Loading...
Permit 1 CITY OF TIGARD _14 BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2022-00031 • Date Issued: 6/15/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 2S110AB00400 Jurisdiction: Tigard Site address: 14400 SW 112TH AVE Project: The Ridge Apartments,Building K Subdivision: CANTERBURY PLACE,AMENDED Lot: PTS 1-4 Project Description: Building K:New exterior cladding,windows,doors,and roof.Repair roof drain system. Multiple addresses: 1440 &14402 SW 112th Ave. Contractor: LMC INC Owner: HOUSING AUTHORITY OF WASHINGTON COUN 19200 SW TETON AVE ATTN: HENRY ALVAREZ TUALATIN, OR 97062 111 NE LINCOLN STE#200L HILLSBORO, OR 97124 PHONE: 503-646-0521 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 06/15/2022 $4,366.89 Occupancy Grp: R-2 Occupancy Load: 44 Demolition 12%State Surcharge-Building 06/15/2022 $524.03 Dwelling Units: 0 Plan Review 06/15/2022 $2,838.48 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 06/15/2022 $434.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 06/15/2022 $86.00 Value: $665,067 11x17) Info Process/Archiving-Sm$0.50(up to 06/15/2022 $6.00 11x17) Floor Areas: Metro CET 06/15/2022 $798.08 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $9,053.48 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OA 952-001-00900' � ��{//.�You may optain a copy of the rules or direct questions to OUNC by calling 503.232 1987 or 1.800 332.2344. Issued By: cyviLcyl A (1`. ( Permittee Signature: i ' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application . �,126 Commercial �." FOR OFFICE USE ONLY ,lr Received 7 City of Tigard 1 P"1 2 i'o Date/13y:a 27 'Q7� �'�� Permit No.: (P�Z2 q',� � III " 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Revie' �, t yryt t-' — -1' - Related Permit: Phone: 503-71R-2439 Fax 503-598-1960 t_ n tii , Date/By: ,,,,_ 'f l GARD Inspection Line: 503-639-4175 �,, , aN ' Date Ready/By: 3 7 Sae Page 2 for i ii 1� Internet: www.tigard-or.gov l:+v -•' NotifiediMethod: .,9� y� Supplemental Information Pre-NA . • C.o• TYPE OF WORK REQUIRED HATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all II Addition/alterationireplacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION,_ work indicated on this application. El I-and 2-family dwellingValuation: $ y ❑Commercial/industrial ❑Accessory building II Multi-family Number of bedrooms: ❑Master builder I ❑Other: Number of bathrooms: JOB SCLE INFORMATION AND LOCATION Total number of floors: Job site address: 14400/14402 SW 112th Avenue-Building K New dwelling area: square feet City/State/ZIP: Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.#: Project name: The Ridge Covered porch area: square feet Cross street/directions to job site: Near intersection of SW 112th Ave and SW Gaarde St Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST ubdivisiom Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: 25110AB00400 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. NEW EXTERIOR CLADDING,WINDOWS, DOORS,AND ROOF.REPAIR ROOF DRAIN Valuation: $ 665,067 SYSTEM. Existing building area: square feet New building area: square feet .. • PROPERTY OWNER ❑ T1NANT Number of stories: liki Name: AHP4 LLC Type of construction: Address: 111 NE Lincoln,Suite 200-L Occupancy groups: City/State/ZIP: Hillsboro,OR 97124 Existing: Phone:( 503 ) 846-4784 Fax:( ) New: ' I APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES" (Please refer to fee schedule) Business name: Pinnacle Architecture Structural plan review fee(or deposit): Contact name: Ryan Cain FLS plan review fee(if applicable): Address: 960 SW Disk Drive#101 City/State/ZIP: Bend,OR 97062 Total fees due upon application: Phone:( 541)388-9897 Fax: :( ) Amount received: E-mail: ryan@parch.blz PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: LMC Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 19200 SW Teton Avenue Solar Installation Specialty Code checklist. review City/State/ZIP: Tualatin,OR 97062 Permit fee(includes plan $180.00 and administrative fees): Phone:( 503)646-0521 Fax:( 503)646-6823 State surcharge(12%of permit fee): $21.60 CCB Lie.: 161282 Total fee due upon application: $201.60 . II apnea by Ryan Cain Ryan !+a i �µc-m5 E-rvenvlaa��a-. This permit application expires if a permit is not obtained Authorized signature: l� anenna,„,,d,135.�ecO8Oe ea oartzoz,.,zn s s smevn within 180 days after it has been accepted as complete. Print name: Ryan Cain Date: 1 2/22/2 1 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits,BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT « Accessibility: Barrier Removal Improvement Plan 111 Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 7,600,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] 1,900,000 FITMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ 295,000 (5 ADA unit (b) An accessible entrance: $ 30,000 entries) (c) An accessible route to the altered area: $ 370,000 (Accessible (d) At least one accessible restroom for each sex or a single unisex baths and restroom: $ 1,200,000 kitchens in AC units&share( (e) Accessible telephones: $ N/A laundry areas; (f) Accessible drinking fountains:and, $ N/A (Accessible (g) When possible,additional accessible elements such as storage and amenities for alarms: $ 41,500 pool& Community TOTAL(shall equal line [2] of Valuation Computation): $ 1,936,500 Room,AV uni equipment) I:\Building\Peanuts\BUP_COM_PermitApp dor Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT IIIPlan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number El zoning El applicant name 0 phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. I:\Bluffding\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP_COi41_PermirApp.doc Rev.03/05/2019 1 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT C T 1 G A R D Building Permit Review — Commercial - With Land Use Building Permit #: E,tP2022"c003 ( Site Address: I 1 d0'I(iiittJz�s� (, r2-*' 4 Suite/Bldg#: V Project Name: 'T�Q, Q,l ea (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review �,,, ,, /� Proposal: C .�v1YA// k,J I� 4(1)51 M15( 6 d\-epafr (?)a P fall let SI rel RV Verify site address/suite# exists and active in permit system. ❑ River Terrace Neighborhood• ❑ Yes ? No Land Use Case#:;1 �/M j(�'Q(X}g6 g:IPlans Match Approved Land Use: Site Plan Landscape Plan ❑ Other: E Urban Forestry Plan ❑ Elevation Plan i% a Building Height: Maximum Height 35 Actual Height 2,> 6 ❑ Conditions Met: ❑ Prior to Submittal iv Prior to Permit Issuance 0 Business License: Exists: (1) Yes ❑ No,applicant was provided a business license application Public Facilities Improvement (PFI) Permit: Require/d:: q�❑ Yes,a plicant was no ied erg No / pia" For: /❑ Yes /❑ No,stop intake Notes: / 'LVD4- 51 `►O- h4 ikdr� 91�F - pia" 'rib,- `h6 i'!lalcy Approved by Planning: / �,/, a Date: b/?�/Zp Z.-Z . Revisions (after Building Submittal only) Reviewer ` Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: rj(/ZQ/?-(o2-2-- Site Plans: # 3 Building Plans: # 3 Building Permit#: Enter building permit# above. Workflow Routing: Planning Engineering l Permit Coordinator L uilding Workflow Sign-off: V?Sign-off for Planning(include notes from planning review) Route Application Documents: ['Building: original permit application, site plans,building plans,engineer and beam calculations and trust details, if applicable,etc. Notes: By Permit Technician: 'IlDate: D7T..17/2022 I:\Building\Fomis\BldgPennitRvw_COM_W ithLand Use_111819.docx Engineering Review 0---Slope at building pad: I'FI Permit#: Conditions "Met"prior to issuance of building permit Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) >Water Quality/Quantity Facility: �/ Assess Water Quality Fee in-lieu: ❑ Yes 14 No Assess Water Quantity Fee in-lieu: 0 Yes ErNo LIDA Facility on lot: ❑ Yes 0 No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: f Approved by Engineering: , 1i7� � Date: )-- 3 -Lc- Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit Approved,NOT Released: Date: 2-1`EI201'2- Notes: SkAOM 1+ SVF e i- ‘AA p\AD tore cs pan- Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: 0 Yes 1g N/A LIDA Fee: ❑ Yes ,VJ N/A OK to Issue Permit (� Approved by Permit Coordinator: I IL Date: 21 I r 2i2- I:\Building\Forms\B Id gPemil tRvw_COM_W ithLand U se_l 118 19.d ocx