Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (2)
�ti �C O � Y 9— OFFICE COPY Approved plans 0‘ AERIAL SITE VIEW JURISDICTION CODES AND STANDARDS 0...• a `'`- . GOVERNING WORK SHALLEION �rt1g� `"`1, I_ ALL COMPLY WITH '` ,- } - 2021 OREGON ELECTRICAL SPECIALTY CODE(OESC) 2019 OREGON STRUCTURAL SPECIALTY CODE(OSSC) - 2021 OREGON RESIDENTIAL SPECIALTY CODE(ORSC) Jr 1 •. -w•y, '(, , 2018 INTERNATIONAL FIRE CODE(IFC) �..�j{ r 2021 OREGON PLUMBING SPECIALTY CODE r H AND ALL STATE AND LOCAL BUILDING.ELECTRICAL.AND PLUMBING CODES. X CONFIDENTIAL-THE INFORMATION "' r HEREIN CONTAINED SHALL NOT BE USED _ "'-)'44 SITE CLASSIFICATION NOTES,OSHA REGULATION FOR THE BENEFIT OF ANYONE EXCEPT IO -, OCCUPANCY CLASS SFR DEVELOPER.LLC NOR SHALL IT BE CONSTRUCTION CLASS V-B DISCLOSED IN WHOLE OR IN PART TO 4 ZONING TYPE: RESIDENTIAL OTHERS OUTSIDE RECIPIENTS �+e. ORGANIZATION,EXCEPT IN CONNECTION S,rrTT a A,' Vil--,.f,- y 1 WITH THE SALE AND USE OF THE I. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. RESPECTIVE EQUIPMENT,WITHOUT THE J �{ y WRITTEN PERMISSION OF ION DEVELOPER 2. THIS PROJECT HAS BEEN REVIEWED AND WILL NOT DIRECT CONCENTRATED SOLAR RADIATION OR GLARE ?*�yS _ ONTO NEARBY PROPERTIES OR ROADWAYS. LLC. 4!-1 3. ROOF ATTACHMENTS SHALL BE SPACED NO GREATER THAN 24'ON CENTER IN ANY DIRECTION WHERE LOCATED WITHIN 3'OF A ROOF EDGE,HIP,EAVE.OR RIDGE OSSC 3111.3.5.3 ITEM 3.2 ELECTRICAL CRITERIA.NOTES NQO-EP ,# TEMPERATURE SOURCE. ASHRAE WEATHER STATION: PORTLAND HILLSBORO I CERTIFIED EXTREME MIN.TEMPERATURE. -8 ASHRAE 0.0%HIGH TEMP 37 PV INSTALLATION O 0 PROFESSIONAL w» . -t 1. DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. .�_ SCOTT A.GURNEY �r�!#PV-0117719-015866 M - „-- '�• 2. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS(WHEN PROVIDED)IN �ek ACCORDANCE WITH NEC 110.14(D)ON ALL ELECTRICAL. ION DEVELOPER,LLC T' 3. PV MODULE CERTIFICATIONS WILL INCLUDE ULI703,IEC61646,IEC61730. 4801 N UNIVERSITY AVE#900 PROVO.Ul • i 84604 4. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO �..rp 888 781.7074 ` ' - �* •-�zr O f."i k r y-^�iy �5 � `_ LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. X r♦ A. • 5 • . PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL DAVID STANLEY CONRAD f k� 5.7 • jr ' NY:1�,7 ,L BE PROVIDED AS PER SECTION[NEC 110.26]. C-ELECTRICAL CONTRACTOR t -- _ r _ • nsza STRUCTURAL CRITERIA,NOTES DESIGN LOAD STANDARD ASCE 7-16 I WIND EXPOSURE CATEGORY B WIND SPEED(3-SEC GUST). 96 MPH 1 GROUND SNOW LOAD: 25 PSF`� 4 RECEIVED DESIGNSNOW LOAD. 25 PSF p 4 SEISMIC DESIGNCCATEGORY: D SEISMIC RISK FACTOR: II Z NI W N _ 3 LStL- <n z ci 9 1"1I z N Q - _, MID Y M'1) , 0 ^rn(OF I- N 1— M1 � , V w . BUILDING DN1SiON Z � - R r o z E0 z a o,u T CITY OF TIGARD - a w 0 0 - - " . �` ZQ = w owe. # - 1'D FOR ,ODE COMPLIANCE Cr S 0 m a 0- ., tt" " " - E` tl ab 0 IL I — 7c z 3 0) it _1 '- 3 • pprovc Z ^ SCOPE OF WORK SHEET LIST OTC: [ 1 U n `=' 1-- DRAWING BY INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM G-I COVER SHEET ENPHASE ENERGY V-2 SITE PLAN(AD. LIB) Permit #: -1282Z—OD I J v 0 PR 7.98 KW DC 8:6.09 KW AC PHOTOVOLTAIC SOLAR ARRAY S-3 ROOF PLAN (LF- _Ores, DATE S-4 STRUCTURAL DETAILS Address: i z- a ` ��WIN\ ' . Oy IL-05-2022 PV MODULES: (21)SILFAB SOLAR SIL-380 HC 20211101 S-5 STRUCTURAL CALCULATIONS&NOTES 4) y` E-6 ELECTRICAL DETAILS(LINE DIAGRAM) Suite #: PROJECT ID INVERTER(S): (21)ENPHASE IQ7PLUS-72-2-US E-7 ELECTRICAL CALCULATIONS& NOTES 006UOK E-8 ELECTRICAL LOAD CALCULATIONS(ADM`R). OREG•N ROOF TYPE: COMPOSITION SHINGL VALIDITY OF PER 'l$' ELECTRICAL LABELS&LOCATIONS .+• ' Date: ink' oeL1. SHEET NAME PV MOUNTING HARDWARE: ECOFAS N ILICKFIT ff 1� -10 ELECTRICAL DIRECTORY PLACARD(AD. LIB) 'I 4y 05/17/2022 COVER SHEET THE ISSUANCE OF A PERMIT -N Rows SHEET NUMBER REVISON BASED ON CONSTRUCTION EXPIRES:12/31/24 G-I 0 DOCUMENTS AND OTI- ER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. ORSC 105.4 . • SITE NOTES: I. ROOF ATTACHMENTS SHALL BE SPACED NO CHIMNEY ION GREATER THAN 24"ON CENTER IN ANY DIRECTION WHERE LOCATED WITHIN 3' OF A ROOF EDGE,HIP, EAVE, OR RIDGE OSSC 3111.3.5.3 ITEM 3.2 111 CONFIDENTIAL-THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT 10 DEVELOPER.LLC NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION.EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT,WITHOUT THE WRITTEN PERMISSION OF ION DEVELOPER LLC. 6BCEP 1 CERTIFIED PV INSTALLATION PROFESSIONAL - S.j /..',SCOTT A GURNEY �. #Pv-OII]]I9-015866 LLIION DEVELOPER,LLC 4801 N UNIVERSITY AVE#900 PROVO.Ul W6460L n= Q 888]81]0]L I -- � O ZZ Y C= F-LL �~ WZ 3l, �� oCt F��� RSI (` o n LIJN 00 Mil ` )\/���� Z. N N J Z NZ Q rn B WM HU III Ep PROF OVERHEAD SERVICE LINE DREG N DRAWING BY v44,fir�(N15 ENPHASE ENERGY SCALE: 3/32" = I'-0" 44N R0`N\�l 05/17/2022 DATE 918 EXPIRES:12/31/24 4-05-2022 SYSTEM LEGEND ((N) O ROOF SECTION ROOF PV MODULE PROJECT ID 0 I(N)PV COMBINER PANEL cN) (N)JUNCTION BOX SUNEYE LOCATION SECTION OTY AZIMUTH PITCH TSRF 006UOK (El UTILITY METER/ CRITERIA AND RSI UI ND I6 77% ® I(N)I IN)PV LOAD CENTER (R1 (N)AC DISCONNECT FIRE SETBACK SPECIFICATIONS MAIN SERVICE PANEL LO ACD (VISIBLE-OPEN LOCKABLE LABELED DISCONNECT) N SHEET NAME YAiNI(E)MAIN SERVICE PANEL (N)PV PRODUCTION OCR ROOF PLAN METER (N)MICROINVERTER (N)PV MODULE SHEET NUMBER REv1SON e (El SUBPANEL I(N)I(N)DC-DC/STRING I U S-3 cb I(N)DC DISCONNECT 1 INVERTER RACKING INSTALLATION SCHEDULE AND STRUCTURAL CRITERIA RACKINPV RACKNG ECOFASTEN CLICKFIT RAAIL SPNAPORTRAIT-MODULE ORIENTATION �PV?MODULE REA TAG SPAN I PV MOUNTING RAIL t PORTRAIT ION RACKING TYPE: RAIL X-SPACING P-XI 49 IN.O.C.MAX. ORIENTATION STANDOFF: CLICKFIT L-FOOT O-CANTILEAVER P-X2 16 IN.MAX. 11 N STANDOFF TYPE: L-FOOT 0 FLASHING Y-SPACING P-YI 37.4 IN.MIN.-45.3 IN.MAX. ____..! 506•X 3-I/2•ZINC PLATED PV ARRAY DETAIL,FRONT VIEW —P-X2 P-XI FASTENER: STEEL LAG SCREW Y-CANTILEAVER P-Y2 12.1 IN.MIN.-16 IN.MAX. CONFIDENTIAL-THE INFORMATION SCALE:3/8'=I'-O" 1 HEREIN CONTAINED SHALL NOT BE USED X LANDSCAPE II*e FOR THE BENEFIT OF ANYONE EXCEPT 10 STRUCTURAL RAIL-LANDSCAPE-MODULE ORIENTATION N M� O ORIENTATION DEVELOPER.LLC NOR SHALL IT BE ROOF TOPE: COMPOSITION SHINGLE X-SPACING L-XI 40 IN.O.C.MAX. O DISCLOSED IN WHOLE OR IN PART TO ROOF SHEATHING TYPE. I/2•PLYWOOD X-CANTILEAVER L-X2 16 IN.MAX. L-X2 L-XI OTHERS OUTSIDE RECIPIENTS ORGANIZATION,EXCEPT IN CONNECTION STRUCTURE TYPE. CONVENTIONAL FRAMING V-SPACING L-YI 21.1 IN.MIN.-25.1 IN.MAX. WITH THE SALE AND USE OF THE RAFTER SIZE: 2-2x6 Y-CANTILEAVER L-Y2 7.9 IN.MIN.-9.8 IN.MAX. RESPECTIVE EQUIPMENT.WITHOUT THE RAFTER SPACING: 24 PORTRAIT WRITTEN PERMISSION OF ION DEVELOPER ORIENTATION LLC. ARRAY PARAMETERS TOTAL ROOF AREA(SO.FT.) 2559 �P Y2 �ABCEP TOTAL PV MODULE ROOF REA 50.FT.) 413.7 L_Y2 f CERTIFIED %PV MODULE ROOF COVERAGE 16% LANDSCAPE '3� oR1ENr4naN PV INSTALLATION r0 FROSTS P-YI ' PROFESSIONAL '�� 'g.� SCOTT A.GURNEY #PV-01I]T I9-015066 .SYj PV ARRAY DETAIL,SIDE VIEW GINfE9 py...c.,_ ON DEVELOPER,LLC $GALE:3/6"=I-0" �'� 4801 N UNIVERSITY AVE#900 PROVO.Ul 950P r� '' 84604 888.781.7074 DAVID STANL DREG N ' L-YI RACKING ATTACHMENTS TO BE STAGGERED BY SHIFTING EACH C-ELECTRICAL E CONTRACTOR ✓4/1/)1�1Gti� SUBSEQUENT ROW OF ATTACHMENTS ONE RAFTER OVER CI524 •q/ A05�17�2�22 TO DISTRI: TE Le• :ASS ALL FRAMING MEMBERS UNDER PV ARRAY. 4N RONN\,4 EXPIRES:12/31/24 0 w = STRUCTURAL UPGRADE REQUIRED-FULL RAFTER SISTER w N > PV MODULE I. INSTALL(N)FULL SISTER FULL LENGTH LUMBER OR Q v V OVERLAPPED W/SPLICE TO(E)RAFTERS TO OCCUR ONLY UNDER J z_ o N Q Allillli PV ARRAY. w r n M v 1- N Q N _J N w C CLICKFIT RAIL 2, SECURE WITH(N)SIMPSON SDW22300 STRUCTURAL SCREWS 3 a. ` OR 16D SINKERS SPACED STAGGERED 16"APART. p 0G 0 Y L z w Q ,J O U,u 3. SECURE EACH END WITH 3 SCREWS OR NAILS GROUPED WITHIN Q w CLICKFIT L-FOOT Q = w EACH END0 - mQ a �i-W(E)COMP SHINGLEii'- ZWAXAXROOF MEMBRANE \ J F v v ° ' \r DRAWING BY -� COMP SHINGLE FLASHING 4'-0"MIN. IF ENPHASE ENERGY INSTALLED W/ 2i"MIN.IIIIIIIIIIIIIPF (E)RAFTER OVERLAPPED SPLICE DATE DEPTH 5/16'ZINC PLATED STEEL (E)CEILING JOIST 14-05-2022 LAG SCREW WITH 2-1/2" • MIN. EMBEDMENT IN TO PROJECT ID (E)ROOF RAFTER 006UOK (E)LBW STRUCTURAL UPGRADE FULL RAFTER SISTER O STANDOFF DETAIL O SHEET NAME SCALE: 3" = I'-0" SCALE: N.T.S STRUCTURAL DETAILS SHEET NUMBER REVISON S-4 0 PV SYSTEM STRUCTURAL SPECIFICATIONS AND CALCULATIONS PV SYSTEM EQUIPMENT SPECIFICATIONS DESIGN LOCATION AND SITE SPECIFICATIONS GRAVITY LOAD/FRAMING CALCULATIONS I 0 II MODULE MANUFACTURER I TYPE SILFAB SOLAR SIL-380 HC 20211101 JURISDICTION DEAD LOAD(PSF) RSI SOLAR MODULE WEIGHT(LBS) 43 CITY OF TIGARD ROOF MEMBRANE COMPOSITION SOLAR MODULE LENGTH(IN.) 69.4 STATE OREGON SHINGLE 4.0 SOLAR MODULE WIDTH(IN.) 40.8 ADOPTED LOAD STANDARD ASCE 7-16 SHEATHING I/2"PLYWOOD 1.7 SOLAR MODULE AREA(SQ.FT) 19.7 OCCUPANCY/RISK CATEGORY II PV RACKING ECOFASTEN CLICKFIT BASIC WIND SPEED(MPH(3-SEC GUST)) 96 CONVENTIONAL CONFIDENTIAL-THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED PV RACKING TYPE RAIL WIND EXPOSURE CATEGORY B FRAMING W/ FOR THE BENEFIT OF ANYONE EXCEPT IO PV ROOF ATTACHMENT CLICKFIT L-FOOT GROUND SNOW LOAD(PSF)(PG) 25 STRUCTURAL DEVELOPER,LLC NOR SHALL IT BE 5/16"X 3-I/2"ZINC PLATED STEEL LAG FRAMING UPGRADE- RAFTER 1.6 DISCLOSED IN WHOLE OR IN PART TO PV ROOF ATTACHMENT FASTENER SCREW BASE ELEVATION(FT) 153 2-2X6 @ 24 IN.O.C. OTHERS OUTSIDE RECIPIENTS RACKING DEAD LOAD(POE) 0.8 -DF#2 0I3.4 FT. ORGANIZATION.EXCEPT IN CONNECTION MAX SPAN WITH THE SALE AND USE OF THE SOLAR MODULE DEAD LOAD(PSF) 2.18 DESIGNED ROOF SNOW LOAD CALCULATIONS ASCE 7-16(CRC) RESPECTIVE EQUIPMENT,WITHOUT THE TOTAL PV ARRAY DEAD LOAD(PSF) 2.98 SLOPED ROOF SNOW LOAD(PSF) EON.7.4-I WRITTEN PERMISSION OF ION DEVELOPER LLC. -PS=(Cs)(0.7)(CE)(CT)(Is)(Ps) TOTAL ROOF DEAD LOAD(POP) 7.3 PV SYSTEM STRUCTURAL SPECIFICATIONS EXPOSURE FACTOR(CE)= 1.0 TABLE 7.3-I ADJUSTED TO SLOPED ROOF(PSF) 7.5 STRUCTURE TYPE-ROOF SHAPE INHABITED-GABLE/FLAT ROOF THERMAL FACTOR(CT)= 1.0 TABLE 7.3-2 NABCEP MIN.ROOF SLOPE(DEG.) 16 IMPORTANCE FACTOR(Is)= 1.0 TABLE 1.5-2 PV ARRAY ADJ.TO ROOF SLOPE(POE) 3.1 MEAN ROOF HEIGHT(FT.) 9 SLOPE FACTOR(Cs)= 1.0 FIG.7.4-I ROOF LIVE LOAD<ROOF SNOW LOAD(POP) 25.0 I CERTIFIED PORTRAIT ATT.SPACING(IN.O.C.) 48 Ps(PST)= 25 OY, TOTAL LOAD(POE) 35.6 PV INSTALLATION LANDSCAPE ATT.SPACING(IN.O.C.) 48 ItOF ATTACHMENT POINTS 42 RAFTER/TOP CHORD MEMBER PROPERITES DF#2-2-286 PROFESSIONAL MAX.POINT LOAD(LBS/ATT.) 18.3 SECTION MODULUS(S)(IN'3) 15.13 S-4 SCOTT A.GURNEY TOTAL V DEAD LOAD TO RAFTER(LBS) 18.3 MOMENT OF INERTIA(1)(IN'4) 41.59 #PV-OI77l9-OI5866 TOTAL LOAD ON MEMBER(W)(PIE) 71.1 ION DEVELOPER.LLC DESIGN WIND PRESSURE AND CONNECTION UPLIFT CALCULATIONS ASCE 7-16(CBC) MAX.MEMBER SPAN(L)(FT) 13.4 4801 N UNIVERSITY AVE#900 PROVO.U1 84694 DESIGN WIND PRESSURE(PSF)=P=DH(GCN(YE)MA) EQN.29.4-7 MODULUS OF ELASTICITY(E)(PSI) 1600000 888.78L7074 VELOCITY PRESSURE(PSF)=OH=0.00256(KH)(KZ7XKo)(KEXV'2) EON.26.10-I SHEAR(Fv)(PSI) 180 TERRAIN EXPO.CONSTANT(A)= 7 TABLE 26.11-1 ARRAY EDGE FACTOR(YE)= I TABLE 26.13-I AREA(A)(IN-2) 16.5 DAVID STANLEY CONRAD TERRAIN EXPO.CONSTANT(ZG)(FT)= 1200 TABLE 26.11-I GROUND ELEVATION FACTOR(KE)= 0.99 FIG.29.4-8 C-ELECTRICAL CONTRACTOR VP EXPOSURE COEFF.(KH)= 0.70 EON.C26.10-I EON.26.10-I MAX BENDING STRESS CHECK (FB)(CBXCF)(CR) C1574 TOPOGRAPHIC FACTOR(KZ.)= 1.0 EON.26.8-1 OH(PSF)= 13.96 BENDING(Fs)(PSI) 900 WIND DIRECTIONALITY FACTOR(KB)= 0.85 TABLE 26.6-I LOAD DURATION FACTOR(Co) 1.15 SIZE FACTOR(CF) 1.30 UPLIFT DOWNWARD REPETITIVE MEMBER FACTOR(CR) 1.15 GABLE ROOF 7°<0 820. ZONE I ZONE 2R ZONE 2E ALL ZONES FIGURE 30.3-2B ALLOWABLE BENDING STRESS(PSI) 1547.3 3 RAIL-PORTRAIT MODULE ORIENTATION 48 IN.O.C. 48 IN.O.C. 48 IN.O.C. 48/N.O.C. W = SOLAR PANEL PRESSURE EQ.FACTOR(YA)= 0.80 0.80 0.80 0.80 ACTUAL BENDING STRESS(PSI)_(wL-2)/(8(S)) 1266.5 Z N W EXTERNAL PRESSURE COEFF.(GCP)_ -2.0 -3.0 -3.6 0.7 82% OK > II ASD PRESSURE 0.6P(PSF)_ -13.40 -20.10 -24.12 13.03 Q u TRIBUTARY AREA(SQ.FT)= 11.6 11.6 8.7 MAX DEFLECTION CHECK-TOTAL LOAD UNIFORM DISTRIBUTED U7 N V MAX.UPLIFT(0.6DA0.6P)(LBS)_ -134.3 -211.8 -t93.7 ALLOWABLE DEFLECTION L/180 J - c0 NI Q Y M 0.893 IN. W I- PA -7 4; L,RAIL-LANDSCAPE MODULE ORIENTATION 48 IN.O.C. 48/N.O.C. 48 IN.O.C. 48/N.O.C. ACTUAL MAX DEFLECTION (W)(U"4/185(E)(1) W Q N -7C SOLAR PANEL PRESSURE EQ.FACTOR(TA)= 0.80 0.80 0.80 0.80 0.322 IN. Z U) Ce , L EXTERNAL PRESSURE COEFF.(GCP)_ -2.0 -3.0 -3.6 0.7 ASD PRESSURE(0.6P)(PSF)_ -13.40 -20.10 -24.12 13.03 36% OK � 4 w Z < 0 P MAX DEFLECTION CHECK-LIVE LOAD Q Q 3 c00 O - TRIBUTARY AREA(SO.FT)= 6.80 6.80 5.10 ALLOWABLE DEFLECTION L/240 F = W (17 W LA 5 MAX.UPLIFT(0.6Da0.6P)(LBS)_ -79.0 -124.5 -113.9 0.67 IN. 0 F CL CO Q CJ F 0 O O Q = 0_ ACTUAL MAX DEFLECTION (W)(L)'4/185(EX1) ROOF ATTACHMENT FASTENER CHECK Z In C] J d NOS 12.2 0.277 IN. CLICKFIT L-FOOT-3/I6'X 3-1/2"ZINC PLATED W 3 Q /n W op Z P O .", o, STEEL LAG SCREW MANUFACTURER MAX.UPLIFT CAPACITY=359.6 LBS 41% OK LLIJ N v v r LAG SCREW WITHDRAWAL DESIGN VALUE(LBS)=W=1800(G'3/2)(D"3/4) 12.2.1 MAX SHEAR CHECK - ROOF ATTACHMENT FASTENER(D)= 5/16 IN.LAG SCREW LUMBER SPECIFIC GRAVITY(G)= 0.5 TABLE 2.3.2 ALLOWABLE SHEAR FA(A) DRAWING BY FASTENER OTT PER ATTACHMENT= I LOAD DURATION FACTOR(CD)= 1.6 TABLE 12.3.34 2970 LBS. ENPHASE ENERGY FASTENER EMBEDMENT DEPTH(IN.)= 2.5 PRYING COEFFICIENT= 1.4 ACTUAL MAX SHEAR (wXU/2 WITHDRAWAL DESIGN VALUE(W)(LBS/IN.)= 266.0 I PROFE477 LBS. DATE LAG SCREW WITHDRAWL CAPACITY(LBS)= 760.0G 16% OK IL-OS_2022 MA X.ATT.WITHDRAWAL CAPACITY(LBS)= 359.6 > 211.8 MAX UPLIFT DEMAND(LBS) OK950P f PROJECT ID DREG N 006UOK SHEET NAME 9lgN�ROW�F� OS/17/2022 STRUCTURAL CALCS SHEET NUMBER REVISOR EXPIRES:12/31/24 S-5 0 CONDUCTOR AND RACEWAY SCHEDULE TAG art S'.ZE-a TYPE DESIGNATOR I/V TAG OTT SIZE-N TYPE DESIGNATOR I/V 4 TO SIZE-A TYPE DESIGNATOR I/V TAG OTT SIZE-♦ `APE DESIGNATOR (0 (I) 8 AWG THHN/THWN,CU. BLACK(LI) 25.44 AC(MAX) 3 (2) 10 AWG THHN/THWN,Cu. BLACK(LI) 15.7A AC(MAX) T2 G (I) 10 AWG 2C,NM-B W/G,CU. (LI.L2,EGC) 15.7A AC(MAX) 1 (I) 12 AWG 2C,TC-ER.CO (LI,L2) I5.7A AC(MAX) ION (I) 8 AWG THHN/THWN,CU. RED(L2) 240V AC (2) 10 AWG THHN/THWN,CU. RED(L2) 240V AC FREE AIR 240V AC (I) 6 AWG SOLID BARE CU. (EGC) 240V AC (I) 10 AWG THHN/THWN,CU. WHITE(N) (I) 10 AWG THHN/THWN,CU. GREEN(EGC) (I) 3/4 IN. EMT OR FREE AIR (RACEWAY) (I) 10 AWG THHN/THWN,CU. GREEN(EGC) (I) 3/4 IN. EMT (RACEWAY) (I) 3/L IN. EMT (RACEWAY) EXTERIOR EXTERIOR INTERIOR EXTERIOR CONFIDENTIAL-THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT IO DEVELOPER.LLC NOR SHALL IT BE ELECTRICAL LINE DIAGRAM DISCLOSED IN WHOLE OR IN PART To OTHERS OUTSIDE RECIPIENTS (21)SILFAB SOLAR SIL-380 I-IC 20211101 PV MODULE(S) ORGANIZATION,EXCEPT IN CONNECTION UL 1703 LISTED WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT,WITHOUT THE (21)ENPHASE IO7PLUS-72-2-US MICROINVERTER(S)[240V] WRITTEN PERMISSION OF ION DEVELOPER JUNCTION BOX LLC. (N)200A MAIN SERVICE PANEL LOAD-SIDE SOURCE CONNECTION ENPHASE IQ COMBINER 3 (OPTIONAL-FOR UL 1741 LISTED (N)150A/2P MAIN DISCONNECT BUSBAR PLUG-IN TYPE BREAKER (PV CIRCUITS ONLY) CONDUCTOR SPLICE) JUNCTION BOX (NEC 705.)2) (N)150A/2P (N)20A/2P NAB C E P SECONDARY POWER (I) SOURCE(PV°CPO)TO 'R-HEI � ^ \ aacutr NEI 1 CERTIFIED LSA/Z._______ OADS BE LOCATED AT - I. \ i OF 13OPPOSITE END OF INTEGRAT(D _ N( ` MODULES L. PV INSTALLATION O BUSBAR FROM PRIMARY 2P OCPD F R V PROFESSIONAL SOURCE(MAIN OCPD) 10 ENVOY 15554- (E)LOADS (NEC 705.12) GATEWAY, 'Cj.� «SCOTT A.GURNEY.-. OO %PV-0117719-015866 2 JUNCTION BOX ION DEVELOPER,LLC 4801 N UNIVERSITY AVE 7/900 PROVO,UT (I) 8460E 120/240 VAC (N)ISA/2P60HZo ®Z <• -i I\ (. CIRCUIT :until BB8.78I.7074 SINGLE PHASE IIT_ I OF 8 UTILITY - _ �_ MODULES DAVID STANLEY CONRAD SERVICE T r C-ELECTRICAL CONTRACTOR CI524 Cl.) 3 O2 15.MAKE AND MODEL NUMBER, SQUARE D HOM-SC816D200C O al N (N)GROUNDING Z O ELECTRODE j N = SYSTEM Q V EN U _IZ o N Q J Y m N W N Mi N U alQ ^ _J N C Z N 3 Cr O ` ELECTRICAL LINE DIAGRAM NOTES a CD o I-., 0.,ot. Z < = W (n W .p 5 o H m Q U ca r u ad O O _ - Z V) p J z 3 E W c. Z N Q (n W H- per. O ^ ^ 0. DRAWING BY ENPHASE ENERGY DATE 14-05-2022 PROJECT ID 006UOK SHEET NAME ELEC. LINE DIAG. SHEET NUMBER REVISON E-6 0 PV SYSTEM ELECTRICAL SPECIFCATIONS AND CALCULATIONS DESIGN LOCATION AND TEMPERATURES RACEWAY/CONDUCTOR CALCULATIONS I O N TEMPERATURE DATA SOURCE ASHRAE MICROINV.TO JUNCTION BOX(I) STATE OREGON MAX INVERTER OUTPUT CIRCUIT CURRENT= 15.7 A AC JURISDICTION CITY OF TIGARD MAX CURRENT XI25%= 20.0 A AC WEATHER STATION PORTLAND HILLSBORO PER NEC 690.8(B)(I)(W/OUT CORRECTION FACTORS) ASHRAE EXTREME LOW TEMP(°C) -8 CONDUCTOR SIZE/INSULATION/TYPE= 12 AWG 2C,TC-ER,CU. CONFIDENTIAL-THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED ASHRAE 0.4%HIGH TEMP(°C) 37 CONDUCTOR AMP.RATING @ 90°C= 30 A FOR THE BENEFIT OF ANYONE EXCEPT 10 DESIGNED MAX.SYSTEM VDROP/VRISE 2.00% AMB.TEMP.AMP.CORRECTION= NOT APPLIED DEVELOPER.LLC NOR SHALL IT RE DISCLOSED IN WHOLE OR IN PART TO ADJUSTED AMPACITY COMPLIANCE(A)= 30 > 20.0 OK OTHERS OUTSIDE RECIPIENTS PV MODULE SPECIFICATIONS SILFAB SOLAR SIL-380 HC 20211101 RACEWAY SIZE/TYPE= 3/4 IN. EMT OR FREE AIR ORGANIZATION,EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RATED POWER(PMAX)(W) 380 CROSS-SECTIONAL AREA OF CONDUCTOR(S)/CABLE(S)(IN."2)= 0.142 IN.2 RESPECTIVE EQUIPMENT,WITHOUT THE MAXIMUM POWER VOLTAGE(VMP) 35.32 CROSS-SECTIONAL AREA OF RACEWAY(IN.'2)= 0.533 IN.2 WRITTEN PERMISSION OF ION DEVELOPER LC. MAXIMUM POWER CURRENT(IMP) 10.77 %ALLOWABLE RACEWAY FILL(NEC CHAPTER 9,TABLE I)= 53% > 27% OK OPEN CIRCUIT VOLTAGE(VOC) 42.17 SHORT CIRCUIT CURRENT(ISC) 11.36 JUNCTION BOX TO JUNCTION BOX(2) NABCEP PMP/VMP TEMP.COEFFICIENT -0.36 MAX INVERTER OUTPUT CIRCUIT CURRENT= 15.7 A ACI CERTIFIED VOC TEMP.COEFFICIENT -0.28 MAX CURRENT X125%= 20 A AC SERIES FUSE RATING 20 PER NEC 690.8(B)(I)(W/OUT CORRECTION FACTORS) PV INSTALLATION ADJ.MODULE VOC @ ASHRAE LOW TEMP 46.1 CONDUCTOR SIZE/INSULATION/TYPE= 10 AWG 2C.NM-B W/G,CU. PROFESSIONAL ADJ.MODULE VMP @ ASHRAE 2%AVG.HIGH TEMP 29.7 CONDUCTOR AMP.RATING @60°C= 30 A Cj, .. �SCOTT A.GURNEY #OF CONDUCTORS IN RACEWAY CORRECTION= NOT APPLIED /i,xPV-0117719-015e66 INVERTER SPECIFICATIONS ENPHASE 107PLUS-72-2-US AMB.TEMP.AMP.CORRECTION= NOT APPLIED ION DEVELOPER,LLC TYPE MICROINVERTER ADJUSTED AMPACITY COMPLIANCE(A)= 30 > 20.0 OK 4801 N UNIVERSITY AVE N900 PROVE.U7 86604 MAX.OR RECOMMENDED MODULE POWER(W) 440 RACEWAY SIZE/TYPE= FREE AIR R88.781.7074 MAXIMUM INPUT DC OPEN-CIRCUIT VOLTAGE(VOC) 60 I M S A T VOLTAGE V 22 DAVID STANLEY CONRAD MAXIMUM START VOLTAGE(V) 60 C-ELECTRICAL CONTRACTOR CISZ4 MAXIMUM INPUT CURRENT(ISC)(A) 15 CEC PEAK OUTPUT POWER(W) 290 JUNCTION BOX TO COMBINER BOX(3) MAX.CONTINUOUS OUTPUT CURRENT(A) 1.21 MAX INVERTER OUTPUT CIRCUIT CURRENT= 15.7 A AC NOMINAL(L-L)OUTPUT VOLTAGE 240 CEC WEIGHTED EFFICIENCY(%) 97.0% PER NEC 690.8(B)(2)(WITH CORRECTION FACTORS) o CONDUCTOR SIZE/INSULATION/TYPE= 10 AWG THHN/THWN,CU. LU SYSTEM ELECTRICAL SPECIFICATIONS CIR I CIR 2 CONDUCTOR AMP.RATING @60°C= 35 A Z N 0 NUMBER OF MODULES PER CIRCUIT 13 8 #OF CONDUCTORS IN RACEWAY CORRECTION= 0.8 > N Q U DC POWER RATING PER CIRCUIT(STC)(W DC) 4940 3040 AMB.TEMP.AMP.CORRECTION= 0.88co = TOTAL MODULE QUANTITY 21 PV MODULES ADJUSTED AMPACITY COMPLIANCE(A)= 24.64 > 15.7 OK _J Z 0 Q STC DC POWER RATING OF ARRAY 7980W DC RACEWAY SIZE/TYPE= 3/4 IN. EMT 1 1 Y M M n U INVERTER OUTPUT CIRCUIT CURRENT(A AC) 15.73 9.68 CROSS-SECTIONAL AREA OF CONDUCTOR(S)/CABLE(S)(IN.'2)= 0.1061N.'2 3 Q al _J 0 0 C w a 125%INVERTER OUTPUT CIRCUIT CURRENT(A AC) 9.66 2.1 CROSS-SECTIONAL AREA OF RACEWAY(IN.'2)= 0.5331N."2 < CIRCUIT OCPD RATING(A) 20 %ALLOWABLE RACEWAY FILL(NEC CHAPTER 9.TABLE I)= 40% > 20% OK O Z N Z Q d ,u COMBINED INVERTER CONTINUOUS OUTPUT CURRENT 25.41A AC F- Q w O -/ C7 0 PV POWER PRODUCTION SYSTEM OCPD RATING(X125%) 35A COMBINER BOX TO MAIN PV OCPD(10) Z Q = w ON w 2 N S MAX.ARRAY STC-AC POWER(W) 6090W AC(STC) COMBINED INVERTER CONTINUOUS OUTPUT CURRENT= 25.4 A AC O 0 < S ,A 71I7W AC Z u° GO O J Z I. MAX.ARRAY CEC-AC POWER(W) (CEC) MAX CURRENT XI25%= 32.0 A AC w 3 Cl) Q N w m PER NEC 690.8(B)(I)(W/OUT CORRECTION FACTORS) 1" w 0" ( 0• AC VOLTAGE RISE CALCULATIONS DIST(FT) COND. VRISE(V) VEND(V) %VRISE CONDUCTOR SIZE I INSULATION/TYPE= 8 AWG THHN/THWN,CU. rn J N ~ VRISE SEC.I(MICRO TO JBOX)• 28.8 12 Cu. 1.8 241.8 0.76% CONDUCTOR AMP.RATING @75°C= 50 A DRAWING BY VRISE SEC.2(JBOX TO COMBINER BOX) 50 10 Cu. 1.9 241.9 0.79% #OF CONDUCTORS IN RACEWAY CORRECTION= NOT APPLIED ENPHASE ENERGY VRISE SEC.3(COMBINER BOX TO P01) 10 8 CU. 0.4 240.4 0.17% AMB.TEMP.AMP.CORRECTION= NOT APPLIED DATE TOTAL VRISE 4.1 244.1 1.71% OK ADJUSTED AMPACITY COMPLIANCE(A)= 50.0 > 32.0 OK 14-05-2022 8 MICROINVERTER MAX SUB-BRANCH CIRCUIT SIZE TO COMPLY WITH VRISE CALCULATIONS. RACEWAY SIZE/TYPE= 3/4 IN. EMT PROJECT ID CROSS-SECTIONAL AREA OF CONDUCTOR(S)/CABLE(S)(IN."2)= 0.146 IN.'2 OO6UOK CROSS-SECTIONAL AREA OF RACEWAY(IN.'2)= 0.533 IN.'2 SHEET NAME %ALLOWABLE RACEWAY FILL(NEC CHAPTER 9,TABLE I)= 40% > 27% OK ELECTRICAL CALCS. SHEET NUMBER REVISON E-7 0 ELECTRICAL FIELD-APPLIED HAZARD MARKINGS [NEC6 PHOTOVOLTAIC SYSTEM ❑A EACHPV SYSTEMDISCONNECTING MEANS. f (F SIGN LOCATED ON OR NO MORE THAN 3 I O [N 690.54,NEC 90.13(B)] FT FROM THE RAPID SHUT DOWN A AC DISCONNECT A ,. DISCONNECT SWITCH[NEC 690.56(C)]. RATEDAC OUTPUT UMW 25.4A .. .' . NOMINAL OPERATING AC VOLTAGE 240 V FOR BUILDINGS WITH PV SYSTEMS.TO CONFIDENTIAL-THE INFORMATION -SOLAR PV SYSTEM EWIIPPED G BE LOCATED AT EACH SERVICE HEREIN CONTAINED SHALL NOT BE USED ��-. FOR PV DISCONNECTING MEANS WHERE ALL WITH RAPID SHUTDOWN EQUIPMENT LOCATION TO WHICH THE PV FOR THE BENEFIT OF ANYONE EXCEPT IO B DISCLOSED DEVELOPER.LLC NOR SHALL IT BE TERMINALS OF THE DISCONNECTING MEANS UM RAMO SWTDDWX SYSTEM IS CONNECTED. [NEC DISCLOS IN WHOLE OR IN PART TO ELECTRIC SHOCK HAZARD MAY BE ENERGIZED IN THE OPEN POSITION. E1xIDBTOTHE 690.56(C)] OTHERS OUTSIDE RECIPIENTS [NEC 690.13(B),NEC 705.22] gU%00 PVSKSTEN � � ORGANIZATION.EXCEPT IN CONNECTION TERMINALS ON THE LINE AND ,yHqECUEg WITH THE SALE AND USE OF THE LOAD SIDES MAY BE ENERGIZED #WDIRFSNOMa RESPECTIVE EQUIPMENT.WITHOUT THE ._...IN THE OPEN POSITION MIIEA10UY WRITTEN PERMISSION OF ION DEVELOPER LLC, PERMANENT DIRECTORY TO BE LOCATED AT \ AT EQUIPMENT CONTAINING OVERCURRENT 0MAIN SERVICE EQUIPMENT LOCATION IF ALL NABCEP �� C DEVICES IN CIRCUTS SUPPLYING POWER TO A ELECTRICAL POWER SOURCE BUSBAR OR CONDUCTOR SUPPLIED FROM ItAHaIMNIMI ION ITUT1,0000111111CAIII DISCONNECTING MEANS (SOLAR ARRAY DUAL POWER SUPPLY MULTIPLE SOURCES.[NEC 705.12(C)] FORMIC Me FMILED901. AWAY� I CERTIFIED 1fOMAR00F MIMED BHMAIMYrA1N RAPID SHUTDOWN SWITCH)ARE GROUPED PV INSTALLATION SOURCES:l7TIL1Tl'GRID AND ADeOOO�ONKC�I"D IMAM AND IN LINE OF SITE OF MAIN SERVICE tl10UPEDANDIABEIEDWIMINLINE OF HIE PV SOLAR ELECTRIC SYSTEM me toRi write LOCATION. DISCONNECTING MEANS.[NEC 690.56(C)8 PROFESSIONAL NEC 705.10]. S..K. *PV GURNEY RPV-0101177]]I9-015866 PLACED ADJACENT TO PV SYSTEM PLUG-IN ION DEVELOPER,LLC 1,1111111111111111111 D TYPE BREAKER TO A BUSBAR FORA LOAD 4801 N UNIVERSITY AVE*900 PROVO,U, 04 POWER SOURCE SIDE CONNECTION.[NEC 705.12(B)(3)(2)] 888.781.7074 . OUTPUT CONNECTION DO NOT RELOCATE THIS DAVID STANLEY CONRAD OVERCURRENT DEVICE C-ELECTRICAL CONTRACTOR C1524 111 LL 6 ❑A © © E] © ZLu o 0.1 ❑B D❑ CI © El Q (0 (El MAIN SERVICE PANEL COMBINER BOX V) = U J Z CIn Q 117 ® gliE J `L *0OD N LL ♦- N I? F., U U.I Q T` J d) N< Z N rn N J WE . IliIX El- //�� H- - Y l Ow / p Q U.1 CDp ZI p o l Q UJ V) IL `O T PV SYSTEMDISCON 0 F ~ 0 m Q U OUTPUT )TO Z DO N D co I 0 PV INVERTER _ Z (N)PV BREAKER OUTPUT CIRCUIT(S) UJ 3 ^ Q N UJ m \ N LZ O' p N 0, r. I\ V) J N H N v _ DRAWING BY II i..., ENPHASE ENERGY NM DATE ] I ] 14-05-2022 PROJECT ID 006UOK ALL CAUTION,WARNING,OR DANGER SIGNS OR LABELS SHALL: SHEET NAME I, COMPLY WITH ANSI Z535.4-2011 STANDARDS. ELECTRICAL LABELS 2. BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HANDWRITTEN. 3. SHALL BE OF SUFFICEINT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 4. UNLESS OTHERS SPECIFIED MINIMUM TEXT HEIGHT TO BE}'(3MM). SHEET NUMBER REVISON E-9 0 IDENTIFICATION OF POWER SOURCES A PERMANENT PLAGUE OR DIRECTORY TO BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION I O DENOTING THE LOCATION OF EACH POWER SOURCE DISCONNECTING MEANS AND SHALL INDICATE THE LOCATION OF RAPID SHUTDOWN INITIATION DEVICES. FOR THE BUILDING OR STRUCTURE AND BE GROUPED WITH OTHER PLAQUES OR DIRECTORIES FOR OTHER ON-SITE SOURCES. ALL MARKING TO COMPLY WITH 110.21(B).(NEC 705.10) CONFIDENTIAL-THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT 10 DEVELOPER.LLC NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION,EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT,WITHOUT THE CA TIO \ : vl „ L T I H L E WRITTEN PERMISSION OF ION DEVELOPER LLC. SOU � C - S OF POW - NABCEP I POWER TO THIS BUILDING IS SUPPLIED FROM THE CERTIFIED FOLLOWING SOURCES WITH DISCONNECTS LOCATED PV PROFESSIONAL AS SHOWN: BP°o IY;I9-`OIsebb ION DEVELOPER.LLC 4801 N UNIVERSITY AVE#900 PROVO,U' 84604 888.781.7074 W � DAVID STANLEY CONRAD WC-ELECTRICAL CONTRACTOR C1524 N PV ARRAY LL.1 Y 21 O a e = Q LLI a e LL Z N O I- LU CD e e a a I-- W Q U S a = t J Z O 1 C.'a a 0 a a 1- Y PA M U W I- N a a N C 10 0 1- Z w Z -J dg0 0 I Z Q = w161 �I�tl� N 0 z I- CC a s vS MAIN DISTRIBUTIONL RAPID SHUTDOWN AC z 9D o o z P UTILITY DISCONNECT DISCONNECT SWITCH Lu a W WI F- IZ 0, 0 Cr ET) J N F v v DRAWING BY ENPHASE ENERGY DATE 14-05-2022 PROJECT ID 006UOK SHEET NAME ELEC. DIRECTORY SHEET NUMBER REVISON E-IO 0 ....vs. nee.xe ..ri sxa reea.rr ..«r. eaa.r«.sxxrFta. Fr4«frar..»frnup«fNsfttJwznad»F »ftftS xv. eiNffrxvr.aiwSeu sr.sunxfxu.+t rtuSaftu rax.xtt.+. rrxrrSs... ION Solar ION Provo, N University Ave. Suite 900 Provo, UT 84604 luke.rowley@ionsolar.com Tuesday, May 3, 2022 RE: Len W& Marian S Ewell Residence- 12975 SW Watkins Ave,Tigard, Oregon To Whom It May Concern: I have evaluated the roof structural elements of the residence for the required design loads and the additional load that will be imposed by the proposed solar system.The existing roof information was provided by a site visit by an audit team at ION Solar. Based on that site visit, it is my understanding that the roof framing information is as follows: Roof Structure: 2x6 Rafters @ 24" O.C. Roofing Material: Composition Shingle The Required codes and loads are as follows: Codes: 2019 OSSC, 2021 ORSC Risk Category: II Wind Speed (3-Sec Gust, MPH): 96 Exposure Category: B Ground Snow Load (psf): 25 Roof Snow Load (psf): 25 Roof Live Load (psf): 20 (superseded by roof snow load) After reviewing the existing roof framing information and in accordance with the structural calculations on sheet S-5 of the plans,which were performed according to the applicable codes and loads above, it is my recommendation that the existing roof framing requires additional 2x6 rafters be sistered to the existing rafters, according to detail I on sheet S-4 of the plans,to safely and sufficiently support the required structural design loads and the weight of the new solar system. This evaluation only applies to the areas of the roof that will be directly supporting the solar system and does not make any recommendations for any other structural components of the building.The racking must be installed per the manufacturer's recommendations. The 5/16"x 3-1/2" zinc plated steel lag screw used to attach the solar system to the roof must be staggered to evenly distribute the loads over the affected area and must penetrate the rafters with a minimum embedment depth of 2.5" REO PRO/Zs,, THIS LETTER VOID UNLESS STAMPED Sincerely, 444 \\G I N Ee. /py A. Luke Rowley, PE 9:950P� OREGON 1 11 *'' 05/17/2022 NR0`N rvninrc_�n N9I I. IIyt ,11 • • • • f SILFAB PRIME SILFAB • • • SOLAR`"' SIL-380 HC 1.1 Ij ;Et rya ;l rtt1 t#1411.'„z? • RELIABLE ENERGY. PROUD DIRECT FROM THE SOURCE . PARTNER OF Introducing Silfab Prime. Designed to outperform. KJN Dependable, durable, high-performance solar panels engineered for North American homeowners. SILFABSOLAR.COM jr, ►,:: IEC Fraunhofer c H uBS i•t tak tnterPcts `"� !SE a Chubb provides error and omisston insurance to Stlfat Sot ELECTRICAL SPECIFICATIONS 380 Test Conditions STC NOCT Module Power(Pmax) Wp j„ 380 1 284 Maximum power voltage(Vpmax) V 35.32 32.83 Maximum power current(Ipmax) A 10.77 8.64 Open circuit voltage(Voc) 'i V 42.17 III 39.55 Short circuit current(Isc) A 11.36 9.16 Module efficiency % '. 20.8% 19.4% Maximum system voltage(VDC) V 1000 Series fuse rating A 20 Power Tolerance Wp ±3% Measurement conditions:STC 1000 W/m'•AM 1.5•Temperature 25°C•NOCT 800 W/ma•AM 1.5•Measurement uncertainty<_3% Sun simulator calibration reference modules fromFraunhoferInstitute.Electricalcharacteristicsmayvaryby±5%andpowerby±3%. MECHANICAL PROPERTIES/COMPONENTS METRIC IMPERIAL Module weight 19.5kg±0.2kg ; 431bs±0.4lbs Dimensions(H x L x D) 1762 mm x 1037 mm x 35 mm �i 69.4 in x 40.8 in x 1.37 in Maximum surface load(wind/snow)* 5400 Pa rear load/5400 Pa front load 112.8 lb/ft'rear load/112.8 lb/ft'front load Hail impact resistance 0 25 mm at 83 km/h 01 in at 51.6 mph 120 Half cells-Si mono PERC 120 Half cells-Si mono PERC Cells 9 busbar-83 x 166 mm 9 busbar-3.26 x 6.53 in 3.2 mm high transmittance,tempered, 0.126 in high transmittance,tempered, Glass DSM antireflective coating DSM antireflective coating Cables and connectors(refer to installation manual) I 1350 mm,05.7 mm,MC4 from Staubli 53.15 in,0 0.22 in(12AWG),MC4 from Staubli Backsheet High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, fluorine-free PV backsheet Frame Anodized Aluminum(Black) Bypass diodes 3 diodes-30SQ045T(45V max DC blocking voltage,30A max forward rectified current) Junction Box • UL 3730 Certified,IEC 62790 Certified,IP68 rated TEMPERATURE RATINGS WARRANTIES Temperature Coefficient Isc +0.064%/°C Module product workmanship warranty 25yo-ars** Temperature Coefficient Voc -0.28%/°C Linear power performance guarantee 30 years Temperature Coefficient Pmax -0.36%/°C 297.1%end 1st yr P >_91.6%end 12th yr NOCT(±2°C) 45°C >_85.1%end 25th yr Operating temperature -40/+85°C >82.6%end 30th yr CERTIFICATIONS SHIPPING SPECS ULC ORD C1703,UL1703,CEC listed,UL 61215-1/-1-1/-2,UL 61730-1/-2, Modules Per Pallet: i 26 or 26(California) Product IEC 61215-1/-1-1/-2***.IEC 61730-1/-2***,CSA C22.2#61730-1/-2,IEC 62716 Ammonia Corrosion;IEC61701:2011 Salt Mist Corrosion Certifed,UL Fire Rating:Type 2 Pallets Per Truck 1i34 or 32(California) Factory 1509001:2015 Modules Per Truck 884 or 832(California) .r * A Warning.Read the Safety and Installation Manual for mounting specifications and before handling,installing and operating modules. ** 12 year extendable to 25 years subject to registration and conditions outlined under"Warranty"at silfabsolar.com *** Certification in progress. PAN files generated from 3rd party performance data are available for download at:silfabsolar.com/downloads i L- 69.4"[1762mm] - 1 ION Y E r� 14"[356mm] 41.3"[1050mm] 14"[356mm] M• T +1888.781.7074 1 IONSOLAR.COM -, r r '-Mounting Hole(x4) C� _ SILFAB SOLAR INC. /' 0.5"[12mm] 800 Cornwall Ave Bellingham WA 98225 USA T+1 360.569.4733 o info@silfabsolar.com E E SILFABSOLAR.COM ...__ o r rn 0 1770 Port Drive 1.4"[35mm E o Burlington WA 98233 USA l � �_ en eo T+1 360.569.4733 240 Courtneypark Drive East 3 cU Ea Mississauga ON LOT 2Y3 Canada 3 0.06" 53.15" T +1905.255.2501 w-* [1.5mm] [1350mm] a �i L. "1 7 F+1905.696.0267 Cable Length r o © Silfab-SIL-380-HC-20211101 ralna a Hole(x8) (I) M No reproduction of any kind is allowed without g Data and information is subject to ra:-' �" I_ permission 1 - a , modifications without notice.0 Silfab Solar Inc., 8"[20Omm] 2621.s Ifab Solari is a trademark of Silfab Solar Inc. ..,1L,.i ._.2.4"[60mm] J i' ii Data Sheet Enphase Microinverters Region:AMERICAS G Enphase The high-powered smart grid-ready Enphase IQ 7 MicroTM and Enphase IQ 7+ MicroTM IQ 7 and IQ 7+ dramatically simplify the installation process while achieving the highest system efficiency. Microinverters Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy', Enphase IQ Battery", and the Enphase Enlighten'M monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install • Lightweight and simple • Faster installation with improved,lighter two-wire cabling ''- • Built-in rapid shutdown compliant(NEC 2014&2017) y. Productive and Reliable • Optimized for high powered 60-cell/120 half-cell and 72- imm5 ce1l/144 half-cell*modules • More than a million hours of testing • Class II double-insulated enclosure 'ENPMASE E • UL listed ",.M 1 Smart Grid Ready NC IPS • Complies with advanced grid support,voltage and frequency ride-through requirements • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) 0 *The IQ 7+Micro is required to support 72-cell/144 half-cell modules. CER11HED E N P H AS E To learn more about Enphase offerings,visit enphase.com '� . Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA(DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell/120 half-cell PV modules 60-cell/120 half-cell and 72- only cell/144 half-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Ise) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage/range2 240 V/ 208 V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms • Maximum units per 20 A(L-L)branch circuit3 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor(adjustable) 0.85 leading...0.85 lagging 0.85 leading...0.85 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak efficienc 97.6% 97.6% 97.5% 97.3'4 CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range -40°C to+65°C Relative humidity range 4%to 100%(condensing) Connector type MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Dimensions(HxWxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 lbs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio,See the compatibility calculator at https://enohase.com/en-us/support/module-compatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com e EN PHASE ©2020 Enphase Energy.All rights reserved.Enphase,the Enphase logo,Enphase IQ 7,Enphase IQ 7+,Enphase IQ Battery, Enphase Enlighten,Enphase IQ Envoy,and other trademarks or service names are the trademarks of Enphase Energy,Inc.Data subject to change.2020-08-12 D�V ooa Eco Fasten. For Installers. By Installers. 111411. 40 "PM. ? +1}r+g#�f alf rl fr} 1# f i $d t' 411.114/111401 CLICK COMPLETE RAIL- BASED RACKING SYSTEM N STA L LAT 0 \ REVISION DATE: 03/03/22 VERSION: v2.7 eee,Z/eil////fe,j7/Z:/:7V1:e /'ee/fedfif ECOFASTENSOLAR.COM nr CLICK Ii1EcoFostenINSTALLATION GUISE For Instatters. By Installers. Clicking the page name will take you to that page TABLE OF CONTENTS PAGE 01 FEATURES & BENEFITS PAGE 02 INTRODUCTION PAGE 03 . F OVERVIEW PAGE 04 A COMPONENTS PAGE 05 r{ RATINGS PAGE 06 ARRAY LAYOUT PAGE 07 II e INSTALLATION PAGE 08 f ti A ',Ii GROUNDING PAGE 17 ACCESSORIES PAGE 21 #` 1 MODULE LIST PAGE 27 , c lik CLAMP PART NUMBERS PAGE 36 ri r r 'i PAGE ``', 01 CLICK INSTALLATION GUIDE i EcoFasten. For Installers. By Installers. 444.t. LINN Ulf Y y 40, CLICKFIT ClickFit conforms to UL 2703 and is one of the fastest installing rail-based systems in the industry. Thanks to its Click-In Rail assembly, the rails can be connected to any of EcoFasten's composition shingle, tile, and metal roof mounts in seconds without the need for fasteners or tools. The ClickFit system is made of robust materials, such as aluminum and coated steel, to ensure corrosion resistance and longevity. ClickFit has been tested in extreme weather conditions including wind, fire, and snow. FEATURES • Tool and fastener free rail attachment • Fully integrated bonding • Click-on Mid & End Clamps • Compatible with a variety of EcoFasten roof attachments PAGE 02 CLICK E INSTALLATION 73UI - ooaEcoFasten o For Installers. By Installers. INTRODUCTION This manual describes the installation of the ClickFit mounting system for photovoltaic modules on steep-slope roofs. Described within are details for composition shingle and tile, attachments for ClickFit System. Other roof types as well as all other installation manuals can be found for download at www. EcoFastenSolar.com. GENERAL INSTALLATION CONDITIONS Failure to observe the requirements in this document can lead to the exclusion of all guarantees and product liability. EcoFasten Solar reserves the right to amend this document without prior notice. STABILITY AND CONDITION OF THE ROOF The roof must be in good condition and strong enough to support the weight of the modules, including the additional equipment, wind and snow loads. When in doubt, consult with the engineer of record, and/or the local building inspector. APPLICATION RANGE OF CLICKFIT Refer to Compatibility module list at the end of this document. Please refer to the Ecofasten ClickFit span tables for system structural certification and allowable spans. WARRANTY Guarantee according to the warranty conditions and general terms and conditions of EcoFasten Solar. These conditions can be found on the website at www. EcoFastenSolar.com. LIABILITY EcoFasten Solar cannot accept any liability whatsoever for damage or injury caused by not taking adequate safety precautions or (accurately) following the instructions given, or resulting from negligence during the installation of the product and any corresponding accessories specified in this document. PAGE 03 CLICK :. D� I \STALLATIIJF\ SUIDE oiEcoFosten For Installers. By Installers. OVERVIEW 's:N\ The ClickFit mounting system consists of patented adjustable tile hooks and L feet, rails, and the installation materials required for the mounting of photovoltaic modules on composition shingle or tile roofs. For simplicity, tile hooks and L feet will be referred to as "attachments". ATTACHING TO THE ROOF The attachments are fastened to the rafters. Attachments are height-adjustable to level the system on uneven roof surfaces. ATTACHING THE RAIL The rail assembles to the attachments with a click-connector, or Clicker. The rail simply clicks into place without the use of any tools. r ATTACHING THE MODULES The modules are attached to the rails by means of mid clamps and end clamps. Installer must review module and any 3rd party manufacturer's documentation for �. compatibility and compliance with warranty terms and conditions. \,\.\ PAGE 04 • CLICK D Q :0 EcoFasten INSTALLATION 3UIDE � � For Installers. By Installers. 41/4 SYSTEM COMPONENTS REQUIREDNvit 4 CLICKFIT RAIL RAIL SPLICE TILE HOOK L-FOOT END CAP MID CLAMP Ra END CLAMP SYSTEM COMPONENTS ACCESSORIES FRAME MLPE MODULE JUMPER MLPE MOUNT MOUNT PAGE Refer to ClickFit Alternate Component Addendum for components not shown 05 fdtf. CF5 f�b�rz 11i��r5 t t ,t . `'I (j l/ Ai F !f i! !ort £ • ` of 157j iiii tt it 1 i It I. # P k� CLICK ,. � INSTALLATIO\ GUIDE oç: EcoFasten . , For Installers. By Installers. RATINGS Fire Rating* Class A System Fire Rating Max System Voltage 1500 VDC Max Fuse Rating 40A Certification Conforms to UL STD 2703 Warranty 25 Year Material and Workmanship UL 2703 Markings Product listing label is located on the rail end-caps Roof Pitch 2:12-12:12 UL 2703 Allowable Design Load Rating 10 psf downward,5 psf upward,and 5 psf lateral Max Module Size 25.6 sqft \k\44\1\44\\\\44 Module Orientation Portrait or Landscape Multiple use Rated Components(Position Independent) Mid Clamp,Frame MLPE Mount and MLPE Mount *Class A System fire rating with Type 1 &2 PV modules.Any module-to-roof gap is permitted,with no skirt required.This rating is applicable with any roof attachment. UL 2703 MARKING EXAMPLE: Dcr a EcoFasten 5 ESDEC " triii ) ,,,..,, i'CLICKFIT �, Intertek ,,, � iSYSTEM 05�55£,,g,Praa P:11 G ID CODE SSS-QQ-YYYY xxxxxxx TORQUE SPECIFICATIONS Component Torque(in-lb) Notes Lag Screw N/A Fully Seat.Use visual indicator of the black EPDM ring around the bonded washer for torquing. Mid-Clamp 144 End-Clamp 96 Rail Clicker Leveling Bolt 142 Pre-torqued upon delivery.Applies to Tile Hook and L-Foot/Clicker Hook Height Bolt N/A Lightly clamp hook to flush with top of next tile row Ground Lug N/A Refer to specific ground lug manufacturer's installation manual MLPE Clip 144 MLPE Mount 144 PAGE 06 • CLICK EcoFasten INSTALLATION GUIDE ooa o For Installers. By Installers. - 4%,4*. • Refer to span tables, local jurisdiction, or engineer of record specifications when determining setbacks from roof edges, attachment spans, etc. • Mark the perimeter and corners of the array on the roof surface. *Add 3/4" to account for the gap between modules in each direction* • Draw or snap chalk lines where the rails will be installed,(refer to module manufacturer specs to determine allowable mounting locations). • Locate rafters within the area of the array. It may be necessary to shift the array East or West on the roof in order to fall within the rail cantilever specs (1/ 3 of span). • Stagger rafters every row if required by the local jurisdiction, engineer of record, or company policy. v>f PAGE 07 CLICK DAV 'ktst,i'44444k ,4'44.4 I \ STALLATION GUIDE o�a Ec o Fa ste n. For Installers. By Installers. 4,\\NN N *1' ' ':44tt IN ; 4 $3. `E Ale Ale • PRE-INSTALLING RAIL SPLICES 1. Determine the number of rails required per row of modules. 2. Insert a rail splice into one rail. Do not push it past the center bump. 3. Slide the next rail onto the rail splice until the two rail ends meet. 4. Repeat steps 2 and 3 until the desired length is achieved. This is usually easiest to do from the ground. PAGE 08 t - a CLICK °O' EcoFasten INSTALLATIONG _ IDE D04 For Installers. By Installers. INSTALLATION OF FLASHING & L-FOOT • ClickFit for comp shingle roofs uses EcoFasten GF-1 watertight flashing system. • Other roof types may use different EcoFasten Solar IS attachments, visit ecofastensolar.com to learn about other applications. 'Note the orientation of the L foot and Clicker.The two Clicker"arms"should be facing downslope' INSTALLATION STEPS: 0 o o. - wy.� i ' <-----:**:,:>-e- ,,,,,,,,<---<„: --, 1. Locate rafter lines. 2. Drill 1/4" pilot holes at all attachment points and back fill using roof- compatible sealant. 3. Separate shingles where flashing is to be installed. Insert the flashing so the top portion is under the next row of shingles North. Ensure the flashing is pushed to the third-course of shingle to prevent water infiltration through the vertical joints between shingles. 4. Align GF-1 flashing hole with pilot hole. Insert the lag bolt with pre-installed bonded washer through the L foot and EPDM grommet. Tighten the lag bolt until fully seated. The EPDM Ring visual indicator is the most effective way to ensure a watertight seal. PAGE 09 4r CLICK :C341 INSTALLATIC 3UIIJE For Installers. By Installers. INSTALLING TILE HOOKS 1. Locate rafters on the roof, mark the tiles to be removed. Hint: In some cases rafter tails are visible at the eaves of the roof, making it easy to find the rough location of the rafters. In other cases, the fascia board may have nail heads visible where it was attached to the rafters. In the worst-case a row of tiles may need to be moved to determine the rafter locations. 2. Slide the tile at the desired location upward to expose the roof sub surface. If the tile is to be notched, or if using a replacement flashing, remove it entirely. Clean the sub surface with a brush to remove any debris that could affect the sealing. 3. Locate the rafter center and mark it. 4. Place the tile hook with the hook itself in the valley of the next tile below. Drill one 1/4" pilot hole in the rafter center,taking care to keep the hook in the valley of the tile below. Backfill this hole with a roof-compatible sealant. For flat tiles, try to avoid having the hook land directly under a joint between tiles, this will create a larger gap or more notching than necessary. 5. Install one 5/16"x 4"lag screw on the row of holes closest to the tile hook arm. If possible, install the screw in one of the three holes directly next to the arm. If the lag screw must be installed in one of the seven holes furthest from the arm (denoted by the red rectangle below), install three deck screws in the pattern shown by the green circles below. 6. Adjust the height of the tile hook as necessary using the bolt shown in the fourth image. 7. Flash the surrounding area and lag screw head with roof-compatible sealant as necessary. Refer to Tile Hook Subflashing Installation guide on the next page. 8. Replace the tile that was moved and/or removed, or install the tile replacement flashing. If it is to be notched, mark the tile for notching. Notching can be done with a grinding wheel or by using a chisel. i ,;;O'''''' - ' ''''' 10,kfri ' .. f � _ Y PAGE 10 w CLICK INSTALLATICh GLI E 1EcoFasten. For Installers. By Installers. TILE HOOK SUB-FLASHING INSTALLATION TOOLS REQUIRED: v k . \k„,„, Caulking gun, roofing mastic applicator MATERIALS REQUIRED: Roofing mastic, reinforcing fabric, roof sealant 1111.li Apply a continuous line of the roofing Lower the sub-flashing over the tile hook base.It may manufacturer's approved sealant on the be necessary to move adjacent tiles to easily lower the underside of the ClickFit tile hook sub-flashing sub-flashing onto the roof deck. to form a U-shape around the raised edges. qi,1", . '>;,4111 r ,.r, r-> 1c I . Ecol-aster recommends following the I RI guidelines Place the sub-flashing over the base of the tile hook so three-course sealing method.Start the three-course the flashing covers the entire base sealing method by applying a layer of roofing mastic over the edges of the tile hook sub-flashing. tf ;ff a f1.y , 2 ora, :1: r e. f. f <i 1. . , .. }e N t Place strips of reinforcing fabric over mastic to Apply a final layer of mastic to completely cover cover approximately 2"from the edge of the the reinforcing fabric.The flashing is now installed PAGE sub-flashing in both directions.Place strips on and sealed. the side first,then the top edge. 41 41 CLICK >,, v '''',4\N\ INSTALLATION 3UIDE oIa°a EcoFasten, For Installers. By Installers. 1 CLICKFIT INSTALLATION USING SIMPLEBLOCK-U® \\H%*%14.' PRE-INSTALLATION: The SimpleBlock-U can be installed on many different standing seam profiles. See SimpleBlock-U '` Installation Manual for compatible and non-compatible standing seam profiles. Be sure that each standing seam is no thicker than Y" in width. INSTALLATION: OPosition the SimpleBlock assembly on the panel 0 fill° seam. Make sure the block is fully seated on the metal seam. OTorque the 2 preinstalled oval point set screws to 150in-Ibs using the included 3/16" hex drive. .F llIVW ro ,, ''rgf „ O Included with the block, slide the hex holt into the channel on top of the SimpleBlock-U assembly. OPlace the ClickFit Universal L-Foot over the hex bolt O followed by the serrated flange nut and torque to #fi 150in-Ibs. a Folding Profiles Snapp ng Pmtilas 1; " ,I 2' MAX I2"MAX --- -MAX ? "MAX 'i zl ro) ,, J ?T z L :/ -)- . i PAGE 12 .4 , - CLICK INSTALLATION GUIDE aODEcoFasten For Installers. By Installers. INSTALLING THE RAIL 1. Place the rail in the Clickers. 2. Ensure the rails extend a minimum of 2" past the last attachments in each row. I Ow 3. Push the rail into each L-foot; an audible click should be heard T when the rail is fully seated. Verify the rail is sitting flush with both ledges. If attachments are extremely misaligned it may be necessary to loosen the leveling L' d- bolt and adjust the height of the � t i L-foot. Tighten the clamping bolt I ',--" Yi to 144 in-lbs. f I [H 4. Level the rail if necessary by r..----1 '`'t loosening the bolt attaching the Clicker to the L-foot or tile hook. i s ti , , r- -" PAGE 13 N CLICK " rr, DAV INSTALLATION 3UI1E o EcoFasten. For Installers. By Installers. \\\\k\4 MODULE INSTALLATION 0 INSTALL THE END CLAMPS ON EACH RAIL ON WHATEVER END YOU ARE STARTING WITH 'a Snap the end clamp onto the rail. 0 Slide the end cap onto the rail. '` Turn the leg of the end clamp around the cap. O ,,, 1a 1b �' fr'' , e ,,,..."-. ..0., .,..- _,:, ,,,,,,....;:, -,---,,,, . , ,,-,„:>-.-,,,,,--- -.-.0›....„ , ...,,,--,,-„ ,---- 1111111, 0'� Ate, C PLACE MODULE Place the module on the rail, ensuring , ,s the module junction box is up-slope.* ab+ref. 0 0 ALIGN AND TIGHTEN Slide the module to the end clamp and 4 align it with the array corners. Tighten '-,,,, the end clamp to 96 in-lb \to �- Fl ---,„,.., 41:*,..., J 0 ~� PAGE 14 CLICK ooa EcoFasten garµ 4 \STALLATICf� GUIDE o For Installers. By Installers. INSTALLING ADDITIONAL MODULES O CLICK IT ON iClick a mid clamp onto each rail. 4 - =" 0 SLIDE IT UP O - __, ,,1 Slide the mid clamps until they are flush with the side of the existing module. 0 PLACE AND TIGHTEN Place and slide the next module firmly against the mid clamps. Align the ,/ti � bottom edges of the modules. Tighten mid clamps to 144 in-lb. O -41"--4 . O 00/0/. ' ' - PAGE F 15 N CLICK PAV INSTALLATION GUIDE o3a EcoFasten \\ For Installers. By Installers. INSTALLING END CLAMPS AT THE END OF A ROW 1. Install the last mid clamps in the row. 2. Measure the rails from the last mid clamp to the module width plus 1". 3. Cut the rails at this mark. There is some adjustment in the end cap/clamp so it does not need to be a perfect cut. 4. Install end clamps and end caps, tighten to 96 in-lb ALTERNATIVE METHOD: 1. Install the last module in the row, tighten the mid clamps. 2. Using a circular saw with a metal blade, or carefully with a reciprocating saw, cut the rail approximately 1" past the edge of the last module. 3. Install end clamps and end caps, tighten to 96 in-lb Replace the tile that was moved and/or removed, or install the tile replacement flashing. If it is to be notched, mark the tile for notching. Notching can be done with a grinding wheel or by using a chisel. � ' ` ' \N..44‘ ; ,\I 4 4 , \,_,A,_‘ ''' '<•116-,‘SI 1.41,7611....', ,,,,,. .,,W.1*,W.SN1164:1 6 AN,q erSil ' • �w \ , - 4\ '•:,. ti� ,. , .\ .:s\ e'\\.. \ 76.1•1*****"' PAGE 16 CLICK . INSTALLATION GUIDE çEcoFasten a ., For Installers. By Installers. R , ' BONDING AND GROUNDING BONDING PATHS Bonding paths are carried throughout the array in a variety of ways. They are carried module- to-module and module-to-rail through mid clamps, carried at rail-to-rail connections through , the bonding jumpers, and carried row-to-row using bonding jumpers either module-to-module on the module frame or rail-to-rail on the ends of the rails. MID CLAMP 2 mid clamps bonding asp is 4 , pairs of modules GROUNDING LUG (//0 1 ground lug per continuous array CM,,,,,,,p, $.0...... .....$4,s, ,.,- 4,340.- i _ .4.*:...s,s,s ...., - 414 ,,,, ic, , . , , .-. 4-4z„.....„ Z ..... ,.., ..... ........., ... „4-., ,,,..„ , ,, ..<5.,4,0,.. , . , ter. <,-,7- , ,A,vt.. .., _..; -' RAIL SPLICE 1 splice bonding MODULE JUMPER adjacent pair of rails 1 module jumper bonding module to module and row to row PAGE 17 CLICK <I) EcoFosten 4 4\7 4 k s I \ STALLATION SUIOE For Installers. By Installers. GROUNDING 2 6..f 4 i�Y + NECESSARY COMPONENTS One of the following grounding lugs(or any UL 2703 Compliant ground Lug): • BurndyCL50-1TN Ground Lug(UL 2703 - E3514343 / UL 467-E9999) • ILSCO SGB-4 Ground Lug(UL 2703 - E354420/ UL 467 - E34440) • ILSCO GBL-4DBT(UL 2703 - E354420 / UL467 - E34440) • ILSCO GBL-4DBTH (UL 2703 - E354420/ UL 467 - E34440) • ILSCO GBL-4SS (UL 2703 - E354420/ UL 467 - E34440) 4'Equipment grounding wire should be sized in accordance with the National Electrical Code,NFPA70 PAGE arsii a minimum of 1/4"clearance is required between bare copper wires and aluminum components, 4e` Vt., lr CLICK ,,fin INSTALLATION JU oO EcoFasten I � E v For Installers. By Installers. ~ MLPE MOUNT INTALLATION NMI Lower the MLPE Mount to the rail Tilt and hook the mount around the top"dog ear"of the rail r Ic U Set the MLPE Mount flush with the top of the rail Slide the microinverter flange between the MLPE Mount and the serrated bolt flange (- Repeat this process for all other microinverter Tighten the bolt to 144 in-lbs and/or optimizer installations PAGE 19 s&ist,silkt CLICK < EcoFosten I TALLATIO\ GUILE I\S For Installers. By Installers. WIRE CLIP INSTALLATION \\\ \\*N 1. :-------Th '1/44.,\ ._____ 6,7r- - - - ,:,) i 1 With the ClickFit Rail in \\N • lace and the Wire Clip in hand, place the wire end on either side of the 2' rail. With the wire end touching the bottom lip ..6 of the rail, roll and click- in the Wire Clip to the opposite end of the rail. You will hear an audible 21. ,, L r- '� click when the Wire Clip is set in place. PAGE 20 CLICK INSTALLATICf GUIDE o EcoFasten '' -\\,,,, v For Installers. By Installers. FRAME MLPE MOUNT E INSTALLING THE FRAME MLPE MOUNT ACCESSORY: • Install the Frame MLPE Mount • Slide the Frame MLPE Mount onto the lip of the micro-inverter/power optimizer. • Slide the micro-inverter/power optimizer into the opposite lip of the module frame. • Tighten the bolt to 144 in-lb to clamp the Frame MLPE Mount to the module frame and the micro-inverter/power optimizer to the Frame MLPE Mount. • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. FRAME MLPE MOUNT AND MLPE MOUNT ARE COMPATIBLE WITH: • ENPHASE: M250-72, 250-60, M215-60, C250-72, S230, S280, IQ 6, IQ 6+, IQ7, IQ 7A, IQ 7+, IQ7 PD, IQ 7X, Q Aggregator; IQ8-60, IQ8PLUS-72, IQ8A-72, IQ8H-208-72, IQ8H-240-72, IQ8M-72, may be followed by-2-US • SOLAREDGE: M1600, P300, P320, P340, P370, P400, P401, P405, P485, P505, P600, P700, P730, P800p, P800s, P801, P850, P860, P950, P960, P1100, P1101, S440, S500 • SEE PAGE 26 FOR COMPATIBLE MODULE LIST PAGE 21 CLICK A4 \\S\44%4\\\N INSTALLATIC \ GUIDE o �a ECoFasten For Installers. By Installers. .441.14.41c4sbssostt MODULE MAINTENANCE AND SERVICING During servicing or maintenance, module removal may disrupt the bonding path and could introduce the risk of electric shock. If module removal is required for servicing, then a Module jumper shall be installed to the adjacent modules to maintain the bond path. Modules should only be removed by qualified persons in compliance with the instructions in this manual. yrim ---•--- Bond Path Grounding Lug Equipment Grounding Conductor(EGC) generally to earth ground Brackets/Mid-Clamps Module jumper PAGE 22 CLICK r:I: EcoFasten NSTALLATION3UIlE a For Installers. By Installers. JUNCTION BOX INSTALLATION JUNCTION BOX PREP ri Prior to installation, use step drill bit to place pass through holes for conduits or water-tight connectors. Drill bit starter locations are provided on the sides and front of enclosure. Do not install conduit facing up roof. ♦ RAIL INSTALLATION Use rail-specific MLPE mounting hardware to attach Rail Hangers to rail. Ensure junction box is pushed as close to the rail as possible.Torque to 80-in lbs(1/2"or 7/16" socket), do not overtighten. *1 f installing in areas with ground snow loads greater than 40 psf,install junction Box under module directly next to module D t $ fl frame edge. PAGE 23 i CLICK Ioa \ STALLATION SUIlE :Da v EcoFasten For Installers. By Installers. JUNCTION BOX INSTALLATION '4\‘'\ kii\ DECK SCREWS WITH SEALING WASHERS(2X) DECK MOUNTED INSTALLATION Align sealing oval of box to align with mating feature on flashing.An EPDM foam gasket is pre-installed to the underside of the junction box to seal the flashing to the box without the need for additional sealant. Secure with supplied#12 x 1- "deck screws (2x) until the junction box is pulled tight to the flashing. Do not over-tighten screws to avoid stripping screws in OSB. *If installing pass through fittings,ensure that the Junction Box and roof deck are both properly prepared.Complete installation process before attaching the Junction box to the deck. A FINALIZING INSTALLATION Install wiring, conduit and fittings per NEC requirements and following local AHJ guidance. Using Philips Head Driver tighten the bolt. For additional details refer to the full Junction Box Installation Manual. PAGE 24 CLICK INSTALLATION SUIIIE o�a EcoFasten # „5, , For Installers. By Installers. SKIRT INSTALLATION (OPTIONAL) The skirt is designed to give the rows of the array facing the eave of the roof a uniform t' appearance.The installation consists of three basic components listed below. `fir ak f J l t SKIRT & END CAP r SKIRT CLAMP 1 ,l 1. Once the first row of modules is installed (or after the array is complete ), locate the correct length and number of skirts for the array. 2. Locate the correct amount of skirt clamps for the array. 80" skirts are preferred when applicable. The general rule when using 80"skirts is the number of modules plus one for the � ,' , end of the array.When using 65"skirts, the rule changes to 2 skirt clamps per module. The w ,I general rule is number of modules plus one for the end of the array. If you have ten modules li you will need eleven skirt clamps. In the case of heavy snow loads or other circumstances call EcoFasten Solar for additional instructions. fit aig ''' 3. Working with a helper, align the end of the skirt with one edge of the array, drop the first skirt � , a clamp onto the module and skirt, ensure all flat faces are parallel and fully engaged with each ' a I other. Skirt clamps must be installed within 10 inches from the end of the Skirt. Ensure the '" clamp is engaging either the top of the skirt or the step depending on the module size. Tighten bolt to 12 ft-lb. 'i 4. There should be enough play in the assembly to drop the next skirt clamp onto the next 1 module at roughly the same location relative to the clamp on the last module. Ensure all faces are parallel and fully engaged with each other. Slide next skirt over the skirt end cap or rt' coupling of the first skirt.Tighten bolt to 12 ft-lb. 5. Repeat steps 3 and 4 until the end of the arrayis reached. Install a skirt clampwithin 10 ,- ?. l P P NOPW 1 inches from the end of the array. Cut the skirt flush with the end of the array as necessary. An qv it additional skirt clamp may be necessary to hold a short piece of skirt at the end of the array. tr °< 6. Once the last skirt is cut and clamped in place, install an end cap in the end of the last skirt.To 11 '¢ ensure the end cap stays in place through various weather conditions, it is acceptable to install ,,;; a small amount of roof sealant onto the edge of the end capthat will contact the inside face ' 144,9 of the skirt. Replace the tile that was moved and/or removed, or install the tile replacement ��� `' f.' flashing. If it is to be notched, mark the tile for notching. Notching can be done with a grinding wheel or by using a chisel. € > PAGE 25 CLICK4:1 acDEcoFasten \STAELATIC � GUIDE ooa4.44,,,t_ %., For Installers. By Installers. Install first skirt clamp within 10 inches from the end of the array with 80"skirts, the second clamp location will be similar to the first clamp but installed on the second module. Continue to < the end of the array. 41 4 P.411 I i 4 4 it\h%I I*4\4 14\4 41 4\44444%41444:4 ' ''''''''' ,.His'',. y .r Install last skirt clamp within 10 inches from the end of the array prior to cutting. 4 Install end cap on the last module. Adding a M- small amount of sealant is optional. THINGS TO CONSIDER PRIOR TO INSTALLING THE SKIRT ARE: • Potential snow drifting in the area the skirt is to be installed. If the snow load is greater than 20psf in your region two skirt clamps are required per module and skirt coupler must be used. Contact EcoFasten for information on the skirt coupler. • There are three options for skirts: A, B and C. The A& B skirts can be identified by looking at the inner channel, if it's ribbed then it is a B skirt and will use 32mm (inner channel) and 38mm utilizing the top of the skirt. A skirts will have a smooth inner channel and use PAGE 35mm (inner channel) and 40mm utilizing the top of the skirt. C skirts will only use 30mm �� skirts and do NOT have an inner channel. CLICK .. ` D�1EcoFasten INSTALLATION '3 _ I1E o For Installers. By Installers. UL 2703 CERTIFIED MODULES This racking system may be used to ground and/or mount a PV module complying with UL 1703 or UL 61730 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions. Unless otherwise noted, "xxx" refers to the module power rating and both black and silver frames are included in the certification. " " MANUFACTURER LIST OF UL 2703 APPROVED MODULES Adani modules with 35 and 40mm frames ASX-Y-ZZ-xxx Adani Where"X"can be B, M or P,"Y"can be 6 or 7, and "ZZ"can be blank, PERC, B-PERC, or AB-PERC Aionrise modules with 35 and 40mm frames Aionrise AIONyyG1-xxx Where"yy"can be 60 or 72 Amerisolar modules with 35,40 and 50 mm frames AS-bYxxxZ Amerisolar Where"b"can be 5 or 6;"Y"can be M, P, M27, P27, M30, or P30; and ""Z"" can be blank,W or WB I I Aptos modules with 35 and 40 mm frames Aptos Solar DNA-yy-zzaa-xxx Where"yy"can be 120 or 144; "zz"can be MF or BF; and "aa"can be 23 or 26 Astronergy modules with 30, 35,40, and 45 mm frames aaSMbbyyC/zz-xxx Astronergy Solar Where"aa"can be CH or A; "bb"can be 60, 66, or 72;"yy"can be blank, 10 or 12; "C"can M, P, M(BL), M-HC, M(BL)-HC, P-HC, M(DG), or M(DGT); and "zz"can be blank, HV, F-B, or F-BH ASUN modules with 35 and 40 mm frames ASUN-xxx-YYZZ-aa ASUN Where"YY"can be 60 or 72;"ZZ"can be M,or MH5; and "aa"can be blank or BB Auxin modules with 40 mm frames AXN6y6zAxxxB Auxin Where"y"can be M or P; "z"can be 08, 09, 10, 11, or 12; and "A"can be F, M or T; and "B"can be blank, A, B or C PAGE 27 e'1404 01409 CLICK \ INSTALLATION GUIDE <1Açi> EcoFasten 4 }#4 For Installers. By Installers. Nt, MANUFACTURER LIST OF UL 2703 APPROVED MODULES Axitec Modules with 30, 35 and 40 mm frames \ss\\*N\ Axitec AC-xxxY/aaZZb Where"Y"can be M, P or MH; "aa"can be blank, 125- or 156-; "ZZ"can be 54, 60, 72, 108, 120, or 144; "b"can be S, X,V,VB,XV, or MX Boviet modules with 35 and 40mm frames °• tirtittivig \\\\4:444\k,1/4\ BVM66aaYY-xxxBcc Boviet Where"aa"can be 9, 10 or 12;"YY"is M, or P; and "B"can be blank, L or S; and "cc"can be blank, H, H-BF, H-HC, HC-BF or H-HC-BF BYD modules with 35 mm frames 4441\ BYD BYDxxxAY-ZZ Where"A"can be M 6P6, MH or PH; "Y"canor be C K; and "ZZ"can beor 30 36 `4w Canadian Solar modules with 30, 35 and 40 mm frames Canadian Solar CSbY-xxxZ Where"b"can be 1, 3 or 6; "Y"can be H, K, L, N, P, U, V,W,X or Y; and "Z" can be M, P, MS, PX, M-SD, P-AG, P-SD, MB-AG, PB-AG, MS-AG, or MS-SD CertainTeed modules with 35 and 40mm frames CertainTeed CTxxxYZZ-AA Where"Y"can be M, P, or HC;"ZZ"can be 00, 01, 10, or 11; and "AA"can be 01, 02, 03, 04 or 06 Csun modules with 35 and 40 mm frames YYxxx-zzAbb CSUN Where"YY"is CSUN or SST; "zz"is blank, 60, or 72; and "A" is blank, P or M or MM; "bb" is blank, BB, SBB, BW, or ROOF , Dehui modules with 35 and 40mm frames Dehui DH-MYYYZ-xxx Where"YYY"can be 760, 772, 860, 872; and "Z"can be B or W Ecosolargy modules with 35, 40, and 50 mm frames ECOxxxYzzA-bbD Ecosolargy Where"Y"can be A, H, S, or T; "zz"can be 125 or 156;"A"can be M or P; "bb" can be 60 or 72; and "D"can be blank or B ET Solar modules with 35,40, and 50 mm frames ET-YZZZxxxAA ET Solar Where"Y"can be P, L, or M; "ZZZ"can be 660, 660BH, 672, 672BH, 754BH or 766BH; and"AA"can be TB, TW, WB, WW, BB, WBG,WWG, WBAC, WBCO, WWCO,WWBCO or BBAC PAGE 28 , ,x\-, CLICK D�: EcoFasten INSTALLATION GUIDE o For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Flex modules with 35,40, and 50 mm frames FXS-xxxYY-ZZ; Flex Where"YY"can be BB or BC; and"ZZ"can be MAA1 B, MAA1 W, MAB1 W, SAA1 B, SAA1 W, SAC1 B, SAC1 W, SAD1 W, SBA1 B, SBA1 W, SBC1 B, or SBC1 W GCL modules with 35 mm and 40 mm frames GCL GCL-ab/YY xxx Where"a"can be M or P; "b"can be 3 or 6; and "YY"can be 60, 72, 72H, or 72DH Gigawatt modules with 40 mm frames GigaWatt Solar GWxxxYY Where"YY"can be either PB or MB Hansol modules with 35 and 40 frames HSxxxYY-zz Hansol Where"YY"can be PB, PD, PE,TB,TD, UB, UD, or UE; and "zz"can be AH2, AN1, AN3,AN4, HH2, HV1, or JH2 Hanwha Solar modules with 40,45, and 50 mm frames HSLaaP6-YY-1-xxxZ P Hanwha Solar ° Where"aa"can be either 60 or 72; "YY"can be PA or PB; and "Z"can be blank or B Hanwha Q CELLS Modules with 32, 35, 40, and 42mm frames aaYY-ZZ-xxx where"aa"can be Q. or B.;"YY"can be PLUS, PRO, PEAK, LINE PRO, LINE PLUS, PLUS DUO or PEAK DUO; and "ZZ"can be G3, G3.1, G4, G4.1, L-G2, L-G2.3, L-G3, L-G3.1, L-G3y, L-G4, L-G4.2, L-G4y, LG4.2/TAA, BFR-G3, BLK-G3, BFR-G3.1, BLK-G3.1, BFR-G4, BFR-G4.1, BFR G4.3, BLK-G4.1, G4/SC, G4.1/ �' r SC, G4.1/TAA, G4.1/MAX, BFR G4.1/TAA, BFR G4.1/MAX, BLK G4.1/TAA, BLK ;1 G4.1/SC, EC-G4.4, G5, G5/SC, G5/TS, BLK-G5, BLK-G5/SC, BLK-G5/TS, L-G5, Hanwha Q CELLS L-G5.1, L-G5.2, L-G5.2/H, L-G5.3, G6, G6/SC, G6/TS, G6+, BLK-G6, L-G6, L-G6.1, L-G6.2, L-G6.3, G7, BLK-G6+, BLK-G6+/AC, BLK-G6+/HL, BLK-G6+/SC, r I BLK-G6/TS, G6+/TS, BLK-G6+/TS, BLK-G7, G7.2, G8, BLK-G8, G8+, BLK-G8+ L-G7, L-G7.1, L-G7.2, L-G7.3, L-G8, L-G8.1, L-G8.2, L-G8.3, L-G8.3/BFF, ML-G9, :1 BLK ML-G9, ML-G9+, BLK ML-G9+, BLK-G10+, BLK-G10+/AC, ML-G10, BLK ML-G10, ML-G10+, BLK ML-G10+, ML-G10.a, BLK ML-G10.a, ML-G10.a+, BLK , ML-G10.a+, XL-G9, XL-G9.2, XL-G9.3, XL-G10.2,XL-G10.3, XL-G10.c or XL- G10.d PAGE 29 CLICK DAV I \ STALLATIO \ GUILE 04 EcoFasten For Installers. By Installers. '4\444. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Heliene modules with 40 mm frames Heliene YYZZxxxA Where"YY"can be 36, 60, 72, 96, 120 or 144;"ZZ"can be HC, M, P, or MBLK; and"A"can be blank, HomePV, or Bifacial HT-SAAE modules with 35 and 40 mm frames HT-SAAE HTyy-aaaZ-xxx Where"yy"can be 60, 66 or 72;"aaa"can be 18, 156 or 166;"Z"can be M, P, M-C, P-C, M(S), M(VS), M(V), P(V), M(V)-C, P(V)-C, or X Hyundai modules with 33, 35, 40 and 50 mm frames HiY-SxxxZZ 4%\\N\s'% Hyundai Where"Y"can be A, D or S;"S"can be M or S; and"ZZ"can be HG, HI, KI, MI, , MF, MG, PI, RI, RG, RG(BF), RG(BK), SG,TI or TG 1. \\4 4 4S\SS\SS Itek Modules with 40 and 50 mm frames Itek IT-xxx-YYCin Where"yr can be blank, HE, or SE, or SE72 JA Solar modules with 30, 35,40 and 45 mm frames U.I JAyyzz-bbww-xxx/aa Where"yy"can be M, P, M6 or P6; "zz"can be blank, (K), (L), (R), (V),(BK),(FA), 1111.1111111 JA Solar (TG), (FA)(R), (L)(BK), (L)(TG), (R)(BK), (R)(TG), (V)(BK), (BK)(TG), or(L)(BK)(TG); "bb"can be 48, 54, 60, 66, 72 or 78;"ww"can be D09, S01, SO2, S03, S06, :3 S09, S10, S12, 517, S20, S30 or S31; and"aa"can be BP, MR, SI, SC, PR, 3BB, 4BB,4BB/RE, 5BBlal Jinko modules with 35 and 40 mm frames JKMYxxxZZ-aa rl Where"Y"can either be blank or S; "ZZ"can be M, P, or PP; and"aa"can be Jinko blank, 60, 60B, 60H, 60L, 60BL, 6OHL, 60HB, 60HBL, 6HBL-EP, 60-J4, 60B-J4, 60B-EP, 60(Plus), 60-V, 60-MX, 6RL3, 6RL3-B, 6TL3-B, 7RL3-V, 7RL3-TV, 72, 72B, 72-J4, 72BJ4, 72(Plus), 72-V, 72H-V, 72L-V, 72HL-V, 72-MX, 72H-BDVP, 72HL-TV, or 72HL-V-MX3 Kyocera Modules with 46mm frames KYxxxZZ-AA Kyocera Where"Y"can be D or U; "ZZ"can be blank, GX, or SX; and "AA"can be LPU, LFU, UPU, LPS, LPB, LFB, LFBS, LFB2, LPB2, 3AC, 3BC, 3FC, 4AC, 4BC,4FC, 4UC, 5AC, 5BC, 5FC, 5UC, 6BC, 6FC, 8BC, 6MCA, or 6MPA ,,,1 „ +r, � 1 11 LG modules with 35,40,and 46 mm frames LGxxxYaZ-bb LG ! Where"Y"can be A, E, M, N,Q,S;"a"can be A, 1,2 or 3;"Z"can be C, K,T,or W; i PAGE and"bb"can be A3,A5,A6, B3, B6, E6, E6.AW5,G3,G4,J5, K4, L5, N5,V5,V6 } CLICK ‘ w P0a Qa I (�STALLATICN GUISE a EcoFasten For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Longi modules with 30, 35 and 40 mm frames LRa-YYZZ-xxxM k Longi Where"a"can be 4 or 6; "YY"can be blank, 60, 66 or 72; and "ZZ"can be . blank, BK, BP, HV, PB, PE, PH, HBD, HIB, HIH, HPB, HPH, or HIBD Mission Solar modules with 33, 35 and 40 mm frames YYYbb-xxxZZaa Mission Solar Where"YYY"can be MSE or TXS;"bb"can be blank, 6 or 60A; "ZZ"can be blank, MM, SE, SO, SQ, SR, SX,TS, 120 or 144; and"aa"can be blank, BB, BW, 1J,4J, 4S, 5K, 5R, 5T, 60, 6J, 6S, 6W, 6Z, 8K, 8T, or 95 °x Mitsubishi modules with 46 mm frames r Mitsubishi PV-MYYxxxZZ °-; Where"YY"can be LE or JE; and "ZZ"can be either HD, HD2, or FB ' Motech IM and XS series modules with 40, 45, and 50 mm frames Next Energy Alliance modules with 35 and 40mm frames le Next Energy yyNEA xxxZZ Alliance where"yy"can be blank or US; "ZZ"can be M, MB or M-60 tp Neo Solar Power modules with 35 mm frames D6YxxxZZaa Neo Solar Power I Where"Y"can be M or P; "ZZ"can be B3A, B4A, E3A, E4A, H3A, H4A; and "aa" can be blank, (TF), ME or ME(TF) _ Panasonic modules with 35 and 40 mm frames VBHNxxxYYzzA Panasonic (HIT) Wh "YY"can be KA, , SA or ZA; " "can be 01, , 03,04, 06,ere06B, 11, 11B, 15, 15B either, 16, 16BRA , 17, orl8;zzand "A"caneither be blank02 E, GorN Panasonic modules with 30 mm frames Panasonic EVPVxxxA (EverVolt) Where"A"can be blank or H, K or PK 4vi 'tuf'r i i Toihira Peimar modules with 40 mm frames SbxxxYzz Pelntar Where"b"can be G, M or P; "Y"can be M or P; and "zz"can be blank, (BF), or (FB) Philadelphia modules with 35 and 40 mm frames PS-YzzAA-xxxN. Philadelphia Solar Where"Y"can be M or P; "zz"can be 60, 72 or 144; and"AA"can be blank, L (BF), (HC)or(HCBF) _. PAGE 31 ,&,\.s,„ CLICK INSTALLATION GUILE çEcoFosten 7 For Installers. By InstaLlers. 1 a MANUFACTURER LIST OF UL 2703 APPROVED MODULES Phono Solar modules with 35,40, and 45 mm frames Phono Solar \\ ' PSxxxY-ZZ/A Where"Y"can be M, M1, MH, MIN, M4, M4H, or P; "ZZ"can be 20 or 24; and "A"can be F,T, U, UH, or TH IRecom modules with 35 and 40 mm frames \\‘' Recom i RCM-xxx-6yy Where"yy"can be MA, MB, ME or MF **4\14\\,b\S'114 ' ''"' '`"`""''''''Fr''''''Phi''' =t. REC modules with 30, 38 and 45 mm frames RECxxxYYZZ REC Solar Where"YY"can be AA, M, NP, NP2, PE, PE72,TP,TP2,TP2M,TP2SM,TP2S, TP3M or TP4; and "ZZ"can be blank, Black, BLK, BLK2, SLV, 72 or Pure ReneSola modules with 35, 40 and 50 mm frames AAxxxY-ZZ Renesola ? Where"AA"can be SPM(SLP)or JC;"Y"can be blank, F, M or S; and "ZZ" can be blank,Ab,Ab-b,Abh,Abh-b,Abv, Abv-b, Bb, Bb-b, Bbh, Bbh-b, Bbv, Bbv-b, Db, Db-b, or 24/Bb Renogy Modules with 40 and 50 mm frames Renogy RNG-xxxY Where"xxx" is the module power rating; and"Y"can be D or P s I Risen Modules with 35 and 40 mm frames Risen RSMyy-6-xxxZZ I Where"yy"can be 60, 72, 120, 132 or 144; and "ZZ"can be M or P S-Energy modules with 35 and 40mm frames SABB-CCYYY-xxxZ S-Energy Where"A"can be C, L or N; "BB"can be blank, 20,40 or 45;"CC"can be blank, 60 or 72;"YYY"can be blank, MAE, MAI, MBE, MBI, MCE or MCI; and "Z"can be V, M-10, P-10 or P-15 SEG Solar modules with 35 and 40 mm frames SEG-aYY-xxx-ZZ SEG Solar Where"a"can be blank, 6 or B; "YY"can be blank, MA, MB, PA, or PB; andNaN "ZZ"can be blank, BB, BG, BW, HV, WB,WW, BMB, BMA-HV, BMA-TB, BMB- ' HV, BMB-TB, BMD-HV Seraphim modules with 35,40 and 50 mm frames SRP-xxx-YYY-ZZ Seraphim USA Where"xxx" is the module power rating; and "YYY"can be 6MA, 6MB, 6PA, 6PB, BMD, 6QA-XX-XX, and 6QB-XX-XX; ZZ is blank, BB or HV PAGE 32 CLICK 4, INSTALLATION SUIDE oa EcoFasten 4. 5 . For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES , "� Sharp modules with 35 and 40 mm frames Sharp NUYYxxx Where"YY"can be SA or SC Silfab Modules with 35 and 38 mm frames" SYY-Z-xxxAb Where"YY" can be IL, SA, LA, SG or LG; "Z"can be blank, M, P, or X; "A"can be blank, UorX Solaria modules with 35 and 40 mm frames PowerXT-xxxY-ZZ Solaria Where"Y"can be R or C; and "ZZ"can be AC, BD, BX, BY, PD, PL, PM, PM-AC, PX, PZ,WX or WZ Solarcity modules with 40 mm frames 444, Solarcity SCxxxYY (Testa) Where"YY"can be blank, B1 or B2 SolarTech modules with 40 and 42 mm frames AAA-xxxYY SolarTech Where"AAA"can be PERCB-B, PERCB-W, HJTB-B, HJTB-W or STU;"YY"can be blank, PERC or HJT SolarWorld Sunmodule Plus, Protect, Bisun, XL, Bisun XL, may be followed SolarWorld AG by mono, poly, duo, black, bk, or clear; modules with 31, 33 or 46 mm frames SW-xxx ( SolarWorld Sunmodule Plus, Protect, Bisun,XL, Bisun XL, may be followed SolarWorld by mono, poly, duo, black, bk, or clear; modules with 33 mm frames Americas1111. SWA-xxx Sonali Modules with 40 mm frames ` Sonali SSxxx Stion Thin film modules with 35 mm frames 1 Stion STO-xxx or STO-xxxA SunEdison Modules with 35,40 & 50 mm frames SE-YxxxZABCDE k.` N. SunEdison Where"Y"can be B, F, H, P, R, or Z; "Z"can be 0 or 4;"A"can be B, C, D, E, H, I,J, K, L, M, or N ;"B"can be B or W;"C"can be A or C;"D"can be 3, 7, 8,or 9; and "E"can be 0, 1 or 2 Suniva modules with 35, 38,40,46, and 50 mm frames OPTxxx-AA-B-YYY-Z Suniva MVXxxx AA B YYY-Z PAGE Where"AA" is either 60 or 72; "B"is either 4 or 5;"YYY"is either 33 100,101,700,1 B0, or 1 B1; and "Z"is blank or B CLICK D ht INSTALLATION GUIDE oca EcoFasten F. For Installers. By Installers. ,,,s4.:\ MANUFACTURER LIST OF UL 2703 APPROVED MODULES Sunpower standard (G3 or G4)or InvisiMount(G5)35,40 and 46 mm frames4 SPR-Zb-xxx-YY Sunpower Where"Z"is either A, E, P, M or X;"b"can be blank, 17, 18, 19, 20, 21, or 22; :1:;14,,s\444144, 4si: and "YY"can be blank, BLK, COM, C-AC, D-AC, E-AC, BLK-E-AC, G-AC, BLK-C- AC, or BLK-D-AC Sunspark modules with 40 mm frames i Sunspark sYY-xxxz-A Where"YY"can be MX or ST; and "Z"can be M, MB, M3, M3B, P or W; and ,44,..,„,1, "A"can be 60 or 72 Suntech Modules with 35, 40 and 50mm frames STPxxxy-zz/aa +: Suntech 1 Where"y" is blank or S; and"z"can be 20, 24,A60 or A72U; and "aa"can be Vd,Vem, Vfw,Vfh, Wdb,Wde,Wd, or Wfhb t6xx, . , >¢ ar , Talesun modules with 35 and 40mm frames TP6yZZaaxxx-b Talesun Where"y"can be blank, F, H, or L;"ZZ"can be 60 or 72;"aa"can be M, M(H), or P; and"b"can be blank, B, T, or(H) Tesla modules with 40 mm frames { Tesla TxxxY It Where"Y"can be H or S t Trina Modules with 30, 35,40 and 46mm frames 1111111 TSM-xxxYYZZ Where"YY"can be DD05, DD06, DD14, DE09, DE14, DE06X, DE15, DE15V, Trina ' DEG15, PA05, PC05, PD05, PD06, PA14, PC14, PD14, PE14, or PE15 ; and "ZZ" I can be blank, (II), .05, .05(11), .08, .10, .18, .08D, .18D, 0.82, .002, .00S, 05S, 08S,A,A.05,A.08,A.10,A.18,A(II),A.05(II),A.08(II),A.082(II),A.10(II),A.18(II), H, H(II), H.05(ll), H.08(II), HC.20(II), HC 20(II), M, M(II), M 05(II) MC 20(II) hil. ,` '"- ' fd� '"? r, �l URE modules with 35 mm frames r' ..:.. .... ... . .. .. .:.. � d DyZxxxaa , URE Where"D"can be D or F, "y"can be A, 6 or 7; "Z"can be K or M; and"aa"can be H3A, H4A, HBA, E7G-BB, E8G or E8G-BB Vikram solar modules with 40 mm frames Vikram VSyy.ZZ.AAA.bb Where"yy"can be M, P, MBB, MH, MS, MHBB, or PBB; "ZZ"can be 60 or 72; "AAA"is the module power rating; and "bb"can be 03, 04 or 05 PAGE 34 i . t. CLICK INSTALLATION GUIDE o0a EcoFasten For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES VSUN modules with 30, 35 and 40 mm frames VSUNxxx-YYz-aa VSUN Where"YY"can be 60, 72, 108, 120, or 144; "z"can be M, P, MH, PH, or BMH; and "aa"can be blank, BB or BW Waaree modules with 40mm frames Waaree WSyy-xxx where"yy"can be blank or M Winaico modules with 35 and 40 mm frames Wsy-xxxZa Winaico Where"y"can be either P or T; "Z"can be either M, P, or MX; and"a"can be blank or 6 Yingli modules with 35 and 40 mm frames Yingli YLxxxZ-yy Where"Z"can be D or P; "yy"can be 29b, 30b, 34d, 35b, 36b or 40d ZN Shine modules with 35mm frames ZN Shine ZXMY-AAA-xxx/M Where"Y"can be6or7,"W"can be72, NH120, NH144orNHDB144 Y� k4 PAGE 35 CLICK D�V INSTALLATION GUIDE oI EcoFasten. For Installers. By Installers. CLAMP PART NUMBERS END CLAMPS Frame Thickness Article Number 30 mm 2099016 32 mm 2099017 35 mm 2099018 38 mm 2099019 40 mm 2099020 45 mm 2099021 MID CLAMPS Frame Thickness Article Number 30-40 mm 2099022 00o EcoFasterr' For Installers. By Installers. v°a GF.1 ooa EcoFasten INSTALLATION GUIDE For Installers. By Installers. 4'-*.4\\,\\\ CLICKING THE PAGE NAME WILL TAKE YOU TO THAT PAGE TABLE OF CONTENTS PAGE 01 FEATURES & BENEFITS PAGE 02 COMPONENTS PAGE 03 INSTALLATION PAGE 04 rt LINE DRAWINGS PAGE 06 SPECIFICATIONS PAGE 12 igiogoo 1/1 kommiitgi Pk f f t t . PAGE 01 , ... ,N„ GF_i \:. ooa EcoFasten $ �, INSTALLATION GUIDE vFor Installers. By Installers. x 4AA444 l*f t,T AFpPo *9 r FL/39871 i e. ' 4 X E 9 * N p i y‘ r A L% STATE Of, 6?!a P � ti-02 UR po►1.vea -4 3 rN:am, ;y 'y a '`a r a•- 'v's"` b.t a s s f 1 �"-,h ,��er. � 3f'' "., #a.s.: :',f, rc.'' +a ,` f,p A t ' rr. 1 i , n s, it rlgt,, ` z °` 1,J j,}�{pt' r . , �d c 141. z r Y; x GF-1 ., GF-1 is our most versatile solution for composition shingle roofs. Install the flashing , using a single fastener for a quick & easy installation. When using the GF-1 flashing ,$¥ : grommet and an EcoFasten compression bracket, a watertight seal is created, maintaining the integrity of the roof. FEATURES • Mill or black finish • Patented Watertight Technology . • Installs without removing shingles �# >3 �,, • Single lag bolt attachment F 1. 4ti 4_ , • Compatible with a variety of compression brackets { t • Florida Product Approved for any combinationof 8"x12"GF-1 tilM'Atf Ate £, flashing with the ClickFit L-foot&Lag Screw PAGE 02 - G Fasi ooa EcoFasten � 4, INSTALLATION GUIDE � �'� ' Far Installers. By Installer's. � ' i '`,, 44 z SYSTEM COMPONENTS 4f, f t,'J 1yi sf�i# _. rim}, "' s,, 3r°�Zi 0 0 v;- _ aims C:1 1. L-FOOT SCL-101 BLK 3" 4. GF-1 FLASHING GLV MLL 8X12" - (OTHER OPTIONS AVAILABLE) GALVALUME FLASHING WITH PRE- INSTALLED EPDM RUBBER GASKET " 2. 5/16" LAG BOLT (AVAILABLE IN 3"AND 4") (AVAILABLE IN 8X10&8X12,WITH MILL&BLACK FINISH OPTIONS) 3. 5/16" EPDM BONDED WASHER \44\ rt PAGE 03 \1/4 k aoo EcoFasten : INSTALLATION GUIDE For Installers. By Installers. 1.\:\44 INSTALLING GF-1 Snap horizontal lines across the \\NS roof to mark the mount rows,then locate the rafter and mark the installation position of each GF-1 flashing. -441111 Drill a 7/32"pilot hole into the rafter or structural member for the lag screw. Backfill with sealant PR- compatible with the roof type. -00 € 411 04 *[ 441 e rowileT /141111, Slide flashing up under the next row of shingles directly above the pilot hole,taking care to align the hole in the flashing with the pilot hole. PAGE 04 r � fro. rk, V a , G F...,1 1, „, <} EcoFastenINSTALLATION GUIDE �x For Installers. By Installers. _ ' ' Rs f CS, €s,. INSTALLING GF-1 � h .4y Td L{5 r 'a:r #aar - Thread the EPDM bonded washer _, , onto the lag bolt followed by one of EcoFasten's compression brackets °,,. t.441C , ;, and then insert the lag bolt into the gasketed hole in the flashing. s, ',aoa '#�� IIf�'}S iyr6P))� iii liFk b:: +' e'p:N,�.'f j f3t1S41,17 Drive the lag bolt down into the i '''' 'ii°'', rafter using an impact driver. Torque range is between 100-400t'' ' t torque inch-pounds depending A on the type of wood and time of 11' year.The visual indicator for proper VV, ;tir =,r fr ,�i,fo , x,: torque is when the EPDM on the t �, lit underside of the bonded washer ����� begins to push out the sides as the }_ " ' i I.i.ki # ?., washer compresses. Do not over tli torque. #fiYl gltfr- NINA Spa fw e l#n i ddr `.,. PAGE 05 T\ G F MB 1 144.4, '---.''' ago : EcoFasten , ,.„,,.,4, 4\ INSTALLATION GUIDE For Installers. By Installers. , vxj� >t, v,,,,, e ram^ ; kr,„:,:,..\\ CUT SHEET: GF-1 FLASHING GLV MLL/BLK - -_ ITEM NO. PART NUMBER DESCRIPTION --- QTY. REV. REVISIONS DESORPTION DATE 1 750041-02 GP1-GAL-MLL-812 1 A A RELEASE TO Esoec E�RmnrlEcox TI mo�rw,l APPROVED 5/16 STAINLESS STEEL AND EPDM 2 150002 BONDED SEALING WASHER 1 A D D � n csq� i rigiitg lie ,•- B.00 [203.21 1 ,iv''F+r�a" c c - © '. ��' x 12.00 Ry. • 1304.8] "1 B B 0.02 [0.5]) *too — — f. ,� - n THIRD ANGLE PROJECTION oRAwN _ ID) dta,�€' ENOAPRR ve m�xz �� �� 3&3+t'° t; +�.WirT A on APv.1Do LLEiRANCE A ovxr INTERPRET DNA AND TOLERANCE INNOVATIVE NOONTIME SYSTEMS DO NOT SCALE DRAWING PER ASMEO5510]-2co9 �ROPRIEfpRYpNDCONEIDENTIpL DIMENsIo"sTo�ERnNCESTIREiN: GF-1 FLASHING GLV MLL 8X12 � INCHES. MILLIMETERS 3 1.PACKAGE PER"3012011-PCK" .xx: �; I i; 3012011 E. IGF-1 FLASHING GLV MLL 8X12"50-PACK INST) .xxx:y-.oro :+i-.2s A I wacM - RA t.� h, s...ao..rrEA coER T6 EN EEOE5.c ANGLES:+i-I° AL_i� s Cori 6 I 5 I 4 ww 3E. I 2 sc I I HEE, aftitlee 11 mi3 F id..' IR y. PAGE f 06 G F....1 .,,,kk\-''',,,,,,.„,„ ooa EcoFasten 4 ' , INSTALLATION GUIDE For Installers. By Installers. aE -4,,,,, *a '4. �(,k b t#�• 'SOS �*R3f„gw�'44, s 't, \ f`*y a:44',i44 CUT SHEET: L-FOOT L-102 BLK 3" �, 4,,*4 455 4 x 04 1 ITEMI NO. PART NUMBER 5 DESCRIPTION 4 QTY. REV. 3 I 2 REVISIONS I ogre RovE f{T. ¢RA. oacRPl oN 1 450050-01 _ L-102-3 ANOD BLK 1 01 I Ruuse ro escecvoxM.i(Ecoxn) 10A0"0z)I AxorOFF 0 #,., t 2 150009-08 SS HEX HD CAP SCREW,FULL THD,3/8-16 UNC X 1.25 LONG 1 01 y�;tl 44 lf 'ep 3 150011-03 SS SERRATED FLANGE LOCK NUT,3/8-16 I 02 `� 0 /t k]+ { g„,. `I x f 4r�, o C C %© ([76.23.00]) r . J B B — THIRD ANGLE PROJECTION WN /so o: : 1A�I Dl1 ig A Ow.P .D a/o a/.I 1 1 , A A. 1 INTERPRET DIM AND TOLERANCE INNOVATIVE MOUNTING arms DO NOT SCALE DRAWING PER ASME0IXOIMI-200P $ s DIMENSIONSTOLERANCESARER�: L—FOOT L-102 BLK 3" }# RRORMEfpRY AND CONFIDENTIAL INCHES. IMILLN1EITRS] s t I.PACKAGE PER"3011015-PCK" +a P;T L-FOOT L-102 ELK 3"50-PACK INST) .zx:+/-.030 . .zs Fs 1§ 7 I 3011015 Rq. ;�.��R�1✓ A Ic .�rvexnrteo.corr a»eroec Wc. ANGLES'+/.1° AIE.I.I I WEIGHT: I Mori 6 I 5 I 4 I NR rN3. I 2sc I ,SEE .4° ^'S 'T4g V. T � 16. 6; , 161. N, PAGE 07 N q „i 4,1 , N,,, OF..1 ,,.. 4„, ,, ,, ..., 00EcoFasten aINSTALLATION GUIDE 4 For Installers. By Installers. CUT SHEET: L-FOOT L-102 MLL 6" 6 I 5 I —4- 1 3 I 2 1 ITEM NO. PART NUMBER DESCRIPTION QTY. REV. REVISIONS PPON DAR(EGO C FORMAT S O. APPRDOvfD FS, T EDF D M>2] OUNT21 RA I N //"5 1 450082-02 L-102-6 1 01 A '4.Y4ia r' t.A �t4�, 2 150009-08 SS HEX HD CAP SCREW,FULL THD,3/8-16 UNC X 1.25 LONG I 01 °+k,'�' `))4 3 150011-03 SS SERRATED FLANGE LOCK NUT,3/8-16 I 02 D D .gig S 1 I >i'i{ SuS/ . II t' x zl� = fa c d c o.,°s J, © ( 6.00 [152.4] ) , 0 , 0 B B . 3.00 2.00 ( [76.2] ) ( [50.8])�"/ { t'' - la, ',..4' al THIRD ANGLE PROJECTION ° pzj01jzp, n\\\) //�-''�� 8 t xa;g,f+i4>' r Ce-A4P) iPSD wms/xA ����� wro noz 1, A 0A AwF.TO ros/2021 1 7 A oA. TO ommnon INTERPRET IXM AND TOLERANCE INNOVATIVE IROUNTINi f1'fifMf t. DO NOT SCALE DRAWING PER ASME n asIM1-2D09 DIMENspNsioLERANeesAREiN: L-FOOT L-102 MLL 6" F fT RRORRIETARY AND CONFIDENTAL INCHES. 1MELIMEiER51 r 1.PACKAGE PER"3011016-PCK" TNE RINTTION xx'v-030 x./75 ` g IL-FOOT L-102 MLL 6"50-PACK INST) xxz:./-.01a 00 0/23 A I G. 3011016 AA 2' ANGLES.El-I° ALE I. I WEIGHT: TT 6 I 5 I 4 I «<. 3 I 2fc I 1 c, 1,'PmI , fii: K: } r [f S PAGE 08 D� V Oa EcoFastenGF...,1 . , . .: , INSTALLATION GUIDE For Installers. By Installers. \ - \\* CUT SHEET: L-FOOT SCL-101 MLL/BLK 3" ITEM NO. PART NUMBER DESCRIPTION QTY. REV. REVISIONS REV DESCRIPTION DATE APPROVED 1 450049-02 L FOOT W/STANDARD DIMPLE AND OPEN SLOT,3 IN TALL MLL 1 01 A NEwaeLeASE ro Esoce roemarTco a,W arosnov ano iPs 2 150009-08 SS HEX HD CAP SCREW,FULL THD,3/8-16 UNC X 1.25 LONG I 01 3 150011-03 SS SERRATED FLANGE LOCK NUT,3/8-16 I 02 D D i *t/�F k „ ek'ki i+{y �t llr tl tII i a a ( 3.0 [76.2] ) I Wx li£t`li l9 ffir: aatcea poll B .7" --'7:- , ,*� $U >;, 0 ( .88 Kg& [47.6]) t, ,N+fti 1.,, a' 0 ...,�...�r-..n_., THIRD ANGLE PROJECTION ° �Ps w/os mz 1��1 ('—. .....( A =AAp a i oug= "mil o.A. ro LRANCE v A mvzon i .INTERPRET DIM AND ioLERANCE INNOVATIVE YOUNTINi fI'lEtlif DO NOT SCALE DRAWING PER ASMEYILSIMI-2°°9 L-FOOT SCL-101 MLL 3" �; £r� PROPRIETARY AND CONFIDENTIAL DIMENSIONS TOLERANCES ARE IN: 3( , ,, I.PACKAGE PER"3011017-PCK" INCHES. IMIILIMETERs1 ME W.W.I.CONTANED IN TIM MAW. Vh' F IL-FOOT SCL-101 MLL 3"50-PACK INST. .xx.*/-03o x../-.�s owe.N v 3011017 aA Ono Rpm: .erxan .cavr . oAcaoEc•c. ANGLES'+/-I" EERIE:t'.i I WEIGN1'. I or 6 I 5 I 4 r a3 I 3 I 1 R� __,... linligli T1 N„ #0 4444 Pegigt 11''' tir„ PAGE 09 �,#{ r, `r Mr. y :. '• GF_i ,, ooa EcoFasten °w ::\INSTALLATION GUIDE For Installers. By Installers. kk N,\"1/4,,,, CUT SHEET: CF UNIV L-FOOT MLL 3 - 2012022 -.. 6 I 5 -_ I q 3 I. _—_- 2 I _._-------._ ITEM NO. PART NUMBER DESCRIPTION QTY. REV. REVISIONS REV DEscRiPrroN DATE APPROVED 1 750120 CLICKFIT L FOOT ASSEMBLY 1 A A New REIEfs5 to Esoee*0(0*5 mo xz5OI oslz�lzozl RADuvs D D , ,, Tnt a 'fii 7'# t agaro Agri 0 r ! P — ;P{Er1*Jfit''s' €q I c c it_t(1' zerso ( 2.76 [70.1]) 7 ,. f 1" 4404 lee.'� { 0 110 e BJooie ag a ili Y { THIRD ANGLE PROJECTION 05 RPs -osrvrm l 1,IIV M `� A / r-�T w *D A osrzrizosl ��I DI }�� A �I nrrz rD osizrrzozl INTERPRET DIM AND TOLERANCE INNOVATIVE mammas MVSIIWE V DO NOT SCALE DRAWING PER ASM0 YI451M1 2009 Ai PROPRIETARY AND CONFIDENTIAL IN DIMENSCHIOES MLLIMNS TOLERANCESETE ARERSIIN CF UNIV L-FOOT MLL 3 fd . [ 1 r 1.PACKAGE PER"2012022-PCK" .xx a/-.090 x,/.7s c.Nu 2� 2�22 REEV. � a' A (CF UNIV L-FOOT MLL 3"50-PACK INST.) ;;,o„ -.010 . A zx: ANGLE$:t/-I° S< E:'.I I WEIRIOl t 6 I 5 I 4 I 3�..>0. I 3 1 1NED .._. i #/ r: r,Orfk' n tIANSJI WIMPANIA f PAGE k I 0 : ... INSTALLATION GUIDE aOD EcoFasten '''%\k\:s For Installers. By Installers. \\t s s\\%\s'*''''***‘''' '''t''4''''''''',:.• CUT SHEET: RI COMP SLIDE AL BLK - 2011013 5 i_.._ 4 I 3 I 2 ] ITEM NO. PART NUMBER DESCRIPTION QTY. REV. zevs orvs REV DESCRIPTION Ef off DATE APPROvED I 450092-01 ROCKIT V3 SLIDECOMP _ I 01 A NEW RELEASE I055DE05ow.,Ai(EGO wnat 07/19/2021 RADOPS 2 53-100-010 LAG SCREW,5/16-4",THREAD 3",EPDM BACKED 1 C WASHER 4w D D t1rs 9 io 1 3 V i{5 18I lI t.;tp,UT€1 i13 it, 1f 4 — iwitolpgif 1 S1Yt, c (e#diiotti adto,, lO°r 1— — a.00 ,,,,,, , rlal,fl p 0 r" 'z [101.6] B '` ' B O 1111s_/, r, /t.=t €1= a„ tl f f I,/ THIRD ANGLE PROJECTION ° RPs oanvzon (/(�'��, 1'-,—eNfeer I--- —J��/ A H.c7EZ rR an3rozi ^0A ARre.R° /13/azzl I 2 A — INTERPRET DIM AND TOLERANCE INNOVATIVE WOYNTINf f1/fT�Yf /13/2021 DO NOT SCALE DRAWING PER ASME YIe.5IMI-2009 DIMENSIONSTOLERANCES ARE IN' RI COMP SLIDE AL BLK PROPRIEFARY AND CONFIDENIIAI INCHES. [MRIR.tETERSI ^` %x.+/-.030 %:+/-JS I.PACKAGE PER"2011013-PCK" -NO 2011013 (RI COMP SLIDE AL BLK 50-PACK INST.) .xxx:./-.olo xx.+/-.zs A I IRA ANGLES:+/-1° SCA ,wHG rt_ 3 iOf 6 I 5 I 4 1 .<.s..00.� o 3r oe>ofEw:E«". I I 1rv� .__ ,. 7r,r. ,r p l, f '1<l=a 153 1va%`1 PAGE 11 GF..1 aoD EcoFasten =3 INSTALLATION GUIDE For Installers. By Installers. . 4 SYSTEM COMPONENTS 1 . GF-1 Flashing: All flashing options come with a pre-installed integrated EPDM grommet and one bonded stainless steel EPDM washer. Flashing are available in three options: 1 . 8 x 12" .032 gauge galvalume with mill or black (kynar painted) finish. 2. 8 x 10" .032 gauge galvalume with black (kynar painted) finish. 3. 8 x 12" .032 gauge aluminum with black (kynar painted) finish. .x 2. Aluminum Compression Bracket: e,. 3,1000 Compatible with a variety of EcoFasten compression brackets. EcoFasten compression brackets are made out 6000 series aluminum with options441,K UN; available for mill or black finishes depending on the bracket. ita. „ k,414 „ IOW 3. Recommended Fasteners :. 5/16"x4" lag bolts. 3" option also available. F.'3s,,:, _ 4. Recommended Sealant: If required by roof manufacturer, sealant shall be roof manufacturer approved. 11111A- DELIVERY / STORAGE / HANDLING Inspect material upon delivery. Notify manufacturer within 24 hours of any missing .'Y or defective items. Keep material dry, covered and off the ground until installed. PAGE 12 D�V OF..1 ooa EcoFasten INSTALLATION GUIDE For Installers. By Installers. FLORIDA PRODUCT APPROVAL Approved for any combination of 8"x12" GF-1 flashing with the ClickFit L-foot & Lag Screw. PATENTS Visit www.efpatents.com for patent information. DESIGN REQUIREMENTS 1. Bracket spacing to be recommended by project engineer. 2. It is important to design new structures or assess existing structures to make sure they withstand retained loads. EXAMINATION 1 . Substrate: Inspect structure on which brackets are to be installed and verify that it will withstand any additional loading that may be incurred. 2. Notify General Contractor of any deficiencies before installing EcoFasten Solar brackets. 3. Verify that roofing material has been installed correctly prior to installing solar attachment bracket. INSTALLATION '. Comply with architectural drawings and project engineer's recommendation for PAGE location of system. Comply with Manufacturer's written installation instructions for 13 installation and layout. EcoFasten. 4141 W. VAN BUREN ST, SUITE 2, PHOENIX AZ 85009 An Esdec Solar Group company 1 - 8 7 7 - 8 5 9 - 3 9 4 7 I INFO @ E C O F A S T E N S O L A R . C O M ..,..i. ..i . f.. — 5 '•. ..¢}'o. k. e ,, a ._ 't 4.✓ x,. > ...—c .. z, ._ .r ,i Xt ! ..e.,. ..,. tntertek Total Quality.Assured. ESDEC, • „ r SCOPE OF WORK UL 441 TESTING ON ECOFASTEN'S GF1 REPORT NUMBER 104500499LAX-001 ISSUE DATE 09-DECEMBER-2020 PAGES 6 DOCUMENT CONTROL NUMBER GFT-OP-10a (21-June-2019) © 2019 INTERTEK • tntcrtck 25800 Commercentre Drive Lake Forest,CA 92630 USA Total Quality.Assured. Telephone: (949)448-4100 Facsimile: (949)448-4111 SUMMARY REPORT www.intertek.com 09-DECEMBER-2020 Intertek Report No.: 104500499LAX-001 Intertek Project No.:G104500499 Yann Schwarz Ph: 510 225-0973 ESDEC, Inc. Email:yann.schwarz@esdec.com 28357 Industrial Blvd. Hayward,CA 94545 Subject: Project Summary of the Rain Testing per UL 441 on Ecofasten's GF1 Dear Mr.Yann Schwarz Intertek was contracted by ESDEC, Inc.to perform testing in general accordance with UL 441 on Ecofasten's GF1 photovoltaic(PV) module attachment. Results obtained are tested values and were secured by using the designated test method(s).Testing was conducted at ESDEC's test facility at 28357 Industrial BLVD, Hayward,CA 94545. This letter report represents the summary of our evaluation of the above referenced product(s). UL 441,Safety for Gas Vents,Section 27:Rain Test This letter report does not constitute certification of this product or any opinion or endorsement by this laboratory. If there are any questions regarding the results contained in this report, or any of the other services offered by Intertek, please do not hesitate to contact your dedicated Intertek Project Manager. Completed by: Deep Vora Reviewed by: Samantha Doshi Title: Project Engineer Title: Team Lead-Solar cA0t19j/ Signature: Signature Date December 09, 2020 Date: December 09, 2020 Please note:this Letter Report does not represent authorization for the use of any Intertek certification marks. This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party,other than to the Client in accordance with the agreement,for any loss,expense or damage occasioned by the use of this report.Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material,product or service must first be approved in writing by Intertek.The observations and test results i n this report are relevant only to the sample tested. This report by itself does not imply that the material,product,or service is or has ever been under an Intertek certification program. Version:21-June-2019 Page 2 of 6 GFT-OP-10a tntcrtck ESDEC Inc. 104500499LAX-001 • Total Quality.Assured. SUMMARY REPORT MATERIAL SOURCE/INSTALLATION The test specimen was provided by the client.The specimen was installed onto a Spruce- Pine-Fir wood deck. The test deck measured 3'wide by 3' high and was constructed of#2 Spruce Pine Fir nominal 2x4 lumber. One rafter was centered on deck for bolt attachment. The rafters were attached to the top and bottom plates with 3"long roofing screws. A sheet of nominal 15/32"thick plywood was secured to the studs with#8 x 1-5/8" roofing screws. The test deck was then covered with#30 felt paper and three-tab asphalt shingles. Description/Installation(GF1 by Ecofasten):The test specimen was composed of an 8"x 12"x 0.03125"thick galvalume flashing and a 1-7/8"wide by 3" high extruded aluminum L- foot. The underside of the L-foot was secured with one 5/16"x 4" lag screw with a EPDM backed washer through the L-foot,flashing and into the center rafter of the test deck. The GF1 assembly was installed without sealant. GF1 L-Foot Part numbers covered by this test report are as follows: Part Number � ,- 3011015 or L-102-3-ANOD BLK L-FOOT L-102 BLK 3" 3011017 or SCL-101-3 ANOD BLK L-FOOT SCL-1010 MLL 3" 3011018 or SCL-101-3 L-FOOT SCL-1010 BLK 3" LIST OF OFFICIAL OBSERVERS NAME COMPANY Jae Hendrickson ESDEC, Inc. TEST RESULTS The temperature during testing was 18°C(64°F)and the humidity was 57%. The results are tabulated as follows: Test Specimen#1(GF1 by Ecofasten): TITLE OF TEST RESULTS ALLOWED NOTE Water Penetration, Pass No leakage 1, 2, 3 Per UL 441-One hour of water spray General Note:All testing was performed in accordance with the referenced standard(s). Note 1:Tested at 2/12 pitch Note 2:Test results are applicable for asphalt shingle roofs having a slope of 2:12 or greater Note 3:No sealant was used in this test.Any Roofing manufacturer approved sealant is allowed Version:21-June-2019 Page 3 of 6 GFT-OP-10a tc? rtc l< ESDEC Inc. 104500499LAX-001 Total Quality.Assured. SUMMARY REPORT I'rr^x°let m r PHOTOGRAPHS 1 F 1 t. j /I ri It R r t. r'. I f i M. Photo No. 1 Unassembled Test Specimen(including 1 lag screw, 1 flashing,and 1 aluminium L-foot) li k f, 4t X f,erg r y , 424 hI : l r , 3 1 F- , + y$�' a,�'.r l , _ -.q, , 1 ref'a '111 ,iy ;'Y ( § lih y 1 ¢ ��� x� �,� �igx ea } d t� lr tlt a ti !� iq{a a ,.• } get'4' �,�� 3 ,. it } + Photo No.2 Test Specimen Under Test verr{nr..')1 II nn 1/110 Dom..,.n..F C err, n 1n_ • r / tntcl ESDEC Incrt�k 104500499LAX-001 Total Quality.Assured. SUMMARY REPORT it if 10 , ON to q r >, 4. . . ,n a O..,m1F..+ yt in Q b Photo No.3 Test Specimen After Test , ah, ,r "' :,. rn 1 .r4„ 4 r i, J1 t i 2 ,rn d +'is s yr- ''''' ' 414144N. '..'4-.' 1,---‘;-, tt, '43,--,-,,,,t i; .....&1 tr Photo No.4 Underside of Test Desk After Test—no visible water penetration ant?rtck ESDEC Inc. 104500499LAX-001 Total Quality.Assured. RECEIVED SUMMARY REPORT I~° Y 2 3 122 CITY OF TIGARD DRAWINGS BUILDING DIVISION The test specimen drawings have been reviewed by Intertek and are representative of the test specimen(s) reported herein.Any deviations are documented herein or on the drawings. R.a Rw DESCRIPTION [2232] GPI PLAIN,*MUCRRUCk. 2 L POO,..MU.OR RUCK3 LAG AM ilonceo WASHER C i/16X 4124.IM M IQ HEAD [3D16] 0 RAN MOWING fPXEPATMKptlQJDAI CPI PART NUMMt 02 [T62] 7 4y RYTY 44. P2] Ill T 2.52 (8.1 -MOD ANGLE PROJRC21011 to, :2174 -~-j h+.F49a!'Un n.+:i.-O.Rn I MIDYATMi R1RA1�Y DO ILO-SCALE DRAWIT e,'uw,y;ca ECOFASTEN GPI NwNlu.rocw.xnw "�, '". ft "w �, x-:rn I 800114 .Aas A xC? • Drawing No. 1 Ecofasten's GF1 Version:21-June-2019 Page 6 of 6 GFT-OP-10a