NEW MECHANICAL WORK Ln a) AN AUTOMATIC TIME SWITCH CONTROL DEVICE APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL: (HEAVY LINE) M 10. DUCT SYSTEMS USED WITH BLOWER TYPE EQUIPMENT WHICH ARE COMPLYING WITH SECTION 119(c), WITH AN ACCESSIBLE a IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH THE 90' ELBOW, R/D OR R W-1 5 - - MATCHLINE OR PROPERTY LINE `_♦ PORTIONS OF A HEATING, COOLING, ABSORPTION, EVAPORATIVE COOLING ) / � L L � >W - WITH OVERRIDE THAT ALLOWS OPERATION OF APPLIANCE EFFICIENCY REGULATIONS. WI OUTDOOR AIR VENTILATION SYSTEM SHALL BE SIZED IN ACCORDANCE THE SYSTEM FOR UP TO 4 HOURS; SECTION IDENTIFICATION O a mi ad N WITH THE 2019 OREGON MECHANICAL SPECIALTY CODE. OR b) INCLUDE A STATEMENT INDICATING THAT THE INSTALLED DEVICES b) AN OCCUPANCY SENSOR; OR CONFORM TO THE APPLIANCE EFFICIENCY REGULATIONS AND PART SQUARE CORNER ELBOW WITH (DETAIL SIMILAR) LL. N 11. HEATING AND COOLING EQUIPMENT AND SYSTEMS CAPACITY DO NO EXCEED TURNING VANES THE LOADS CALCULATED IN ACCORDANCE WITH SECTION 503.2.1 OF THE c) A FOUR-HOUR TIMER THAT CAN BE MANUALLY OPERATED. 6 AND THE REQUIREMENTS FOR SUCH DEVICES GIVEN IN THE O 0 Q LCL EXCEPTION: MECHANICAL SYSTEMS SERVING RETAIL STORES PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL INDICATES DIRECTION OF CUTTING N H OREGON ENERGY EFFICIENCY SPECIALTY CODE. THE REPORTED EFFICIENCIES ENFORCEMENT AGENCYPLANE J . OF THE EQUIPMENT HAVE BEEN TESTED AND RATED IN ACCORDANCE WITH AND ASSOCIATED MALLS, RESTAURANTS, GROCERY STORES, 90' TAKE-OFF OR TEE J Ce THE APPLICABLE TEST PROCEDURE. THE EFFICIENCY HAS BEEN VERIFIED CHURCHES, AND THEATERS EQUIPPED WITH 7-DAY c) STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE LETTER INDICATES SECTION M Z O O THROUGH CERTIFICATION UNDER AN APPROVED CERTIFICATION PROGRAM OR, PROGRAMMABLE TIMERS. CONSTRUCTION OR INSTALLATION WAS PERFORMED. (N0. INDICATES DETAIL) IF NO CERTIFICATION PROGRAM EXISTS, THE EQUIPMENT EFFICIENCY RATINGS 90' CONICAL TAKE-OFF A ARE SUPPORTED BY DATA FURNISHED BY THE MANUFACTURER. 2) AUTOMATICALLY RESTART AND TEMPORARILY OPERATE 2. THE APPLICANT SHALL FILE ALL CERTIFICATE(S) OF ACCEPTANCE, . ' U V o THE SYSTEM AS REQUIRED TO MAINTAIN: WITH THE ENFORCEMENT AGENCY PRIOR TO RECEIVING A FINAL M-3 M-3 SHEET NUMBER WHERE SECTION IS H 12. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2019 OREGON MECHANICAL a) A SETBACK HEATING THERMOSTAT SETPOINT, IF THE SYSTEM OCCUPANCY PERMIT. THE SIGNERS) SHALL BE ELIGIBLE UNDER DIVISION 3DRAWN SPECIALTY CODE. PROVIDES MECHANICAL HEATING; AND OF THE BUSINESS AND PROFESSIONS CODE TO SIGN SUCH DOCUMENTS. 45' LATERAL TAKE-OFF Uj 14 Q SHEET NUMBER WHERE SECTION IS EXCEPTION: AREA WITH THE DESIGN WINTER OUTDOOR TAKEN INSULATION/LINING NOTES TEMPERATURE OF GREATER THAN 32'F. 3. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON(S) TRANSITION OR REDUCER (FOT= Z Q H RESPONSIBLE FOR BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT FLAT ON TOP, FOB=FLAT ON H 1. ENERGY CODE: AS A MINIMUM, COMPLY WITH THICKNESSES AND b) A SETUP COOLING THERMOSTAT SETPOINT, IF THE OR CENTRALLY OPERATED BUILDINGS) AT OCCUPANCY THE FOLLOWING: BOTTOM) PIPING O O TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. SYSTEM PROVIDES MECHANICAL COOLING. O EXCEPTION: AREA WITH THE DESIGN SUMMER OUTDOOR a) OPERATING INFORMATION: THE APPROPRIATE CERTIFICATE(S) OF d, {-1 WYE FITTING CD CONDENSATE DRAINAGE W Q N 2. ALL AIR DISTRIBUTION SYSTEMS DUCTS AND PLENUMS SHALL BE TEMPERATURE OF LESS THAN 100'F. COMPLIANCE AND A LIST OF THE FEATURES, MATERIALS, I--�J INSTALLED, SEALED AND INSULATED TO MEET THE REQUIREMENTS OF COMPONENTS, AND MECHANICAL DEVICES INSTALLED IN THE G NATURAL GAS SECTION 604 OF THE 2019 OREGON MECHANICAL SPECIALTY CODE. 3. THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN 'F. BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM 90' RECTANGULAR TAKE-OFF WITH SUPPLY-AIR AND RETURN-AIR DUCTS CONVEYING HEATED OR COOLED EFFICIENTLY. 45' TAPER PIPE CAP AIR SHALL BE INSULATED TO A MINIMUM LEVEL OF R-8, UNLESS DUCTS 4. THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT b) MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE PIPE PLUG ARE IN A CONDITIONED SPACE. STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL. 90' DIVERGING RECTANGULAR TEE, ACTIONS SHALL BE CLEARLY STATED AND INCORPORATED ON A 2. EXTENT OF INTERNAL DUCT LINING: READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO ` EITHER RADIUS OR TURNING VANES 11 UNION A. GRILLE AND DIFFUSER BOXES AND BOOTS. VENTILATION IDENTIFYING THE OPERATION AND MAINTENANCE MANUAL. B. TRANSFER DUCTS. c) VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF PARALLEL FLOW BRANCH -�� FLANGE 3. EXTENT OF EXTERNAL DUCT INSULATION: OR DEVICES TO BEE OPERATED AT THE VENTILATION RATES AS 1. CONTROLS SHALL PROVIDED TO ALLOW OUTSIDE AIR DAMPERS OUTDOOR AIR AND RECIRCULATED AIR THAT THE VENTILATION CONNECTION, EITHER RADIUS OR GATE VALVE OR BALL VALVE A. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACES, SPECIFIED IN THESE PLANS. SYSTEMS ARE DESIGNED TO PROVIDE TO EACH AREA. TURNING VANES n MECHANICAL ROOMS, ELECTRICAL ROOMS, AND EQUIPMENT 4. CERTIFICATE OF OCCUPANCY AND ALL REQUIRED ACCEPTANCE DOCUMENTS a BALL VALVE ARCHITECT/ENGINEER OF RECORD ROOMS NOT SPECIFIED TO BE INTERNALLY LINED. 2. OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED SHALL BE SUBMITTED TO THE FIELD INSPECTOR DURING CONSTRUCTION. FLEXIBLE DUCT PRESSURE REDUCING VALVE (PRV) B. SUPPLY AIR ABOVE CEILINGS OR EXPOSED NOT WITH DAMPERS THAT AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL THESE FORMS KEN McCRACKEN, SPECIFIED TO BE INTERNALLY LINED. ARE REVIEWED AND APPROVED. C. OUTDOOR AIR INTAKE. ROUND DUCT INDICATOR �- BREAK IN PIPING OR DUCTWORK ARCHITECT Architecture•Program Management•Permitting SCHEDULES SEQUENCE OF OPERATIONS ABBREVIATIONS 19120 SE 34TH STREET, SUITE 115 VANCOUVER, WA 98683 2 Contact:ELIZABETH COLE OCCUPIED AND UNOCCUPIED OPERATION (614) 212-4330 DIFFUSER, GRILLE AND REGISTER SCHEDULE GAS PACKAGED ROOFTOP UNIT SCHEDULE (PROVIDED BY LANDLORD) AFF ABOVE FINISHED FLOOR ecole@pmdginc.com THE TEMPERATURE CONTROL SYSTEM SHALL BE SET FOR AHJ AUTHORITY HAVING JURISDICTION CFM TONS COOLING CAP. HEATING CAP. MINIMUM OUTSIDE OCCUPIED AND UNOCCUPIED HOURS. DURING THE OCCUPIED AH AIR HANDLING UNIT MANUFACTURER DWG. MOTOR (BTU/HR) (BTU/HR) RATING EXT.SP AIR ELECTRICAL HOURS, THE SPACE SHALL BE MAINTAINED AT 72-F (ADJ.) IN THE TAG LOCATION TYPE MATERIAL FINISH SIZE &MODEL NO. GENERAL REMARKS TAG SERVICE TYPE WG 1 MAKE/MODEL NOTES COOLING MODE AND 70-F (ADJ.) IN THE HEATING MODE. BTUH BRITISH THERMAL UNIT REF. MAX Q ARI �� WEIGHT a BHP TOTAL SENSIBLE INPUT INPUT EFFICIENCY CONDITIONS CFM V. (d Hz MCA MOCP LBS PER HOUR OA CEILING SUPPLY ALUMINUM WHITE 24x24 TITUS LAY-IN, AG-75, NARROW TEE BORDER TYPE TO DURING UNOCCUPIED PERIODS, THE SPACE TEMPERATURE SHALL i-5, 8, l0 - -- _ - - - CFM CUBIC FEET PER MINUTE OMNI-AA-NT FIT 9/16' FINELINE BEVEL CEILING GRID 14.0 SEER MAINTAIN 750F (ADJ.) IN THE COOLING MODE AND 650F (ADJ.) IN (E)RTU-1 LOBBY/OFFICES M2.1 CLNG/HTNG 1600 5.0 1.0 58.280 47,360 110,000 88,000 80.090 0.5 245 208 3 60 31.0 45.0 700 CARRIER48FCEA06 OO CU CONDENSING UNIT TheaedraganCaseandshollnsaemeaond!orraland cealwiarvao�rty EXHAUST/ LAY-IN, AG-75, NARROW TEE BORDER TYPE 11.0 EER THE HEATING MODE. of JP MorOan chase and shoo not be caped«reproaaced without warren O CEILING RETURN ALUMINUM WHITE 24X24 TITUS 3FL-NT TO FIT 9/16" FINELINE BEVEL CEILING GRID 1-3. 8-11 COP COEFFICIENT OF autrorrsation. The contract documents were prepared fuse on m'¢sp fio 14.0 SEER PERFORMANCE site m conjunaron with as ise date and are not smraae f«use on a different (E)RTU-2 BACK AREA/OFFICES M2.1 CLNG/HTNG 1600 5.0 1.0 58,280 47,360 110,000 88,000 80.0`% 0.5 245 20B 3 60 31.0 45.0 700 CARRIER 48FCEA06 OO e«at a later rme. Use of these drowlogs f«reference or a:ample on TITUS 11.0 EER © CEILING SUPPLY ALUMINUM WHITE 12X12 OMNI-AA AG-75 1-5, 10 - --__ _ (E)RTU & (E)RTU-2: Q DIM DIMENSION engine . ep requires one services of pooped Its far r architect and engineers. Reproduction of the contract document fns reuse on another O REMARKS DN DOWN project s not aothoad. CEILING EXHAUST/ 'a RETURN ALUMINUM WHITE 12x12 TITUS 350FL AG-75 1-3, 8-11 UPON RECEIVING A SIGNAL FROM THE TEMPERATURE CONTROL EA EXHAUST AIR DAINTREE TO PROVIDE BUILDING ENERGY MANAGEMENT SYSTEM (BMS). EQUIPMENT SHALL BE PROVIDED WITH ELECTROMECHANICAL CONTROLS ONLY; DAINTREE TO PROVIDE WI-FI COMMUNICATING THERMOSTATS. SYSTEM FOR OCCUPIED HOURS, THE RTU FAN SHALL ENERGIZE 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE O EER ENERGY EFFICIENCY RATIO O CEILING SUPPLY ALUMINUM WHITE 18x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3,8, 11-13 O UNIT FAN SPEED TO RUN AT 320 CFM PER TON. AND REMAIN ON DURING OCCUPIED HOURS. THE TEMPERATURE EF EXHAUST FAN SEAL 1"SINGLE BORDER FOR LINEAR DIFF SER,GOP FACE CONTROL SYSTEM SHALL MAINTAIN THE COOLING AND HEATING EFF EFFICIENCY BRED PRF F s/ OF CEILING RETURN ALUMINUM WHITE 18x4 TITUS FL-TZ-DF 3, 8-11, 13 S ESP EXTERNAL STATIC PRESSURE F O 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE © CEILING SUPPLY ALUMINUM WHITE 24x4 TITUS FL-TZ-DF 1-3, 8, 11-13 EXH EXHAUST 15,423 � � BORDER FOR NARROW TEE CEILING 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE EXHAUST FAN SCHEDULE SPLIT SYSTEM COOLING ONLY UNIT SCHEDULE F FAHRENHEIT HO CEILING RETURN ALUMINUM WHITE 244 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8-11, 13 FC FAN COIL UNIT , V SINGLE SLOT LINEAR DIFFUSER, DROP FACE TAG SERVICE LOCATION CFM SP DRIVE MAX MOTOR ELECTRICAL WEIGHT MODEL NO. REMARKS CFM ELECTRICAL EFFICIENCY WEIGHT FLR FLOOR N OJ CEILING SUPPLY ALUMINUM WHITE 30x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 WG RPM HP V p HZ (LBS) TAG SERVICE LOCATION LOW/MED/HIGH VOLT 0 Hz SEER I EER MANUFACTURER&MODEL (LBS) REMARKS FPM FEET PER MINUTE o FIELD VERIFY ALL CONDITIONS FPS FEET PER SECOND �qP KO CEILING RETURN ALUMINUM WHITE 30x4 TITUS FL-TZ-DF gORDERFORSLOT NARROWDIEECEILI GDROP P FACE 1-3, 8-11 13 EF 1 RESTROOM/ ROOF 550 0.25 DIRECT 550 /15 15 60 50 GREENHECK 2 3 4 FC-1 ATM ROOM WALL 88/238/305 208 1 60 9.0 11.2 CARRIER 40MHHCl2-3 20 2,3,4,5 FSD FIRE/SMOKE DAMPER Rka ROe�S g/17/20 JANITOR/ G-090-D FC-2 DATA ROOM WALL 188/238/305 208 1 60 19.0 11.2 CARRIER 40MHHC12-3 20 1,23,4,5 G GAS I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE BREAK ROOM DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL LO CEILING SUPPLY ALUMINUM WHITE 36x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 GRD GRILLES, REGISTERS, ROBISON VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO REMARKS COOLING ELECTRICAL AND DIFFUSERS I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE NOM. WEIGHT INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL HP HORSEPOWER, HEAT PUMP O CEILING RETURN ALUMINUM WHITE 36x4 TITUS FL-TZ-DF 1-3. 8-11, 13 TOTAL SENS. BORDER FOR NARROW TEE CEILING 1. PROVIDE WITH THE FOLLOWING: 2. INTERLOCK FAN OPERATION WITH OCCUPANCY SENSORS IN ROOMS SERVED. TAG SERVICE LOCATION TONS MBH MBH V 0 Hz MCA MOCP MANUFACTURER&MODEL (LBS) REMARKS INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD HVAC HEATING, VENTILATING, AND ENGINEERING, INC V SINGLE SLOT LINEAR DIFFUSER, DROP FACE A. CLASS 1 MOTORIZED DAMPER MODIFICATIONS DUE TO EXISTING CONDITIONS. O CEILING SUPPLY ALUMINUM WHITE 48x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 1-3, 8, 11-13 B. DISCONNECT SWITCH 3. PROVIDE VARIABLE SPEED CONTROLLER DIRECT DRIVE FAN. T & B CU-1 ATM ROOM ROOF 1 1.0 11.5 I 9.1 1268 1 160111.0115.0 1 CARRIER 38MHRBC12AA3 55 1,2 AIR CONDITIONING 19401 40TH AVE W SUITE 302,LYNNWOOD,WA 96036 V SINGLE SLOT LINEAR DIFFUSER, DROP FACE C. SUPPORT BRACKETS AND ISOLATOR CONTRACTOR SHALL MARK BALANCED POSITION ON CONTROLLER. CU-2 DATA ROOM ROOF 1.0 11.5 9.1 208 1 160 111.0115.0 1 CARRIER 38MHRBC12AA3 55 1,2 THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR IN INCH TEL:206364-3343 FAx:4258350098 © CEILING RETURN ALUMINUM WHITE 48x4 TITUS FL-TZ-DF 1-3, 8-11, 13 OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND KW KILOWATT CONTACT:GRANT HANSEN BORDER FOR NARROW TEE CEILING D. FLEXIBLE CONNECTION 4. PROVIDE 4-WAY CONTROL CIRCUIT BY ONE OCCUPANCY SENSOR IN REMARKS CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL MBH THOUSAND BTU PER HOUR ISSUE DATE DESCRIPTION 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE E. EXHAUST GRILLE MATCHING TYPICAL EACH RESTROOM, ONE OCCUPANCY SENSOR IN THE JANITOR CLOSET,© 1. PROVIDE THERMAL OVERLOAD PROTECTION. COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY MCA MINIMUM CIRCUIT AMPACITY CEILING SUPPLY ALUMINUM WHITE 60x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING 3, 8, 11-13 R.A. GRILLE SPECIFICATION AND ONE TIMER SWITCH IN THE LOUNGE. 2. PROVIDE LIQUID LINE SPECIALTIES INCLUDING FILTER DRIER, SIGHT GLASS,TXV,SOLENOID VALVE, 24V 1 ph THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE MOCP MAXIMUM OVER CURRENT ® CEILING RETURN ALUMINUM WHITE 60x4 TITUS FL-TZ-DF 1 'SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1-3, 8-11, 13 CONTROL WIRE BY CONTROLS CONTRACTOR. FINAL AND SHALL BE IMPLEMENTED AT CONTRACTOR'S COST. PROTECTION BORDER FOR NARROW TEE CEILING3. DAINTREE TO PROVIDE BUILDING ENERGY MANAGEMENT SYSTEM (BMS). EQUIPMENT SHALL BE PROVIDED WITH MTD MOUNTED O CEILING SUPPLY ALUMINUM WHITE 72x4 TITUS FL-TZ-DF 1"SINGLE SLOT LINEAR DIFFUSER, DROP FACE ELECTROMECHANICAL CONTROLS ONLY; DAINTREE TO PROVIDE WI-FI COMMUNICATING THERMOSTATS. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF S BORDER FOR NARROW TEE CEILING 3, 8, 11-13 OSA OUTDOOR AIR 4. PROVIDE WITH DIVERSITECH MODEL CP-22 EXTERNAL CONDENSATE PUMP LOCATED ON WALL NEXT TO FAN COIL. LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR 08D OPPOSED BLADE DAMPER I"SINGLE SLOT LINEAR DIFFUSER, DROP FACE 1 5. FAN COIL UNIT POWERED BY CONDENSING UNIT. BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT O CEILING RETURN ALUMINUM WHITE 72x4 TITUS FL-TZ-DF BORDER FOR NARROW TEE CEILING -3, 8-I1, 13 ACCORDANCE WITH GOVERNING CODES, THE PLANS AND POC POINT CONNECTION EXHAUST/ V SINGLE SLOT LINEAR DIFFUSER, BORDER 22 SPECIFICATIONS NOT WITHSTANDING,THE CONTRACTOR SHALL PRV PRESSURE REDUCING VALVE OU WALL ALUMINUM WHITE 30x4 TITUS FL-10 1-3, ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT 9, 11, 13 RA RETURN AIR 0 8-17-20 LANDLORD COORDINATION RETURN OR EQUAL TO SURFACE MOUNT ON WALL DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN RD ROOF DRAIN Qj 5-29-20 BID ADDENDUM OV CEILING SUPPLY ALUMINUM WHITE OPENING PRICE ANR AIR NOZZLE WITH CORE 1, 3,8 INTENT. REF REFERENCE RG RETURN GRILLE 4-30-20 BID SET O CEILING SUPPLY ALUMINUM WHITE 48x6 TITUS FL-20 EQUALSINGO FIT N ARROWINEAR TEE CEILING BORDER 16 0R 1-3,8, 11-13, 15 RPM REVOLUTIONS PER MINUTE 4-13-20 PERMIT SUBMISSION EQUAL TO FIT NARROW TEE CEILING SA SUPPLY AIR 2"SINGLE SLOT LINEAR O DIFFUSER, BORDER 16 OR 4-3-20 90% SET CEILING RETURN ALUMINUM WHITE 48x6 TITUS FL-20 EQUAL TO FIT NARROW TEE CEILING 1-3, 8, 11-13, 15 SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS 3-20-20 PLANNING O CEILING SUPPLY ALUMINUM WHITE 48x4 TITUS FL-10 WITHHSINGLESLOTLNGCLIINEAR ITOSER, ACEM U 1.3,8, 11-14 CHASE BANK GENERAL NOTE NATIONAL ASSOCIATION WITH HARD CEILING CLIP TO SURFACE MOUNT SP STATIC PRESSURE PROJECT INFORMATION BLOCK 1"SINGLE SLOT LINEAR DIFFUSER, BORDER 66 TYP TYPICAL JOB# JPM19010.0 O CEILING RETURN ALUMINUM WHITE 48x4 TITUS FL-10 WITH HARD CEILING CLIP TO SURFACE MOUNT 1-3,8. 11-14 CONTRACTOR SHALL COORDINATE FINAL LOCATION OF V VENT DATE: 1/20/2020 REMARKS THERMOSTATS, SWITCHES, FLOOR AND WALL RECEPTACLES, CARD WB WET BULB (TEMPERATURE) DRAWN BY: GH 1. COORDINATE WITH LIGHT FIXTURES AND OTHER CEILING DEVICES FOR EXACT LOCATIONS OF ALL AIR FIXTURES. READER, DOOR ACTUATOR, ]-BOXES, ETC. WITH ARCHITECTURAL 2. COORDINATE FRAME STYLES WITH CEILING OR WALL SYSTEM FRAMING AND FINISH MATERIALS. PROVIDE GYPSUM BOARD / PLASTER FRAME TO SUPPORT AND/OR STRUCTURAL DRAWINGS PRIOR TO INSTALLATION. CHECKED BY: PR FIXTURE WITHIN GYPSUM CEILING. CONTRACTOR SHALL CONTACT THE ARCHITECT IN CASE OF ANY 3. N.C. VALUES FOR DIFFUSERS, GRILLES AND REGISTERS SHALL NOT EXCEED 25, WITH A ROOM ABSORPTION RATE OF IOdb. DISCREPANCIES AND AWAIT FOR A WRITTEN RESPONSE PRIOR TO DRAWING INDEX MODEL 4. PROVIDE BACK SIDE OF SUPPLY AIR FIXTURES WITH FACTORY-INSTALLED R-6 INSULATION BLANKET. PROCEEDING WITH THE WORK. 5. PROVIDED DIRECTIONAL BLOW CLIPS (1-3) AS READ. FOR DIRECTIONAL AIRFLOW CONTROL. MO.0 LEGEND, NOTES, SCHEDULES, DRAWING STANDARDS v20.1 6. NOT USED. & DRAWING INDEX 7. WHERE PLENUM RETURNS ARE UTILIZED, CONCEAL VISIBILITY TO PLENUM SPACE BY PROVIDE DUCT BOOT SECURED TO CEILING FRAMING OR OPTIONAL SHEET TITLE OPPOSABLE BLADE DAMPERS FOR 2X2 RA GRILLES, AND 'FBR' RETURN HOODS AT LINEAR SLOT RA FIXTURES. WHERE RETURN AIR FLOW CONTROL IS REQUIRED, MOA MECHANICAL DETAILS PROVIDE OPTIONAL OPPOSABLE BLADE DAMPERS IN THE 2X2 GRILLES, AND'FBBO' BLANK-OFFS IN THE LINEAR SLOT AIR FLOW IS NOT TO BE ADJUSTED BY RE-SIZING OF THE FIXTURE GRILLE AREA. 8. "OR EQUAL"SUBSTITUTIONS PERMITTED. SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT OF RECORD BY THE PROCESS DEFINED IN THE PROJECT MANUAL. M2.0 MECHANICAL CONTROL PLAN LEGEND, NOTES,, 9. EXHAUST GRILLES ARE TO BE DUCTED TO THE ROOF CENTRIFUGAL EXHAUST FAN SYSTEM, WHICH IS CONTROLLED BY 4-WAY SWITCH WIRING AT THE VARIOUS SCHEDULES, Oc DRAW LOCATIONS. MECHANICAL INSTALLER SHALL COORDINATE WITH THE ELECTRICIAN FOR EQUIPMENT AND CONTROL DEVICE PROVISION AND M2.1 MECHANICAL FLOOR PLAN INSTALLATION. DRAWING INDEX 10. ALL SA, RA, AND EXHAUST FIXTURES IN 2X2 CEILING GRIDS SHALL BE 24"X 24"FULL FIXTURES. THE USE OF REDUCED VENT AREAS WITHIN LARGER PLATES TO M2.2 MECHANICAL ROOF PLAN RESTRICT AIR FLOW IS NOT PERMITTED. AIR FLOW CONTROL IS TO BE PROVIDED BY ADJUSTABLE DAMPERS WITHIN THE DUCTS OR BOOTS SERVING THE FIXTURES. 11. SPECIFY EDGE DETAIL/ BORDER TYPE FOR COMPATIBILITY WITH GYPSUM BOARD CEILINGS WHERE REQUIRED. M3.0 ENERGY CODE COMPLIANCE SHEET NUMBER 12. LINEAR SLOT FIXTURES SET IN GRID CEILINGS ARE INTENDED TO HAVE A CONTINUOUS, SEAMLESS APPEARANCE FOR THE FULL RUN OF THE NARROW CEILING GRID SPACING, WITHOUT VISUAL DIFFERENTIATION BETWEEN SA, RA, AND UNUSED PORTIONS OF THE RUN. PROVIDE OPTIONAL'FBR' RETURN HOODS AND 'FBBO' BLANK-OFFS AS REQUIRED. 13. PROVIDE FABRICATED SHEETMETAL PLENUM THE FULL LENGTH OF SLOT LINEAR DIFFUSER. M0 , 0 w O . O 14. PROVIDE TITUS (OR EQUAL) FBMC-10 MITERED CORNERS. 15. FLOWBAR DIFFUSER TYPE TO BE SPECIFIED IN PRIVATE OFFICES ONLY.SPECIFY SLOT DIFFUSER WIDTH AS REQUIRED TO MEET AIR DISTRIBUTION REQUIREMENTS IN \V/� THE HIGHEST-DEMAND OFFICE, AND APPLY THAT DIFFUSER THROUGHOUT ALL OFFICES. COPYRIGHT 2020. ROBISON ENGINM Nc. INC. DAINTREE MECHANICAL CONTROL: DESIGN-INTENT EXHAUST FAN CONTROL DIAGRAM TYPICAL MECHANICAL EQUIPMENT ZONE FIGURE 1 : WGA100 (CAN BE USED WITHOUT SENSOR FOR SWITCHING UNE LOAD) 1. ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED/UNSWITCHED POWER.WSA10 ' WIRELESS SENSOR ADAPTERS REQUIRE 24V POWER. _ EXHAUST DIAGRAM SYMBOLS REFER TO MFRS.FIGURE 1 %Re Ni Binary Input, (DIP Switch 4 or DIP Switch 5 On) 2. DURING INSTALLATION THE LAST 4 DIGITS OF THE IEEE ADDRESS FOR EACH WIRELESS COMPONENT ^"k011111°E"`850i'E401EO=PM YSMW 9111701 001-111 "All;w rxr"lA4, RTU OR WIRLESS PROBE DUCT TEMP.SENSOR aaf Hot 120-2 MUST BE RECORDED ON THE SHOP DRAWING SET CORRESPONDING TO THE LOCATION OF THE e9 avurAs�r6-iGi& MF&rMF NbWn TWOMM�rau O-ILZORML4R MOUAFTnAMONrl -O�e�OO,laWW " SPLIT-SYSTEM Lie a9e COMPONENT. o APPRCOC V161P,1®OIPY,910CFMwhing UUV.WdROCdPA11CYWMM6UMO MI;, MORWNAR odweroucnurer W1rH&kCKO DANT I CONDENSING UNIT REMOTE TEMPERATURE LM0 • �� 3. FOR ANY SENSORS ATTACHED TO A WIRELESS SENSOR ADAPTER WSA 10 THE LAST 4 DIGITS OF THE — — �— — — — — — — — — — — — — — — — — SENSORS AS INDICATED ON PLAN rat r �" WGA 100 O Cap IEEE ADDRESS FOR THE RESPECTIVE WSA10 MUST BE RECORDED.THE SPECIFIC WSA10 PORT MUST nwed JANITORS ALL GENDER GENDER LOUNGE SELF-POWERED CT FOR / "tHeg � e+� ALSO BE RECORDED PER SENSOR. CLOSET RESTROOM RESTROOM EQUIPMENT FAN POWER 1 (( 1MW 4. DURING WIRELESS ADAPTER INSTALLATION FOLLOW THESE STEPS AS DEFINED IN THE DEVICE \ / / Switched ❑ ❑ ❑ tmr ❑ IIS /II WIRED TO WGA100 DUCT T )) I I (( T I (( T �(( T Land INSTALLATION GUIDE IN THE FOLLOWING ORDER. Z / \ \ 120 2mAc A. CONFIRM WIRELESS ADAPTER DIP SWITCHES ARE SET CORRECTLY. i 19411111.11117" s.e.� 24VDC RED 24 Y9C Power Output B. RESET ADAPTER Fill ACK Grouirid/Caftrimars C. PERFORM PROPER L ADAPTERS) '(Li°a. °0L "°°L9R TO EQUIPMENT DAMRREE THERMOSTAT WIRED TO RTU .�.e Cew.,, Ln 5. INSTALLER MUST BECOME FAMILIAR WITH THE PUBLISHED INSTALLATION GUIDES FOR THE PRODUCTS IN DISTIBUTION PANEL _ J TERMINAL BLOC(VIA STANDARD 8 Control eltc xu. n .nmrw wNA rp aR- THE PROJECT SCOPE. DAINTREE INSTALLATION GUIDES CAN BE FOUND AT: CONDUCTOR WIRING ewNah high, MoNed with I HTTPS://PRODUCTS.CURRENTBYGE.COM/CONTROL-SYSTEMS/WIRELESS-LIGHTING-CONTROLS 6. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROCUREMENT AND INSTALL OF DAINTREE AND RELATED COMPONENTS PERTAINING TO IT/DATA, LIGHTING, POWER AND HVAC. DAINTREE GENERAL NOTES: 1. MOUNT ALL THERMOSTATS AND SENSORS ON WALL"'ABOVE FINISHED FLOOR. 00 2. HVAC, LIGHTING AND POWER SHALL BE CONTROLLED AND MONITORED BY A WIRELESS NETWORKED Lu ENERGY MANAGEMENT SYSTEM UTILIZING DAINTREE CONTROLSCOPE SOFTWARE AND OPEN, STANDARDS BASED CONTROLSCOPE CONNECTED HARDWARE. a W 3. THE DAINTREE SYSTEM WILL INCLUDE A COMMUNICATIONS INTERFACE IN ORDER TO NETWORK a FACILITY TO COMPANY WIDE SYSTEM NETWORK. 4. THE FOLLOWING SYSTEM WILL BE PROVIDED BY DAINTREE NETWORKS: A. SYSTEM INFRASTRUCTURE i. WIRELESS AREA CONTROLLER (WAC).THE WAC IS THE WIRELESS SYSTEM GATEWAY PROVIDED BY DAINTREE NETWORKS. IF MULTIPLE WACS ARE NECESSARY THEY CAN BE DAISY CHAINED VIA ETHERNET CABLE.WACS MUST BE POWERED WITH 120V RECEPTACLE. ii. A CELLULAR MODEM WILL PROVIDE ACCESS TO THE CONTROLSCOPE NETWORK.WAC(S) ARE CONNECTED TO THE CELLULAR MODEM. 000\ iii. AN UNINTERRUPTED POWER SUPPLY (UPS) WILL BE INSTALLED TO PROVIDE AN UNINTERRUPTED RECEPTACLE FOR WAC(S) AND CELLULAR MODEM. Uj � B. HVAC CONTROL (ClG I. WIRELESS THERMOSTATS (WTS10) WILL PROVIDE NETWORKED CONTROL OF ROOF TOP UNITS VIA STANDARD 8 WIRE INTERFACE.THE THERMOSTATS WIRELESSLY COMMUNICATE WITH THE D SYSTEM BUT MUST BE WIRED TO RTU. ii. WIRELESS SENSOR ADAPTERS (WSA10) CAN ACCOMODATE 4 THERMISTOR TYPE TEMPERATURE SENSORS AND 2 LOW VOLTAGE (0-1 OV) SENSORS AND SHALL PROVIDE CONTROL OF: 1. 0-10V CT(S) LU 2. PROBE DUCT TEMPERATURE SENSORS C = N 3. EXTERIOR TEMPERATURE SENSOR W i. WIRELESS ROOM TEMPERATURE SENSORS PROVIDE MONITORING PER REQUIRED SPACE LL. CN INCLUDING ATM ROOM TEMPERATURE MONITORING. iv. WGA 100 (WIRELESS GENERAL PURPOSE ADAPTERS) PROVIDE ON/OFF CONTROL OF H - -- -- BASEBOARD HEATERS AND DUCT HEATERS. v. WGA 100 ADAPTER ALSO PROVIDES CONNECTION FOR LEAK SENSOR. wej 0/ a C. INDOOR LIGHTING z Q o O I. CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA100-PM WIRELESS ADAPTERS. i ii. WIRELESS OCCUPANCY SENSORS SHALL BE INSTALLED TO PROVIDE COVERAGE IN DESIRED AREAS. LUiii. WIRELESS SWITCHES (W WD1) SHALL PROVIDE OVERRIDE CONTROL OF INTERIOR AND U 0 EXTERIOR LOADS. N D. EXTERIOR LIGHTING i. CIRCUIT ON/OFF CONTROL SHALL BE PROVIDED BY WA 100-PM WIRELESS ADAPTERS IF LOADS L LU ARE SINGLE POLE. IF EXTERIOR LIGHTING IS MULTI POLE AN AUXILIARY RELAY CAN BE USED. INTERIOR AND EXTERIOR LOADS MUST BE CONTROLLED BY SEPARATE ADAPTERS IN ORDER TO Q N ALLOW FOR SEPARATE CONTROL. O 0 WIIRfiESS ROOM ii. LOW VOLTAGE OPEN LOOP PHOTOCELL SHALL BE INSTALLED TO CONTROL EXTERIOR Alt TEMP LIGHTING. Z D E. POWER MONITORING J we""'i. CTS WILL BE INSTALLED ON EACH PHASE OF MAIN POWER AND UTILITY GRADE MODBUS N CONNECTED POWER MONITOR SHALL BE INSTALLED. 1IMMM RMl ii. SELF POWERED CTS WILL BE INSTALLED TO MONITOR RTU FAN POWER CONSUMPTION AND DETECT FAULT. EACH SHALL BE WIRED TO WSA10. F. IRRIGATION CONTROL INTEGRATION (WHEN REQUIRED) Q 1. THE IRRIGATION SYSTEM WILL BE CONNECTED TO CONTROLSCOPE VIA CELLULAR MODEM. O _ — 5. ALL WIRELESS ADAPTERS MUST BE PROVIDED WITH UNINTERRUPTED (UNSWITCHED POWER). `OO WIRELESS 6. THE DAINTREE SYSTEM DOES NOT SUPPORT CONTROL OF VAV/DAMPER BASED SYSTEMS.THE CARRIER ROOT A VAV SYSTEM SHALL BE STAND ALONE.CONTROL COMPONENTS MUST BE COMPATIBLE WITH CARRIER IBRRFI RTU-1(I AND ARE NOT IN DAINTEE SCOPE. (ONSELF POWEREDCT FOR FC 1 m 1 7. NOT USED. FAN POWER.WRE TO WIRELESS ROOM _ L _ — WGAQIOV INPUT AR TEMP SENSOR 8. FOR CARRIER VRF MODELS, PROVIDE 24V THERMOSTAT INTERFACE ACCESSORY TO BE DETERMINED ARCHITECT/ENGINEER OF RECORD rj BY CARRIER.VERIFY WITH MECHANICAL EQUIPMENT SCHEDULE,SPECIFICATIONS,AND MECHANICAL W J=PROBE DUCT ENGINEER. STEMPERATURE 9. INSTALL WA 100-PM FOR EF-1 CONTROL. CONFIGURE AS ON/OFF DEVICE TO ALLOW FOR MANUAL SENSOENISO R KEN McCRACKEN, SWITCHING. WGA100 ADAPTER DOES NOT SUPPORT MANUAL SWITCHING.SEE MECHANICAL RCP ARCHITECT O FOR EF-1 SPECIFICS. Architecture•Program Management•Permitting 10. THE DAINTREE SYSTEM HUMIDITY AND TEMP SENSORS DOES NOT SUPPORT CONTROL OF 19120 SE 34TH STREET,SURE 115 VAV/DAMPER BASED SYSTEMS.THEY ARE ONLY FOR MONITORING. VANCOUVER,WA 98683 Contact:ELIZABETH COLE (614) 212-4330 ecole@leQpmdgindginc.com SITE SPECIFIC CONTROL NOTES: T I. THE SUPPLY OF HEATING AND COOLING ENERGY TO EACH ZONE IS CONTROLLED BY INDIVIDUAL EXHAUST FAN THERMOSTATIC CONTROLS THAT RESPOND TO TEMPERATURE WITH THE ZONE. TIMHt_SWtfCH WRRESS OUTSIDE 2, THERMOSTATIC CONTROLS TO PROVIDE A TEMPERATURE RANGE OR DEADBAND OF AT LEAST 50F 60 AIRTEWSENSOR WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS CAPABLE OF BEING me,edrawings and: ificaronsare the aonfidenr iandp,aioropenr SHUT OFF OR REDUCED TO A MINIMUM. of ie Morgan Chase and shall not be oopled«,epmdacetl without mitten authoiz tion. The contract documents were prepared far use on thisspecific H 0C) 3. EACH HVAC SYSTEM HAS CONTROLS THAT VARY THE START-UP TIME OF THE SYSTEM TO JUST MEET THE see in coniundion with its issue date and are not suroble far use on a different 4 0 ( TEMPERATURE SET POINT AT TIME OF OCCUPANCY. site th r a e,t time. use of these drawings foret rete nsee a exomp eon anomer project reauees of semces of Frau licensed se an an and RTIj�2(( engineers. R tp ti e. of f t es etrad documents tar reuse on anomer 4. EACH ZONE IS PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY THE aroiee's not authorized. WALL MIOUNM WRELE5S ROOM DAINTREE SYSTEM. O WIRELESS ROOM OCCUPATJC.`Y ARTEMPSBVSOR II SEAL R�0 PROFFS AR TEMP SENSOR SB4SOR *� QiDAINTREE DEVICES KEY: I Ne 1)) (7""W RR -2 I SELF POWERED Cr FOR r I FAN POWER.WIRE TOl L ION ROOF) WGAO-10VTNPUT z24 WIRELESS WALL DIMMER ® )�/ WIRELESS ADAPTER WAPM ))) WA10 (WWD1) (WA100-PM) e o WR$EASROOM WREMPROBE DUCf WIRELESS GENERAL WGA >�) �qRK R ROg�S AR TEMP SENSOR SUPPLY TEMPERATURE Seem r/ ROOF) WIRELESS PIR OS 1)) ADAPTER (WGA 100) 8/17/20 ZIROBISON(WOS2-CM-E) WIRELESS SENSOR WSA10 �) ADAPTER (WSA10) ENGINEERING, INC LOW VOLTAGE OPEN 19401 40TH AVE W SUrrE 302,LYNNWOOD.WA 98036 LOOP PHOTOCELL OL PS WIRELESS TEMP TEL:206-364-3343 FAX:4258350098 CONTACT:GRANT HANSEN LL® WASENSOR �)) ISSUE DATE DESCRIPTION OCCUPANCY FTr2 C- ROOM S ((( SENSOR [TSTAT \ TEMPERATURE FC-2 ROOM AR WIRELESS TSTAT 0 THERMOSTAT TS10 SENSOR STANDARD 8 CONDUCTOR L TSTAT W04G TO RR A & RTU-2TERMNAL BLOCK FOR (( LEAK SENSOR CELLULAR �(( >�) SENSOR ECTION LEAK TECTION OPEN AREA HVAC CONTROL ((r - WIRELESS ROOM MODEM CURRENT AM7EMpSBJSOR .. OS OS O 8-17-20 LANDLORD COORDINATION Rl" TRANSFORMER Q 5-29-20 BID ADDENDUM WALL IN-DUCT SMOKE PUSH-BUTTON 4-30-20 BID SET -U- DETECTOR TEST — TEST TIMER SWITCH BY —C/3 T _ OCCUPANCY 0 4-13-20 PERMIT SUBMISSION SENSOR KEY SWITCHES ELECTRICIAN HARDWIRE TO SENSOR 4-3-20 90%SET rn WIRELESS 3-20-20 PLANNING 4 WALL MOUNTEDo OUTSIDE AIR PROJECT INFORMATION BLOCK OCCUPANCY �} TEMPERATURE OTS ))) JOB# JPM19010.0 SENSOR U) SENSOR DATE: 1/20/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS V20.1 SHEET TITLE MECHANICAL CONTROL PLAN Z SHEET NUMBER MECHANICAL CONTROL PLAN SCALE 1 A A ^ • O 1/4"=1'-0" 1 V 1 L COPYRGHT 2020, ROBISON O(QEERe(O, INC. GHANSEN F Vit ROfYCCRA0(EN\_CHASE&WKS\424-1360 CHASE TMW &GREENWAY— 1M,AM. OR\DNG\Y2-0— C(1ROL PLAILBWC OS-27-2020 0&O9 -- „ 8�1 KEYED NOTES: MIL 1. 12x12 EXHAUST DUCT UP TO EXHAUST FAN ON ROOF. CONNECT DUCTWORK TO EXISTING DUCT DROP AS SHOWN. _ 2. NOT USED. 3. ATM & DATA ROOMS ARE NOT OCCUPIED. FOR ELECTRICAL AND STORAGE EQUIPMENT ONLY.THESE ROOMS NOT NEED DIRECTLY VENTILATED. SU 4. EXISTING SUPPLY AIR DUCT AT AND RETURN AIR DUCT UP THRU ROOF TO PACKAGED ROOFTOP UNIT. CONNECT DUCTWORK TO EXISTING DUCT DROP AS SHOWN. 5. UNDERCUT DOOR A MINIMUM 1". 6. SPLIT SYSTEM WALL MOUNTED DUCTLESS FAN COIL UNIT WITH CONDENSATE PUMP MOUNTED ON WALL NEXT TO UNIT. COORDINATE ACTUAL INSTALLATION LOCATION IN FIELD WITH OWNER. 7. AIR NOZZLE DIFFUSER TO BE MOUNTED IN LOCATION SHOWN ALIGNED WITH LIGHT FIXTURE. IF BUILDING CONDITIONS OBSTRUCT MOUNTING LOCATION, CONTACT THE ARCHITECT/ENGINEER Ln TO EXPLORE OTHER ALTERNATIVES. MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING SYSTEM AS INDICATED ON THE DRAWINGS.ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL FOR COMPLETE, FINISHED WORK,TESTED, AND READY FOR OPERATION. 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE 0 UL CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE o ASSOCIATED AIR BALANCE COUNCIL (AABC),THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), OR THE TESTING, ADJUSTING, AND BALANCING BUREAU (TABB). BALANCE EACH SUPPLY, a RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5%OF REQUIREMENTS AND FURNISH A REPORT w TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, BALANCED, a A AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE A REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY. AN AIR BALANCE TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION. MINIMUM R 8 INSULATION IN UNCONDITIONED SPACE. INSULATE ALL ROUND DUCTS EXTERNALLY, EXCEPTEXHAUST DUCTS, WITH 2"FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT WITH 1"-THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND W DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6-9'. Q 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, LO FEE a FIRE, OR FIRE/SMOKE WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. M 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE ♦�/ INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTER O N THAN 24 GAUGE STEEL. 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. LL. C4 IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE W OCCUPIED SPACE. H 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS M L AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST & BALANCE AGENCY. / ii O- _ - 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS. PROVIDE Q O p ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. _ W U o V V V V - V 11. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' INSTRUCTIONS AND 75 75 75 V 75 75 RECOMMENDATIONS. y P N 75 0L1 L 770 L"0 3 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL 170 150 oy 100 S EQUIPMENT AND MATERIALS. W a 80 80 300 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE NL _° DEVELOPMENT AND FLAME SPREAD REQUIREMENTS. INSULATION"R"VALUES SHALL COMPLY Z Q H 9A 0 0 0 APPLICABLE ENERGY CODE. O O F� r� 14x12 12x12 - - - 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR, UNLESS OTHERWISE Z Q ❑ 6 NOTED. LU N f 14x12 14x 2 10x8 15. INSTALL DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 16) IN SUPPLY AIR DUCTWORK N f CONNECTED TO HEAT PUMP UNIT.WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT _ L-M ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE '6"FBBO / 4 T DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY _ THE MANUFACTURER. 270 16. SEE ELECTRICAL DRAWINGSF R ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. / N 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF 170 80 / / / / Lsoo 1'FBBO THE STRUCTURE. COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS, WATER PIPING, A PLUMBING VENTS, AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/M0.1 FOR M / -11 / ❑ 250 MORE INFORMATION. 80-) 80 135 / / / 250 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY L ` // // PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY.ANY CHANGES RESULTING ARCHITECT/ENGINEER OF RECORD FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S L LSW J 4600 B ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. 200 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO KEN McCRACKEN, 270 CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND ARCHITECT EQUIPMENT, ETC. Architecture•Program Monay, n i d l'r-r'ni Hing - - - - - - 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) 19120 SE 34TH STREET, SUITE 115 O g YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED 1'FBBO L600 L300 1'FB80 0 B WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER VANCOUVER, WA 98683 P N 250 AT NO ADDITIONAL COST TO THE OWNER. Contact:ELIZABETH COLE 6 4 170 330 0 150 M T B ecole@pmdg(614) 212 inc..com N 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL 80-) :Er80 115 270 125 TOOLS, APPLIANCES, SURPLUS MATERIALS,AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO BE 4 REMOVED SHALL BE TURNED OVER TO THE OWNER. CC O00 N 80 0 N 80 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER,THE ITEMS e, L-W 200 FBBOL-m 2'FBBO 200 ,.#( L�00 OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. 14X12 libb. I 12X10 F=r 100 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE Th.drawings and:oe ieoonon:are the confidenroland wowlemrvwooeny NFORMATION ON MANUAL BALANCE DAMPER. of JP Narcan Chase and shall not be,copied or reproduced without written outhonzation. The contract documents were prepared la use on this specific site in conjunction with its issue date and we not suitable fa use on a different 12x10 1248312 12x10 } 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORKsite or at a later time. use of,hese aowinM for reference or a,sample,on another prajeot reouies the services of crop" licensed architects and rt SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH$MAGNA REQUIREMENTS. angineas. Reproduction of the contract documents fa reuse on another L 3'FBBO project is not authomed. P N --- 60 A 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT 170 150 2'FBBO T 75 ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS 100 270 -4 R1a SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN S$ 80 ,ji 0 ACCORDANCE WITH THE CURRENT BUILDING CODE. SEAL 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL RED PRo 1 FAN COILS, CONDENSING UNITS, RTU'S, AND EXHAUST FANS. INF SS, Li10t 2'FBBO 500 80 28. ALL REFRIGERANT SHALL BE R-410A. NO R-22 SHALL BE USED. 15,423 C- 10�7, r N 200 OD A 29. ALL HVAC UNITS TO BE PROPERLY LABELED. ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED - _ - _ _ - 150 AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1, FC-1, ETC. ) 10 0 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE N 41 0 ," 0 REQUIRED PRIOR TO OCCUPANCY. e 2'FBBO L1f ��RK R ROBS - - - - - - - - - 100 8/17/20 R3ROBISON I 200 .'E� I Sao S0 5 5 ENGINEERING, INC 19401 40TH AVE W SUITE 302,LYNNWOOD,WA 98036 B g25 TEL:206-364-3343 FAX:4258350098 ❑ 450 ❑ CONTACT:GRANT ANSEN ESCR ISSUE DATE DESCRIPTION D 520 A 75 1'6"FBBO 1'6"FBBO L`1 e1 ei e1 so 1 S-01 $1 4 0 8-17-20 LANDLORD COORDINATION 0 5-29-20 BID ADDENDUM NOTE: 4-30-20 BID SET DUCTWORK DRAWN IS FOR SCHEMATIC PURPOSES. IF ROUTING AND/OR 4-13-20 PERMIT SUBMISSION SM DO NOT WORK WITH EXISTING CEILING OBSTRUCTIONS, CONTACT 4-3-20 90% SET ARCHITECTANGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3-20-20 PLANNING PROJECT INFORMATION BLOCK JOB# JPM19010.0 DATE: 1/20/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS v20.1 SHEET TITLE MECHANICAL FLOOR PLAN Z SHEET NUMBER MECHANICAL FLOOR PLAN SCALE 1 M201• 1 COPYRIGHT 1020. ROMOR Bill MC. "M RAWS\424-13111 CRASS HOARD a GIEDWAY- WARD,OR\OR6\Y2-1 - ROM RAKM 05-27-1020 acct psae No mil n- "L9__jt $(t KEYED NOTES: ip 1. ROOF MOUNTED EXHAUST FAN. MAINTAIN A MINIMUM 10'-0" FROM ANY OUTSIDE AIR INTAKE OPENING. 2. EXISTING ROOF MOUNTED PACKAGED UNIT. REUSE EXISTING DUCT DROPS. FURNISH AND INSTALL ALL TEMPERATURE CONTROL WIRING FROM THE UNIT TO CONTROL DEVICES. UNIT SHALL HAVE ALL FILTERS REPLACED AND ALL COILS CLEANED WITH APPROVED METHODS. ALL COIL FINNS SHALL BE COMBED AS STRAIGHT AS POSSIBLE. ALL THIS WORK SHALL BE PERFORMED AFTER CONSTRUCTION AND PRIOR TO C.O. 3. PROPOSED LOCATION FOR SPLIT SYSTEM REMOTE ROOF MOUNTED CONDENSER UNITS AND REFRIGERATION SUPPORT SYSTEM. 4. OUTSIDE AIR INTAKES SHALL BE LOCATED AT LEAST 10 FEET AWAY FROM ALL EXHAUST AND PLUMBING VENTS. 5. REFRIGERATION LIQUID AND SUCTION LINES FROM ROOF MOUNTED CONDENSER UNITS, PENETRATE tn ROOF AND SEAL WEATHER-TIGHT. ROUTE DOWN TO ASSOCIATED FAN COIL UNIT. PROVIDE WITH PIPE CURB AND CHASE WITH GOOSENECK. MECHANICAL GENERAL NOTES: 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING SYSTEM AS INDICATED ON THE DRAWINGS. ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN SPECIFICATIONS. IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL FOR COMPLETE, FINISHED WORK,TESTED, AND READY FOR OPERATION. O 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE LL CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE w ASSOCIATED AIR BALANCE COUNCIL (AABC),THE NATIONAL ENVIRONMENTAL BALANCING BUREAU Q (NEBB), OR THE TESTING,ADJUSTING, AND BALANCING BUREAU (TABB). BALANCE EACH SUPPLY, w RETURN, EXHAUST AND OUTSIDE AIR DEVICE WITHIN 5%OF REQUIREMENTS AND FURNISH A REPORT a TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, BALANCED, Cj B A AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY. AN AIR BALANCE TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL CODES, BEFORE FINAL APPROVAL OF THIS PROJECT. 3. ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND ACCOUNT FOR INSULATION. MINIMUM R-5 INSULATION IN UNCONDITIONED SPACE. INSULATE ALL ROUND DUCTS EXTERNALLY, EXCEPT EXHAUST qT DUCTS, WITH 2" FIBERGLASS INSULATION WITH VAPOR BARRIER. INSULATE ALL RECTANGULAR DUCT /0% WITH 1"-THICK, 1-1/2 LB. DENSITY DUCT LINER.TAPE ALL JOINTS. 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS (NO EXTRACTOR) AND DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6-0". 1. Q 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, FIRE, OR FIRE/SMOKE WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE L L W _ INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING Q (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER). DUCTWORK SHALL IN NO CASE BE LIGHTER O QW N N i THAN 24 GAUGE STEEL. / 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. LL. C4 / \ / \ IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE H / \ OCCUPIED SPACE. \ 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS J �/ / AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST&BALANCE AGENCY. Q O O 1 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS. PROVIDE ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. U 0 \ 11. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' INSTRUCTIONS AND LU 4 \ RECOMMENDATIONS. y 1 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL Q i ) EQUIPMENT AND MATERIALS. L LU 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE Q N DEVELOPMENT AND FLAME SPREAD REQUIREMENTS. INSULATION"R"VALUES SHALL COMPLY E RTU-1 ) APPLICABLE ENERGY CODE. O Q \ 5.0 TONS 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR, UNLESS OTHERWISE 800 LBS NOTED. LU N \ j / 15. INSTALL DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 16) IN SUPPLY AIR DUCTWORK a N / CONNECTED TO HEAT PUMP UNIT. WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT Z r \ / ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN. LOCATE DUCT MOUNTED SMOKE \ / DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY Q / THE MANUFACTURER. \ / 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. \ �I CU-2 CU-1 17. UNLESS OTHERWISE NOTED, INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE, TIGHT TO THE BOTTOM OF I _ \ THE STRUCTURE. COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS,WATER PIPING, \ 55 LB 55 LB PLUMBING VENTS, AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/M0.1 FOR MORE INFORMATION. - ` 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING CONFLICTS.THE - _ CONDENSING UNIT CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY PLATFORM A PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY.ANY CHANGES RESULTING ARCHITECT/ENGINEER OF RECORD SEE STRUCTURAL FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S / INSULATED ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. / \ REFRIGERANT LINES 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO KEN McCRACKEN, / \ ABOVE ROOF- CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND ARCHITECT DEMISING WALL PROVIDE WITH EQUIPMENT, ETC. BELOW / A PIPE SUPPORTS 5 WEATHER-PROOF n no-ecwre•Program anagemeni•Pe it ng / \ (TYP.) ALUMINUM 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) 19120 SE 34TH STREET, SUITE 115 / \ JACKET. (TYP.) YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED VANCOUVER, WA 98683 / \ WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER Contact:ELIZABETH COLE / \ AT NO ADDITIONAL COST TO THE OWNER. 16141212-4330 / 4 \ 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL ecole@pmdginc.com TOOLS, APPLIANCES,SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO BE ( REMOVED SHALL BE TURNED OVER TO THE OWNER. -� 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER,THE ITEMS n OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. EI IRTU-2 ) 2 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. \ 5.0 TONS / 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION.SEE DETAIL 12/M0.1 FOR MORE o^eSBd`ovaWsandsl a ikamn'Qethe`onrbentiaiand pmueetaryp`ope`ty f JP Morgan Clhi and shall not be coped or reproduced efthoat written 800 LBS / INFORMATION ON MANUAL BALANCE DAMPER. aothoi¢a9on. theconhactdocamentsw e VeWred for use on this spedfic site in conjunction wth Its issue date and are not suitable far use on a different / EF-1 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION. DUCTWORKior of a later time. Use of these Nawings fa reference or exampe on 50 LB another pa laat rtinne. s the :arises ra property faerued or exams and B SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH SMACNA I REQUIREMENTS. argtneaa. Reproduction of the contract document:far reuse on another\ \ / 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT project Is not authaved. / ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS \ / SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN \ / ACCORDANCE WITH THE CURRENT BUILDING CODE. SEAL 1 \ i / RO 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL RED I I'll FAN COILS, CONDENSING UNITS, RTU'S, AND EXHAUST FANS. NfFp Sipes 28. ALL REFRIGERANT SHALL BE R-410A. NO R-22 SHALL BE USED. 15,423 r 29. ALL HVAC UNITS TO BE PROPERLY LABELED. ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED AS ASSOCIATED WITH THE HVAC UNIT. ( I.E. CU-1, FC-1, ETC. ) N 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY. e 'r! ROOF �Rk R ROBS 8/17/20 \ HATCH ZIROBISON ENGINEERING, INC 4"VTR 19401 40TH AVE W SUITE 302,LYNNWOOD,WA 98036 O 3 TEL:206-C NTACT:GRAM HANS-3343 FAx: EN350O98 ISSUE DATE DESCRIPTION 4 Q 8-17-20 LANDLORD COORDINATION 0 5-29-20 BID ADDENDUM 4-30-20 BID SET 4-13-20 PERMIT SUBMISSION 4-3-20 90%SET 3-20-20 PLANNING PROJECT INFORMATION BLOCK JOB# JPM19010.0 DATE: 1120/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS v20.1 SHEET TITLE MECHANICAL ROOF PLAN Z SHEET NUMBER MECHANICAL ROOF PLAN SCALE COPYRIGHT 2020,ROBI5011 EMOEOM GIG Q MBtM BAN(5\424-1380 04 SE 7"90!01IEII1sAY- TWX. 0R\O%\V2-2- ROOF PIARAIG 05-27-2020 OC12 9 MIL ,IMF Ul O O u- Section Section section 0 Mechanical Rough-In Plans Verified Field Verified Mechanical Rt h-In Plans Verified Field Verified COMcheck Software Version 4.1.4.0 COMcheck Software Version 4.1.4.0 W # 9 Complies? Comments/Assumptions # 9 Complies? Comments/Assumptions # Footing/Foundation Inspection Complies? Comments/Assumptions Inspection Value Value Inspection Value Value &Re .ID & Req.ID & Re .ID _ a 6.4.4.1.4 Thermally ineffective panel DComplies 6.4.1.4, HVAC equipment efficiency Efficiency:_ Efficiency:_ OComplies See the Mechanical Systems list 6.4.3.7 Freeze protection and snow/ice ❑Complies Inspection Checklist Mechanical Compliance Certificate W [ME4113 surfaces of sensible heating ❑Does Not 6.4.1.5 verified. Non-NAECA HVAC []Does Not for values. [F09)3 melting system sensors for future ❑Does Not n87 panels have insulation>= R-3.5. [ME11z equipment labeled as meeting connection to controls. d ❑Not Observable 901 ❑Not Observable ❑Not Observable Energy Code: 90.1 (2016) Standard ❑Not Applicable ❑Not Applicable ❑Not Applicable Requirements: 0.0%were addressed directly in the COMcheck software 6.4.4.2.1 Ducts and plenums having ❑Complies 6.4.3.4.1 Stair and elevator shaft vents [ Complies Additional Comments/Assumptions: Project Information [ME10]2 pressure class ratings are Seal ❑Does Not [ME313 have motorized dampers that ❑Does Not Text in the"Co a user"Comments/Assumptions"a column is provided by the user in the that is o Requirements screen. For each 1 Class A construction. automatically close. requirement,the user certifies that a code requirement separate e t met and how that is documented,or that an exception Energy Code: 90.1 (2016)Standard ❑Not observable []Not observable is being claimed.Where compliance Is itemized in a separate table,a reference to that table is provided. Ti ❑Not Applicable []Not Applicable Project �Title: Chase Tigard &Greenway 6.8.1-15, Electrically operated DX-DOAS DComplies 6.4.3.4.2, Outdoor air and exhaust systems []Complies Section ! Location: Tigard,Oregon 6.8.1-16 units meet requirements per ❑Does Not 6.4.3.4.3 have motorized dampers that ❑Does Not # Plan Review Compiles? Comments/Assumptions Climate Zone: 4c [ME110]2 Tables 6.8.1-15 or 6.8.1-16. 3 & Re .ID Project Type: Alteration ❑Not Observable use and meet maximum leakage []Not Observable ❑Not Applicable [ME4] rates.Check gravity dampers []Not Applicable 4.2.2, Plans,specifications,and/or OComplies Y g 6.4.4.2.1, calculations provide all information ❑Does Not ■ ■ 6.4.4.2.2 Ductwork operating>3 in.water ❑Complies where allowed. 6.7.2 with which compliance can be M W ❑Not Observable Construction Site: Owner/Agent Designer/Contractor column requires air leakage Dopes Not 6.4.3.4.5 Enclosed parking garage OComplies [PR2]1 determined for the mechanical w testing. [ME39]3 ventilation has automatic []Does Not systems and equipment and ❑Not Applicable 12100 SW Scholls Ferry Rd. WA Mark D.Robison ❑Not Observable Tigard,OR 97223 Robison Engineering,Inc. contaminant detection and document where exceptions to the ❑Not Applicable []Not Observable standard are claimed. Load 19401 40th Ave W,Suite 302 Q capacity to stage or modulate Lynnwood,WA 98155 [MEI6.5.2.3 Dehumidification controls OComplies fans ci 50%or less of design ❑Not Applicable calculations per acceptable Y [ME79]3 provided to prevent reheating. capacity. engineering standards and ', 206-366-3343 DDoes Not ca act 9 9 retooling,mixing of hot and cold -. handbooks. mrobison@robisonengineering.com []Not Observable : [ME5]4.4 Ventilation fans>0.7s hp have []Complies —- airstreams or concurrent heating [MES]3 automatic controls to shut off fan []Does Not 4.2.2, Plans,specifications,and/or ❑Complies and cooling of the same ❑Not Applicable - when not required. 8.4.1.1, calculations provide all information ❑Does Not airstream. []Not Observable 8.4.1.2, with which compliance can be Mechanical Systems List ii 6.5.2.4.1 Humidifiers with airstream OComplles []Not Applicable 8.7 determined for the electrical systems ❑Not Observable M [ME68]3 mounted preheating jackets have ❑Does Not 6.4.3.8 Demand control ventilation OComplies [PR6]2 and equipment and document where ❑Not Applicable Quantity System Type 8 Description O UJ ^' preheat auto-shutoff value set to [ME6]1 provided for spaces>500 ft2 and ❑Does Not exceptions are claimed.Feeder 2 CU-1.2/FC-1,2 ` , ❑Not Observable >25 people/1000 le/1000 R2 occupant N activate when humidification is connectors sized in accordance with not required. ❑Not Applicable p p p []Not Observable Cooling:1 each-enc System,Capacity=ui kBEffic Air-Cooled Condenser q _ density and served by systems approved plans and branch circuits -- - ----- ------ --- -- - — Proposed Efficiency=19.00 SEER,Required Efficiency: 13.00 SEER 6.5.2.4.2 Humidification system dispers14 N ion ❑Complies with air side economizer,auto []Not Applicable sized for maximum drop of 3%. a modulating outside air damper Fan System: None ,w [ME691 tube hot surfaces in the []Does Not 9 1'30 6.7.2.4 Detailed instructions for HVAC ❑Complies N Q � v airstreams of ducts or air- control,or design airflow>3,000 [PR5]1 systems commissioning included on ❑Does Not handling units insulated>=R- [-]Not Observable cfm. the plans or specifications for projects SYSTEM COMPLIANCE REQUIREMENT UNKNOWN 0.5. ❑Not Applicable >=50.000 ft2. ❑Not Observable Alteration details have not been specified J Ce 6.5.3.2.1 DX tooling systems>s 75 016) OComplies fee the Mechanical 5ystems list ❑Not Applicable M Q O O 6.5.2.5 Preheat coils controlled to stop DComplies [ME40]2 (>=65 k8tu/h effective 12016) []Does Not for values. `_r [ME70]3 heat output whenever ❑Does Not and chilled-water and Additional Comments/Assumptions:tions: Mechanical Compliance Statement evaporative cooling fan motor h ❑Not Observable P P mechanical cooling,including P 9 P economizer operation,is active. -- -— - - - ❑Not Observable >=Y designed to vary supply []Not Applicable Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building � ❑ LUQ Not Applicable fan airflow as a function of load plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been V 6.5.2.6 Units that provide ventilation air DComplies and comply with operational designed to meet the 90.1(2016)Standard requirements in COMcheck Version 4.1.4.0 and to comply with any applicable [ME106]3 to multiple zones and operate in ❑Does Not requirements. mandatory requirements listed in the Inspection Checklist. conjunction with zone heating [ME711.1 Insulation exposed to weather ❑Complies Mark Robison - President � ✓L 8/17/20 W Q Q and coolingsystems are []Not Observable [ME7]3 protected from damage. ❑Does Not prevented from using heating or DNo[Applicable Insulation outride of the Name-Title Signature Date heat recovery to warm supply air conditioned space and associated ❑Not Observable above 60°F when representative with cooling systems Is vapor ❑Not Applicable > Z Q v• building loads or outdoor air retardant. O O temperature indicate that most 6.4.4.1.2 HVAC ducts and plenums R-_ R-_ OComplies zones demand cooling. [ME812 insulated per Table 6.8.2.Where []Does Not i0 6.5.3.3 Multiple zone VAV systems with ❑Complies See the Mechanical Systems list ducts or plenums are installed in .❑Not Observable [ME42]3 DDC of individual zone boxes ❑Does Not for values. or under a slab,verification mayUJ have static pressure setpoint ❑Not Observable need to occur during Foundation ❑Not Applicable N reset controls. []NotInspection. 14 Not Applicable 6.4.4.1.3 HVAC piping insulation thickness. .. in. _in. OComplies 6.5.4.2 HVAC pumping systems with>- DComplies [ME912 Where piping is installed in or ❑Does NotIwo 'Mom [ME25]3 3 control values designed for Dotes Not under a slab,verification may ❑No[Observable variable fluid flow(see section need to occur during Foundation details). []Not Observable Inspection. []Not Applicable cc ONotApplicable 11 High Impact(Tier 1) -:2: Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) 11 High Impact(Tier 1) s 2'1 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) 1 I High Impact(Tier 1) '21;Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) 11 High Impact(Tier 1) Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) Project Title: Chase Tigard&Greenway Report date: 08/1720 Project Title: Chase Tigard&Greenway Report date: 08/17/20 Project Title: Chase Tigard&Greenway Report date: 08/17/20 Project Title: Chase Tigard&Greenway Report date: 08/17/20 Project Title: Chase Tigard&Greenway Report date: 08/1720 Data filename: F:\ Pedro+McCracken\ Chase Banks\424-1360 Chase Tigard&Greenway-Tigard,OR\Calcs\20 Pae 5 of 9 Data filename: F:\ Pedro+McCacken\ Chase Banks\424-1360 Chase Tigard&Greenway-Tigard,OR\CalcsQO Pae 4 of 9 Data filename: F:\ Pedro+McCracken\ Chase Banks\424-1360 Chase Tigard&Greenway-Ti ard,OR\Calcs\20 Page 3 of 9 Data filename: F: Pedro+McCracken\ Chase Banks\424-1360 Chase Ti ard&Greenway-Tigard,OR\Calcs\20 Pae 2 of 9 Data filename: F:\ Pedro+McCracken Chase Banks\424-1360 Chase Ti ard&Greenway-Tigard,OR\Calcs\20 Pae 1 of 9 9 Y 9 9 9 Y 9 9 9 Y 9 �. 9 Y 9 9 L 9 Y 9 9 0817 Chase Tigard&Greenway-Mech.cck 0817 Chase Tigard&Greenway-Mech,cck 0817 Chase Tigard&Greenway-Mech.cck 0817 Chase Tigard&Greenway-Mech.cck 0817 Chase Tigard&Greenway-Mech.cck ARCHITECT/ENGINEER OF RECORD KEN McCRACKEN, ARCHITECT SeCtlen Section Section acture•Progiam Management•Permitting # Final Inspection Complies? Comments/Assumptions # Rough-In Electrical Inspection Complies? Comments/Assumptions # Mechanical Rough-in Plans Verified Field Verified iComplies? Comments/Assumptions &Req.ID &R .ID Inspection Value Value 19120 SE 34TH STREET, SUITE 115 6.4.3.1.2 Thermostatic controls have a 5°F ❑Complies 8.4.2 At least 50%of all 125 volt 15-and ❑Complies 6.5.6.1 Exhaust air energy recovery on OComplies VANCOUVER, WA 98683 ![FI3]3 deadband. ❑Does Not [EL10]2 20-Amp receptacles are controlled by Dopes Not IME5611 systems meeting Tables 6.5.6.1- ❑Does Not Contact:ELIZABETH COLE ❑Not Observable an automatic control device. :❑Not Observable 1,and 6.5.6.1-2. ❑Not Observable (614) 212-4330 ❑Not Applicable ❑Not Applicable ❑Not Applicable ecole@pmdginc.com 6.4.3.2 Temperature controls have setpoint ❑Complies 8.4.3 New buildings have electrical energy ❑Complies 6.5.7.2.1 Kitchen hoods>5,000 chn have OComplies [F120]3 overlap restrictions. ❑Does Not [EL1112 use measurement devices installed. []Does Not [ME32]2 make up air>=50%of exhaust ❑Does Not ❑Not Observable Where tenant spaces exist,each ❑Not Observable air volume. tenant is monitored separately. In []Not Observable ❑Not Applicable buildings with a digital control system ❑Not Applicable _ []Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ❑Complies the energy use is transmitted to to 6.5.7.2.4 Approved field test used to ❑Complies [F12113 one automatic shutdown control. ❑Does Not control system and displayed i [ME49]3 evaluate design airflow rates ❑Does Not graphically. and demonstrate proper capture [:]Not Observable ❑Not Observable 10.4.1 Electric motors meet requirements ❑Complies end xhaustsstemcontainment of kitchen these Mogan Chow spand shall name copied or repro lu�ed! finoutonoperty mithen ❑Not Applicable x exhausts stems. ❑Not Applicable of JP Morgan Chase one shall not be coped«regoduced without wdHen [EL9] where applicable. ❑Does Not Y _ _ 6.4.3.3.2 Setback controls allow automatic ❑Complies 6.5.8.1 Unenclosed spaces that are ❑Com lies siteautin'oation, The conks! a dom nftan were«epored 1«use on ma spenirha [f12213 restart and temporary operation as ❑Does Not ❑Not Observable p P site in conjunction with its!me date and era not for rete t«use on a nnpleont required for maintenance. ❑Not Applicable (ME34) heated use only radiant heat. ❑Does Not fne th at r later time. Use of(nese sawing 1«reference«example on ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: another proles repvres p�l � o «� ie<s a nd ❑Not Observable engineers. Reproduclbn of 1M1a cronhacf doeuerenh for reuse on another ❑Not Applicable is not outno%ed. 6.4.3.6 when humidification and Complies 6.5.9 Hot gas bypass limited to: c=240 ❑Complies [F16]3 dehumidification are provided to a ❑Does Not [ME3511 kBtu/h-15%>240 kBtu/h-10% ❑Does Not zone,simultaneous operation is ❑Not Observable prohibited.Humidity control prohibits ❑Not Observable the use of fossil fuel or electricity to ❑Not Applicable ❑Not Applicable SEAL produce RH>30%in the warmest -- -._---- .----_-._..--- - 6.4.3.9 Heating for vestibules and air ❑Complies _D PROF ❑ F zone humidified and RH<60%in the IME6312 curtains with integral heating Does Not I I s coldest zone dehumidified. f s include automatic controls that ❑Not Observable F,p 02 6.7.2.1 Furnished HVAC as-built drawings OComplies shut off the heating system when 15,423 IF1713 submitted within 90 days of system Dopes Not outdoor air temperatures>45F. ❑Not Applicable r acceptance. ❑Not Observable Vestibule heating and cooling systems by a ❑Not Applicable thermostat irnthevestibule with 6.7.2.2 Furnished 0&M manuals for HVAC ❑Complies heating setpoint<=6OF and N [FI813 systems within 90 days of system ❑Does Not cooling setpoint>=80F. O acceptance. ❑Not Observable 6.5.10 Doors separating conditioned ❑Complies Tj ❑Not Applicable [ME7313 space from the outdoors have ❑Does Not �Rk8\CD controls that disable/reset ONot Observable D. RO 8/17/20 6.7.2.3 An air and/or hydronic system OComplies heating and cooling system when IF1911 balancing report is provided for HVAC ❑Does Not open. ONot Applicable systems serving zones>5,000 ft2 of [-]Not , Observable Additional Comments/Assumptions:area. �❑NotApplicable ROR ISOV 6.7.2.4 HVAC control systems have been ❑Complies IFI1011 tested to ensure proper operation, 'ODoes Not ENGINEERING, INC calibration and adjustment of controls. ❑Not Observable ❑Not Applicable 19401 L:40TH AVE W SUIT343 302,LrnN OOD,5.635 0 98036 TEL:2063643343 FAX:4258350098 110.4.3 Elevators are designed with the DComplies CONTACT.GRANT HANSEN j[FI24]' proper lighting,ventilation power,and 'Oboes Not standby mode. ISSUE DATE DESCRIPTION ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 0 8-17-20 LANDLORD COORDINATION 0 5-29-20 BID ADDENDUM 1 High Impact(Tier 1) `12. Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1 High Impact(Tier 1) 2,` Medium Impact(Tier 2) ,°*d.Low Impact(Tier 3) 1 High Impact(Tier 1) ,.Medium Impact(Tier 2) 3::Low Impact(Tier 3) 4-30-20 BID SET Project Title: Chase Tigard&Greenway Report date: 08/1720 Project Title: Chase Tigard&Greenway Report date: 08/1720 Project Title: Chase Tigard&Greenway Report date: 08/17/20 Project Title: Chase Tigard&Greenway Report date: 08/1720 4-13-20 PERMIT SUBMISSION Data filename: F:\ Pedro+McCacken\-Chase Banks\424-1360 Chase Tigard&Greenway-Tigard,OR\Calcs\20 Page 9 of 9 Data filename: F:\ Pedro+McCracken\_Chase Banks\424-1360 Chase Tigard&Greenway-Tigard,OR\Calcs\20 Page 8 of 9 Data filename: F:\_Pedro+McCracken\-Chase Banks\424-1360 Chase Tigard&Greenway-Tigard,OR\Calcs\20 Page 7 of 9 Data filename: F:\_Pedro+McCracken\_Chase Banks\424-1360 Chase Tigard&Greenway-Tigard,OR\Calcs\20 Page 6 of 9 0817 Chase Tigard&Greenway-Mech.cck 0817 Chase Tigard&Greenway-Mech.cck 0817 Chase Tigard&Greenway-Mech.cck 0817 Chase Tigard&Greenway-Mech.cck 4-3-20 90%SET 3-20-20 PLANNING PROJECT INFORMATION BLOCK JOB# JPM19010.0 DATE: 1/20/2020 DRAWN BY: GH CHECKED BY: PR MODEL DRAWING STANDARDS V20.1 SHEET TITLE ENERGY CODE COMPLIANCE SHEET NUMBER M3e0 OWYMMT 2020, RO&SM DI(**DlIK W- GHMW F:\-PEEOR04I1CMAo D1\-0I/SE BANKS\424-1360 CHASE TIGARD it GREQIwAY- TIGARD, Oft\DNG\M3-0 - BUM CODE WIPUAKEAMG 05-27-2020 08:12