Loading...
Report CEIVEL 6 . Oregon Solar Installation Specialty Code MAY 2 6 2022 Check List for Prescriptive Photovoltaic Installations in accordance with Section 305.4 %I OF TIGARD BUILDING DIVISION Department of Consumer and Business Services Building Codes Division 73T20222 - Of/77 1535 Edgewater NW,Salem,Oregon / 3 ?go S(/�J 8.," �� Mailing address: P.O. Box 14470,Salem,OR 97309-0404 Phone:503-378-4133•Fax: 503-378-2322 Web: bcd.oregon.gov Property Owner Information Property Owner Name:Richard Gardner Installation address: 13940 Sw 87th Ct City:Tigard State: OR Zip: 97224 Structure on which modules are to be installed:Roof Day Phone: ((503) 39-9307 Evening Phone: ( Email address:gardner552@yahoo.com Contractor:TML International LLC CCB#:223690 Day Phone: ( 360 )836-1729 Evening Phone: ( Email address:permit@infinitysolarusa.com Site Plan • Attach a simple site plan showing the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. • System must be shown in sufficient detail to assess whether the requirements of section 304.9 or one of the exceptions have been met. • The site plan must be on 8.5 x 11 or larger paper. Structural Information All Structures: • Is this conventional light framed wood construction? NNoo (circle one) • Does the structure have pre-engineered trusses? Yes• No (circle one) ; OR O • Does structure have roof framing members spaced at 24 inches on center maximum? Yes No (circle one) 0 0 • Is the weight of the PV modules and racking less than 4.5 pounds per square foot? Yes Imo (circle one) • Is the roofing material metal, single layer wood shingle, or not more than two layers of composition shingle? Yes No (circle one) Structural Information (continued) Standing Seam Metal Roofs: • Is the metal gauge 26 or heavier?Yes No ( circle one) • Clamp design: Are clamps designed to withstand uplift of at least 115 pounds for clamps spaced at 60 inches on center or less or at least 75 pounds for clamps spaced at 48 inches on center or less?Yes No (circle one) • Is the spacing of the clamps as measured along the seam less than or equal to 24"o.c.? Yes No ( circle one) • Is the roofing panel width 18-inches or greater?Yes No (circle one) • Will the roofing panel attachments be at least#10 screws at 24-inches on center? Yes No (circle one) • Will the roofing panels be installed over minimum %-inch nominal wood structural panels attached to framing with 8d nails at 6-inches on center at panel edges and 12-inches on center field nailing? Yes No (circle one) If no. on any of these requirements, the project may not be submitted using the prescriptive path. Roof Design and Attachment • Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV system racking attachment. • System must be shown in sufficient detail to assess whether the requirements of section 305.4 have been met. • The structural plan must be on 8.5 x 11 or larger paper. Wind Design • Does the project site exceed 95 MPH in exposure C or 105 MPH in exposures A or B. Yes No (circle one) If yes, the project may not be submitted using the prescriptive path. • • Is the module height less than 18 inches above the roof in accordance with section 305.4? Yes No©(circle one) • PV Modules • Manufacturer: Wuxi Suntech • Model Number: STP365S-B60/WNHB • Listing Agency: UL 61730 Mary Dinsmore-Smith for TML International LLC ,sgrtak5/26/2022 Applicant name (please print) Appli ant ignature Date