Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
n CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2021-00240 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 6/8/2022 Parcel: 1 S134DC03001 Jurisdiction: Tigard Site address: 11130 SW TIGARD ST Project: Dirksen Nature Park Subdivision: CHERRY HILL ACRE TRACTS Lot: 6 Project Description: Finish and install a timber boardwalk with galvanized steel decking,and timber handrailing with galvanized steel handrail openings. Contractor: LEE CONTRACTORS LLC Owner: TIGARD, CITY OF PO BOX 896 13125 SW HALL BLVD BATTLEGROUND, WA 98604 TIGARD, OR 97223 PHONE: 360-852-2317 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: VB Permit Fee-COM-New Construction 06/08/2022 $685.68 Occupancy Grp: U Occupancy Load: 0 12%State Surcharge-Building 06/08/2022 $82.28 Plan Review 11/08/2021 $445.69 Dwelling Units: 0 DC Provision Review,COM TI-Ping 06/08/2022 $274.00 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 06/08/2022 $274.27 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 06/08/2022 $84.00 Value: $77,000 11x17) Info Process/Archiving-Sm$0.50(up to 06/08/2022 $12.00 Floor Areas: 11x17) Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,857.92 Required: Required Items and Reports(Conditions) 1 Special Inspection(see plans) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 9 001-0 0. Y. may obtain a cop s or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ' Permittee Signature: cre— //.D� Call 503.6 9.4175 by 7:00 a.m.for the next available inspection date. // This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application —.9 27 21 Commercial RECE Y LEI FOR OFFICE USE ONLI Cityof Tigard Date/B d l� �� &)P2OZI-00240 g y iI Permit No.: 13125 SW Hall Blvd.,Tigard,OR 97223 SEP 2 7 2021 Plan Review Phone: 503-718-2439 Fax: 503-598-1960 Date/By: Zr�'� Related Permit: l l t Ago Inspection Line: 503-639-4175 crr'OF TIGARD Date ReadyBy: Ions: la See Page 2 for Internet: www.tigard-or.gov otified Method: Tr& Supplemental Information BUILDING DIVISION TYPE OF WORK CARED DATA:1-AND 2-FAMILY DWELLING ®New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling 0 Commercial/industrial Valuation: $ Accesso 'buildin Number of bedrooms: ❑ rS g ❑Multi-family ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 11130 SW Tigard Street New dwelling area: square feet City/State/ZIP: Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name:Dirksen Nature Park Covered porch area: square feet Cross street/directions to job site: SW Cornell Place Deck area: square feet From Permit Center to Burnham St to Main St to Tigard Street. Cross over Fanno Other structure area: square feet Crk.bridge crossing. Site is on left or south side of road btwn.bridge and Gab Ave REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Cherry Hill Acre Tracts I Lot#: 6 Permit fees*are based on the value of the work performed. Tax map/parcel#: 'sisa°c s000sonisoozs1oo,s1oi,s�uz,saoo,saoo Indicate the value(rounded to the nearest dollar)of all 1S13aDU o�oo,ioou.�auo asoo. zs u�3�s 02U0 a z�1:us oao0 . equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Furnish and install a timber boardwalk with galvanized steel decking,and timber Valuation: $ 77,000 handrailing with galvanized steel handrail openings. Existing building area: square feet New building area: square feet t1 PROPERTY OWNER 0 TENANT Number of stories: Name: City of Tigard Type of construction: Parks Infrastructure Address: 13125 SW Hall Blvd Occupancy groups: City/State/ZIP: Tigard,OR 97223 Existing: Phone:(503 ) 639-4171 Fax:( ) New: 0 APPLICANT ❑x CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: City of Tigard ,/r6� Structural plan review fee(or deposit): 7 J7i7 Contact name: Jeff Peck FLS plan review fee(if applicable): Address: 13125 SW Hall Blvd City/State/ZIP: fees due upon application: Tigard,OR 97223 Phone:(503 Amount received: )718-2466 or 971-295-6588 Fax::( ) E-mail: jeffp�)tigard-or.gov PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name: LT L Cep ✓ �Gc., Submit two(2)sets of roof plan with connection details Address: a Dc 67 4 �2 kc(�J od fire ndepartment access,alCongde wchecklist. the. Oregon `1'1,r— Solar Installation Specialty Code checklist. City/State/ZIP: f�f'� Permit fee(includes plan review ` "� '� ��� � �� and administrative fees): $180.00 Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.: G�� 3 .- Lit,12-2_ Total fee due upon application: $201.60 Authorized signature: G�J�- 4„1Z c . - This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Jeff Peck Date: 9/27/21 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(l1/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ■ Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PemritApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ;71 Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations T I GA R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. El map&tax lot# ❑x project name © site address ❑ suite number x0 zoning x❑ applicant name x❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT II le Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439• www.tigard-or.gov Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire& Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard q COMMUNITY DEVELOPMENT DEPARTMENT Ill TIGRD Building Permit Review — Commercial - With Land Use Building Permit #: Bu p2021-©U2g0 Site Address: //I '0 S10 77 /6 S7 Suite/Bldg#: Project Name: D'R/c n) fV+jute& iS;,q-a(< /ur0 ;id 44-4e (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review /r Proposal: Z e S./AU, . j571-fL jv7 Pits ? i `f ts r�� 1- ,>!c ei`Os/� c ce / r, bf, j / S( ,,, , ,,a1,....(,c crift'site address/suite# exists and ative in permit system. River Terrace Neighborhood: ❑ Yes 'No Land Use Case#: C o l' Z©/ 3 jO / "Plans Match Approved Land Use: -Site Plan ❑ Landscape Plan E Other: ❑ Urban Forestry Plan ❑ Elevation Plan iiid Building Height: Maximum Height Actual Height -a-Conditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance a Business License: Exists: 'es ❑ No,applicant was provided a business license application ublic Facilities Improvement (PFI) Permit: Required: ❑ Yes, applicant was notified ❑ No Applied For: ❑ No,stop intake Notes: Approved by Planning: a aj '/ Date: /v 7".�z' . .r 11 Revisions (after Building Submittal only) C Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: a9,.27/ZOZ./ Site Plans: # 5 Building Plans: # .3 Building Permit#: Ltl Enter building permit#above. l Workflow Routing: [VPlanning ©'Engineering Permit Coordinator LWBuilding Workflow Sign-off: CVSign-off for Planning(include notes from planning review) Route Application Documents: [Building: original permit application, site plans,building plans, engineer and beam calculations and trus`etails,if applicable,etc. Notes: illi By Permit Technician: �� - / Date: 1(4//,�Z.( 1:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_l 118 19.docx En ineering Review Ce Slope at building pad: VANPIJ [ PFI Permit#: y�k C'Conditions "Met"prior to issuance of building permit I1/✓ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)w4 R' 'ater Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes [ 'No Assess Water Quantity Fee in-lieu: 0 Yes 'No LIDA Facility on lot: 0 Yes fa' No 0 NOT Approved by Engineering: Date Notes: Approved by Engineering: !YAtfMUti Date: /4/1i/202,J Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review &Conditions "Met"prior to issuance of building permit /— Approved,NOT Released: Tree 'pINtc1D1 r d- at — 101 liISbate: Notes: ` Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: gr SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes 7J N/A Tigard Trans SDC: ❑ Yes / N/A Parks SDC: ❑ Yes /l N/A OK to Issue Permit Approved by Permit Coordinator: PrrcL Date: (P I l 2o2,2i I:\Building\Forms\BldgPermitRvw COM_WithLandUse 111819.docx