Loading...
Plans BUP2018 -00108 P'y CEIVED bassetti architects APR 12 2018 CITY OF-FIG ARD 721 NW 9TH Ave, Suite 350 BUILDING DIVISION Portland, Oregon 97209 T (206) 340 9500 F (206) 340 9519 CIVIL ENGINEER & LANDSCAPE Cardno 6720 SW Macadam Ave Suite 200, Portland, OR 97219 T(503)-419-2500 STRUCTURAL ENGINEER Catena Engineers 1500 NE Irving St., Suite 412 Portland, OR 97232 T(503)-467-4980 MECHANICAL ELECTRICAL & PLUMBING ENGINEER Glumac 900 SW Fifth Ave., Suite 1600 Portland, OR 97204 TENANT IMPROVEMENTS FOR MDF ROOM RELOCATION T(503)-227-5280 FOOD SERVICE CONSULTANT Webb Foodservice Design 3700 SE Lafayette Ct. Portland, OR 97202 T(503)-236-8566 ACOUSTIC & AV CONSULTANT The Greenbusch Group 1900 W. Nickerson St., Suite 201 Seattle,WA 98119 T 206-378-0569 COST CONSULTANT Construction Focus 740 Almaden St. Eugene, OR 97402 T 541-686-2031 L.J. Oz LL 0 U, z Q W U 20 LLI J W 0W w 2i 0- 0 � 0 Z LL Qo z w --� # REVISIONS DATE u --- i� - - ILL TIGARD TUALATIN SCHOOL DISTRICT i :EJLLL� a TIGARD HIGH Li SCHOOL zMODERNIZATION Q U 9000 SW DURHAM RD. O TIGARD, OR. 97224 —� JOB NO: 16992.00 OFFICE COPY WWN ISSUE DATE: APRIL 12, 2018 CITY OF TIGARD CC REVIEWED FOR CODE COMPUANCE G Approve& / 0 � j OTC: E v i _ O C� LO UNE 5fcCONACHi ease _ 91 Addresst Lia c-� LL SEA E,wA Suite#: fly: ampooft wow 0 /2718 COVER SHEET V J co lf') co 75O N CITY OF TIGARD MDF-GO - 00 O approved b Planning Date: — 4717- 1100 initials: ABBREVIATIONS VICINITY MAP bassetti architects LIST OF ARCHITECTURAL ABBREVIATIONS ACC AMBULATORY ACCESSIBLE TOILET COMPARTMENT MAX MAXIMUM SW SETT�ST ACP ACOUSTICAL CEILING PANEL MDF MEDIUM DENSITY FIBERBOARD 721 NW 9TH Ave, Suite 350 ACT ACOUSTICAL CEILING TILE MDO MEDIUM DENSITY OVERLAY AFF ABOVE FINISH FLOOR MFR MANUFACTURER o Portland, Oregon 97209 ALUM ALUMINUM MIR MIRROR m J T (206) 340 9500 F (206) 340 9519 APPROX APPROXIMATE MISC MISCELLANEOUS w 1 m AVE AVENUE MMA METHYL METHACRYLATE AVG AVERAGE MO MASONRY OPENING Q p S� AWP ACOUSTICAL STRETCHED FABRIC WALL PANEL MET METAL -00 0 o�� > BCT BABY CHANGING TABLE SURFACE MOUNTED NA NOT APPLICABLECIVIL ENGINEER & LANDSCAPE BLDG BUILDING NIC NOT IN CONTRACT 9L = U) F PROJECT SITE Cardno BOT BOTTOM NR NON RATE °D 6720 SW Macadam Ave Suite 200,C AMERICAN STANDARD CHANNEL NTS NOT TO SCALE 3: Portland, OR 97219 CPT CARPET OC ON CENTER xK T (503)-419-2500 CG CORNER GUARD OD OUTSIDE DIAMETER CJ CONTROL JOINT OPNG OPENING SW DURHAM RD �-��� STRUCTURAL ENGINEER CL CENTER LINE OPP OPPOSITE �`�� CMU CONCRETE MASONRY UNIT OZ OUNCE Catena Engineers COL COLUMN P PAINT w ♦ r � ��� 1500 NE Irving St., Suite 412 CONC CONCRETE PERP PERPENDICULAR CT CERAMIC TILE PL PLATE a a �O Portland, OR 97232 DEPT DEPARTMENT PLAM PLASTIC LAMINATE oT(503)-467-4980 00 DF DRINKING FOUNTAIN PLYWD PLYWOOD JQe� DIA DIAMETER PNL PANEL I c,� MECHANICAL ELECTRICAL & DIM DIMENSION PTD PAPER TOWEL DISPENSER W/WAST RECEPTACLE co PLUMBING ENGINEER DIM PT DIMENSION POINT PSF POUNDS PER SQUARE FOOT �����J Glumac DN DOWN PSI POUNDS PER SQUARE INCH DR DOOR RAF RESILIENT ATHLETIC FLOORING SW WAVERLY DR Por SW Fifth Ave., Suite 1600 Portland, OR 97204 DW DISHWASHER RCP REFLECTED CEILING PLAN DWG DRAWING REBAR REINFORCING BAR 0 5 -227-5280 EA EACH RM ROOM FOOD SERVICE CONSULTANT EL ELEVATION RO ROUGH OPENING UJ ELEC ELEC ROW RIGHT OF WAY Webb Foodservice Design co 3700 SE Lafayette ELEV ELEVATOR SCHED SCHEDULE t. EM ENTRANCE MAT SD SOAP DISPENSER z Portland, OR 97202 EQUIP EQUIPMENT SF SQUARE FEET p 1p T(503)-236-8566 EXIST EXISTING SSHEATHING Al ACOUSTIC & AV CONSULTANT EXT EXTERIOR SIMIM w SIMILAR G� The Greenbusch Grou FA FIRE ALARM SN SANITARY NAPKIN a c��� FD FLOOR DRAIN SPEC SPECIFICATIONS 10 P FE FIRE EXTINGUISHER SST STAINLESS STEEL cn 1900 W. Nickerson St., Suite 201 FEC FIRE EXTINGUISHER CABINET STC SOUND TRANSMISSION CLASS Seattle,WA 98119 FIO FURNISHED AND INSTALLED BY OWNER STD STANDARD T 206-378-0569 FOF FACE OF FINISH SUSP SUSPENDED FOIC FURNISHED BY OWNER INSTALLED BY CONTRACTOR T&G TONGUE AND GROOVE COST CONSULTANT FOM FACE OF MASONRY TLT TOILET FOS FACE OF STUDS TOC TOP OF CURB/TOP OF CONCRETE Construction Focus FRWC FIBER REINFORCED WALL COVERING TPD TOILET PAPER DISPENSER 740 Almaden St. FSP FIXED SOUND ABSORPTIVE PANELS TSCD TOILET SEAT COVER DISPENSER Eugene, OR 97402 FTG FOOTING TWS TACKABLE WALL SURFACE T 541-686-2031 GA GAUGE TYP TYPICAL GC GENERAL CONTRACTOR UL UNDERWRITERS LABORATORIES GWB GYPSUM WALL BOARD UNO UNLESS NOTED OTHERWISE GYP GYPSUM UR URINAL TENANT IMPROVEMENTS FOR HDWD HARDWOOD VERT VERTICAL HM HOLLOW METAL VOL VOLUME HORIZ HORIZONTAL WAC WHEEL CHAIR ACCESSIBLE TOILET COMPARTMENT ID INSIDE DIAMETER W/O WITHOUT IN INCHES WAF WOOD ATHLETIC FLOORING INT INTERIOR WC-MB WALL COVERING MARKERBOARD JT JOINT WD WOOD L LENGTH/ANGLE(AS STRUCTURAL SHAPE) WDW WINDOW MDF ROOM RELOCATION LB POUND WT WEIGHT LF LINEAR FOOT LINO LINOLEUM LSD LIQUID SOAP DISPENSER LWD LINEAL WOOD CEILING GRAPHIC SYMBOLS PROJECT DATA GENERAL NOTES SHEET INDEX PROJECT ADDRESS: TIGARD HIGH SCHOOL MDF-G0.00 COVER SHEET 9000 SW DURHAM RD. 1. VERIFY AND COORDINATE SITE CONDITIONS, EXISTING BUILDING CONDITIONS, AND DIMENSIONS. BUILDING ELEVATION ROOM NAME TIGARD, OR. 97224 BRING INCONSISTENCIES TO ATTENTION OF ARCHITECT BEFORE PROCEEDING WITH WORK. MDF-G0.01 PROJECT INFORMATION&SHEET INDEX Elevation ID ROOM NAME OWNER TIGARD-TUALATIN SCHOOL DISTRICT 2. IMMEDIATELY BRING INCONSISTENCIES, ERRORS AND OMISSIONS FOUND IN THE DRAWINGS AND 1 1219 6960 S.W. SANDBURG ST SPECIFICATIONS TO ATTENTION OF ARCHITECT. MDF-A0.01 MDF PLANS A101 Room Number TIGARD, OR 97223 Sheet Number CONTACT: CATHY KRAUS(503)913 3777 3. DO NOT SCALE DRAWINGS. COORDINATE DIMENSIONS SHOWN ON DRAWINGS WITH ACTUAL MDF-A0.02 MDF DETAILS AND SCHEDULES FIELD MEASUREMENTS. NOTIFY ARCHITECT OF DISCREPANCIES. ARCHITECT OF RECORD BASSETTI ARCHITECTS 721 NW 9TH AVE.,#350 4.ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE AND NOMINAL FACE OF MASONRY, BUILDING SECTION SCHEDULE INDICATOR PORTLAND, OR 97209 AND CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE. L -Louver CONTACT: CAROLINE LEMAY(503)224 9162 Section ID W_1 SF-Storefront 5. WORK INSTALLED IN CONFLICT WITH CONSTRUCTION DOCUMENTS WILL BE CONSIDERED IN 2 W-Window TAX PARCEL NO: 2S114AA00100 NON-CONFORMANCE AND SHALL BE CORRECTED AT NO EXPENSE TO OWNER OR ARCHITECT. A3.21 FP-Fiberglass Sandwich Panel Sheet Number SITE AREA: 43.2 Acres 6. COORDINATION: COORDINATE WORK TO COMPLY WITH DRAWINGS AND SPECIFICATIONS, INCLUDING MECHANICAL, ELECTRICAL, EQUIPMENT AND OTHER CONSTRUCTION. P2 RESTORATION KEY NOTE LEGAL DESCRIPTION: SECTION 11, TOWNSHIP 2 SOUTH, RANGE 1 WEST,WILLAMETTE MERIDIAN WALL SECTION 7. FOLLOW MANUFACTURER'S INSTRUCTIONS, EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE INDICATED OR REQUIRED BY CONSTRUCTION DOCUMENTS OR APPLICABLE CODES, ORDINANCES AND REGULATIONS. Section ID MATCH LINE 1 _ _ 8. PROVIDE AND INSTALL SOLID BLOCKING OR BACKING FOR ALL WALL AND CEILING MOUNTED A4.11 ITEMS. Sheet Number Location of Adjacent Drawing JURISDICTION: CITY OF TIGARD 9. PROVIDE INTERMEDIATE ROD AND SHELF SUPPORTS FOR SPANS EXCEEDING 36". FIRE DISTRICT: TUALATIN VALLEY FIRE&RESCUE # REVISIONS DATE DETAIL REFERENCE SEWER DISTRICT: TIGARD SEWER 10. INSTALL OUTLETS, SWITCHES AND OTHER RECESSED ITEMS AT FIRE RATED WALLS IN WATER DISTRICT: TIGARD WATER ACCORDANCE WITH I.B.C. Detail ID DOOR NUMBER 3 CODES: CITY OF TIGARD MUNICIPAL CODE 11. INSTALL GYPSUM BOARD, OR OTHER SHEATHING OR BACKER BOARD AS SCHEDULED OR N A9.04 2014 OREGON STRUCTURAL SPECIALTY CODE(OSSC) INDICATED, ON BOTH SIDES OF WALL FRAMING UNINTERRUPTED FROM FLOOR TO UNDERSIDE OF Sheet Number 2014 OREGON PLUMBING SPECIALTY CODE(ORSC) FLOOR OR ROOF DECK, UNLESS NOTED OTHERWISE. N N 1 2014 OREGON MECHANICAL SPECIALTY CODE(OMSC) N 2014 OREGON ENERGY EFFICIENCY SPECIALTY CODE(OEESC) 12.ATTACH PIPING IN SOUND RATED WALLS WITH VIBRATION ISOLATORS. ISOLATE PIPING IN OR 2014 OREGON ELECTRICAL SPECIALTY CODE(OESC) CONTACT WITH CONSTRUCTION. 1 2014 OREGON FIRE CODE(OFC) A101 ICC ANSI A117.1-2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 13. MOUNT ELECTRICAL WIRING DEVICES AND MECHANICAL TEMPERATURE SENSORS AT HEIGHTS S1 El 2010 OREGON SOLAR INSTALLATION SPECIALTY CODE(OSISC) PER SPECIFICATIONS. VERIFY SWITCH, OUTLET AND OTHER DEVICE HEIGHTS TO CLEAR E2 CASEWORK, RADIATORS AND WALL MOUNTED ITEMS, INCLUDING BACK SPLASHES. RECITE NUMBER PROPOSED USE: EDUCATIONAL 9TH-12TH GRADE 14. ISOLATE AND OFFSET OUTLETS ONE STUD SPACE MINIMUM AT SOUND RATED WALLS TO JR241-2 OCCUPANCY: GROUP E J PREVENT SOUND TRANSMISSION. C 2 15. COORDINATE SIZES AND LOCATIONS OF OPENINGS AND ROUGH-INS FOR MECHANICAL, TYPE OF CONSTRUCTION: PROPOSED: TYPE II-B&TYPE V-A ELECTRICAL AND OTHER EQUIPMENT WITH RELATED SUB-CONTRACTORS,AND SHOP DRAWINGS EXISTING TYPE II-B&TYPE V-1 HR BUILDINGS EXISTING-TO-REMAIN APPROVED BY THE ARCHITECT, BEFORE PROCEEDING WITH THE WORK. FULLY SPRINKLERED AND FIRE ALARMS 16. VERIFY SIZES AND LOCATIONS OF MECHANICAL AND ELECTRICAL EQUIPMENT PADS, CURBS, TIGARD TUALATIN SCHOOL DISTRICT INTERIOR ELEVATION CASEWORK INDICATOR BASES, POWER,WATER AND DRAIN INSTALLATION WITH EQUIPMENT MANUFACTURERS BEFORE Elevation ID PROCEEDING WITH THE WORK. PROVIDE AND INSTALL SEISMIC BRACING&FASTENING IN TIGARD HIGH 1A ACCORDANCE WITH CODE REQUIREMENTS. 17. COORDINATE EXACT LOCATION OF CONDUIT, PLUMBING AND PIPING WITH ELECTRICAL AND SCHOOL 1D A101 1B MECHANICAL SUBCONTRACTORS. Sheet Number 18. EXIT DOORS: OPERABLE FROM INSIDE BUILDING WITHOUT USE OF KEY OR SPECIAL z 1C 211H KNOWLEDGE OR EFFORT. O M O D E R N I ZAT I O N 19. EXIT SIGN LETTERS: SIX INCHES HIGH MINUMUM. CONFORM WITH APPLICABLE CODES, 20. FINISHES: IN FINISHED INTERIOR AREAS: NO EXPOSED PIPE, CONDUITS, DUCTS,VENTS, ETC. Q GRID LINES N NORTH ARROW UNLESS NOTED OTHERWISE, CONCEAL UTILITY LINES BEHIND FINISHED CONSTRUCTION UNLESS U 9000 SW DURHAM RD. NOTED AS EXPOSED CONSTRUCTION ON DRAWINGS OR APPROVED BY ARCHITECT. IF AFOREMENTIONED WORK CANNOT BE CONCEALED WITHIN FINISHED CONSTRUCTION OF THE O TIGARD, OR. 97224 /q CONTRACT DOCUMENTS THE CONTRACTOR SHALL PROVIDE& INSTALL FURRED&FINISHED HORIZONTAL&VERTICAL CHASES TO MATCH ADJACENT FINISH TO CONCEAL WORK, COORDINATE -� JOB NO: 16992.00 WITH ARCHITECT. W ISSUE DATE: APRIL 12, 2018 21. OFFSET AND ADJUST FRAMING TO MAKE FINISHED SURFACES FLUSH AND TRUE TO LINE. PARTITION INDICATOR EXIT SIGN C 22. PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR METALS. 0 23. FIRE EXTINGUISHER CABINETS, EXIT SIGNS, FIRE ALARM AND FIRE PROTECTION SYSTEM O COMPONENTS SHALL BE LOCATED IN CONFORMANCE WITH KING COUNTY FIRE DEPARTMENT AND C'? LOR'�iE McCQi•91 331 Partition Type OTHER REGULATORY REQUIREMENTS. n/ eose gl FLOOR BOX 24. PROVIDE AND INSTALL FIRE-RESISTIVE JOINT SYSTEMS, FIRE BLOCKS, DRAFT STOPS,AND t -i-3S]EEA FIRESTOP SYSTEMS IN ACCORDANCE WITH I.B.C. A METAL 0 0 SHELVING 25. FIRE PROTECTION: PROVIDE AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM THROUGHOUT, IN ACCORDANCE WITH APPLICABLE CODES, REGULATIONS,AND ORDINANCES. ,04/1 V/zu 18 26. SPRINKLER SYSTEM TO BE APPROVED BY CITY OF TIGARD FIRE DEPARTMENT AND OTHER REGULATORY AGENCIES PRIOR TO INSTALLATION. OBTAIN ARCHITECT'S APPROVAL OF FIRE PROJECT PROTECTION DRAWINGS PRIOR TO SUBMITTAL FOR FIRE DEPARTMENT REVIEW. 2 27. RUN FIRE PROTECTION MAIN LINES AND INSPECTOR TEST LINES OUT BEYOND BUILDING LINES. INFORMATION a DO NOT DRAIN WATER ACROSS SIDEWALK OR OTHER CONCRETE SURFACES. w N �^ M 28. PROVIDE DESIGN BUILD FIRE PROTECTION DRAWINGS AND ENGINEERING AS REQUIRED BY v, CONSTRUCTION DOCUMENTS AND CITY OF TIGARD FIRE DEPARTMENT. Lb ao 29. COORDINATE INSTALLATION OF FIRE PROTECTION SYSTEM WITH ARCHITECTURAL, C V_ STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER WORK TO ENSURE NO CONFLICT G oAS A RESULT OF FIRE PROTECTION SYSTEM INSTALLATION. MDF-GO . 01 30. CORNER GUARDS ARE SHOWN ON FINISH PLANS, A-10 SERIES. W 31. ELECTRICAL PERMIT AND INSPECTION MUST BE OBTAINED THROUGH OREGON STATE. WALL LEGEND - MDF ROOM b8ssetfi architects _-� EXISTING WALL (THICKNESS VARIES) 721 NW 9TH Ave, Suite 350 PROPOSED WALL (THICKNESS PER WALL TYPE) Portland, Oregon 97209 T (206) 340 9500 F (206) 340 9519 CIVIL ENGINEER & LANDSCAPE Cardno 6720 SW Macadam Ave Suite 200, Portland, OR 97219 T(503)-419-2500 STRUCTURAL ENGINEER Catena Engineers S14) S14) 1500 NE Irving St., Suite 412 Portland, OR 97232 T(503)-467-4980 MECHANICAL ELECTRICAL & PLUMBING ENGINEER Glumac - 900 SW Fifth Ave., Suite 1600 CN Portland, OR 97204 T(503)-227-5280 FOOD SERVICE CONSULTANT Webb Foodservice Design 3700 SE Lafayette Ct. -- Portland, OR 97202 N T(503)-236-8566 1 ACOUSTIC &AV CONSULTANT F-A0. 2 El 16-1 t The Greenbusch Group NO CEILING 1900 W. Nickerson St., Suite 201 Seattle,WA 98119 MDF T 206-378-0569 COST CONSULTANT Pao Construction Focus - - , 740 Almaden St. Eugene, OR 97402 EXISTING MAIN _ T 541-686-2031 ENTRY TO REMAIN C O __ _ ; • -•, •". : : L.L.. EXISTING -- ACCESSIBLE RE116-1 PATH OF - LL z v TRAVEL TO P40 REMAIN O V) T. PREP ° 33 _ 0 23 0 0 : o 0 0 0 - ,• w U OFFI E I NF o KITCHEN ° 0 o PR C11 R OM LOCATION OF O ° 2q ° � 118- F• EXISTING _ _ II A OFFI OFFICE SRO FFICE DES N ANST2102A RECEPTION FOR 3 4 PR CT.R OM ACCESS TO WN D56 I� COOK � Eg 116 CHOIR TELEPHONE 2c MAIN GYM II COMMONS SERI[ NURS 102 U102 OR '... O 1 I� 16c 66 • OF C CT. 0 f1/ L1� (� ° S 114 RO E ST R I$�REP BA DOFF E 7 ST32 108A O � O HEALTH -� •. tTfl ACT I I MUSIC COMM LOCATION OF �/ OFFICE D58 9 FFIC S ORAGE/M ST21 NEW DATA LL. D60 STORE OFFICE K R OFFICE RECEP 10 LIBRARY DEMARK& T MST R. GIRLS TEA 2 21 18 1 14 11- 106 EXISTING-TO- z LL 520 J�L2ST GUITAR ESTING CEN R PAS �� CEPTIONI 100 REMAIN TOR. 19c1 RM E EN EMBLE RO M ELECTRIC MAINS Q C) GIRLS TEAM 1 19 • SPEC.ED.CR FFICE ASS IASON PRINCIPAL - SPEC.ED.CR 120 104 � SUPPLY Z M ST R. 514 E STOR. CONF. 512 AUL B AIL 17 15 13 • 122 N I N 20J�-a a 12 - ° •� ° MDF ROOM PLAN MDF ROOM - REFLECTED CEILING PLAN E- �P 1 E HO CES ° ° ° ° �i 511 = CORR � $P 506 014K �� i_L_ - =S-S=S-S-I-LZZ�=S=S-S=S=L-LZZ�-S-S� 1/4" = 1'-0" l4" - 1'-0" ----- - 508 i ��� — ° CORRIDOR 1 �711 GIRLS PE 0505T ERR OM B ROOM M FF4 VARSITY CHEE U 8.OFF. BUSINESS LA OH6 SKET OR. STOR. ( i� SOCIAL STUDIES 507 503 604A 504 MEN WOME STOR. 404 � 220 MATH ENGLISH I 04 416 414 40 ` 406 ° �I� ° 218 DAT i i• 216 ENGLISH JAN WKRM 214 4A4D OFFICE p �i• -- PROPOSED 40oC ENGLISH ROUTE FOR BOILER BOILER CAD 1 COMP.SCI. BUSINESS OFFIC OUNSE G �• 222 ELECTRIC AND 4A4E 418 LAB CLASSROOM SOCIAL STUDIES a ° DATA CONDUITS 422 408 404 F ti• COMMON TO MDF ROOM �j OOC ENGLISH OFFICE ° �i• ° 212 REFER TO HAZARDOUS NF. i ENGLISH REFER TO HAZARDOUS MATERIALS ABATEMENT OOG i�i� 224 MATERIALS ABATEMENT I OFFIC FFIC FI i -- I SPECIFICATION BY TRC DATED JOURNALISM VIDEO OB 400H - I: ° i- SPECIFICATION BY TRC DATED JANUARY 18 2018 AND 11111111 PRODCTION COMP.GRAPHIC V i CHE LOCATION OF JANUARY 18, 2018 AND HAZARDOUS MATERIALS 424 4Y6 440 BUS LA �� ORKRO M SOCIALS ISH EXISTING MENS HAZARDOUS MATERIALS G �y WMN MEN ENGLISH 200 210 SURVEY REPORT BY TRC ggoA ACCOUN CAREER CENTER ° �i� ° 1 238 I 236 2� ----�26 AND WOMENS SURVEY REPORT BY TRC DATED NOVEMBER 17,2017 446 RESTROOMS DATED NOVEMBER 17, 2017 STUDIO I 7U 446A M 450 ° ° �,• TF" �, &DRINKING / I REVISIONS DATE 4 4 �� �, , - - - CORRIDOf�--�" CORRIDOR WATER -- CORR OH3 OH5 FOUNTAIN m ,� 4A4S o ��_� SJ E V.RO M �' 23B KIT EN I � MATH MATH MATH MATH - TEXT STOR. FICE 206 DILE 436 438 442 444 1324 WORK R 202D _ SEE LOWER FLOOR CN — — — _ 0 -� — _ _, _ ,._ .._ - - � O CN PLANS - ART COMPUTER LAB 232 SHWR LIFE SKILLS _.... FE' 2A 434 ° ° COMPUTER LAB CIRCULATION 2026 0 T 202 -- ENGLISH 242 200A r� • ., -- - - 244 REMOVE FLOOR REMOVE ALL + _ CONE.RM. F'ON FINISHIN THIS AREALIGHTING AND2 LIBRARY CEILING FIXTURES IN 200E F-Ao. 1 2466 ° DEMOLISHED OFFICE WORK RM CEILINGS 246C 246 t . . ,� n ?\ LOCATION OF _ ��\�K x r�wX� - PROPOSED MDF OFFICE J ROOM 246D ; ELEC � M - • . — OFFICE aooz °STAIR � - ' TIGARD TUALATIN SCHOOL DISTRICT .` 246 ' - TIGARD HIGH OFFICE 246EX ,/ ! V I x a r ` x ELEVATOR MECH. �j , � ��� SCHOOL 248B 248A �'` x' STORAGE z MODERNIZATION LOWER LEVEL 248C OWER&UPPER LEVELS _ Q U .• - 9000 SW DURHAM RD. - TIGARD, OR.97224 REMOVE ACT AND GRID O • i I JOB NO: 16992.00 Uj 3 ISSUE DATE: APRIL 12, 2018 PROVIDE TEMPORARY s BRACING FOR CEILING O � ��y - AS NECESSARY LOPUNE NfcCONACH ❑ oD o e o DURING CONSTRUCTION 1 �/ ease 9t LL 0 SEA LIE,WA O O 104718 MDF PLANS �S 14) IS 14) N �' N � N � 00 OVERALL MAIN LEVEL PLAN MDF ROOM - DEMOLITION PLAN MDF ROOM - DEMO REFLECTED CEILING PLAN N 1/32" = 1'4' 1/4" = 1'-0" - `� 1/4" = 1'-0" w MDF-A0 . 01 WALL AND PARTITION TYPE SCHEDULE-GENERAL NOTES: INTERIOR WALLS DOOR SCHEDULE - MDF ROOM RELOCATION T.I. 1. WALL AND PARTITION SCHEDULE FORMAT: OPENING SIZE DOOR FRAME DETAILS WALL TYPE(A) —\ FIRE RATING(1 HR) WOOD STUD _ RATING GLAZ ELEC CARD HOLD SEC.CO KEY ELEC. PANIC COMMENTS (E) ' N0. WIDTH HEIGHT /LABEL = asse P TYPE MATL TYPE MATL HEAD JAMB THRESH TYPE BLINDS LATCH READER OPEN NTACT SWITCH OPER HDWE EXISTING architects A6SUBSCRIPT- E116-1 3'-0" 7'-0" F1 HM A HM SEE BELOW A 092116-GWB CORE DESIGNATION(6") ONE LAYER EACH SIDE 721 NW 9TH Ave, Suite 350 PAINT Portland, Oregon 97209 T MATCH ADJACENT SURFACES T (206) 340 9500 F (206) 340 9519 2. WALL&PARTITION TYPES ARE REFERENCED BY RELITE SCHEDULE - MDF ROOM RELOCATION WALL&PARTITION TYPE SYMBOL. 3, WALLS&PARTITIONS ARE DIMENSIONED ON THE OPENING SIZE RATING/ FRAME DETAILS GLAZING COMMENTS (E) = CIVIL ENGINEER & LANDSCAPE PLANS TO OTHERWISE.WA Ls&PARTITIONSNOT°WN NO. WIDTH HEIGHT LABEL ' TYPE MATL HEAD JAMB THRESH TYPE BLINDS EXISTING Cardno DIMENSIONED ARE LOCATED BY COLUMN 6720 SW Macadam Ave Suite 200, CENTERLINE,WINDOW MULLION OR OTHER SUCH 09 81 16-ACOUSTICAL Portland, OR 97219 OBVIOUS REGULATOR. GENERAL CONTRACTOR BLANKET INSULATION RE116-1 6'4" 4'-0" S-3 T(503)-419-2500 SHALL BE RESPONSIBLE FOR COORDINATING THE 06 10 00-WOOD FRAMING ALL AND PARTITION LAYOUTS. STRUCTURAL ENGINEER 4. DIFFERING WALL&PARTITION TYPES SHALL ALIGN Catena Engineers SO WALL PLANES CONTINUE UNBROKEN WITHIN 1500 NE Irving St., Suite 412 ROOMS AND ADJACENT FACE OF FINISHES ALIGN Portland, OR 97232 UNLESS OTHERWISE INDICATED. T(503)-467-4980 O 2" OPNG 2" MECHANICAL ELECTRICAL & 5. TYPICAL WALL AND PARTITION FRAMING, FACING WIDTH PLUMBING ENGINEER AND INSULATION SHALL EXTEND FULL HEIGHT TO V OPENING WIDTH WIDTH Glumac UNDERSIDE OF FLOOR DECK OR ROOF DECK MARK STUD SIZE WALL THICKNESS = Gl SW Fifth Ave. Suite 1600 STRUCTURE ABOVE UNLESS NOTED OTHERWISE. `" Portland OR 97204 P40 3 1/2" 4 7/8" ,'I ,fl ,fl 6. PROVIDE AND INSTALL SOLID BLOCKING OR N BACKING FOR WALL AND CEILING MOUNTED ITEMS IN = T(503)-227-5280 ACCORDANCE WITH THE SPECIFICATIONS. EXTEND 0 BLOCKING BEYOND LOCATION INDICATED BY 16' _ FOOD SERVICE CONSULTANT EACH SIDE. co z = = Webb Foodservice Design RA o 0 3700 SE Lafayette Ct. w z TINGTEST/FILE VALUE Portland, OR 97202 _ N o T(503)-236-8566 FIRE - w Uj FLOOR LINE T.O.C. � SOUND w FLOOR LINE T.O.C. FLOOR LINE T.O.C. ACOUSTIC &AV CONSULTANTThe Greenbusch Group 1900 W. Nickerson St., Suite 201 Seattle,WA 98119 INTERIORWALL_ TYPES - MDF_F ROOM 2 HM F1 FLUSH O T206-378-0569 _ - RELITE FRAME DOOR TYPE DOOR FRAME COST CONSULTANT -- 1/4" = 1'-0" - - - 1/4" = 1'-0" - - -- onstruction Focus 740 Almaden St. Eugene, OR 97402 T 541-686-2031 I 114000-FOOD SERVICE/MECH EQUIPMENT L 07 62 00-PREFINISHED I r O Z FLASHING J I 0 COPPING — — I- 06 10 00-PLYWOOD Z U SHEATHING,COORD W/ W STRUCT DWGS G 0 LLJ it WOOD STUD BRACING 07 54 23-THERMOPLASTIC ( 0 ROOFING HANGER DIV 22&23-MECH HOODS II I I 0 ACP&CROSS TEE(TYP) AND FLASHINGS. COORD W/ 0 MECH AND PLUMB DWGS Ii I (J-1 LL 06 10 00-NAILER I I Z 2X4 RUN ROOFING Q CEILING HT OVER CURB I I Z SEE RCP 07 54 23-THERMOPLASTIC AND SECURE I W ROOFING 2X10 2X10 z w SHADOW MOLDING 2X6 GWB EACH SIDE WOOD STUDS PER WALL TYPE - WALL GWB/ACP MECH EQUIP CURB EXTENSION MECH EQUIP WOOD SLEEPER 311 11-011 EXISTING ROOF REVISIONS DATE ASSEMBLY TO / REMAIN NOTES: 07 54 23-SEALANT 1. CONFIGURE FLASHINGS FOR I PROPOSED WALL CONDUIT, PIPE, OR HSS TO BOTTOM OF SECTIONS. I 07 62 00-PREFINISHED ROOF DECK 2. PROVIDE SINGLE PIECE ORI FLASHING DIVIDED FLASHINGS TO SUIT CONSTRUCTION SEQUENCE. 07 54 23-SEALANT 'Ilk l TIGARD TUALATIN SCHOOL DISTRICT 07 62 00-SST CLAMPING TIGARD HIGH RING � i TYP.WOOD STUD 07 54 23-THERMOPLASTIC ROOFING SCHOOL PREMOLDED PIPE FLASHING zMODERNIZATION CONTINUOUS WOOD STUD EXISTING CEILING _0 BACKING AT CENTERLINE TO REMAIN. OF ITEM TO BE ANCHORED REMOVE GRID, Q PROVIDE WOOD STUD BACKING LIGHTINGFIXTURES AND U 9000 SW DURHAM RD. 0 IN THE WIDTH NECESSARY TO TILES AS TIGARD, OR. 97224 NECESSARY. ACCOMODATE ITEM TO BE i ANCHORED OR AS NOTED. JOB N0: 16992.00 H Hill PATCH&REPAIR W N ISSUE DATE: APRIL 12, 2018 D A4 NOTE: SOLID WOOD BLOCKING PROVIDED AT ALL TOILET HANDRAILS 0 � � O t6PLIONRUN E'*1icCOSACH TYP WOOD STUD BACKING DETAIL PIPE / CONDUIT PENETRATION FLASHING P40 ease, _ 9l I..Cr_ , 6 LL---- - - - - -- SEA Jf ,WA 0 0 /2 18 MDF — E116 MDF DETAILS & i SCHEDULES M o I I MAIN FLOOR - -- - -v 194'-0" L6 00 CDr N 75 WALL MDF-AO. 02 SECTION - MDF ROOM 1 314"