Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit Support Document
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT r Request for Permit Action i t G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 • www.tigard-or.gov TO: CITY OF TIGARD Building Division 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPermits@tigard-or.gov FROM: ❑ Owner El Applicant El Contractor ity Staff Check(✓)one REFUND OR Name: INVOICE TO: (Business or Individual) Mailing Address: City/State/Zip: Phone No.: PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED (1): ANCEL/VOID PERMIT APPLICATION. El REFUND PERMIT FEES (attach copy of original receipt and provide explanation below). ❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). Permit#: P i 7 )O I K 7 Site Address or Parcel#: //G tit) s L.J (^f,�,,,r _,,-- y .� Project Name: 01/ 7 '7 ," ,�,� Jf'�r3`e I Subdivision Name: Lot#: EXPLANATION: /7 �rn,7`- �vtwd 1� , 'r emc c•_ ",, 6e Signature: 4j Date: L/4 j-,� Print Name: . `T Refund Policy 1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of: • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal service. 3. Please allow 3-4 weeks for processing refund requests. Route to Sys Admin: Date 9/7/ By e7 Route to Records: Date By Refund Processed: Date By Invoice Processed: Date By Permit Canceled: Date 14 l%'j,I 2,2► By 1V Parcel Tag Added: Date By I:\Building\Forms\RegPermitAction_120518. oc Building Permit Application `Commercial VIE('� I� "t) I OR Ol-i l(1: I tit':0\1.1 City of Tigard `"' Received -+ ♦ Permit No.: ,J !PI " 13125 SW Hall Blvd.,Tigard,OR 97223 3 `Z01i DateBv: fi..) , , Plan Review Phone: 503.718.2439 Fax: 503.598.1960 JU� DateB : Other Permit: /a1 ;.--' t 1-f G A R D Inspection Line: 503.639.4175 ("1�'�' �� Date Ready/By: See Page 2 for Internet: www.tigard-or.gov C, rt lk$10 otified,/Ivtethod ' ill: Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ®New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. 0 1-and 2-family dwelling ®Commercial/industrial Valuation: $ EllAccessory building El Multi-familyNumber of bedrooms: ElMaster builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: — 116y© 9.._,/ a/ ^,fE New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 G�-� Garage/carport area: square feet �T sv-4 A' `e`' Suite/bldg./apt.no.: Project name:217-S Phase II Covered porch area: square feet Cross street/directions to job site:11600,11630,11660 SW Hall Blvd. Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:see below Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overh d,and the profit for the DESCRIPTION OF WORK work indicated on this applicatio v Gr.J t�i✓ v0 j Washington County Tax Map 1 S135DD Tax Lots 00100,1300,1400,and 5200 6/9 1 1'�'y. ' j � A New Self-Storage Building. Phase II of an existing storage facility. Existing building area: square feet A three(3)story,68,139 SF building New building area: 68139 square feet ® PROPERTY OWNER 0 TENANT Number of stories: 3 Name:Wentworth Property Company Type of construction: IIB i,,' Address:802 N 3rd Avenue Occupancy groups: . City/State/ZIP:Phoenix,AZ 85003 Existing: -(7‘. 1 Phone:(602)875.5014 Fax:(602)578.6829 `• New: S 1 Storage CI ® CONTACT PERSON BUILDING PERMIT FEES* Business name:Wentworth Property Company (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:David Brown FLS plan review fee(if applicable): Address:802 N 3rd Avenue City/State/ZIP:Phoenix,AZ 85003 Total fees due upon application: Amount received: Phone:(602) 875.5014 Fax: :(602)578.6829 PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail:dbrown@wentprop.com Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name:TBD Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. City/State/ZIP: Permit fee(includes plan review $180.00 and administrative fees): Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60 , CCB tic.: Total fee due upon application: $201.60 Authorized signature: 1/�,{, C� This permit application expires if a permit is not obtained VV�� within 180 days after it has been accepted as complete. [/7Print name "r'i M M IAJA,tit � Date: 7 f?z Service Board. I:\Building�l'ermits\BUP-COM PetmitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) * Fee methodology set by Tn-County Building Industry Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildin:. and related facilities shall be made to insure that the path of travel to the altered area d the restroom, telephones and drinking fountains are readily accessible to individuals disabilities unless such alterations are disproportionate to the overall alterations in te : of cost and scope. (2) Alterations made to the path of travel to an altered area may be '-emed disproportionate to the o erall alteration when the cost exceeds twenty-five per-c: t(25%). VALUATION: Total of. renovation,alteration or modification bei ;,done, excluding ainting and wallpapering. [1] $ MULTIPLI.R(25%barrier removal req ' ement): x .25 TOTAL BUDG T FOR BARRIER ' MOVAL: [2] $ ELEMENTS: In choosing which acc• sible el- ents to provide under this section,priority shall be given to those elements that w pr.'ide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entr. ce: $ (c) An accessible r. te to the altered area. $ (d) At least on• .ccessible restroom for each • or a single unisex restroom: (e) Acces '.le telephones: $ (f) Ac,essible drinking fountains:and, $ (g) en possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Peanits\BUP-COM PennitApp.doc 03/03/2011 Dan Nelson From: Wolff, John F. <John.Wolff@tvfr.com> Sent: Tuesday, September 19, 2017 5:22 PM To: 'Lars Johansson' Cc: 'Saj Jivanjee'; 'Tim McNamara'; Mark VanDomelen; Dan Nelson; Gary Pagenstecher; Walter Barnett; Kenny Fisher Subject: RE: 217 Self Storage - Phase II Attachments: Stamped Approval of AM&M.pdf Lars, I have reviewed your AM&M application and it has been granted for approval based on the fact that your proposal is deemed an equivalency to the adopted codes. The application has been approved as written. I have stamped and signed the letter approved. It is missing Saj's signature however. Please get the appropriate signature on the letter. The approved AM&M request and response letters must be blue lined on the plans prior to plan approval. Retain a copy of the AM&M proposal and response at the project site at all times. This documentation may be required for review by TVF&R and City of Tigard inspection staff. Please provide an updated scaled or dimensional site plan showing the changes with one copy to TVF&R and copies to the City of Tigard. I am not sure how many the City of Tigard will need? John Wolff—IAAI - CFI Deputy Fire Marshal Tualatin Valley Fire and Rescue 503-259-1504 From: Lars Johansson [mailto:Iars@jcaoregon.com] Sent:Tuesday, September 19, 2017 2:47 PM To: Wolff,John F. <John.Wolff@tvfr.com> Cc: 'Saj Jivanjee'<saj@jcaoregon.com>; 'Tim McNamara'<tim@tim-mcnamara.com> Subject: FW: 217 Self Storage - Phase II John, Good afternoon. I sent this e-mail to you on September 11th and received an automatic reply stating you would be back on Tuesday, September 19th. I am resending this to you in case my previous e-mail somehow got trashed or lost in a spam folder. Please see the attached Alternate Materials and Methods request (pdf). It is my understanding that if/when you approve this I will then need to submit to you a new site plan with our proposed changes. At that point please let me know how many copies you would need, what drawing size and if you need the changes clouded and revision numbered. I am not sure if you would need an elevation or not showing the roof ladder or if the site plan will do. Thank you, Lars Johansson 1 Jivanjee Circosta Architecture, LLP Partin Hill Architects, LLC 209 NE Lincoln St., Suite A Hillsboro,OR 97124 503-640-1216 ext. 2 From: Lars Johansson [mailto:lars@jcaoregon.com] Sent: Monday, September 11, 2017 11:13 AM To: 'Wolff, John F.' Cc: 'Saj Jivanjee'; 'Tim McNamara' Subject: RE: 217 Self Storage - Phase II John, Attached is our Alternate Materials and Methods request. It is my understanding that if/when you approve this I will then need to submit to you a new site plan with our proposed changes. At that point please let me know how many copies you would need, what drawing size and if you need the changes clouded and revision numbered. I am not sure if you would need an elevation or not showing the roof ladder or if the site plan will do. Thank you, Lars Johansson Jivanjee Circosta Architecture, LLP Partin Hill Architects, LLC 209 NE Lincoln St., Suite A Hillsboro, OR 97124 503-640-1216 ext. 2 From: Wolff, John F. [mailto:John.Wolff@tvfr.com] Sent: Wednesday, September 06, 2017 2:36 PM To: 'Lars Johansson' Cc: 'Saj Jivanjee'; 'Tim McNamara'; Mark VanDomelen (markv@tigard-or.gov) Subject: RE: 217 Self Storage - Phase II Lars, Your proposal for alternate materials and methods will be supported by TVF&R as drawn. You will need however, to fill out the AM&M application request (attached) for official approval and for project plan documentation. You will need to indicate that the alternates you are providing are in lieu of code requirements that you are not able to meet do to geographical location on the property and that your proposals provide equal safety standards. You should address: 1- Lack of required access within 150 feet of all portions of the building. (Proposed roof access) 2- Lack of required emergency apparatus turn-around (Proposed Hall Blvd Emergency Access) John Wolff—IAAI -CFI Deputy Fire Marshal Tualatin Valley Fire and Rescue 2 503-259-1504 From: Lars Johansson [mailto:lars@jcaoregon.com] Sent:Wednesday, September 06, 2017 11:43 AM To:Wolff,John F. <John.Wolff@tvfr.com> Cc: 'Saj Jivanjee'<saj@icaoregon.com>; 'Tim McNamara' <tim@tim-mcnamara.com> Subject: FW: 217 Self Storage- Phase II John, Good morning, I am following up on the meeting with City of Tigard last week and the e-mail I sent regarding relocating the fire vehicle access road and adding a roof access ladder. I am attaching a new drawing showing the potential location for a roof access ladder along with our proposed emergency vehicle access from Warner Ave onto Hall Blvd. Could you please have a look at this and let me know if this meets TVFR criteria or not. We would like to get to a solution and your approval as soon as possible so we can move forward with getting ODOT looking at the emergency vehicle access onto Hall, the owner of the apartment on board with the lot-line adjustment, along with the surveyor, civil and landscape architect. Many thanks, Lars Johansson Jivanjee Circosta Architecture, LLP Partin Hill Architects, LLC 209 NE Lincoln St., Suite A Hillsboro, OR 97124 503-640-1216 ext. 2 From: Lars Johansson [mailto:lars@jcaoregon.com] Sent: Thursday, August 31, 2017 8:43 PM To: 'Wolff, John F.' Cc: 'Saj Jivanjee'; 'Tim McNamara' Subject: 217 Self Storage - Phase II John, First off, thank you for attending the meeting with us at the City of Tigard on such short notice. We believe your input was very instrumental in allowing us to find a path forward with our project.We still need your help and input in navigating the criteria TVFR has so the solution we are proposing meets both TVFR's requirements and the City of Tigard's. As was suggested during the meeting we are proposing to connect the emergency vehicle access from Warner Ave to Hall Blvd. It is my understanding that in doing so we can get rid of the access between our building and the apartment building and then provide roof access from the outside. Please see attached drawing. I did not indicate a roof access area on the drawing because I am not sure of where to locate that and what the other requirements would be. Could you please let me know where I can look up the required information and a confirmation that I am on the right track? Most sincerely, Lars Johansson Jivanjee Circosta Architecture, LLP Partin Hill Architects, LLC 209 NE Lincoln St., Suite A Hillsboro, OR 97124 503-640-1216 ext. 2 3 :.»»»r».u»e.xr»»a»»« «x.f.»xtu.a»s»x»«»uu»»»rx»»uaru.. «»»ar»r.a»x»»u»«»a»xu»»xu..xx«x uuuuuuuaux»xau«w»uxruraruaxwuuxrfxsiu.xxx.nuu»»uu.su.uu...xrutuax«.«u«rxuxu«uxwuuuuue»xaauNtbwlawt+wlrlsNtuNttlua... L. Dan Nelson From: Wolff,John F. <John.Wolff@tvfr.com> Sent: Tuesday, August 22, 2017 4:07 PM To: 'Lars Johansson' Cc: Saj Jivanjee; 'Tim McNamara'; Mark VanDomelen; Dan Nelson Subject: RE: 217 Self Storage - Phase II Attachments: Guidelines for Alternate Materials and Methods Requests.pdf Lars, I can appreciate your situation with meeting City requirements; however, the code dictates that fire department access roads shall be within 150 feet of all portions of the exterior wall of the first story of the building. Therefore, with the elimination of the emergency access road you would be in violation of the fire code as there would not be adequate access to the rear of the building. Neither of the options shown resolve this issue. When considering what constitutes a second access, a neighboring property cannot be considered without the benefit of a perpetual easement agreement stating that the access will not be terminated. In option #2 it appears you are showing access to Hall Blvd. If this was the case then that could be your second access? I'm sorry I don't have a solution to offer you other than to reduce the size of the building to accommodate fire access. The options you have presented do not meet the fire code. In summary; The way the plans are currently being presented, two accesses are required, access is required to the rear of the building and based on the length of the access a turnaround is required. You can submit an application for an alternative materials or methods request in lieu of meeting a code requirement for our review. I have attached a guide for that process for your convenience. John Wolff—IAAI -CFI Deputy Fire Marshal Tualatin Valley Fire and Rescue 503-259-1504 From: Lars Johansson [mailto:lars@icaoregon.com] Sent:Thursday,August 17, 2017 5:44 PM To: Wolff,John F.<John.Wolff@tvfr.com> Cc:Saj Jivanjee<sai@jcaoregon.com>; 'Tim McNamara' <tim@tim-mcnamara.com> Subject: 217 Self Storage- Phase II 1 John, Good afternoon, a little while ago you had provided us with a service provider letter for a new project we are proposing to put up, a 3 story self storage facility off Warner Rd. in Tigard by hwy 217 and hwy 99.Working with the city recently we have come across an issue regarding the emergency vehicle access road and our landscape buffer that we need to resolve and would very much appreciate your help and input. In the city's staff report under conditions of approval they told us that along the northern property line we have to have a 20-ft buffer between the building and property line where we face an existing apartment building but we had designed a 10-ft buffer under their buffer option D-3 with the emergency access road along the other side of the property line (see the original layout in the Emergency Vehicle Access Options.pdf as I have attached a few drawings to help illustrate the condition and a few of options that I thought might be a way to resolve things). To get a 20-ft buffer we have to remove the emergency access road between the buildings and horse trade a lot line adjustment or some type of landscape easement with the existing apartment building owner.According to your service provider letter item 1 under the Fire Apparatus Access we need to have two separate means of fire apparatus access since our building is 3 stories and slightly over 30-ft in height. One possible way to look at it is that we get rid of our originally proposed emergency vehicle access road all together as we already have two if you count 1) being our 36-ft wide driveway to the south between our existing self storage and our proposed new one,2)the existing apartment to the north provides a driveway that leads up to our proposed building.The other options to consider are proposed in the attached pdf as option 1 and 2. Please note that our proposed self storage building has 3 fire hydrants within close proximity. I hope I have presented our situation clearly. Please have a look and let me know what you think Sincerely, Lars Johansson Jivanjee Circosta Architecture, LLP Partin Hill Architects, LLC 209 NE Lincoln St., Suite A Hillsboro, OR 97124 503-640-1216 ext. 2 2 Dan Nelson From: Mark VanDomelen Sent: Wednesday, October 25, 2017 5:04 PM To: Dan Nelson Cc: Albert Shields; Gary Pagenstecher Subject: FW: Fwd: Send data from MFP11763963 10/20/2017 15:28 Attachments: pla legal and map.pdf; easement exhibit maps.pdf Dan, can you please work with Albert to let him know where we are at on building review? Thanks, Mark VanDomelen Building Official City of Tigard markv@tigard-or.gov (503)718-2448 From: Gary Pagenstecher Sent: Wednesday, October 25, 2017 4:53 PM To: Mark VanDomelen; Albert Shields Subject: FW: Fwd: Send data from MFP11763963 10/20/2017 15:28 Will you please look at Saj's concerns below regarding building permits and get back to me on status, or attend our meeting tomorrow at 8:30 in CR3. Thanks, Gary From: Saj Jivanjee [mailto:saj@jcaoregon.com] Sent: Wednesday, October 25, 2017 10:46 AM To: Gary Pagenstecher; Tom McGuire; David M. Brown; Lars Johansson; Tim McNamara; Jared Langenhuizen; Jeffrey Long; Marty Wine Subject: Fwd: Fwd: Send data from MFP11763963 10/20/2017 15:28 Gary, In order to have constructive meeting on Thursday we need to explain that there are few steps for us to complete the land use requirement and we'll need city cooperation in these matter and expedited as soon as possible. 1. Please see attached lot line adjustment and all cross easement legal surveys to ensure fire lane/access that will be granted to all parties concern. We need a confirmation from the City these legal description are acceptable to the city. 2. We need to complete legal agreements which needs to be approved by all parties and lenders and recorded. 3. We need to compensate the adjacent property owner for purchase of his property. 4. We need to complete landscaping plan. 5. We need to finalize civil drawings. 6. We need to know what progress has been made by city to complete rest of our building permit drawings. i For the record, I still want to state that while we are doing this to expedite our land-use approval base on staff interpretation of our land use approval, I as an architect and planner for the project we had other option for landscaping within the city code and still meet city requirement. Due to time constraint and cost are force to go through this expensive process. We hope to have clear guideline for our building permit approval and timeline after our meeting on Thursday. Thanks for your cooperation. Saj Also see the pdf file containing the exhibit maps for the easements, I inadvertently had Al's stamp on them instead of mine. (I am still getting use to his retirement after 10 months) Caswell/Hertel Surveyors, Inc 6150 SW 124th Avenue Beaverton, Oregon 97008 Office: 503-644-3179 Fax: 503-644-3190 Original Message Subject: Fwd: Send data from MFP11763963 10/20/2017 15:28 From: Saj Jivanjee <saj@jcaoregon.com> Date: Fri, October 20, 2017 3:33 pm To: infochsurveyinc.com Ben, Please change the lot line adjustment as per my attached drawing. Your help is much appreciated. City has agreed as per my drawing. Call me at 503 970 0326. The neighbor is willing to transfer the property to me. Saj Forwarded message From: <scanner@partinhill.com> Date: Fri, Oct 20, 2017 at 3:28 PM Subject: Send data from MFP11763963 10/20/2017 15:28 To: Saj Jivanjee <sajjcaoregon.com> Scanned from MFP11763963 Date:10/20/2017 15:28 Pages:4 Resolution:200x200 DPI 2 ii}exltx{f.HxAuf43A{Gfti{tl1fi11lftNF{/(t/pxtytk{i{{y{gtFFltdiilfiFFfiN]JtkY 3{H4tf}tt&Flt{ialf{it{#lFFx It trexsli{4Ff3>t -!a#ftflFxYlYf{UtEt{lW — 1 October 26, 2017 RE: 217 STORAGE BUILDING Project Information Building Permit: BUP2017-00187 Construction Type: 2B Address: 11640 SW Warner Occupancy Type: S-1 Area: 68139 Sq Ft Stories: 3 Name: 217 Self Storage Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2014 edition; 2014 Oregon Fire Code. Please respond to conditions below. 1) Stairway doors are to be 1 hour rated with no more than 100 sq in view panel. Table 716.5 2) Provide insulation Corn Check document. 3) Two male and two female restrooms are required as per Chapter 29 OSSC. 4) Complete structural plan review. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718-2436 dann@tigard-or.gov October 26, 2017 RE: 217 STORAGE BUILDING Project Information Building Permit: SIT2017-00024 Construction Type: 2B Address: 11640 SW Warner Occupancy Type: S-1 Area: 68139 Sq Ft Stories: 3 Name: 217 Self Storage Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2014 edition; 2014 Oregon Fire Code. Please respond to conditions below. 1) Please apply for a FPS permit for underground fire piping and location of fire hydrants. 2) Please apply for a site utilities plumbing permit. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718-2436 dann@tigard-or.gov September 11, 2017 John Wolff, Deputy Fire Marshal II Tualatin Valley Fire and Rescue Command& Business Operations Center and North Operating Center 11945 SW 70`h Ave. Tigard, Oregon 97223-9196 Subject: AM&M Proposal for 217 Self-Storage Phase II AM&M Service Request Number 1 Staff Report to the Hearings Officer for the City of Tigard,Oregon,Land-Use Permits CUP2016-00005,ADJ 2016-00120,ADJ 2016-00121,LLA 2016-00017 Dear Mr.Wolff: In accordance with Section 104.9 of the 2010 Oregon Fire Code,we are requesting an alternate method of fire protection for the proposed project detailed below. This is in response to item 5 in the Conditions of Approval of the Staff Report to the Hearings Officer for the City of Tigard, Oregon dated May 26, 2017 for the self-storage facility submitted under land-use permits CUP2016-00005,ADJ 2016-00120,ADJ 2016-00121, LLA 2016-00017 (CUP: Conditional Use Permit,AD):Adjustment, LLA: Lot Line Adjustment). Project Information: Project: 217 Self-Storage Phase II 11600, 11630, 11660 SW Hall Blvd, 11708 SW Warner Ave. Tigard,OR 97223 Owner: Henry Louie 13665 SW 130`h Pl. Tigard, OR 97223 Contact Info: Saj Jivanjee (503)-970-02 36 Proposal: The proposed self-storage facility is located in the City of Tigard off SW Warner Ave. and SW Hall Blvd. The new building is a total of 68,139 sf,3 stories and fully sprinkled.There are two existing fire hydrants on property both within 50 feet of our proposed building and one fire hydrant located on the east side of Hall Blvd approximately 260 feet away.The new building is using an existing entrance off SW Warner as the only site entrance and will be shared with an existing self-storage facility.The site entry starts at 30 feet wide then opens up to 36 feet wide and goes right up to the edge of the new building along the southern elevation.The total length of the drive is approximately 125 feet long.All but two parking spaces are within the building.The other two are at the far end of the drive.This grants fire apparatus access to the southern elevation of the building.The southern and most of the western elevation are the only elevations that are approximately 32 feet in height at the eaves. The north and east elevations are below 30 feet in height at the eaves. It is our understanding that our project requires a secondary fire apparatus access road per 2014 OFC Section D104.1 The original project proposal had included an approved secondary fire apparatus access road and turnaround outside of our property that ran along the east and then angled up along the north.This made it so both access roads were within 150 feet of all portions of the exterior wall of the first story. Item 5 in the Conditions of Approval in the Staff Report to the Hearings Officer for the City of Tigard, Oregon dated May 26, 2017 states that we are required to have a 20 foot buffer instead of the 10 foot buffer originally proposed.Due to the requirements and configuration of our proposed building and the existing site conditions of both our property and the adjacent property there will not be enough room to physically accommodate a 20 foot buffer and a 20 foot fire apparatus access road. The distance between our proposed building and the existing apartment building on the adjacent property is 37 feet total. We will not be able to provide access within 150 feet of all portions of the building and we will not have a vehicle turn-a-round. We would like to propose the following alternate methods and materials: 1. Construct a 20 foot wide fire apparatus access road that has a continuous connection from SW Warner to SW Hall with a Knox Box and a gate at both ends. 2. Add a roof ladder access on the north exterior elevation of the building. Justification: The 20 foot wide secondary fire apparatus access road will be continuous between SW Warner and SW Hall which, if needed,will allow for safer and easier mobility of the emergency vehicles responding to an emergency call at our location. It will provide them a dedicated place to stage equipment and personnel and allow the vehicles and to be able to pull in and out in one direction without need to turn around. The roof access ladder will allow for fire fighters to have a secondary access to and from the roof opposite the main fire apparatus access road providing better safety. Additional Comments: We appreciate your consideration of this proposal.Should you find 1:hat the proposed items provide an equivalent level of safety and protection to that prescribed in the OFC,we will submit revised site plan and elevations. If you have any questions regarding this AM&M proposal or our project in general, please do not hesitate to contact me at 503-970-0326. Sincerely, Saj Jlvanjee Owner/Principle Jivanjee Architect, PC TUALATIN VALLEY FIRE b RESCLE APPE^VED.,• C0: ,;TONALLY APPROVED Q APPROVAL OF PLANS IS NOT AN APPROVAL OF OMISSIONS OR OVERSIGHTS. SE ► LETTER t1 `� R 9-1ct-/r7 DATE