Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (69)
FPS2021 -00029 RECEIVED FIRE PROTECTION PLANS FOR MAR 17 2021CITY OF S � CH 0 L L ' S BUILDING D1GARD V SION pfFICE Te I@ 4M rp Y 10340 STV NIMBUS AVE TIGARD OREGON 97223 PHOENIX FIRE PROTECTION y. 4 4130 AIRPORT ROAD V o NAMPA, IDAHO 83687 r y' PHONE:(208)468-9115 FAX.-(208) 461-9117 x ID. LIC. F.P.S.C. #108 1APUBLIC WORKS LIC. #16630—A-4(13930) ° UTAH LIC. # 6579958-5501 5370 OREGON LIC. # 181692 WYOMING ID # 2008-000553828 WASHINGTON LIC. # PHOENFP911KL JIM• JOE3 INFORMATION e JOB x 21-304 5CHOLL5 BU51NE55 CENTER T.I. 10340 5W NIMBUS AVE TIGARD OREGON 91223 h DRAWN BY : DON WELAND 1, at 111111 „ y < CHECKED BY : TRENT BICE NICET 0 101524 DATE : MARCH 2021 CODES: NFPA 13 2019 VICINITY MAP PROJECT LOCATION IFC 2015 NOT TO SCALE OCCUPANCY CLASS : 8,5-1 CONSTRUCTION TYPE: II B SQUARE FOOTAGE : N/A NUMBER OF FLOORS : I .OTECTION f=L AN EXPANDED SCALE : A5 NOTED ON PLANS WAREHOUSE EXISTING 5.(ok 1550 PENDENT SPRINKLER C_08 LOCATIONS IN AREA OF REMODEL EXISTING SPRINKLERS TO REMAIN NOTICE 0 IT IS THE OWNER'S RESPONSIBILITY TO PROVIDE HEAT ADEQUATE TO (E)RR PREVENT FREEZING THROUGHOUT FC (E) RR PHOENIX FIRE SCOPE OF WORK FOR SCHOLLS BUSINESS AREAS PROTECTED BY WET PIPE FIRE —� ITC-091SPRINKLER SYSTEMS INCLUDING ALL CENTER TENANT IMPROVEMENT ENCLOSURES FOR DRY PIPE VALVES, ND ALL — 11 — — — — — — — VALVES CONTROLLING WAT RTHER r- IPHOENIX FIRE TO ADD (1) and RELOCATE 13,NEW STANDARD SPRAY SUPPLIES TO THE FIRE SPRINKLER RELOCATE TO NEW LOCATION PENDENT SPRINKLERS 70 ACCOMMODATE NEW WALLS AND CEILINGS. SYSTEMS. EXISTING SPRINKLERS TO REMAIN CONTRACT WITH: I I NOTE AREA ABOVE CEILINGS IS NON-COMBUSTIBLE AND NO SPRINKLER KH: PROTECTION REQUIRED 63049 LOWER MEADOW DRIVE a-, u' PHOENIX TO ATTACH NEW ARM OVER5 AND DROPS TO EXISTING OUTLETS BEND OREGON 91101 � 541 3891119 EXPANDED EXPANDED EXPANDED PHOENIX TO ADD NEW PENDENT SPRINKLER 70 EXISTING BRANCH LINE WITH s= OFFI FFICE BREAK RM © — MECHANICAL TEE GENERAL NOTES: Co c-o5 Qi FIRE PROTECTION SYSTEM TO BE DESIGNED AND IN IN ADD NEW PENDENT HEAD EXISTING HANGERS AND EARTHQUAKE BRACING TO REMAIN ON EXISTING ACCORDANCE WITH THE APPLICABLE BUILDING CODES, STATE SYSTEM AND NO MODIFICATION TO THEM_ DESIGN AND INSTALLATION OF NEW AND LOCAL FIRE MARSHALS REQUIREMENTS, NFPA 13, 2019 NATIONAL INSTITUTE FOR CERTIFICATION PHOENIX FIRE SCOPE OF WORK PHOENIX FIRE SCOPE OF WOW, SYSTEM COMPONENTS (I.E. HEADS, HANGERS, MATERIAL) SHALL CONFORM TO EDITION. IN ENGINEERING TECHNOLOGIES h 9 (E)OFFICE NFPA "13 2016 AND STATE AND LOCAL CODES. �ALL ELECTRICAL WIRING Of FIRE PROTECTION SYSTEM AND The records of tba organization sbo"teat c-ore COMPONENTS TO BE PERFORMED BY OTHER TRADE DIVISIONS. TRENT BICE ALL PAINTING OF FIRE PROTECTION PIPING AND RELATED Automatic sprinldu system leront COMPONENTS TO BE PERFORMED BY OTHER TRADE DIVISIONS. 00301 / LEVEL III RELOCATE EXISTING SPRINKLER TO NEW ®ALL INSULATING OF FIRE PROTECTION PIPING AND RELATED is``'fired'°the teehn'eef area(') J — LOCATION WITH ARM OVER COMPONENTS TO BE PERFORMED BY OTHER TRADE DIVISIONS. T echnician 101524tion No. i 1 PLAN SYMBOLSQs SPRINKLER PIPING TO BE HUNG AS PER NFPA 13. OPEN © ADD NEW SPRINKLER - ATTACH TO EX15TING I EARTHQUAKE AND SWAY BRACING TO BE AS PER NFPA 13. Certification(s) Valid mza 04/01/2021 Fi OFFICE SPRINKLER LINE WITH MECHANICAL TEE FOR SWAY BRACING LOADS AND CONFIGURATIONS, SEE SWAY WSTTTUTE FOR CERTIFICATION c of BRACING CALCULATIONS ATTACHED TO HYDRAULIC CALCULATIONSNGINEERING TECHNOLOGIES (E)OFFICE AND SWAY BRACING DETAILS ON FIRE SPRINKLER DRAWINGS. records of this H orgemiraUon ahor that c-os -- �LATERAL SWAY BRACES ARE REQUIRED ON ALL FEED AND CROSS DON WELAND MAINS, REGARDLESS OF SIZE. LATERAL SWAY BRACES ARE REQUIREDutomatic sprinWer system layout PER NFPA 13 2016 ON BRANCHLINES 2-1/2" AND LARGER. LEVEL I certified in tha technical arae(') BRACES ARE NOT REQUIRED ON PIPES INDINDUALLY SUPPORTED BYTechm en ce fi ation eco. 252.1.42 MODIFICATIONS THAT CANNOT BE ISOLATED, SUCH AS RELOCATED RODS LESS THAN 6 AS PER NFPA 13 9.3.5.5.10 105253 Qe ALL WELDING TO BE DONE BY A CERTIFIED WELDER IN ADROPS, SHALL REQUIRE TESTING AT SYSTEM WORKING PRESSURE. FABRICATION SHOP PER NFPA STANDARDS. tion(s)Vaud Thru 01/05/2023 SYSTEM TO BE INSTALLED, TESTED, AND FLUSHED per INSTTTUTE FOR CERTIFICATION (E)CONF NFPA 13 STANDARDS AND LOCAL REQUIREMENTS. IN ENGINNEERING TECHNOLOGIES I RM 252.T THE TEST PRESSURE SHALL BE READ FROM A GAUGE LOCATED To UNDERGROUND AND ABOVEGROUND PIPING TO BE HYDRO— The records of this AT THE LOW ELEVATION POINT OF THE SYSTEM OR PORTION BEING orgamiaeuon th°"that JC-021 STATICALLY TESTED AT 200 PSI FOR 2 HOURS. BROOK STEWART -__ TESTED. THE PRESSURES IN PIPING AT HIGHER ELEVATIONS SHALL BE ALL SPRINKLER FITTINGS SHALL MEET OR EXCEED THE Automatic Sprintler system layout PERMITTED TO BE LE55 THAN 200 PSI (138 BAR) WHEN ACCOUNTING REQUIREMENTS OF NFPA 13 TABLE 6.4.1. LEVEL 11 FOR ELEVATION LOSSES. SYSTEMS OR PORTIONS OF SYSTEMS THAT CAN BE T2 ALL SPRINKLER PIPING SHALL CONFORM TO NFPA 13 TABLE 6.3.1.1 1 certified e 6n in the technical firati u No. _ ISOLATED SHALL BE PERMITTED TO BE TESTED SEPARATELY. STANDARDS AND LOCAL REQUIREMENTS. 141221 =i a SPARE SPRINKLER CADINET AND WRENCH i0 BE FURNISHED PER NFPA 13. (3 ROOM OCCUPANCY AND CEILING HEIGHT SHOWN AS: ROOM NXIEEin s)Valid Than 10/01/2021 s DOMESTIC MATERIAL NOT REQUIRED. m-0 NTEING FOR NOLOGICATTON Ts ELEVATION OF PIPE SHOWN AS [0-0] IS FROM ABOVE FINISHED FLOORINEERING TECHNOLOGIES N N FLOOR AND ELEVATIONS SHOWN AS [0-0 bts] ARE FROM BOTTOM OFds of tics organization ohm that DEMO FLOOR PLAN FLOOR PLAN TOP OF STRUCTURE DOWN. ENNIS APPLE ty PIPING: STEEL PIPING CONFORMING TO NFPA 13, ASTM A135etie Sprinitier System layout W E w E AND / OR ASTM A795. LEVEL 1 ified in the technical area(s) 1/8 re = 1 a — 0" 1/8 ss = 1 s — �u Td IN ROOMS NOT EXCEEDING 800 SQ FT AND OF UNOBSTRUCTEDchmeum certification No. CONSTRUCTION, SPRINKLERS SHALL BE PERMITTED TO BE LOCATED149314 S S NOT MORE THAN 9' FROM ANY SINGLE WALL. IN LIGHT HAZARD ONLY. s)Vaud Thm 01/01/2022 AS PER NFPA 13 8.6.3.2.4.1 s SPRINKLERS ARE NOT REQUIRED UNDER INTERMEDIATE STAIR NSU SPRINKLER SCHEDULE 8 LEGEND STORIAGE.NGS OAS PER NBFPA¶ LE 1B3 81�3.22..3.jnON AND NOT USED FOR SIN I SPRINKLER DESCRIPTION RESP. K-FAC NFT TEMP. FINISH ESCUTCHEON att. zo PER NFPA 13 8.15.1.1 CONCEALED SPACES OF EXPOSED L STAMP RA1414RELIABLE SSP QR 5b I/2" 155 CHROME SEMI �CES5ED 4 COMBUSTIBLE CONSTRUCTION SHALL BE PROTECTED BY SPRINKLERS EXCEPT IN CONCEALED SPACES WHERE SPRINKLERS ARE NOT AP HEAD CABINET WITH MR 6 5PARf HEADS t WREICWE51 PROVIDED TOTAL COI9dT THIS PROJECT 4 REQUIRED TO BE INSTALLED BY 8.15.1.2.1 THRU 8.15.1.2.18 & 8.15.6 zl' �21 ON SYSTEMS WHERE THE PRESSURE AT THE SPRINKLER EXCEEDS , s