Loading...
Plans (68) FPS2020-00011 RECEIVED JAN 2 7 2020 CITY OF TICARD BRU DING Divisinns �I I w1 Source Information Dale of Flow Test I info: 12/17/2018 Location of flow test data Home Depot Hydrant Source of flow test data Wyatt Fire Protection Source Data Points Pum Data Points Calculation results for Design Area 1 - Canopy Pressure Flow Pressure Flow This system as shown on Wyatt Fire Protection company print no dated 1/17/202 100.0010 00.00 0.00 for COCA COLA CANOPY at 15333 SW SEQUOIA PKWY#100 96.00 2224.00 contract no C20-10 is designed to discharge at a rate of 0.1 gpm/ft'(L/min/m2)of floor area over a maximum area of 230 ft' when supplied with water at a rate of 30.3 qpm at 42.8 psi at the base of the riser. Hose stream allowance of is included in the above. * 7 Occupancy classification: Light Hazard Number of heads flowing: 2 Commodity classification: System Type: Wet Maximum storage height: Maximum velocity: 10.56 ft/s Storage arrangement: Flow from In-Rack sprinklers: 0 gpm Pressure Required at Source: 42.8 psi I Flow from Overhead sprinklers: 30.3 gpm Pressure Available at Source: 100 psi Flow from Inside Hoses: 0 gpm Surplus Pressure at Source: 57.2 psi Flow from Outside Hoses: 0 gpm Other fixed flows: 0 qpm Total flow in system piping: 30.3 gpm Additional flow at/beyond source: 100 qpm Total of all flows: 130.3 gpm LOCATION OF NEW CANOPY 15 ­41 1fi 18 r J 1 12 3 ❑ i SCOPE: EXTEND SPRINKLER SYSTEM TO SITE PLAN EXTERIOR CANOPY. SYSTEM TO BE ,/32•=1'-0° FILLED WITH PROPYLENE GLYCOL LISTED FOR USE IN FIRE SPRINKLER SYSTEMS. GLYCOL SYSTEM TO BE ❑ CONTAINED WITH RP BACKFLOW a DEVICE AND UTILIZE EXPANSION TANK 9,2„ FOR PRESSURE FLUCTUATIONS. r1 oU m BACKFl.OW DENCE, DRNN TO VBE PIPED OUTSIDE 7 SAMMY SIDEWINDER (SWC) 1-V: ,a-Pa "riF11 15' _ - OFFICE COPY FPT-,C EXPANs ON am e: T""T CITY OF TIGARD LOCA ` HEAD EL NTH TE1. ALL THREAD ROD REVIEW.�D FOR CODE COMPLIANCE Area: 249.40 EXTEND SPRINKLER PROTECTION \'rNf TD EXTERIOR CANOPY. Approved: OTC: I I Permit #: F•Pj�,�r _ C'7 � Address: �S �� Z Po L . n e- Uk. 0 Suite #: By: �_ Date: I O RCP—CANOPY HANGER DETAIL 1/4•=1'-0• NOT TO SCALE VALIDITY OF PERN-Ii , EFIN:AL ASE PROVIDE THE ISSUANCE OF A PERMIT LETED NFPA 13 I BASED ON CONSTRUCTION RIAL AND TEST DOCUMENTS AND OTHER TIFICATE AT DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM INSPECTI®`,T REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 NOTES SPRINKLER SYMBOLS REVISIONS Meets design requirements of NFPA 13 2013 edition. SYMBOL STATUS BRAND SIN TYPE FINISH TEMP F ORIFICE THREAD K' FACTOR NOTES TOT. DATE DESCRIPTION BY I new piping to be Eddy Thread 40 w/ screwed ductile iron fittings. NEW TYCO TY323 SSP-OR Ch/Ch 200 1/2- 1/2- 5.6 2 COCA C0LA CANOPY II hangers to be per NFPA 13 rea light hazard J W YAT T PERMIT NO. I onnovers greater than 2'-0' shall be provided with hangers. Area of work to be protected ere a light hazard occupancy. Max. sprinkler spacing to be 225 sq. ft. per head. W SEQUOIA PKWY #10 0 CONTRACT N0. C20-10 Total area of work area is 230 sq. n. FIRE PROTECTION, INC. DRAWN BY M.COLLEY 9095 S.W. Burnham PORTLAND , O R 97224 SCALE 1/4" _ 1'-0• Tigard, OR 97223 DATE 17 JAN 2020 (503) 684-2928 REVISED VANOSDEL CONSTRUCTION, PO BOX 1057, BATTLE GROUND WA 98604 1 OF 1