Loading...
Plans (29) BUP2021 -00071 VALIDITY OF PERMITTHE ISSUANCE A PERMIT RECEIVED BASED ON CONOSTRUCTIION J awLoa*ek" DOCUMENTS AND OTHER of DATA SHALL NOT PREVENT MAR 1 6 GA O — 111 1 1,1141111,11_ I� THE CODE OFFICIAL FROM OILY OF TIGARD t1TRRf — — REQUIRING THE CORRECTION BUILDING nIVISION OF ERRORS. OSSC 105.4 ■ STRUCTURED PAR ! / Architecture ■ Interiors 5TH FLOOR TOILET ROOM UPGRADES Planning ■ Engineering LANDLORD IMPROVEMENT 3 - - Portland, OR LINCOLN ��I�E`�1��� 503.224.9560 0 0 CITY OF TIGARD, ancouverSITE 360.695 7879 _ 10220 SW G R E E N B U R G RD , REVIEWED FOR CODE COMP1 IANCE Seattle, WA Approved:-j 206.749.9993 TIGARD OREGON OTCs j www.mcknze.com AddreJs{s: t o w MACKENZIE. H1111111suite}F: / `/ DESIGN DRIVEN I CLIENT FOCUSED En Dates %4 !X Client 26' sotoo zoo• 1 VICINITY MAP LEGEND INDEX OF DRAWINGS 5 H o R E S T E I N 0.0 NOT TO SCALE GENERAL :..a s-::: G0.01 TITLE SHEET, VICINITY MAP, CODE SUMMARY, LEGEND AND NOTES i EXISTING CONSTRUCTION TO BE DEMOLISHED Sig — _. ARCHITECTURAL o EXISTING WALL TO REMAIN A1.10 DEMOLITION PLAN, PARTIAL FIFTH FLOOR PLAN, FINISH PLAN, DIMENSION PLAN AND NOTES A1.20 DEMO RCP, REFLECTED CEILING PLAN, INTERIOR ELEVATIONS, AND NOTES Project ® NEW WALL TO UNDERSIDE OF CEILING, REFER TO 4/A5.20 A5.20 INTERIOR DETAILS 5TH FLOOR A6.10 SCHEDULES ® NEW PLUMBING WALL, SEE DETAIL 3/A5.20 TOILET ROOMS NEW DEDICATED OUTLET SCOPE OF WORK LANDLORD $os NEW LIGHT SWITCH WITH OCCUPANCY SENSOR THE SCOPE OF WORK FOR THE PROJECT INCLUDES INTERIOR LANDLORD IMPROVEMENTS TO THE TOILET IMPROVEMENT 3 LINCOLN ROOMS ON THE FIFTH FLOOR OF SIX FLOORS TOTAL. ALL NEW PLUMBING FIXTURES TO OCCUR AT S EXISTING FLOOR DRAIN LOCATION EXISTING AND MODIFIED PLUMBING LOCATIONS, UNLESS NOTED OTHERWISE. WORK TO INCLUDE 10220 GREENBURG RD. r EXISTING 2X2 LIGHT FIXTURE TO REMAIN DEMOLITION, NEW WALLS, DOORS, AND FINISHES. TIGARD, OREGON � ® a � EXISTING CORRIDOR LIGHT FIXTURE TO REMAIN VALUATION*0`1-,40b.00 71 a EXff EX L= EXISTING GYPSUM BOARD CEILING TO REMAIN DESIGN/CODE DATA NEW GYPSUM BOARD CEILING, REFER TO 2/A5.20 GOVERNING CODE: 2019 OREGON STRUCTURAL SPECIALTY CODE �~ ULD KI LI OCCUPANCY: B CODE SUMMARY LEGEND ® EXISTING FIRE STROBE LOCATION CONSTRUCTION TYPE: TYPE 1-B AREA OF WORK: APPROXIMATELY 250 SQUARE FEET ■ PORTLA 0 EGO ■ 'T\ ' a EXISTING CEILING MOUNTED COVERPLATE TO REMAIN OCCUPANCY LOAD: WOMEN'S TOILET ROOM 1132 SQUARE FEET): 1 W u EXT EXIT ACCESS MEN'S TOILET ROOM (118 SQUARE FEET): 1 1 o LF-2 NEW 4' RECESSED LINEAR LED LIGHT FIXTURE 1 REQUIRED EXIT, 1 EXIT PROVIDED PER TOILET ROOM. OF AREA OF WORK o LF-3 NEW 8' RECESSED LINEAR LED LIGHT FIXTURE ALL EXITS ARE NEW AND WILL HAVE APPROPRIATE EXIT SIGNAGE. BUILDING IS FULLY SPRINKLED AND m IS ---------- GL-1 NEW ACCENT TILE AT VANITY HAS NFPA SMOKE DETECTION WITH ON SITE EMERGENCY GENERATOR FOR FIRE/LIFE/SAFETY BACKUP © MACKENZIE2021 ■ � � � � � ■ COMMON PATH OF EGRESS TRAVEL = 20'-0" ALL RIGHTS RESERVED — — — — — PT-2 NEW 4'HIGH TILE POWER. THESE DRAWINGS ARE THE PROPERTY OF MACKENZIE AND ARE NOT TO BE USED CODE SUM MARY P LAN OCCUFAN" WATER CLOSETS LkVATORIEs OR REPRODUCED IN ANY MANNER, 2 WITHOUT PRIOR WRITTEN PERMISSION / UNCTION OCCLOAO RATIO MEN'S WATEq WOMEN'S WAiffl RATIO MENS WOMEN'S 00.1NgNG 0.0 — PT-1 NEW FLOOR TILE,ya OFFSET aoseis nosE7s uvaioglEs uvATOR1Es DUNTAINs 5TH FLOOR NTS slneY Ilabg,ro,the NannmOn of Erl-11.OrOlei,i,_' REVISION SCHEDULE a,Ome,xrvi<es nerAN, g mercnanaix,.11ke 1 RER 00 s 90.t ullaingbanb,light industrial,ambulatory care ana g6 1PER 355 W,1PER SO REMAINDER PER 80 r imilar uxi 17 173 REMAINDER 108 108 Delta Issued As Issue Date 6sS ADA ACCESSIBLE TURN RADIUS AND ADA CLEAR FLOOR SPACE EIST.LARED 2 o2 oa / EOUIgFD TOTALS 2 Z 1 2 PROJECT GENERAL NOTES LJ ROVIDEDI '1 2 2 A. THE DRAWINGS LOCATE PRODUCTS, SURFACES, AND MATERIALS AND THE NOTES CONVEY DESIGN INTENT. THE PROJECT INTENT IS TO PROVIDE FOR A COMPLETE, WORKING SYSTEM. SEPARATE PERMIT 2019 OSSC SECTION 107.3.4.2 (BY SEPARATE PERMIT) B. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE LATEST ADOPTED BUILDING CODE EDITION, AND TO CONDITIONS AND SPECIFICATIONS OF ALL GOVERNING AUTHORITIES. FIRE ALARM C. VERIFY AND CONFIRM ALL CONDITIONS, DIMENSIONS, AND LAYOUT INFORMATION PRIOR TO START OF CONSTRUCTION. NOTIFY MACKENZIE OF ANY DISCREPANCIES PRIOR TO START MECHANICAL OF WORK. ANY CORRECTION WORK REQUIRED AS A RESULT OF NOT REPORTING SUCH DISCREPANCIES SHALL BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. ELECTRICAL PLUMBING D. CONTRACTOR AND SUBCONTRACTORS SHALL CAREFULLY EXAMINE THE SITE AND THE CONSTRUCTION DOCUMENTS OF THE ENTIRE WORK. INCONSISTENCIES IN THE PLANS OR SPRINKLER SPECIFICATIONS SHALL BE CALLED TO THE ATTENTION OF MACKENZIE. SYMBOLS AND REFERENCES E. REFER TO ENLARGED PLANS AND ELEVATIONS WHERE INDICATED FOR ADDITIONAL INFORMATION. ENLARGED PLANS TAKE PRECEDENCE OVER PLANS OF SMALLER SCALE, AND NOTE: DESIGN BUILDERS ARE FULLY RESPONSIBLE FOR THE DESIGN THESE SYSTEMS/COMPONENTS. SHEET TITLE: DETAILS TAKE PRECEDENCE OVER PLANS. IN THE CASE OF A CONFLICT, THE HIGHEST COST OPTION SHOULD BE PRICED. THESE SYSTEMS/COMPONENTS SHOWN ON DOCUMENTS ARE SCHEMATIC ONLY: THEY ARE NOT PROJECT NORTH INTENDED TO REPRESENT FINAUCODE COMPLIANT DESIGN. PROVIDE DESIGN DOCUMENT SUBMITTAL TO TITLE SHEET, F. DETAIL REFERENCES SHALL BE APPLIED TO ALL INSTANCES WHERE THE SAME CONDITIONS OCCUR, UNLESS NOTED OTHERWISE. ARCHITECT OF RECORD FOR REVIEW PRIOR TO SUBMITTAL VICINITY MAP, G. THE TERMS "ABOVE FINISH FLOOR" (AFF) AND "FINISH FLOOR ELEVATION" (FFE) REFER TO FINAL FINISHED FLOOR ELEVATION, WHETHER BUILT-UP SLAB, COMPOSITE DECK, OR RAISED TRUE NORTH ACCESS FLOOR. CONTACTS CODE FILLED ARROW H. DO NOT SCALE DRAWINGS. A DETAIL# SUMMARY, I. CUTTING AND DRILLING OF STRUCTURAL MEMBERS NOT DETAILED REQUIRES THE WRITTEN PERMISSION OF THE STRUCTURAL ENGINEER OF RECORD. INTERIOR ELEVATION 1 2 ARCHITECT CONTRACTOR LEGEND AND KEY MARK SHEET# J. SAVE AND RECYCLE DEMOLITION DEBRIS AS APPLICABLE. ALL DEMOLISHED OR REMOVED EXISTING MATERIAL SHALL BE LEGALLY DISPOSED. COORDINATE WITH CITY OF TIGARD MACKENZIE RUSSELL CONSTRUCTION NOTES REQUIREMENTS FOR RECYCLING/RE-USE OF DEMOLITION DEBRIS. SUB-CATEGORY 1515 SE WATER AVE, SUITE 100 20915 SW 105TH AVE CATEGORY PORTLAND, OR 97214 TUALATIN, OR 97062 K. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THEIR WORK. THE CONTRACTOR WILL COORDINATE CLEAN UP OF ALL AREAS AFFECTED BY DUST OR ANY DRAWN BY: KRR, SJR MATERIALS, BOTH DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT, INCLUDING THE INSIDE OF ALL WINDOWS AS NECESSARY SO THAT THE SPACE IS READY FOR CONTACT: LINDSEY CARPENTER CONTACT: DONN STURDIVANT KEYNOTE �J TEL: 503.224.9560 TEL: 503.692.9002 CHECKED BY: LJC, PDK OCCUPANCY BY TENANT. SPACE NAME FAX: 503.228.1285 EMAIL: DSTURDIVANT@RUSSELLCONSTRUCTION.COM L. ALL DESIGN-BUILD ITEMS, SYSTEMS, AND ELEMENTS ARE TO BE SUBMITTED FOR REVIEW AND APPROVED BY MACKENZIE. ROOM/SPACE IDENTIFICATION OFFIC SPACE # EMAIL: LCARPENTER@MCKNZE.COM CCB: 58918 SHEET: 114 M. EXISTING MATERIAL NOTED TO BE RETURNED TO THE OWNER SHALL BE SAFELY STORED AND PROTECTED UNTIL IT IS REMOVED FROM THE SITE BY THE OWNER. CONTRACTOR SHALL COORDINATE WITH THE OWNER. DOOR SYMBOL NUMBER 101A LANDLORD/OWNER G0w01 SHORENSTEIN REALTY SERVICES 5335 MEADOWS ROAD, SUITE 275 LAKE OSWEGO, OREGON 97035 CONTACT: HEIDI KNAPP JOB NO. 2190952.06 TEL: 503.412.4864 EMAIL: HKNAPP@SHORENSTEIN.COM PERMIT SET. 02/20/2021 219095206\DRAWINGSVARCHITECTURALt2021-0211 PERMIT SET-NEW LAYOUll06 G0.01.DWG SJR 02/18/21 17:17 1:96.00 KEYNOTES GENERAL DEMOLITION NOTES I I 4 1. ALIGN NEW WALL WITH EXISTING WALL. A. REMOVE EXISTING FLOORING, WALL TILE, VANITY, SINKS, TOILETS, URINALS, AND PARTITIONS THROUGHOUT. PATCH, REPAIR AND PREP SUBSTRATES AS REQUIRED TO RECEIVE NEW FINISHES. SEE 10 2. EXISTING FLOOR DRAIN LOCATION TO RECEIVE NEW FLOOR DRAIN COVER. COORDINATE FINAL SHEET A6.10 FOR FINISHES. MAINTAIN ALL EXISTING PLUMBING LOCATIONS FOR RE-USE, IF FEASIBLE. FINISH WITH OWNER. B. THE CONTRACTOR SHALL CAREFULLY EXAMINE CONSTRUCTION DOCUMENTS FOR THE WORK. ANY IIII I fill I 5 3. SALVAGE EXISTING AUTO FAUCET FOR RE-USE IF FEASIBLE. CONTRACTOR TO CONFIRM THEY ARE IN CONFLICTS, INCLUDING BUT NOT LIMITED TO BUILT CONDITIONS OF M.E.P. IN THE PLANS SHALL BE Architecture • Interiors l Ilii \ I \ / IIII �7) IGOOD WORKING ORDER. PROVIDE NEW AS REQUIRED. COORDINATE WITH LANDLORD. CALLED TO THE ATTENTION OF THE ARCHITECT/DESIGNER, SO THAT THE CLARIFICATION CAN BE Planning IS Engineering 4. NEW PLUMBING WALL LOCATION. CONTRACTOR TO CONFIRM DEPTH ALLOWS ENOUGH SPACE FOR ISSUED. NEW PLUMBING LINES AND INFORM A/E OF ANY CONFLICTS. 6 12 C. SALVAGE ALL DEMOLISHED COMPONENTS AS POSSIBLE. COORDINATE AND RETURN TO LANDLORD 5. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW, WALL MOUNTED ADA HEIGHT FOR FUTURE USE. \ I 12 TYP. 7 TOILET AT WITH CODE REQUIRED ADJACENT ADA GRAB BARS FOR AMBULATORY STALL. SEE DETAIL D. SAVE AND RECYCLE DEMOLITION DEBRIS WHERE POSSIBLE. COORDINATE WITH CITY OF TIGARD IL 3 9A/A5.20. PROVIDE DUAL FLUSH OPERATION, ASSUME SLOAN UPPERCUT. PROVIDE STANDOFF AS REQUIREMENTS FOR RECYCLING DEMOLITION DEBRIS. Portland, OR JREQUIRED WHERE TOP OF VERTICAL GRAB BAR MOUNTS TO GYPSUM WALL TO ENSURE FLUSH 503.224.9560 11 8 "'� / MOUNT. ASSUME STANDOFF TO MATCH ADJACENT PAINT COLOR. E. CAP ALL ABANDONED PLUMBING, ELECTRICAL CONDUIT, AND OTHER UNDER SLAB UTILITIES AS Vancouver, WA 15 6 REQUIRED. 360.695.7879 _ _ _ 1 6. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW, WALL MOUNTED STANDARD Seattle, WA -TF HEIGHT TOILET. PROVIDE DUAL FLUSH OPERATION. ASSUME SLOAN UPPERCUT. F. EXISTING STRUCTURE TO BE LEFT UNDISTURBED AND INTACT. PERFORM NO DEMOLITION THAT MAY 206.749.9993 15 COMPROMISE THE STRUCTURAL INTEGRITY OF THE BUILDING WITHOUT WRITTEN APPROVAL OF THE I / 3 3 \ I I / G 14 7. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW, WALL MOUNTED STANDARD 111 \ € I ARCHITECT/DESIGNER. WWw. ck11Ze.00111 l� / TYP I TYP 17 +� 6 I HEIGHT URINAL. I 16 ❑ 18 17 8. PROVIDE NEW SHORENSTEIN STANDARD PORCELAIN, LOW FLOW, WALL MOUNTED ADA HEIGHT G. SALVAGE EXISTING DOORS AND DOOR SIGNAGE FOR RE-USE. MACKENZIE. ❑ 16 URINAL, SEE 9H/A5.20. MODIFY PLUMBING LOCATION AS REQUIRED TO ACCOMMODATE ADA DESIGN DRIVEN I CLIENT FOCUSED BB $DS ' $D BB 14 G�. '6 CLEARANCE GENERAL NOTES Client 9. NEW RECESSED COMBINATION TOILET PAPER DISPENSER, SEAT COVER DISPENSER. SEE 9G/A5.20. EXI IS AA 10. NEW RECESSED COMBINATION TOILET PAPER DISPENSER, SEAT COVER DISPENSER AND SANITARY A. ALL EXISTING CONDITIONS TO REMAIN, UNLESS NOTED OTHERWISE. NAPKIN RECEPTACLE. SEE 9G/A5.20. Do WOPAEN'S MEIV'S p Typ B. DIMENSIONS REFLECT FACE OF FINISH TO FACE OF FINISH, UNLESS NOTED OTHERWISE. D 501 5G2 D 11. NEW SHARED TOILET PARTITION MOUNTED COMBINATION TOILET PAPER DISPENSER, SEAT COVER s x o a e s r e 1 x I L (/ I� DISPENSER, AND SANITARY NAPKIN RECEPTACLE. SEE 9G/A5.20, TYPICAL. C. ALL DIMENSIONS SHOWN AS PLUS/MINUS D ARE FOR GENERAL LAYOUT AND REFERENCE ONLY. L - - - -� VERIFY AND CONFIRM ALL DIMENSIONS AND CONDITIONS PRIOR TO START OF WORK, NOTIFY 12. NEW 6'H METAL FLOOR MOUNT TOILET PARTITION WALLS AND DOORS, SL-1. PARTITION DOORS TO ARCHITECT/ENGINEER OF ANY DISCREPANCIES PRIOR TO START OF WORK. SWING OUTWARD AND AUTOMATICALLY RETURN TO CLOSED POSITION. D. WALL THICKNESSES ARE NOMINAL, UNLESS NOTED OTHERWISE. 13. NEW T-6"H X 18"W METAL WALL MOUNT URINAL PARTITION, SL-1. MOUNT AT V AFF. E. ADD SOUND INSULATION IN ALL NEW WALLS. 14. NEW PARTIALLY RECESSED PAPER TOWEL DISPENSER UNIT, AC-1. SEE 9F/A5.20. PROVIDE POWER AS F. ELECTRICAL, DATA AND SWITCHING LOCATIONS ARE SHOWN TO CONVEY GENERAL INTENT ONLY. Project REQUIRED. COORDINATE ELECTRICAUDATA/SWITCHING REQUIREMENTS WITH OWNER AND PROVIDE DRAWINGS BY 5TH FLOOR Simmons RRISS, MIRRORS MORRIS 15. NEW RECESSED WASTE RECEPTACLE UNIT, AC-2. SEE 9F/A5.20. PROVIDE 3 5/8" STUD WALL AS SEPARATE PERMIT. TOILET ROOMS REQUIRED FOR EQUIPMENT CLEARANCE. MAINTAIN EXISTING WALL ASSEMBLY RATING, AS GOUTLETS INDICATED ARE EXISTING UNLESS NOTED OTHERWISESITE VERIFICATION HAS BEEN p REQUIRED. CENTER OF UNIT TO ALIGN WITH CENTER OF SINK. LANDLORD.+ + + PERFORMED ON 09/29/2020 AND PLAN, ELECTRICAL AND CEILING INFORMATION HAS BEEN UPDATED � a 16. NEW SOLID SURFACE VANITY COUNTERTOP WITH 6"X6" SQUARE OPENING FOR WASTE, 2" (OBSERVATION IS LIMITED TO VISIBLE/ACCESSIBHLE AREAS). CONTRACTOR TO FIELD VERIFY AND IMPROVEMENT BACKSLASH, SS-1, AND NEW RECTILINEAR UNDERMOUNT SINKS, SI-1. CONFIRM ADDITIONAL REQUIREMENTS WITH TENANT. 3 LINCOLN 17. PROVIDE NEW AUTO SOAP DISPENSER, SD-1. H. INSULATE PIPES BELOW SINK PER CODE. 10220 GREENBURG RD. 18. NEW 24"WIDE BY 48" HIGH BACKLIT MIRRORS, LF-1, CENTERED OVER EACH SINK. PROVIDE 60"--tAFF I. ALL INTERIOR DOORS TO BE SOLID CORE FLUSH WOOD DOORS TO MATCH BUILDING STANDARD TIGARD, OREGON DEMOLITION PLAN 2 PARTIAL FIFTH FLOOR PLAN POWER CENTERED ABOVE CH REQUIREMENTS WITH MANUFACTUIRER.OPOWER MIRRORS. COORDINATE FINAL POWER UNLESS NOTED OTHERWISE. 1 .1 1/4"=1'-0" J. PATCH AND REPAIR ALL EXISTING WALLS WHERE AFFECTED BY NEW WORK. Q A 1 .1 1/4"=1'-0" 19. PROVIDE SCHLUTER TRIM AT NEW CARPET AND NEW TILE TRANSITION, BRUSHED ALUMINUM. SEE DETAIL 8/A5.20. K. PREP ALL SURFACES TO FACILITATE PROPER FLUSH TILE INSTALLATION. INSTALL PER TCA METHODS. GJ f INSTALLATION OF IMPERFECT PRODUCT IS NOT ACCEPTABLE. >~ ULD KI LI 20. NEW 12"X24" PORCELAIN TILE FLOORS, PT-1 AND TILE BASE, PT-1 B. L. MODIFY EXISTING PLUMBING ROUGH-IN LOCATIONS AND/OR BLOCKING AS REQUIRED TO MEET ADA 10" 21. NEW FLOOR TILE, PT-1, TO BE CUT AROUND DRAIN TO ENSURE PROPER SLOPE IS MAINTAINED. MOUNTING HEIGHTS AND REQUIREMENTS. • • 22. NEW WALL TILE, PT-2, WHERE INDICATED BY - -. PROVIDE SCHLUTER TRIM AT ALL EXPOSED M. CONTRACTOR TO NOTIFY A/E AND LANDLORD IF ISOLATION SHUT-OFF VALVE IS NOT EXISTING AT PORTLA 0 EGO TILES EDGES, BRUSHED ALUMINUM. SEE ELEVATION 3/A1.20 FOR MEN'S TOILET AND 4/A1.20 FOR TOILET ROOMS. CONTRACTOR TO PROVIDE PRICING TO LANDLORD FOR NEW SHUT OFF VALVE AT HOT q � WOMEN'S TOILET FOR TYPICAL WALL TILE LAYOUT. AND COLD WATER SUPPLY. PROVIDE ACCESS PANEL, LOCATION AND FINISH TBD. OF 23. NEW MOSAIC TILE, GL-1, AT VANITY WHERE INDICATED BY- - - - . N. NEW FIXTURES AND ACCESSORIES TO MATCH 1 LINCOLN REMODELED TOILET ROOMS, INCLUDING 24. PROVIDE NEW SHORENSTEIN STANDARD AIR FRESHENERS. COORDINATE FINAL SPECIFICATION AND FIRST AND FOURTH FLOORS, MACKENZIE 2021 C? ¢ p CrQ ALL RIGHTS RESERVED v LOCATIONS WITH OWNER. LID 21 1 THESE DRAWINGS ARE THE PROPERTY OF 25. START TILE INSTALLATION HERE WITH FULL TILE. MACKENZIE AND ARE NOT To BE USED ❑ Fp 22 OR REPRODUCED IN ANY MANNER, FD DD 22 WITHOUT PRIOR WRITTEN PERMISSION 0 I I REVISION SCHEDULE +I � I Delta Issued As Issue Date N C3 20 Lu N ALTERNATE UPGRADES A IG PROVIDE SEPARATE PRICING FOR THE FOLLOWING: 31_111 3_6„ ia - 4 CE-r _ _ I 1 2 2 ° 1 0 I AA. PROVIDE NEW ADA ACTUATOR BUTTON. CONCEAL NEW MECHANICS ABOVE EXISTING CEILING, IF _n 1:31FEASIBLE. PROVIDE ELECTRICAL STRIKE, PASSAGE LATCHSET F75 FUNCTION, AND DOOR H/C ❑ �/�� OPERATOR TO EXISTING DOOR. ADA ACTUATOR BUTTON ON EACH SIDE OF THE DOOR AND ACCESS CONTROL OF DOOR TO PROVIDE THE FOLLOWING SEQUENCE: PRESSING THE ACTUATOR BUTTON RELEASES THE ELECTRIC STRIKE PRIOR TO ACTUATION OPERATION. L_J u LL 24 U 4 25 F BB. IN LIEU OF EXISTING DOOR HARDWARE TO REMAIN AS-IS, PROVIDE NEW SILVER LATCHING HARDWARE, HINGESETS, CLOSERS, WALL STOPS, DOOR STOPS, AND KICK PLATES. COORDINATE SHEET TITLE: FINAL SPECIFICATIONS AND REQUIREMENTS WITH LANDLORD. DEMOLITION 19 PLAN, PARTIAL LFULLILE TYP FIFTH FLOOR FULL TILE PLAN, FINISH PLAN, DIMENSION PLAN, AND NOTES DRAWN BY: KRR, SJR CHECKED BY: LJC, PDK SHEET: A1m10 3 DIMENSION PLAN 4 FINISH PLAN 1 .1 1/4"=1'-0" 1 .1 1/4"=1'-0" JOB No. 2190952.06 PERMIT SET: 02/20/2021 219095206\DRAWINGSWRCHITECTURAL\2021-0211 PERMIT SET-NEW LAYOUT\06 A1.10.DWG SJR 02/18/21 17:19 1:48.00 cE 4'-60± EQ EQ GENERAL DEMOLITION NOTES I I � A. REMOVE CEILING MOUNTED LIGHTING THROUGHOUT. PATCH, REPAIR AND PREP SUBSTRATES AS REQUIRED TO RECEIVE NEW FINISHES. EXISTING 4 w SEE SHEET A6.10 FOR FINISHES. �. '. LF73 EXISTING B. THE CONTRACTOR SHALL CAREFULLY EXAMINE CONSTRUCTION DOCUMENTS FOR THE WORK. ANY CONFLICTS, INCLUDING BUT NOT . r-1 LIMITED TO BUILT CONDITIONS OF M.E.P. IN THE PLANS SHALL BE CALLED TO THE ATTENTION OF THE ARCHITECT/DESIGNER, SO THAT I a �� THE CLARIFICATION CAN BE ISSUED. Architecture Interiors C. SALVAGE ALL DEMOLISHED COMPONENTS AS POSSIBLE. COORDINATE AND RETURN TO LANDLORD FOR FUTURE USE. 5 Planning • Engineering u . I. .. D. SAVE AND RECYCLE DEMOLITION DEBRIS WHERE POSSIBLE. COORDINATE WITH CITY OF TIGARD REQUIREMENTS FOR RECYCLING DEMOLITION DEBRIS. E. EXISTING STRUCTURE TO BE LEFT UNDISTURBED AND INTACT PERFORM NO DEMOLITION THAT MAY COMPROMISE THE STRUCTURAL +. +'..• Lu + +' _ INTEGRITY OF THE BUILDING WITHOUT WRITTEN APPROVAL OF THE ARCHITECT/DESIGNER. ® Portland, OR 503.224.9560 GENERAL 81_611 81-611 Vancouver, WA A. ALL EXISTING CONDITIONS TO REMAIN, UNLESS NOTED OTHERWISE. 360.695 7879 3 B. GYPSUM BOARD CEILING 8'-611± (EXISTING) AFF. Seattle, WA EXISTING 'F-2 W 2. ® EXISTING 206.749.9993 C. HTING LAYOUT IS SHOWN FOR PRELIMINARY DESIGN NTENT ONLY FINAL LIGHTING LAYOUT TO BE PROVIDED BY THE ELECTRICAL LIG I CONTRACTOR AND IS DEPENDANT ON OREGON ENERGY CODE ALLOWANCES AND EXISTING BUILDING INFRASTRUCTURE IN CEILING. www.mcknze.com l`J + + ELECTRICAL CONTRACTOR TO REVIEW ALL REQUIRED LIGHTING LEVELS AND DISTRIBUTION AND NOTIFY ARCHITECT OF ANY CONCERNS OF FOOTCANDLES OR FIXTURE PLACEMENT/LOCATION WITHIN ANY AREA OF THE SPACE. FINAL LAYOUT TO BE REVIEWED AND APPROVED MACKENZIE. W BY SEPARATE PERMIT. DESIGN DRIVEN i CLIENT FOCUSED ' . . ED D. HVAC CONTRACTOR TO PROVIDE FULL SHEET OF THE FLOOR AFFECTED UPON COMPLETION. CONTRACTOR IS RESPONSIBLE TO Client 0 0 0 0 PROGRAM THE OVERRIDE HVAC BUTTON. E. CONTRACTOR TO REVIEW EXISTING CONDITION OF ALL CEILING DEVICES WITH OWNER AND PROVIDE NEW AS REQUIRED. O O KEYNOTES SHORE STEIN 1. PROVIDE NEW GYPSUM BOARD CEILING, WHERE INDICATED. ASSUME TO MATCH EXISTING HEIGHT OF 8'-6"± AFF. PREP CEILING TO RECEIVE NEW PAINT. CONFIRM FINAL SPECIFICATIONS WITH LANDLORD. PROVIDE LIGHT FIXTURES, LF-2, LF-3, AND LF-4, AS INDICATED. ❑ o ❑ 0 2. RELOCATE EXISTING CEILING COMPONENTS AS REQUIRED AND WHERE AFFECTED BY NEW LIGHTING LAYOUT. 3. REMOVE EXISTING HEADER. PATCH AND REPAIR GYPSUM CEILING TO BE FLUSH WITH EXISTING CEILING HEIGHT. 4. CENTER NEW LIGHT FIXTURE BETWEEN EXISTING HVAC FIXTURES. Project 5. ADJUST LIGHT FIXTURE PLACEMENT TO CLEAR EXISTING HVAC FIXTURES. 5TH FLOOR TOILET ROOMS ELEVATION GENERAL NOTES LANDLORD IMPROVEMENT A. SEE 9/A5.20 FOR ADDITIONAL INFORMATION ON FIXTURE MOUNTING HEIGHTS, ALL REQUIRED ADA CLEARANCES ARE TO FACE OF FINISH. 3 LINCOLN B. ALL DIMENSIONS THIS SHEET ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED. 10220 GREENBURG RD. DEMO RCP 2 REFLECTED CEILING PLAN TIGARD, OREGON C. ALL NEW TOILETS/URINALS TO BE LOCATED AT EXISTING PLUMBING LOCATIONS, UNLESS OTHERWISE NOTED. MODIFY BLOCKING AND / / 1 .2 1/4"=1'-0" ROUGH-IN LOCATIONS, AS REQUIRED, TO MEET ADA MOUNTING HEIGHT REQUIREMENTS. D. INSULATE ALL UNDER COUNTER HOT WATER AND WASTE LINES. 45? �C� E. COORDINATION OF BLOCKING REQUIREMENTS FOR WALL-MOUNTED SPECIALTIES BY CONTRACTOR. f F. CONFIRM REQUIREMENTS AND SIZES FOR ALL EQUIPMENT/APPLIANCES PRIOR TO CONSTRUCTION OF CABINETRY/COUNTERS. UL KI LI G. FINISH ENDS OF COUNTERS, DOORS, FACES, TYPICAL. H. ALL EXPOSED EDGES AT DOORS AND SHELVING TO BE PLASTIC LAMINATE TO MATCH ADJACENT VERTICAL SURFACES. PORTLA , 0 EGO I. SCRIBE TO FIT CASEWORK AT ALL WALLS. J. SHIM AS REQUIRED. OF K. VERIFY TILE LAYOUT FOR APPROVAL PRIOR TO INSTALLATION. MACKENZIE 2021 L. SINK TO BE CENTERED WITH CENTER OF CABINET OPENING. © ALL RIGHTS RESERVED THESE DRAWINGS ARE THE PROPERTY OF M. MIRRORS TO BE CENTERED OVER SINKS. MACKENZIE AND ARE NOT TO BE USED OR REPRODUCED IN ANY MANNER, N. PROVIDE 60" ± AFF POWER, CENTERED ABOVE EACH SINK TO POWER MIRRORS. COORDINATE FINAL POWER REQUIREMENTS WITH WITHOUT PRIOR WRITTEN PERMISSION MANUFACTURER. O. ASSUME BLACK MELAMINE AT INTERIOR OF CABINETS. REVISION SCHEDULE P. INSTALL WALL TILE, PT-1, TO EXTEND (2) FULL TILE HEIGHTS PAST THE TOP OF THE VERTICAL GRAB BAR. Delta Issued As Issue Date 1 1 BRUSHED ALUMINUM PORCELAIN TILE, i 1 5.2 SCHLUTER STRIP AT PT-2 5.2 GLASS TILE, GL-1 EXPOSED TILE EDGES 7"+ BACKLIT MIRRORS, LF-1 BRUSHED ALUMINUM SCHLUTER STRIP AT 6"x6" FINISHED EDGE I _ EXPOSED TILE EDGES CUT-OUT SL-1 SL-1 PORCELAIN TILE, PT-2 NEW AUTOMATIC SOAP GLASS TILE, GL-1 7 F— F_ DISPENSERS SHEET TITLE: BACKLIT MIRRORS, LF-1 I I I I I I I DEMO RCP, CENTER SINK W/CABINET &x6" FINISHED EDGE CUT-OUT REFLECTED CEILING I j OPENING, TYP. PLAN AND NOTES NEW AUTOMATIC SOAP DISPENSERS, TYP I I I c I I E CENTER SINK W/CABINET OPENING, TYP. 1'-5"± SOLID SURFACE COUNTERTOP, T SS-1 AND 2" BACKSPLASH/ SIDE SPLASH 'H±Effi LJ — o b PLASTIC LAMINATE, PL-1 co CID SOLID SURFACE COUNTERTOP, SS-1 in to AND 2" BACKSPLASH/ SIDE SPLASH _ LOCKING LOWER CABINETRY ON DRAWN BY: KRR, SJR / / \ NON-ADA APPROACH SIDE ONLY LOCKING LOWER CABINETRY ON NON-ADA < > > b (SEE FLOOR PLAN) CHECKED BY: LJC, PDK APPROACH SIDE ONLY (SEE FLOOR PLAN) N / \.\ / \.\ C\1SHEET: —T 27 t I 1 1 Irrr= I 1\11 1 .111/ PLASTIC LAMINATE, PL-1 is IF -1 2'-8" CUT TILE, PT-1 CUT TILE, PT-1 3'-0" 3'-0" OPEN TO BELOW, PER CODE. ■ O OPEN TO BELOW, PER CODE. FLOORING FLOORING TO EXTEND UNDER Z Al TO EXTEND UNDER CABINET. 6'-3:: CABINET Lu 5:-7" VERIFY 0 - JOB No 3 MEN'S WALL ELEVATION 4 WOMEN'S WALL ELEVATION uJ 2190952.06 W 1 .2 @MEN'S 502 1/2 —1 -0 J 1 .2 @ WOMEN'S 501 1/2-=v-o- _J SET. 02/20/2021 W '219095206'C:\TEMP\ACPUBLISH-26380\06-Al.20.DWG SJR 02/18/21 17:20 1:48.00 350S125-33 METAL STUD BRACING AT 4'-0" O.C. � \ / ATTACH STUD TRACK SOUND ATTENUATION BATT INSULATION, \ / TO BRACE ABOVE. NOTE: CELING `OST MAX SPANS7>1 ADD TRACK ABOVE TYPICAL \ \ \ / / / ■ 600S137-33 METAL STUD CEILING JOIST SUSPENDED \ / GYP TO ALIGN WITH ® 16" oc MAX SPAN 17'-6" W/ SUSPENDED GYPSUM GYPSUM CEILING \ // \ / LOWER WALL TRACK 200050-54 U—CHANNEL AT MIDSPAN CEILING BELOW GYP Architecture • Interiors 362S125-18 METAL STUD CEILING JOIST I 45' O 16" oc MAX SPAN 7'-9" _ Planning IS Engineering EXISTING WALL PER PLAN 362S137-33 METAL STUD CEILING JOIST METAL STUD BRACING AND TRACK TO ® 16" oc MAX SPAN 10'-8" FLOOR STRUCTURE ABOVE AT 8'-0" OC METAL STUD CEILING JOIST ( K WATER RESISTANT GYP. FINISHED JOINT W/ (2) #8 SHEET METAL SCREWS AT SEE MAX SPAN NOTE ABOVE x TILE BACKER WHERE EACH END. STUD SIZING PER SPAN TABLE. Portland,OR REQUIRED BRACING TO BE PROVIDED WHERE 503.224.9560 xDISTANCE BETWEEN PERPENDICULAR SOUND ATTENUATION Vancouver,WA U—CHANNEL FINISH PER PLANS INTERSECTING WALLS OR HORIZONTAL AT ALL NEW WALLS, TYP. 360.695.7879 AS REQ'D BRACING BETWEEN WALLS EXCEEDS 8'-0" OC, OR PROVIDE CLNG. SUPPORT FOR TOP Seattle, WA BOTTOM TRACK, ATTACH OF WALL EQUAL TO NOTE ABOVE 206.749.9993 TO SLAB W/ POWDER DRIVEN ANCHORS ® GYP BD EA SIDE METAL STUDS SEE WALL HEIGHT wwW.mcknze.com ACOUSTOICALPSEA\LANT DE TABLE FOR GAUGE AND SPACING MACKENZIE. x #10 SMS AS SHOWN, CONT ACOUSTIC SEALANT EA SEE SPECS BELOW TRACK SIDE AGAINST TRACK NO DESIGN DRIVEN I CLIENT FOCUSED BASE PER SCHEDULE SEALANT AT SIM COND Client 5/8" GYP BD SEE 1/2" MAX REFLECTED CEILING PER ANS FLOORING, SEE FINISH BOTTOM TRACK TO FINISH PLANS FOR HEIGHTS PLAN ? CONCRETE SLAB FLOOR W/ POWDER DRIVEN T AFFo :DANCHORS AT 4'-0" OC 3 2 CEILING JOIST FRAMING 3 PLUMBING WALL a 4 NON—BEARING WALL z s H o R E S T E I N 5.2 METAL STUDS WITH MIDSPAN SUPPORT AND BLOCKING NTS U 5.2 © WOMENS 501 3"=1'-0" 3 AT FLOOR AND GYPSUM CEILING 3"=1'-0" 3 5.2 s 3 LINCOLN STUD SIZE: 2}�" Project LIMITING WALL HEIGHT TABLE 5TH FLOOR NTE3OR NON STRUCTURAL WALLS L/240 ® 5psf TOILET ROOMS DESIGNATION SPACING MAX WALL HEK FIT LANDLORD 250S125-18 24" 8'-4" IMPROVEMENT 250S125-18 16" 9'-7" EXISTING CORRIDOR CARPET 3 LINCOLN 16 11'-3"'"' 10220 GREENBURG RD. 250S125-18 16 250S125-27 llSCHLUTER SCHIENE TIGARD, OREGON " '-3 3/B" PROFILE 362S125-18 24" 13'-5" GROUT c ;V 362S125-18 16" 14'-4" TILE AS SPECIFIED 1�1� C�1 362SI62-33 16" 16'-5" UL KI LI 'If 362S162-43 16" 18'-0" THIN SET MORTAR BED 6005162-33 16" 24'-6" IM11111h 11W111 t Y// PORTU! 0 EGO MERIOR NON STRUCTUFWL WALLS EXISTING FLOOR SLAB �O� WITH C ERAMC TLE FACM L/360 ® 5psf °° ° a ° ° 9 a °^° e n OF DEWINATM SPACM MAX WALL 1"EK iT 4 362S125-18 16" 12'-4" MACKENZIE 2021 362S125-33 16" 14'-3" j1 0 ALL RIGHTS RESERVED Jm THESE DRAWINGS ARE THE PROPERTY OF F MACKENZIE AND ARE NOT TO BE USED OR REPRODUCED IN ANY MANNER, WALL TABLES ARE BASED ON WALLS SHEATHED BOTH SIDES FULL HEIGHT WITH = WITHOUT PRIOR WRITTEN PERMISSION 1/2" GYPSUM BOARD ATTACHED WITH #6 SCREWS MIN. AT 12"-0" O.C. MAX. J J WALL HEIGHT TABLE 3 s CARPET TRANSITION TO TILE U REVISION SCHEDULE Delta Issued As Issue Date 39"-41" NEW BACKLIT MIRROR 0 2'-1" LL TILE: REFER TO 3 —0 IY2„ �� a > ELEVATIONS 3,4/A1.20 Li 2"SOLID SURFACE BACKSPLASH j z x NEW UNDERMOUNT SINK M < M LL O P R PLA SOLID SURFACE WITH 1'-6" I a 1 a EASED EDGE OVER M / Nw 10, MARINE GRADE PLYWOOD SHEET TITLE: N NO HARDWARE, PROVIDE INTERIOR A TYPICAL AMBULATORY STALL B GRAB BAR SECTION C LAVATORY D MIRROR itt MAGNETIC TOUCH RELEASE GRAB BARS NTS LF-1 a ON ADA SIDE ONLY(SEE DETAILS FLOOR PLAN) 6" 6" 6" 2" 8" Z 2x4 AT EACH FLAT BAR N SUPPORT 1 I I I F.B. 1/4'x 2"WITH (3) 1/4"0 x p SWITCHES & r usHQ 1-1/2"LAG SCREWS TO 2x4 ENVIRONMENTAL x x CONTROL Nco 1 -8" V AT COUNTER AND (4) 1/2"0 CONTROLS e CO in o MB THRU STUDS LOCATE FB IM a N SUPPORTS AT 3'-0"OC MAX DRAWN BY: KRR, SJR v M 11 HOT WATER SUPPLY WRAP ALL WASTE AND CHECKED BY: LJC, PDK E SWITCHES AND OUTLETSF ACCESSORY G ACCESSORY H ACCESSIBLE URINAL + LINES SHEET: ACCESSIBLE RECESSED ACCESSIBLE PROVIDE 2x BLOCKING AT PAPER TOWEL COMBINATION TOILET METAL STUDS DISPENSER/WASTE SEAT COVER DISPENSER/ OPEN TO BELOW AT ADA RECEPTACLE SANITARY NAPKIN NOTE: N A5 . 2 DISPOSAL/TOILET TISSUE ALL STAINLESS STEEL, BOBRICK OR SIM SIDE. w DISPENSER (SIM AT MEN'S) ACCESSORIES TO BE SATIN FINISH LINO Cn U w JOB NO. s TOILET ACCESSORIES AND FIXTURES p LAVATORY SECTION 2190952.06 Ld 5.2 MOUNTING HEIGHTS AND DIMENSIONS 1/4"=1'—O" 0 5.2 11/2"=1'-0" PERMIT SET: 02/20/2021 H •219095206`C:\TEMPWCPUBLISH 26360\O6 A5.20.DWG SJR 02/18/21 17:20 1:96.00 SCHEDULE OF INTERIOR FINISHES SCHEDULE OF LIGHT FIXTURES PT-1: FLOOR TILE: PENTAL, MORE, PERLA MATTE 12"X24"AT FLOORS.3 OFFSET. GROUT LF-1: SEURA, LED BACKLIT MIRROR WITH DIMMER, FORTE DESIGN, CUSTOM 24"X48" SIZE FINISH LEGEND JOINT TO BE 16" WIDE AS RECOMMENDED BY MANUFACTURER. FOR COMPLETE INSTALLATION RECOMMENDATIONS CONTACT: ■ PT-1 B: ASSUME CUT PT-1 @ 6"X24" FOR BASE TILE. LESLIE FLOHR LESLIE FLOHR CONSULTING ROOM FLOOR MAIL BASE MAIL N. WALL E.WALL MAILS.WALL MAIL W.WALL MAIL CEILING MAT'L NO. ROOM NAME FINISH FINISH MAIL FINISH FINISH FINISH FINISH FINISH CEILING HEIGHT COMMENTS PT-2: WALL TILE: PENTAL, BOSTON, GESSO 3"X12"AT WALLS.3 OFFSET. GROUT JOINT 206-852-9360 Architecture ® Interiors TO BE 1 LESLIE@LESLIEFLOHRCONSULTING.COM ,s'WIDE. Planning ■ Engineering 501 WOMEN'S PT-1 PT-1 B GB/P/PT-2 GB/P/PT-1/GL-1 GB/P P/PT-2 GB EXIST/8'-611± 1,3 GL-1: GLASS MOSAIC ACCENT TILE: DALTILE, COLORWAVE, CW17 SMOKED PEARL 1"X1" LF-2: FLUXWERX, NOTCH, LINEAR RECESSED LED LIGHT FIXTURE, 4'WIDE, TRIMLESS 502 MEN'S PT-1 PT-1B GB/P/PT-2 P/PT-2 GB/P P/PT-2/GL-1 GB EXIST/8'-6"± 1,3 GLASS MOSAIC AT VANITY WALLS. GROUT JOINT TO BE 16"WIDE. LF-3: FLUXWERX, NOTCH, LINEAR RECESSED LED LIGHT FIXTURE, 8'WIDE, TRIMLESS GT-1: GROUT: CUSTOM BUILDING PRODUCTS, 09 NATURAL GREY, EPDXY, NON-SANDED. FOR COMPLETE INSTALLATION RECOMMENDATIONS CONTACT: 6" GROUT JOINT, SEAL PER MANUFACTURER'S INSTRUCTIONS. ROBBIE KENAGY Portland, OR HARRY L. STEARNS 503.224.9560 P-1: BENJAMIN MOORE, OC-62 BABY'S BREATH, FINISH TO HAVE A MASTER PAINTER 503-262-2640 FINISH SCHEDULE NOTES: ABBREVIATIONS: INDEX OF 3 WITH A GOOD SCRUB RATING AND SHEEN AT 15%-25%AT 60 RKENAGY@HLSTEARNS.COM Vancouver, WA A. PATCH AND REPAIR ALL EXISTING WALLS WHERE AFFECTED BY NEW WORK. PAINT NEW AND EXISTING EXIST EXISTING DEGREES, 360.695.7879 WALLS. GB GYPSUM BOARD NOTE: CONFIRM ALL FIXTURES HAVE MATCHING COLOR TEMPERATURES Seattle, WA B. PROVIDE NEW FLOOR FINISH AND BASE THROUGHOUT. P PAINT P-2 SHERWIN WILLIAMS, SW7622 HOMBURG GRAY. FINISH TO HAVE A MASTER 206.749.9993 PT PORCELAIN TILE PAINTER INDEX OF 3 WITH A GOOD SCRUB RATING AND SHEEN AT 15%-25%AT 60 FINISH SCHEDULE COMMENTS: GL GLASS TILE DEGREES. www.mcknze.com 1. ASSUME P-1 UNLESS NOTED OTHERWISE ON FINISH PLAN, P-3: MATCH EXISTING CORRIDOR PAINT. CONFIRM FINAL SPECIFICATIONS WITH MACKENZIE. 2. MATCH EXISTING CORRIDOR FINISHES. LANDLORD, 3. NEW GYPSUM BOARD CEILING TO MATCH EXISTING HEIGHT. ENSURE FLUSH TRANSITION. GEEIOM DRIVEN I CLIENT FOCUSED SS-1: WILSONART QUARTZ, HAIDA Q4008 Client PL-1: WILSONART, FAWN CYPRESS 8208K-16, CASUAL RUSTIC FINISH, AEON MDF-1: MATCH EXISTING CORRIDOR PAINTED MDF BASE. S H O R E S T E I N MEANS AND METHODS SCHEDULE OF TOILET FIXTURES Project 5TH FLOOR 09900 PAINT SLA: TOILET PARTITIONS: HADRIAN, #4 BRUSHED STAINLESS STEEL TOILET ROOMS 1. THE OUTLINED PAINT SPECIFICATIONS MAY BE MATCHED BY OTHER MANUFACTURERS. ACCEPTABLE MANUFACTURERS: BENJAMIN MOORE, SHERWIN WILLIAMS, MILLER, OR SI-1: KOHLER, CAXTON RECTANGLE, K-2000, UNDER-MOUNT BATHROOM SINK, LANDLORD APPROVED SUBSTITUTION. SUBMIT RECOMMENDED SHEEN WITH DRAW DOWNS FOR 0 WHITE IMPROVEMENT A/E REVIEW AND APPROVAL. SD-1: AUTOMATIC SOAP DISPENSER: MATCH BUILDING STANDARD. CONFIRM FINAL 3 LINCOLN 2. PROVIDE ONE COAT PRIMER AND TWO COATS PAINT ON ALL GYPSUM BOARD SPECIFICATIONS WITH LANDLORD. SURFACES. 10220 GREENBURG RD. 3. CONTRACTOR SHALL PROVIDE ONE FULL GALLON OF EACH WALL COLOR PAINT WITH AC-1: GEORGIA PACIFIC, 59466A, RECESSED EN-MOTION PAPER TOWEL DISPENSER, TIGARD, OREGON LABELS TO OWNER UPON COMPLETION OF THE PROJECT. LABEL ALL LEFTOVER PAINT STAINLESS STEEL AND STORE AS DIRECTED BY OWNER. D AC-2: K, B-3644, RECESSED WASTE RECEPTACLE, MODIFY UNIT TO BE AS FLUSH WITH T ����` �C�r 4. DISPOSE OF ALL PAINT MATERIALS OFF SITE. DO NOT POUR DOWN DRAINS, CATCH WITH THE WALL AS POSSIBLE BASINS, OR IN LANDSCAPE AREAS. 5. SUBMIT PAINT DRAW DOWNS TO A/E FOR EACH PAINT COLOR FOR REVIEW AND FOR REFERENCE ONLY: ~ ULD KI LI APPROVAL. 6. APPLY PAINT PER MANUFACTURER'S RECOMMENDATIONS. TOILET: KOHLER, KINGSTON, K-4325, WHITE 7. NO VOC PAINT SYSTEMS TO BE UTILIZED, TO INCLUDE PRIMERS AS WELL AS FINISH URINAL: KOHLER, BARDON, K-4991-ET, WHITE PORTLA 0 EGO PRODUCTS. S. EGGSHELL WASHABLE FINISH AT CEILING AND SOFFITS, SATIN WASHABLE FINISH AT FLOOR DRAIN: NICKEL BRONZE STRAINER WALLS. SEMI-GLOSS FINISH AT ALL TOILET ROOM WALLS AND CEILINGS. FINISH TO OF HAVE A MASTER PAINTER INDEX OF 3 WITH A GOOD SCRUB RATING AND SHEEN AT 15%-25%AT 60 DEGREES. MACKENZIE 2021 09300 TILE © ALL RIGHTS RESERVED 1. INSTALL TILE ACCORDING TO MANUFACTURER'S RECOMMENDED INSTRUCTIONS. THESE DRAWINGS ARE THE PROPERTY OF MACKENZIE AND ARE NOT TO BE USED 2. INSTALL TILE IN ACCORDANCE WITH CURRENT TCA HANDBOOK GUILDLINES AND OR REPRODUCED IN ANY MANNER, DETAILS. METHOD F122 FOR FLOORS IN ALL LOCATIONS. WITHOUT PRIOR WRITTEN PERMISSION 3. CONTRACTOR TO CONFIRM GROUT SPECIFICATION IS APPROPRIATE FOR EACH AREA OF WORK. REFER TO SCHEDULE OF INTERIOR FINISHES. REVISION SCHEDULE 4. GROUT JOINT REQUESTED IS 1/16". CONFIRM MANUFACTURER RECOMMENDED GROUT Delta Issued As Issue Date JOINT SIZE, NOTIFY PROPERTY MANAGER AND ARCHITECT OF ANY DISCREPANCIES PRIOR TO WORK. 5. APPLY TILE AND GROUT SEALER AS RECOMMENDED BY MANUFACTURER. 6. CONTRACTOR TO COORDINATE PRE-INSTALLATION MEETING ON SITE WITH ARCHITECT AND TILE INSTALLER FOR FINAL LAYOUT REVIEW PRIOR TO INSTALLATION, 7. PROVIDE SCHLUTER TRANSITION STRIP WHERE TILE TRANSITIONS TO CARPET. INSTALL TRANSITION STRIP ACCORDING TO MANUFACTURER'S RECOMMENDED INSTRUCTIONS. 8. CONTRACTOR TO PROVIDE MOCK-UP FOR REVIEW AND APPROVAL OF CARPET TILE, PORCELAIN TILE AND SCHLUTER TRANSITION PRIOR TO INSTALLATION. SHEET TITLE: SCHEDULES DRAWN BY: KRR, SJR CHECKED BY: LJC, PDK SHEET: A6 . 10 JOB NO. 2190952.06 PERMIT SET: 02/20/2021 '219095206'C:\TEMP\ACPUBLISH-2638O\O6-A6.10.DWG SJR 02/18/21 17:20 1:96.00