Permit CITY OF TIGARD MECHANICAL PERMIT
11 I ; COMMUNITY DEVELOPMENT Permit#: MEC2022-00186
Date Issued: 3/30/2022
T I G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S135BA03303
Jurisdiction: Tigard
Site address: 10500 SW CASCADE AVE
Project: Beaverton Motorcycles Subdivision: None Lot: None
Project Description: Install ductwork and registers to accommodate the new office layout. Install(2)exhaust fans for compressor and
fluid rooms. Install radiant heater.
Contractor: WILLAMETTE HVAC LLC Owner: 10500 SW CASCADE LLC
3075 SE CENTURY BLVD STE 206 819 SE MORRISON ST#110
HILLSBORO, OR 97123 PORTLAND, OR 97214
PHONE: 503-259-3200 PHONE:
FAX: 503-848-2597
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 03/22/2022 $474.71
Class of Work: ALT Type of Const: VB Plan Review 03/22/2022 $118.68
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 03/22/2022 $56.97
Stories: Info Process/Archiving-Sm$0.50(up to 03/22/2022 $6.00
11x17)
Project Valuation: $15,000.00 Info Process/Archiving-Lg$2.00(over 03/22/2022 $4.00
11x17)
Fuel Air Handlers Additional Plan Review 03/30/2022 $45.00
Fuel Types: Electricity Units< 10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces< 100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: 1 Vent Systems: Total $705.36
Hoods: Comm Incinerators:
Required Items and Reports(Conditions)
Woodstoves: Gas Fireplaces:
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work: 1
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090, You may obtain a copy of the rules
Issued By: Permittee Signature: -y,"///gW-Y)j,-7
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Mechanical Permit Application Cn Ve FOR OFFICE USE ONLY
City of Tigard ate (g 101E �r Permit No �C -06726D /By:
13125 SW Hall Blvd.,Tigard,OR 97223 MAR 03 2022 Plan Review
Phone: 503.718.2439 Fax: 503.598.1960
DDate/By: 7 Other Permit:
T I G A R D Inspection Line: 503.639.4175 CITY OF i I GARD Da ead By' mr s: See Page 2 for
Internet: www.tigard-or.gov y
BUILDING DIVISION otified/Method: t�,aC� Supplemental Information
TYPE OF WORK COMMERCIAL FEE* SCHEDULE — USE CHECKLIST
Mechanical permit fees*are based on the value of the work
0 New construction ®Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all
❑ Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit.
Value:$$15,000.00
CATEGORY OF CONSTRUCTION
RESIDENTIAL EQUIPMENT/SYSTEMS FEES*
❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building For special information use checklist.
❑Multi-family ❑ Master builder ❑Other: Description P Qty. Fa. Total
JOB SITE INFORMATION AND LOCATION Heating/cooling:
Air conditioning
Job site address: 10500 SW Cascade Ave (requires site plan showing placement) 46.75
Furnace 100,000 BTU(ducts/vents) 46.75
City/State/ZIP:Tigard OR
Furnace 100,000+BTU(ducts/vents) 54.91
Suite/bldg./apt.no.: Project name:Beaverton Motorcycle Heat pump
(requires site plan showing placement) 61.06
Cross street/directions to job site: Duct work 23.32
Hydronic hot water system 23.32
Residential boiler(radiator or
hydronic) 23.32
a. Unit heaters(fuel-type,not electric),
in-wall,in-duct,suspended,etc. 46.75
Subdivision: Lot no.: Flue/vent for any of above 23.32
Other: 23.32
Tax map/parcel no.. Other fuel appliances:
DESCRIPTION OF WORK Water heater 23.32
Install ductwork and registers to accommodate the new office layout.Install Gas fireplace/insert 33.39
Flue vent for water heater or gas
two exhaust fans for compressor and fluid rooms.Install radiant heater. fireplace 23.32
Log lighter(gas) 23.32
Wood/pellet stove 33.39
Wood fireplace/insert 23.32
Chimney/liner/flue/vent 23.32❑ PROPERTY OWNER 0 TENANT
Other: 23.32
Name:
Environmental exhaust and ventilation:
Address: Range hood/other kitchen
equipment 33.39
City/State/ZIP: Clothes dryer exhaust 33.39
Single-duct exhaust(bathrooms,
Phone:( ) Fax:( ) toilet compartments,utility rooms) 23.32
® APPLICANT 0 CONTACT PERSON Attic/crawlspace fans 23.32
Business name:same as below Other: 23.32
Fuel piping:
Contact name: $14.15 for first four;$4.03 for each additional
Address: Furnace,etc.
Gas heat pump
City/State/ZIP: WalUsuspended/unitheater
Phone:( ) Fax::( ) Water heater
— Fireplace
E-mail:
m mcr 15it-err, c`� 01 I I G rat to rhvv c. C ern Range
CONTRACTOR Barbecue
Business name:Willamette HVAC,LLC Clothes dryer(gas)
Other:
Address:3075 SE Century Blvd Suite 206 MECHANICAL PERMIT FEES*
City/State/ZIP:Hillsboro,OR 97123 Subtotal
Phone:(503)259.3200 Fax:(503)848.2597
Minimum permit fee($90.00)
Plan review(25%of permit fee)
CCB lie.:56951 State surcharge(12%of permit fee)
TOTAL PERMIT FEE
This permit application expires if a permit is not obtained within 180
Authorized signature: )'YLQ„Ll,,, days after it has been accepted as complete.
Print name:michael malstrom Date:2/25/2022 * Fee methodology set by Tri-County Building Industry Service Board
1.'Building\Permits\MEC-PermitApp.doc 03,07,I 440-4617T(I I/02/COM/WEB)
Mechanical Permit Applicatio CEI V E FOR OFFICE l St.()NIA
City of TigardReceived
g MAR 2 3 2022 Date/By: Permit No.: MEC2022-00186
13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
3 Phone: 503.718.2439 Fax: 503.598.196 k°>`.ITY OF TIGARD Date/By: Other Permit:
T I G A R D Inspection Line: 503.639.4175 A' ` Date Ready/By: Juris: See Page 2 for
Internet: www.tigard-or.gov 3UILDING DIVISION. Notified/Method: Supplemental Information
TYPE OF WORK COMMERCIAL FEE* SCHEDULE— USE CHECKLIST
Mechanical permit fees*are based on the value of the work
❑New construction ®Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all
❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit.
Value:$$50,000.00
CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT!SYSTEMS FEES*
❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building For special information use checklist.
❑Multi-family ❑Master builder ❑Other: Description Qty. Ea. Total
JOB SITE INFORMATION AND LOCATION Heating/cooling:
Air conditioning
Job site address:10500 SW Cascade Ave (requires site plan showing placement) 46.75
City/State/ZIP:Tigard OR Furnace 100,000 BTU(ducts/vents) 46.75
Furnace 100,000+BTU(ducts/vents) 54.91
Suite/bldg./apt.no.: Project name:Beaverton Motorcycle Heat pump
(requires site plan showing placement) 61.06
Cross street/directions to job site: Duct work 23.32
Hydronic hot water system 23.32
Residential boiler(radiator or
hydronic) 23.32
Unit heaters(fuel-type,not electric),
in-wall,in-duct,suspended,etc. 46.75
Subdivision: Lot no.: Flue/vent for any of above 23.32
Other: 23.32
Tax map/parcel no.: Other fuel appliances:
DESCRIPTION OF WORK Water heater 23.32
Additional work:Install 3 fans for owner track system and two for Dyno rooms. Gas fireplace/insert 33.39
Flue vent for water heater or gas
7 total for the job.Install two make up air vents for Dyno rooms. fireplace 23.32
Log lighter(gas) 23.32
Wood/pellet stove 33.39
Wood fireplace/insert 23.32
0 PROPERTY OWNER 0 TENANT Chimney/liner/flue/vent 23.32
Other: 23.32
Name: Environmental exhaust and ventilation:
Address: Range hood/other kitchen
equipment 33.39
City/State/ZIP: Clothes dryer exhaust 33.39
Phone:( ) Fax:( ) Single-duct exhaust(bathrooms,
toilet compartments,utility rooms) 23.32
® APPLICANT 0 CONTACT PERSON Attic/crawlspace fans 23.32
Business name:same as below Other: 23.32
Fuel piping:
Contact name: $14.15 for first four;$4.03 for each additional
Address: Furnace,etc.
Gas heat pump
City/State/ZIP: Wall/suspended/unit heater
Phone:( ) Fax::( ) Water heater
Fireplace
E-mail:mmalstrom@willamettehvac.com Range 1
CONTRACTOR Barbecue
Business name:Willamette HVAC,LLC Clothes dryer(gas)
Other:
Address:3075 SE Century Blvd Suite 206 MECHANICAL PERMIT FEES*
City/State/ZIP:Hillsboro,OR 97123 Subtotal
Minimum permit fee($90.00)
Phone:(503)259.3200 Fax:(503)848.2597
Plan review(25%of permit fee)
CCB lic.:56951 State surcharge(12%of permit fee)
TOTAL PERMIT FEE
This permit application expires if a permit is not obtained within 180
Authorized signature: ti.m days after it has been accepted as complete.
Print name:michael malstrom Date:3/14/2022 * Fee methodology set by Tri-County Building Industry Service Board
1:\Building\Permits\MEC-PermitApp.doc 03/07/12 440-4617T(11/02/COM/WEB)
FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
III City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Transmi tal Letter
t
T 1 c;A i;D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: COW . DATE RECEIVED:
DEPT: BUILDING DIVISION RECEIVED
FROM: k.)ICHAEL. 4 ALSR-O t MAR 2 3 2022
COMPANY: WILL L4 j F. -kVAc1 L J C CITY OF TIGARD
PHONE: ( ) 25 g-- 3200 3UILDING DIVISION By: i�
EMAIL: m iflc J S` 'COM GJ W\l1 a.c.0i5Nl
RE: 1 t & Sl3 CA CA( _Ave 1 �2 .- 18 co
(Site Address) (Permit Number)
(Project name or subdivision name and lot number
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s) of plans. (9, Revisions: . a ct„rst
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS: 1T)b1 1 I xsRk< :. I L ...t_.(3) R $03-/ 2T1 Ac
3-t AL T W-F D-tt r e s. -1 Tom- . - -
1 a AL T A-tiz -ta D„\10 .
FOR OFFICE USE ONLY
Routed to Permit Thnician: Date: 3 - 3O -Q.�- Initial
Fees Du : a] Ye( [ No Fee Description: Amount Due:
• Hp- p1ex , rzv; •w l/ $� --v
$
$
$
Special
Instructions:
Reprint Permit(per P • ❑Yes -�LI No [ Done
Applicant Notified: Date: 730 Ian— Initials:
�/
I:\Building\Forms\TransmittalLetter-Revisions_073120.doc
City of Tigard
114 COMMUNITY DEVELOPMENT DEPARTMENT
I
T l c n It l7 Building Permit Review — Commercial - No Land Use
Building Permit #: 4% t C,102_2-- t 9/Y/
Site Address: 165ao sNA) CaSck . Suite/Bldg#:
Project Name: $6avtdotel, M AI rtAlcte
(Name of commercial business occupying the. ace. If vacant,enter Spec Space.)
Planning Review
Proposal: W
ay ova`• its(-all C2 .
Existing Business Activity: d.ve,l(i ITV
Proposed Business Activity:
Verify site address/suite# exists and active in permit system.
River Terrace N.e ghborhood: ❑ Yes n No
$ Zoning: jiA1i,L.
g.►Permitted Use: ii31 Yes ❑ No ❑ Spec Space
0 Confirm no land use required.
Business License:
Exists: (;)( es ❑ No,applicant was provided a business license application
Notes:
Approved by Planning: kaalA, Date: 3(717412-2—
,
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 2 Z�? �f,
Site Plans: # /
Building Plans: # 2"
Building Permit#: Ia.-Enter building permit# above.
Workflow Routing: ["Planning ❑ Permit Coordinator TYBuilding
Workflow Sign-off: [Sign-off for Planning(include notes from planning review)
Route Application Documents: [Building: original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: D3/4,ZU222—
I:\Building\Forms\B1dgPermitRvw_COM NoLandUse_111819.docx
Permit tor Review
❑ Conditions "Met"pri• o ance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Se, pplicant:
• Revision Notice 2: Da - to Applicant:
Revision Notice 3: grit to Applicant:
❑ SDC Fees Entere.• Wash Co Trans Dev Tax: ❑ Yes ❑ N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK s e Permit
,.proved by Permit Coordinator: Date:
I:\Building\Forms\BIdgPermitRvw_COM NoLandUse_111819.docx