Report COMcheck Software Version COMcheckWebIPA i RECEIVED
Envelope Compliance Certificate CDEC 0 9 2021
OF TIGARD
BUILDING DIVISION
Project Information OFFICE COPY lc,�/"e /n2022_00(a1
Energy Code: 90.1 (2019) Standard
Project Title: Agilyx Bench Scale and Analytic Lab /32elo cat! (.04u/ C�V
Location: Tigard, Oregon J
Climate Zone: 4c
Project Type: Addition
Performance Sim. Specs: EnergyPlus 8.1.0.009 (EPW: TBD)
Construction Site: Owner/Agent: Designer/Contractor:
13240 SW Wall st. Andrew Swartwout Tonya Minnick
Tigard, Oregon 97223 Agilyx R&W Engineering
13240 SW Wall st. 9615 SW Allen Blvd Ste 107
Tigard, Oregon 97223 Beaverton, Oregon 97005
928.301.9225 5037263312
andrew.swartwout@agilyx.com tminnick@rweng.com
Building Area Floor Area
1-Lab (Manufacturing Facility) : Nonresidential 2233
Envelope Assemblies
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
Envelope TBD: All building area types must be assigned to at least one envelope assembly
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 1 of 16
IPA COMcheck Software Version COMcheckWeb
‘fil Interior Lighting Compliance Certificate
Project Information
Energy Code: 90.1 (2019) Standard
Project Title: Agilyx Bench Scale and Analytic Lab
Project Type: Addition
Construction Site: Owner/Agent: Designer/Contractor:
13240 SW Wall st. Andrew Swartwout Tonya Minnick
Tigard, Oregon 97223 Agilyx R&W Engineering
13240 SW Wall st. 9615 SW Allen Blvd Ste 107
Tigard, Oregon 97223 Beaverton, Oregon 97005
928.301.9225 5037263312
andrew.swartwout@agilyx.com tminnick@rweng.com
Allowed Interior Lighting Power
Proposed Interior Lighting Power
Interior Lighting TBD: No lighting fixtures specified
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 2 of 16
COMcheck Software Version COMcheckWeb
ril il Exterior Lighting Compliance Certificate
Project Information
Energy Code: 90.1 (2019) Standard
Project Title: Agilyx Bench Scale and Analytic Lab
Project Type: Addition
Exterior Lighting Zone 0 (Unspecified)
Construction Site: Owner/Agent: Designer/Contractor:
13240 SW Wall st. Andrew Swartwout Tonya Minnick
Tigard, Oregon 97223 Agilyx R&W Engineering
13240 SW Wall st. 9615 SW Allen Blvd Ste 107
Tigard, Oregon 97223 Beaverton, Oregon 97005
928.301.9225 5037263312
andrew.swartwout@agilyx.com tminnick@rweng.com
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts / Wattage (B X C)
Total Tradable Watts(a)= 0
Total Allowed Watts= 0
Total Allowed Supplemental Watts(b)= 350
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 350 watts may be applied toward compliance of both non-tradable and tradable
areas/surfaces.
Proposed Exterior Lighting Power
Exterior Lighting TBD: Exterior lighting zone not specified (see project screen)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 3 of 16
irill COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Information
Energy Code: 90.1 (2019) Standard
Project Title: Agilyx Bench Scale and Analytic Lab
Location: Tigard, Oregon
Climate Zone: 4c
Project Type: Addition
Construction Site: Owner/Agent: Designer/Contractor:
13240 SW Wall st. Andrew Swartwout Tonya Minnick
Tigard, Oregon 97223 Agilyx R&W Engineering
13240 SW Wall st. 9615 SW Allen Blvd Ste 107
Tigard, Oregon 97223 Beaverton, Oregon 97005
928.301.9225 5037263312
andrew.swartwout@agilyx.com tminnick@rweng.com
Mechanical Systems List
Quantity System Type & Description
1 MAU-1 (Single Zone):
Heating: 1 each -Central Furnace, Gas, Capacity = 600 kBtu/h
Proposed Efficiency = 81.00% Et, Required Efficiency: 80.00% Et
Fan System: MAU-1 I Process Exhaust--Compliance (Motor nameplate HP and fan efficiency method) : Fails
Fans:
MAU-1 Supply, Constant Volume, 5000 CFM, 5.0 motor nameplate hp, 1.00 fan energy index , fan exception:
Emergency function only
EF-1 Exhaust, Constant Volume, 6000 CFM, 7.5 motor nameplate hp, 1.30 fan energy index , fan exception:
Emergency function only
1 HP-1/FC-1 (Single Zone):
Split System Heat Pump
Heating Mode: Capacity= 30 kBtu/h,
Proposed Efficiency = 8.50 HSPF, Required Efficiency = 8.20 HSPF
Cooling Mode: Capacity = 56 kBtu/h, , Air Economizer
Proposed Efficiency = 15.00 SEER, Required Efficiency: 14.00 SEER
Fan System: FC-1/HP-1 I ANALYTICAL LAB--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
EF-3 Exhaust, Constant Volume, 1050 CFM, 1.0 motor nameplate hp, 1.00 fan energy index
EF-2 Exhaust, Constant Volume, 2150 CFM, 2.0 motor nameplate hp, 1.00 fan energy index
FCHP1 Supply, Single-Zone VAV, 6000 CFM, 5.0 motor nameplate hp, 1.00 fan energy index
1 WH-1:
Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 62 kBtu/h
No minimum efficiency requirement applies
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 90.1 (2019) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
R.w/ 12/07/2021
Tonya Minnick/R&W
Name-Title Signature Date
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 4 of 16
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 90.1 (2019) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
6.4.4.2.1, calculations provide all information ❑Does Not
6.7.2 with which compliance can be Location on plans/spec: ALL SHEETS
[PR2]i determined for the mechanical Not Observable
systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
7.7.1, calculations provide all information ❑Does Not
10.4.2 with which compliance can be Location on plans/spec: P0.1, P1.1, P2.1, P3.3
[PR3]1 determined for the service water Not Observable
heating systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
4.2.5.2 Commissioning shall be performed as ❑Complies Exception: Buildings, additions, or alterations with less than
[PR5]1 stated in Sections 5.9.2, 6.9.2, 7.9.2, ❑Does Not 10,000 ft2 of conditioned space and combined heating,
8.9.2, 9.9.2, 10.9.2, 11.2(d), and ❑Not Observable cooling, and service water heating equipment totaling less
G1.2.1(c). Commissioning must utilize than 960,000 Btu/h in capacity.
ASHRAE/IES Standard 202 or other ❑Not Applicable
generally accepted engineering Location on plans/spec: MO.1, M1.1, M1.2, M4.1
standards acceptable to the building
official. FPT and verification
requirements for commissioning are
as stated in Section 4.2.5.1.
Commissioning shall document
compliance of the building systems,
controls, and building envelope with
required provisions of this standard.
Commissioning requirements shall be
incorporated into the construction
documents.
Additional Comments/Assumptions:
1 THigh Impact(Tier 1) ri 2 Medium Impact (Tier 2) L 3 Low Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 5 of 16
Section
# Complies? Comments/Assumptions
6.4.3.7 Freeze protection and snow/ice LJCump|ies Requirement will bemet.
[F09]3 melting system sensors for future []Does Not
connection tocontrols. []Not Observable Location on �|aplans/spec: � ' �plans/spec: �O l Ml l' MI.2' ��4 l
L_ LJNotApp|icab|e
Additional Comments/Assumptions:
1 High Impact(Tier 1) Medium Impact(Tier 2) 3 Low Impact(Tier 3)
---------------
ProjectTlde: »mi|yx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: page 6of 16
Section
Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
7.4.4.1 Temperature controls installed on ❑Complies Requirement will be met.
[PL2]3 service water heating systems ❑Does Not
(<=120°F to maximum temperature Location on plans/spec: P0.1, P1.1, P2.1, P3.3
for intended use). ❑Not Observable
❑Not Applicable
7.4.6 Heat traps installed on non-circulating ❑Complies Requirement will be met.
[PL4]3 storage water tanks. ❑Does Not
['Not Observable Location on plans/spec: P0.1, P1.1, P2.1, P3.3
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 7 of 16
Section 1 '
Mechanical Rough-In Plans Verified Field Verified
# I Complies? Comments/Assumptions
& Re ID' Inspection Value Value
q. =
6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: ❑Complies See the Mechanical Systems list
6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values.
(ME1]2 equipment labeled as meeting
90.1. ❑Not Observable
❑Not Applicable
6.4.3.4.1 Stair and elevator shaft vents ❑Complies Exception: Requirement
[ME3]3 have motorized dampers that ❑Does Not does not apply.
automatically close.
❑Not Observable
ENot Applicable
6.4.3.4.2, Outdoor air and exhaust systems ❑Complies Requirement will be met.
6.4.3.4.3 have motorized dampers that ❑Does Not
[ME4]3 automatically shut when not in ❑Not Observable Location on plans/spec:
use and meet maximum leakage MO.1, M1.1, M1.2, M4.1
rates. Check gravity dampers ❑Not Applicable
where allowed.
6.4.3.4.5 Enclosed parking garage ❑Complies Exception: Requirement
[ME39]3 ventilation has automatic ❑Does Not does not apply.
contaminant detection and
capacity to stage or modulate ['Not Observable
fans to 50%or less of design ❑Not Applicable
capacity.
6.4.3.4.4 Ventilation fans >0.75 hp have ❑Complies Requirement will be met.
[ME5]3 automatic controls to shut off fan ❑Does Not
when not required. Location on plans/spec:
[Not Observable MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.3.8 Demand control ventilation ❑Complies Exception: Spaces where 75
[ME6]1 provided for spaces >500 ft2 and ❑Does Not percent of the supply
>25 people/1000 ft2 occupant ['Not Observable outdoor airflow is requried
density and served by systems for makeup air that is
with air side economizer, auto ❑Not Applicable exhausted from the space or
modulating outside air damper transfer air required for
control, or design airflow >3,000 makeup air that is exhaused
cfm. from the space(s).
Location on plans/spec:
MO.1, M1.1, M1.2, M4.1
6.5.3.2.1 DX cooling systems >= 75 kBtu/h EComplies Exception: Requirement
[ME40]2 (>= 65 kBtu/h effective 1/2016) ❑Does Not does not apply.
and chilled-water and
evaporative cooling fan motor hp ❑Not Observable See the Mechanical Systems list
>= 1/4 designed to vary supply ❑Not Applicable for values.
fan airflow as a function of load
and comply with operational
requirements.
6.4.4.1.1 Insulation exposed to weather ❑Complies Requirement will be met.
[ME7]3 protected from damage. ❑Does Not
Insulation outside of the [Not Observable Location on plans/spec:
conditioned space and associated MO.1, M1.1, M1.2, M4.1
with cooling systems is vapor ❑Not Applicable
retardant.
6.4.4.1.2 HVAC ducts and plenums R- R- ❑Complies Requirement will be met.
[ME8]z insulated per Table 6.8.2. Where ❑Does Not
ducts or plenums are installed in Location on plans/spec:
or under a slab, verification may ❑Not Observable NO UNDER SLAB WORK
need to occur during Foundation ❑Not Applicable
Inspection.
6.4.4.1.3 HVAC piping insulation thickness. in. in. ❑Complies Requirement will be met.
[ME9]2 Where piping is installed in or ❑Does Not
under a slab, verification may ❑Not Observable Location on plans/spec:
need to occur during Foundation NO UNDER SLAB WORK
Inspection. ❑Not Applicable
11 High Impact(Tier 1) i 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 8 of 16
Section Mechanical Rough-In ' Plans Verified Field Verified Complies? Comments/Assumptions
Inspection Value i Value
& Req.ID i_-. ' i
6.4.4.1.4 Thermally ineffective panel EComplies Requirement will be met.
[ME41]3 surfaces of sensible heating EDoes Not
panels have insulation >= R-3.5. [Not Observable Location on plans/spec:
MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.4.2.1 Ducts and plenums having EComplies Requirement will be met.
[ME10]z pressure class ratings are Seal ElDoes Not
Class A construction. ['Not Observable Location on plans/spec:
MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.4.2.2 Ductwork operating >3 in. water EComplies Requirement will be met.
[ME11]3 column requires air leakage ElDoes Not
testing. Location on plans/spec:
❑Not Observable M1.1, M1.2, M4.1
❑Not Applicable
6.4.4.2.2 Ductwork operating >3 in. water EComplies Requirement will be met.
[ME11]3 column requires air leakage ❑Does Not
testing. Location on plans/spec:
❑Not Observable MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.5.2.3 Dehumidification controls EComplies Exception: Capability of first
[ME19]3 provided to prevent reheating, ElDoes Not reducing supply air volume
recooling, mixing of hot and cold 50%or less of the design
airstreams or concurrent heating [Not Observable rate or minimum outdoor air
and cooling of the same ❑Not Applicable ventilation, or per regulatory
airstream. standard, whichever is
larger, before combined
heating/cooling occurs.
Location on plans/spec:
MO.1, M1.1, M1.2, M4.1
6.5.2.4.1 Humidifiers with airstream ❑Complies Exception: Requirement
[ME68]3 mounted preheating jackets have ❑Does Not does not apply.
preheat auto-shutoff value set to
activate when humidification is ❑Not Observable
not required. ❑Not Applicable
6.5.2.4.2 Humidification system dispersion EComplies Exception: Requirement
[ME69]3 tube hot surfaces in the ❑Does Not does not apply.
airstreams of ducts or air-
handling units insulated >= R-
0.5. Observable
0.5. ❑Not Applicable
6.5.2.5 Preheat coils controlled to stop EComplies Requirement will be met.
[ME70]3 heat output whenever ElDoes Not
mechanical cooling, including Location on plans/spec:
economizer operation, is active. ❑Not Observable MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.5.2.6 Units that provide ventilation air EComplies Exception: Requirement
[ME106]3 to multiple zones and operate in ❑Does Not does not apply.
conjunction with zone heating
and cooling systems are ❑Not Observable
prevented from using heating or ENot Applicable
heat recovery to warm supply air
above 60°F when representative
building loads or outdoor air
temperature indicate that most
zones demand cooling.
6.5.3.6 Motors for fans >= 1/12 hp and EComplies Requirement will be met.
[ME72]z < 1 hp are electronically- ElDoes Not
commutated motors or have a Location on plans/spec:
minimum motor efficiency of ❑Not Observable MO.1, M1.1, M1.2, M4.1
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
1 High Impact(Tier 1) 121 Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 9 of 16
Section Mechanical Rough-In I Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID I_._
6.5.3.6 Motors for fans >= 1/12 hp and ❑Complies Requirement will be met.
[ME72J2 < 1 hp are electronically- ❑Does Not
commutated motors or have a Location on plans/spec:
minimum motor efficiency of ❑Not Observable MO.1, M1.1, M1.2, M4.1
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.1.3 Fans have efficiency grade (FEG) ❑Complies Exception: Fans operate
[ME74]2 >= 67.The total efficiency of the ❑Does Not during emergency
fan at the design point of conditions.
operation <= 15%of maximum ❑Not Observable
total efficiency of the fan. ❑Not Applicable Location on plans/spec:
MO.1, M1.1, M1.2
6.5.3.1.3 Fans have efficiency grade (FEG) ❑Complies Exception: Individual fans
[ME74]2 >= 67.The total efficiency of the EDoes Not with motor nameplate
fan at the design point of horsepowerof= 5 hp.
operation <= 15%of maximum ❑Not Observable
total efficiency of the fan. ❑Not Applicable Location on plans/spec:
MO.1, M1.1, M1.2, M4.1
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the
terminal fan except when space [Not Observable
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c) during heating
for warmup or setback
temperature control, either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]z terminals have automatic ❑Does Not does not apply.
controls to a)turn off the
terminal fan except when space ❑Not Observable
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c) during heating
for warmup or setback
temperature control, either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
1 High Impact(Tier 1) j 2'Medium Impact(Tier 2) 13 I Low Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 10 of 16
Section Mechanical Rough-In
g i Plans Verified Field Verified
& Req ID�
Inspection Value Value 4 Complies? Comments/Assumptions
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum Location on plans/spec:
exhaust air rate required by [Not Observable MO.1, M1.1, M1.2
Standard 62.1, Standard 170, or ❑Not Applicable
applicable codes or accreditation
standards. Outdoor air ventilation
systems shall comply with one of
the following: a) design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b) dampers,
ductwork, and controls allow the
system to supply <= the
required minimum outdoor air
rate with a single set-point
adjustment., or c) system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum Location on plans/spec:
exhaust air rate required by ['Not Observable M0.1, M1.1, M1.2
Standard 62.1, Standard 170, or ❑Not Applicable
applicable codes or accreditation
standards. Outdoor air ventilation
systems shall comply with one of
the following: a) design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b) dampers,
ductwork, and controls allow the
system to supply <= the
required minimum outdoor air
rate with a single set-point
adjustment., or c) system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ❑Does Not does not apply.
pP Y•
have static pressure setpoint
reset controls. ['Not Observable See the Mechanical Systems list
❑Not Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ❑Does Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
❑Not Applicable for values.
6.5.4.2 HVAC pumping systems with >= ❑Complies Exception: Requirement
1[ME25]3 3 control values designed for ❑Does Not does not apply.
variable fluid flow (see section
details). ❑Not Observable
❑Not Applicable
[1 High Impact(Tier 1) 21—Medium Impact(Tier 2) 3 JLow Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 11 of 16
Section --- --------
Mechanical Rough-In Plans Verified Field Verified Complies? Comments/Assumptions
& Req.ID Inspection Value I Value
7.5.3 Gas-fired water-heating ❑Complies Requirement will be met.
[ME78]z equipment installed in new ❑Does Not
buildings: where a singular piece
of water-heating equipment >= ❑Not Observable
1,000 kBtu/h serves the entire ❑Not Applicable
building,thermal efficiency must
be >= 90 Et. Where multiple
pieces of water-heating
equipment serve the building
with combined rating is >= 1,000
kBtu/h,the combined input-
capacity-weighted-average
thermal efficiency, thermal
efficiency must be >= 90 Et.
Exclude input rating of
equipment in individual dwelling
units and equipment <= 100
kBtu/h.
6.5.6.1.1 Exhaust Air Energy Recovery for ❑Complies Requirement will be met.
[ME56]1 Nontransient Dwelling Units ❑Does Not
❑Not Observable Location on plans/spec:
M0.1, M1.1, M1.2, M4.1
❑Not Applicable
6.5.6.1.2 Exhaust air energy recovery for ❑Complies Exception: Laboratory
[ME111]i spaces other than Nontransient ❑Does Not systems meeting Section
dwelling units meeting Tables 6.5.7.3.
6.5.6.1.2-1, and 6.5.6.1.2-2. Not Observable
❑Not Applicable Location on plans/spec:
MO.1, M1.1, M1.2, M4.1
16.5.7.2.1 Kitchen hoods >5,000 cfm have ❑Complies Exception: Requirement
[ME32]z make up air>=50%of exhaust ❑Does Not does not apply.
air volume.
❑Not Observable
❑Not Applicable
16.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]z with mechanical exhaust <= the ❑Does Not
greater of criteria of supply flow, ❑Not Observable Location on plans/spec:
required ventilation rate, exhaust MO.1, M1.1, M1.2, M4.1
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]z with mechanical exhaust <=the ❑Does Not
greater of criteria of supply flow, ❑Not Observable Location on plans/spec:
required ventilation rate, exhaust MO.1, M1.1, M1.2, M4.1
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.3.8 Occupied standy controls for ❑Complies Requirement will be met.
[ME112]1 zones serving rooms that are ❑Does Not
required to have automatic Location on plans/spec:
partial OFF or automatic full OFF ❑Not Observable MO.1, M1.1, M1.2, M4.1
lighting controls per Section ❑Not Applicable
9.4.1.1 shall meet the following
within five minutes of all rooms in
that zone entering occupied-
standby mode: a)Active heating
set point shall be setback at least
1°F, b)Active cooling set point
shall be setup at least 1°F and
c)All airflow supplied to the zone
shall be shut off whenever the
space temperature is between
the active heating and cooling
set points.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 12 of 16
Section Mechanical Rough-In Plans Verified Field Verified 1
# Complies? Comments/Assumptions
& Req.ID Inspection Value Value
6.5.7.2,2 Kitchen hoods with a total ❑Complies Exception: Requirement
[ME47]3 exhaust airflow rate >5000 cfm EDoes Not does not apply.
meet replacement air, ventilation
system, or energy recovery ENot Observable
requirements shown in Table ENot Applicable
6.5.7.1.3.
6.5.7.2.3 Kitchen hoods with a total ❑Complies Exception: Requirement
[ME48]3 exhaust airflow rate >5000 cfm ❑Does Not does not apply.
meet replacement air, ventilation
system, or energy recovery ENot Observable
requirements. ENot Applicable
6.5.7.2.4 Approved field test used to ❑Complies Exception: Requirement
[ME49]3 evaluate design air flow rates ❑Does Not does not apply.
and demonstrate proper capture
and containment of kitchen ENot Observable
exhaust systems. ENot Applicable
6.5.8.1 Unenclosed spaces that are ❑Complies Exception: Requirement
[ME34J2 heated use only radiant heat. ❑Does Not does not apply.
ENot Observable
ENot Applicable
7.4.2 Service water heating equipment ❑Complies
[ME36]2 meets efficiency requirements. ❑Does Not
ENot Observable
ENot Applicable
6.4.3.9 Heating for vestibules and air ❑Complies Exception: Requirement
[ME63]z curtains with integral heating ❑Does Not does not apply.
include automatic controls that
shut off the heating system when ENot Observable
outdoor air temperatures > 45F. ❑Not Applicable
Vestibule heating and cooling
systems controlled by a
thermostat in the vestibule with
heating setpoint <= 60F and
cooling setpoint>= 80F.
6.5.10 Doors separating conditioned ❑Complies Exception: Alteration
[ME73]3 space from the outdoors have ❑Does Not project to existing building.
controls that disable/reset
heating and cooling system when ENot Observable
open. ENot Applicable
Additional Comments/Assumptions:
1'High Impact(Tier 1) j 2TMedium Impact(Tier 2) 3 ILow Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 13 of 16
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
10.4.1 Electric motors meet requirements ❑Complies Requirement will be met.
[EL9j2 where applicable. ❑Does Not
['Not Observable Location on plans/spec: MO.1, M1.1, M1.2, M4.1
❑Not Applicable
Additional Comments/Assumptions:
11High Impact(Tier 1) 1 2 l Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 14 of 16
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies Requirement will be met.
[FI3]3 deadband. 1/Does Not
❑Not Observable Location on plans/spec: MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.3.2 Temperature controls have setpoint ❑Complies Requirement will be met.
[F120]3 overlap restrictions. ❑Does Not
['Not Observable Location on plans/spec: M0.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.3.3.1 HVAC systems equipped with at least ❑Complies Requirement will be met.
[FI21]3 one automatic shutdown control. ❑Does Not
[Not Observable Location on plans/spec: MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.3.3.2 Setback controls allow automatic ❑Complies Requirement will be met.
[FI22]3 restart and temporary operation as ❑Does Not
required for maintenance. ['Not Observable Location on plans/spec: MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.3.5 Heat pump controls prevent ❑Complies Requirement will be met.
[FI5]3 supplemental electric resistance heat ❑Does Not
from coming on when not needed. ❑Not Observable Location on plans/spec: MO.1, M1.1, M1.2, M4.1
❑Not Applicable
6.4.3.12 Air economizer has a fault detection ❑Complies Requirement will be met.
[FI200]3 and diagnostics (FDD)system (see ❑Does Not
details for configuration and Location on plans/spec: MO.1, M1.1, M1.2, M4.1
operational requirements).
❑Not Applicable
6.4.3.6 When humidification and ❑Complies Requirement will be met.
[FIE]3 dehumidification are provided to a ❑Does Not
zone, simultaneous operation is Location on plans/spec: NA
prohibited. Humidity control prohibits Not Observable
the use of fossil fuel or electricity to ❑Not Applicable
produce RH > 30% in the warmest
zone humidified and RH < 60% in the
coldest zone dehumidified.
6.7.2.1 Furnished HVAC as-built drawings ❑Complies Requirement will be met.
[F17j3 submitted within 90 days of system ❑Does Not
acceptance.
['Not Observable
❑Not Applicable
6.7.2.2 Furnished O&M manuals for HVAC ❑Complies Requirement will be met.
[FIB]3 systems within 90 days of system ❑Does Not
acceptance.
['Not Observable
❑Not Applicable
6.7.2.3 An air and/or hydronic system ❑Complies Exception: Requirement does not apply.
[FI9]1 balancing report is provided for HVAC ❑Does Not
systems serving zones >5,000 ft2 of
conditioned area. El Not Observable
❑Not Applicable
7.4.4.3 Public lavatory faucet water ❑Complies Requirement will be met.
[FI11]3 temperature <=110°F. ❑Does Not
❑Not Observable Location on plans/spec: P1.1, P3.3, P3.4
❑Not Applicable
10.4.3 Elevators are designed with the ❑Complies Exception: Requirement does not apply.
[FI24]2 proper lighting, ventilation power, and ❑Does Not
standby mode.
❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Agilyx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: Page 15 of 16
,
Section � �� � --- -----
# Final Inspection Complies? Comments/Assumptions
& ��.i��_ _______
7.4.3 Piet 8ftofoutlet piping in LJ[omp|ies Requirement will be met.
[F[45]' nonredou|ating storage system, or []Does Not
branch piping connected to ��ca�|mm mm �|am�s�ao ' �Pl l PZ l' P] 3 P34
recirculated, heat traced, or
[]Not0bsemab|e � � ' �
impedanco heated piping is []NotApp|icab|e
insulated.
_
Additional Comments/Assumptions:
l � Low
Project Title: Agi|yx Bench Scale and Analytic Lab Report date: 12/07/21
Data filename: page 16nf 16
r
COMcheck Software Version 4.1.5.3 OFFICE COPY
Interior Lighting Compliance Certificate
(116
Project Information �e 2p11
9
Energy Code: 90.1 (2016) Standard lk-C -\\GPRD
Project Title: Agilyx Bench Scale&Analytic Lab f,\� Gp\V\S\0N
Project Type: Addition By\\-QM
Construction Site: Owner/Agent: Designer/Contractor:
13240 SW Wall St. Andrew Swartwout
Tigard, OR 97223 agilyx
13240 SW Wall St.
Tigard, OR 97223
928.301.9225
Andrew.Swartwout@Agilyx.com
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
1-Ind.Lab(Common Space Types:Laboratory For Medical/Industrial/Research) 1500 1.45 2175
2-Lab(Common Space Types:Laboratory For Medical/Industrial/Research) 818 1.45 1186
3-Corridor(Common Space Types:Corridor/Transition<8 ft wide) 317 0.66 209
4-Storage(Common Space Types:Storage>=50-<=1000 sq.ft.) 884 0.46 407
Total Allowed Watts= 3977
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
1-Ind. Lab(Common Space Types:Laboratory For Medical/Industrial/Research)
LED 1:Type A/AE:Surface Linear LED:Other: 1 10 135 1350
2-Lab (Common Space Types:Laboratory For Medical/Industrial/Research)
LED 2:Type B/BE:Surface Linear LED:Other: 1 8 75 600
3-Corridor(Common Space Types:Corridor/Transition<8 ft wide)
LED 3:Type C/CE:Linear LED:Other: 1 3 38 114
4-Storage (Common Space Types:Storage>=50-<=1000 sq.ft.)
LED 4:Type C/CE:Linear LED:Other: 1 8 38 304
Total Proposed Watts= 2368
Interior Lighting PASSES: Design 40% better than code
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been
designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.3 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Dennis Hall-Electrical Designer ,42--—��� 12/6/2021
Name-Title Signature Date
Project Title: Agilyx Bench Scale&Analytic Lab Report date: 12/06/21
Data filename: C:\Users\Dennis.RWE\Desktop\Agilyx.cck Page 1 of 6
0
COMcheck Software Version 4.1.5.3
ifirt
Exterior Lighting Compliance Certificate
Project Information
Energy Code: 90.1 (2016) Standard
Project Title: Agilyx Bench Scale&Analytic Lab
Project Type: Addition
Exterior Lighting Zone 2 (Light industrial area with limited nighttime use(LZ2))
Construction Site: Owner/Agent: Designer/Contractor:
13240 SW Wall St. Andrew Swartwout
Tigard, OR 97223 agilyx
13240 SW Wall St.
Tigard, OR 97223
928.301.9225
Andrew.Swartwout@Agilyx.com
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts/Unit Wattage (B X C)
LOADING/DRIVE(Walkway<10 feet wide) 200 ft of 0.5 Yes 100
Total Tradable Watts(a)= 100
Total Allowed Watts= 100
Total Allowed Supplemental Watts(b)= 400
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
LOADING/DRIVE (Walkway< 10 feet wide 200 ft of walkway length):Tradable Wattage
LED 1:Other: 1 6 39 234
Total Tradable Proposed Watts= 234
Exterior Lighting PASSES: Design 53% better than code
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed exterior lighting systems have been
designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.3 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Dennis Hall - Electrical Designer �_ �---_�� 12/6/2021
Name-Title Signature Date
Project Title: Agilyx Bench Scale&Analytic Lab Report date: 12/06/21
Data filename: C:\Users\Dennis.RWE\Desktop\Agilyx.cck Page 2 of 6
iiminiregorrnorrimiilW No.
•
COMcheck Software Version 4.1.5.3
II(in'
Inspection Checklist
Energy Code: 90.1 (2016) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
4.2.2, Plans, specifications, and/or ElComplies Requirement will be met.
8.4.1.1, calculations provide all information El Does Not
8.4.1.2, with which compliance can be Location on plans/spec: E1.0 and E3.0
8.7 determined for the electrical systems El Not Observable
[PR6]2 and equipment and document where ❑Not Applicable
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
9.4.3, 9.7 calculations provide all information ElDoes Not
[PR4]1 with which compliance can be El Not Observable Location on plans/spec: E0.2, E2.0 and E2.1
determined for the interior lighting
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
9.7 Plans, specifications, and/or ❑Complies Requirement will be met.
[PR8]1 calculations provide all information ElDoes Not
with which compliance can be Location on plans/spec: E2.0
determined for the exterior lighting
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Additional Comments/Assumptions:
L1 iHigh Impact(Tier 1) 1 2 'Medium Impact(Tier 2) 1 3 Low Impact(Tier 3) 1
Project Title: Agilyx Bench Scale&Analytic Lab Report date: 12/06/21
Data filename: C:\Users\Dennis.RWE\Desktop\Agilyx.cck Page 3 of 6
Section
Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID 8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Receptacles intended for 24 hour operation of
[EL10]z 20-Amp receptacles are controlled by ❑Does Not equipment.
an automatic control device.
['Not Observable Location on plans/spec: E1.0
❑Not Applicable
8.4.3 New buildings have electrical energy ❑Complies Exception: Critical and Equipment branches of NEC Article
[EL11]2 use measurement devices installed. ❑Does Not 517.
Where tenant spaces exist, each ❑Not Observable
tenant is monitored separately. In Location on plans/spec: E1.0
buildings with a digital control system ❑Not Applicable
the energy use is transmitted to to
control system and displayed
graphically.
9.4.1.1 Automatic control requirements ❑Complies Requirement will be met.
[EL1]z prescribed in Table 9.6.1,for the ❑Does Not
appropriate space type, are installed. ❑Not Observable Location on plans/spec: E2.0 and E2.1
Mandatory lighting controls (labeled
as 'REQ') and optional choice controls ❑Not Applicable
(labeled as'ADD1' and 'ADD2') are
implemented.
9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met.
[EL2]z per approved lighting plans and all ❑Does Not
manual controls readily accessible and Location on plans/spec: E2.0 and E2.1
visible to occupants. ❑Not Observable
❑Not Applicable
9.4,1.1f Daylight areas under skylights and ❑Complies Exception: Requirement does not apply.
[EL13]1 roof monitors that have more than ❑Does Not
150 W combined input power for
general lighting are controlled by ❑Not Observable
photocontrols. ;❑Not Applicable
9.4.1.4 Automatic lighting controls for exterior ❑Complies Requirement will be met.
[EL3}2 lighting installed. ❑Does Not
❑Not Observable Location on plans/spec: E2.1
❑Not Applicable
9.4.1.3 Separate lighting control devices for EComplies Requirement will be met.
[EL4]1 specific uses installed per approved ❑Does Not
lighting plans. ❑Not Observable Location on plans/spec: E2.0 and E2.1
❑Not Applicable
9.6.2 Additional interior lighting power ❑Complies Requirement will be met.
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is Location on plans/spec: E2.0
automatically controlled and ❑Not Observable
separated from general lighting. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Agilyx Bench Scale&Analytic Lab Report date: 12/06/21
Data filename: C:\Users\Dennis.RWE\Desktop\Agilyx.cck Page 4 of 6
-
' Section | -- ------ -- —
# Final Inspection Complies? Comm emta/Assmmmptimms
&1Re8.ID J
8J.1 Furnished as-built drawings for LJ[omp|ies Requirement will bemet.
[F|lO]s electric power systems within 30days []Does Not
n/system acceptance.
[]NotObsemab|e
[]NotApplicable
8I2 Furnished O&M instructions for []Complies Requirement will bemet.
[F[17]3 systems and equipment tothe []Does Not
building owner or designated
representative. []motob,ervab|e
ONotApp|icab�
92.2.3 Interior installed lamp and fixture LJ[omp|ies See the Interior Lighting fixture schedule for values.
[F|18]1 lighting power is consistent with what []Does Not
is shown on the approved lighting
plans, demonstrating proposed watts []mot0bsemab|e
are less than nr equal toallowed []NotApp|icab|e i
watts.
9.42 Exterio,Ughdngpowe�—cunsistenL [][nmp|ies---�See the Exterior Lighting fixture schedule for values. --
[F|1911 with what is shown on the approved []DoesNct
lighting plans, demonstrating
proposed watts are less than o,equal []NotObsemab|e
to allowed watts. []NotApp|icab|e
9.4.4 4t least 75mof all permanently []Complies Exception: Requirement does not apply.
[F|ZO]z installed lighting fixtures indwelling []Does Not
units have >~ ss |m8w efficacy or
>= 45 |m/W� �� efficacy.acy� []NotObsemab|e
�� []mo«Appxcab|e
AdditionsUCommmments/Assummptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier Z — �'Low Impact(Tier 3) /
Project Title: xgi|yx Bench Sca|e6 Analytic Lab Report date: 12/06/21
Data filename: c:\users\Dennisavvs\Deskmp\Aoi|vx.ok page 5of 6
•
Project Title: Agilyx Bench Scale&Analytic Lab Report date: 12/06/21
Data filename: C:\Users\Dennis.RWE\Desktop\Agilyx.cck Page 6 of 6