Permit 11111 CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT
Permit#: BUP2022-00068
Date Issued: 7/5/2022
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S1260000300
Jurisdiction: Tigard
Site address: 9669 SW WASHINGTON SQUARE RD CO3
Project: The North Face Subdivision: None Lot: None
Project Description: Interior remodel/building: new non load bearing walls,fixtures,finishes, lighting,mechanical,electrical,and
store front work.
Contractor: SOLEX Owner: PPR WASHINGTON SQUARE LLC
42146 REMINGTON AVE BY MACERICH RET
TEMECULA, CA 92590 PO BOX 4085
SANTA MONICA, CA 90411
PHONE: 951-308-1706 PHONE:
FAX: 951-308-1856
FEES
Specifics:
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIB Plan Review 03/23/2022 $1,307.77
Occupancy Grp: M Occupancy Load: 40 Permit Fee-Additions,Alterations, 07/05/2022 $2,011.95
Demolition
Dwelling Units: 0 12%State Surcharge-Building 07/05/2022 $241.43
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 07/05/2022 $434.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 07/05/2022 $804.78
Value: $250,000 Info Process/Archiving-Lg$2.00(over 07/05/2022 $86.00
11x17)
Info Process/Archiving-Sm$0.50(up to 07/05/2022 $17.50
Floor Areas: 11x17)
Total Area: 0 Metro CET 07/05/2022 $300.00
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $5,203.43
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. Y u may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: �, Permittee Signature: cr__, -- /a/Ze..17,i2
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
. Building Permit Application u _3
Commercial RECEIVE , FOR OFFICE USE ONLY
City of Tigard Received/y'� )� �� permit No.: � (p g
Date/By:v/ LL
IN e 13125 SW Hall Blvd.,Tigard,OR 97223 MAR 15 2022 Plan Review
! Phone: 503-718-2439 Fax: 503-598-1960 Date/By: Related Permit:
T I G A R D Inspection Line: 503-639-4175 Date Ready/By: it_ ` t , list s ® See Page 2 for
Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: !�l //L/ � Supplemental Information
BUILDING DIVISION ��' !!!
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
El New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $
Accessory buildingNumber of bedrooms:
❑ ry El Multi-family
El Master builder El Other:
Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:Cikkil SW Washington Square Road New dwelling area: square feet
City/State/ZIP: Tigard, OR 97223 nu. ilv" ewer Garage/carport area: square feet
Suite/bldg./apt.#: CO3 Project name: Covered porch area: square feet
Cross street/directions to job site: Washington Square Rd. and Blum Rd. Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: 1 S 126000300 DESCRIPTION OF WORK
Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
This project is an interior remodel/building out of an interior mercantile space at Valuation: $ 250,000
Washington Square Mall.Work includes new non-load bearing partitions,fixtures, Existing building area: 4,505 square feet
finishes, lighting,plumbing, mechanical,electrical,and storefront work New building area: 4,505 square feet
❑ PROPERTY OWNER 1.1 TENANT Number of stories: 1
Name:VF Outdoor and Action Sports Coalition Type of construction: I I B
W Address: 1588 South Coast Drive Occupancy groups: M - Mercantile
City/State/ZIP: Costa Mesa, CA 92626 Existing: M - Mercantile
Phone:(610) 476-5128 Fax:( ) New: M - Mercantile
BUILDING PERMIT FEES*
❑ APPLICANT ® CONTACT PERSON
Business name: RGLA Solutions, Inc. (Please refer to jee schedule)
Structural plan review fee(or deposit): /,307,77
Contact name: Diana Smith
FLS plan review fee(if applicable):
Address: 5100 River Road, Suite #125
Total fees due upon application:
City/State/ZIP: Schiller Park, IL 60176
Amount received:
Phone:(847) 9162747 Fax: :( )
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail:dsmith@rgla.com
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name: 1(ca`tom Cvt c ,4 d�`C Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: L fak/qG t(C/i7 11 A1—C. 7� Solar Installation Specialty Code checklist.
City/State/ZIP: 7-gkt?r ebt A eo/�C.1_c, Permit fee(includes plan review $180.00
1I ! and administrative fees):
Phone:(Icyj0 / Fax:( )
J ! ��/ State surcharge(12%of permit fee): $21.60
CCB Lic.: t 7 K i c- 5nl/2-3 .- Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:Diana Smith Date: 3/8/2022 * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1,11 " Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
T I GA R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ 250,000
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 62,500
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $ LL Provided
(b) An accessible entrance: $ LL Provided
(c) An accessible route to the altered area: $ LL Provided
(d) At least one accessible restroom for each sex or a single unisex
restroom: $ See Plans
(e) Accessible telephones: $ LL Provided
(f) Accessible drinking fountains:and, $ See Plans
(g) When possible,additional accessible elements such as storage and
alarms: $ See Plans
TOTAL(shall equal line [2] of Valuation Computation): $ 62,500
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
N . Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
I:\Building\Permits\BUP_COM_PetmitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
T I GA RD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Pemuts\BUP_COM_Pern itApp.doc Rev.03/05/2019
City of Tigard
1111 COMMUNITY DEVELOPMENT DEPARTMENT
! .
TIGARD Building Permit Review — Commercial - No Land Use
Building Permit #: ?%(,(PZ02Z^ 8
Site Address: q 6 itt s(A) G(s4-014Sg, , Suite/Bldg#:
Project Name: 'TM F cd- 1c111- ;I .i)uurtre
(Name of commercial business occupy g the space. If vacant,enter Spec Space.)
Planning Review r
Proposal: i- p�e1 ;(I t ( i/lo -'i
t / I ✓ ,(-- 1 Lc, 'Ga(, P.e V•1 a(, s-5 v�e WO et
Existing Business Activity: !'',j.'4:_ . Sates — 0 r7ej/l A pe.4ci,I
Proposed Business Activity: ,.
fZVerify site address/suite# exists and active in permit system.
❑ River Terrace Neighborhood: ❑ Yes No
rN Zoning: AAUG
V3 Permitted Use: ) Yes ❑ No ❑ Spec Space
pConfirm no land use required.
VD Business License:
Exists: p Yes ❑ No,applicant was provided a business license application
Notes:
Approved by Planning: Date: `5/ 2-2-
Revisions (after Building Submittal only) Reviewer Date
Revision 1: El Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: D //j-/202Z
Site Plans: # 3
Building Plans: #
Building Permit#: enter building permit#above.
Workflow Routing: IF-Planning El Permit Coordinator [ Building
Workflow Sign-off: I� � off for Planning(include notes from planning review)
Route Application Documents: r. :uilding: original permit application,site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: d3�/�2
I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx
V
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved, NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
•
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans DevTax: ❑ Yes • r ❑•N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit Coordinator: Date:
I:\Building\Forms\BIdgPermitRvw_COM NoLandUse_l 11819.docx