Loading...
Plans BUP2021 -00080 OFFICE COPY SITE RECEIVED J SW LocustSve,et 2ND FLOOR APR 01 NZI �• 1 CITY OF TIGARD Hill TIDING DIVISION I Wn 19TIll I I I-Mll 111111 in I I Ifi11 ■ 5 LINCOLN 1 u Architecture Interiors - siTtucruRED�n PARrdNG TOILET ROOM Planning Engineering 3LINCOLNPROJECT LEGEND 4 LINCOLN 0 ctk =lC\\,��� _ O111Lp : 4 F UPGRADES Portland, OR O O \� 5 EXISTING CONSTRUCTION TO BE DEMOLISHED 503.224.9560 RED .4`� Vancouver, WA LOBSTER ��% o EXISTING WALL TO REMAIN 360.695.7879 s` c� y [ z LINCOLN o EXISTING 2-HOUR RATED WALL TO REMAIN LANDLORD IMPROVEMENT 20Seattle, W 6 749.9 93 D ® NEW WALL TO GYPSUM BOARD CEILING, SEE DETAIL 4/A5.20 www.mcknze.com IS I �• J © o _ NEW DUPLEX OUTLET IU 5 LINCOLN MACKENZIE . O 1 LINCOLN LINCOLN NEW LIGHT SWITCH WITH OCCUPANCY SENSOR AND DIMMING CAPABILITIES DESIGN DRIVER , CLIENT FOCUSED G 10200 SW GREENBURG ROAD 7IIII I II IIIIIIII u "I TOWER '�" (ALT) NEW ADA ACTUATOR BUTON Client ll q GUSTAV'S 30" 48" - - T I G A R D , OREGON ADA ACCESSIBLE TURNING RADIUS 48"I 11 I 1 �6'p AND ADA CLEAR FLOOR SPACE PLAZA _ ..� L J I_ _ _I _ STRUCT III'N'G U1I!!!�11��1�ii1�J 1SS!1IMM1�GG11111�1 c IITfiTf11 Illllllltlll �llllllllll m ® PORCELAIN TILE PT-1 5 rt o R e s 7 e t IN 0, 2 INDEX OF DRAWINGS .................... --- GLASS MOSAIC TILE GLA REFER TO FINISH PLANS GENERAL SW Oak Street G0.01 TITLE SHEET, SITE PLAN, CODE SUMMARY PLAN, AND NOTES 1 VICINITY MAP - - - - - - - - PORCELAIN WALL TILE PT-2 REFER TO FINISH PLANS ARCHITECTURAL Project 0.0 NOT TO SCALE P-X A0.01 ADA CLEARANCES AND NOTES 2ND FLOOR TOILET ACCENT PAINT LOCATION VARIES A1.10 DEMOLITION PLAN, PARTIAL SECOND FLOOR PLAN, FINISH/DIMENSION PLAN, DEMOLITION RCP, REFLECTED CEILING PLAN, AND NOTES ROOM UPGRADES EIJEXISTING GYPSUM BOARD CEILING A4.10 INTERIOR ELEVATIONS LANDLORD A5.20 INTERIOR DETAILS AND SCHEDULES ' .. : IMPROVEMENTS 'ILI {� NEW GYPSUM BOARD CEILING, SEE DETAIL 3/A5.20 5 LINCOLN $ EXISTING FIRE STROBE LOCATION 10200 SW GREENBURG RD a TIGARD, OR 97223 EXISTING SPRINKLER HEAD 9 o L-2 NEW 8' RECESSED LED LIGHT FIXTURE SCOPE OF WORK i THE SCOPE OF WORK FOR THE PROJECT INCLUDES INTERIOR TENANT IMPROVEMENTS OF �y ' EXIT EXIT „ I o L-3 NEW 5'RECESSED LED LIGHT FIXTURE APPROXIMATELY 414 SQUARE FEET AT THE TOILET ROOMS ON THE SECOND FLOOR OF SEVEN FLOORS. WORK TO INCLUDE DEMOLITION, NEW WALL DA UPGRADE J N S,A UPGRADES, FINISHES A PAU D. Clj A yfl <iiiro L-4 NEW RECESSED LED SQUARE CAN LIGHT FIXTURE � Y VALUATION: $49,000 / I ,I/NL, PO ND, OREG I`: I CODE SUMMARY LEGEND DESIGN/CODE DATA °F GOVERNING CODE: 2019 OREGON STRUCTURAL SPECIALTY CODE ----_-- MACKENZIE 2021 EXIT EXIT ACCESS OCCUPANCY: B © ALL RIGHTS RESERVED CONSTRUCTION TYPE: TYPE 1-B THESE DRAWINGS ARE THE PROPERTY OF NOT IN SCOPE TENANT AREA: APPROXIMATELY 414 SQUARE FEET MACKENZIE AND ARE NOT TO BE USED LL_ OCCUPANCY LOAD: 3 OR REPRODUCED IN ANY MANNER, WITHOUT PRIOR WRITTEN PERMISSION _j COMMON PATH OF EGRESS TRAVEL = 100'-0" MAX. 1 REQUIRED EXIT, 1 EXIT PROVIDED PER TOILET ROOM. O28'-9" BUILDING IS FULLY SPRINKLED AND HAS NFPA SMOKE DETECTION WITH ON SITE EMERGENCY REVISION SCHEDULE GENERATOR FOR FIRE/LIFE/SAFETY BACKUP POWER. Delta Issued As Issue Date 2 CODE SUMMARY PLAN o.0 2ND FLOOR NTS SEPARATE PERMIT, 2019 OSSC SECTION 107.3.4.1 11 ' (BY SEPARATE PERMIT) THE ISSL l4NCE OF A PERMIT FIRE SPRINKLER BASED ON CONSTRUCTION FIRE ALARM DOCUMENTS AND OTHER MECHANICAL D PROJECT GENERAL NOTES SYMBOLS AND REFERENCES tF H�; T L NOT PREVENT ELECTRICAL HE COOL- OFFICIAL FROM PLUMBING REQUIRI'=^ TL.- CORNECTION OF ERRORS. OSSC 105.4 A. THE DRAWINGS LOCATE PRODUCTS, SURFACES, AND MATERIALS AND THE NOTES CONVEY DESIGN INTENT. THE PROJECT INTENT IS TO PROVIDE FOR A COMPLETE, WORKING SYSTEM. PROJECT NORTH NOTE: DESIGN BUILDERS ARE FULLY RESPONSIBLE FOR THE DESIGN OF THESE SYSTEMS/COMPONENTS. B. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE LATEST ADOPTED BUILDING CODE EDITION, AND TO CONDITIONS AND SPECIFICATIONS OF ALL GOVERNING AUTHORITIES. NORTH ARROW THESE SYSTEMS/COMPONENTS SHOWN ON DOCUMENTS ARE SCHEMATIC ONLY: THEY ARE NOT SHEET TITLE: TRUE NORTH INTENARCHITECT OF RECORD FOR REVIEW PRIOR TO SUBMITTAL ED TO REPRESENT FINAUCODE COMPLIANT DESIGN. PROVIDE DESIGN DOCUMENT SUBMITTAL TO TITLE SHEET, C. VERIFY AND CONFIRM ALL CONDITIONS, DIMENSIONS, AND LAYOUT INFORMATION PRIOR TO START OF CONSTRUCTION. NOTIFY MACKENZIE OF ANY DISCREPANCIES PRIOR TO START OF WORK. ANY CORRECTION WORK REQUIRED AS A RESULT OF NOT REPORTING SUCH DISCREPANCIES SHALL BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. 4tDETAIL FILLED ARROW SITE PLAN, D. CONTRACTOR AND SUBCONTRACTORS SHALL CAREFULLY EXAMINE THE SITE AND THE CONSTRUCTION DOCUMENTS OF THE ENTIRE WORK. INCONSISTENCIES IN THE PLANS OR SPECIFICATIONS SHALL BE # CONTACTS CODE CALLED TO THE ATTENTION OF MACKENZIE. KEY EMA KELEVATION ET# SUMMARY E. REFER TO ENLARGED PLANS AND ELEVATIONS WHERE INDICATED FOR ADDITIONAL INFORMATION. ENLARGED PLANS TAKE PRECEDENCE OVER PLANS OF SMALLER SCALE, AND DETAILS TAKE PRECEDENCE -CATEGORY ARCHITECT CONTRACTORPLAN, AND OVER PLANS. IN THE CASE OF A CONFLICT, THE HIGHEST COST OPTION SHOULD BE PRICED. GORY MACKENZIE RUSSELL CONSTRUCTION F. DETAIL REFERENCES SHALL BE APPLIED TO ALL INSTANCES WHERE THE SAME CONDITIONS OCCUR, UNLESS NOTED OTHERWISE. 1515 SE WATER AVE, SUITE 100 20915 SW 105TH AVE NOTES KEYNOTE PORTLAND, OR 97214 TUALATIN, OR 97062 G. THE TERMS "ABOVE FINISH FLOOR" (AFF) AND "FINISH FLOOR ELEVATION" (FFE) REFER TO FINAL FINISHED FLOOR ELEVATION, WHETHER BUILT-UP SLAB, COMPOSITE DECK, OR RAISED ACCESS FLOOR, SPACE NAME OFFICE Copy DRAWN BY: SJR OFFIC SPACE # CONTACT: LINDSEY CARPENTER CONTACT: DONN STURDIVANT H. DO NOT SCALE DRAWINGS. ROOM/SPACE IDENTIFICATION TEL: 503.224.9560 TEL: 503.692.9002 I. CUTTING AND DRILLING OF STRUCTURAL MEMBERS NOT DETAILED REQUIRES THE WRITTEN PERMISSION OF THE STRUCTURAL ENGINEER OF RECORD. koFLOORFINISH FAX: 503.228.1285 EMAIL: DSTURDIVANT@RUSSELLCONSTRUCTION.COM CHECKED BY: MRT, PDK WALL BASE FINISH EMAIL: LCARPENTER@MCKNZE.COM CCB: &fY OF TTGARDE, SHEET: J. SAVE AND RECYCLE DEMOLITION DEBRIS AS APPLICABLE. ALL DEMOLISHED OR REMOVED EXISTING MATERIAL SHALL BE LEGALLY DISPOSED. COORDINATE WITH CITY OF TIGARD REQUIREMENTS FOR WALL FINISH REVIE D FOR CODE CONIPLIANCE RECYCLING/RE-USE OF DEMOLITION DEBRIS. LANDLORD/OWNER \`{J Approved: ) GO .I. 01 K. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THEIR WORK. THE CONTRACTOR WILL COORDINATE CLEAN UP OF ALL AREAS AFFECTED BY DUST OR ANY MATERIALS, BOTH SHORENSTEIN REALTY SERVICES O i'C: [ ] 66 DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT, INCLUDING THE INSIDE OF ALL WINDOWS AS NECESSARY SO THAT THE SPACE IS READY FOR OCCUPANCY BY TENANT. SHOO N TEIN REALTY ROAD, SUITE 310 Permit #: „pQQQ L. ALL DESIGN-BUILD ITEMS, SYSTEMS, AND ELEMENTS ARE TO BE SUBMITTED FOR REVIEW AND APPROVED BY MACKENZIE. PORTLAND, OREGON 97223 Address: M. EXISTING MATERIAL NOTED TO BE RETURNED TO THE OWNER SHALL BE SAFELY STORED AND PROTECTED UNTIL IT IS REMOVED FROM THE SITE BY THE OWNER. CONTRACTOR SHALL COORDINATE WITH THE CONTACT: HEIDI KNAPP Suite #: Crvte+l /,tt JOB NO. 2190950.09 OWNER. TEL: 503.412.4844 EMAIL: HKNAPP@SHORENSTEIN.COM Br Date: (a -7�, 2\ CONSTRUCTION SET: 04/011/2+021 219095009\DRAWINGS\ARCHITECTURAL\PERMIT SET\09 GO.01.DWG SJR 03/31/21 12:13 1:96.00 16 36" 39"-41" 36" 48" 18" _� MAX MIN TOILET ACCESSORY ABBREVIATIONS LEGEND 12 24" 18"VERT G BAR 24" MIN URINAL CSD COMBINATION SEAT DISPENSER 36" GRAB INSTALL FLUSH FO FACE OF BAR HANDLE AT qp^ 1 1 "-1 " MIN SCREEN HC HANDICAP � v HD HAND DRYER OPEN SIDE OFGRAB BAR CSD N Z HC URINAL W/ MIN MINIMUM TOILET c J ENLONGATED Z T BAR / BA m ¢ 6" MPU MIRRORED MULTI-PURPOSE m c UNIT fD U RIM MIN g PTD APER TOWEL DISPENSER m a ^ SND SANITARY NAPKIN DISPENSER Architecture Interiors m cp r iv SNR SANITARY NAPKIN RECEPTACLE 59"11211 SCD SEAT COVER DISPENSER Planning Engineering 42" 42" MAX W/ FLRTO TOP OF 6"-18 tIA1MIN I MOUNTED WC MIN TP TOILET PAPER 54„ WC WATER CLOSET WR WASTE RECEPTACLE ® TOILET GRAB BARBEL- REAR WALL FB] ® TOILET GRAB BARS GRAB - SIDE WALL C❑ ® COMBINED RECESS D DISPENSER ® PATOILET STALL- SIDE WALL TORTEITION LAYOSTALL- UTTN E ® URINAL Portland, OR 36" PTD WR PTD/WR HD SND MPU HEIGHT OF 503.224.9560 30" OPERABLE GENERAL NOTES: Vancouver360.695,7879 EQ EQ CSD PARTS, TYP _ fj F—,L- 1. MOUNT ALL TOILET ROOM Seattle, WA SWITCHES & o o ACCESSORIES PER MANUFACTURER'S 206.749.9993 ENVIRONMENTAL WITHIN STATED ADA TOLERANCES.RECOMMENDED MOUNTING TS, p e � _ www.mcknze.com Z CONTROLS co 2. FLOOR DRAINS TO BE LOCATED a H OD OUTSIDE OF ADA CLEAR FLOOR MACKENZIE. ? � N AREAS, COORDINATE WITH PLUMBING. 00 3. WRAP ALL EXPOSED WASTE AND HOT WATER LINES PER ADA CODE. oEsia"DRIVEN 1 CLIENT FOCUSED 36° Client ❑ ® STANDARD TOILET STALL CLEAROFLOO SPACE SIDE WALLSTANDARD URINAL I❑ ® SWITCHES AND OUTLETS J❑ ® TOILET ACCESSORIES LAVATCOMBINED DISPENSER m Ld 2 ADA TOILET ROOM FIXTURE MOUNTING HEIGHTS AND CLEARANCES S H o R E S T E IN Q Project _ 2ND FLOOR TOILET ROOM UPGRADES oz � — — — — LANDLORD 00 -C IMPROVEMENTS o �v : 36" MIN N u_3 o 122" 12"I"I a Co : 42" MI 00< IF BOTH LATCH 5 LINCOLN �+- AND CLOSER / 10200 SW GREENBURG RD TIGARD, OR 97223 PULL SIDE PUSH SIDE 6" HINGE SIDE APPROACH -SWINGING DOORS O r�S �` _ w ¢ _J PAU D. L a Luo W U �' a - r- - - - � �� 24" 1 U= o z 18 I o \ I- 3 � o J1�P0 ND, REG �o cu �o I 24" I o v t2 1 ' cwn ~ ¢ w O IL MIN a MIN% AND BOTHLATCH m o mIt o 0 0 �l� LJJ _J o �h O U U PULL SIDE PUSH SIDE PULL SIDE PUSH SIDE 21 ¢ N of I u7 0 _ _ I I E © MACKENZIE 2021 W ALL RIGHTS RESERVED UTHESE DRAWINGS ARE THE PROPERTY OF ZMACKENZIE AND ARE NOT TO BE USED ~ LATCH SIDE APPROACH -SWINGING DOORS FRONT APPROACH -SWINGING DOORS = OR REPRODUCED IN ANY MANNER, W O WITHOUT PRIOR WRITTEN PERMISSION J Z U H s � D ACCESSIBLE DOOR CLEARANCES o s TYP. MOUNTING HEIGHTS REVISION SCHEDULE Delta Issued As Issue Date OYQ SHEET TITLE: ADA CLEARANCES AND NOTES DRAWN BY: SJR CHECKED BY: MRT, PDK SHEET: A0 . 01 JOB NO. 2190950.09 CONSTRUCTION SET: 04/01/2021 `219095009'C:\TEMPVACPUBLISH 16536\09 A0.01.DWG SJR 03/30/21 14:40 1:96.00 GENERAL NOTES DEMOLITION PLAN VESTIBULE FULL TILE VESTIBULE FULL TILE A. REMOVE EXISTING FLOORING THROUGHOUT. PATCH, REPAIR AND PREP SUBSTRATE AS REQUIRED TO RECEIVE NEW FINISHES. SEE SHEET A5.20 FOR FINISHES. 201 201 B. THE CONTRACTOR SHALL CAREFULLY EXAMINE CONSTRUCTION DOCUMENTS FOR THE WORK.ANY CONFLICTS, P8 F -3 E 26 INCLUDING BUT NOT LIMITED TO BUILT CONDITIONS OF M.E.P. IN THE PLANS SHALL BE CALLED TO THE ATTENTION ■ P-3 EX D D OF THE ARCHITECT/DESIGNER, SO THAT THE CLARIFICATION CAN BE ISSUED. p p C. SALVAGE ALL DEMOLISHED COMPONENTS AS POSSIBLE. RETURN TO LANDLORD FOR FUTURE USE. 77 1 D D J J J D. SAVE AND RECYCLE DEMOLITION DEBRIS WHEflE POSSIBLE. COORDINATE WITH CITY OF TIGARD REQUIREMENTS Architecture Interiors i FE]] AA LL N y J LL H FOR RECYCLING DEMOLITION DEBRIS. Planning Engineering 5 5 ISE E. CAP ALL ABANDONED PLUMBING, ELECTRICAL CONDUIT, AND OTHER UNDER SLAB UTILITIES AS REQUIRED. NP 21 O 21 F. RETAIN EXISTING FIRE EXTINGUISHERS FOR FUTURE USE. v J _ G. EXISTING STRUCTURE TO BE LEFT UNDISTURBED AND INTACT. PERFORM NO DEMOLITION THAT MAY COMPROMISE THE STRUCTURAL INTEGRITY OF THE BUILDING WITHOUT WRITTEN APPROVAL OF THE ARCHITECT/DESIGNER. p H. SALVAGE ALL EXISTING DOORS AND HARDWARE FOR RE-USE. VI �Cf) �O" / 16 � � P- FLOOR PLAN Portland, OR G 503.224.9560 3 4 1Y 4 17 6/ 1 TYP+60"T 2T ❑ , GFI 17 p + 25 D ❑ Vancouver, WA * / L / I. ALL EXISTING CONDITIONS TO REMAIN, EXCEPT NOTED BELOW. 360.695.7879 J. DIMENSIONS REFLECT FACE OF FINISH TO FACE OF FINISH, UNLESS NOTED OTHERWISE. 2 ❑ TYP o IP ❑: Seattle, WA , 0 2 4' " K. WALL THICKNESS ARE NOMINAL, UNLESS NOTED OTHERWISE. 2 O {{ _ 206.749.9993 16 6 , GFI 17 5'- 51-14"-i o C R L. ALL INTERIOR DOORS TO BE EXISTING, UNLESS NOTED OTHERWISE. _ 3 17 +60", M. OUTLETS INDICATED ARE EXISTING UNLESS NOTED OTHERWISE. SITE VERIFICATION HAS BEEN PERFORMED ON www.mcknze.com (51- / v CL - - 02/05/2021, WHILE OCCUPIED AND PLAN, ELECTRICAL AND CEILING INFORMATION HAS BEEN UPDATED ( } WOMEN'S TOILET 8 fvIEN'S TOILET OM N' T ILE _} 202 203 2 2 = Q M N' TOILET (OBSERVATION IS LIMITED TO VISIBLE/ACCESSIBLE AREAS). CONTRACTOR TO FIELD VERIFY AND CONFIRM MACKENZIE. _ - ADDITIONAL REQUIREMENTS WITH TENANT. P 1 T-1 DESIGN DRIVEN 1 CLIENT VOCUEED ______ T ; 20 13 -- 20 P-1 r-1 P 1 i i N. ELECTRICAL, DATA AND SWITCHING LOCATIONS INDICATED ARE SHOWN TO CONVEY GENERAL INTENT ONLY. - 5 10 COORDINATE ELECTRICAL/DATA SWITCHING REQUIREMENTS WITH TENANT AND PROVIDE DRAWINGS BY DEFERRED Client +76" � - -- f O B 22 22 SUBMITTAL. 0. RE-USE OR MODIFY EXISTING PLUMBING LOCATIONS, IF FEASIBLE. PROVIDE NEW PLUMBING AS REQUIRED BY NEW ( 4 1 1 2 LAYOUT. MODIFY EXISTING PLUMBING ROUGH-IN LOCATIONS AND/OR BLOCKING AS REQUIRED TO MEET ADA `J 1 4.11 A 4.11 1 _ = MI MOUNTING HEIGHTS AND REQUIREMENTS. ---------------- 1 TYP 9 - - P. CONTRACTOR TO NOTIFY A/E AND LANDLORD IF ISOLATION SHUT-OFF VALVE IS NOT EXISTING AT TOILET ROOMS. 14 CONTRACTOR TO PROVIDE PRICING TOLNDLORDFOR NEW SHUT OFF VALVE ATHOT AND COLD WATER SUPPLY. s H o R E S T E I N ® - TYP PROVIDE ACCESS PANEL, LOCATION AND FINISH TBD. (/5 Q. CONTRACTOR TO NOTIFY A/E AND LANDLORD IF DRAIN IS NOT EXISTING AT TOILET ROOMS. CONTRACTOR TO PROVIDE PRICING TO LANDLORD FOR NEW DRAIN AT EACH ROOM. LANDLORD TO CONFIRM FINAL LOCATION AND lu JL 7 \P P FINISH. (0O/ R. ALL DIMENSIONS SHOWN AS PLUS/MINUS (±)ARE FOR GENERAL LAYOUT AND REFERENCE ONLY.VERIFY AND \ 12 71 / 24 U (J CONFIRM ALL DIMENSIONS AND CONDITIONS PRIOR TO START OF WORK. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES PRIOR TO START OF WORK. fyp S. ADD SOUND INSULATION IN ALL NEW WALLS. Project 2ND FLOOR TOILET - FINISHES ROOM UPGRADES T. NEW FLOOR TILE (PT-1) AND TILE BASE (PT-1 A) THROUGHOUT. LANDLORD 1 DEMOLITION PLAN 2 PARTIAL SECOND FLOOR PLAN 3 FINISH/DIMENSION PLAN U. PATCH AND REPAIR OTEDOTHERWIREQUIRED BYNEW CONSTRUCTION. PAINT NEW AND EXISTING WALLS THROUGHOUT, IMPROVEMENTS P-1, UNLESS NOTED OTHERWISE. V. PREP ALL SURFACES TO FACILITATE PROPER FLUSH TILE INSTALLATION. INSTALL PER CURRENT TCA METHODS. 5 LINCOLN 1 1 1/4"=1'-0" 1 .1 1/4"=1'-0" 1 ,1 1/4"=1'-0" INSTALLATION OF IMPERFECT PRODUCT IS NOT ACCEPTABLE. 10200 SW GREENBURG RD W. GROUT JOINTS IN FLOOR TILE TO ALIGN WITH GROUT JOINTS ON CUT BASE TILE. GROUT JOINT REQUESTED TO BE TIGARD, OR 97223 1/16". CONFIRM MANUFACTURER RECOMMENDED GROUT JOINT SIZE, NOTIFY ARCHITECT OF ANY CONCERNS PRIOR TO INSTALLATION. X. CONTRACTOR TO ENSURE FLOOR TILE IS ADEQUATELY SLOPED AT NEW AND EXISTING FLOOR DRAIN LOCATIONS. iD A�n CUT TILE TO SMALLER PIECES AS REQUIRED TO OBTAIN PROPER SLOPE FOR DRAIN. ��SY' t Y. CONTRACTOR TO COORDINATE PRE-INSTALLATION MEETING ON-SITE WITH ARCHITECT/LANDLORD AND TILE INSTALLER FOR FINAL LAYOUT REVIEW PRIOR TO INSTALLATION. Z. NO VOC PAINT SYSTEMS TO BE UTILIZED, TO INCLUDE PRIMERS AS WELL AS FINISH PRODUCTS. PAU D. L AA. ACCESSORIES AND EQUIPMENT TO MATCH FIRST FLOOR TOILET ROOM SPECIFICATIONS. LANDLORD TO APPROVE ALTERNATE UPGRADES ALL ITEMS PRIOR TO ORDER AND INSTALL. PROVIDE SEPARATE PRICING FOR THE FOLLOWING: REFLECTED CEILING PLAN ��PO ND, REG EQ rL EQ EQ EL EQ AA. PROVIDE NEW ADA ACTUATOR BUTTON. CONCEAL NEW MECHANICS ABOVE EXISTING CEILING, IF AB.NEW GYPSUM BOARD CEILING TO MATCH EXISTING CEILING HEIGHT AT 8'-8"± AFF. FEASIBLE. PROVIDE ELECTRICAL STRIKE, PASSAGE LATCHSET F75 FUNCTION,AND DOOR H/C AC.COORDINATE ELECTRICAL REQUIREMENTS WITH LANDLORD, ALL ELECTRICAL DRAWINGS WILL BE BY SEPARATE OF O� OPERATOR TO EXISTING DOOR. ADA ACTUATOR BUTTON ON EACH SIDE OF THE DOOR AND PERMIT. ACCESS CONTROL OF DOOR TO PROVIDE THE FOLLOWING SEQUENCE: PRESSING THE ACTUATOR AD.HVAC CONTRACTOR TO PROVIDE FULL SHEET OF THE FLOOR AFFECTED UPON COMPLETION. CONTRACTOR IS BUT RELEASES THE ELECTRIC STRIKE PRIOR TO ACTUATION OPERATION. RESPONSIBLE TO PROGRAM THE OVERRIDE HVAC BUTTON. © MACKENZIE 2021 •' - •- ALL RIGHTS RESERVED I I ____ p .. - '• - Q BB. IN LIEU OF EXISTING DOOR HARDWARE TO REMAIN AS-IS, PROVIDE NEW SLIVER LATCHING A D BY W '- - •- W THESE DRAWINGS ARE THE PROPERTY OF .,• :,.,• 0 AND KICK PLATES. COORDINATE MACKENZIE AND ARE NOT TO BE USED �1 h E LIGHTING LAYOUT IS SHOWN FOR PRELIMINARY DESIGN INTENT ONLY FINAL LIGHTING LAYOUT TO BE PROVIDE -- v d -' 4 . 'Q ' FINAL SPECIFICATIONS AND REQUIREMENTS WITH LANDLORDS A BUILDING INFRASTRUCTURE RW CEILING. ELECTRICAL OCONTRACCTOR TO REVIEW ALL REQUIRED LIGHTING LEVELS OR REPRODUCED IN ANY MANNER, - _____ I ' -. ... .••.- :.•:" - - . -- �' FIXTUREWITHOUT PRIOR WRITTEN PERMISSION :. . -: : .. C7 : _ O PLACEMENT/LOCATION ON WITHIN ANYCAREA OFOTHE NSPACCE CONFIRM NEW LIGHT FIXTURE PLACEMENT DOES NOT „ W _':. i' _ W INTERFERE WITH NEW WALL CONSTRUCTION AND SAT MAIN GRID LINES, RELOCATE IF REQUIRED. FINAL LAYOUT TO C' r_____;____ BE REVIEWED AND APPROVED BY LOCAL JURISDICTION THROUGH DEFERRED SUBMITTAL. REVISION SCHEDULE - : - : ����� KEYNOTES 8'-8"AFF. O Delta Issued As Issue Date IH„ °°, 1 , , , , W '1 ,' ISr 1 IMM OOI 4L____Jy____ W _, •• .. _ 1. EXISTING FLOOR DRAIN LOCATION TO RECEIVE NEW FLOOR DRAIN COVER. COORDINATE FINAL FINISH 16. NEW OR RELOCATED PAPER TOWEL DISPENSER, PT-1. SEE DETAIL 2J/A0.01. PROVIDE POWER AS REQUIRED. ___1 • IHH r1____________ ----� HH - ._ "'• WITH LANDLORD. MAINTAIN EXISTING WALL RATING AS REQUIRED. r'rGu bbl DOE 00I �S'r r 1 2B CO '°O °°' I V I rL 2. SALVAGE EXISTING AUTOMATIC SOAP DISPENSER AND AUTOMATIC FAUCET FOR RE-USE, IF IN GOOD 17. NEW PARTIALLY RECESSED WASTE RECEPTACLE UNIT,WR-1. SEE DETAIL 2J/A0.01. NOTIFY A/E IF WALL bbl - - _ . .. C1 COC-- OOI $ W WORKING ORDER. PROVIDE NEW, IF REQUIRED. CONFIRM FINAL SPECIFICATION WITH LANDLORD. DOES NOT PROVIDE ENOUGH INTERNAL CLEARANCE FOR EQUIPMENT. MAINTAIN EXISTING WALL RATING 1_____.1_____J---___I.ti°° nn, ,. ,_ _ . . °° MMI f�l 1�1 1 B"AFF '' CT AS REQUIRED. I°ba i W 3. SALVAGE EXISTING AUTOMATIC PAPER TOWEL DISPENSER FOR RE-USE, IF IN GOOD WORKING ORDER. :'. --- "' 'CM PROVIDE NEW IF RE T 1 18 SQUARE OPENING FOR WAS BACKSPLAS InH bbl ------r----r---r---- •.. ,. <. - , I I I______u FIH Doi , ' + REQUI D P SS 1J,AND NEW RECTI INEAR UNDER MO NT SINKS, SINK 1. r-----r----- n°n°i 4. DEMOLISH EXISTING SANITARY NAPKIN DISPENSER FOR RE-USE. PATCH AND REPAIR WALL TO MATCH pp A 19 NEW 24 WIDE X 48 HIGH BACKLIT MIRRORS LF- ENTERED OVER EACH SINK PROVIDE 60 AFF POWER I°° On] I I I I ADJACENT. , 1, C 2„ �a °°'On EACH SINK TO POWER MIRRORS COORDINATE FINAL POWER REQUIREMENTS WITH rQQ „„, ,_____ ,______, _____ ,_ - � . ' ' - 5. INSTALLED AND RE-INSTALL, FEASIBLE. COORDINATE „HI I I I 1 ___ _ W SALVAGE EXISTING LANDLORD LL IF CENTERED ABOVE °b HI 1 1 FINAL LOCATION WITH LANDLORD. A FACTU ------�-----H-----+-----BOO HHI I 1 I 1 M NU RER r----�'HH HH' 27 W 20. PROVIDE NEW SHORENSTEIN STANDARD AIR FRESHENERS,AC-1. COORDINATE FINAL SPECIFICATION AND 'IHH RRI I `'. 6 1 I' , 'IHH °O, '-' - HH bbr rSHEET TITLE: •y�-1� __= r----1 - : :. t.: REQUOIRED. PATCH AND REPLISH EXISTING AIR R WALNG L O MATCH F NTAIN AND NISH OF EXISTING ST NG WALLAS REQUUND. CAP ALL IRED ED BY DEMOLITION. LOCATIONS WITH LANDLORD. DEMOLITION PLAN 1 1 1 I' ' : °b: y ,�,I _ 1 J______L_____L_____1�=cacJJ a obl 1 I, ' '° . 21 TIO RUSHED ALUMINUM SEE ND rL PROVIDE SCHLUTER TRIM AT EXISTING CARPET AND NEW TILE TRANSITION, B PARTIAL SECOND q°DOE °O' 7. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW WALL MOUNTED ADA HEIGHT TOILET, ;DO „OI I JI EXISTING DETAIL 12/A5.20. TRANSITION TO ALIGN WITH CENTER OF DOORWAY. °° MHHH------1------H---------- 4 "._ - •:` WC-2, WITH CODE REQUIRED ADJACENT SIDE ADA GRAB BARS AND VERTICAL GRAB BAR, GB-1,ATE FLOOR PLAN, I I I 'DU HMI 1 I 1 •. , .. . !______'______L_____!------'bb HHI ' : - CATION. SEE DETAIL 2A-B/A001 PROVIDE DUAL FLUSHOPERATIO ASSUME 22 - - PLUMBING LO N, NEW 12"X 24" PORCELAIN TILE FLOORS, PT 1,AND 6"X 24" PORCELAIN CUT TILE BASE, PT 1A. 12"X 24" 1 I I IOC HHI , ICI .. FINISH/DIMENSION o"o; UPPERCUT. FLOOR TILE TO BE OFFSET AT 1/3 PER TCNA STANDARDS. PROVIDE SCHLUTER TRIM,TS-1,AT ALL EXPOSED 1 I�r IHH °Ou_ •. .,• ____,______L_ ___1____ ' HH ❑OI I - Q 0 TILE EDGES. SEAL ALL GROUT PER MANUFACTURER'S INSTRUCTIONS. USE EPDXY GROUT THROUGHOUT. AN, DE , 1 IHu bbl I -- .r- •.. ''- •• � w B. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW WALL MOUNTED ADA HEIGHT URINAL, ------r-----r- ---T---- °b °b' - , W fi' :. UR-2. PROVIDE MODIFIED PLUMBING LOCATION PER NEW FIXTURE PLACEMENT, PROVIDE NEW AS COLOR TO MATCH ADJACENT GROUT. CP, RE P DEMOLITION 1 °b °°I I I 1 R ELECTED Out °OOL J______'______L__________ :: -, - REQUIRED. SEE DETAIL 2E/A0.01. 23. NEW PORCELAIN TILE FLOORS, PT-1,TO BE CUT AROUND DRAIN TO ENSURE PROPER SLOPE IS PLAN, AND 1 , I IO° °O, ------'------H____-.-----. I I MAINTAINED. CEILING cu 00l 9. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW WALL MOUNTED STANDARD HEIGHT NOTES , I , 1°° °OI I I I I .. TOILET,WC-1. PROVIDE MODIFIED PLUMBING LOCATION PER NEW FIXTURE PLACEMENT, PROVIDE NEW AS 24. NEW WALL TILE, PT-2, 12"X 4"TILE ALONG WALLS WHERE INDICATED BY- -. PROVIDE SCHLUTER TRIM, DRAWN BY: SJR REQUIRED. PROVIDE DUAL FLUSH OPERATION,ASSUME SLOAN UPPERCUT. TS-1,AT ALL EXPOSED EDGES. USE EPDXY GROUT THROUGHOUT. EQ EQ EQ EQ 10. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW WALL MOUNTED STANDARD HEIGHT 25. NEW GLASS MOSAIC TILE AT VANITY WHERE INDICATED BY ""' , GL-1. USE EPDXY GROUT CHECKED BY. MRT, PDK rL rL URINAL, UR-1. PROVIDE MODIFIED PLUMBING LOCATION PER NEW FIXTURE PLACEMENT, PROVIDE NEW AS THROUGHOUT. 4 DEMOLITION RCP 5 REFLECTED CEILING PLAN REQUIRED. SEE DETAIL 2H/A0.01. 26. START TILE INSTALLATION HERE WITH FULL TILE. SHEET: 11. NEW RECESSED MOUNT COMBINATION TOILET PAPER DISPENSER, SEAT COVER DISPENSER, CSD-1. SEE 27. RELOCATE EXISTING CEILING COMPONENT AS REQUIRED WHERE AFFECTED BY NEW CEILING AND 1 .1 1/4"=1'-0" 1 .1 1/4"=1'-0" DETAIL 2C/A0.01. LIGHTING LAYOUT. 12. NEW RECESSED MOUNT COMBINATION TOILET PAPER DISPENSER, SEAT COVER DISPENSER,AND 28. PROVIDE NEW GYPSUM BOARD CEILING THROUGHOUT. ASSUME TO MATCH EXISTING CEILING HEIGHT OF Almlo SANITARY NAPKIN RECEPTACLE, CSD-2. SEE DETAIL 2C/A0.01. 8'-8"- AFF. PREP CEILING TO RECEIVE NEW PAINT, P-1. PROVIDE CEILING ACCESS PANELS AS REQUIRED. 13. NEW SHARED TOILET PARTITION MOUNTED COMBINATION TOILET PAPER DISPENSER, SEAT COVER CONFIRM FINAL SPECIFICATIONS WITH LANDLORD. PROVIDE LIGHT FIXTURES, LF-2, LF-3, AND LF-4. NOTIFY DISPENSER, AND SANITARY NAPKIN TACLE, CSD-3. SEE DETAIL 2G/AO.01. A/E F ANY EQUIPMENT CONFLICTS. 14. NEW PARTITION MOUNTED COMBINATION TOILET PAPEROJOB NO. ER DISPENSER, SEAT COVER DISPENSER, CSDA. SEE 29. PATCH AND REPAIR CORRIDOR FINISHES TO MATCH EXISTING,WHERE AFFECTED BY DEMOLITION. 2190950.09 DETAIL 2G/A0.01. 15. NEW 6'-0" HIGH METAL FLOOR MOUNTED TOILET PARTITION WALLS AND DOORS,TP-1. SEE DETAIL 2D/A0.01 CONSTRUCTION SET: 04/01/2021 `219095009`C:\TEMMACPUBLISH 16536\09 A1.10.DWG SJR 03/30/21 14:40 1:48.00 FOR ADA STALL LAYOUT. 7 11 5.20 20 SIM V 11"+ E PORCELAIN TILE, BRUSHED SCHLUTER STRIP, TS-1, GB- 1 11 ± PT-2, TYP AT ALL EXPOSED EDGES, TYP CEILING�— GLASS MOSAIC TILE, GL-1 NEW UNFRAMED MIRROR j F WITH BACKLIT, LF-1 i ■ CENTER MIRROR WITH / CENTER OF SINK r I I I I Architecture Interiors I I ! Planning Engineering 6"X6" FINISHED EDGE­, i I I CUT-OUT I I I I I I RELOCATED AUTOMATIC—.,, SOAP DISPENSER AND I I ( OPEN T BEYOND FAUCET, TYP L L Portland, OR SOLID SURFACE COUNTER = 503.224.9560 TOP, SS-1, AND 2" / \ o o Vancouver, WA BACKSIDE SPLASHLID Ln 360.695.7879 LOCKING LOWER Seattle, WA CABINETRY ON NON-ADA / / \ EAo 206.749.9993 APPROACH SIDE ONLY (SEE FLOOR PLAN) www.mcknze.com PLASTIC LAMINATE, PL-1 \ \ / M AC K E N Z I E END PANEL, TYP (O / fD (Q DESIGN DRIVEN I CLIENT FOCUSED OPEN TO BELOW, PER 5°± 3'-0" 3'-0" 5" Client CODE. FLOORING TO WC-1 TP-1, TYP---ZGB-1 WC-2 PT-1 A, TYP WC- WC-2 CSD-2 EXTEND UNDER CABINET 6 9 ELEVATION A ELEVATION B ELEVATION C J a z w VANITY & WALL ELEVATION 3 S H O R E S T E I N 4.1@WOMEN'S TOILET 202 1/2"=1'-0" w J w 7 5.20 GB-1 PORCELAIN TILE, 1'-4"± E BRUSHED SCHLUTER STRIP, TS-1, GB-1 PT-2, TYP AT ALL EXPOSED EDGES, TYP Project CEILING 2ND FLOOR TOILET GLASS MOSAIC TILE, GLA ROOM UPGRADES NEW UNFRAMED MIRROR LANDLORD WITH BACKLIT, LF-1 / IMPROVEMENTS CENTER MIRROR WITH CENTER OF SINK / 5 LINCOLN /--6"X6" FINISHED EDGE 10200 SW GREENBURG RD I CUT-OUT TIGARD, OR 97223 I I RELOCATED AUTOMATIC \ / SOAP DISPENSER AND I I I FAUCET, TYP OPEN TCXBEYOND �`` ASC L__ __jSOLID SURFACE COUNTER �� oTOP, o c BACK/SIDE SPLASH // \\ . i' PAU D. L LOCKING LOWER c CABINETRY ON NON-ADA PO ND, REG APPROACH SIDE ONLY / \ (SEE FLOOR PLAN) / \ PLASTIC LAMINATE, PL-1 / \ Oi'p i47jOPEN TO BELOW, PER CODE. FLOORING TO EXTEND UNDER CABINET © M RIGHTS IE2021 SER +_ 2'8" ALL RIGHTS RESERVED WC-2 TP-1, TYP--/ WC-1 PT-1A, TYP--/ UR-1 UR-2 2 UR-2 CSD-2 WC-2 THESE DRAWINGS ARE THE PROPERTY OF 5, '1 30"CLR INSIDE MACKENZIE AND ARE NOT TO BE USED OR REPRODUCED IN ANY MANNER, ELEVATION A VERIFY ELEVATION B ELEVATION C WITHOUT PRIOR WRITTEN PERMISSION J a REVISION SCHEDULE 2 VANITY & WALL ELEVATION z w Delta Issued As Issue Date 4 1 @ MEN'S TOILET 203 1/2" w J w ELEVATION GENERAL NOTES A. SEE 2/A0.01 FOR ADDITIONAL INFORMATION ON FIXTURE MOUNTING HEIGHTS. ALL REQUIRED ADA CLEARANCES ARE TO FACE OF FINISH. B. ALL DIMENSIONS ON THIS SHEET ARE TO FACE OF FINISH UNLESS NOTED OTHERWISE. C. ALL NEW TOILETS/URINALS TO BE LOCATED AT EXISTING PLUMBING LOCATIONS, UNLESS OTHERWISE NOTED. MODIFY BLOCKING AND ROUGH-IN LOCATIONS, AS REQUIRED, TO MEET ADA MOUNTING HEIGHT REQUIREMENTS. SHEET TITLE: D. INSULATE ALL UNDER COUNTER HOT WATER AND WASTE LINES PER ADA CODE. INTERIOR E. COORDINATION OF BLOCKING REQUIREMENTS FOR WALL MOUNTED SPECIALTIES BY CONTRACTOR. ELEVATIONS F. CONFIRM REQUIREMENTS AND SIZES FOR ALL EQUIPMENT/APPLIANCES PRIOR TO CONSTRUCTION OF CABINETRY/COUNTER TOPS. G. FINISH ENDS OF COUNTERS, DOORS, FACES, TYPICAL. H. ALL EXPOSED EDGES AT DOORS AND SHELVING TO BE PLASTIC LAMINATE TO MATCH ADJACENT VERTICAL FINISH. I. SCRIBE TO FIT CASEWORK AT ALL WALLS. J. SHIM AS REQUIRED. DRAWN BY: SJR K. VERIFY TILE LAYOUT FOR APPROVAL PRIOR TO TILE INSTALLATION. CHECKED BY: MRT, PDK L. SINK TO BE CENTERED WITH CENTER OF CABINET OPENING. SHEET. M. MIRRORS TO BE CENTERED OVER SINKS. N. PROVIDE 60"± AFF POWER, CENTERED ABOVE EACH SINK TO POWER MIRRORS. COORDINATE FINAL A4m10 POWER REQUIREMENTS WITH MANUFACTURER. O. ASSUME BLACK MELAMINE AT INTERIOR OF CABINETS. P. PROVIDE SCHLUTER TRIM, TS-1, AT ALL EXPOSED TILE EDGES. SEAL ALL GROUT PER _7 MANUFACTURER'S INSTRUCTIONS. USE EPDXY GROUT THROUGHOUT. COLOR TO MATCH ADJACENT JOB NO 2190950.09 GROUT. CONSTRUCTION SET: 04/01/2021 '219095009`C:\TEMMACPUBLISH 16536\09 A4.10.DWG SJR 03/30/21 14:40 1:96.00 TRACK BLOCKING W/ 1 1/2" FLANGES. SIZE & GAGE TO MATCH SCHEDULE OF LIGHT FIXTURES SCHEDULE OF INTERIOR FINISHES METAL STUD CEILING JOISTS. LOCATE IN EVERY 6TH SPACE FOR STUDS @ 16" oc & @ EACH END OF WALL. \ / ATTACH STUD TRACK LF-1: (BACKLIT MIRROR) SEURA, LED BACKLIT MIRROR, HALO DESIGN, CUSTOM 24"X48"SIZE, PL-1: (CABINET FACES) FORMICA, SILVER RIFTWOOD, 6413-NG, NATURAL GRAIN, GRAIN / \ / TO BRACE ABOVE. DIMMABLE DIRECTION: VERTICAL WITH BLACK MELAMINE INTERIOR NOTE: CEILING JOIST MAX SPAM \ / ADD TRACK ABOVE ■ FOR COMPLETE INSTALLATION RECOMMENDATIONS CONTACT: SS-1: (COUNTER TOPS) PENTAL QUARTZ, PEARL WHITE, POLISHED, THICKNESS: 2CM 6005137-33 METAL STUD CEILING JOIST SUSPENDED \ \ \ / / / GYP TO ALIGN WITH LESLIE FLOHR @ 16" oc MAX SPAN 17'-6" W/ GYPSUM CEILING \ // \ / LOWER WALL TRACK LESLIE FLOHR CONSULTING PT-1: (FLOOR TILE) PENTAL, FRAY, SAND, SIZE: 12"X24"AT FLOORS, INSTALLATION: 1/3 OFFSET. 200050-54 U-CHANNEL AT MIDSPAN BELOW GYP Architecture Interiors 206.852.9360 NOTE: GROUT, GT-1, JOINTS TO BE 1/16"WIDE, PER MANUFACTURER'S STANDARDS. 362SI25-18 METAL STUD CEILING JOIST 45' Planning Engineering LESLIE@LESLIEFLOHRCONSULTING.COM @ 16" oc MAX SPAN 7'-9" � U 3625137-33 METAL STD CEILING JOIST LF-2: (RECESSED LINEAR LED) FLUXWERX, NOTCH 2, LINEAR RECESSED LED LIGHT FIXTURE, PT-1A: (CUT TILE BASE) ASSUME CUT PT-1 TO BE 6"X24" FOR TILE BASE. METAL STUD BRACING AND TRACK TO TRIMLESS, 8'WIDE, COLOR TEMPERATURE: T.B.D., SYMMETRICAL LIGHT DISTRIBUTION PT-2: (ACCENT TILE) UNITED TILE, CROSSVILLE, RETROACTIVE, EMPRESS WHITE,A215, @ 16" cc MAX SPAN 10'-8" FLOOR STRUCTURE ABOVE AT 8'-0" OC POLISHED, SIZE: 4"X12"AT WALLS. x W/ (2) #8 SHEET METAL SCREWS AT LF-3: (RECESSED LINEAR LED) FLUXERX, NOTCH 2, LINEAR RECESSED LED LIGHT FIXTURE, NOTE: GROUT, GT-1, JOINTS TO BE 1/16"WIDE, PER MANUFACTURER'S STANDARDS. METAL STUD CEILING JOIST FINISHED JOINT EACH END. STUD SIZING PER SPAN TABLE. TRIMLESS, 5'WIDE, COLOR TEMPERATURE: T.B.D., SYMMETRICAL LIGHT DISTRIBUTION SEE MAX SPAN NOTE ABOVE x Portland, OR GL-1: (GLASS MOSAIC ACCENT TILE) DALTILE, COLORWAVE, CW08 WISTERIA, SIZE: 1"X1"AT BRACING TO BE PROVIDED WHERE 503.224.9560 LF-4: (RECESSED LED) LITHONIA, SQUARE SERIES, LDN4, RECESSED LED LIGHT FIXTURE, 4"X4", VANITY WALLS. / / SOUND ATTENUATION DISTANCE BETWEEN PERPENDICULAR Vancouver,WA U-CHANNEL INTERSECTING WALLS OR HORIZONTAL COLOR TEMPERATURE: T.B.D. NOTE: GROUT, GT-1, JOINTS TO BE 1/16"WIDE, PER MANUFACTURER'S STANDARDS. AS REQ'D AT ALL NEW WALLS, TYP. BRACING BETWEEN WALLS EXCEEDS 8'-0" 360.695.7879 FOR COMPLETE INSTALLATION RECOMMENDATIONS CONTACT: GT-1: (GROUT) CUSTOM, 386 OYSTER GRAY., EPDXY, 1/16" GROUT JOINT. OC, OR PROVIDE CLNG. SUPPORT FOR TOP Seattle, WA ROBBIEKENAGY OF WALL EQUAL TO NOTE ABOVE 206.749.9993 HARRY L. STERNS TS-1: (TRANSITION STRIP) SCHLUTER, SCHIENE PROFILE, BRUSH ALUMINUM FINISH, SIZEMETAL STUDS SEE WALL HEIGHT www.mcknze.com 503.201.7690 RECOMMENDED BY MANUFACTURER. GYP BD EA SIDE TABLE, 8/A5.20, FOR GAUGE RKENAGY@HLSTERNS.COM AND SPACING P-1: (FIELD PAINT) SHERWIN WILLIAMS, SW7012 CREAMY. x #10 SMS AS SHOWN, CONT ACOUSTIC SEALANT EA MACKENZIE . NOTE: FINAL LIGHT FIXTURE SPECIFICATIONS ARE TBD AND TO BE REVIEWED BY SELECTED VENDOR SIDE AGAINST TRACK NO DESIGN DRIVEN I CLIENT FOCUSED PRIOR TO PROJECT START. ENSURE ALL NEW FIXTURES HAVE SAME COLOR TEMPERATURE. A/E TO P-2: (ACCENT PAINT) SHERWIN WILLIAMS, SW7036 ACCESSIBLE BEIGE. SEE SPECS SEALANT AT SIM COND Client REVIEW LIGHTING SUBMITTAL PRIOR TO PROCUREMENT, 1/2" MAX P-3: (CORRIDOR PAINT) MATCH EXISTING FINISH AND SHEEN. L GYP BD SEE REFLECTED CEILING BOTTOM TRACK TO FINISH a PLANS FOR HEIGHTS CONCRETE SLAB PAINT NOTE: EGGSHELL WASHABLE FINISH AT CEILING AND SOFFITS, SATIN WASHABLE FINISH AFF FLOOR W1 POWDER DRIVEN U AT WALLS. SEMI-GLOSS FINISH AT ALL TOILET ROOM WALLS AND CEILINGS. FINISH o ANCHORS AT 4'-0" OC 3 AT 5%-25DHAVE A M TS60 DEGREES.TER PAINTER INDEX OF 3 WITH A GOOD SCRUB RATING AND SHEEN 3 CEILING JOIST FRAMING I 4 NON-BEARING WALL z s H o R E S T E I N I rJ 2 METAL STUDS WITH MIDSPAN SUPPORT AND BLOCKING NTSz 5 2 AT FLOOR AND GYPSUM CEILING 3"=1'-0" U 3 NEW BACKLIT MIRROR * 5 LINCOLN STUD SIZE: 2 1/2" SCHEDULE OF TOILET ACCESSORIES MEANS AND METHODS WALL TILE PER ELEVATION, * EXCEPT AS NOTED FOR NEW WALL, PROVIDE 3 5/8" STUD EXTEND 6"BEHIND MIRROR AT ALL SIDES LIMITING WALL HEIGHT TABLE Project TP-1: (TOILET PARITIONS) HADRIAN, #4 BRUSHED STAINLESS STEEL, 85"TALL 09680 CARPET 2" SOLID SURFACE 2ND FLOOR TOILET NOTE: PROVIDE HARDWARE FOR DOORS TO SWING OUTWARD AND AUTOMATICALLY 1. REMOVE ALL EXISTING CARPET AT AREA OF WORK. PREP FLOOR TO RECEIVE NEW CARPET. BACKSPLASH AND SIDE INTERIOR NDN STRUCTURAL NON-COMPOSITE WALLS L/240 @ 5psf ROOM UPGRADES RETURN TO CLOSED POSITION. SPLASH,AS OCCURS 2. INSTALL ALL CARPETS PER MANUFACTURER'S INSTRUCTIONS. NEW UNDERMOUNT SINK DESIGNATION SPACING MAX. WALL HEIGHT LANDLORD SINK-1: KOHLER, CAXTON K-2000, UNDER-MOUNT BATHROOM SINK, COLOR: 0 WHITE 3. CARPET MEASUREMENTS TO BE FIELD VERIFIED PRIOR TO ORDER OF CARPET. SOLID SURFACE WITH EASED IMPROVEMENTS - EDGE OVER MARINE GRADE 250SI25-18 24" 8'-4' PTD-1: GEORGIA-PACIFIC, SEMI RECESSED AUTOMATIC PAPER TOWEL DISPENSER, 59466A, 4. SEAL ALL CUT EDGES AT SEAMS AT CARPET INSET TO PREVENT RAVELING. NOTIFY A/E OF C� PLYWOOD ANY CONCERNS PRIOR TO ORDER. - NO HARDWARE PULL, 2505125-18 16" 9'-7" 5 LINCOLN STAINLESS STEEL -- 09900 PAINT PROVIDE MAGNETIC TOUCH 250S125-27 24" 9'-10" 10200 SW GREENBURG RD WR-2: BOBRICK, RECESSED WASTE RECEPTACLE, B-43644 WITH LINERMATE, SATIN FINISH 1. THE OUTLINED PAINT SPECIFICATIONS MAY BE MATCHED BY OTHER MANUFACTURERS. RELEASE ON ADA SIDE ONLY TIGARD, OR 97223 (SEE FLOOR PLAN) 250S725-18 16" 11'-3" STAINLESS STEEL ACCEPTABLE MANUFACTURERS: BENJAMIN MOORE, SHERWIN WILLIAMS, MILLER, OR APPROVED SUBSTITUTION. SUBMIT RECOMMENDED SHEEN WITH DRAW DOWNS FOR A/E 2X4 AT EACH FLAT BAR 362SI25-18 24" 13'-5" CSD-1: (RECESSED COMBINATION SEAT DISPENSER) LANDLORD STANDARD. REVIEW AND APPROVAL. 6" 6" 6° 2" g SUPPORT �j F.B. 1/4"X 2"WITH (3) 1/4"0 X 362SI25-18 16" 14'-4" N,,5 Al CSD-2: (RECESSED COMBINATION SEAT DISPENSER WITH SANITARY NAPKIN WASTE) LANDLORD 2. PROVIDE ONE COAT PRIMER AND TWO COATS PAINT ON ALL GYPSUM BOARD SURFACES. I I/ 1-1/2" LAG SCREWS TO 2X4 `I STANDARD. AT COUNTER AND (4) 1/2"0 362SI62-33 16" 16'-5" 3. CONTRACTOR SHALL PROVIDE ONE FULL GALLON OF EACH WALL COLOR PAINT WITH PAU D. L LABELS TO OWNER UPON COMPLETION OF THE PROJECT. LABEL ALL LEFTOVER PAINT AND Cr MB 7HRU STUDS LOCATE FB _J3625162-43 16" 18'-0" �2 CSD-3: SHARED PARTITION MOUNTED SEAT DISPENSER WITH SANITARY NAPKIN WASTE N 1'-8" U SUPPORTS AT T-0" OC MAX ( ) STORE AS DIRECTED BY OWNER. LANDLORD STANDARD. / N c 6005162-33 16" 24'-6" 4. DISPOSE OF ALL PAINT MATERIALS OFF SITE. DO NOT POUR DOWN DRAINS, CATCH BASINS, _ L� PO ND, REG CSD-4: (PARTITION MOUNTED SEAT DISPENSER) LANDLORD STANDARD. OR IN LANDSCAPE AREAS. / a INTERIOR NON STRUCTURAL NON-COMPOSI'T'E WALLS PLASTIC LAMINATE FACES WRl-I CERAMC TILE FACING L/360 @ 5 sf 5. SUBMIT PAINT DRAW DOWNS TO A/E FOR EACH PAINT COLOR FOR REVIEW AND APPROVAL. WRAP ALL WASTE AND HOT p WC-1: (STANDARD HEIGHT TOILET) LANDLORD STANDARD. / WATER SUPPLY LINES PER OF O 6. APPLY PAINT PER MANUFACTURER'S RECOMMENDATIONS. ADA CODE DESIGNATION SPACING MAX. WALL HEIGI-ff WC-2: (ADA HEIGHT TOILET) LANDLORD STANDARD. 7. NO VOC PAINT SYSTEMS TO BE UTILIZED, TO INCLUDE PRIMERS AS WELL AS FINISH + _� PROVIDE 2X BLOCKING AT 362S125-18 16" 12'-4" MACKENZIE 2021 PRODUCTS. METAL STUDS © ALL RIGHTS RESERVED UR-1: (STANDARD HEIGHT URINAL) LANDLORD STANDARD. 362S125-33 16" 14'-3" 8. EGGSHELL WASHABLE FINISH AT CEILING AND SOFFITS, SATIN WASHABLE FINISH AT WALLS. iN THESE DRAWINGS ARE THE PROPERTY OF UR-2: (ADA HEIGHT URINAL) LANDLORD STANDARD. SEMI-GLOSS FINISH AT ALL TOILET ROOM WALLS AND CEILINGS. FINISH TO HAVE A MASTER 6" 5) U) MACKENZIE AND ARE NOT TO BE USED PAINTER INDEX OF 3 WITH A GOOD SCRUB RATING AND SHEEN AT 15%-25%AT 60 DEGREES. Y � OR REPRODUCED IN ANY MANNER, Z WALL TABLES ARE BASED ON WALLS SHEATHED BOTH SIDES FULL HEIGHT WITH WITHOUT PRIOR WRITTEN PERMISSION GB-1: (GRAB BARS) LANDLORD STANDARD ADA GRAB BARS, CONFIRM FINAL SPECIFICATION 09300 TILE 1/2" GYPSUM BOARD ATTACHED WITH #6 SCREWS MIN. AT 12"-0" 0.C. MAX. m WITH LANDLORD PRIOR TO PROCUREMENT, ASSUME BOBRICK TOILET COMPARTMENT 1. INSTALL TILE ACCORDING TO MANUFACTURER'S RECOMMENDED INSTRUCTIONS. GRAB BARS, (36") 5806-36, (42") 5806-42, (18") 5806-18 Q ~ REVISION SCHEDULE 2. INSTALL TILE IN ACCORDANCE WITH CURRENT TCA HANDBOOK GUILDLINES AND LAVATORY SECTION AT SINK �n $ WALL HEIGHT TABLE =j AC-1: (AUTOMATIC AIR FRESHENER) LANDLORD STANDARD. DETAILS. METHOD F122 FOR FLOORS IN ALL LOCATIONS. I J Delta Issued As Issue Date 5.2 1 1/2"=1'-0' > 5.2 Q 3. CONTRACTOR TO CONFIRM GROUT SPECIFICATION IS APPROPRIATE FOR EACH a AREA OF WORK. REFER TO SCHEDULE OF INTERIOR FINISHES. 4. GROUT JOINT REQUESTED IS 1/16". CONFIRM MANUFACTURER RECOMMENDED WALL TILE PER ELEVATION GROUT JOINT SIZE, NOTIFY PROPERTY MANAGER OF ANY DISCREPANCIES PRIOR TO WORK. Z-1" 2"SOLID SURFACE 5. APPLY TILE AND GROUT SEALER AS RECOMMENDED BY MANUFACTURER. BACKSPLASH AND SIDE 6. CONTRACTOR TO COORDINATE PRE-INSTALLATION MEETING ON SITE WITH SPLASH, AS OCCURS ARCHITECT AND TILE INSTALLER FOR FINAL LAYOUT REVIEW PRIOR TO SOLID SURFACE WITH EASED EXISTING CARPET AS OCCURS INSTALLATION. - EDGE OVER MARINE GRADE 7. PROVIDE SCHLUTER TRANSITION STRIP WHERE TILE TRANSITIONS TO CARPET. N J PLYWOOD SCHLUTER SCHIENE INSTALL TRANSITION STRIP ACCORDING TO MANUFACTURER'S RECOMMENDED 3/8„ PROFILE, OR SIM SHEET TITLE: INSTRUCTIONS. INTERIOR GROUT AS SPECIFIED 8. CONTRACTOR TO PROVIDE MOCK-UP FOR REVIEW AND APPROVAL OF CARPET TILE, DETAILS AND PORCELAIN TILE AND SCHLUTER TRANSITION PRIOR TO INSTALLATION. 2X4 AT EACH FLAT BAR TILE AS SPECIFIED 6" 6" 611 2" 8" SUPPORT SCHEDULES `O F.B. 1/4"X 2"WITH (3) 1/4"0 X THIN SET MORTAR BED 1-1/2" LAG SCREWS TO 2X4 AT COUNTER AND (4) 1/2"0 O ¢ MB THRU STUDS LOCATE FB CN 11-8° U SUPPORTS AT 3'-0"OC MAX a - , " - EXISTING FLOOR SLAB a cli "d DRAWN BY: SJR PLASTIC LAMINATE FACES a ° .Q co CHECKED BY: MRT, PDK + SHEET: 311 PROVIDE 2X BLOCKING AT METAL STUDS N ±111 RUBBER BASE A5m2O TYPICAL FLOORING TRANSITION -_ 00 "2 1'-0"=1'-0" w JOB NO. 11 LAVATORY SECTION co 2190950.09 5.2 1 1/2"=1'-0" Q CONSTRUCTION SET: 04/01/2021 J '219095009'C:\TEMP\ACPUBLISH_16536\09_A5.20.DWG SJR 03/30/21 14:40 1:96.00