Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
BUP2019 -00293 PROJECT NARRATIVE &7REOG BUILDING LOCATION PROJECT CONSISTS OF REMODEL WORK TO 26,115 SF OF EXISTING OFFICE AND WAREHOUSE SPACE. WORK SHALL INCLUDE BUT NOT BE LIMITED TORECEIVED IvIASELECTED DEMO OF EXISTING INTERIOR NON STRUCTURAL WALLS AND DOORSOCT 17 2019 ��cu • NEW NON STRUCTURAL DRYWALL/METAL STUD WALLS CITY OF TIGARD '9� C SW 72ND AVENUE • SUSPENDED CEILINGS BUILDING DIVISION OF "" / • DOORS/FRAMES AND PAINTING E r p (\ • ELECTRICAL DISTRIBUTION PROJECT # 19380 F 3 B • LIGHTING \c RR ALL WORK TO MEET ADA REQUIREMENTS. USNERN p pc\F Gp CONSOUw� HNlplllll 61NN7 WORK INCLUDED BUT PERFORMED UNDER SEP. PERMIT v H o PLUMBING WORK 'E BURLIN FIRE PROTECTION SPRINKLERING U L SW 74TH AVENUE HEATING, VENTILATION & AIR CONDITIONING WORK Q ELECTRICAL WORK, BOTH LINE VOLTAGE AND LOW VOLTAGE c: O � C) SITE MAP BUILDING INFORMATION o A-1 NOT TO SCALE OWNER: PACIFIC REALTY ASSOCIATES, L.P. = a N 15350 SW SEQUOIA PKWY #300 g ^ o 7 2 3 4 5 8 7 8 9 10 77 PORTLAND, OR 97224 � o 0 LO o LO o -- CO (503) 624-6300 (PHONE) U) z 1 A (503) 624-7755 (FAX) 1E o z o B Sw j 950 F I BLDG. #: Oregon Business Park III Bldg. E (3obp218) � �' a U') U') m CONST. TYPE.: III-B I 18,905 S I THIS BUILDING HOUSES TWO TENANTS INCLUDING THIS TENANT. THE EXISTING BUILDING IS A SINGLE STORY BUILDING OF 38,750 SF AND IS FULLY SPRINKLERED. THERE IS FRONTAGE ON ALL FOUR SIDES OF AT LEAST 60 FEET. ACTUAL BUILDING AREA TOTALS r - IUD) - I B OCCUPANCY = 19,855 SF S-1 OCCUPANCY = 18,895 SF _ I TOTAL 38,750 SF § 4 1 MIXED OCCUPANCY - NON-SEPERATED USES. (OSSC 508.3) ALLOWABLE AREA IS UNLIMITED. (OSSC 507.3) Fs TENANT INFORMATION ' TENANT: TUALATIN SOIL & WATER CONSERVATION DISTRICT OCCUPANCY AREAS & LOADS: B 18,908 SF 190 OCC S-1 7,210 SF 15 OCC S-1 S-1 I 115 SF Q 11,685 SF 7,210 SF TOTAL 26, J ' I Q NUMBER OF EXITS REQUIRED B 2 EXITS 3 PROVIDED 1 S-1 1 EXITS 2 PROVIDED w D AREA R_ _ OF r PLUMBING FIXTURE CALCS w o 0 OVERALL BUILDING PLAN OCCUPANCY WATER CLOSETS OCCUPANCY LAVATORIES O a W N A-1 1/32^ = 1'-0" Z� Business B: 0-50 50.00 occ. 1:25 = 2.00 B: 0-50 80.00 occ. First 80 1 :40 = 2.00 U U) Q rn B. over 50 140.00 occ. 1.50 = 2.80 B. over 50 110.00 occ. Over 80 1.80 = 1.38 1 z w ww Storage S-1 / S-2: 15.00 occ. 1:100 = 0.15 S-1 / S-2: 15.00 occ. 1:100 = 0.15 W �5 m 0 TOTAL = 4.95 TOTAL = 3.531 z m o 0 < CODE SUMMARY w I- o ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH STATE AND LOCAL ~ 01-- Q_ CODE REQUIREMENTS THAT APPLY, INCLUDING BUT NOT LIMITED TO: DATE: 10/10/19 • 2014 OREGON STRUCTURAL SPECIALTY CODE (OSSC) PERMIT / CONST �3FFICE.COQ� • 2014 OREGON MECHANICAL SPECIALTY CODE (OMSC) ClFFICE. IG PY REVISION • 2014 OREGON PLUMBING SPECIALTY CODE (OPSC) FOROF TTGDE OMPLIAVCE • 2014 OREGON ELECTRICAL SPECIALTY CODE (OESC) 1 1 . • 2014 OREGON FIRE CODE (OFC) OTc:�`a'�j 2. • ASCE-7-10 Permit #: ti� I r 3. • ICC/ANSI A117.1-2009 Address: 7 I� �� 4. • 2014 OREGON ENERGY EFFICIENCY SPECIALTY CODE Suite#: 5 BYE Date: 6. 7. 8. VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT DRAWN BY: BASED ON CONSTRUCTION R.M.T. DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 CITY OF TIGARD A� O Approved by Planning Date: to-I2-I4 Initials: CL 01 00 00 GENERAL DATA PULL HANDLE,SURFACE MOUNTED CLOSER,BOTTOM SWEEP,AND THRESHOLD. 09 62 00 SPECIALTY FLOORING FLOW SETTING TO PROVIDE A HEATING RANGE OF 105 TO 120 DEGREES. CONTACT MESHER SUPPLY FOR a. SUSPENDED CEILING SYSTEM(T-BAR)-PERFORATED FACE ADJUSTABLE CURVED BLADES-DESIGN 4. DOOR(DOUBLE DOORS): SELECT PRODUCTS GEARED CONTINUOUS HINGES,VON DUPRIN 3547A-EO(ONE AVAILABILITY,(503)236-4148. TITUS PCS SUPPLY AND TITUS PAR RETURN OR APPROVED EQUAL, GENERAL REQUIREMENTS DOOR LEAF)AND 3547A-NL-0P(THE OTHER DOOR LEAF)CONCEALED VERTICAL ROD(IN US26D)EXIT DEVICES 09 6519 RESILIENT FLOORING-SHEET VINYL_FLOORING 6. FLOOR DRAINS SHALL BE INSTALLED IN TOILET ROOMS CONTAINING TWO(2)OR MORE WATER CLOSETS OR 2 1. VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AND AT THE EXISTING BUILDING AND WITH V DIAMETER BY 10'LONG BRUSHED STAINLESS OFFSET PULL HANDLES,SURFACE MOUNTED 1. SEAL THE EDGES OF THE SHEET VINYL FLOORING TO THE CONCRETE FLOOR WITH A CONTINUOUS BEAD OF OR MORE WATER CLOSETS AND URINALS IN COMBINATION. THE FLOOR SHALL SLOPE TOWARD THE FLOOR b. GYPSUM BOARD CEILING;SUPPLY-CURVED BLADE W/OBD DESIGN TITUS 250;RETURN-BAR TYPE- 6,01 ' 1 DESIGN TITUS 350;EXHAUST-METAL OR ALUMINUM-1/2 x 1/2 EGG CRATE DESIGN TITUS 50F. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK. CLOSERS,BOTTOM SWEEPS,AND THRESHOLD. APPROVED SEALANT. SET THE 4'VINYL COVE ASE INTO A FRESH BED OF SEALANT TO SEAL THE ASE TO DRAIN. f�^� #3082 � EA Z CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL EXISTING 5. ELECTRIC STRIKE(WHEN NEEDED FOR ACCESS CONTROL SYSTEM): VON DUPRIN 6300. THE SHEET VINYL. MITER THE CORNERS AND APPLY A BEAD OF SEALANT TO SL THE JOINT. 7. FLOOR DRAINS TO BE INSTALLED WITH PRIMER VALVE WITH ISOLATION VALVE. NO ATMOSPHERIC c. ALL SUPPLY REGISTERS TO HAVE MANUAL VOLUME DAMPERS LOCATED IN DUCT AT OR NEAR CLOSEST V WYE BRANCH. `, ' CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL.SUBMITTAL OFA PROPOSAL SHALL BE CONSIDERED PRIMERS. DRAINS TO BE PRIMED FROM TOILET MARTIN W.HANSON 6. FINISH: MATCH EXISTING 09 6519 RESILIENT FLOORING-VINYL COMPOSRION TILE OM O FIXTURES UNLESS OTHERWISE APPROVED BY CONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE,AND NO FURTHER COMPENSATION SHALL BE DUE PACTRUST. PROVIDE A MIN.12'x 12'ACCESS DOOR. d. CLEAN OR REPLACE ALL SUPPLY AND RETURN AIR GRILLS AND THEIR HOUSINGS AT PROJECT THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO PERFORM SUCH INSPECTION. 09 00 00 FINISHES 1. FINISH FLOORING TO EXTEND UNDER CASEWORK COMPLETION. 2. INSTALL TILES IN QUARTER TURN PATTERN. PLUMBING-REST ROOM FD(TURES(SINGLE OCCUPANCY I SHOWER ROOM) ' 3. BY SUBMITTING A PROPOSAL,CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE GENERAL 20.THERMOSTAT: ALL EXISTING MERCURY TYPE THERMOSTATS TO BE REPLACED. NEW THERMOSTATS TO BE (n C�W $,OREGON Qt 09 91 23 PAINTING 1. WALL HUNG LAVATORY TOTO LT307A,OR AMERICAN STANDARD 0358.115. AND IN R Y T T THE WORK HONEYWELL COMMERCIAL GRADE NSIONPR T EXAMINED THE SITE A INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY O COMPLETE O 8000 OUCH SCREEN MODEL TB8220Uf003 WHERE POSSIBLE /A 1. CLEAN,SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS. A APPROVED SUBSTITUTE: IAL- '�" DESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE LIMITED TO 2. LAVATORY FAUCET-AMERICAN STANDARD,COLONY PRO 7075.104 SINGLE CONTROL, LESS POP-UP ROD& TO LINE SIGNATURE COMMERCIAL THERMOSTAT MODEL NO.P374.2800 -7 DAY ALL MATERIALS AND INSTALLATION,DISPOSAL OF EXCESS MATERIALS(USEABLE FINISH MATERIALS SHALL BE 2. SUBMIT SAMPLES OR DRAW DOWNS FOR THE FOLLOWING: INTERIOR: HOLE PROGRAMMABLE WITH LOCKOUT FUNCTION-AUTO CHANGEOVER ONLY. MOUNT AT ADA HEIGHT(MAY [� O O�� LEFT IN THE TENANT SPACE AS NOTED ON PLANS),CLEANING AND ALL PREPARATION OF SUBSTRATE 1. WALLS: REQUIRE CHANGING HEIGHT AT"REPLACEMENT'LOCATIONS). CONTRACTOR SHALL PROGRAM ` C VVVV SURFACES PRIOR TO INSTALLATION,AS WELL AS FINAL CLEAN UP. a. FLOOR COVERINGS, BASE AND TRANSITION STRIPS 3. TOILET FLOOR MOUNT TANK TYPE TOTO CST744EL(SLAT ADA STALL)OR KOHLER CIMARRON K3496. THERMOSTATS AND BALANCE SYSTEM. �- b. PLASTIC LAMINATES a. PRIME NEW DRYWALL WITH MILLER'S HIGH-BUILD"SUPER SEAL"PRIMER. 4. TOILET SEAT: BEMIS 1955SSC OR OLSONITE IOSSCT 4. IT IS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN EXISTING BUILDING 21.THERMOSTAT LOCATIONS TO BE REVIEWED BY ARCHITECT PRIOR TO INSTALLATION. STANDARDS FOR ALL EXISTING PRODUCTS AND SYSTEMS. UPON DISCOVERY OF A DISCREPANCY TO THIS c. ALL NATURAL WOOD(INCLUDING DOORS AND CASEWORK) b. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER'S 5. SHOWER STALL-CDX ACCESSIBLE SHOWER MODEL#XS38BFFWAC-WHITE WITH ROUGH OPENING OF 38 1/4" 120-0-XX WITH A TIGHT ROLLER STIPPLE FINISH. RESTROOM FINISHES TO BE MILLER'S 170.5-XX SIG 22.WAREHOUSE HEAT: INTENTION,THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY. d. PAINT LATEX ENAMEL. WIDE BY 38'DEEP. a. GAS FIRED UNIT HATERS USED IN NON-CONDITIONED AREAS SHALL COMPLY WITH CURRENT STATE PROJECT # 19380 5. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. e. TILE, MARBLE,GRANITE,STONE,GROUT AND SCHLUTER TRIMS 2. DOORS AND FRAMES: 6. ADA SHOWER HAD-HANSGROHE RAINDANCE SELECT S 120 AIR 3-JET HAND SHOWER WITH RAINDANCE ENERGY CODE REQUIREMENTS. PROVIDE ADJUSTABLE TSTAT FOR EACH UNIT. 6. COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPET"WALK-OFF MATS"TO PROTECT EXISTING UNICA S WALLBAR,36"-CHROME CARPETS. f. TOILET PARTITIONS a. NEW HOLLOW METAL-PRIME,SAND,AND FINISH WITH TWO COATS OF SEMI-GLOSS OIL.SPRAY OR ROLLED APPLICATION. 7. PROVIDE FLOOR DRAIN AS INDICATED ON PLAN. 23.EXHAUST FANS: T ALL ROOF PENETRATIONS FROM ABANDONED EQUIPMENT TO BE REMOVED. PATCH AND REPAIR ROOF AND 9. HARDWARE 8. BALANI OF PLUMBING FIXTURES: a. CEILING MOUNTED EXHAUST FANS SHALL HAVE A MINIMUM PERFORMANCE TO MEET THE CURRENT ROOF MEMBRANE TO MATCH THE EXISTING ROOF. 3. FINISH FLOORING TO EXTEND UNDER ALL NEW CASEWORK. b. EXISTING HOLLOW METAL-SAND,FILL IMPERFECTIONS WITH BONDO,SAND AND PRIME PATCHES WITH CODE REQUIREMENTS INCLUDING INTEGRAL ACKDRAFT DAMPER AND VENTING TO THE EXTERIOR. I td ALKYD PRIMER,AND FINISH WITH SEMI-GLOSS OIL ENAMEL.SPRAY OR ROLLED APPLICATION a. ALL SEALANT SHALL MATCH GROUT COLOR AT TILE SURFACES. COOK GEMINI SERIES 100 OR EQUAL;80 CFM WITH A SONE RATING OF 1.6 OR LESS,100 CFM WITH A 1 8. ALL ROOF WORK TO BE PERFORMED BY PACTRUST APPROVED ROOFING COMPANIES. APPROVED 4. PROVIDE A TRANSITION STRIP WHERE EVER TWO DIFFERENT FLOOR MATERIALS MEET c. WOOD-PRIME WITH ALKYD OIL UNDER-COATER,SAND,FILL ALL FASTENING HOLES WITH PAINTER'S b. SUBMIT SEALANT COLOR PRIOR TO INSTALLATION FOR ARCHITECT APPROVAL FOR ALL OTHER SONE RATING OF.9 OR LESS,200 CFM WITH A SONE RATING OF 1.6 OR LESS. U ^^, COMPANIES INCLUDE: 5. PROVIDE SCHLUTER METAL TRIM AT ALL EXPOSED EDGES OF TILE(EXCEPT AT BULLNOSED EDGE)OF TILE PUTTY,CAULK ALL CRACKS IN CASINGS AND BETWEEN JAMBS AND WALLS USING DAP LATEX CAULK, APPLICATIONS. b. SINGLE FIXTURE RESTROOMS,JANITOR'S CLOSETS OR SINGLE SHOWER ROOMS TO HAVE CEILING W a. ARROW ROOFING, 503-460-2767 (CERAMIC,QUARRY OR PORCELAIN) AND FINISH WITH SATIN OIL ENAMEL. PLUMBING-REST ROOM FO(TURES(MULTI OCCUPANCY) MOUNTED EXHAUST FANS,WIRED PER DIVISION 16 AND SWITCHED WITH THE LIGHTS. 4-0 b. PACIFIC ROOFING,503-640-3163 09 21 00 GYPSUM BOARD d. WOOD-STAIN,SAL AS REQUIRED,AND VARNISH WITH SATIN VARNISH. 1. UNDER MOUNT SINK AMERICAN STANDARD STUDIO UNDERCOUNTER SINK 0614.300 WITH MOUNTING KIT c. MULTIPLE FIXTURE RESTROOMS,COMBINATION RESTROOM&SHOWER,AND LOCKER ROOMS TO HAVE ROOFTOP MOUNTED EXHAUST FAN,FACTORY CURB AND BACKDRAFT DAMPER,WIRED PER DIVISION 16, GENERAL 3 U c. ROOF TOPPERS,360-574-7248 . CEILINGS: 047194-0070A CONTROLS AS REQUIRED BY DESIGN.COOK ACE-D SERIES OR EQUAL. d. GOT YOU COVERED ROOFING,503-975-9136 1. ALL GYPSUM BOARD WALLS: ONE LAYER 5/6"TYPE X GYPSUM WALLBOARD,EITHER AT RIGHT ANGLES OR a. EXISTING GYP BOARD/PLASTER-SAND,SPACKLE ALL IMPERFECTIONS,SPOT PRIME AND FINISH TO 2. COUNTER MOUNTED FAUCET:AMERICAN STANDARD 6058.105 AC POWERED WITH THERMOSTATIC MIXING L PARALLEL TO FRAMING ON EACH SIDE OF METAL STUDS SPACED AT 24'O.C. FASTEN WITH 1"TYPES ACHIEVE UNIFORM COVERAGE WITH MILLER'S 6200 OR 4480. d. SPECIALTY ROOMS REQUIRING EXHAUST SHALL MEET THE ABOVE MINIMUM REQUIREMENTS- tO.KEEP THE AREA M WORK FREE OF GARAGE AND DEBRIS U A DAILY BASIS INCLUDING DOCK ACCESS V'�� INDIVIDUAL ROOMS WITH AN EXHAUST REQUIREMENT GREATER THAN 250 CFM,SHALL HAVE A DRYWALL SCREWS 8'O.C.TO VERTICAL EDGES AND 12'O.C.TO TOP AND BOTTOM RUNNERS AND 3. TOILET W/FLUSHOMETER-AMERICAN STANDARD AS 2234.015 AT NON ACCESSIBLE STALLS AND 3043-711 AT ROOFTOP MOUNTED FAN. ARRAS AND COMMON AREA. FLOORS TO BE SWEPT OR VACUUMED DAILY. b. NEW GYP BOARD/PLASTER -PRIME WITH SUPER SEAL AND FINISH TO ACHIEVE UNIFORM COVERAGE INTERMEDIATE STUDS. STAGGER ALL VERTICAL AND HORIZONTAL JOINTS 24'O.C.(OR ONE STUD SPACING), WITH MILLER'S 6200 OR 4480. ACCESSIBLE LOCATIONS. S( LOAN OPTIMA PLUS FLUSH VALVE 8111 1.6 PGF)or(AUTOMATIC FLUSHOMETER 24.HVAC TESTING. 11.PROVIDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS INCLUDING BUT NOT LIMITED TO EACH SIDE AND OPPOSITE SIDES.. SLOAN REGAL 111 WC FLUSH VALVE 1.6 GBP WITH EBV -A OPTIMA SIDE-MOUNT OPERATOR) COMMON CORRIDORS AND STAIRS,BUILDING ENTRANCES,SUITE ENTRANCES,ETC. THE CONTRACTOR WILL 4. GENERAL NOTES: a. CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES,COMPONENTS, BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING IMPROVEMENTS DUE TO CONSTRUCTION 2 ALL OFFICE GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND TWO FINISH COATS WITH SANDING BETWEEN 4. TOILET SEAT: BEMIS 1955SSC OR OLSONITE 1DSSCT O ACTIVITIES. FINISH COATS(LEVEL 4 FINISH). APPLY USG SHEETROCK BRAND FIRST COAT. PAINT AS INDICATED. a. KEEP ALL HARDWARE,HINGES,AND DOOR KNOBS CLAN OF ALL PAINT SPLATTERS,DRIPS,OR ROLLER EQUIPMENT AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH O O 12. TEMPORARY SANITARY FACILITIES. CONSTRUCTION WORKERS SHALL NOT USE BUILDING V! 3. ALL OTHER GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND ONE FINISH COAT WITH SANDING AFTER FINISH SPRAY. S. AT BACK TO BACK TANK TYPE TOILET INSTALLATIONS US 3"VENT THROUGH ROOF APPROVED PLANS AND SPECIFICATIONS. ,^ C'7 RESTROOM E RESTROOM FACILITIES. COAT(LEVEL 3 FINISH). PAINT AS INDICATED. b. ALL SURFACES TO BE SANDED BETWEEN COATS,PRIOR TO INSTALLATION OF NEXT COAT. 6. URINAL-TOTO UT447,AMERICAN STANDARD WASHBROOK 6590.001,OR KOHLER K-5016-ET W/AUTOMATIC b. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN � 4. IN FINISHED SPACES FURR-0UT BUILDING COLUMNS AND EXTERIOR WALLS WITH 5I8'GYPSUM BOARD OVER c. DURING PROGRESS OF WORK,KEEP JOB SITE CLAN OF ALL PAINT MATERIALS,RUBBISH,CANS,AND FLUSHOMETER SLOAN_ REGAL 186-0.5 URINAL FLUSH VALVE 0.5 GPF WITH EBV-89-A OPTIMA SIDE-MOUNT ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. 13.STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DESIGNATED AT OPERATOR) c. A COMPLETE COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND O PRE-CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY OTHER METAL STUDS. RAGS AT THE END OF EACH DAY. Y COMMON BUILDING AREA BE USED FOR STORAGE. 5. PROVIDE ACOUSTIC GASKETS WHERE WALL INTERSECTS STOREFRONT.QUIETJOINT SHH WHERE WALL d. UPON COMPLETION OF WORK,CLEAN7. PROVIDE ONE FLOOR DRAIN IN EACH RESTROOM LOCATED UNDER TOILET PARTITION. FILED WITH PACTRUST.ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING = d V MEETS MULLION AND QUIETJOINT SHG WHERE WALL MEETS GLAZING.COLOR SELECTED BY ARCHITECT. AND SCRAPING,USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. B. SEALANT AT PLUMBING FIXTURES: 25.PROJECT CLOSE OUT DOCUMENTS REQUIRED: 04 1-- 14.KEEP THE ROOF FREE OF DEBRIS(I.E.NAILS,SCREWS,BOTTLES,ETC.)AT ALL TIMES. _Q (V 6. AT ALL EXISTING WALLS,REMOVE ALL NAILS,SCREWS,FASTENERS,ETC.LEFT BY PREVIOUS TENANT AND e. PROTECT WORK OF OTHER TRADES. a. ALL SEALANT SHALL MATCH GROUT COLOR AT TILE SURFACES. a. AutoCAD FILE SHOWING AS-BUILT INFORMATION. � d 15.ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. 0 O) PATCH HOLES READY FOR PAINT. f. PROVIDE'WET PAINT'SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. b. SUBMIT SEALANT COLOR PRIOR TO INSTALLATION FOR ARCHITECT APPROVAL FOR ALL OTHER b. ELECTRONIC PDF FILE OF THE AutoCAD FILE ABOVE. 16.CONFIRM SIZES OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF STRUCTURAL,MECHANICAL, O 7. REPAIR GYPSUM BOARD AT REMOVED ELECTRICAL RECEPTACLES OR DATA BOXES AND FINISH READY FOR APPLICATIONS. O ELECTRICAL AND PLUMBING WORK PRIOR TO FRAMING OR CUTTING FOR INSTALLATION. PAINT 10 00 00 SPECIALTIES c. HARD COPY OF AutoCAD FILE ABOVE. W O 00 PLUMBING-BREAK ROOM FO(TURI-S LO O d. OPERATIONS MANUALS F M � 17.LAVE THE PROJECT CLAN AND READY FOR OCCUPANCY. 10 11 00 VISUAL DISPLAY SURFACES U S OR ALL EQUIPMENT,INCLUDING TSTATS. (n * 8. UPON REMOVAL OF WALL ASE,REMOVE RESIDUAL ADHESIVE AND PREP WALL TO PAINT READY CONDITION. 1. BREAK ROOM SINK ELKAY EWHAD211545(UNDER COUNTER MOUNT) Q O ti 18.CLFAN ADJACENT EXTERIOR AREA, I.E.WALKS,EXTERIOR GLASS,ETC. WALL CONSTRUCTION MATERIALS 1. PROJECTOR SCREEN:-' DA-�.-:��BOARDROOM�LECTROL,GLASS e. COLORED ZONE MAP WITH THERMOSTAT LOCATIONS INDICATED. ?) Z 4' 4' (D 19.FILL ALL PAPER AND SOAP DISPENSERS IN RESTROOMS AND BREAK AREAS. 1. PROVIDE STUDS,TRACKS,BRACING, FASTENING AND OTHER ACCESSORIES NECESSARY FOR COMPLETE 10 2813 REST ROOM ACCESSORIES(SINGLE OCCUPANCY/SHOWER ROOM) 2. KITCHEN FAUCET-AMERICAN STANDARD COLONY SOFT SINGLE CONTROL FAUCET#4175.500 26 00 00 ELECTRICAL : DESIGN/BUILD (4 J CD (O Z 3. 1/4'COPPER WATERLINE W/SHUT OFF VALVE FOR COFFEE MAKER AND REFRIGERATOR,SEPARATE LINES IF GENERAL O � .� , 20-CLEAN ALL SUPPLY AND RETURN DIFFUSERS AT PROJECT COMPLETION. INSTALLATION. 1. PAPER TOWEL DISPENSER AND WASTE(SEE PLANT FOR QUANTITY)GEORGIA PACIFIC ENMOTION STAINLESS REQUIRED. L!') J 21-PROVIDE"AS-BUILT'DRAWINGS OF THE WORK AT THE CONCLUSION OF CONSTRUCTION."AS-BUILT" 2. FRAMING MEMBERS SHALL HAVE THE STRUCTURAL PROPERTIES INDICATED WHERE PHYSICAL STRUCTURAL STEEL RECESSED AUTOMATED TOUCHLESS TOWEL DISPENSER#59466A W/AC POWER ADAPTOR 59481 (HARD 1. ALL ELECTRICAL FEEDS TO OUTLETS,SWITCHES,ETC. MUST BE VERTICAL DROPS FROM ABOVE EXCEPT FOR C M 0 O O DRAWINGS MAY BE IN THE FORM OF TWO COPIES OF CONSTRUCTION DOCUMENTS MARKED-UP WITH RED PROPERTIES ARE NOT INDICATED,THEY SHALL BE AS NECESSARY TO WITHSTAND ALL IMPOSED LIVE LOADS. WIRED AT NEW RESTROOMS ONLY)WITH STAINLESS STEEL TRASH RECEPTACLE#59491.SET TOWEL LENGTH JANITOR CLOSETS HORIZONTAL RUNS UNDER WINDOWS AND RECEPTACLES ON THE SAME STUD. C L0 LL LO v m PEN.DELIVER RECORD DRAWINGS TO THE ARCHITECT. COMPLETE OPERATION AND MAINTENANCE MANUALS DESIGN FRAMING IN ACCORDANCE WITH AISI SG-673. TO MAXIMUM AND SET PAPER READY TO TEAR. 1. REUSE EXISTING FIXTURES WHERE POSSIBLE. 2. ALL ELECTRICAL FEEDS TO OUTLETS AND DATA BELOW WINDOW SILLS TO BE ROUTED THROUGH BUILDING SHALL BE PROVIDED FOR ALL MECHANICAL,ELECTRICAL AND PLUMBING EQUIPMENT.PROVIDE AS-BUILT CAD 3. COLD-FORMED FRAMING SHALL BE GALVANIZED METAL CONFORMING TO ASTM A446/A 446 M GRADE A(33000 2. LAVATORY MOUNTED SOAP DISPENSER 34 FL OZ.,4-SPOUT LENGTH BOBRICK B822 2. JANITOR FLOOR SINK-MUSTEE 63M MOP SERVICE BASIN 24"X 24"X 10'OR SWAN MS2424 24'X 24". SHELL WALLS. DO NOT FEED FROM PERPENDICULAR INTERIOR PARTITIONS. FILES TO PACTRUST FOR ALL MEP TRADES.PACTRUST MAY HOLD CONTRACTOR'S FINAL PAYMENT UNTIL "AS-BUILT'DRAWINGS AND O&M MANUALS HAVE BEEN RECEIVED AND APPROVED. PSI)G60. 3. SURFACE MOUNTED MULTI-ROLL TOILET TISSUE DISPENSER BOBRICK B-2888 3. JANITOR FLOOR SINK FAUCET-CHICAGO FAUCETS 897 OR AMERICAN STANDARD 8344.112. 3. ALL NEW ELECTRICAL DEVICES TO BE WHITE 22.IT IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDE A COMPLETE, 4. PROVIDE THE LISTED GYPSUM BOARD PRODUCTS BY U.S.GYPSUM,GEORGIA PACIFIC,NATIONAL GYPSUM OR 4. SURFACE MOUNTED TOILET SEAT COVER DISPENSER BOBRICK B-4221 4. PROVIDE F.R.P.BEHIND JANITOR SINK AND ONE FOOT BEYOND ON EACH SIDE. 4. REPLACE ALL NON-WHITE EXISTING ELECTRICAL DEVICES TO WHITE FUNCTIONING PROJECT INCLUDING ALL GENERAL,MECHANICAL AND ELECTRICAL CONSTRUCTION REQUIRED AN APPROVED EQUAL. 5. MIRROR STANDARD SIZES 1/4"PLATE MIRROR WITH EDGES"FLAT GROUND"BOTTOM EDGE SUPPORTED BY A PLUMBING-MISCELLANEOUS 5. PROVIDE LABELS AT EACH ELECTRICAL RECEPTACLE IDENTIFYING CORRESPONDING PANEL AND BREAKER. TO FULFILL THAT INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED,REGARDLESS OF 5. STANDARD GYPSUM BOARD SHALL BE TYPE'X',5/8'THICK WITH TAPERED EDGES CONFORMING TO ASTM CONTINUOUS BRIGHT CHROME"J"METAL,5/16'X 3/8" (HEIGHT OF EXPOSED FACE)WITH CONCEALED LEG WHETHER OR NOT SHOWN ON THE DRAWINGS. C-36. SCREWED TO THE WALL TO CARRY THE WEIGHT OF MIRROR. 1BRINI(ING 6. PROVIDE TYPEWRITTEN UPDATED SCHEDULE AT PANEL TO IDENTIFY CIRCUIT BREAKERS. 23.ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE NOTED'N.I.C.'. 6. WATER RESISTANT GYPSUM BOARD SHALL BE 5/8"THICK WITH TAPERED EDGES. CONFORMING TO ASTM 6. GRAB AR SATIN FINISH BOBRICK 88806 SERIES EQUAL 7. VERIFY ELECTRICAL METER AND TAG METER WITH THE TENANTS ADDRESS OR SUITE NUMBER. METER 24."ALIGN"AS USED IN THESE DOCUMENTS,MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE SAME C830. IDENTIFICATION NUMBER AND TENANT ADDRESS INFORMATION SHALL BE GIVEN TO PACTRUST PRIOR TO 10 2813 REST ROOM ACCESSORIES(MULTI OCCUPANCY) 2. WATER COOLER WITH BOTTLE FILLING STATION: ELKAY EZH2O LZSTL8WSLK INSTALLED IN THE RIGHT-HAND TENANTS MOVE-IN. PLANE,EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. 7. AT TOILET ROOMS USE 5/8'USG FIBERROCK BRAND AQUATOUGH INTERIOR PANEL FROM FLOOR 1. PAPER TOWEL DISPENSER AND WASTE(SEE PLAN FOR QUANTITY)GEORGIA PACIFIC ENMOTION STAINLESS HIGH SIDE CONFIGURATION 25.DO NOT DISASSEMBLE SETS OF CONSTRUCTION DRAWINGS.DRAWINGS ARE INTERRELATED. TO 48'A.F.F.ON WALLS BEHIND OR ADJACENT TO PLUMBING FIXTURES. NO SUBSTITUTES. 8. ELECTRICAL CONTRACTOR TO PROVIDE EMERGENCY LIGHTING IN EXIT PATH SHOWN ON PLAN EQUAL TO (EXCEPTION:EXCEPTION AT LOCATIONS TO RECIEVE PLASTIC LAMINATE OR TILE WAINSCOT.) STEEL RECESSED AUTOMATED TOUCHLESS TOWEL DISPENSER#59466 W/AC POWER ADAPTOR WITH PROJECT CLOSE OUT DOCUMENTS REQUIRED: 1-FOOT CANDLE. 26.SUBMIT SAMPLES OR DRAW DOWNS FOR ALL FINISHES REQUESTED TO THE ARCHITECT OF RECORD WITHIN z STAINLESS STEEL TRASH RECEPTACLE#59491.SET TOWEL LENGTH TO MAXIMUM. 1. PROVIDE AS-BUILT INFORMATION TO ARCHITECT AT PROJECT COMPLETION.INCLUDE THE FOLLOWING: 9. EXIT LIGHTS:RUUD LIGHTING"PLASTIC LED EXIT SIGN"MODEL EXPBURWH RED LETTERS,WHITE TWO WEEKS OF PROJECT AWARD.PRODUCTS INSTALLED WITHOUT APPROVED SAMPLES ARE SUBJECT TO 8. AT TILE WAINSCOT LOCATIONS INSTALL CEMENT BACKER BOARD%'THICK WITH SQUARE,REINFORCED, 2. TOILET PARTITIONS:POWDER COATED STEEL, FLOOR ANCHORED WITH CONTINUOUS BRACKETS,FULL REPLACEMENT AT CONTRACTOR COST.AN APPROVED SUBMITTAL DOES NOT CHANGE THE CONTRACTUAL SMOOTH EDGES. PROVIDE DUROCK BRAND CEMENT BOARD OR APPROVED EQUAL. CANTILEVER ONLY. NO CEILING ATTACHMENT OR HEAD RAIL OVER DOORS.HADRIAN WITH"NOSIGHTLINE a. DIMENSIONS (HORIZONTAL AND VERTICAL)OF BUIRED PLUMBING LINES INSTALLED OR DISCOVERED BY HOUSING,WITH BATTERY BACKUP. REQUIREMENT TO PROVIDE THE SPECIFIED ITEMS UNLESS SPECIFICALLY NOTED AS A SUBSTITUTION BY THE 9. INSTALL WATER-RESISTANT GYPSUM BOARD BEHIND WAINSCOT OF FRP,PLASTIC LAMINATE,ETC. SOLUTION"OR ACCURATE PARTITIONS WITH"ULTIMATE PRIVACY". INSTALL USING FACTORY PROVIDE THIS CONSTRUCTION. 10.WHERE NEEDED,CONTRACTOR TO FURNISH AND INSTALL NEW DRY TYPE TRANSFORMERS TO PROVIDE CONTRACTOR AND SPECIFICALLY APPROVED BY THE ARCHITECT AS SUCH.REPLACE SUCH PRODUCTS AS 10 TRIM ACCESSORIES SHALL COMPLY WITH ASTM C-1047. SCREWS ONLY. PROVIDE BACKING IN WALL TO SUPPORT WALL BRACKETS. b. LOCATION OF SHUT OFF VALVES 208V/120V POWER FROM THE 480V/277V SYSTEM. SIZE TO BE BIDDER DESIGN. DIRECTED AT CONTRACTOR'S COST. 3. COUNTER MOUNTED SOAP DISPENSER BOBRICK 6826.18 WITH B-826-20 AC ADAPTER(ONE AT EACH SINK) 23 00 00 HVAC : DESIGN!BUILD a. TRANSFORMERS TO BE ENERGY STAR LABELED. 27.SUBMIT COMPLETE SHOP DRAWINGS FOR MILLWORK,SPECIAL SYSTEMS,MECHANICAL,ELECTRICAL AND 11.USE GEORGIA PACIFIC DENSGLAS GOLD ON EXTERIOR FACE OF EXTERIOR WALLS AND COAT WITH STO FINISH - - b. CASE TO BE TOTALLY ENCLOSED WITH LOUVERS TO PREVENT FOREIGN OBJECTS INTO THE INTERIOR. PLUMBING SYSTEMS(INCLUDING FIRE PROTECTION SYSTEMS). SUBMIT A MINIMUM OF TWO COPIES OF ALL SYSTEM. 4. TOILET SEAT COVER DISPENSER,SANITARY NAPKIN DISPOSAL AND TOILET TISSUE DISPENSER BOBRICK B-357 GAS METER SHOP DRAWINGS FOR REVIEW AND APPROVAL TO THE ARCHITECT OF RECORD.ARCHITECT WILL RETAIN ONE WALL CONSTRUCTION EXECUTION WOMEN'S (MOUNTS IN PARTITION) c. ENCLOSED AND VENTILATED,AIR COOLED TYPE,CLASS H INSULATION,DESIGNED FOR 115 DEGREES C COPY AND ONE COPY WILL BE RETURNED TO THE CONTRACTOR. 5. TOILET SAT COVER DISPENSER,SANITARY NAPKIN DISPOSAL AND TOILET TISSUE DISPENSER BOBRICK 1. CONTRACTOR TO VERIFY GAS METER AND TAG METER WITH THE TENANTS ADDRESS OR SUITE NUMBER. TEMPERATURE RISE ABOVE 40 DEGREES C AMBIENT TEMPERATURE AT FULL LOAD CONTINUOUS 1. FASTEN FRAMING MEMBERS TOGETHER BY WELDING OR BY USING SELF-DRILLING OR SELF-TAPPING TOILE AND B-35745 WOMEN'S MOUNTS SIDE WALL OF SINGLE ND TOILET TI METER IDENTIFICATION NUMBER AND TENANT ADDRESS INFORMATION SHALL BE GIVEN TO PACTRUST PRIOR OPERATION. EQUIP WITH 2-1/2 PERCENT ANFC TAPS AND FOUR 2-1/2 PERCENT BNFC TAPS. MAXIMUM 28.THE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION SYSTEMS SCREWS. WELDING SHALL CONFORM TO AWS D13 WELDING PROCEDURE. ELECTRODES AND SCREW ( T) TO TENANTS MOVE-IN. SOUND LEVEL SHALL BE NEMA STANDARD WITH ISOLATION DAMPERS BETWEEN THE CORE AND COIL CONTRACTOR.ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER CONNECTIONS SHALL BE AS REQUIRED AND INDICATED IN THE DESIGN CALCULATIONS. DO NOT FIELD WELD 6. TOILET SEAT COVER DISPENSER AND TOILET TISSUE DISPENSER BOBRICK B-347 MEN'S (MOUNTS IN HVAC-BID PROCEDURE ASSEMBLY AND CASE. LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. COORDINATE MATERIALS LIGHTER THAN 18 GA. PARTITION) INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER HEADS SHALL BE 1. FOR BIDDING PURPOSES,THE HVAC CONTRACTOR WILL ASSUME THAT EXISTING HVAC EQUIPMENT IS IN 11.FOR FLOOR POWER AND DATA ACCESS 2. PROVIDE ACCURATELY ALIGNED RUNNERS AT TOP AND BOTTOM OF PARTITIONS. ANCHOR TRACKS AS 7. TOILET SEAT COVER DISPENSER AND TOILET TISSUE DISPENSER BOBRICK B-3474 AND B-34745 MEN'S CENTERED IN CEILING TILE(OR 2 x 2 MODULE OFA SECOND LOOK II TYPE OF CEILING TILE WHERE INDICATED IN THE DESIGN CALCULATIONS. BUTT WELD JOINTS IN TRACKS OR SPLICE WITH STUD INSERTS. MOUNTS SIDE WALL OF SINGLE COMPARTMENT) PROPER WORKING ORDER. APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE-APPROVED IN WRITING BY ( T) a. AT SLAB ON GRADE:USE WIREMOLD RF64E BOX WITH 6CTC2 COVER AT CONFERENCE ROOMS FASTENERS SHALL BE AT LEAST 3 INCHES FROM THE EDGE OF CONCRETE SLABS. 2. INVENTORY EXISTING H.V.A.C.ROOFTOP UNITS AND SUBMIT TO ARCHITECT A CONDITIONS REPORT OF EACH AND 6CFFTC COVER AT FURNITURE FEEDS.PROVIDE 1'CONDUIT FOR POWER AND 2°CONDUIT FOR THE ARCHITECT PRIOR TO INSTALLATION. 6. MIRROR STANDARD SIZES 1/4'PLATE MIRROR WITH EDGES*FLAT GROUND-BOTTOM EDGE SUPPORTED BY A UNIT DATA. 11111111111 29.COORDINATE ALL CONSTRUCTION SEQUENCING WITH PACTRUST AND SCHEDULE ALL SERVICE 3. CUT STUDS SQUARE AND SET WITH FIRM BEARING AGAINST WEBS OF TOP AND BOTTOM TRACKS. POSITION CONTINUOUS BRIGHT CHROME"J"METAL,5/16"X 3/8" (HEIGHT OF EXPOSED FACE)WITH CONCEALED LEG INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS TO MINIMIZE INCONVENIENCE TO CURRENT TENANTS. STUDS VERTICALLY IN TRACKS AND SPACE AS INDICATED IN DESIGN. DO NOT SPLICE STUDS. PROVIDE AT SCREWED TO THE WALL TO CARRY THE WEIGHT OF MIRROR. 3. LIST TONNAGE OF EACH UNIT. 12.LOW VOLTAGE SYSTEMS(TELECOMMUNICATION AND DATA)BY FUTURE TENANT. LEAST TWO FULL HEIGHT KING STUDS AT DOORS AND OTHER OPENINGS 2 FEET WIDE OR LARGER. PROVIDE g GRAB BAR SATIN FINISH BOBRICK B-6906 SERIES HVAC-DESIGN PROCEDURE 13.LIGHTING ENERGY MANAGEMENT IS REQUIRED IN ALL BUILDINGS. GENERAL JACK STUDS OVER OPENINGS,AS NECESSARY,TO MAINTAIN INDICATED STUD SPACING. PROVIDE TRIPLE 1. REMOVE ALL EXISTING VCT,SHEET VINYL,ETC.IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PRIOR STUDS AT CORNERS,POSITIONED TO RECEIVE INTERIOR AND EXTERIOR FINISHES. FASTEN STUDS AT TOP 10 28 13 BREAK COUNTER 1. USE EXISTING AND/OR NEW EQUIPMENT TO DESIGN MECHANICAL H.V.A.C.SYSTEM PER DESIGN STANDARDS 14.00CUPANCY CONTROL DEVICES SHALL BE LEVITON OR WATT STOP. TO INSTALLATION OF NEW FLOORING. AND BOTTOM TRACKS BY WELDING OR SCREWING BOTH FLANGES TO THE TRACKS.PROVIDE LONG LEG LISTED BELOW. 15.TEST ALL LIGHTING CONTROL SYSTEMS TO ENSURE THAT CONTROL DEVICES,COMPONENTS,EQUIPMENT TRACK AT TOP OF WALL TO ALLOW FOR DEFLECTION WHERE WALL MEETS STRUCTURE ABOVE. 1. PAPER TOWEL DISPENSERS,SURFACE MOUNTED(KITCHEN/BREAK ROOM)BOBRICK&262 2. ALL ROOF PENETRATIONS FOR ELECTRICAL,LOW VOLTAGE,GAS PIPING,ETC.SHALL BE SLEEVED THROUGH 10 4416 FlRE EXTINGULSHERS 2. PRIOR TO AWARD OF CONSTRUCTION CONTRACT,H.V.A.C.CONTRACTOR SHALL SUBMIT TO ARCHITECT FOR AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND A LAD ROOF JACK,CLAMPED WITH A STAINLESS STEEL CLAMP AND SEALED WITH VULKEM 921 4. INSTALL ALL INTERIOR AND EXTERIOR GYPSUM BOARD PRODUCTS AND ACCESSORIES AS REQUIRED FOR REVIEW AND APPROVAL A FULL DESIGN SCHEMATIC FOR THE TENANT SPACE INCLUDING BOTH SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE POLYURETHANE SEALANT. SILICONE SEALANT NOT PERMITTED. THE PROJECT. 1. FIRE EXTINGUISHER 2A10 BC (WALL MOUNTED OR IN SEMI RECESSED CABINET AS INDICATED ON PLAN) NEW/RENOVATED WORK AND SYSTEMS UNTOUCHED BY THE TENANT IMPROVEMENT AS APPLICABLE. IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. 5. AT TOILET ROOMS TO RECEIVE SHEET VINYL FLOORING, INSTALL THE GYPSUM BOARD(OR AUQATOUGH) 2. FIRE EXTINGUISHER CABINET: JL INDUSTRIES ACADEMY SERIES MODEL#C1027V10. INCLUDE THE FOLLOWING: 16.REMOVE ALL UNUSED DATA AND POWER BOXES AND INFILL WITH GYP BOARD. EXCEPTION-UNUSED DATA 11 01 73 29 CUTTING AND PATCHING WITH 1/4'GAP BETWEEN THE BOARD AND THE FLOOR TO PREVENT WICKING. a. DUCTING AND SIZES BOXES UNDER WINDOW SILLS TO REMAIN. ALL BLANK COVER PLATES TO BE BUILDING STANDARD FINISH. 1. PERFORM CUTTING AND PATCHING WITH SKILLED CRAFTSMEN EXPERIENCED WITH THE TYPE OF WORK11 00 00 EQUIPMENT 6. COMPLY WITH USG GYPSUM CONSTRUCTION HANDBOOK AND MANUFACTURER'S RECOMMENDATIONS. b. SUPPLY AND RETURN LOCATIONS AND CFM AT EACH GRILL OR DIFUSER 17.REMOVE ALL UNUSED LOW VOLTAGE WIRING(TELEPHONE AND DATA)FROM THE RECEPTACLE TO THE am BEING UNDERTAKEN. 1. DISHWASHER: GE GLDT696JSS STAINLESS STEAL-ENERGY STAR RATED. DISTRIBUTION BOARD.LEAVE PULL STRINGS FROM THE BOX TO THE SPACE ABOVE THE CEILING. A SECTION 7. FINISH QUALITY: c. ROOF EQUIPMENT,SIZES AND LOCATIONS 2. PROTECT EXISTING CONSTRUCTION TO PREVENT DAMAGE. 2. GARBAGE DISPOSAL:INSINKERATOR BADGER V 1/2 HP OF THE EXISITNG LOW VOLTAGE WIRE MAY BE LEFT IN LIEU OF A PULL STRING 3. PERFORM CUTTING USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED. AREA PROCESS TRADE NOMENCLATURE d. UNITS REQUIRING DUCTED SMOKE DETECTION OFFICE LIGHTING 12 00 00 FURNISHINGS e. THERMOSTAT LOCATIONS AND ZONENNIT ASSOCIATED THEREWITH 1 4. PATCH,USING MATERIALS IDENTICAL TO EXISTING MATERIALS THAT VISUALLY MATCH EXISTING ADJACENT WAREHOUSE TAPE/FINISH COAT" TIGHT DOUBLE(LEVEL 3) 1. OFFICE LIGHT FIXTURES: LITHONIA LED FIXTURE.2BLT240L ADP MVOLT EZi LP835. 1A J SURFACES TO THE FULLEST EXTENT POSSIBLE OFFICE/OTHER AREAS TAPER 1. REMOVE EXISTING EXTERIOR WINDOW BLINDS.FINISH COATS'I SMOOTH FINISH TAPED(LEVEL 4) f. ANY SUPPLEMENTAL EXHAUST FANS OR SPECIAL SYSTEMS 2. REST ROOM-WALL MOUNTED LIGHT FIXTURE-PEERLESS CERRA WALL LED,CRW7L LLP 4FT MSL4 80CRI 35K USG"FIRST COAT" "SAND AFTER TAPE/FINISH COAT 2. PROVIDE ROLLER BLINDS AT ALL EXTERIOR WINDOWS. 5. PATCH WITH DURABLE,INVISIBLE SEAMS THAT ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. (S) g. ZONE DIAGRAM 1900LMF DARK ZT 120 SCT C210. IL 6. AT CONCRETE SLAB REPAIRS(POUR BACKS),PROVIDE#3 x 12"LONG REAR DOWELS AT 24'O.C. MIN.WITH NOTE:AT EXTREMELY DARK ACCENT WALLS PROVIDE LEVEL 5 FINISH. a. MARIAK CONTRACT CHAIN OPERATED CLUTCH ROLLER SHADES HVAC DESIGN STANDARDS 3. RECESSED LED DOWN LIGHT: LITHONIA LDN6 35/10 L06 AR LD MVOLT TRW r , MIN.6'PENETRATION INTO EXISTING CONCRETE AND MIN.OF 6'EXPOSURE INTO POUR ACK.CENTER b. NO HEAD BOX U.N.O. THE FOLLOWING ARE MINIMUM DESIGN STANDARDS: 4. OFFICE EGRESS LIGHTING:ISOLITE MINI GENIE SERIES LED VERSION LMIGN NM SQ-CEILING AND WALL DOWEL IN SLAB DEPTH. 8. FINISH EXPOSED INTERIOR GYPSUM BOARD WALLS AND CEILINGS SMOOTH STRAIGHT READY FOR FINISH AS c. FABRIC-MARIAK ECONOSCREEN-3%COLOR-903 GRAY/BLACK U.N.O. MOUNT. SEE PLAN FOR EGRESS PATH.USE OF ISOLITE INVERTER AS ALTERNATE TO BATTERY IS 7. REMOVE PATCHES THAT ARE VISUALLY UNSATISFACTORY IN THE ARCHITECTS OPINION AND REPLACE AT NO SHOWN ON PLANS. 1. 350 SQUARE FOOT PER TON(UNLESS OTHERWISE APPROVED IN WRITING BY PACTRUST). ACCEPTABLE. 5. INSTALL BUILDING STANDARD ADDRESS AND/OR SUITE NUMBER LABELS TO ALL EXTERIOR DOORS. 2. ADDRESS LOADS BY SPECIFIC LOCATION AND USE,AS WELL AS CRITERIA PROVIDED TO PACTRUST BY w ADDITIONAL COST. O9 31 00 PORCELAIN TILE 5. LIGHT SWITCHES:ACUITY CONTROLS PRE SET ALL PRIVATE OFFICE AND CONFERENCE ROOM SWITCHES TO 07 00 00 THERMAL&MOISTURE PROTECTION 12 ALL CABINET SPECIFICATIONS TENANT PRIOR TO CONSTRUCTION: VACANCY AND TO TURN ON AT LAST DIM LEVEL. C = 1. PROVIDE TILE AS SCHEDULED AND SHOWN IN FINISH MATERIALS LIST OR ELSEWHERE ON DRAWINGS. 1. ALL CABINETRY TO BE INSTALLED OVER FINISH FLOOR AT ALL RESILIENT FLOORING LOCATIONS. a. EXTERIOR EXPOSURE AREAS C 1. REPLACE ALL MISSING AND DAMAGED ROOF AND WALL INSULATION ABOVE THE CEILING GRID. 2. USE LATICRETE THIN SET MORTAR AND GROUT. FLOOR TILE AND BASE TO HAVE EPDXY GROUT. GROUT a. STANDARD WALL SWITCH WITH OCCUPANCY SENSOR-USE WSD _ 2. PROVIDE NEW ROOF INSULATION TO MATCH EXISTING AT ABANDONED MECHANICAL UNITS. COLOR TO BE SELECTED(NON-SANDED). 2. AN CUSTOM GRADE STANDARDS FOR CASEWORK AND COUNTER TOPS U.N.O b. INTERIOR AREAS,SIZE AND USE b. WALL SWITCH WITH OCCUPANCY SENSOR AND DIMMING-USE WSXD Y O 3. AT ALL UN-USED EXISTING ROOF PENETRATIONS,REMOVE EQUIPMENT AND REPAIR ROOF SYSTEM. 3. FOLLOW LATICRETE AND TCNA PRINTED INSTRUCTIONS FOR TCNA F115 AT FLOOR AND BASE AND W243 ON 3. HIGH PRESSURE LAMINATE(P-LAM HPL)ALL EXTERIOR SURFACES,INCLUDING 4-TOE KICK. EDGE BANDING c. CONFERENCE/TRAINING ROOMS c. WALL SWITCH WITH DIMMING AND CEILING MOUNTED OCCUPANCY SENSOR-USE SPOD 0' WALLS. WHERE INSTRUCTIONS CONFLICT,USE MOST STRINGENT. JOINTS TO BE UNIFORM 1/8"WIDE AT THE (MATCHING PVC ACCEPTABLE),FIN ENDS,DOORS,AND LIGHT VALENCE ETC. UPPER CABINET BOTTOMS d. COMPUTER/SERVER AND TELEPHONE ROOMS TO HAVE PROVISION FOR LOW AMBIENT OPERATION O 0- W � OPTIONAL HPL FINISH,STANDARD MELAMINE FINISH. OPEN CABINETS OPTIONAL HPL FINISH,STANDARD WAREHOUSE LHiHTING (l CV 08 10 00 DOORS AND WINDOWS FLOOR TILE.CENTER THE WALL AND BASE TILE JOINTS ON THE FLOOR TILE JOINTS SPACE UNIFORMLY AS AND 24-HOUR USE.VERIFY NEED FOR A SEPARATE SPLIT SYSTEM TO MAINTAIN TEMPERATURE. W N MELAMINE FINISH. 1. LITHONIA LIGHTING LED BAY LIGHTING IBG15L MVOLT 753573864332 WITH OCCUPANCY SENSOR ONEACH fn Z 1. RE-USE EXISTING DOORS AND FRAMES WHERE POSSIBLE INDICATED.(WALL TILE JOINTS WILL BE SLIGHTLY WIDER THAN 1l8'). 3. SYSTEM DESIGN CRITERIA-SIZE ZONES FOR 3-5 TON UNITS BASED ON USE&EXPOSURE CRITERIA. r 4. TOE KICK PLYWOOD 4"H WITH P4 AM COVER PACKAGED OR SPLIT SYSTEM EQUIPMENT GRATER THAN 5 TONS SHALL BE SPLIT INTO MULTIPLE ZONES. FIXTURE(wardam aes below 24) (n Q Q) 2. APPROVED DOOR,FRAME,AND HARDWARE SUPPLIERS INCLUDE: 4. PROVIDE SCHLUTER EDGE TRIM APPROPRIATE FOR FINISHES AT TRANSITIONS. PROVIDE PHYSICAL 111 J SUBMITTAL OF PROPOSED TRIM TO ARCHITECT FOR APPROVAL 5. DOORS AND DRAWER FRONTS PLASTIC LAMINATE OVER 11/16'PARTICLE BOARD WITH MATCHING PaAM OR VAV OR WATER SOURCE HEAT PUMP SYSTEMS GREATER THAN 3 TONS SHALL BE SPLIT INTO MULTIPLE 2. UTHONIA LIGHTING ELM LT EGRESS LIGHTING. I W a. BAXTER AND FLAMING. (503)225-0486 PVC EDGES. ZONES. Z W W 5. CLEAN TILE AND GROUT AND SEAL WITH MIRACLE SEALANTS 511 IMPREGNATOR SEALER. RESTRICT TRAFFIC J O b. D&D DOOR (503)2055533 FOR 4 DAYS AFTER COMPLETION. 6. MELAMINE(LOW PRESSURE LAMINATE/LPL)ALL INTERIOR AREAS,DRAWER PARTS,SHELVING ETC. 4. ALL ENCLOSED ROOMS OR OFFICES TO HAVE DUCTED SUPPLY&RETURN GRILLES. W Z m c. BENSON INDUSTRIES (503)907-2200 09 53 00 SUSPENDED ACOUSTICAL CEILING 7. FLUSH OVERLAY/FRAMELESS STYLE CONSTRUCTION. 5. VACANT SPACE SHALL HAVE DEDICATED GAS SERVICE FOR FUTURE BUILD-OUT OR FREEZE PROTECTION. 7 m d d. GRANT SUPPLY (360)887-0647 1. COMPLY WITH CURRENT SEISMIC REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE. 8. THERE SHOULD BE 1/8'OR LESS GAP TOLERANCE BETWEEN DOORS AND DRAWERS. 6. UNITS: LENNOX,TRANE,YORK OR CARRIER-7 1/2-TON MAXIMUM UNIT SIZE. ANY UNIT IN EXCESS OF 7 1/2 L Z > Z TONS SHALL HAVE SPECIAL WRITTEN APPROVAL FROM PACTRUST. 3. DOOR AND RECITE FRAMES SHALL BE ALPHA ALUMINUM PRODUCTS,INC.(AAP),OR APPROVED. SUBMITTAL 2. FOLLOW MANUFACTURERS PRINTED INSTRUCTIONS FOR THE DELIVERY AND INSTALLATION OF CEILING 9. HINGES-BLUM#75M3580, 110 DEG.SELF CLOSING CLIP ON(OR EQUAL). 0 Un J REQUIRED PRIOR TO ORDERING MATERIAL.NEIN FRAMES TO BE FACTORY FINISH CUSTOM COLOR. 7. HVAC UNITS EQUAL TO OR GREATER THAN 5-TONS TO HAVE DUCT SMOKE DETECTORS AND BE CONNECTED 0 (- SYSTEM,INCLUDING GRID,PANELS,AND HANGARS AND ACCESSORIES. 10.DRAWER SLIDES-BLUM #230M SERIES EXTENSION(OR EQUAL)75 LBS.MIN.FOR STANDARD DRAWERS. TO A MONITORING STATION WITHIN THE BUILDING. LLLLLL W t- Of 4. ALL INTERIOR DOORS SHALL BE SOLID CORE WOOD UNLESS NOTED OTHERWISE. 3. USE ALL PRODUCTS FROM ARMSTRONG WORLD INDUSTRIES, INC. ACCURIDE#4032(OR EQUAL)HD/FULL EXT 150 LBS.MIN.FOR HD AND FILE DRAWERS. Q' L0 0 5. DOOR HARDWARE SHALL BE SCHLAGE AL SATURN OR D RHODES SERIES U.N.O. 11.PULLS-96 MM C-TQC WIRE PULLS. FINISH TO MATCH DOOR HARDWARE. 8. ROOF TOP UNITS SHALL BE PLACED 24'MINIMUM FROM ROOF EDGE TO CENTER OF UNIT. MULTIPLE UNITS 0 N a 4. CO-ORDINATE CEILING WORK WITH INSTALLERS OF RELATED WORK INCLUDING BUT NOT LIMITED TO SHALL BE PLACED SYMMETRICALLY IN A LINE BASED ON LOAD CALCULATIONS BY STRUCTURAL ENGINEER. 6. ALL DOOR HARDWARE SHALL BE INSTALLED WITH A 2 3/4'BACKSET. INSULATION,GYPSUM BOARD,LIGHT FIXTURES,MECHANICAL SYSTEMS,ELECTRICAL SYSTEMS AND FIRE 12.GENERAL CONTRACTOR TO PROVIDE CABINET MAKER WITH SINK TEMPLATE(SPEC SHEETS)FOR EACH SINK. 9. CURBS: 14"HIGH CURBS. ASSEMBLED AND LEVELED TO ROOF,ANCHORED TO STRUCTURAL MEMBERS SPRINKLERS SINK CUTOUT SHALL BE DONE IN SHOP WHEN FEASIBLE AND BEFORE BACK SPLASH IS INSTALLED IN ALL DATE: 10/10/19 7. DOOR FINISH SUBMITTAL:CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR DOOR FRAMES,DOOR BELOW ROOFING. HARDWARE AND DOORS AS WELL AS A CONTROL SAMPLE OFTHE FINISHED DOOR SKIN W/STAIN AND FINISH 5. PRODUCTS: CASTO BE SEALED. MINIMIZE COUTO ALLOW CUT OUT OBE NTERT0SITIONED PROPERLY. ALL RAW EDGES 0P BUILD UPS AT FRONT AND ACK OF SIINK CUTCUT OUT OUTATO BACK SPLASH a. PROFESSIONALLY ROOF IN ALL CURBS AND PENETRATIONS BY PACTRUST APPROVED ROOF PERMIT / CONST T SHALL APPROVE CONTROL SAMPLE. FINISHED PRODUCT IS SUBJECT TO REJECTION BY ARCHITECT IF THIS APPLIED(IF NEW DOORS ARE BEING PROVIDED). BEFORE FINISHING DOORS IS COMMENCED ARCHITECT a. GRID-PRELUDE 24 XL 15/16'EXPOSED TEE(HEAVY DUTY) ACCOMMODATE PLUMBERS SINK CLAMPS CLEARANCE. CONTRACTOR. SEE DIVISION 1 GENERAL NOTES THIS PAGE. PROCESS IS NOT FULLY ADHERED TO AND FIELD PRODUCT DOES NOT MATCH THE APPROVED CONTROL b. TILES-ARMSTRONG FINE FISSURED#1732,24 x 24 x 5/8'W/ANGLED TEGULAR EDGE 13.KITCHEN/BREAK ROOM CABINETS-BASE CABINET WITH SOLID SURFACE TOP AND 4'BACK SPLASH. ALL b. UNIT MUST BE LEVEL,SEALED WITH NO AIR LEAKS AND COUNTER FLASHED. REVISION SAMPLE. c. ACCESSORIES-MANUFACTURERS'STANDARD CABINETS TO HAVE DOORS AND DRAWERS,U.N.O. UPPERS 12'D X 36'H-ATTACH TO WALL WITH FRENCH CLEAT,COUNTER AND COUNTERTOPS 24'DEEP. MICROWAVE SHELF 18-D WITH 3'RADIUS OUTSIDE c. CONDENSATE MUST BE TRAPPED AT UNIT. 6. ALL INTERIOR GLAZING SHALL BE TEMPERED. 6. ALL TILE CUTS SHALL BE DONE WITH RAZOR SHARP KNIVES. CUTlTRIM TILE EDGE TO CRATE TEGULAR EDGE CORNERS. P-LAM AT TOEIBASE. ALL SHELVES ADJUSTABLE.PROVIDE HOLES AND POSTS(1 AT BASE,2 AT 10.SEISMICALLY ATTACH UNIT TO CURB IN CODE-APPROVED METHOD. 9. DEAD BOLT LOCKS AT NEW EXTERIOR DOORS TO BE INSTALLED WITH A SCHLAGE MORTISE DOUBLE CONDITION SO THAT CEILING TILES LAY FLAT. UPPERS). 11.ALL GAS PIPING SHALL BE STANDARD BLACK STEEL PIPE W/SUPPORTS PER CODE. PIPING SHALL BE RUN 1 CYLINDER 20-013C "C'KEYWAY;SOLID BRASS;WITH ADAMS-RITE CAM AND COMPRESSION RING 1 1/8"LENGTH 7, CEILINGS LESS THAN OR EQUAL TO 144 SF AND SURROUNDED BY WALLS CONNECTED TO THE STRUCTURE 14.WORK/COPY/STORAGE CABINETS-BASE CABINETS WITH NAM TOP ON PARTICLE BOARD DECKING. SCRIBE INSIDE OF BUILDING W/LEAD FLASHINGS AT ROOF PENETRATIONS. LEAD ROOF JACKS TO BE SEALED AND WITH HARDENED CYLINDER GUARD RING KEEDEX K-24. FINISH TO MATCH BUILDING STANDARD. ABOVE ARE EXEMPT FROM THE SEISMIC DESIGN REQUIREMENTS. CLAMPED COUNTERTOPS TO WALLS. ALL CABINETS OPEN MELAMINE STANDARD INTERIORS WITH DRAWERS,U.N.O. (STAINLESS STEEL WORM GEAR). Z. 1 D.PATCH AND REPAIR ALL HOLES OR DAMAGE TO EXISTING STORE FRONT WINDOWS AND DOORS.TOUCH UP 8. CEILING AREAS OF 1,000 SF OR LESS SHALL BE EXEMPT FROM LATERAL-FORCE REQUIREMENTS. UPPERS AT 15'D X 30"H -ATTACH UPPERS TO WALL WITH FRENCH CLEAT. BASES AT 24"D X 36"H. PRAM AT 12.ALL EXISTING AND NEW GAS PIPING EXPOSED TO THE EXTERIOR TO BE PROTECTED FROM RUST AND FINISH FOR AS NEW LOOK. TOEIBASE. ALL SHELVES ADJ.HOLES AND POST(1 AT ASE, 1 AT UPPERS). CORROSION WITH OIL BASED PAINT COLOR GR 3. 11.OVERHEAD DOORS;WAYNE DALTON THERMOSPAN 125,EXTERIOR WHITE/STUCCO. FLUSH STEEL INSULATED, 9- INSTALL CEILING GRID WITH TWO EDGES ATTACHED TO ADJACENT WALLS. THE OTHER TWO EDGES SHALL BE ( �' 2"THICK;STANDARD LIFT OPERATING STYLE WITH TRACK AND HARDWARE. OPERATION;PULL ROPE FOR ATTACHED TO WALL MOLD USING BERC2 CLIPS ALLOWING THOSE TWO SIDES TO FLOAT. 15.WORK COUNTER TOPS-COUNTER TOPS WITH P-LAM ON PARTICLE BOARD DECKING. SCRIBE COUNTERTOPS 13.LOW VOLTAGE IN SEALTITE CONDUIT FROM BELOW ROOF LINE DIRECT TO UNIT. DO NOT EXCEED BEND DOORS TO 10'TALL,CHAIN HOIST FOR TALLER DOORS. 10.PROVIDE CEILING SEISMIC JOINTS AT LOCATIONS AS SHOWN TO LIMIT CONTIGUOUS CEILING GRID AREAS TO TO WALLS. PROVIDE GROMMET HOLES ABOVE ALL POWER AND DATA LOCATIONS. PROVIDE STEEL MID SPAN RADIUS OF MANUFACTURER'S GUIDELINE. 4. NO MORE THAN 2500 S.F.THE STATIONARY SIDE OF THE JOINT SHALL PERMIT THE INSTALLATION OF A LIGHT SUPPORTS AS NEEDED EQUAL TO WORK STATION BRACKETS AS MFG.BY A&M HARDWARE,INC 14.ECONOMIZER TO MEET CODE AND AS FOLLOWS: 12.TUNE UP EXISTING OVERHEAD DOORS FOR SMOOTH OPERATION. WORK INCLUDES: FIXTURE IMMEDIATELY ADJACENT TO THE JOINT. (888647-0200). 5.a. ADJUST OVERHEAD SPRING TENSION TO MEET MANUFACTURER'S SPECIFICATIONS. 16.RESTROOM LAVATORIES(WHERE APPLICABLE)-24-D SOLID SURFACE TOP AND 4"BACK SPLASH. a. 6 TONS AND ABOVE MUST HAVE ECONOMIZER. 11.INSTALL TWELVE GAUGE VERTICAL HANGER WIRE TIES 4 FT ON CENTER WITH THREE TIGHT TURNS AROUND (� SEALSb. REPLACE TOP AND BOTTOM DOOR SLS AS NEEDED. THEMSELVES WITHIN THREE INCHES.INSTALL PLUMB WITHIN 1:6 UNLESS COUNTER SLOPING WIRES ARE 17.CLOSET SHELF-(WHERE APPLICABLE),MELAMINE 18-D WITH CHROME COAT ROD-KV#770-1,KV#734 b. BAROMETRIC RELIEF ON 5-7 1/2 TON UNITS. c. REPLACE BENT TRACKS AND PANEL SECTIONS. PROVIDED.CONNECTIONS AT SUPPORTING STRUCTURE TO CARRY NOT LESS THAN 100 LBS.EACH TERMINAL FLANGES AT EACH END AND KV1195 SUPPORTS AT 24'O.C.(OR APPROVED). c. 8 TONS AND ABOVE MUST HAVE POWER EXHAUST. END SHALL BE SUPPORTED WITHIN 8 INCHES OF EACH WALL. 18.JANITOR-FIBERGLAS REINFORCED PLASTIC(F.R.P.)WAINSCOT 48"H(SEE PLANS IF REQUIRED). d. 1 1/2 THRU 4-TON OSA INTAKE WITH DAMPER. 7 d. REPLACE ROLLERS AND HINGES AS NEEDED. 12.PROVIDE LATERAL-FORCE BRACING AT GRID MAIN WITH RIGID VERTICAL STRUTS TWELVE FEET ON CENTER 21 00 00 FIRE SUPPRESSION : DESIGN/BUILD 15.ALL UNITS TO MEET OR EXCEED CURRENT ENERGY EFFICIENCY CODE REQUIREMENTS. 8 e. REPLACE ROPES AS NEEDED. EACH WAY BEGINNING WITHIN SIX FEET OF PERIMETER EDGE. f. LUBRICATE ROLLERS 13.INSTALL 12 GAUGE SEISMIC SPLAY WIRE TO THE MAIN BEAM WITHIN 2 INCHES OF EACH VERTICAL STRUT. 1. PROVIDE SPRINKLERS THROUGHOUT SPACE AS REQUIRED BY CODE. SPRINKLER HEADS SHALL BE 16.DROP CANS TO BE SAME SIZE AS CURB OPENING AND TO EXTENDED TO WITHIN 2'OF SUSPENDED CEIILING. WIRES TO BE ARRAYED 90 DEGREES FROM EACH OTHER AND AT AN ANGEL NOT EXCEEDING 45 DEGREES CENTERED IN 2 X 2 CEILING TILE.LAYOUT OF SPRINKLERS BY CONTRACTOR. SPRINKLER LAYOUT IN ALL HARD MINIMUM 26 GAUGE FOR SUPPLY AIR. SEAL EDGES OF SUPPLY AIR. 08 11 13 HOLLOW METAL DOORS AND FRAMES FROM THE PLANE OF THE CEILING.ATTACHE SPLAY WIRES TO GRID AND TO THE STRUCTURE IN SUCH A CEILING AREAS(GYPSUM BOARD/PLASTER)TO BE REVIEWED AND APPROVED BY ARCHITECT PRIOR TO 17.DISTRIBUTION DUCTWORK: DRAWN BY: MANNER THAT THEY CAN SUPPORT A MINIMUM DESIGN LOAD OF 200 LBS OR THE ACTUAL DESIGN LOAD,WITH INSTALLATION,1. DOOR: AXE', 18 GAUGE, THICK,GALVANIZED HOLLOW METAL DOOR,SEAMLESS EDGES,FULLY ENCLOSED A SAFETY FACTOR OF 2,WHICHEVER IS GREATER. 2. IN NEW CEILING GRID SYSTEMS OVER 144 SF PROVIDE FLEXIBLE HEADS FOR MINIMUM SEISMIC a. SPIRAL DUCT PERMITTED ONLY IF EXPOSED. R.M.T. A AND BLED TOP,BONDEEDD POLYSTYRENE OR POLYURETHANE CORE,RUST INHIBITIVE PRIMER. ELECTRICAL MOVEMENT. NO"OOPS RINGS ALLOWED-. b. 26 GAUGE OR TO SMACNA STANDARDS WHERE DUCT IS CONCEALED ABOVE A CEILING. ROOM DOORS 42'WIDE. 14.VERTICAL STRUTS TO BE POSITIVELY ATTACHED TO THE SUSPENSION SYSTEM AND THE STRUCTURE ABOVE. 2. FRAME: 16 GAUGE,GALVANIZED METAL WITH WELDED CORNERS,2'FACE DIMENSION,5/8-INTEGRAL 15.USE ARMSTRONG BERC2 CLIPS TO SATISFY SEISMIC WALL CONNECTION REQUIREMENTS.SEE DETAIL. 22 00 00 PLUMBING : DESIGN!BUILD c. WRAP CONCEALED SUPPLY DUCTWORK IN NON-CONDITIONED AND SEMI-CONDITIONED SPACE WITH STOP,RUST INHIBITIVE PRIMER. GENERAL REQUIREMENTS MINIMUM R4.2 INSULATION WITH FSK BARRIER. 16.EDGES. SPREADER ARS AT TERMINAL ENDS OF MAIN RUNNERS AND CROSS MEMBERS AT UN-ATTACHED d. HANGERS 12 GAUGE WIRE OR 18-GAUGE 1"WIDE STRAP. EXPOSED DUCT MUST HAVE ALL THREAD 3. HARDWARE: C PAIR,41/.X4%5BALL BEARING BUTTS WITH NON-REMOVABLE PINS,SCHLAGE E ND53PD RHODES EDGES.SPREADER BARS ARE NOT REQUIRED IF A 90 DEGREE INTERSECTING CROSS OR MAIN IS WITHIN B 1. CONTRACTOR D SUBMIT LAYOUT D ELEVATIONS AND PLANS PROVIDED FOR ALL SHUT OFF VALVES,CLEAN HANGERS AND FULL DIAMETER STRAP UP TO 18'0. LARGER THAN 18'MUST HAVE SADDLE TYPE CLAMP. ENTRANCE LOCK WITH 5-PIN C-KEYWAY KEYED TO PACTRUST BLUE KEY,SURFACE MOUNTED CLOSER,TOP INCHES OF THE PERIMETER WALL. OUTS,ACCESS DOORS,AND FLOOR DRAINS TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. DRIP,BOTTOM SWEEP,LOCK GUARD,AND THRESHOLD. ELECTRICAL ROOM USE VON DUPRIN 35A-NL EXIT RIM 17.IN EXISTING SPACES REPLACE WATER STAINED OR DAMAGED TILES. 2. PLUMBING CONTRACTOR TO PROVIDE AND INSTALL 1 MASTER SHUT OFF VALVE FOR EACH SET OF e. BRANCH DUCTS SHALL BE PLUMB AND SQUARE(NO OCTOPUS). TEES SHALL BE MAXIMUM OF 45 DEVICE WITH NIGHT LATCH EXTERIOR TRIM. HARDWARE FINISH SATIN CHROME(US26D). ( ) DEGREES. 08 43 13 ALUMINUM STOREFRONT DOORS AND WINDOWS 18.TUNE UP GRID SYSTEM TO WITHIN PLUS OR MINUS 0.5 INCHES OF LEVEL. RESTROOMS. LOCATE VALVE BEHIND HANDICAP WATER CLOSET IN MEN'S TOILET ROOM. 3. ALL DOMESTIC WATER PIPING TO BE TYPE L COPPER-NO EXCEPTIONS. ALL EXPOSED PIPING TO BE f. EACH BRANCH DUCT TO HAVE BALANCE DAMPER IN Y BRANCH. Aiiiiiiiiii 1. DOORANINDOW FRAMES:2'x 4 1l2'OS GLAZED. 19.BENT OR DAMAGED T-BARS TO BE REPLACED. INSULATED. g. ALL DISTRIBUTION DUCT WORK TO BE INSTALLED MIN.24"ABOVE FINISH CEILING. 2. DOORS:MEDIUM STILE ALUMINUM SIZE PER PLAN WITH INSULATED,LOW-E NON-REFLECTIVE GLAZING. 20-REPAIR HOLES IN GRID FROM REMOVED WALLS. USE OF ARMSTRONG-BP ES4"EXPANSION SLEEVE 4, WATER HEATER(ELECTRIC)30 GAL AND LARGER 2T7V LESS THAN 30 GAL 120V. PROVIDE HUB DRAIN AT 18.FLEX DUCT WILL BE NO LONGER THAN 6'FROM RIGID DUCT DOWN TO DIFFUSER. 3. DOOR HARDWARE(SINGLE DOOR): SELECT PRODUCTS GAACCEPTABLE.TED CONTINUOUS HINGE,VON LOCATION FOR BLOW OFF. 19.DIFFUSERS: DUPRIN 35A-NL-0P(IN US26D)EXIT RIM DEVICE WITH V DIAMETER BY 10-LONG BRUSHED STAINLESS OFFSET 5. POINT OF DEMAND WATER HEATER-BOSCH POWER STREAM PRO-MODEL RP2P 2TT V/30A. ADJUST WATER �� #3082 MARTIN W.HA7NC-)- - ---- --- -- -- -- — -- - --- --- ---- ---- - KA--- cp, S 0 67LII 11 II II II IIF OF " NOTES ,I II " II II II II I, 1 ,I II II 11 II II II 11 I ,I II 11 IF-, r � II II II I, I . DEMO AS SHOWN PROJ ECT # 19380 • REMOVE MEZZANINE IN SOUTH EAST CORNER ,1 II 11 II I 1 1 1 II II II I, I ,I II 11 II I 1 1 1 II II II I, 1 ,I II �� II 1 1 1 1 II II II I, I I I / 1111 \ 111 \ 11 L---- i 1 I 111 \ I III ,I I 1111 \ 111 \ II I I I III \ 111 \ II73 m JL r-1 ,-=sir------------ I LL_\ ` TiE _______________ ____ _____ ' 1—r--------- r� —r— ---------T fr=-------------rr=== r —==a i I II/1111111 /1111111 /111 1--------1, If--------- I ��hh 11 /\\\ IV(L1Ti 1tia RIIu¢G i i ii I \ I II 1 1 1 1 1 11 ,I II II . 1 II r---------1 C\' I I II I I, IIII II II I ��IZc�=i=�II.T.=r=�1 I I II I I� 'I 11 II y It I I I I Li Ij \\ 1 II QQQQ�. vS O tJl I ij �I II ILO L —----------- -— JL- -_--,I =__' I I I i�? 1 c QO I K, II I� I I 1 11 L___________'---331I � II IL_J O r---= rJ1JL-J� t==J1 Ir --------------�1 / 11 '�'J L_ Yk rr� l „ 11 J I a'. T I� , , i, II U \ o �i it u i L N F° 04 11 ' ' 11 II II 1, 11 II 1 I C I - -11 IF O QO In it—@— LLJ Q to Q IL-Icel c: (n C7 r -11 Z (o r UI I `----------Ill`\\\ I� �i `\\ �r V V i--j� f>n Q N N Z _ .� > II 11 L-----------q1ItlI \ 11 II ' Ir-1-11 J (D CD II _______J L____ _ T - J' 1E===1 IF_J_�I � 0 II ____________________ ---- =lrrT� 'L ' J' of co co I I I -T- ,I �'�II C M Ilf___l O O c U.) O vU,) II 1 \ it I 1 'r-+-71 ���{I - �- --- -� �--------------------- __ _ —=8 ��--- F—�I ---= 4' OF P \\ I pyy7l II I I Fes_____________ �-q r _y EP' r n II II -_ III I \\ II ' 1 11 ------------_----------- 11 II i J n11n II ----------- ----------- 1 II / 11 / l II / III II 11 I1 II � LLJ k11 �y II I' II i 11 11 ,I L-- II II II j Y II IF -----4 / Iiia Tl 14_____________J / AIIA I I U ---- �--a : II 1, I 1 11 II I I II II I I II II I I 'I II I I i 1J Ir '' 11 F 11 II II II II II II I I 11El -Jr____-____�� r�Jr____ 1�- --JL______ ______ ______ ______ L ______ 11 II lf____ � � r lf____ \ � r lf____ \ � r � �I � pip- if-- ` � `i ` ,j 1 ItA j \ tlllA / II 1 IIIII / II 1 11111 I „ \ tlllll / \ IIII 1� YI IY ��� „ --__i�i1 1111 Phi , 11 II \ tlllA / II \ IIIIY / II \ II Itl / II \ Allll / \ IIII \ Alln / II \ 1111 / I� I� II Nli II II II II II ICq_ II II II II II II II 11 II II Ike- II I 11 _ II II II II II I� II I� 11 �//L�L:' II II II II II II II II ;, II "1 r` II I, II II II II 11 II II II II II I, p II II II II II II II ___ II II II I, / If 1 11 II li / tlLLI \� II I _______ 1 �_ ,I II I I Q II Q --u I ' e- �� d L N W N c/) Z L U cf) Q W J W Z W Of LVW U) _j i1 i ) Z 00 S LL_ Z Q = ~ n "`- y= W Lc) a--' ONd DATE: 10/10/19 " - -- PERMIT / CONST II II II REVISION II 11 II 5. 6. 7. 8. ----------- -------------------------------- -------------------------------- -------------------------------- -------------------------------- DRAWN BY: R.M.T. 1 DEMO PLAN z� A-2 SCALE 1/8" = 1'-0" A� 2 RSOrREGO�o ---------- — -------------------------- ---- ------------------------- ----------------------------- ----------------------------- --------------------- ---- ------ --------- ----------- ----------------------------_.. 1__L� IS11 f� I I 'I 1 1 I I I I ;;I I 1 1 I I , I , I I , I 'll I I I I INOTES OF H11,1_� R `i=' r 11 1 ' " I . REMOVE FLORESCENT LIGHT FIXTURES PROJECT # 19380 -- __L_J__1__L�,J__1__L_J__1__L1.1�_ __F_J__L__ _J__,L__L_J__1__L_J__� JILJJLJ � 31LJLL J ��. I II I 1 1 I I I I ' I I I 11 I I I I I•� 'IREMOVE ALL EXISTING CEILING TILE __ Vz,'� 1I1 •h ' ' >< < >< >< >< 1 >< >< + >< II REMOVE HVAC SUPPLY AND RETURN GRILLS I ' 'I' 'R I - I I II , II II II i I 'll . I , , ' ' JI--I I T :T__ -}-- --rHJ- - __ - ♦ 1--� -3'-M-- �l-i --r--I i-�--T--r- =-r--r-�-- �= --' ` ' ` I' ' • 1 '>< j1 I ` I 1 1 1 1 I I ) 1 I 1 1 11 ' •1 I11 ♦ I I II ' / ljTI + I11 1 I 1. I _ I__ 1 1 il __F_J_____+crJ_iIL__L____1__L_J_____L_J__1__L_J_____L_J__ J__J _IJ _ IJ_I _I _ I__I .LL_F _ _ __ _ J _ __ __ _ _ __ 1_ _I _ I_ Ir-=zI yll L __ _ __ ____ __'j_'__h _•1._ __ _1_S__ _ __7__L_s_�__L- _ _ __ __ C_ __ _ __ __ _ _ __ __ _ __ __ _ __ __ - ____ __ _ _ = _ __ _ _ _ _ • I I 1 1 I 1 1 1 I I ^+ II y__+__F_ W �1III- �><' '+ �>G` G` I1 ` I1 G\ ' �>< + • 1 �><' ' >G' ' �><` 1 ' <' I I �> SO >G' 1 >G' • I ' II'- ' I I 1 I I I ��r„ , ���- _ 1 I (,�r�J I 1�1 '___ _ _ e __Ir' __L_ ' IIl__ � __' _ 1 1 --r-i ''. - -�-- �--T-- -r-� r-r- � � � � � � � 1 -ice- 1 �-11 c-\== r-� 1 �__T__ -i r- -- �\!1__j I 1' • Q • L _J__ 1__' J__1__L_ '__1 L_J__ '__L_J__1__' 1 _ - - lr __ _ __ I Tr-\ r I I I , I I 11--7-- AL T I I 111 II I I \S, I I I I ' I 1 I ' 1 I I • ' , 1 II I I II 1 1 I I 1 \ I 111j I I�SiI I I I I I I I I I _�__ _F_�__}__�_-4'-_}__F \ / . r� I // /+ I I I 1 I d♦/ 1 , < I I ♦>C\ 1 \ / ' . . 1 1 ' • 1 1 11 I I • I S =ab-da 1 1 I I I 1 I 1 I 1 \/ I y� 'ftj I 1 I I ka� I II � I V I _-L= 1 L I�' ll_I I I I I-_P -I 1 I I I 1 I I TTTrrr �1 • • I /\ ��r�__�� c_ __ -'fir _��__T I r_7 _r_-t_s� I_1--T__r_7-_T_-r-1-_T--r_ •. _>< /R >< 1 11� 1 •F�♦•\ I��I I I I I I I I IL1J__ ♦/ , I I I 1 I I 1 1 I I I } 11 , I II 1 -- ' I1/Q II , I II /n\ >< >< I I I I I I ' I I I =_-\�S'jI A3�IB �><' I CD • i i 1 i • I ' 1 I I I 1 I I I 1 I I I 11 <� I i I I ®AIA3 u _ r I I L- I I I J__ ' ' ' I +__ • • I 1 I I • I I 1 I I I 1 I 1 1 >G` I ' I, d 1 I II I O _.i__1����� . __ r-�--H4__r_ It �_J__+__1 _ ' _ ____ ____ ____ ♦ ____J __ __ SVT a y /n\ • 1 1 1 b y I I I I I I 1 I I I - 1 ,_\ I I I i i / `r----I N (S) I I ham'\�'1 I I I I I /"1 1 1"A ><' + i • / \ �. �� / \ Q m _J__�c..,Jlr•->a__1__L_J__1__L_Jka�JL__L_JIG. ak II I I I I I I I I I 1 I I I <' ><' ' OS I 11 I I `>G' ><' <' Q Q O L O i1 <' 1 z><' . �><' 1 I i • 1 1 i OLO >< c: i 1 (n Q (o r= -T-- --- -r-� r-�--Tr =ssk ---- ---- - -- ---- 1 i Z Q n r_ __ II O O O Q n M a Lo Lo � Lo -6 _= --- i i i i i i i n L n I \ ' I 1 I I I i�aamimmiwunw�m mimaamimq_ii - 11 II I®®9311H�1®®9313Hiffl®®A31�AII 3 � ---- - - - • � O I - �� 111 r 1111 ♦ - IIA ♦ Ild ` \V AIAHA3I�AIIAIAEAlI�AII®®931�Ai1 / -- ---- - --- ---- __ ju _______________ II I II 1 • • ' -- -- - -- -- - — -- - -- II • II ' I I --7 ---i _i - �i Iy -; --�i ---- 111 \ - - -- ---- i ./ ---- / a` V I. lyl 1 • - -i1 i1 rG it ���i �><i �><i II �><' � <' 1 II 1 I i> r>G' - - 1 <� p 11 1 / 1 l 11 1 / \ 11 \ 1 / , I - I ---- I I ---- I ---- I ---- <' I G\ X111, 1 �� X111, \v Al X111, II X111, 11 I I 1 I I I I /n\ ' \V • I\V i \V V 11 V V V V �1 ' / \ Lf --r- --T--r- --T--r- --TT;-r��-- ; LLJ i t I I I I I 1 I 1 1 I1 1 `I♦`M 1 1 C I G p-- —+— fah-- — h__ _ __T__ - __T__ - y_TT- - I O a W N U) Z N ------------------------ ® 1 W _ W Z W Lu m Q z m � .L, Z - Z -� W Q Q � 0- DATE: DATE: 10/10/19 II IL _ `----— PERMIT / CONST 11 11 REVISION 11 II II Q, 1. 2. ®� 3. 4. 0 5. 6. 7. 8. -------------------------------- -------------------------------- DRAWN BY: -- ------ -- R.M.T. 1 DEMO CEILING PLAN z A-3 SCALE 1/8" = 1'-0" A� 3 #3082 A9B 10 � MARTIN W.HANSON n ---------- ----------------------------- - ------------------- -- ---- -- ------ --------------------- - --- ------------ ------- ------ ----------- c- - KAM SOREGON too V its ER V 11 EQ. EQ. ;Eo. �Eo. NOTES F OF cPr-� tura CPT-t 74 q fRl:c i • NEW FLOOR COVERING THROUGHOUT PROJECT # 19380 ars r4r r T- -- s4r -- II - - • NEW BASE THROUGHOUT r T---------1 r T 1 r---------T 1 r---------T 1 • NEW PAINT THROUGHOUT I I I I I I I 9 NEW INTERIOR DOORS AND FRAMES THROUGHOUT I I I I I 1 1 I I I I I ' • ELECTRICAL FIXTURES TO BE WHITE V I I I I 1 1 I I ----------------- a NEW ROLLER BLINDS AT EXTERIOR WINDOWS iM I I I L----------L----------L------- • CFI ars O vRFlA6 I I I I 1 I I I I 1 1 I INSTALL STICK PIN INSULATION ABOVE CEILING GRID AT ALL EXTERIOR �, I I I I I •_0 101 OFFICE WALLS � ALL WALLS THIS ROOM TO I ' I� 1Q 1 1� I • RESTROOM UPGRADES TO INCLUDE V G 12'ABOVE FINISH CEILING I I I I t\\ w I I •rSoxN I I I •rBOxIN I I I - •reoxN I I 1 "Jr• ewcN 1 r---------T T •• PORCELAIN TILE FLOORING L WITH 1 1 cF.IL1NG 1 Lse•rR �NQ 1 CEILING I ' 1 ' .. PORCELAIN TILE WAINSCOT AT WALL BEHIND FIXTURES Q ALLWALLSPLYWOOD I I 1 1 I 1 ' I i i .• NEW TOILET PARTITIONS �, 1T-0• ED. PRINTABLE PLYWOOD T08' 1 I I I I I I I I I I I cil A.F.F.MIN. I 1 I 1 ' ' OPEN OFFICE ' ' ' CONFERENCE •• NEW MIRRORS 113 I I I I I I 1O2 �---------+---------I k---------+---------d �rRovoE�,)saG RVEF------d k---------+---------� ' I I •• ALL NEW MOTION SENSOR PLUMBING FIXTURES. TANK TYPE TOILET � o 00 I I I I I PROVIDE CIRC. POLRwoRKsrA I -_ I I AT SHOWER ROOM No � I I I I �_ T---------T________ BACIv1G 103 1 1 I I 1 1 (2)PRNrERLOCATILMI.S ' pI• I I 1II III II III III I III III III III iIII III III • SOLID SURFACE COUNTER TOPS WITH UNDERMOUNT SINKS o•• ALL NEW ACCESSORIES INCLUDING p e o N• GP PAPER TOWEL DISPENSERS I I I I I 1 I 1 1 I I 1 I I I � � SURFACE MOUNT DEDICATED PANEL -- I ••• SOAP DISPENSERS 2 N H - ---- �- +---- �- +--------- ---------+---------� Q N ' 1 PROVIDE120206V200A3PHPOWER FEED 1 I J I J 1 1 J I J I ' •• NEW LED CEILING LIGHT FIXTURES — d TENANT RESPONSIBLE FOR BREAKERS I I I I I I L_________J___-____-_J_____----- ' ol AND DISTRIBUTIONMOTION SENSOR SWITCHES ' 1 •r BOX IN 1 ' •r Box IN 1 ' •r BOX IN 1 'reach ' •• ( I l LR1(• I COLING CEILgq 1 �y O ' 45•REP. I I I I v Q 0 u7 O I LV62 ars 1 i I 1 I W O En O L_J I I 1 I I I 1 I (n Q CYJ D.W. dbFYO I I I I I I I I I I r T T ------ c % 2 _-to TRAINING BREAK OUT I I i I I I I I I I I U) Q 04 04 Z A-T O rp L_________J__________J L_________J__________J L_________J__________J L_________J__________J I I I �L• N N 104 J 1 z / CIRC. s• ` 9r� o � �11 � p 1 b ars ar-t -� - I X 0 0 0 -- --- ® I tag Ito 109 I � - - i i a l11 l m ++ r -lo r T --1 L----------L--------- ------ -_-'' p.� ?-0r !4r Q�� I I I I ER I JAN. 111 1 I S q H6 i i i i art ara I '110 112 1 I COFFEE SODA I I I I s MEN WOMEN GRINDER/ DISPENSER 1a-0• ta-0• �.1 . 112 ' WATER FOR I 1 I MEN REFACE CABINETNEW SODA MACHINES r-0 INSTALL NEW SS-0OUNTER SODA MACHINES ---_- ____-___ L�— 107 re• TOP AND BACK SPLASH AREA MANAGER I�-ram 1 I 1I 1 1 1 1 ' ADD UNDERMOUNT SINK I I ADD SECOND DISHWASHER •r B00(N 118 I I I I I I I I 1 I •r lrl)OLN I I I BREAK ADD SOUND WALL I CELNG I Qg>1p I I 1 THIS LOCATION I I REE VEND.dt db � I I I I I I 1 I I ® 9by ��••y�� I I I I I 1 I `l - PROVIDE Pr-2L--------- ---------J-_______--J I - ------- --------TF-- BACKING I I I I I I I I a IIWELLNESS WOMEN 1 1 1 1 1 IT I I I r---------T---------T 1 ® 1aeCOPY/WORK 108 I 121 126 § 117 ROOM TO INCLUDE(2) 1 I 1 ' OPEN OFFIPE COPIER COPI i) TONS MIN.AC L_________J L_________J_____ I I b I 4�-0'- .2 INCLUDE(6)2GA DED. 11$ I I TRAINING I T4' - ----- ---- --- 5 1 CIRCUITS. PROVIDE(1)29A CIRCUIT PE�1 105 ® MAIL h ar NEW ELECTRICAL POLRMKIR LOCATIO81 rr J 122 § § 9'd a CIR PANEL LOCATIONS (ZJ PRRIIBl LOCATIONS �_________+_-_______+_____-__- I I I I b ` 120 a r 1 r T_________1 h hI I I I I O 122 !Y ED, 1D CPr2_CPT1 I 1 I ® I I I .-. . .. I I qpA k I I 1 I 6 119 I I 1 I I e O O 124 ® 1 1 1 1 ® I➢ BREAKOUT --------- --------- --------- NEW WINDOWS OLD 1 I I I I OVERHEAD DOOR LOCATION 118 I I I I I 19 EQ. 12'-r EQ. I I M e toy -- CONFERENCE CONFERENCE r T------ - --T--------- STORAGE CONFERENCE tza tz5 6v 11 ® I I I I I PROVIDE /19\ �_________+_________� BACKING Sr 80" \ / 1 1 1 1 I PROVIDE PROVIDE 60• BREAK OUT I I 1 r2 8r '� GACICING BAG(ING I I 1 '- m IL 3 PROVIDE PROVIDE W 119 I I IU BACKING BACKING - 1 l� ItL� S�ILII IrrIl1 /,1L�1Tj�, ��1rr111II�� rr I 1 I I Ly UJl (bv ll U11� a J J W 37-2' ' G I I Y o 3WW aWI w N U EDa � 12Mw - w Zw � 1© FES I 1 1 1 U) m Z O I Im m Z i SHOWER I 9O CONSTRUCTION LEGEND w C4 WAREHOUSE EXISTING TO REMAIN DATE: 10/10/19 126 I s.4. _ I 3 c----=_D EXISTING TO BE REMOVED PERMIT / CONST A$ / NEW WALL WITH INS. REVISION ® w NEW WALL WITH INS.TO 12•ABOVE CEILING GRID NEW WALL TO ROOF STRUCTURE DUPLEX RECEPTACLE 2 FOURPLEX RECEPTACLE 3 O DZ3Q DEDICATED OUTLET 4. ljJ,T: EXISTING ELECTRICAL TO REMAIN 5. FLOOR MONUMENT W/SERVICES SHOWN 6. SPECIAL OUTLET 7. TEUDATA MUD RING WITH PULL STRING 8' a ELECTRICAL PANEL -------k----- =__:mmmmmmm:m ------------------------------ -------------------------------- -------------------------------- -------------------------------- O POWER J-BOX DRAWN BY: R.M.T. ® FLUSH MOUNT FLOOR MONUMENT W/POWER AND DATA ER FIRE EXTINGUISHER IN RECESSED CAB. PARTITION AND POWER PLAN Es FIRE EXTINGUISHER-SURFACEMOUNTED Ze Q THERMOSTAT A-4 SCALE 1/8" = 1'-0" A�4 NOTE: ALL FURNITURE AND EQUIPMENT SHOWN HERE IS FOR REFERENCE ONLY AND NOT FOR CONSTRUCTION.TENANT IS RESPONSIBLE FOR DESIGN AND INSTALLATION. 7� S UNISTRUT a'OC EACH DIRECTIONMSUSPENDED CEILING AT 12WAF.F. BOTTOM OF UNISTRUT AT 11-8'SEE ENGINEERING FOR STRUCTURAL DESIGNV ----------------------------- ---------------- ------ ------ --------- ----------- ------------------------ ------ - --------------- ---------- �CLAWMAS,OREGON \ C R NOTES TF OF 0� ® DZ ® DZ DZ DZ ® DZ ® DZ -. Oz • NEW CEILING TILE THROUGHOUT- FINE FISSURED PROJECT # 19380 )AE ® ]f;( • NEW BLT LED LIGHTING AS SHOWN • NEW OCC SENSORS FOR ALL LIGHTING OV F IAB NEW HVAC SUPPLY AND RETURN GRILLS 101- • NEW LED LIGHTING IN WAREHOUSE V DZ • sO g INDICATES COMMON PATH OF TRAVEL REQUIREING EMERGENCY LIGHTING EQUAL TO 1-FOOT CANDLE FOR s O I I I I I I I A MINIMUM DURATION OF 90 MINUTES. � e I I I PE FF E V I I I 1 1 I I 11 INDICATES NEW CEILING GRID Q DZ i I 1 I I I t CONFEREEI I 1 I I I I O CD O D2 BLT LED LIGHT FIXTURE m M + CD • I I 1 1 I I I > O 9 1 I I I 1 ® �e DZ_ BLT LED LIGHT FIXTURE WITH DAYLIGHT ZONE OPTION 0- N DZ I I 1 1 I I I QuL- N a 1 I I 1 i I I 1 • O .... 4—_ J_ _ �. __ 1 1-74- _ _L __ j • �. S� CONSTRUCT PLATFORM ABOVE CEILING GRID FOR C� p o Ln o - TRANSFORMER. U m Lo 0 nRA NIN BR UT 5 Rly, L c Q N N Z � � CO cp 5 f) 9� - � co coM o lel a o a J 11 } O O Z ® lat :Vncl ry 0. .:. ® Os ,R MEIF ` ,a7. .:. .... p.� §., ®..: .. Eff Ax 11 e -'a 74' miIIIIIII NEW TRANSF RMER \ PLATFORM ABOVE 128 rr I CEILING GRID COP) I 117 ;.. I \ / R 1 I IE IS( IR . m 3Sf K24 a R Dz LL 1 - R Dz a J 124 7 Q IbF 3 or or R b3 W1 I I _ I - I \s o 0 � o d W N 0 0 0 0 L U worn I WSW Z W w W Amo Z ED HOWER U 127 W r, W § ® oma ° WAREHOUSE 728 DATE: 10/10/19 PERMIT / CONST W-v w� �� wa �� Tri REVISION 1. 2. 3. 0 CEILING LEGEND 4. 2 X 2 LED BLT CEILING FIXTURE 5 LED HIGH BAY WAREHOUSE FIXTURE 7 OCCUPANCY SENSOR ON EACH FIXTURE 8. WALL MOUNTED EGRESS LIGHT FIXTURE -------------------------------- -------------------------------- ________________________________ ------------------------ RECESSED LED LIGHT(TYP.) DRAWN BY: $ STANDARD SWITCH R.M.T. ® OCCUPANCY SWITCH 0 CEILING OCCUPANCY SENSOR 1 REFLECTED CEILING PLAN FYI SUPPLY DIFFUSER z A-5 SCALE 1/8" = 1'-0" RETURN DUCT ® EXHAUST FAN _ 2X A5 TLE SPRINKLER HEAD 8 EXIT SIGN(LED RED) FINISH MATERIALS (FOR BUDGET ONLY) r�'``� � j FINISH SCHEDULE ALL FINISHES MUST BE SUBMITTED TO PACTRUST PRIOR TO INSTALLATION. #3082 � WALLS CEILINGS CARPET SQUARE TILE: MARTIN W.HANSON RM!/ NAME FLOOR BASE NORTH EAST SOUTH WEST MATERIAL HEIGHT REMARKS RMi# CPT-1 SHAW CATALYST CARPET TILE 24 X 24 64505 STIPPLE-QUARTER TURNED 100 RECEPTION CPT-2/SILT 4"RF PGWB EWWSGWB PGWB PGWB ESAT 9'-0' - 100 CPT-2 SHAW TRU COLOURS EW24 24 X 24 68549 LAVA � CL SS,OREGON 101 VRF LAB CPT 1 4'RF PGWB E-WW42GWB PGWB PGWB E-SAT 9'-0' - 101 CPT-3 SHAW WELCOME II 24 X 24 31549 CHARCOAL J1 102 CONFERENCE CPT-1 4'RF E-PGWB PGWB E-PGWB PGWB E-SAT W-W - 102 VINYL COMPOSITION TILE 9�,(� D� 0�� 103 CIRC. CPT-2 4'RF PGWB PGWB PGWB PGWB ESAT 9'-0' - 103 VCT-1 ARMSTRONG EXCELON IMPERIAL TEXTURE, 51804 EARTHSTONE GREIG, 12"x 12"x 1/8" 104 TRAINING BREAK OUT CPT-2/LVT-2 4-RF E-PGM PGWB PGWB PGWB ESAT 9'-0' 104 VCT-2 ARMSTRONG STATIC DISSIPATIVE 51950 MARBLE BEIGE, 12"x 12"x 1/8" 105 TRAINING CPT-1 4'RF E43GWB E43GWB PGWB E-PGWB ESAT 91-0" - 105 106 STORAGE CPT-1 4'RF PGWB PGWB PGWB E-PGWB E-SAT 9'4' - 106 LUXURY VINYL TILE PROJECT # 19380 LVT-1 MOHAWK GROUP SELECT STONE-T003M TEA TIN- 18 X 36- 1/3 BRICK ASHLAR, EASTNVEST 107 MEN POT B'POT E�GWB E-PGWB E-PGWB PGWB E-WBC 9'-0' POT WAINSCOTTAT WET WALLS 107 LVT-2 MOHAWK GROUP SELECT STONE-T003M TEA TIN-7.25 X 36- 1/3 BRICK ASHLAR, EASTNVEST 108 WOMEN POT 6'POT E-PGWB PGWB E-PGWB E-PGWB E-WBC 9'-0- POT WAINSCOTTAT WET WALLS 108 109 CIRC. CPT-2 40 RF PGWB PGWB PGWB E-PGW13 ESAT 91-0' - 1109 SHEETVINYL 110 JAN. VCT-1 4 RC PGWB E-PGWB E42GVVB E-PGWB E-SAT 914' - 110 SV ARMSTRONG REJUVENATIONS STONERUN,-LITHOS PHYLITE 34335,WELDED SEAMS +r 111 MEN POT 6'POT E-PGWB E-PGWB PGWB E-PGWB E-WBC 9'-0' POT WAINSCOTT AT WET WALLS 111 SLATE TILE V 112 WOMEN POT 8'POT PGWB E-PGWB E-PGWB E-PGWB E-WBC 9'-0' POT WAINSCOTT AT WET WALLS 112 SLT OTM SLTCOUGRY1616B COUNTRY GREY(NO GROUT) 113 OPEN OFFICE CPT1/CPT.3 40 RF PGWB E-WW-PGWB E-WW-PGWB PGWB ESAT 9'-0' - 113 '— -- - -_ 114 BREAK LVT 4'RC PGWB E-PGWB E-PGWB PGWB ESAT 9'-0' - 114 BASE 115 OPEN OFFICE CPT-1 /CPT-3 4"RF PGWB PGWB WW-PGWB E-PGWB E-SAT 9'-0' - 115 RF ROPPE 4" FLAT RUBBER BASE, 123 CHARCOAL,AT ALL CARPET AREAS. L 116 AREA MANAGER CPT 1 4'RF E-PGWB PGWB PGWB PGWB ESAT 9 0' - 116 RC ROPPE 4"COVED RUBBER BASE, 123 CHARCOAL,AT ALL HARD SURFACES. TRANSITION ROPPE 150 DARK GREY 117 IT VCT-2 4"RC E-PGWB PGW8 PGWB PGWB ESAT 94' - 117 118 BREAKOUT CPT-1 40 IRF PGWB PGWB PGWB PGWB ESAT 9-0' - 118 PAINT: PTA BENJAMIN MOORE SUPERSPEC EGGSHELL, OC-15 BABY FAWN 119 BREAK OUT CPT-1 4'RF E-PGWB PGWB E-PGWB E43GWB ESAT 9-0' - 119 0 - - PT-2 BENJAMIN MOORE SUPERSPEC EGGSHELL, HC-87 ASHLEY GRAY(ACCENT COLOR) Q 0 120 CIRC. CPT-2 4'RF PGWB PGWB PGWB PGWB ESAT 9'4' - 120 (AT ALL RESTROOMS USE MILLER 320-5-10 SEMIGLOSS ACRINAMEL) W 121 COPY/WORK CPT-2 4"RF PGWB PGWB PGWB PGWB ESAT 9'4' - 121 PT-3 MILLER 130-1-05 PERFORMANCE PLUSS-FLAT-MIX IXX79W(WAREHOUSE WALLS) 122 MAIL CPT-2 4'RF PGWB PGWB PGWB PGWB ESAT 9'-0' - - 122 0 123 CONFERENCE CPT-1 4"RF PGWB PGWB PGWB E-PGWB ESAT 9'-0' 123 LAMINATE: .� PL-1 NEVAMAR EM6001TAGED ELEMENTS ALL FACESO� D N 124 CONFERENCE CPT-1 4"RF PGWB_ PGWB PGWB E-PGWB ESAT 9'-0' - 124 Z PL-2 WILSONART 4945-38 AGED ELEMENTS COUNTER, B.S. AND SELF-EDGE. Q N D 125 CONFERENCE CPT1 4"RF PGWB PGWB PGWB E-PGWB E-SAT 9'-0' - 125 CAB PULLS 626 SATIN CHROME 126 WAREHOUSE SC CRF E-PGWB PGWB E-CONIC E-CONIC ETR 25-W - 126 127 SHOWER SV 4'RC PGWB PGWB PGWB PGWB WBC 9-0' - 127 COUNTER TOP ALTERNATE: 00 0 Ln 0 SOLID SURFACE COUNTERS 128 WELLNESS CPT 2 CRC PGWB E-PGWB E-PGWB PGWB ESAT 9'-0' - 128 0 m 11- SS-1 PENTAL QUARTZ BQ278H PALOMA HONED BREAK COUNTER, B.S.AND SELF-EDGE C SS-2 PENIAL QUARTZ BQ980P RIVER BANK POLISHED RESTROOM COUNTER, B.S. AND SELF-EDGE � J 4 4 Z � TOILET PARTITION COLOR: 0 � I HADRIAN Lo POW DOOR SCHEDULE DOORS, HARDWARE AND FRAMES DER COATED-837 BLACK FOX C p Lo Lo o Lo DOOR DATA FRAME DATA HARDWARE DOORS PLANE SLICED WHITE MAPLE-CLEAR FIRE RATING REMARKS MARK MFGR PACIFIC ARCHITECTURAL WOOD PRODUCTS,INC. MARK DOOR SIZE THK CORE VENEER FINISH HAND TYPE FINISH DEPTH ACTION MANUFACTURER FINISH FUNCTION - ADDRESS 714 NE 55TH AVENUE, PORTLAND,OR 97213 101A 3'-0"x 8 '-0" 1 3/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZED 4 7/8' - LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 16 X 30 LITE KIT 101A CONTACT DKK MARSH PHONE: (603)284-0024 FAX: (503) 284-0107 101B PR 3'-0'x 8'-0" 1 3/4' PS WHITE MAPLE CLEAR NA 'ALUMINMUM ANODIZED 4 7/8' - LEVER/LOCK/CLOSER SCHLAGE 626 SATIN CHROME AL53PD RH ACTIVE/KEY FROM ROOM 101 SIDE 1018 102 3'-0'x 8'-0" 1 3/4' SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 4 7/8' - LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 6 X 30 LITE KIT 1p2 HARDWARE 626 SATIN CHROME 105APR TOx 8'-0. 13/4' SC PS WHITE MAPLE CLEAR INA ALUMINMUM ANODIZED 4 7/8" 1- LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 6 X 30 LITE KIT-BOTH DOORS/LH ACTIVE LEAF 105A FRAMES CLEAR ANODIZED 1058 3'-0'x 8'-0- 1 3/4' SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 4--7/80-1- LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 6 X 30 LITE KIT 1058 CONTRACTOR TO PROVIDE BUILDING STANDARD BLINDS AT ALL EXTERIOR GLASS. 106 PR 3'-0'x 8'-0" 1_3/4' SC PS WHITE MAPLE CLEAR NA ALUMINMUM ANODIZED 4 7/8' - LEVER/LOCK SCHLAGE 626 SATIN CHROME ND80PD LH ACTIVE LEAF 106 107 3'-0'x8'-0' 13/4' SC PSWHITEMAPLE CLEAR Left ALUMINMUM ANODIZED 47/8" - LEVER/CLOSER SCHLAGE 626 SATIN CHROME ND10S - 107 RESTROOM FINISH MATERIALS (FOR BUDGET ONLY) 108 3'4Y x 8'0 1 3/4' SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 47/8- - LEVER/CLOSER SCHLAGE 626 SATIN CHROME ND10S - 108 109 3'4 -0"0'x 8' 13/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZED 4 7/8" - LEVER/LOCK/CLOSER SCHLAGE 626 SATIN CHROME ND96PDEL 6 X 30 LITE KIT/FAIL SAFE 109 TILE AND GROUT 110 T-(r x 8'-0' 1 3/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZED 7 1/4" - LEVER/LOCK SCHLAGE 626 SATIN CHROME ND80PD - 110 POT-1 PORCELAIN CROSSVILLE, SHADES AV243 12 X 24 FOG UPS(FLOOR) POT-2 PORCELAIN CROSSVILLE, SHADES AV243 6 X 24 FOG UPS(FLOOR) 111 3'-0'x 8'4' 1 3/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZEDrA 7/8' - LEVER/CLOSER SCHLAGE 626 SATIN CHROME ND10S - 111 POT-3 PORCELAIN CROSSVILLE, SHADES AV243 6 X 24 FOG UPS(BASE-CUT TO 4") 112 3'-0'x 8'-0' 1314* SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED718' - L.EVER/CLOSER SCHLAGE 626 SATIN CHROME ND10S - 112 POT/ PORCELAIN CROSSVILLE, SHADES AV243 4 X 24 FOG UPS(BASE BN-STOCK) 116 3'-0'x 8'-0' 13/4' SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 7/8' - LEVER/LOCK SCHLAGE 626 SATIN CHROME AL53PD 3 X 7 SIDELITE 116 POT-5 PORCELAIN CROSSVILLE, SHADES AV241 6 X 24 FROST UPS(WALL) 117 T-(r x 8'0 1 3/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZED 4 7/8" - LEVER/LOCK SCHLAGE 626 SATIN CHROME NDBOPD - 117 GT-1 LATICRETE 24 NATURAL GREY(EPDXY) 1/8" MIN. 118 T-(r x 111 13/4" SIC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 47/8' - LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 3 X 7 SIDELITE 118 119 3'-0'x 8' ' 1 3/4" SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 4 7/8" - LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 3 X 7 SIDELITE 119 122 37-0'x 8'0 1 314' SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 47/8' - LEVER/LOCK/CLOSER SCHLAGE 626 SATIN CHROME ND96PDEL 6 X 30 LTTE KIT/FAIL SAFE 122 123A 3-0'x 8'-0' 1 3/4' EC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 4 7/8' I- LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 3 X 7 SIDELITE 123A 123B 70 x V-0" 1 3/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZED 4 7/8" - LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 3 X 7 SIDELITE 1238 124 T-(r x 8'-0" 1 3/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ,ANODIZED 4 7/8" - LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 3 X 7 SIDELITE 124 125 3'-0'x 8'-0" 1 3/4' SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZED 4 71W - LEVER LATCH SCHLAGE 626 SATIN CHROME AL10S 3 X 7 SIDELITE 125 126A PR 3'0 x 8'0 1 3/4" SC I PS WHITE MAPLE CLEAR NA ALUMINMUM ANODIZED 4 7/8' - LEVER LATCH/CLOSER SCHLAGE 626 SATIN CHROME ND10S 6 X 30 LITE KIT IN ACTIVE LEAF/RH ACTIVE LEAF 125A 127 3'-0'x 8'-0' 1 3/4' SC PS WHITE MAPLE CLEAR Right ALUMINMUM ANODIZED 4 7/8' - LEVER/LOCK/CLOSER SCHLAGE 626 SATIN CHROME ND40S - 127 128 3'-0'x 8'-0" 11314- 1 SC PS WHITE MAPLE CLEAR Left ALUMINMUM ANODIZED 14 7/8' - LEVER/LOCK SCHLAGE 626 SATIN CHROME AL40S - 128 Falk BOBRICK aJ � Q Bt7ORICK6426 SOBRICK r , EACH SH( 133644 Nv LV x Lu i '-_ FE11 PGT-2 FEI -_ TRIMTHISROWTO POT-, ALIGN WITH PARTITION FLUTILEHERE \ - I I Y o o 4e I o I O QWv AT [Z N is I U (A Z 2 / (n Q 6) /��--�\ \ 4218 / // El I POT-2 t Z t1J BOBRICK 1 , R I TRIM THIS R TO J 83644 /� \ z _ In ALIGNWITHPA mON uj ? m O s� TI I I POT-1 TI Z m > \ 4 1 D I A O FULL TILE HERE Q 0 > Q z ,� I A I A n/ LU L0 ~ LL � O IN Gwp BOBRICK I I O I2WI: N 5 8-3474 p 6 Aa 1 q7 I I I 0 2 BRICK , I - : o DATE: 10/10/19 n I PERMIT / CONST BOBRIC BOBRICK iJ—' Q D B35745K I O O EACH SINK26 - REVISION I TT 59466 BOBRICKL o o 0 o e 1. BOBRICK I I I GP B-3574 I - - - - - - - - - - - - - - - - - - - - - - I . 2. BOBRICK 13 13-357 A-7 _ " 3. 8 4T z kTL . F.D.F s� - r---e4r 5. z b m - - C BOBRICK36" f 1 1 6• 131x44 - �' 2 4 7. �' I 4 ? _ _ 8. 2'-11' B-0' x I - Gi - - - - - - - — — — — — — — — — — - - - - - - - - - - - ��- - - - s-s TOWEL HOOK DRAWN BY: 11 TRIM THIS ROW F TO FULL' TILE HERE R.M.T. x ALIGN WITH PARTI„ON RESTROOM PLANS z� (2�RESTROOM TILE PLANS z� (3)SHOWER ROOM PLAN :m A-6 SCALE 1/4" = V-0" A-6 SCALE 1/4" = 1'-0" A-6 SCALE 1/4" = 1'-0" iV E4 _ EQ. EQ. _ EQ. #3082 O O MARTIN W.HANSON - ' CLA KAM S,OREGON� _ 41" _ 41" _ PO BOBRICK BOBRICK Or 4r -- 1r B-3944 MIRROR MIRROR B_3944 12" _ 42" PROJECT # 19380 BOB RICK AQUATOUGH WAINSCOT °r° AQUATOUGH WAINSCOT - -- - - - - -- --- � , BOBRICK _. ._ - L- -J �� -- — BOBRICK �••� B-4745f B-3574 iR II II �i g i / IN WALL IN WALL SUPPORT Li SUPPORT u BRACKET BRACKET •• POTS POTS POTS POT-4 POTS , POT-0 POTS POTS �1) 30" 2) 18• (1) ts" (2) L 16• 16• J1) t6• �2) 1s• ��� 16• 2) 30• 0c _ 60" - - - 60" -_ U) Xt (a)RESTROOM ELEVATIONS 2 RESTROOM ELEVATIONS 3 RESTROOM ELEVATIONS 4 RESTROOM ELEVATIONS o A-7 SCALE 1/2" = 1'-0" MEN 107 A-7 SCALE 1/2" = 1'-0" MEN 107 A-7 SCALE 1/2" = 1'-0" WOMEN 108 A-7 SCALE 1/2" = 1'-0" WOMEN 108 = cc j 11 Orn a NIS EQ. �. EQ. _.. EQ. -- EQ. U' O O � O W O Lc) O p1pc(oo tl,-- Z 4 4 0 U) acjcj Z 5� o F- ,, 5 U') D_ MM 41" 41" L Lo MIRROR m B&-3944 POT a 12• 4r 4r 12• BOBRICK B--39443944 MIRROR - MIRROR / ! /24 AQUATOUGH WAINSCOT AQUATOUGH WAINSCOT 24- J —T \ -BOBRICK BOBRICK < B-3474 a B-35745 ; IN WALL IN WALL SUPPORT `� m SUPPORT Li BRACKET BRACKET POT-0 I POT-4 POTS POT-4 POT-4 POT"3 I POT4 (1) 15" 1S (2) 15• (1) 1-- 18' 2�- �1) 30" � 2) 18' (1) 15" _ (2) 15- _ 15• 60" 60" - (a)RESTROOM ELEVATIONS (�j:)RESTROOM ELEVATIONS (J�RESTROOM ELEVATIONS s RESTROOM ELEVATIONS A-7 SCALE 1/2" = 1'-0" MEN 111 A-7 SCALE 1/2" = 1'-0" MEN 111 A-7 SCALE 1/2" = 1'-0" WOMEN 112A-7 SCALE 1/2" = 1'-0" WOMEN 112 -INSTALL CURTAIN EQ. _ EQ. _ 33• 33" __162" 1• 13" 13" 1" 1T 34" _ 34--x• 38" ROD.CURTAIN BY -- TENANT SD ADJ.SW 41" - SHELF42" MICRO SHELF AT 18" BOBRICK 1r B-3944 v - -- `w� DEEP WITH 2" J 1 RADIOUS CORNERS 12 OPEN BACK I ~�, MIRROR 2 2 11• AQUATOUGH WAINSCOT A TOUGH WAINSCOT __ _ 1. 1 2 1• L.L _ 36• _g• c 2 38• SS- 36' _ 24" 24' 15' 34' SS-1 241w 2 � W N - L —12 ;f BACK SPLASH m — — — — o 1 m Q tv a PLAM BENCH , 2 \ v m v _ ADAE NK U DISHWASHER O U) Z N . " -------ADJ SHELF---- - -- ---- ------- GARB GE ! LU Q O0i 2"CONT.CLEAT CENTER w — DISP AL H Z W W SUPPORT o u F J O [O �., "RUBBER BASE + 4"RUBBER BASEV5 y 4"RUBBER BASE p{/1M BASE PIAM SASE D] (1) 364 -,l?� 55" _ (2) 28" - 26" _ (3) 24" _ _ 18" _ P4� 30. - 362" (1) (2) ZD �j Q 1..1. W (9)RESTROOM ELEVATIONS 10 CABINET ELEVATIONS N O I- oir�_ a- A-7 SCALE 1/2" = 1'-0" SHOWER 127 A-7 SCALE 1/2" = 1'-0" TRAINING BREAK OUT 104 DATE: 10/10/19 PERMIT , CONST 1. 342" s°z 3a • s°z• 34z- r r 3°z• 3�°i" 3az" 342' 342" 34z" r - - - �_ � i 1" REVISION ADJ SHELF SHELF ADJ SHELF SHELF _______ ______ _ _______-----------------------------------------__ _ __________ ___------------ ______ _______ _______ ______ ------------ __--------------------------------------------_ _ _ ADJSHELF 3- J Y J y q V � I Ji v 5 e 6. 1. e,, "7 1 1 1 1 -7 N 2 36• 5�1 18" 1• 7. 1• 34k "2• 342• 342• 34k 1" 11. 1• 4 "2• 3421" 3421" 3421" 3421" 1• 1'• 4• 8. 2 2 12 m — — — — — — — — — — — — 6 i i — DRAWN BY: R.M.T. ADA INK — SHELF ALUSHELF SFtSF ------ ______ _______ _ ______- ______ ------------------------- z - �___ ______ ______ ^ ___ ______ ______________ ---__-- N P-LAM BASE v P{AM BASE •v P4 M BASE v At• 7 11 - CABINET ELEVATIONS 12 CABI (a)CABINET ELEVATIONS CABINET ELEVATIONS A-7 SCALE 1/2" = 1'-0" MAIL 122 A-7 SCALE 1/2" = 1'-0" COPY/WORK 121 A-7 SCALE 1/2" = 1'-O" WELLNESS 128 DETAIL GENERA_L NOTES: 10 r FA, ROOF STRUCTURE.1. FOR WALLS UP TO 14'-0'TALL, USE 362S125-30 MTL.STUDS @ 24"O.C.UNLESS nCALLED OUT OTHERWISE IN DETAIL.USE 362T125-30 MTL.TRACK. 8" MAX. 8'MAX.EXISTING WINDOW WALL MULLION 2. FOR WALLS OVER 14'-0"TALL,USE 600$7 25-33 MTL. STUDS @ 16"O.C. UNLESS ACTUAL SHAPE AND SIZE MAY VARY CALLED OUT OTHERWISE IN DETAIL. USE 600T125-33 MTL. TRACK. FROM EXTRUSION SHOWN 3. ALL WALLS:ATTACH BOTTOM TRACK TO FLOOR WITH POWDER DRIVEN CONCRETE WALL o o c�ANCHORS AT 24"O.C. EXISTINGo4. IN WALLS WITH ACOUSTIC INSULATION, SET BOTTOM TRACK IN BED OF SEALANT. GLAZINGii PROVIDE HC SIGNAGE FOR ALL Z OF _ INSULATION IN EXTERIOR WALLS - y2 " . W a 2' NEW AND EXISTING HC RR'S 5. FOR WALL FINISHES, FLOOR FINISHES AND WALL BASE TYPE, REFER TO /s /a KROY#2835207 BLACK(MEN) w PROJECT FINISH SCHEDULE. U 3/16"x 1" BLACK FOAM INSULATION TAPE ARMSTRONG BERC2 CLIP 4 I ARMSTRONG BERC2 CLIP 4 / KROY#2835209 BLACK(WOMEN) w PROJECT # 19380 POWDER DRIVEN ANCHORS SUSPENDED CEILING ATTACHED TO GRID UNATTACHED TO GRID O w # U STRUCTURAL SUPPORTING CALCS: ATTACHED WALL UNATTACHED WALL v wio ADDITIONAL SWITCH LL GANG LOCATION w 1. POWERS 0.300 HEAD(3/4"EMBED)0.145 SHANK DIAMETER w = q O Z ALLOWABLE SHEAR=70 LBS RACO STYLE RECESSED REVEAL WMAX HANGER WIRE W/STRUT AND SPLAY �j TRACK, CONCEPT WALLS#1-487RDT HANGER WIRE ���111111 WIRES PER CEILING BRACING DETAIL O 2. 12'-0"TALL WALL WITH CODE REQUIRED 5 PSF MINIMUM LATERAL ALUMINUM WINDOW SYSTEM CENTER ON WINDOW MULLION AND POP-RIVET a _ w U (WIND)LOAD SHEAR=5 PSF' 12'-0"/2=30 PLF SECURED BY GYP BOARD. NO SCREWS CROSS TEE \ Q MAIN BEAM CROSS TEE U "� R-19 BATT INSULATION IN WINDOW WALL SYSTEM ALLOWED U F 3. ANCHORS AT 16"O/C _ ELECTRICAL w ¢ G SHEAR= 30PLF` 16"/ 12"=40 LBS ?. > _ Z MTL. STUDS. `: EXISTING WINDOW SILL o 0 0 0 0 0 0 0 0 qa W J BOX TOR j ca O U) 0000 '. eveeva 4. UNITY CHECK t. vae ° oo .. "_ 000 � 000 � SK � WALL STUD FLUSH WITH WINDOW SILL 40 LBS/70 LBS=0.57< 1.0 OK FREE END FD(TED END(FULL 2,C Q SMOOTH FIN. GYP BD. OVER TILE SECTION) v _ 5. ANCHORS AT 24"O/C 7/8'ANGLE MOLDING O w v SHEAR=30 PLF`24"/ 12"=60 LBS BOTTOM TRACK AND FLASHING - METAL STUDS POP-RIVET TANGLE MOLDING UNDERCUT DOOR AS N v � j' UNATTACHED THIS SIDE 6. UNITY CHECK FINISH FLOOR EXPANSION JOINT o REQUIRED TO CLEAR O 60 lbs/70 lbs=0.86< 1.0 OK FLOOR FINISH O O NOTE: CEILING SYSTEM TO BE USED SHALL BE CLASSIFIED AS "HEAVY DUTY". ALL I (n � CONNECTION DEVICES TO BE IBC APPROVED TYPE AND HAVE 100#CAPACITY 1 GENERAL NOTES 5 EXTERIOR WINDOW DETAIL s WINDOW CLOSURE AT MULLION 13 CEILING SEISMIC JOINTS 17 MOUNTING HEIGHTS C) A-8 SCALE 1" = 1'-0" A-8 SCALE 1" = 1'-0" A-8 SCALE 3" = 1'-0" A-8 SCALE 3" = 1'-0" - SCALE 1/2" = 1'-0" = Q N 1,_ FLOOR AND/OR ROOF STRUCTURE 2' O m d 20 GA 3 5/8" METAL STUD BRACING TO ROOF p STRUCTURE AT 10'-0"OC TO BUILDING STRUCTURE - ARMSTRONG BERC2 CLIP (AS ALTERNATE MEANS O p Lo 2-0' 2-0` ABOVE FOR WALLS LONGER THAN 12'-0"WITHOUT OF CONSTRUCTION FOR THIS PROJECT.) o U) d CMD � INTERSECTION WALLS. FASTEN EACH END WITH AT LOCATIONS WHERE WALL ADDITIONAL HANGERS AT ALL MAINS WITHIN 8"OF THE ;E � Z 4 4 O` (1)#8 SHEET METAL SCREW CROSSES A CEILING'r, OR ' PERIMETER L U) Q N N Z RUNS DIRECTLY BELOW, FILL `1N i 16 LITE KIT WHERE SPECIFIED O FJ W cD 0 APPROVED VERTICAL STRUT AT 12'-0"O.C. EA.WAY % SOUND INSULATION 4'CENTERED GAP WITH COMPRESSIBLE BEGINING WITHIN 6'-0"OF THE PERIMETER OF EACH _ 6` FRAME TO MATCH DOOR M of c') (h J OVER WALL FILLER STRIP CEILING SECTION. SEE STRUT DETAIL o F- / CL a v SUSPENDED CEILING , :. GLAZING STRUTS AT FIXTED EDGES NOT ATTACHED TO THE �i Z ED E - BUILDING TO HAVE 4 WAY LATERAL BRACING FROM TH BLOCKING TYPICAL AT FASTENING POINTS. MAIN RUNNER TO THE BUILDING STRUCTURE ABOVE. / iy MTL. STUDS. ft.; :f EMSEAL QUIETJOINT SHG COATED f _ 5/8"GYP. BIRD. BOTH SIDES -'f ? THREE SIDES O " w s. Z = *2 Z / ADDITIONAL SWITCH LL g CENTER LINE OF STUD ;: W z / GANG LOCATION a w = - RACO STYLE RECESSED REVEAL TRACK, _ LCTJ 0 iw sr _< CONCEPT WALLS#1 487RDT CENTER ON SECURE ALL HANGERS TO °iN w O =� '„” • - =" NDOW MULLION AND SECURED BY GYP - R A LL --- BLDG STRUCTURE O v _ w LL :; WI 8' TRAPEZE FOR DUCT _ \ Q de fI" BOARD. NO SCREWS IN WINDOW WALL AND/OR PIPE WORK LL = U 3-1/2" BATT INSUL. IN SOUND ATTENUATION WALLS - MAX Q K U F -0 MAX OR w ~ W Z EXISTIM ALLOWEDNG WINDOW OW SILL IF ORE THANI 6 OUT OF 3 w _ ELECTRICAL t2 BOTTOM TRACK. P.5; >- WALL ISTUD IFLUSH WITH WINDOW SILL BETWEEN MA NRS PLUMB I O F 6 w $OX T `:3: »= RUNNERS _ I .,. MAIN RUNNERS AT 4'-0" �, p O w r Ls SMOOTH FIN. GYP BD. OVER O.C. SUPPORT WITH#12 8 F METAL STUDS WIRE AT 4'-0"O.C.OR WITH FINISH FLOOR-TOP OF SLAB ya #10 WIRE AT 5'-0"O.C. m co v UNDERCUT DOOR AS :;? o REQUIRED TO CLEAR NOTE: CEILING SYSTEM TO BE USED SHALL BE CLASSIFIED AS"HEAVY DUTY". ALL FLOOR FINISH CONNECTION DEVICES TO BE IBC APPROVED TYPE AND HAVE 100#CAPACITY 2 WALL SECTION WITH SOUND INS. 6 WALL BRACING DETAIL 10 WINDOW CLOSURE AT GLAZING 14 CEILING BRACING DETAIL 18 MOUNTING HEIGHTS F' A-8 SCALE 1" = 1'-0" A-8 SCALE 6" = 1'-0" A-8 SCALE 3" = 1'-0" A-8 A- SCALE 1/2" = 1'-0" 20 GA 3 1/2" METAL STUD BRACING TO ROOF STRUCTURE AT 10'-0"OC TO BUILDING STRUCTURE ABOVE FOR WALLS LONGER THAN 12'-0"WITHOUT INTERSECTING WALLS. FASTEN EACH END WITH (1)#8 SHEET METAL SCREW WHERE REQUIRED SUSPENDED CEILING ROOF DECK OR BEAM Nk J Q MTL. STUDS. IL U - 5/8" GYP. BIRD. BOTH SIDES SUSPENDED CLG ASSEMBLY W _ CENTER LINE OF STUD 45, C - a. �w _ Y o r :. Lu X U) O 20 GA 3 5/8" METAL STUD BRACING O Q *k LL TO ROOF STRUCTURE AT 10'-0" d W N OC W/(2)#8 SHEET METAL U co Q rn SCREWS AT EACH END. BRACING BOTTOM TRACK. I W J TO BE PROVIDED WHERE DISTANCE Z_ W fr BETWEEN PERPENDICULAR INTERSECTING LD (n m O WALLS OR HORIZONTAL BRACING FINISH FLOOR =� QQ BETWEEN WALLS EXCEEDS 12'-0"OC Z ED ED Y O H wLo 3 OFFICE TO WAREHOUSE SEP. WALL7 WALL BRACING DETAIL O d A-8 SCALE 1" = 1'-0" A-8 SCALE 3" = 1'-0" DATE: 10/10/19 PERMIT / CONST A ROOF STRUCTURE. BUILDING PANEL JOINT REVISION DEMO EXISTING OVERHEAD DOOR HOLLOW METAL DOOR AND INSTALL 1. WINDOWS AS SHOWN CONCRETE WALL 2. 3. — INSULATION IN EXTERIOR WALLS4. Y I i 5. SUSPENDED CEILING �I 6. r = = = 4 7. 8. ALUMINUM WINDOW SYSTEM I I� �I DRAWN BY: __--- R-19 BATT INSULATIONR.M.T. MTL. STUDS. --]I I A� 8 BOTTOM TRACK AND FLASHING FINISH FLOOR (q:) EXTERIOR WINDOW DETAIL 19 PARTIAL EXTERIOR ELEVATION A-8 SCALE 1" = 1'-0" A-8 SCALE 1/4" = 1'-0"