Loading...
Permit 411 AN#iU44.1411411.11.11iRLN!.Wittiii.thlsiWN4lYaiNN1tLL4:Wt4taii.wtMn:ui4le.tNA41,411HN4#tiakiiAi .44.44..41104,Ns#le,txt- lWti.11+44, arrlt.t aaetza .t . .r a asa lad+ 4AiHlivesrr kre..r.aa r. ee kr,t .... ea ,,. CITY OF TIGARD BUILDING PERMIT • I COMMUNITY DEVELOPMENT BUILDING BUP2022-00113 Date Issued: 5/9/2022 T l G A It D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S112ACO2400 Jurisdiction: Tigard Site address: 14725 SW 72ND AVE Project: Eastern Western Corp Subdivision: None Lot: None Project Description: Demolishing the existing building leaving slab on grade and retaining walls. Contractor: ESSEX GENERAL CONSTRUCTION INC Owner: EASTERN WESTERN CORP 17400 SW 65TH AVENUE#100 PO BOX 3228 LAKE OSWEGO, OR 54531 PORTLAND, OR 97208 PHONE: 503-747-0092 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 04/29/2022 $767.10 Occupancy Grp: B Occupancy Load: 0 Demolition Plan Review 04/26/2022 $498.62 Dwelling Units: 0 Misc Administration Fee 04/29/2022 $2.75 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 04/29/2022 $110.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 04/29/2022 $12.00 Value: $55,000 11x17) Info Process/Archiving-Sm$0.50(up to 04/29/2022 $6.00 11x17) Floor Areas: Erosion Control w/Development 04/29/2022 $161.40 Total Area: 0 12%State Surcharge-Building 04/29/2022 $92.05 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,649.92 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors. Smoke Detectors Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code. State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800 32.2344. Issued By: Hotly Vaw Pe, Wee Permittee Signatur€- . ._1 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial RECEIVED FOR OFFICE U SE ONLY /`City of Tigard RDate/B d Gf/�t�» /71 /,664 /�622- 6))(/ 3 III . a. 13125 SW Hall Blvd.,Tigard,OR 97223 APR 2 6 2022 Plan Review Phone: 503-718-2439 Fax: 503-598-1960 Date/By: LI - V.Z Z` Related Permit: T I GARD Inspection Line: 503-639-4175 Ypr/��yy, D to ReadyBy: / runs: 1i3 See Page 2 for m Internet: www.tigard-or.gov VI TY OF IIla„nV otified/Method:�`/ Supplemental Information BUILDING DIVISION 111 --- TYPE OF WORK REQ D DATA:1-AND 2-FAMILY DWELLING 1 ❑New constructionPermit fees*are based on the value of the work performed. 11 El Demolition Indicate the value(rounded to the nearest dollar)of all El Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling El Commercial/industrial Valuation: $ ❑Accessory building El Multi-family Number of bedrooms: El Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: ,,.i 23 ..;,‘A, ;2,nd Aye New dwelling area: square feet City/State/ZIP: Portland, OR 97224 E44t,f,e.r.., c..,e Y.s Cs,r p Garage/carport area: square feet Suite/bldg./apt.#: Project name:#01L5 J n a 7ve emo Covered porch area: square feet Cross street/directions to job site: Deck area: square feet SW 72nd Ave, between SW Bonita Rd and SW Cardinal Ln Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot#: 2400 Permit fees*are based on the value of the work performed. Tax map/parcel#: 2S 1 I Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. i HIS PRUL j_ S TO DEMOLISH THE EXISTING bj LL::'W LL,vViNG i He Valuation: $ 55,000 SLAB ON GRADE AND RETAINING WALLS. Existing building area: 8,75 I square feet New building area: N/A square feet ❑ PROPERTY OWNER El TENANT Number of stories: N/A Name: astern Western Corp Type of construction: N/A Address: 833 SW 1 I th Ave #8 15 Occupancy groups: • City/State/ZIP:Portland, OR 97205 Existing: B Phone:( n;)1 {n q Fax: ( ) New: N/A APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule Business name: t__:HA Inc Structural plan review fee(or deposit): Contact name: Kelly Douglass FLS plan review fee(if applicable): Address: 15895 SW 72nd Ave, #200 Total fees due upon application: City/State/ZIP: Portland, OR 97224 Phone:( 503)226 1285 Fax::( ) Amount received: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: kellyd@cidainc.com Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: Essex Genera d Construction Inc. Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 17400 SW 65TH Ave #100 Solar Installation Specialty Code checklist. City/State/ZIP:Lake Oswego, OR 97035 Permit fee(includes plan review $180.00 and administrative fees): Phone:( 503)747-0092 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.:54531 /` ///d2-2._ Total fee due upon application: $201.60 Authorized signature: LI/(t I 1 } This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Kelly Douglass Date: 04.2 I.22 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT !pi . .. Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans,details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire &Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 w. City of Tigard 1111 COMMUNITY DEVELOPMENT DEPARTMENT e TIGARI! Building Permit Review - Commercial - No Land Use s Building Permit #: 6a 40 2- O //3 Site Address: 141'Z5 5W' r/ Suite/Bldg#: Project Name: l L1 - S(A) -Z'n° Pe a ) 1i l (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review i 1 ( �, ,l Proposal: a Q Wl(7'1 Vl -2-�( ( 1. 0 10 U I l if ik.V I�Al 5101 00 y i �.1 .� vN - o V'i 'vt)ct��S Existing Business Activity: J r eiA r vIvAkRA--/uu (to ksa, SUUkk' Proposed Business Activity: oz Verify site address/suite# exists and active in permit system. TX River Terrace Neighborhood: ❑ Yes iJ No Zoning: - P ,ia Permitted Use: Ef Yes E No E Spec Space ,® Confirm no land use required. 44gss License: , Exists: ❑ Yes ❑ No,applicant was rovided a business license application Notes: cX Ul S( '-Iw �,(,� as (nA15 vu -1- ' tti+- on s I(e e'- dlfrtito II 1`1 if) Approved by Planning: e561AU12t44 ) iyq Date: 11/7s1j lig 2-2._ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: E Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: WA/12-2 Site Plans: # Building Plans: # 4 Building Permit#: Er—Enter building permit#above. Workflow Routing: 2—Planning E/L,...P.-ermit Coordinator D—Ektilding Workflow Sign-off: 0'Sign-off for Planning(include notes from planning review) Route Application Documents: /E'—Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: / By Permit Technician: Date: —! /�,bi, I I:\Building\Forms\BldgPermitRvw_COM NoLandUse_I 11819.docx Permit Coordinator Review Ply Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes i7r/N/A Tigard Trans SDC: ❑ Yes Al N/A Parks SDC: ❑ Yes N/A OK to Issue Permit Approved by Permit Coordinator: Date: 4 J 1126ZZ I:\Building\Forms\BldgPermitRvw_COM NoLandUse_111819.docx