Loading...
Correspondence PLm2022.-00203 Branden Taggart 73Z9' r?,2ro$�nrrz0 From: #Building Permit Technicians Sent: Tuesday, May 31, 2022 9:53 AM To: Andrew Xu Subject: FW: Bridgeport Village Remodel - Plumbing Permit: 7455 SW Bridgeport Rd. Attachments: PLMU_PermitApp - HDG filled.pdf Hi Andrew, I sincerely apologize for the delayed response. We are just getting caught up with staff being out of the office for extending periods of time. After reviewing the attached application, we will need you to complete the applicant section, and also sign and date the bottom of the form. Once received, I will make sure to expedite plan review for you. Thank you, Branden Taggart City of Tigard ^: Senior Permit Technician Community Development 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent i"tigard-or,gov From: Andrew Xu <andrew.xu@hdgpdx.com> Sent:Thursday,April 28, 2022 9:18 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: Bridgeport Village Remodel - Plumbing Permit: 7455 SW Bridgeport Rd. Caution!This message was sent from outside your organization. Hi Branden, Please see attached Permit Application filled out. Best Regards, Andrew Xu Senior Project Designer D: 503.946.9533 Humber Design Group, Inc. Urban Civil Engineering 110 SE Main Street, Suite 200, Portland, OR 97214 www.hdgpdx.com 100 Best Companies in Oregon 2019 and 2020 100 Best Green Workplaces in Oregon 2019 City of Portland Sustainability at Work Silver Certified 1 From:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Sent:Wednesday, April 27, 2022 4:30 PM To:Andrew Xu <andrew.xu@hdgpdx.com> Subject: FW: Bridgeport Village Remodel - Plumbing Permit: 7455 SW Bridgeport Rd. Andrew, I was out of the office last week unexpectedly. I apologize for the delayed response. I see that the scope of work is within our jurisdiction. Thank you for providing plans showing the location. I have attached the Site Utilities Plumbing Permit Application above for you to complete. Once I receive the completed application, I will forward the plans for our Plumbing Inspector to review. Plumbing plan review is completed within 4-8 weeks—depending on our workload. However, site utilities permits are typically reviewed within the front end of this timeline. Thank you, Branden Taggart City of Tigard 711 . Senior Permit Technician Community Development 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandent@tigard-or,gov From:Andrew Xu <andrew.xu@hdgpdx.com> Sent:Tuesday, April 12, 2022 10:00 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: Bridgeport Village Remodel - Plumbing Permit: 7455 SW Bridgeport Rd. Hi Branden, Please see attached Utility Plan and Basin map for the proposed detention system. Best Regards, Andrew Xu Senior Project Designer D: 503.946.9533 Humber Design Group, Inc. Urban Civil Engineering 110 SE Main Street, Suite 200, Portland, OR 97214 www.hdgpdx.com 700 Best Companies in Oregon 2079 and 2020 700 Best Green Workplaces in Oregon 2079 City of Portland Sustainability at Work Silver Certified 2 From: #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Sent: Monday, March 28, 2022 1:46 PM To: Andrew Xu <andrew.xu@hdgpdx.com> Subject: RE: Bridgeport Village Remodel - Plumbing Permit: 7455 SW Bridgeport Rd. Importance: High Hi Andrew, I will need an aerial shot showing the exact location of the detention system in order to proceed. Thank you, Branden Taggart n City of Tigard ffi.=t- Senior Permit Technician Community Development 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent©tigard-or,gov From: Andrew Xu <andrew.xu@hdgpdx.com> Sent:Thursday, March 17, 2022 12:20 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Re: Bridgeport Village Remodel - Plumbing Permit: 7455 SW Bridgeport Rd. Hi Brenden, The detention system will be installed in The parking lot located just west of the theatre building which is located in Tigard boundary. It was previously coordinated with both Tualatin and Tigard that a plumbing permit will be required for the storm piping (not including the detention system itself) that will be installed in that area. Let me know if that is not the cause anymore. Best Regards, Andrew Xu Get Outlook for iOS From:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Sent:Thursday, March 17, 2022 9:03:55 AM To:Andrew Xu <andrew.xu@hdgpdx.com> Subject: RE: Bridgeport Village Remodel - Plumbing Permit: 7455 SW Bridgeport Rd. Hi Andrew, 7455 SW Bridgeport Road is a ways off of our jurisdictional boundary as you can see from the aerial shot below. We will not be issuing a Plumbing permit for this address since it is outside our jurisdiction. Please verify the address for the detention system piping. 3 , ., al,,, ,, -,t, ,,.,,:-.6,, , : p„. ,,,,,). , ,„ - „ , ; , , „ , :. ., , ,,,.,,,.. ,„.,..,,,:-. , , „,, , j§ �' •P i Rfi'. , , :• ,,,L•".,.. '`;':::7,7•;..: ' '7''' '•'..7,.. . 1 .:. .' ' •,•• ,„.. . 7 7 1.:;,,,j•':•,,, ' )0P.P"r-.4::;.:''''',._ „. • Y h • • ' y94t , ,T ; ??1 '»e» , RJ 5 .i.: i aN a IL,ti ,# s t 4 ,4 • . r t .it: ' & + r. r►;h. r ) aai'i p ° Ir1 :r t •d (-t),• p''''''IL W ,a� Y •w�,{p,` • fp . • {` 'Cf * "dye'', �'� , r. ,y`r, +)',C;,d s 'yet .J �t �.e ;y fK dq' ti t s x /e( ,.gyp; .Y, ,,,, f'� £`fit., ':.,', 1.. *,., ,i,L.',. :,4.,444•1 % 4, ' -0,-:::,"i,-, , viy,:y,44' i;.....%1*,.,y.ty 4,.i i,- 1,,,,c',",'' ; '. r,.., 41,'''. .:4 1 ' 'L „. ',.•4 I.‘L, .1*.4„Lii / • .44;ot • V ' ,'',4, ,• e....T.....,„..i. , ,i , i:1;,, , ,,, t..,,,. ,,, -, „"f t a t yy I : r k a,.• fit if Thank you, 4 a.atauiYMf*IWiuHM4 t&kauMusuWunFWuxsanufiNNMMIO N{itlYtNuiauuuutuauauwaawaFFai3aEHH UM S 4 k4 144SU'....a iwi t&ts"r'i ,yu3iuu4au3f.3a1uoiaylA&yuyikUµliWbsM*.FFlMa 4M144s41 41Y.lua4N]tkNaf4}Jiuibat41 444F44.44 ic#u14SIO ISMIII 144MtMLaieuubke4iruUuiiuseF.s Branden Taggart q City of Tigard a 4. Senior Permit Technician fidAig Community Development 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent@tigard-or.gov From: Andrew Xu <andrew.xu@hdgpdx.com> Sent:Tuesday, March 8, 2022 12:30 PM To: #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Bridgeport Village Remodel - Plumbing Permit You don't often get email from andrew.xu@hdgpdx.com. Learn why_this is important We have a project for the Bridgeport Village Remodel in which the property straddles the boundary between Tualatin and Tigard.There will be a detention system installed on the Tigard side that will be associated with the modifications (located all in the Tualatin boundary). The detention system itself will be included in the TUALATIN permits. It has been coordinated between Tualatin and Tigard that the EC and WQ permits will be signed off via Tualatin and a plumbing permit will be coordinated with Tigard regarding the piping in the ground around the detention system. What further information/process is needed to start on the documentation/approval of the plumbing permit for the in ground utilities around the proposed detention system for the project? Best Regards, Andrew Xu Senior Project Designer D: 503.946.9533 Humber Design Group, Inc. Urban Civil Engineering 110 SE Main Street, Suite 200, Portland, OR 97214 www.hdgpdx.com 700 Best Companies in Oregon 2019 and 2020 700 Best Green Workplaces in Oregon 2019 City of Portland Sustainability at Work Silver Certified DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 5