Report (2) a ION Solar 1,.._) RECEIVED 4801 N University Ave. Suite 900 Provo, UT 84604 APR 26 2022 luke.rowley@ionsolar.com CITY OF TIGARD DIVISION Ill 9"Z022' 00( f (7 16 April 2022 LDI a 3R5 5l Tula PC- RE:Season C&Jason M Burgess Residence- 9395 Southwest Julia Place,Tigard, Oregon To Whom It May Concern: I have evaluated the roof structural elements of the residence for the required design loads and the additional load that will be imposed by the proposed solar system.The existing roof information was provided by a site visit by an audit team at ION Solar. Based on that site visit, it is my understanding that the roof framing information is as follows: Roof Structure: Pre-Manufactured Wood Trusses with 2x4 Top Chords @ 24" O.C. that appear to be in good working order. Roofing Material: Composition Shingle The Required codes and loads are as follows: Codes: 2019 OSSC, 2021 ORSC, Risk Category: II Wind Speed (3-Sec Gust, MPH): 96 Exposure Category: C Ground Snow Load (psf): 25 Roof Snow Load (psf): 25 Roof Live Load (psf): 20 (superseded by roof snow load) After reviewing the existing roof framing information and in accordance with the structural calculations on sheet S-5 which were performed according to the applicable codes and loads above, it is my recommendation that the existing roof framing is adequate to safely and sufficiently support the required structural design loads and the weight of the new solar system as is. Alteration or replacement of existing structural elements is not required. This evaluation only applies to the areas of the roof that will be directly supporting the solar system and does not make any recommendations for any other structural components of the building.The racking must be installed per the manufacturer's recommendations. The 5/16" x 3-1/2" zinc plated steel lag screw used to attach the solar system to the roof must be staggered to evenly distribute the loads over the affected area and must penetrate the truss top chords with a minimum embedment depth of 2.5" r ���p PROFESS Sincerely, mac INFF� /0y9A. Luke Rowley, PE , 50P r � EGON q �11,9 c /18/2022 RO`N CVDIDr . I41I7A r � a � • • •• •••• • • SILFAB PRIME SILFAB . . SOLAR'" SIL-380 HC RECEIVED APR 26 2022 CITY OF TIGARD BUILDING DIVISION 'xai #1 a � • •• RELIABLE ENERGY. • PROUD DIRECT FROM THE SOURCE . PARTNER OF Introducing Silfab Prime, Designed to outperform. ION Dependable, durable, high-performance solar panels engineered for North American homeowners. SILFABSOLAR.COM CE ❑ �T OS 0E I EC Fraunhofer C H u e cam° Intertek Inlettek • ISE *Chubb provides error and omission insurance to Saab Solar Inc. 1, ELECTRICAL SPECIFICATIONS 380 Test Conditions STC NOCT Module Power(Pmax) Wp 380 284 Maximum power voltage(Vpmax) V 35.32 32.83 Maximum power current(Ipmax) i A j 10.77 8.64 Open circuit voltage(Voc) V 42.17 39.55 Short circuit current(Isc) A 11.36 9.16 Module efficiency % 20.8% 19.4% Maximum system voltage(VDC) V 1000 Series fuse rating A 20 Power Tolerance Wp . ±3% Measurement conditions:STC 1000 W/m'•AM 1.5•Temperature 25°C•NOCT 800 W/m'•AM 1.5•Measurement uncertainty s 3% J Sun simulator calibration reference modules from Fraunhofer Institute.Electrical characteristics may vary by±5%and power by±3%. MECHANICAL PROPERTIES/COMPONENTS METRIC IMPERIAL Module weight 9.5kg t0.2kg 431bs±0.41bs Dimensions(HeLxD) ' 1762 mm x 1037 mm x 35 mm 69.4 in x 40.8 in x 1.37 in Maximum surface load(windf snow} , I @t( 5400 Pa rear load/540o Pa front load 112.8 lb/ft'rear load/112.8 lb/ft'front load Cells p 0 25 mm at 83 km/h 0 1 in at 51.6 mph Hail im act resistance I 120 Half cells-Si mono PERC 120 Half cells-Si mono PERC ;i 9 busbar-83 x 166 mm Glass 9 busbar-3.26 x 6.53 in 4 u 3.2 mm high transmittance,tempered, 0.126 in high transmittance,tempered, DSM antireflective coating DSM antireflective coating Cables and connectors(refer to installation manual) 1350mm,e 5.7 mm,MC4 from Staubli 53.15 in,0 0.22 in(12AWG),MC4 from Staubli Backsheet High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, fluorine-free PV backsheet 1 Frame Anodized Aluminum(Black)' ' .. ' •� '.,' ,. - '' ` `� Bypass diodes 3 diodes-30SQ045T(45V max DC blocking voltage,30A max forward rectified current) il Junction Box UL 3730 Certified,IEC 62790 Certified,IP68 rated TEMPERATURE RATINGS WARRANTIES Temperature Coefficient!sc. +0.064°//"C Module product workmanship warranty 25 years" Temperature Coefficient Voc -0.28%/C Linear power performance guarantee 30 years Temperature Coefficient Pmax -0.36%/C >_97.1%end 1st yr NOCT(±2°C) 45°C >_91.6%end 12th yr ij >_ %85.1end 25th yr ! Operating temperature -40/+85°C v82.6%end 30thyr CERTIFICATIONS SHIPPING SPECS ULC ORD C1703,UL1703,CEC listed,UL 61215-1/-1-1/-2,UL 61730-1/-2, Modules Per Pallet: 26 or 26(California) Product IEC 61215-1/-1-1/-2°°°.IEC 61730-1/-2"',CSAC22.2#61730-1/-2,IEC 62716 Ammonia Corrosion;IEC61701:2011 Salt Mist Corrosion Certifed,UL Fire Rating:Type 2 Pallets Per Truck 34 or 32(California) Factory IS09001:2015 Modules Per Truck 884 or 832(California) Ili+ A warning.Read the Safety and Installation Manual for mounting specifications and before handling,installing and operating modules. d 12 year extendable to 25 years subject to registration and conditions outlined under"Warranty"at silfabsolar.com "' Certification in progress. PAN files generated from 3rd party performance data are available for download at:silfabsolar.com/downloads 69.4"[1762mm] ij v E 14"[356mm] 41.3"[1050mm] 14"[356mm] to T +1 888.781.7074 _i_ -1 IONSOLAR.COM -Mounting Hole(x4) f+f SILFAB SOLAR INC. P ' 0.5" 800 Cornwall Ave , f [12mm] � Bellingham WA 98225 USA T +1360.569.4733 nfo®silfabsolar.com . SILFABSOLAR.COM #) [ .__- .o I�io to ' M 1770 Port Drive E Co Burlington WA 98233 USA 14 35mm E m ; Est I �� � o r, ,, ( ? X oa co T+1360.569.4733 ]( w o M y s E= 240 Courtneypark Drive East ¢# PI l 0.06" 53.15" N c Mississauga ON LST 2Y3 Canada -fit [1.5mm] [1350mm] r3 ° T+1905.255.2501 i F+1905.696.0267 ��, L I i Cable Length o o Silfab-SIL-380-HC-20211101 Drainage Hole(x8) t4 } ,� No reproduction of any kind is allowed without 11 _ permission.Data and information is subject to 0 :(.. - modifications without notice©Silfab Solar Inc., 2.4"[60mm] 8"[200mm] 2021.Silfab Solar'"is a trademark of Silfab Solar Inc. ( -Y i II , r li Data Sheet I. Enphase Microinverters I Region:AMERICAS l, I ill 1 smart grid-ready Enphase The high-powered g Y Enphase IQ 7 MicroTM and Enphase IQ 7+ Micro"M IQ 7 and IQ 7+ dramatically simplify the installation process while 1 achieving the highest system efficiency. Microinverters Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy1M, Enphase IQ BatteryTM, and the Enphase it EnlightenTM monitoring and analysis software. 1 IQ Series Microinverters extend the reliability standards set forth by previous generations and I1 undergo over a million hours of power-on testing, 1 enabling Enphase to provide an industry-leading warranty of up to 25 years. 1, lr i Easy to Install I • Lightweight and simple • Faster installation with improved,lighter two-wire cabling • Built-in rapid shutdown compliant(NEC 2014&2017) III Productive and Reliable • Optimized for high powered 60-cell/120 half-cell and 72- moS cell/144 half-cell*modules • More than a million hours of testing • Class II double-insulated enclosure • UL listed �� Smart Grid Ready IN • Complies with advanced grid support,voltage and r frequency ride-through requirements 1 • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) 0 *The IQ 7+Micro is required to support 72-cell/144 half-cell modules. CERTIFIED E N P H AS E To learn more about Enphase offerings,visit enphase.com e Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA(DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings' 235 W 350 W+ 235 W-440 W+ Module compatibility 60-cell/120 half-cell PV modules 60-cell/120 half-cell and 72- only cell/144 half-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module!so) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage/range 240 V/ 208 V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor(adjustable) 0.85 leading...0.85 lagging 0.85 leading...0.85 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak efficiency 97.6% 97.6% 97.5% 97.3% CEC weighted efficiency 97.0% 97.0% 97.0% 97.0°i MECHANICAL DATA Ambient temperature range -40°C to+65°C Relative humidity range 4%to 100%(condensing) Connector type MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Dimensions(HxWxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight tzatl , „„r„Y,.: a st:_ 1.08 kg(2.38 lbs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at https://enphase.com/en-us/suoport/module-compatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com e EN P H A S E ©2020 Enphase Energy.All rights reserved.Enphase,the Enphase logo,Enphase IQ 7,Enphase IQ 7+,Enphase IQ Battery, Enphase Enlighten,Enphase IQ Envoy,and other trademarks or service names are the trademarks of Enphase Energy,Inc.Data subject to change.2020-08-12 cEcoFosten For Installers. By Installers. ,£A , RAPID INSTALLATION, HIGH-QUALITY SOLAR MOUNTING SYSTEM FOR SHINGLE AND TILE ROOFS • CLICKIt s d ''////14//)/ 10/2//f/ 4=1 • CLICK RATINGS Fire Rating** Class A System Fire Rating Max System Voltage 1500 VDC Max Fuse Rating 30A Certification Conforms to UL STD 2703 Warranty 20 Year Material and Workmanship UL 2703 Markings Product listing label is located on the rail end-caps Roof Pitch 2:12-12:12 UL 2703 Allowable Design Load Rating 10 psf downward,5 psf upward,and 5 psf lateral Max Module Size 24 sqft Module Orientation: Portrait or Landscape **Class A System fire rating with Type 1&2 PV modules.Any module-to-roof gap is permitted,with no skirt required.This rating is applicable with any roof attachment. NOTE:Mid Clamp,MLPE Clip,and MLPE Bracket have been evaluated for multiple use,position independent. UL 2703 Marking Example: r . EcoFasten (j1V)US SDFY. CLICKFIT �.. Intertek SYSTEM MFG ID CODE:XXX-MM-YYYY 1234567 000 .omo -.i<.0 sto»na Torque Specifications Component Torque(in-lb) Notes Lag Screw N/A Fully Seat.Use visual indicator of the black EPDM ring around the bonded washer for torquing. Mid-Clamp 144 End-Clamp 96 Rail Clicker Leveling Bolt 142 Pre-torqued upon delivery.Applies to Tile Hook and L-Foot/Clicker Hook Height Bolt N/A Lightly clamp hook to flush with top of next tile row Ground Lug N/A Refer to specific ground lug manufacturer's installation manual MLPE Clip 144 MLPE Mount 144 5 VERSION:2.0 REV DATE:07,16/2020 CLICK SYSTEM COMPONENTS 1) ClickFit Rail 1500033(2130mm) 1500034(3166mm) 1500035(4202mm) 2) Rail Splice 1008061 Co. toil! 'f 1i 3) CF Tile Hook and L foot 1500005-Tile Hook - �� 1500004-L foot I 1 Jt+ 4) CF End Clamp .f . See Section 10 5) CF End Cap 1510041 (Black) 1510042(Grey) S'% 6) CF Mid Clamp „ See Section 10 7) MLPE Mount 1510057 .,,` -' " 8) MLPE Clip(Rocklt Clip 2.0) 9) Module Jumper 1500028 6 VERSION:2.0 REV DATE:07/16/2020 CLICK REQUIRED TOOLS Checklist of tools and accessories Note:*Proper PPE shall be worn at all times* Tape measure Roof crayon or chalk(a chalk line can be helpful as well) •at Cordless drill with torque adjustment and the following bits: • 1/2"Hex socket • 1/4"diameter drill bit.(Drilling length no less than lag bolt depth) Brush for clearing debris from roof surface.Hint:Leaf blowers work well to remove any leftover moisture prior to installation. Torque wrench capable of 0-150 in-lbs Z VERSION:2.0 REV DATE:07i1612020 CLICK ARRAY LAYOUT • Refer to span tables,local jurisdiction,or engineer of record specifications when determining setbacks from roof edges,attachment spans,etc. • Mark the perimeter and corners of the array on the roof surface. *Add 3/4"to account for the gap between modules in each direction* • Draw or snap chalk lines where the rails will be installed,(refer to module manufacturer specs to determine allowable mounting locations). • Locate rafters within the area of the array.It may be necessary to shift the array East or West on the roof in order to fall within the rail cantilever specs(I/3)of span). • Stagger rafters every row if required by the local jurisdiction,engineer of record,or company policy. /7. 8 VERSION:2.0 REV DATE:07/16/2020 CLICK INSTALLING CLICKFIT Pre-installing rail splices 1. Determine the number of rails required per row of modules. 2. Insert a rail splice into one rail.*Do not push it past the center bump.* 3. Slide the next rail onto the rail splice until the two rail ends meet. 4. Repeat steps 2 and 3 until the desired length is achieved.*This is usually easiest to do from the ground.* Ef0Mr' , 411 Oil p � 40.00000 ------ -:_ , ...... 0. ____ e 9 VERSION 2.0 REV DATE:07i16/2020 CLICK FLASHING AND L FEET Installation of flashing and L feet • ClickFit for comp shingle roofs uses EcoFasten Solar's GFI watertight flashing system • Other roof types may use different EcoFasten Solar attachments,see www.EcoFastenSolar.com for more information. Installation Steps: 1. Locate rafter lines from section 5.2. 2. Drill 1/4"pilot holes at all attachment points and back fill using roof-compatible sealant. 3. Separate shingles where flashing is to be installed.Insert the flashing so the top portion is under the next row of shingles North.Ensure the flashing is pushed to the third-course of shingle to prevent water infiltration through the vertical joints between shingles. 1 4. Align GFI flashing hole with pilot hole.Insert the lag bolt with pre-installed bonded washer through the L ,f foot and EPDM grommet.Tighten the lag bolt until a ring of EPDM is visible around the circumference of the bonded washer. Tighten the lag until fully seated.The EPDM Ring visual indicator is the most effective way to ensure a watertight seal. i a 1 1 1 J `Note the orientation of the L foot and Clicker.The two i .- r 1 Clicker"arms"should be facing downslope` 1 �a ®� i 10 VERSION:2.0 REV DATE:07/16/2020 1 1 Il 1 CLICK INSTALLING TILE HOOKS 1. Locate rafters on the roof,mark the tiles to be removed.Hint:In some cases rafter tails are visible at the eaves of the root making it easy to find the rough location of the rafters.In other cases,the fascia board may have nail heads visible where it was attached to the rafters.In the worst-case a row of tiles may need to be moved to determine the rafter locations. 2. Slide the tile at the desired location upward to expose the roof sub surface.If the tile is to be notched, or if using a replacement flashing,remove it entirely.Clean the sub surface with a brush to remove any debris that could affect the sealing. 3. Locate the rafter center and mark it. 4. Place the tile hook with the hook itself in the valley of the next tile below.Drill one 1/4"pilot hole in the rafter center,taking care to keep the hook in the valley of the tile below.Backfill this hole with a roof- compatible sealant.For flat tiles,try to avoid having the hook land directly under a joint between tiles, this will create a larger gap or more notching than necessary. 5. Install one 5/16"x 4"lag screw on the row of holes closest to the tile hook arm.If possible,install the screw in one of the three holes directly next to the arm.If the lag screw must be installed in one of the seven holes furthest from the arm(denoted by the red rectangle below),install three deck screws in the pattern shown by the green circles below. 6. Adjust the height of the tile hook as necessary using the bolt shown in the fourth image. 7. Flash the surrounding area and lag screw head with roof-compatible sealant as necessary.Refer to Tile Hook Subflashing Installation guide on the next page. 8. Replace the tile that was moved and/or removed,or install the tile replacement flashing.If it is to be notched,mark the tile for notching.Notching can be done with a grinding wheel or by using a chisel. 5. \ It" • }� ® 6. go* • 11 VERSION:2.0 REV DATE:07/16/2020 CLICK TILE HOOK SUB-FLASHING CLICKFIT TILE HOOK SUB-FLASHING INSTALLATION STEPS: Tools Required:Caulking gun,roofing mastic applicator 141.1 Materials Required:Roofing mastic,reinforcing fabric,roof sealant j ii I� f a °; I Apply a continuous line of the roofing Lower the sub-flashing over the tile hook base.It may manufacturers approved sealant on the be necessary to move adjacent tiles to easily lower the underside of the ClickFit tile hook sub-flashing sub-flashing onto the roof deck. to form a U-shape around the raised edges. Iq Y b7� {JW N1�E1ik , 1 Lcal-drier i '.o'ninendi tolluwind;the II:I gu.a line> Place the sub-flashing over the base of the tile hook so three-course sealing method.Start the three-course f the flashing covers the entire base. sealing method by applying a layer of roofing mastic over the edges of the tile hook sub-flashing. i 1 N µ ,s ` dn '41;i!':aa.., ' ' S: I ' Place strips of reinforcing fabric over mastic to Apply a final layer of mastic to completely cover cover approximately 2"from the edge of the the reinforcing fabric.The flashing is now installed sub-flashing in both directions.Place strips on and sealed. the side first,then the top edge. 12 VERSION:2.0 REV DATE:07/16/2020 CLICK INSTALLING THE RAIL 1. Place the rail in the Clickers. 2. Ensure the rails extend a minimum of 2"past the last attachments in each row and that each rail is aligned with the next row North and/or South. 3. Roll the rail into each Clicker,an audible"click"should be heard.If attachments are extremely misaligned it may be necessary to loosen the leveling bolt,snap the Clicker onto the rail,then re-tighten the leveling bolt to 142 in-lbs. 4. Level the rail if necessary by loosening the bolt attaching the Clicker to the L foot or tile hook. fi yyyi If[ *Ensure the tab on the Clicker is aligned with the rail edge as shown below* J iI 13 VERSION:2.0 REV DATE:07/16/2020 = f ii ii °i CLICK MODULE INSTALLATION 'i tt( I14 1.Install the end clamps on each rail on whatever end you are starting with. • Snap the end clamp onto the rail. • Slide the end cap onto the rail. • Turn the leg of the end clamp around the cap. "i „, kOki - . .,- .-- �i'• ►y1� /I J 1 k''4°4',,''' e.-- .4,----- 1 .\ f d 2. Place the module on the rail. <. *Ensure module junction box is up-slope* `r //` .fir 3. Slide the module to the end clamp and align Noo.r. l it with the array corners.Tighten the end { ,`* clamp to 96 in-lb. 4, =` I 1 1 14 VERSION:2.0 REV DATE:07/16/2020 • CLICK MODULE INSTALLATION 6.6 Installing additional modules on the rail 1. Click a mid clamp onto each rail. 411,4 2. Slide the mid clamps until they are flush with the • 41, side of the existing module. �^1 3. Place and slide the next module firmly against the mid clamps.Align the bottom edges of the modules.Tighten mid clamps to 144 in-lb. 15 VERSION.2.0 REV DATE:07/16/2020 rfr CLICK MODULE INSTALLATION I[ 6.7 INSTALLING END CLAMPS AT THE END OF A ROW 1. Install the last mid clamps in the row. 2. Measure the rails from the last mid clamp to the module width plus I". 3. Cut the rails at this mark.There is some adjustment in the end cap/clamp so it does not need to be a perfect cut. 1 4. Install end clamps and end caps,tighten to 96 in-lb 1 Alternative method: 1. Install the last module in the row,tighten the mid clamps. 2. Using a circular saw with a metal blade,or carefully with a reciprocating saw,cut the rail approximately I"past the edge of the last module. 3. Install end clamps and end caps,tighten to 96 in-lb x n a � :j 41 1 I f 1 i 16 I VERSION:2.0 REV DATE:07/16/2020 • CLICK MODULE INSTALLATION 6.8 Installing additional rows of modules 1. Place the first module of the next row against the end clamps. 2. Temporarily place a mid clamp in the N-S gap between rows of modules,slide the modules up to the mid clamp as shown below. 3. Once the modules are aligned tighten the end clamps. 4. Install Dynobond clip on the bottom lip of the module frames to bond rows together. 5. Repeat steps 6.5-6.7 until the array is complete. lr t i . • 17 VERSION:2.0 REV DATE:07/16/2020 CLICK BONDING AND GROUNDING Bonding Paths All bond paths are carried either module-to-module through the mid clamp,or module-to-module through the module jumper shown below(bond paths shown in green): CF Mid Clamp Module Jumper 2 mld clamps bonding (j pairs o modules i module jumper r bondl g row to row 1 ground lug per + ! continuous array .01 11% NO. 16001,11 vor Rail Spice ot splice bonding r'( Y adjacent pairs of rails 18 VERSION.2.0 REV DATE.07/16/2020 CLICK BONDING AND GROUNDING 7.2 Grounding GROUNDING LUG INSTALL 1 2 3 4 : : �001�,,` Install ground lug on the module per ground lug and module manufacturer's instructions NECESSARY COMPONENTS: i On of the following ground lugs(or any UL 2703 compliant ground lug): • BurndyCL50-1TN Ground Lug(UL 2703-E3514343/UL 467-E9999) • ILSCO SGB-4 Ground Lug(UL 2703-E354420 I UL 467-E34440) • ILSCOGBL-4OBT(UL2703-E354420 I UL467-E344401 ;n F • ILSCO GBL-4DBTH(UL 2703-E354420/UL 467-E34440) • ILSCO GBL-455(UL 2703-E354420 I UL 467-E34440) This system needs to be grounded in accordance with the National Electrical Code,ANSI/NFPA 70. t *Copper wire should not come in direct contact with aluminum at any point on the array* 7.3 MLPE Clip Installation(Optional) i I INSTALL MLPE CLIP ACCESSORY ,I 1+ Determine mounting location of the MLPE and MLPE Clip #+ /Id � x! on the module frame.Take care not to block drainage 'N' r#t ,,i .., ° holes on the frame. • Push the nut/bolt of the MLPE Clip so the carriage bolt I,ii(i, head is furthest away from the stainless plate. • Slide the bolt shaft into the slot on the MLPE mounting • ;, flange. I f, a • Place the assembly onto the module flange,MLPE jtha �d mounting flange on the far face(upper side)of the r `' module frame flange,stainless plate on the closer face (1ket (bottom side)of the module frame flange. Vik `, • Hold the carriage bolt into the MLPE mounting flange � # slot with your finger,this will keep the carriage bolt from of r= i J ,e I °_ spinning in the slot.Tighten the nut to 144 in-Ibs using a 1/2"hex socket. 1 MLPE CLIP IS COMPATIBLE WITH: i • Enphase Products:M250-72,250-60,M215-60,C250-72,5230,S280,IQ 6,IQ 6+,IQ,IQ7,IQ 7A,IQ 7+,IQ 7X,Q Aggregator • SolarEdge Products:P300,P320,P340,P370,P400,P405,P485,P505, P600,P700,P730,P800p,P800s,P850,P860 • See page 21 for compatible module list with MLPE Clip 19 VERSION:2.0 REV DATE:07/16/2020 �... . — — CLICK MLPE MOUNT INTALLATION I I 'fir rs /-.:' 1all 1 Lower the MLPE Mount to the rail Tilt and hook the mount around I the top"dog ear'of the rail 11 'I, 11 -;=:_____I:-.5.7- , •-• .______ Set the MLPE Mount flush with the top of the rail Slide the microinverter flange between the MLPE Mount and the serrated bolt flange \ 41 Tighten the bolt to 144 in-lbs Repeat this process for all other microinverter and/or optimizer installations MLPE MOUNT IS COMPATIBLE WITH: Enphase Products:M250-72,250-60,M215-60,C250-72,S230,S280,IQ 6,IQ 6+,IQ,IQ7,IQ 7A,IQ 7+,IQ 7X,Q Aggregator SolarEdge Products:P300,P320,P340,P370,P400,P405,P485,P505,P600,P700,P730,P800p,P800s,P850,P860 20 VERSION:2.0 REV DATE:07/16/2020 • CLICK UL2703 CERTIFIED MODULES 1 '1 SILFAB MODULES WITH 38 MM FRAMES SILFAB SYY-Z-XXXAB WHERE"VY'CAN BE IL, SA, LA,SG OR LG;"Z"CAN BE BLANK, M, P,OR X;"A" CAN BE BLANK, B, H, M, N;AND"B"CAN BE A, L, G, OR T SOLARIA MODULES WITH 40 MM FRAMES POWERXT XXXY-ZZ SOLARIA WHERE"Y"CAN BE R OR C;AND"ZZ"CAN BE AC, BD, BX, BY, PD, PM, PM-AC, PX, PZ,WX OR WZ I SOLARCITY MODULES WITH 40 MM FRAMES 1 SOLARCITY SCXXXYY (TESLA) WHERE"YY"CAN BE BLANK, B1 OR B2 1 SOLARTECH MODULES WITH 42 MM FRAMES SOLARTECH STU-XXXYY 1 WHERE"YY"CAN BE PERC OR HJT 1 SOLARWORLD SUNMODULE PLUS, PROTECT, BISUN,XL, BISUN XL, MAY BE SOLARWORLD FOLLOWED BY MONO, POLY, DUO, BLACK, BK,OR CLEAR; MODULES WITH AG 31,33 OR 46 MM FRAMES i SW-XXX SOLARWORLD SUNMODULE PLUS, PROTECT, BISUN,XL, BISUN XL, MAY BE SOLARWORLD FOLLOWED BY MONO, POLY, DUO, BLACK, BK, OR CLEAR; MODULES WITH AMERICAS 33 MM FRAMES SWA-XXX ili SONALI MODULES WITH 40 MM FRAMES ii SONALIrt SSXXX STION STION THIN FILM MODULES WITH 35 MM FRAMES STO-XXX OR STO-XXXA SUNEDISON MODULES WITH 35,40&50 MM FRAMES SE-YXXXZABCDE SUNEDISON WHERE"Y"CAN BE B, F, H, P, R, OR Z;"Z"CAN BE 0 OR 4;"A"CAN BE B,C,D,E,H,I,J,K,L,M,OR N ;"B"CAN BE B OR W;"C"CAN BE A OR C;"D"CAN BE 3,7,8,OR 9;AND"E"CAN BE 0, 1 OR 2 3_ 11 27 VERSION'2.0 REV DATE:07/16/2020 J fI CLICK CLAMP TABLES Frame Thickness Article Number 30 mm 1510015 32 min 1510016 35 mm 1510017 38 mm 1510018 .Il...g.... 40 mm 1510019 45 mm 1510020 rs # t 50 mm 1510021 id clamps Frame Thickness Article Number 30-40 mm 1510011 40-50 mm 1510012 INSTALLER RESPONSIBILITIES Periodic reinspection of components shall be performed to verify that there is no corrosion detrimental to system strength and electrical conductivity,no loose bolts,and/or other variables that could compromise array safety.Any corroded or damaged components shall be immediately replaced. 30 VERSION:2.0 REV DATE:07/16/2020 > � �:.+ ; GreenFasLenTMGFl PRODUCT GUIDE 4 Exploded Product View/B4O.M - 1 y,F Installation Instructions - 2 Cut She - 3 1 Specifications - 4 Test Data - 5 yy 4 i. ini trrC ,� 9: .fit ss Say k. ..- ' a k Ay. 1:' : Y'.;* ''':-__;:. 1']J,.:-_1::'et i 4 is - F x r. _ e „S o�,-.,.-f-_. 4.IEcoFasten Solar � w GreenFasten" GF1 — Product Guide Exploded Product View, Bill of Materials Materials Needed For Assembly Item No. Description of Material/Part Quantity 1 GF-1 Flashing 1 0 2 L-102-3"Bracket*(other options available) 1 3 5/16" EPDM Bonded 304-18.8 SS Washer 1 4 Lag Bolt 5/16" 1 4g) „_,.........„.., ,-, i ,- © Required Tools .;:,:,,,: ..i) 0 .... v . g rill 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved.8/27/14 1 ., FcnFaMan Anlar nrnriurts are nmfertarl by the fnllnwinn 11 S Patents R 151 599 R9 R 153 7nn R9 R 1R1 39R R9 2 155 712 R9 2 145 994 R9 2 9(19 91d R9 2 242 424 R9 R 272 174 R9 R 275 557 R9 GreenFasten- GF1 — Product Guide Installation Instructions with Compression Bracket il! ii, lk i...,-...-72:11 .. _ - ,_ . :. - Fi s . ,,..:,:...-•:..,:-. ,,., .. 4--:--.„.4..,..,—.,?,.,-...--T, '; ram , j i ,:; i . Ste, „_ - i ,,,... m S 1 2 3 4a 4b 4c 1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. - - 2. Drill a pilot hole(1/4"diameter)for the lag bolt. Backfill with sealant. EcoFasten Solar . r recommends an EPDM mastic. * � 3. Insert the flashing so the top part is under the next row of shingles and pushed far j enough up slope to prevent water infiltration through vertical joint in shingles. The 4 leading edge of flashing must butt against upper row of nails to prevent turning when ``-'' : Y tourqued. See page 2.2 for vertical adjustment when leading edge of flashing hits nails " in upper shingle courses. - - . - '.. _ 4. Line up pilot hole with GreenFasten flashing hole. 4a Insert the lag bolt through the EPDM washer, the top compression component a bracket (L-102-3, Rock—It SlideComp*, SCL-101-3*, Z-101*, Conduit Mount -3 Bracket*)and the gasketed hole in the fl ashing and into the rafter. 4L Insert the lag bolt through the EPDM washer,the Comp Mount Slide compression `' 5 bracket and the gasketed hole in the flashing and into the rafter. 4s Insert the lag bolt through the SS washer,the third-party bracket,the EPDM bonded washer,the CP-SQ-Slotted compression bracket and the gasketed hole in the - Consult an engineer or go to www.ecofastensolar.com for flashing and into the rafter. engineering data. 5. Torque:The range is between 100-140 torque inch-pounds depending on the type of wood and time of year.The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer �. compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener.You may need to stop and use a ratchet to finish the install. *not pictured. � _ A 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 2.1 .w�.:a-. ..a FrnFactan Rnlar nrnri,arts aria nrntartari by The fnllnwinn I I S Patantc.R 161 699 R9 R 153 7nn R9 R 1 R1 39R R9 R 1 RR 713 R9 R 14Fi 999 R9 R 2n9 914 R9 R 246 4Fi4 R9 R 972 174 R9 R 27S 667 R2 '1' GreenFasten'" GF1 — Product Guide installation Instructions ;: r * Use for vertical adjustment when leading edge of flashing hits nails in upper shingle courses f a 4' 1 .Slide flashing up under shingles until leading edge 2. Remove flashing and cut'V" notch at marks where nail ,: engages nails. Measure remaining distance to ad- shafts engaged leading edge of flashing the distance desired t just upslope. in Step 1. Notch depth not to exceed 2"length by 1/2"width. Nails beneath shingle "� Placement of"V" notch A s s ii . ;,mot -- 3. Reinstall flashing with notched area upslope. 4. Position notched leading edge underneath nail heads as shown. ` Nails beneath shingle / Nails beneath shingle 3 CS a`Yy W t.x l 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved.8/27/14 2.2 "4 '' t-- r. FrnFasten Snlar nrnrh arts ara nrntartMA by tha fnlInwinn I I S Patents R 151 599 R9 R 155 7nn R9 R 1 R1 3QR R9 R 155 715 R9 8 14R 999 R9 R 209 914 R2 8 945 454 R2 R 972 174 R9 R 925 557 R2 GreenFasten- GF1 - Product Guide Cut Sheets: GF1 A t t A ar 9 ll!■ Ii■ SECTION A-A 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 3.1 FrnFasten Snlar nrnrii Irtc are nrnterteri by the fnllnwinn 1 I S Patents R 151 699 R9 R 153 7nn R2 R 1 R1 1QR R9 R 1 FF 711 R9 R 145 99Q R2 R 9f1Q Q14 R9 R 245 454 R2 R 279 174 R9 R 995 557 R9 GreenFasten- GF1 - Product Guide Cut Sheets: GF1- 812 .. 8" „� 4X R 8„ —1.—r o-- 1/32"± \--00/ 1 E 0 N 16 :sv y � - -o-5/64 J DETAIL A . ._4„ SCALE: 2:1 ,may a 2 Finish Options BLK= Matte Black ~-c- MLL= Mill Finish 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.8/27/14 3.2 v_,' ., ._..,-. FcnFasten Snlar nrnrii icic ara nrntacteri by iha fnllnwinn 1 I S Patantc•R 151 F22 R9 R 1 F3 Inn R9 R 1 R1 3AR R9 R 166 711 R9 R 14fi 99Q R9 R 90R 914 R9 R 245 454.R9 R 972 174 R9 R 99F F57 R9 Gr teem€F1-PrBdonftilaufikide Cut Sheets: Bracket Options - CP-SQ-Stotted -• 1.50 —_ .50 .F .38 2.00 00 0 0.38+.01 0.50 1.00 00 \/ 0 0.88±.01 X 82° 2.00 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 3.3 _.. FcnFastan Solar nrnrli irtc are nrntectad by the fnllnwinn I I S Patantr R 151 522 R7 R 1 S3 7f1n R2 R 1R1 19R R9 R 16R 711 R2 R 146 299 R9 R 2119 914 R2 R 245 454 R2 R 979 174 R9 R 225 5S7 R2 • GreenFasten"" GF1 — Product Guide Cut Sheets: Bracket Options - F-111-A 2\, 216 1" -t t � I t�� r a %"THRU ALL \/ 0 7"X 82°, NEAR SIDE \ • - • • 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.8/27/14 3.4 FcnFactan Snlar nrrxti lets are nrntacterl hu the fnllnwinn II S Patent'R 151 699 R9 R 151 7fln R9 R 1 R1 1OR R9 R 166 711 R9 R 146 999 R9 R 709 914 R9 R 946 464 R7 R 979 174 R9 R 276 667 R9 Ki GreenFasten- GF1 - Product Guide Cut Sheets: Bracket Options - SCL-101-3" x ; ti. 3/8" - co I i. A 46 SERRATIONS cir)C:10) Z . .o i cry 1 l R1/16" r S .C:i 1111111111140), F 1 7/8' 1/4" co 3/4" > _ 1/16" —-a R.005 1111114 R.010 2XR.01 - 60.00° 0 3/8„+.006 \,s 1/8 .002 0 7/8„ X 82° DETAIL A SCALE 3:1 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 3.5 FrnFacten Rohr nrndnrta are nrntecterl by the follower?II S Patentor R 151 599 R9 R 151 Inn R2 R 1R1 39R R9 R 1RR 711 R2 R 146 999 R2 R 2l19 914 R9 R 945 454 R9 R 279 174 R9 R 225 557 R9 GreenFasten" GF1 - Product Guide Cut Sheets: Bracket Options- L-102-3" 2X 3/8" A 46 SERRATIONS ±� co I —...i_./- - CV Lo N 111 N T 1 7/8" — 15/16"— R 1/16" — 3/4" 1 7/8" 1/4„ 00 1/16" liriiii -co R.005 Lo r R.010 t + O 2 X R.01 RH 60.00° „+.006 0 3/8 -.002 1/8" \/ 0 .875±.010 X 82° DETAIL A <; SCALE 3 : 1 ^' 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 3.6 `».» - �� '' FrnFactan Sniar nrnrh ictc ara nrntert,d by the fnllnwinn II R Patentc R 151 R29 R9 R 1 S3 7110 R7 R 1R1 39R R7 R 1RP 711 R7 R 14R 799 R7 R 7f19 914 R9 R 745 454 R7 R 972 174 R9 R 795 557 R7 GreenFasten- GF1 - Product Guide Cutsheets: Bracket Options - Comp Slide ms; .33in .23in [8.26mm] [5.94mm] .52in [ 13.08mm] : SLOT FOR 5/16" HHCS 1 .06in [26.92mm] 1 .00in [25.40mm] 0.377+.006 THRU 4.00in � -.000\/ 0 0.875±.010 X 82° 101 .60mm] 877-859-3947 EcoFasten Solar°AII content protected under copyright.All rights reserved.8/27/14 3.7 _... n..;` 'f-rnFactPn Snlar nrnrlurts are nrnterterl by the fnllnwinn II S Patents R 151 522 R7 R 153 7110 R2 A 181 39R R7 R 166 711 R7 R 145 799 R7 R 7nR 914 R7 A 745 454 R7 R 272 174 R7 R 776 667 R7 v 5. A = GreenFastenT"' GF1 — Product Guide Cut Sheets: Bracket Options- L-102-6" 1 =i li ,,-tee. i 13/32" Pc ire-ii6.4143 --I I ;7-----.:__ x _ _ c0 I c� 4sa IM N co1 \ ' 47'41--, 1 ' LIO 7/16" - R.01 / „ 2„ 1 5 16 t L 1 1/2" 45.00° II 90.00° R.01 ....kwa,„_,.......,,, IIILi.„.„,..,...,...,,,,;-:-.:412-'..,._ ,,, R.01 )/ ", 0 3/8 ±.00 THRU ALL - DETAIL A b. \/ 0 7/8"(±.01)X 82°, NEAR SIDE SCALE 2 : 1 - tilfsh----4:7•1`. Y S2 't f ,y;_-1. ,..:: r`,- 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 3.8 FrnFaetc,n Solar nrnrlurts arc,nrntertc,ri by thc,fnllnwinn 1 I S Patents R 151 522 R9 R 151 7n11 R9 R 1 R1 19R R9 R 155 711 R9 R 14R 999 R9 R 904 914 R9 R 245 454 R9 R 772 174 R9 R 225 557 R9 GreenFasten" GF1 — Product Guide Cut Sheets: Bracket Options - Z-101 H ► 5/8" �1 ;, 3/8„ 1 01 7/16„ --- 1 1/4"-► 1/16 ► -+ 3/16" i 1 / 4X R 1/8" 2 3/4" 1 5/16„ 1 1/2"--11- t 0 3/8„+.00-.002 THRU ALL 8" c:-.), \/ 0 7/8"±.010 X 82°, NEAR SIDE 1 1/2 T 3/4" I� 3/4„ 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 3.9 -- FrnFaeten Rohr nrnrii ir,te are nrntecteri by the fnllnwinn I I S Patents•R 151 579 R7 R 151 Inn R7 R 1 R1 39R R7 R 1RS 711 R7 R 14R 749 R7 R 7tlA 914 R7 R 945 454 R7 R 979 174 R7 R 995 557 R7 GreenFasten- GF1 - Product Guide Specifications PART 1 -GENERAL 1.3 SUBMITTAL C. Base flashing is .032 gauge aluminum em- A. Submit manufacturer's written specifications. bossed to accept EPDM bushing. 1.1 SUMMARY B. Submit standard product cut sheets. D. Bushing is EPDM. A. WORK INCLUDES C. Submit installation instructions. 1. GreenFasten solar attachment bracket that D. Submit product specific load test data,show- attaches Stainless steel bonded washer is 304 18.8 - attaches directly to the roof deck. stainless and EPDM. - ing ultimate and allowable load values. 2. Provide appropriate bracket and fasteners - for the roof system. 1.4 QUALITY ASSURANCE 2.3 FINISH-Mill Finish B. RELATED SECTIONS Installer to be experienced in the installation of A. Bracket is mill finish aluminum 1. Section 07600: Flashing and Sheet Metal specified roofing material for no less than 5 years B. Base flashing(choose one) 2. Section 07500: Roofing in the area of the project. 3. Division 1:Administrative and Procedural 1. Mill Finish Requirements 1.5 DELIVERY/STORAGE/HANDLING 2. Black-kynar painted 4. Division 7:Thermal and Moisture Protection Inspect material upon delivery. Notify manufacturer within 24 hours of any missing or defective items. PART 3- EXECUTION 1.2 SYSTEM DESCRIPTION Keep material dry,covered,and off the ground until A. COMPONENTS: installed. 3.1 EXAMINATION 1. GreenFasten GF1 system consists of alumi A. Substrate: Inspect structure on which brack- num flashing with integral EPDM bushing PART 2 - PRODUCTS ets are to be installed and verify that it will and one bonded stainless steel and EPDM withstand any additional loading that may be washer. 2.1 MANUFACTURER incurred. 2. Fasteners EcoFasten Solar® A.To be of metal compatible with aluminum 289 Harrel Street, Morrisville,VT 05661 B. Notify General Contractor of any deficiencies GreenFasten components. (877)859-3947 before installing EcoFasten Solar brackets. B. Fasteners should be selected for compat- www.ecofastensolar.com ibility with the roof deck. C. Verify that roofing material has been installed C.Fastener strength should exceed or be 2.2 MATERIALS correctly prior to installing solar attachment equal A. Attachment Bracket brackets. to that of the allowable load of the sys- 6000 Series Aluminum(choose one) tem. 3.2 INSTALLATION See test data at www.ecofastensolar.com 1. Comp Mount Slide A. Comply with architectural drawings and proj- 3. Sealant(if required by roof manufacturer): 2. CP-SQ-Slotted ect engineer's recommendations for location to be roof manufacturer approved. 3. F-111-A of system. Comply with Manufacturer's written 4. Aluminum compression bracket 4. L-102-3" installation instructions for installation and 5. L-102-6" layout. B. DESIGN REQUIREMENTS: 6. SCL-101-3" 1. Bracket spacing to be recommended by 7. Z-101 - project engineer. 8. Conduit Mount Bracket _ 2. Install a minimum of one fastener per B. Fasteners(may be supplied by others)to be - assembly. compatible with chosen roof application and 3. It is important to design new structures meet specified pull out values as shown in or assess existing structures to make sure load test data. that they can withstand retained loads. 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 4 FrnFacten Scalar nrnrli irk are nrntarteri by tha fnlinwinn I I R Patent'R 151 522 R7 R 153 7nn R2 R 1R1 39R R2 R 1 RF 718 R2 8 14P 299 R2 R 2119 914 R2 8 245 454 R2 R 279 174 R2 R 295 557 R7 GreenFasten- GF1 - Product Guide Test Data: American Wood Council Lag Bolt Pull-Out Values Lag pull-out(withdrawal) capacities (ibs) in typical -ooF:umber(ASD) Spe- Lag screw specifications cific 5/16"shaft* Gray- per inch thread depth ity Douglas Fir, Larch .50 266 Douglas Fir, South .46 235 Engelmann Spruce, lodge pole .46 235 Pine (MSR 1650 f& higher) Hem, Fir, Redwood (close grain) .43 212 Hem, Fir(North) .46 235 Thread Southern Pine .55 307 Depth Spruce, Pine, Fir .42 205 Spruce, Pine, Fir .50 266 (E of 2 million PSI and higher grades of MSR and MEL) 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 5.1 `.. „_ FrnFacten Snlar nrnrii ictc are nrntecteri by the fnllnwinn II S Patentc-R 151 522 R2 R 155 7f10 R2 R 1R1 595 R2 R 1 RR 711 R2 R 148 9RA R9 R 20A 914 R2 R 245 454 R9 R 972 174 R9 R 225 557 R9 GreenFastenr" GF1 — Product Guide Test Data: GreenFasten Leak Test Wood Blocking Leak Test El al EcoFasten Solar®tested the Green Fasten roof mount system so you can be sure your roof penetrations won't leak, even when under standing water. - Our test apparatus encapsulates the entire bracket and seals against _ the flashing which allows us to flood the bracket and pressurize the - . - system. After the apparatus is flooded it's pressurized to 30psi and left I to stand for over10 minutes.This is equivalent to nearly 70ft of111 standing water. t _ \ . . , iit... .,„. , gi I .ii : . _. a b . kbtattil ems.. 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 5.2 Fcnractcn Snlar nrnrii ictc arc nrntectcri by the fr,I mminn I I S Patantc•R 151 522 R2 R 153 7116 R2 R 1R1 39R R2 R 166 711 R9 R 146 799 R7 R 9119 914 R2 R 245 454 R2 R 979 17d R2 R 925 557 R2 GreenFasten" GF1 — Product Guide Test Data: GreenFasten Leak Test Wood Blocking Leak Test(continued) If there were a leak, an oversized hole in the roof deck and notch in the rafter would allow unrestricted flow to two paper towels that are stuffed around the fastener.To make it clear if there was a leak,the water is dyed green. Neither of the paper towels show any indication of leaking.The GreenFasten system is 100%water tight. z.� 7-2 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 5.3 FrnFacten Snlar nrnrinrtc are nrnterterl by the fnllnwinn I I S Patents R 151 599 R9 R 151 7fO R9 R 1R1 39R R9 R 1R6 711 R9 R 146 999 R2 R 209 91d R2 R 945 454 R9 R 979 174 R9 R 995 557 R2 GreenFasten°" GF1 — Product Guide Test Data: IAPMO Certification No. 0216 11144 EVALUATION REPORT Number: T.- " Originally issued_ 0411 S12011 Ravis®d: 0 411 31201 6 Valid Through: 0413012017 EA-ALI'ATOONSUBJECT: pre-installed EPDM grommet(f;F-t),one-hole bracket(L- C REEK FASTEN-I-81Z FLASHF OOT AND 101-3),skated bracket lS+CL-10I-3)ne two-hole bracket C()SIPSLIDE ROOF MOUNT ASSEMBLIES (4-102.3);an EPDM bonded 18.8 Hashers;and a 3/i6 melt 7.9 mm)diameter lag screw.The published installation REPORT HOLDER: irtstructyais provide more detailed dimensional EcoFasten Solar' information. 2119118 met Street Morrisville,Vermont 0566 t 3.1.2 FlasliFaat Reef Mount:The FlashFoot Roof Mown (MS)766-4273 has five basic components:nilwnmum flashing with a pre- j rianii alninesnott ouards cool escialled FPDM grommet(fiF-I);a 2-of.inchdiaueter(64 min)'Ai lode thick(7,9 mm) support disk; an FPDM IDD!!IO ALLY)MPAN1 NAMES: bonded ISA washer;and a$/i Inch diameter lag screw.The IrnnRidge Inc. published installation instructions prooide more detailed 1495 Zephyr Avenue dimensional i ifonnatinn. Hayward.CA 94544 3A.3 CompSllde Roof%tonal: The CompSiidc Roof ( )227-952523 Mount has six basic comp...east aluminum flashing oath K.sr..irnmridge.emn pre.-irtstatled IPDM grommet IGF-I);a 4 inch(102 mm) CSI Dlt'L5[ON:EiF WOOD:lVb PLAS7 t[S long Corii(iSlide unit,an EPDM bonded IRA washers, C5t inch 06 25 23-Xt ood.Plastic,and t implode t7.9 nun)diameter lag screw;bracket I L- Ftsienistas 101-3);and a A.nigh diameter x 1-Ite inch long(7.9 a 32 MITI)Fier Head Cap Bolt with matching serrated flange nut. I.&5t OPEOF E1:ll-1 A'fl(bN The published installation instructions provide more detailed dimensional information. 1.1 Compliance to the following codes IF regulations: • 2009 International Budding Cade'lll3C) 3.1.4:'Barham Flashing: The aluminum flashir are • 2004 International Residential Code (IRC) made Born anodized aluminum complying with AS ASTM • 2006 International Building Collet(IBC) with Table 2 of this enih fats Fleshings that are used a with each mounting assembly. • 2006Interagioml Residential Code (IRC) • 1997 Uniform Building Code (UBC)-Attached 3.2 motriats Supplement IS Etahated in accordance with: The titecnFasten-1-l(12,FlashFoot and CompSlide Roof Mount components material standards are specified in • 1APM0 ES EvalIndian Criteria for Joint Hangers Table 3 of this report and Miscellaneous Connectors,I Ea)02-20I6)• Fasteners used to secure the flashing to the roof rafter shall 13 Properties assessed: be n/ie-inch-diameter(7.9 mm)lag screws complying with • Structural ANSI/ASME B I8 2.1-B 1.The lag screw shall be long • Water Pceashanon enough to penetrate the rafter a minimum of 2-Ve onclies 2.Q PRODUCT USE (64 mm),Lag screws shall be corrosion-resistant Table I of this report includes pull-out capacities for typical roof lumber. EcoFasten Solar c ant 1ronRidge's GreenFasten-l-8I2„ FlashFoot and CompSlide Roof Mounts are mounting 4.6 DESIGN AND INSTAL LATUP.4 assemblies used to attach solar panels and other types of equipment to the rafters of roofs with asphalt shingle roof 4,1 Design:Compliance iodic following shall be provided coverings in acc+onianee with iBC Section 1509 and IRC by the Destgncr/En inter if Sections R905 and M2302. g ed allowable the s drin having authority-.The tabulated loads shown in 3.Q PRODUCT DESCRIPTION this revolt are based on allowable stress design(ASD I mat till lude the load durition factor,CD,corresponding with the applicable loads in accordance with NDS. 3.I Product information 3.1.1 Gm.Fasfen-I-512: The Crreen.asten-t-812 Roof Where the roof mounts are exposed to temperatures Mount has tour hem:cons mnerets:aluminum flashing with esc eedina IQ()'F f3T.8'C) uplift allowable loads shalt be adjusted by the temperature factor,Cr,in accordance with ri.gelded env*.e ar Sib tay.Ao fwardi er tow•ru'3n ..Mai I......i.arrie on rr+.rno e•aya r wfMe rr••ir:.,nun e me*rc ee.my.•w m.e..a ar n.rm-.w Nil•ew•R n,eren eu•�ie�e.w b.ia ur.w. .,c.naettossere.ew e.ande i,awn San,", ,%.Nirr r e a aaas fir,w aamanea.w sae aae•e,eh e., in Mt." rr�,r�anw.r.rw,rem i.nw 5 t'5 i n er M+e'morn**SO a r*o no aiiww�,WNW. v s.11.poorttske, m.N n.italr. s,411-4EN6.7.fe.•i oasrlr. Obi./tMWuyFdr Ilaml Owiros.eiollaknioa FM-are-LAU 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 5.4 FcnFastpn Solar nrnrh ices art nrntprtpri by the fnllnwinn I 1 5 Patpntc•R 151 522 R2 R 153 700 R2 R 1 R1 39R R2 R 1 RR 711 R2 R 146 299 R2 R 20P 5114 R9 R 945 45A R9 R 972 174 R9 R 995 557 R2 GreenFasten'" GF1 — Product Guide Test Data: IAPMO Certification No. 0216 ilitkip EVALUATION REPORT Number: Originally Issued: 04115(2011 Rwlaad: 04/13/Z015 valid Though: ou3ur/017 Section 10.3.4 oft NDS. When products we attached to fasteners used with the specific propietary p elenati'ae- wood framing having a!noisttae content greaten than 19 treated or fire-retardant treated lumber. percent i16 percent for enginered wood products", or where wet service is expected,the allowable loads shill be 5.4 When required by the code oRcial,a licensed design adjusted by the wet service factor,Car,specified in Section professional shall provide calculations to verify that 103.3 of the NF)5_Connected wood members shell be imposed beds on the asserrdily do not exceed the allowahk analyzed for bed-can-sing capacity at the connection in loads contained in Table I of this report accordance with the NDS. 5.5 When required by the code official,a licensed design 1.2 InstallrWn:The GreenFasien-1-812,FladhFora and professional shall provide calculations for the assemMv CompSlide Roof Monts shall he installed to the rafter support flaming using one lace screw at catch bracket location as described in the published 'installation insrructiaaus.The minimum 6.0Sl"13,STANT1AATI\GDATA specific gravity of the wood member shall be 0.41 The flashing shall be placed underneath the shingle far erauglt Testing and analysis data submitted is in conformance wnh up dope to prevent water infiltration. Installation of IAPMO ES Evaluation Criteria for Joist Hangers and GreenFaaen-I-a 12, FlasliFoot and CompSlide Roof MGsotila eora Comsecto s,I EC002-_2016). Ram test data Mounts are limited to roofs having minimum and is in conformance with the Underwriters I.aboratray maximum slopes of 3:12 II4 percent) and 12:12 (45 Standard for Cols Vents-(IJL 441-96 Section 25). Test percent),respectively_ results are from laboratories in compliance with ISOJIEC 17025. CompSlide Roof Mounts shall be installed with a ttmxlmum spacing of 1-It/%.inches(49.2 trim)center-to- 7.0IDEtiTIFICATION center between bracket Hex Head Cap Bolts and the lag aerew fastener. Ilex Heal Cap Bolts shall Ix installed a Ec°Fasten Solar's and IronRtdge's, Greenaltsten-l-R12. minimum of 1-'li.inch(27 mml on-center from the cad of FlashFoor and CompSlide Roof Mounts are identified with the CompSlide unit. a Label bearing the Manufeettaers tame and address, product designation, LAPMC) Uniform ES Males of When the embossed profile on the sheet flashing lifts the Conformity, this evaluation report number (ER-2161, shingle on the cowrie above, the installer shall add compliance code,and inspection agency_ approved caulking to the underside of the shinetes on the course above. 5.0I.LMITATIONS A P MD The CeeenFsdorn-l-8I2,FlashFoot and CompSlide Roof Mounts described in this report comply with the codes listed in Section 1.0 of subject this report, to the following OT TM conditions: L&PMA ER 11216 5.1 The Grcerfasrcn-l.g l2, FlashFoal and CompSldc Roof Mounts dull be installed in accordance with this report the manufacturers published installation Bala■Gerber.P.E.,S.E. irtstrucoons,codes listed in Section 1.1 of this report and Vice President,Terhakal Operations the supplernem. I.Whirs Evaluation Service 5.2 Calculations showing compliance with this report shall 1 h e submittedofficial. to the code The calculations shall R prepared by a registered design professional where Rkhud Reck,PE.CRO,MCP required by the statuses of the jurisdiction in which the Vice President.Uniform EvalatJo■San lee prtyat is to be constructed. 5.3 Fasteners used in contact with fireretardara-treaed or GP Russ lChaae{ preser at ve-treated lumber shall comply with IBC Section 2304.9.5 or the 200a IRC Section R317.3 (2006 IRC CEO,Tie L3PM0 Grimm Section R319.3),as applicable The report holder or lumber For ruaig iar.,••a...n..ram.,ra.ti...,r.,Pk..,4. treater shall be contacted for recommendations on r...."r....... .—...m/r at,,...,ia...•... minimum emotion resistance and connection capacities of Page 2 of 8 877-859-3947 EcoFasten Solar°All content protected under copyright.All rights reserved.8/27/14 5.5 FrnFacten Solar nrnrin iris are nrntertarl by tha fnlIriwinn I I S Patants'R 151 .527 R2 R 151 7no 1:17 R 1R1 39R R2 R 155 711 R2 R 145 700 R2 R 205 914 R2 R 245 454 R2 R 272 174 R2 R 995 557 R7 GreenFasten- GF1 — Product Guide Test Data: IAPMO Certification No. 0216 11114 EVALUATION REPORT Number: 6 rsr Originsfly Issued: 0411512011 Revised: 04113/2016 ValId Through: 04130f2017 Table I: AlfswsMt Lead ipoundct Load Rrarkrt' ',needle'Nevski Flashitr2 .rF. Direction of Lumber (.reenFacten-I-tl12 F1ashFast - Based tot Tested I Itimafz= L-I01-3 0.52 741 NM 1-102-3 0.42 653 717 t'ptifl SCL-101-3 0.47 604 717 C mpSfidc 0.42 66y N/A 1-101-3 0.52 298 NM L-102-3 0.42 304 339 L azra( SCL-I01-3 0.47 273 339 Co Slide 0.42 221 N/A Rased era I.cad at 118"Deflection d 1_-101-3 0.52 1293 N/5 L-IO2-3 0.42 1356 414 I''NMI SCL-101-3 0.47 1926 414 CotrgrSlidc 0.42 98 N/A t_101-3 0.52 320 NM L-102-3 0.42 29.1 168 Lateral SCL-101-3 0.47 401 168 CompSlide 0.422 tt5 N 'n I'er SI.I Jh.faxco-.1.J.0 N,I arch+2.1 mrn. I.13rrckrim are sber6n In I ewes 2,5 and 6a(itas report 2.lov+e]t value of tested sa mple%divid ` ed rya faCTtrrylf.ad Y_ 3.Avaace laat of word samples at If8..ncfi detleett+sn. Page 3 Of 877-859-3947 EcoFasten Solar°All content protected under copyright.All rights reserved.8/27/14 5.6 FcnFasten Snlar nrnrii rrtc am nrntartari by the fnllnwinn I I S Patiantr 8 151 S22 1:19 R 163 7n11 R9 R 1 R1 3901 R9 R 166 713 R2 R 146 999 R9 R 201)914 R2 R 245 454 R2 R 972 174 R9 R 225 S57 R2 GreenFasten'"' GF1 — Product Guide Test Data: IAPMO Certification No. 0216 EVALUATION REPORT Number:__ 16 Origftlaly Issued: 04/15/2011 Revised: 0013t2016 valid through: 04f3012017 Table 2:Axsrmhh Models sod Installation X Ind elias%ruebh Hacking(%) Brarket(x}/mnantilg kardware Fattener GreeaFsiren-1112 Flat R-1. 12"(GFl-X"X.X- One-hole bracket(1.-10l-3k or 5/1fi-diameter lac screw 1 i 21;GF l-XXX-1112-13; Slotted bracket(SCL-101-3);or GFI-XXX-812-Ptak, Two-hole bracket ti--10'2-31 GI 1-XXX-RI2-ARCS; GFl-XXX-1112-Rigs;ur GF I-XXX-812-Links-t5.G FtaabFoot Roof Forced 12" x 12" wish 2_5"diaaerter x 5116'thick support 5/16-diamcrer lag screw %foam= raised circular center disk and One-hole bracket IL-101- 3i (nmfrSiide Roof Flat R-x 12"; 4"long CampSlidc mounting unn i/I6'dim-serer lagsc-rew, Arrant fiFl-XXX-112-U; and: and 5/16"diameter s. I- GFl-XXX-812-Peak; (Rte-hole bracket(L-101-31;or IF4" tong hex-head cap GFI-XXX-812-ARCS; Hotted bracfu-t(SCL-101-3kor bolt with matching (IF 1-XXX-1112-Radges;or Two-bole bracket tL-102-3) serrated flange nut GF l-XXX-812-Lines-6.0 All tlaahrnrt system%come wah an tSINN bonded I.a.a grommet mounted m the eerier tthtuirs an EPDM hooded 1 a.a aaadier lnsutl with approved sealant under Ile exported tab of asplait ahmgtrr. Table 3:Material Properties Hex Lag screw ANS1/ASMEBIR.2.I-B1werahle12QSM for pullour Figure capacities for typical roof lumber(ADS) s Alununtem Bracket AAS-6061 Figure 2,5 fit:o FPDM Metal roof Type 304 stainless steel complying with ASTM A Nit Figure hushing(washer EPD'.d Grommet 1STh1 D412,D297,D2240,and AST>I D624,with s Figure 4 Jurometer rating of 60 Flashme 15T\I 13-2119 Figure 4 Alumtrtum Sapp t Figure R Plate Com,Sliele \AS 6061 Fteure q Page4 cif 8 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.8/27/14 5.7 FrnFactan Snlar nrorliices Ora nrntartor1 Mr the fnllrmrinn I I S Patantc R 151 529 R9 R 153 7(10 R7 R 1R1 3QR R2 R 1RR 713 R9 R 1d5 79Q R9 R 2011 Q1d R9 R 945 d5d R2 R 772 174 R9 R 295 557 R2 .'"w,,..:vs:..b.:.: '-"`„�,; .: .ems^.- �,.. ...tea'=:. "" .. ;:w .,:;.:: ,�: :r _ _"3.— — axw.e---*-•_ , GreenFasten'" GF1 — Product Guide Test Data: 1APMO Certification No. 0216 1111114, EVALUATION REPORT Number: r.6 Originally Issued: 0 411 31 2 01 1 Revised_ 0 411 3120 1 6 Valid Through: 04/3012017 Load OrientationnDirectlon Detail -4 Uplift Lateral • 41:112' Eco 'aster Solorn www rtn(nstenscte r.c am Building Careen with EcoFasten Solar 4 4'. Page 5of8 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved.8/27/14 __- FcnFacten Colar nrnrincTs are nrntactarl by iha follnwinn II S Patents R 151 829 R7 R 188 7110 R9 R 181 39R R9 R 168 711 R9 R 148 9R9 R9 R 90c1,114.R9 R 74.5 d5d R9 R 272 17d R9 R 225 557 R9 GreenFasten- GF1 — Product Guide Test Data: IAPMO Certification No. 0216 ='' litttpEVALUATION REPORT Number: , EVALUATION REPORT Number: ¢{" TM Originally Issued: 0411 512 01 1 Revised. 0�312014 Valid Through: 04/30/2017 TM` Originally issued: 0 411 51 2 01 1 Revised: 04l131m1$ Veld Through: 04/30/20 4 7 S° w. ' EcoFasten Solar Components -1 /''''..--.--'°(--.1-71/-_,+/— ICS 7:FininCoetninthing Figure 8:Aluminum Support Plate Figure 1: Buret 1-102-3 Lag Screw n: 3 F -: 1 \�� Figure 3: Figure 4: EPDM GreenFast Metal eit-1442 roof Flashing Figure 9:CampSlide Roof Mount Assembly bushing with EPDM • : fFigure itL-101.3 Flgura lb ECt_-10l-3 ` I Page 6 of S PsBc 7 of a 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 5.9 FrnFacton Rnlar nror1 irtc aro nrntortorl hu tho fnlInwinn I I S Patents•R 151 599 R2 R 153 7n11 R9 R 1 R1 3QR R9 R 166 713 R7 R 14R 79Q R9 R 205 R14 R2 R 945 454 R9 R 979 174 R7 R 995 557 R2 I