Loading...
Report . -- - 1., OFFICE COPY IIupao3I- o0 a36 COMcheck Software Version 4.1.5.3 08°3 Sviev Z4 ST 4/11*rilfEnvelope Compliance Certificate RECEIVED SEP 23 2021 CITY OF TIGARD Project Information BUILDING DIVISION Energy Code: 90.1 (2016)Standard Project Title: Tigard Senior Housing Location: Tigard,Oregon ` Climate Zone: 4c Project Type: New Construction Vertical Glazing/Wall Area: 30% Performance Sim.Specs: EnergyPlus 8.1.0.009(EPW: USA_OR_Portlandintl.AP.726980_TMY3.epw) Construction Site: Owner/Agent: Designer/Contractor: 8803 SW OMARA ST Destin Ferdun John Cline TIGARD, OR 97223 Northwest Housing Alternatives SERA Architects 2316 SE Willard St 338 NW 5th Avenue Milwaukie,OR 97222 Portland, OR 97209 (503) 654-1007 503-445-7372 ferdun@nwhousing.org johnc@seradesign.com Building Area Floor Area 1-Residential Units(Multifamily) : Residential 44687 2-Other(Multifamily) : Nonresidential 2423 Envelope Assemblies 1 Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factor(e) Perimeter Roof 1: Insulation Entirely Above Deck,[Bldg.Use 1 -Residential Units] 11600 33.6 0.029 0.032 NORTH North Wall:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Residential Units] 2483 21.0 0.0 0.062 0.064 { Window Fixed:Wood Frame:Fixed,Perf.Specs.:Product ID VPI 226 --- --- 0.260 0.310 Endurance,SHGC 0.22,VT 0.51,[Bldg.Use 1 -Residential Units](b) Window Operable:Wood Frame:Operable,Perf.Specs.:Product ID VPI 92 --- --- 0.270 0.310 Endurance,SHGC 0.18,VT 0.51,[Bldg.Use 1 -Residential Units](b) North Louvers:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Residential Units] 4 0.0 0.0 0.292 0.064 North Concrete:Solid Concrete:8"Thickness,Normal Density,Furring: 173 --- 1.1 0.343 0.090 None,[Bldg.Use 1 -Residential Units] North Metal Wrap:Wood-Framed, 16"o.c.,.[Bldg.Use 1 -Residential 45 10.0 0.0 0.101 0.064 Units] EAST East Wall:Wood-Framed,16"o.c.,[Bldg.Use 1 -Residential Units] 6183 21.0 0.0 0.062 0.064 Window:Wood Frame:Fixed,Pert.Specs.:Product ID VPI Endurance, 1275 --- --- 0.260 0.310 SHGC 0.22,VT 0.51,[Bldg.Use 1 -Residential Units](b) Window:Wood Frame:Operable,Perf.Specs.:Product ID VPI 723 --- --- 0.270 0.310 Endurance,SHGC 0.18,VT 0.51,[Bldg.Use 1 -Residential Units](b) West Louvers:Wood-Framed,16"o.c.,[Bldg.Use 1 -Residential Units] 40 0.0 0.0 0.292 0.064 West Concrete:Solid Concrete:8"Thickness,Normal Density, Furring: 56 --- 1.1 0.343 0.090 None,[Bldg.Use 1 -Residential Units] West Metal Wrap:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Residential 128 10.0 0.0 0.101 0.064 Units] Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 1 of 12 Housing.cck • Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factor(a) Perimeter SOUTH South Wall:Wood-Framed,16"o.c.,[Bldg.Use 1 -Residential Units] 1789 21.0 0.0 0.062 0.064 Window:Wood Frame:Fixed,Perf.Specs.:Product ID VPI Endurance, 258 --- --- 0.260 0.310 SHGC 0.22,VT 0.51,[Bldg.Use 1 -Residential Units](b) Window:Wood Frame:Operable, Perf.Specs.:Product ID VPI 103 --- --- 0.270 0.310 Endurance,SHGC 0.18,VT 0.51,[Bldg.Use 1 -Residential Units](b) Window-Fiberglass Storefront:Wood Frame:Fixed,Perf.Specs.: 167 --- --- 0.340 0.310 Product ID Fiberglass Storefront System,SHGC 0.27,VT 0.64,[Bldg. Use 1 -Residential Units](b) Door,Hollow Metal:Insulated Metal,Swinging,[Bldg.Use 1 - 24 --- --- 0.370 0.370 Residential Units] South Louver:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Residential Units] 2 0.0 0.0 0.292 0.064 South Metal Wrap:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Residential 43 10.0 0.0 0.101 0.064 Units] South Wall Non-Residential:Wood-Framed,16"o.c.,[Bldg.Use 2- 374 0.0 0.0 0.292 0.064 Other] Window-Fiberglass Storefront:Wood Frame:Fixed,Perf.Specs.: 167 --- --- 0.340 0.310 Product ID Fiberglass Storefront System,SHGC 0.27,VT 0.64,[Bldg. Use 2-Other](b) South Wall Non-Residential-Louver:Wood-Framed, 16"o.c.,[Bldg. 2 0.0 0.0 0.292 0.064 Use 2-Other] WEST West Wall:Wood-Framed,16"o.c.,[Bldg.Use 1 -Residential Units] 5408 21.0 0.0 0.062 0.064 Window:Wood Frame:Fixed,Perf.Specs.:Product ID VPI Endurance, 1045 --- --- 0.260 0.310 SHGC 0.22,VT 0.51,[Bldg.Use 1 -Residential Units](b) Window:Wood Frame:Operable, Perf.Specs.:Product ID VPI 630 --- --- 0.270 0.310 Endurance,SHGC 0.18,VT 0.51,[Bldg.Use 1 -Residential Units](b) Window-Fiberglass Storefront:Wood Frame:Fixed,Perf.Specs.: 45 --- --- 0.340 0.310 Product ID Fiberglass Storefront System,SHGC 0.27,VT 0.64,[Bldg. Use 1 -Residential Units](b) Door,Hollow Metal:Insulated Metal,Swinging,[Bldg. Use 1 - 47 --- --- 0.370 0.370 Residential Units] Door,Other(Overhead):Insulated Metal,Non-Swinging,[Bldg.Use 1 - 86 --- --- 0.102 0.310 Residential Units] West Louvers:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Residential Units] 41 0.0 0.0 0.292 0.064 West Concrete:Solid Concrete:8"Thickness,Normal Density,Furring: 53 --- 1.1 0.343 0.090 None,[Bldg.Use 1 -Residential Units] West Metal Wrap:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Residential 114 10.0 0.0 0.101 0.064 Units] West Wall Non-Residential:Wood-Framed,16"o.c.,[Bldg.Use 2- 508 0.0 0.0 0.292 0.064 Other] Window-Fiberglass Storefront:Wood Frame:Fixed,Perf.Specs.: 304 --- --- 0.340 0.310 Product ID Fiberglass Storefront System,SHGC 0.27,VT 0.64,[Bldg. Use 2-Other](b) Door,Alum Storefront: Insulated Metal,Swinging,[Bldg.Use 2-Other] 67 --- --- 0.450 0.370 (a) Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Envelope PASSES: Design 1%better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.3 and to comply with any applicable Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 2 of 12 Housing.cck mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 3 of 12 Housing.cck COMcheck Software Version 4.1.5.3 11(111 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans and/or specifications provide all ❑Complies 5.4.3.1.1, information with which compliance ❑Does Not 5.7 can be determined for the building WRITenvelope and document where pilot Observable exceptions to the standard are ❑Not Applicable claimed. 4.2.2, Plans, specifications, and/or ❑Complies 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be 8.7 determined for the electrical systems ❑Not Observable [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 5.5.4.2.3 In buildings > 2,500 ft2, any enclosed ❑Complies [PR7]2 spaces directly under a roof with ❑Does Not ceiling heights > 15 ft. and used as an office, lobby, atrium, concourse, ❑Not Observable corridor, storage(including ❑Not Applicable nonrefrigerated warehouse), gymnasium,fitness/exercise area, playing area, gymnasium seating area,convention exhibit/event space, courtroom, automotive service,fire station engine room, manufacturing corridor/transition and bay areas, retail, library reading and stack areas, distribution/sorting area, transportation baggage and seating areas, or workshop,the following requirements apply:The daylight zone under skylights is >= half the floor area and (a)the skylight area to daylight zone is >= 3 percent with a skylight VT>= 0.40 or(b)the minimum skylight effective aperture >= 1 percent.The skylights have a measured haze value > 90 percent. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 4 of 12 Housing.cck Section Footing /Foundation Plans Verified Field Verified # Inspection Value I Value Complies? Comments/Assumptions & Req.ID i 4.2.4 Installed below-grade wall R- R- ❑Complies See the Envelope Assemblies [FO1]2 insulation type and R-value ❑Does Not table for values. consistent with insulation specifications reported in plans []Not Observable and COMcheck reports. ❑Not Applicable 1 4.2.4 Installed slab-on-grade insulation R- R- ❑Complies See the Envelope Assemblies f [FO3]2 type and R-value consistent with ❑ Unheated ❑ Unheated ❑Does Not table for values. insulation specifications reported ❑ Heated ❑ Heated ❑Not Observable in plans and COMcheck reports. ❑Not Applicable 5.5.3.5 Slab edge insulation __ft ft ❑Complies See the Envelope Assemblies [FO5]2 depth/length. ❑Does Not table for values. ii ❑Not Observable ❑Not Applicable 5.8.1.7 Exterior insulation protected ❑Complies [FO6]1 against damage, sunlight, ❑Does Not moisture, wind, landscaping and equipment maintenance Not Observable activities. ❑Not Applicable 5.8.1.7.3 Insulation in contact with the �'� ❑Complies [FO7]1 ground has <=0.3%water ❑Does Not absorption rate per ASTM C272. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: i 1 1 1 f I I I 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 5 of 12 i Housing.cck I 1 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 5.4.3.2 Factory-built and site-assembled ❑Complies [FR1]3 fenestration and doors are ❑Does Not labeled or certified as meeting air ❑Not Observable leakage requirements. a , �'� ❑Not Applicable 5.4.3.4 Vestibules are installed where ❑Complies [FR4]3 building entrances separate �� x'` ❑Does Not conditioned space from the exterior,and meet exterior ❑Not Observable envelope requirements. Doors ❑Not Applicable have self-closing devices, and are >=7 ft apart(>= 16 ft apart for adjoinging floor area >= 40000 sq.ft.). Vestibule floor area <=7 50 sq.ft. or 2 percent of the adjoining conditioned floor area. 5.5.4.3a Vertical fenestration U-Factor. U- U- ❑Complies See the Envelope Assemblies [FR8]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.3b Skylight fenestration U-Factor. U- U- ❑Complies See the Envelope Assemblies [FR9]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.4.1 Vertical fenestration SHGC value. SHGC: SHGC: ❑Complies See the Envelope Assemblies [FR10]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.4.2 Skylight SHGC value. SHGC: SHGC: ❑Complies See the Envelope Assemblies [FR11]1 ElDoes Not table for values. [Not Observable ❑Not Applicable 5.8.2.1, Fenestration products rated (U ❑Complies 5.8.2.3, factor, SHGC, and VT) in ❑Does Not 5.8.2.4, accordance with NFRC or energy 5.8.2.5 code defaults are used. ['Not Observable IFR12]2 ❑Not Applicable 5.8.2.2 Fenestration and door products ❑Complies [FR13]1 are labeled,or a signed and ❑Does Not dated certificate listing the U- factor, SHGC,VT, and air leakage ['Not Observable rate has been provided by the ❑Not Applicable manufacturer. 5.5.3.6 U-factor of opaque doors U- U- ❑Complies See the Envelope Assemblies [FR14]2 associated with the building ❑ Swinging ❑ Swinging ❑Does Not table for values. thermal envelope meets ❑ Nonswinging ❑ Nonswinging ❑Not Observable requirements. ❑Not Applicable 5.4.3.1 Continuous air barrier is ❑Complies [FR15]1 wrapped,sealed, caulked, ❑Does Not gasketed, and/or taped in an approved manner, except in ❑Not Observable semiheated spaces in climate ❑Not Applicable zones 1-6. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2, Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 6 of 12 Housing.cck r y 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 7 of 12 Housing.cck Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID1 8.4.2 At least 50%of all 125 volt 15-and ❑Complies [EL10]2 20-Amp receptacles are controlled by ❑Does Not an automatic control device. ❑Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ❑Not Observable buildings with a digital control system ❑Not Applicable the energy use is transmitted to to control system and displayed graphically. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 8 of 12 Housing.cck Sections I Plans Verified Field Verified # Insulation Inspection Complies? , Comments/Assumptions &Req.ID Value Value i 4.2.4 Installed roof insulation type and R- R- EComplies See the Envelope Assemblies [IN2]1 R-value consistent with insulation ❑ Above deck ❑ Above deck ❑Does Not table for values. specifications reported in plans ❑ Metal ❑ Metal ❑Not Observable and COMcheck reports. For some Attic ceiling systems,verification may ❑ Attic ❑ ENot Applicable need to occur during Framing Inspection. 5.8.1.2, Roof insulation installed per ❑Complies 5.8.1.3 manufacturer's instructions. ❑Does Not [IN3]1 Blown or poured loose-fill insulation is installed only where ❑Not Observable the ceiling slope is <= 3:12. Observable_ Applicable 4.2.4 Installed above-grade wall R- R- ❑Complies See the Envelope Assemblies [IN6]1 insulation type and R-value ❑ Mass ❑ Mass ❑Does Not table for values. consistent with insulation ❑ Metal ❑ Metal ['Not Observable specifications reported in plans and COMcheck reports. ❑ Steel ❑ Steel ❑Not Applicable ❑ Wood ❑ Wood 5.8.1.2 Above-grade wall insulation ❑Complies [IN7]1 installed per manufacturer's ❑Does Not instructions. ['Not Observable ❑Not Applicable 4.2.4 Installed floor insulation type and R- R- ❑Complies See the Envelope Assemblies [IN8]2 R-value consistent with insulation ❑ Mass ❑ Mass ❑Does Not table for values. specifications reported in plans ❑ Steel ❑ Steel ❑Not Observable and COMcheck reports. ❑ Wood ❑ Wood ❑Not Applicable 5.8.1.1 Building envelope insulation is ❑Complies [IN10]2 labeled with R-value or insulation ❑Does Not l certificate has been provided listing R-value and other relevant ❑Not Observable 1 data. ❑Not Applicable I 5.8.1.9 Building envelope insulation ❑Complies l [IN18]2 extends over the full area of the ❑Does Not 1 component at the proposed rated i R or U value. ❑Not Observable I ❑Not Applicable 15.8.1.4 Eaves are baffled to deflect air to ❑Complies / [IN11j2 above the insulation. ❑Does Not ! ❑Not Observable ❑Not Applicable 5.8.1.5 Insulation is installed in ❑Complies [IN12]2 substantial contact with the ❑Does Not inside surface separating conditioned space from ['Not Observable unconditional space. ❑Not Applicable 5.8.1.6 Recessed equipment installed in ❑Complies [IN13]2 building envelope assemblies ❑Does Not does not compress the adjacent insulation. ❑Not Observable ❑Not Applicable 5.8.1.7.1 Attics and mechanical rooms ❑Complies [IN15]2 have insulation protected where ❑Does Not adjacent to attic or equipment 8 access. ❑Not Observable ❑Not Applicable i i 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 9 of 12 Housing.cck Section Insulation Inspection Plans Verified Field Verified & Re ID p Value Value q. Complies? Comments/Assumptions 5.8.1.7.2 Foundation vents do not interfere ❑Complies [IN16]2 with insulation. ❑Does Not ❑Not Observable ❑Not Applicable 5.8.1.8 Insulation intended to meet the ❑Complies [IN17]3 roof insulation requirements ❑Does Not cannot be installed on top of a suspended ceiling. Mark this ❑Not Observable requirement compliant if ❑Not Applicable insulation is installed accordingly. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 'Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 10 of 12 Housing.cck Section # ; Final Inspection Complies? Comments/Assumptions & Req.ID 5.4.3.3 Weatherseals installed on all loading ❑Complies [Fill' dock cargo doors in Climate Zones 4- ❑Does Not 8. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 I Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 11 of 12 Housing.cck • Project Title: Tigard Senior Housing Report date: 09/15/21 Data filename: P:\Architecture\1903070\C-Design Coordination\Jurisdictional\ComCheck\Tigard Senior Page 12 of 12 Housing.cck COMcheck Software Version COMcheckWeb inft Interior Lighting Compliance CertifiRfe EIV ED SEP 2 3 2021 Project Information CITY OF TIGARD Energy Code: 90.1 (2016) Standard BUILDING DIVISION Project Title: Tigard Senior Housing Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 8803 SW OMARA ST TIGARD, OR 97223 Ailowea interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts /ft2 Watts 1-Senior Housing (Multifamily) 47679 0.68 32422 Total Allowed Watts = 32422 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp /Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. 1-Senior Housing (Multifamily) LED: 51: LED Downlight: LED Other Fixture Unit 16W: 1 426 16 6603 LED: 54: LED Linear: LED Linear 11W: 1 3 11 32 LED: 55: LED Linear: LED Linear 11W: 1 3 11 32 LED: 56: LED Linear: LED Other Fixture Unit 50W: 1 48 50 2400 LED: R1: LED Recessed: LED PAR 18W: 1 22 18 396 LED: R2: LED Recessed: LED MR 2W: 1 6 2 13 LED: P1: Pendant: LED Other Fixture Unit 50W: 1 6 50 300 LED: P3: Pendant: Other: 1 1 480 480 LED: Fl: LED FAN LIGHT: LED Other Fixture Unit 25W: 1 58 66 3828 LED: V1: LED Vanity: LED Other Fixture Unit 16W: 1 58 16 928 LED: V2: LED Vanity: LED Other Fixture Unit 28W: 1 4 30 120 LED: W4: LED Sconce: LED Other Fixture Unit 6.5W: 1 4 4 16 LED: X1: LED Exit Sign: LED Other Fixture Unit 6.5W: 1 21 4 84 Total Proposed Watts = 15231 ntenor Lighting PASSES: Design 53%better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Tigard Senior Housing Report date: 09/14/21 Data filename: Page 1 of 6 , COMcheck Software Version COMcheckWeb iftrif 444/111 Exterior Lighting Compliance Certificate Project Information Energy Code: 90.1 (2016) Standard Project Title: Tigard Senior Housing Project Type: New Construction Exterior Lighting Zone 2 (Residential mixed use area (LZ2)) Construction Site: Owner/Agent: Designer/Contractor: 8815 SW Omara St ' Tigard, Oregon 97223 Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts / Wattage (B X C) Parking only(Parking area) 29000 ft2 0.04 Yes 1160 Egress Sidewalk(Walkway < 10 feet wide) 700 ft of 0.5 Yes 350 (4) 3' Exterior doors (Pedestrian and vehicular entrances and exits) 12 ft of 14 Yes 168 Stairs on Driveway side (Stairway) 175 ft2 0.7 Yes 122 Total Tradable Watts (a) = 1800 Total Allowed Watts = 1800 Total Allowed Supplemental Watts(b) = 400 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description / Lamp /Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Parking only (Parking area. 29000 ft2): Tradable Wattage LED: G1, G3: LED Pole Light Fixture: LED Roadway-Parking Unit 130W: 1 7 155 1085 Egress Sidewalk (Walkway < 10 feet wide, 700 ft of walkway length): Tradable Wattage LED: W: LED Wall Pack: LED Other Fixture Unit 28W: 1 12 30 360 LED: G3: LED Pole Light Fixture: LED Roadway-Parking Unit 130W: 1 1 155 155 (4) 3' Exterior doors (Pedestrian and vehicular entrances and exits. 12 ft of door width): Tradable Wattage LED: G5: LED Post Top: LED Roadway-Parking Unit 67W: 1 4 71 284 Stairs on Driveway side (Stairway. 175 ft2): Tradable Wattage LED: G4: LED Pole Light Fixture: LED Roadway-Parking Unit 130W: 1 1 155 155 Total Tradable Proposed Watts = 2039 Exterior Lighting PASSES: Design 7% better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: Tigard Senior Housing Report date: 09/14/21 Data filename: Page 2 of 6 Name-Title Signature Date 1 Project Title: Tigard Senior Housing Report date: 09/14/21 Data filename: Page 3 of 6 (1.6 COMcheck Software Version COMcheckWeb 11 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 9.4.3, 9.7 calculations provide all information ❑Does Not [PR4]1 with which compliance can be determined for the interior lighting ❑Not Observable'. and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts, transformers and control devices. 9.7 Plans, specifications, and/or ❑Complies Requirement will be met. [PR8]1 calculations provide all information ❑Does Not with which compliance can be determined for the exterior lighting ❑Not Observable'. and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations,wattage of, bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 `Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/14/21 Data filename: Page 4 of 6 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID __ E 9.4.1.1 Automatic control requirements ❑Complies Requirement will be met. [EL1)2 prescribed in Table 9.6.1,for the ❑Does Not appropriate space type,are installed. Mandatory lighting controls(labeled ❑Not Observable as 'REQ')and optional choice controls ❑Not Applicable (labeled as 'ADD1'and 'ADD2') are implemented. 9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met. [EL2F per approved lighting plans and all ❑Does Not manual controls readily accessible and visible to occupants. [Not Observable ❑Not Applicable 9.4.1.1f Daylight areas under skylights and ❑Complies Requirement will be met. [EL13]1 roof monitors that have more than ❑Does Not 150 W combined input power for general lighting are controlled by [Not Observable photocontrols. ❑Not Applicable 9.4.1.4 Automatic lighting controls for exterior ❑Complies Requirement will be met. [EL3)z lighting installed. ❑Does Not ENot Observable ❑Not Applicable 9.4.1.4d Outdoor parking area luminaires >= EComplies Requirement will be met. [EL21]2 78W and <= 24 ft height controlled to ❑Does Not reduce wattage by 50%when area unoccupied over 15 minutes. ['Not Observable Controlled power limited to <_ ❑Not Applicable 1500W. 9.4.1.3 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and Not Observable separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/14/21 Data filename: Page 5 of 6 Section Final Inspection Complies? Comments/Assumptions & Req.ID 8.7.1 Furnished as-built drawings for ❑Complies Requirement will be met. [F116]3 electric power systems within 30 days ❑Does Not of system acceptance. ['Not Observable ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies Requirement will be met. [F117]3 systems and equipment to the ❑Does Not building owner or designated representative. Not Observable ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what LiDoes Not is shown on the approved lighting plans, demonstrating proposed watts ❑Not Observable'. are less than or equal to allowed ❑Not Applicable watts. 9.4.2 Exterior lighting power is consistent ❑Complies See the Exterior Lighting fixture schedule for values. [FI19]1 with what is shown on the approved ❑Does Not lighting plans, demonstrating proposed watts are less than or equal ❑Not Observable to allowed watts. ❑Not Applicable 9.4.4 At least 75%of all permanently ❑Complies Requirement will be met. [F120]1 installed lighting fixtures in dwelling ❑Does Not units have >= 55 Im/W efficacy or a >= 45 Im/W total luminaire efficacy. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Tigard Senior Housing Report date: 09/14/21 Data filename: Page 6 of 6