Report fTDI Chip Building
TABLE OF CONTENTS
mai
DIVISION 00 DOCUMENTS
Not Included
DIVISION 01 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 23 00 ALTERNATES City of Tigard
01 26 00 CONSTRUCTION PROCEDURES
Approved Plans
01 26 57 CHANGE ORDER PROCEDURES
01 33 00 SUBMITTAL PROCEDURES By Date
01 50 00 TEMPORARY FACILITIES
01 62 00 PRODUCTS AND SUBSTITUTIONS OFFICE COPY
01 73 29 CUTTING AND PATCHING
kafi 01 74 00 CLEANING AND WASTE MANAGEMENT
01 77 00 CLOSEOUT PROCEDURES
mok
DIVISION 02 SITE WORK
Not Included- Refer to Drawings for specifications.
DIVISION 03 CONCRETE
Not Included
kit
DIVISION 04 MASONRY
Not Included
DIVISION 05 METALS
Not Included
DIVISION 06 WOOD ,
sir
06 20 00 FINISH CARPENTRY AND MILLWORK ` '`*
el5 ,//
DIVISION 07 THERMAL AND MOISTURE PROTECTION W I,0 GO'
07 90 00 JOINT PROTECTION
fTDI Chip Bldg.
DIVISION 08 OPENINGS `
08 14 00 WOOD DOORS
08 41 00 ENTRANCES AND STOREFRONTS
08 71 00 DOOR HARDWARE
DIVISION 09 FINISHES
09 21 16 GYPSUM WALLBOARD
09 22 16 NON-STRUCTURAL METAL FRAMING
09 91 00 PAINTING
DIVISION 10 SPECIALTIES
10 80 00 TOILET ACCESSORIES
DIVISION 11 -EQUIPMTNT
Not Included
DIVISION 12 FURNISHINGS
Not Included
DIVISION 13 SPECIAL CONSTRUCTION
Not Included
DIVISION 14 CONVEYING
Not Included
DIVISION 21 FIRE SUPPRESSION
Not Included
DIVISION 22 PLUMBING
22 00 00 BASIC PLUMBING MATERIALS AND METHODS so
AND AIR-CONDITIONING (HVAC)
DIVISION 23 HEATING, VENTILATING, ( )
23 00 00 HEATING, VENTILATING, AND MR CONDITIONING
fTDI Chip Bldg.
1
weN
DIVISION 26 ELECTRICAL
26 00 00 ELECTRIC POWER DISTRIBUTION
26 50 00 LIGHTING
DIVISION 27 COMMUNICATIONS
27 00 00 COMMUNICATIONS
AIM
END OF TABLE OF CONTENTS
IMO
tOg
fTDI Chip Bldg.
DIVISION 01 -- GENERAL REQUIREMENTS
CONTENTS
01 11 00 SUMMARY OF WORK
01 23 22 ALTERNATES
IAN
01 26 00 CONSTRUCTION PROCEDURES
01 26 57 CHANGE ORDER PROCEDURES
01 33 00 SUBMITTAL PROCEDURES
01 50 00 TEMPORARY FACILITIES
01 62 00 PRODUCTS AND SUBSTITUTIONS
Mit
01 73 29 CUTTING AND PATCHING
01 74 00 CLEANING AND WASTE MANAGEMENT
01 77 00 CONTRACT CLOSEOUT
IAA
fTDI Chip Bldg. Job No. 1209-31
Div. 01
01010 -- SUMMARY OF WORK
GENERAL
1.1 SUMMARY
A. Project: fTDIC Chip owner-occupied building improvements.
B. Project summary: Interior improvements including partitions, finishes, plumbing, and lighting
demolition; new framing, plumbing, electrical, equipment, casework, finishes, glazing, minor landscaping,
and HVAC re-distribution. Alternate bid includes storefront replacement and new storefront window
system replacement.
trani C. Project requirements: Verify with Owner as required.
Existing site conditions and restrictions: Verify with Owner.
Requirements for construction schedule, and sequence of work: Coordinate with Owner.
Previous or concurrent work by Owner or others: Possible security system or other low voltage wiring by
Owner. Verify.
Pre-purchased items: See drawings, if any.
Previous asbestos or hazardous waste abatement by Owner or others: None identified.
Items provided and/or installed by the Owner: See Drawings, if any.
Items provided by Owner, installed by Contractor: See Drawings, if any.
Early occupancy by Owner: N/A.
itmo D. Obtain and pay for all permits required for the work. Submit two copies each of all permits to Owner
and to Architect.
E. Comply with all applicable building codes and rules of other governing regulatory agencies. Submit
two copies each of permits, inspection reports, and certificates of compliance to Owner and Architect.
F. Verify field dimensions before ordering fabrications or products to fit in place. Notify Architect of
existing conditions and dimensions that differ from those shown in the Drawings.
G. Unless noted otherwise, the subject of all imperative sentences in the Specifications is the Contractor.
For example, "Provide and install . . ." means "Contractor shall provide and install . . ."
END OF SECTION
fTDI Chip Bldg. Job No. 1209-31
gam
Div. 01
01 23 00 -- ALTERNATES
PART 1 -- GENERAL
1.1 SUMMARY
law
A. List the price for each Alternate in the Bid Form. Include the cost of modifications to other work to
accommodate each Alternate. Include related costs such as overhead and profit.
B. The Owner will determine which Alternates, if any, will be included in the Contract.
C. Alternates are listed on the Drawings.
D. Coordinate Alternates with related work to ensure that work affected by each selected Alternate is
properly executed.
PART 2 -- PRODUCTS
(Not applicable.)
PART 3 -- EXECUTION
(Not applicable)
END OF SECTION
Imo
fTDI Chip Bldg. Job No. 1209-31
Div. 01
fi
ILLY►
01 26 00 -- CONSTRUCTION PROCEDURES
PART 1 -- GENERAL
1.1 SUMMARY
A. Provide administrative coordination of all work, including trained, qualified employees and
subcontractors, and supervisory personnel.
B. Arrange and conduct preconstruction and construction meetings with design principals, consultants,
and construction trades when required by the Architect.
rr
C. Submit progress schedule, bar-chart type, updated monthly. Provide submittal schedule, coordinated
with progress schedule. Submit schedule of required tests including payment and responsibility.
D. Submit payment request procedures to Owner.
E. Provide to the Architect and post at the construction site, a phone and address list of individuals to be
contacted in case of emergency.
F. Maintain and update record drawings and specifications as work progresses. Submit a complete,
updated set of record documents upon conclusion of the work.
G. Keep all work clean and well protected from dirt, weather, theft, and damage.
END OF SECTION
{IP d
f
IP
iWr
ff4YtY,
fTDI Chip Bldg. Job No. 1209-31
Div. 01
aft 01 26 57 -- CHANGE ORDER PROCEDURES
PART 1 -- GENERAL
1.1 SUMMARY
A. Changes in the work may be required which will be authorized by a Change Order.
B. Change Orders, signed by the Owner and Architect, to authorize changes in the work will include
equivalent changes in the Contract Sum and/or Time of Completion.
Ali C. Change orders will be numbered in sequence and dated.
D. A request for estimates for possible changes is not a Change Order or a direction to proceed with the
proposed changes. That can only be authorized through a signed Change Order.
END OF SECTION
oho
rr
fTDI Chip Bldg. Job No. 1209-31
tala
Div. 01
lai 01 33 00 -- SUBMITTAL PROCEDURES
w, PART 1 -- GENERAL
1.1 SUMMARY
km
A. Provide all submittals as specified. Provide four copies where multiple copies are specified but the
number is not stated.
am
B. Provide re-submittals when submittals are not approved.
Oki C. Samples and shop drawings shall be prepared specifically for this project. Shop drawings shall include
dimensions and details, including adjacent construction and related work. Note special coordination
required. Note any deviations from requirements of the Contract Documents.
taill
D. Provide warranties as specified. Warranties shall be signed by supplier or installer responsible for
performance. Warranties shall not limit liability for negligence or non-compliance with documents.
Submit manufacturer's specifications required to prove compliance with these specifications.
wg Submit manufacturer's installation instructions.
Submit Shop Drawings as required with complete details and assembly instructions.
Submit Shop Drawings showing relationship and interface with adjacent or related work.
L
END OF SECTION
L
r
'! t
1
Oil
iiitN
W
,r
fTDI Chip Bldg. Job No. 1209-31
imst
Div. 01
4 rt
a
01 50 00 -- TEMPORARY FACILITIES
PART 1 -- GENERAL
1.1 REQUIREMENTS
A. Provide temporary services and utilities, including utility costs, for all services required for
construction.
B. Provide construction facilities, including protected storage for building materials.
AtiN C. Provide construction access road and walkways as required.
D. Provide security and protection requirements including fire extinguishers as required by the local Fire
,, Marshal, site enclosure fence, barricades, warning signs, security lighting, building enclosure, locking,
di
security, and pest control.
E. Provide personnel support facilities including field office if required by the Architect, sanitary facilities
(including portable toilet), and drinking water.
F. Install and maintain project identification sign as designed and provided by the Architect.
Wit
END OF SECTION
aim
fTDI Chip Bldg. Job No. 1209-31
Div. 01
01 62 00 -- PRODUCTS AND SUBSTITUTIONS
GENERAL
1.1 REQUIREMENTS
A. Provide products from one manufacturer for each type or kind as applicable. Provide secondary
materials as recommended by manufacturers of primary materials.
B. Provide products selected or approved equal. Products submitted for substitution shall be submitted
with acceptable documentation, and include costs of substitution including related work.
C. Conditions for substitution include:
An'or equal'phrase in the specifications.
Specified material cannot be coordinated with other work.
Specified material is not acceptable to authorities having jurisdiction.
Substantial advantage is offered Owner in terms of cost, time, or other valuable consideration.
D. Substitutions shall be submitted prior to award of contract, unless otherwise acceptable. Approval of
shop drawings, product data, or samples is not a substitution approval unless clearly presented as a
substitution at the time of submittal.
END OF SECTION
fTDI Chip Bldg. Job No. 1209-31
ido
Div. 01
01 73 29 -- CUTTING AND PATCHING
PART 1 -- GENERAL
1.1 SUMMARY
A. Cut and patch as required to complete the work for:
Visual quality as directed by the Architect and/or Owner.
Plumbing, HVAC, electrical, and communication systems.
Fire resistance ratings.
Inspection, preparation, and performance.
Cleaning. See Section 01 74 00 on Cleaning and Waste Management.
Irr B. Cut and patch with care to avoid damage to work, safety hazards, violation of warranty requirements,
building code violations, or maintenance problems.
PART 2 -- MATERIALS AND PRODUCTS
2.1 MATERIALS
A. Match existing materials with new materials so that patching work is undetectable.
mr
PART 3 -- EXECUTION
3.1 INSTALLATION
A. Inspect field conditions to identify all work required.
B. Notify Architect of work that might disrupt building operations.
C. Perform work with workmen skilled in the trades involved. Prepare sample area of each type of work
for approval. Protect adjacent work from damage and dirt.
D. For cutting work, use proper cutting tools, not chopping tools. Make neat holes. Minimize damage
to adjacent work. Check for concealed utilities and structure before cutting.
E. Make patches, seams, and joints durable and inconspicuous. Tolerances for patching shall be the
wit
same as for new work.
F. Clean work areas and areas affected by cutting and patching operations as described in Section 01 74
ma' 00 - Cleaning and Waste Management.
fTDI Chip Bldg. Job No. 1209-31
Div. 01
4d
END OF SECTION '
1
1
1
1
1
1
fTDI Chip Bldg. Job No. 1209-31 '
Div. 01
1
wr
01 74 00 -- CLEANING AND WASTE MANAGEMENT
GENERAL
Igo
1.1 SUMMARY
A. Keep the buildings and site well-organized and clean throughout the construction period.
B. Provide general clean up daily and complete weekly pickup and removal of all scrap and debris from
the site. Exception: Reusable scrap shall be stored in a neatly maintained, designated storage area.
Jima
C. Weekly pickup shall include a thorough broom-clean sweep of all interior spaces. Also, each week,
sweep paved areas on the site and public paved areas adjacent to the site. Completely remove swept dirt
and debris. Daily and weekly cleanings will not replace required clean up after the work of specific trades
such as specified herein.
D. At completion of the Work, remove from the job site all tools and equipment, surplus materials,
th" equipment, scrap and debris.
E. Exterior of building: Inspect exterior surfaces and remove all waste materials, paint droppings, spots,
stains or dirt.
F. Interior of building: Inspect interior surfaces and remove all waste materials, paint droppings, spots,
stains or dirt.
!, G. Glass: Clean inside and outside so there are no spots or dirt, and no smudges or streaks remain from
ita the cleaning process.
H. Schedule final cleaning as approved by the Owner to enable Owner to accept a completely clean
Work.
I. Final cleaning will be comparable to that provided by professional, skilled cleaners using commercial
grade cleaning materials. Cleaning materials will be used with care and will be compatible with building
materials and finishes. Final cleaning will include removal of scraps or waste in landscaped areas and
thorough cleaning of walkways, desks,paved areas and public paved areas adjacent to the site.
After installation, inspect all work for improper installation or damage.
Operating hardware must perform smoothly. Repair or replace any defective work. Repair work will be
undetectable. Redo repairs if work is still defective, as directed by the Architect. Clean the work area
and remove all scrap and excess materials from the site.
END OF SECTION
fTDI Chip Bldg. Job No. 1209-31
Div. 01
rw
01 77 00 -- CLOSEOUT PROCEDURES
a
GENERAL
1.1 SUMMARY
A. The following are prerequisites to substantial completion. Provide the following:
Completed punch list and supporting documentation.
Signed warranties.
Certifications as specified.
Occupancy permit from governing agencies and utility companies as required.
Testing and start up of building systems.
Change and transfer of locks and keys as specified.
B. Provide the following prior to final acceptance:
Final payment request with supporting affidavits.
Completed punch list and supporting documentation.
C. Provide sets of record drawings showing original design and all changes made during construction.
D. Provide the following closeout procedures:
Submit record documents.
Submit maintenance manuals.
Complete all repairs, call-backs, corrections, re-adjustments of equipment, final cleaning, and final touch-
up. Remove all temporary facilities, equipment, tools and supplies.
END OF SECTION
lug
fTDI Chip Bldg. Job No. 1209-31
Div. 01
DIVISION 06 -- WOOD
CONTENTS
06 20 00 FINISH CARPENTRY AND MILLWORK
(rw
tag
Eak
fTDI Chip Bldg. Job No. 1209-31 Div. 06
a
FINISH CARPENTRY AND MILLWORK 06 20 00
PART 1 -- GENERAL
1.1 WORK
A. Provide and install wood framing and finish carpentry as shown on the Drawings and as specified
herein. Work includes all connectors, and related hardware and materials.
B. Where additional instructions are required, work shall be as directed by the Design Consultant.
1.2 QUALITY STANDARDS AND TOLERANCES
A. Provide a work force that is sufficient in number for the quantity of work and time schedule.
Workers shall be skilled, trained, experienced, and competent to do the work as specified.
B. Unless otherwise directed by the Design Consultant, all work shall be as per building code and the
Manual for Wood Frame Construction, American Forest and Paper Association (NFPA), National
DesignSpecifications for Wood Construction of the NFPA, Plywood Specifications and Grade guide of
P �' p
the American Plywood Association.
C. Tolerances: Vertical framing shall be plumb within 1/4" per 10 linear feet and horizontal framing
shall be level within 1/4" per 10 linear feet.
vt
D. Moisture content of framing lumber shall be 15% or less by weight. Tests will be conducted on all
newly shipped lumber to confirm moisture content. Kiln-dried or other lumber requiring lower moisture
content shall be as specified.
E. Follow applicable lumber grading agency standards in accepting or rejecting delivered lumber.
Reject special, required lumber that is not marked and certified as preservative-treated or kiln-dried.
1.3 MATERIALS HANDLING AND STORAGE
A. Reject any delivered framing lumber that is not grade-stamped and certified by a bona fide grading
agency. Identify framing lumber by grade, and store each grade separately.
B. Do not accept or use lumber that deviates from grade standards or has excessive moisture content or
other defects. Remove unstamped or defective lumber from the job site.
C. Handle lumber to avoid damage during transport, unloading, and moving on the job site. Handle
chemically treated lumber and panels strictly according to manufacturer's instructions.
D. Store framing lumber and wood panels to prevent damage and moisture absorption. Store metal
connectors that are subject to damage in weathertight wrapping and in safe locations away from traffic or
other sources of damage. Store chemically treated lumber and wood panels outdoors until installation.
Keep chemically treated lumber and wood panels well ventilated if moved indoors.
fI'DI Chip Bldg. Job No. 1209-31 Div. 06
Nil
PART 2 --MATERIALS AND PRODUCTS
rr
2.1 WOOD AND ACCESSORIES
A. Provide and install materials as per detail drawings, applicable trade standards, or approved samples.
Provide wood free of significant defects or deviations from grade standards.
PART 3 -- CONSTRUCTION AND INSTALLATION
a
3.1 PREPARATION
A. Reject any wood that is not certified as to grade. Test and certify moisture content. Provide all tests, +r
certificates, and affidavits as required to verify quality of materials. Do not have finish materials
delivered until after the building is closed in.
B. Do not install finish panels with defects or deviations from grade standards.
C. Handle and store wood with care to avoid damage. Store wood as required to prevent damage and
moisture absorption.
D. Properly ventilate wood treated with preservatives; store away from work areas.
E. Store kiln-dry materials to assure compliance with temperature and humidity restrictions.
3.2 CONSTRUCTION: INTERIOR FINISH WORK mai
A. Coordinate with finish carpentry, furnishings, fixtures, and equipment to be installed by others.
Protect finish work from damage by other trades. Prepare sub-surfaces to receive finish materials.
B. Keep working environment clean, free of airborne construction dust, dry, and at comfortable working
temperature.
C. Make wood joints so as to minimize or conceal shrinkage.
D. Perform all work per details and applicable trade standards; saw cuts straight and clean, tight fits
without gaps, splices tight and staggered (never side by side). Align and exactly match miter joints at
edges and corners. Install running trim in maximum lengths; do not use short pieces or splicing of 0+
scraps.
E. Keep number of joints to a minimum by consistently using maximum size material. Install tight "
joints without gaps. Thoroughly sand finish work smooth.
F. Fasten all pieces straight, true, and secure. Coordinate backing and blocking with other trades with
interfacing work.
fTDI Chip Bldg. Job No. 1209-31 Div. 06
lei
uW
G. Where sanding is required, sand with grain to totally smooth, unblemished surface. Set finish nails
before painting or staining.
ism
H. Reject as nonconforming any work showing visible damage or defects. Protect finish work from
construction damage. Make repairs so they are undetectable.
I. Vacuum clean all work surfaces where sawdust accumulates each day. Remove scraps frequently.
Completely vacuum clean the work area frequently and upon completion of final work.
END OF SECTION
,rr
fTDI Chip Bldg. Job No. 1209-31 Div. 06
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
tam CONTENTS
07 90 00 JOINT PROTECTION
air
fTDI Chip Bldg. Job No. 1209-31 Div. 07
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION 07 90 00
PART 1 -- GENERAL
1.1 WORK
A. Provide everything required to complete the work as shown on the Drawings and specified herein.
B. Extent of Work:
Window Frames,Door Frames, and other Openings in Exterior Walls with Exterior Sealant.
Caulk Joints around Window Frames, Door Frames, and other Openings in Interior Walls with Interior
Sealant.
4,0 Caulk Spaces around Utility Penetrations through Walls. Where subject to Air Infiltration, caulk Spaces
between Wall Framing Members and Windows,Door, and other Openings in Exterior Walls.
Caulk with Exterior Sealant and Interior Sealant where shown on Drawings or as required to fill spaces
between dissimilar materials.
team
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by The Architect, provide all related products and accessories from one
manufacturer.
1.3 SUBMITTALS
gib
A. Submit the following within 30 calendar days after receiving the Notice to Proceed.
mai Submit list of materials to be provided for this work; manufacturer's data required to prove compliance
with these Specifications, manufacturer's installation instructions; shop drawings as required with
complete details and assembly instructions.
Submit samples as required for approval by the Architect and Owner.
1.4 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on drawings and specified herein.
Deliver, store, and transport materials to avoid damage to the products or to any other work and as per
the General Conditions.
B. Have on hand and ready for installation in coordination with roofing, all accessories such as
skylights, hatches, relief vents, expansion joints, etc.
1.5 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work.
ITDI Chip Bldg. Job No. 1209-31 Div. 07
PART 2 -- MATERIALS
2.1 JOINT SEALANTS
INTERIOR SEALANT
Where caulking is indicated and at interior doorframes.
Manufacturer & Brand: Gibson-Homans Latex Acrylic, Pecora AC-20, Sonneborn Sonolac Acrylic Latex
Calk, or approved.
Where sealant is indicated and at damp location.
Manufacturer: GE,Dow,Trimco or approved.
Type: Silicone.
Color: To match adjacent material.
AT EXTERIOR WINDOW FRAMES
r
Manufacturer: Sonneborn "NP 1".
Type: Moisture curing h-performance polyurethane sealant.
Color: Match adjacent window frames.
B. Provide tapes, fastenings, and other related materials as instructed by insulation manufacturer.
PART 3 -- CONSTRUCTION AND INSTALLATION rY
3.1 APPLICATION
A. Construct vertical and horizontal joints at locations and sizes shown in the Drawings. Clean and
prepare work surfaces strictly as instructed by the sealant manufacturer. Clean mortar or other debris
from movement joints prior to application of backing and sealant.
B. Apply materials strictly as instructed by the sealant manufacturer.
C. Use only a primer approved by the sealant manufacturer. Apply exactly as instructed by the primer
manufacturer.
D. Use only a bond breaker approved or manufactured by the sealant manufacturer. Apply exactly as a
instructed by the primer manufacturer.
E. Apply strictly as per instructions of the manufacturer. Apply sealant under pressure as required to
completely fill the joints. Carefully mask around joints where sealant might discolor or stain finish
surfaces. Tool joints to a smooth, consistent profile.
3.2 CLEANUP AND REPAIR
A. Remove masking immediately after joints are tooled. Clean adjacent surfaces as instructed by the
sealant manufacturer. Remove all debris and empty containers from the job site.
B. Repair or reseal defective work as directed by the Architect.
END OF SECTION
fTDI Chip Bldg. Job No. 1209-31 Div. 07
DIVISION 08 -- OPENINGS
CONTENTS
08 14 00 WOOD DOORS
08 40 00 ENTRANCES AND STOREFRONTS
08 71 00 HARDWARE
a
fTDI Chip Bldg. Job No. 1209-31 Div. 08
410 WOOD DOORS 08 14 00
PART 1 -- GENERAL
1.1 WORK
A. Provide wood doors, complete with hardware where shown on the Drawings and as specified herein.
Provide and install all door hardware as shown on schedules and as specified herein.
1.2 QUALITY STANDARDS
A. Provide experienced,well-trained workers competent to complete the work as specified.
B. Unless approved by the Design Consultant, provide all related products and accessories from one
taw
manufacturer.
C. Comply with standards of the Architectural Woodwork Institute for the grades specified.
1.3 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
Deliver and transport materials to avoid damage to the product or to any other work. Return any
products or materials delivered in a damaged or unsatisfactory condition. Materials and products
delivered will be certified by the manufacturer to be as specified.
B. Deliver after interior finish materials are dry and after building reaches average long-term interior
humidity. Packaging must be sealed with clear manufacturer and identification markings. Seal all edges
of unfinished doors.
16. C. Store materials safely to avoid damage and locate to expedite the work. Store flat on 2x4's spaced at
12" centers, and safely protected from damage, weather, and moisture.
D. Comply with recommendations and standards of the Architectural Woodwork Institute.
PART 2 -- MATERIALS AND PRODUCTS
2.1 WOOD DOORS
A. Provide wood doors as per Drawings and Door Schedule. See Door Schedule for selected wood door
grades, species, interior construction, and veneer.
B. Doors shall be manufactured by: Pacific Door or approved.
C. Provide doors that are straight, free of defects and blemishes, and that have correct finish material
thickness.
D. Verify that factory preparation and prefitting follow required hardware templates. Hollow-core doors
must have core construction as required to receive finish hardware.
E. Provide door glazing with stops as required and labeled safety glass.
fTDI Chip Bldg. Job No. 1209-31 Div. 08
uw
F. Provide fire-rated doors that comply with all building code and fire code requirements.
PART 3 -- INSTALLATION
3.1 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work.
B. Do not allow door swings to conflict with electrical switches or outlets, wall guards or rails.
3.2 INSTALLATION
A. Mount frames and doors plumb, straight, and securely braced.
B. Mounting tolerances: Bottom clearance, 1/2" maximum; top clearance, 1/8" maximum; lock and
hinge edge,bevel at 1/8" in 2" maximum.
a
C. Hang doors straight, plumb, smooth in opening and closing. Provide clearances below doors as
necessary to allow for thresholds, weatherstripping, etc.
a
D. Do not cut fire-rated doors so as to negate fire rating.
E. Seal or re-seal doors whenever they are cut. Seal, stain, or paint exterior doors before or immediately a.
after installing them.
F. Install fastenings and hardware as per Hardware Schedule and instructions of manufacturer.
U
3.3 INSPECTION, REPAIR, AND TOUCH-UP
A. After installation, inspect all doors and frames to find and repair damaged surfaces. Repair or
replace any damaged materials or improperly hung doors as directed by the Design Consultant. Repair or
replace any other materials damaged during installation. Any costs for replacing doors for non- "
compliance will be paid by the Contractor.
B. Final door mounts shall be square, smooth operating, and plumb when doors are closed, partially U
open, and fully open.
1
END OF SECTION
1
fTDI Chip Bldg. Job No. 1209-31 Div. 08
. ENTRANCES AND STOREFRONTS 08 41 00
PART 1 -- GENERAL
1.1 WORK(THIS IS AN ADDITIVE ALTERNATE BID)
A. Provide metal frame storefronts and entrances where shown on the Drawings and as specified herein.
B. Frame types and sizes shall match existing types, sizes, finishes, and configurations. Unless
approved by the Architect,provide all products from one manufacturer.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Architect, provide all related products and accessories from one
manufacturer.
1.3 SUBMITTALS
A. Submit the following within 30 calendar days after receiving the Notice to Proceed.
Submit a sample of each frame component. Samples should show the maximum range of light to dark
and color difference. Approved samples will be retained by the Architect to verify that final work
matches samples.
Submit list of materials to be provided for this work.
Submit manufacturer's data required to prove compliance with these Specifications.
Submit manufacturer's installation instructions.
Submit manufacturer's written warranty information.
Submit Shop Drawings with complete details and assembly instructions.
1.4 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
Deliver and transport materials to avoid damage to the product or to any other work. Return any
products or materials delivered in a damaged or unsatisfactory condition. Materials and products
delivered will be certified by the manufacturer to be as specified.
tam
B. Store materials safely to avoid damage and locate to expedite the work. Store delivered doors and
frames consistently vertical or flat. Lift and carry doors and frames with care to avoid damage.
1.5 WARRANTY
A. Provide to the Owner a warranty guaranteeing to replace defective work. Defective work includes
but is not limited to: Failure of, or difficulty in operation of movable components, air infiltration,
defective finish.
fIDI Chip Bldg. Job No. 1209-31 Div. 08
B. Time limit of the warranty is 5 years from the Date of Substantial Completion.
1
PART 2 -- MATERIALS AND PRODUCTS
2.1 ENTRANCES AND STOREFRONTS
A. Provide storefronts complete with glazing as per Drawings. 1
B. Storefront and entrance assemblies shall be as manufactured by: C.L. Laurence or approved.
MATERIAL GAUGES FINISHES aii
Entry door: Match existing Match existing Bronze Annod.
Windows: Match existing Match existing Bronze Annod.
2.2 FINISH HARDWARE
A. Provide hardware as per Drawings, Section 08 71 00, and related sections of these Specifications.
i rYi
PART 3 -- CONSTRUCTION AND INSTALLATION
3.1 PRECONSTRUCTION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work.
B. Store materials safely to avoid damage, and locate to expedite the work. I
3.2 INSTALLATION
Install in accordance with specific manufacturer's recommended specifications.
1
END OF SECTION
1
1
1
fTDI Chip Bldg. Job No. 1209-31 Div. 08
a
40, HARDWARE 08 71 00
IMO PART 1 -- GENERAL
1.1 WORK
gag
A. Provide and install finish hardware where shown on the Drawings and as specified herein.
B. Provide and deliver finish hardware as required to be factory installed. Unless approved by the
Design Consultant,provide all products from one manufacturer.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Design Consultant, provide all related products and accessories from one
manufacturer.
gigg
1.3 SUBMITTALS
gag
A. Submit the following within 14 calendar days after receiving the Notice to Proceed.
Submit manufacturer's data required to prove compliance with these Specifications.
ggig
1.4 MATERIALS HANDLING
Mit
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
Deliver and transport materials to avoid damage to the product or to any other work. Return any
products or materials delivered in a damaged or unsatisfactory condition. Materials and products
gog
delivered will be certified by the manufacturer to be as specified.
B. Store materials safely to avoid damage or exposure to dust or moisture and locate to expedite the
work.
PART 2 --MATERIALS AND PRODUCTS
2.1 HARDWARE
A. Provide and install hardware as per Hardware Schedule.
B. Hardware shall be as manufactured by: Refer to Drawings.
tag C. Provide these hardware groups in quantities as shown on the Drawings:
HARDWARE GROUPS - Refer to Drawings.
gigg
fTDI Chip Bldg. Job No. 1209-31 Div. 08
2.2 KEYING a
A. After confirming with Owner, provide complete locks and key system as shown on Hardware
Schedule and specified herein.
B. Provide factory key and masterkey locks and cylinders.
Number of keys for each lock: Three
Number of masterkeys: Two
Number of grand masterkeys: Two
a
C. Provide construction masterkey system. Upon Substantial Completion, change all construction
locks, and install finish keying. Factory stamp keys: DO NOT DUPLICATE. Tag permanent keys, and
provide certified delivery to the Owner. Provide a complete set of tools and maintenance manuals for all a
locks and operable hardware.
a
PART 3 -- CONSTRUCTION AND INSTALLATION
a
3.1 PRECONSTRUCTION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work.
B. Store materials safely to avoid damage or loss.
a
3.2 INSTALLATION REQUIREMENTS -- GENERAL
A. Temporarily remove or cover exposed hardware when painting or cleaning adjacent materials.
B. Attach all hardware securely with fasteners made specifically for that hardware, without damage to
hardware or fasteners.
C. Match hardware type, size, and finish, all sets of fastenings, such as screws on hinge butts. Match all
required screws to all screw-attached hardware, such as hinges.
D. Set all flush-set hardware such as hinge butts so they are truly flush without any protrusion.
E. Install doors to open and close easily, without binding, quietly, with secure fit at latches and tight fit
at frames.
dee
3.3 INSTALLATION --BUTTS AND HINGES
A. Provide and install butts and hinges as shown in Hardware Schedule and as specified herein.
.rr
B. Hardware shall be as manufactured by: Refer to Drawings.
C. Install as per manufacturer's instructions. Where butt hinges will swing 180 degrees, use hinges with .r
adequate throw to clear the door trim.
3.4 INSTALLATION -- LOCKSETS, LATCHES, AND KEYS
A. Install locksets as per manufacturer's instructions. Install cylinder cores with tumblers set upward. '
fTDI Chip Bldg. Job No. 1209-31 Div. 08
a
B. Carefully guard master keys during construction. Remove construction locks, and install permanent
locks. Match up locks and tagged keys after installing all units. Verify that all keys and locks operate
smoothly without effort.
C. Deliver keys and instructions to owner, all checked with door locks.
3.5 INSTALLATION -- DOOR CLOSERS
A. If specified on the drawings, install per manufacturer's instructions, with special attachments as
required for wood or aluminum doors. Install closer fasteners straight, true, and undamaged.
B. After adjustment, verify that door closers operate smoothly at correct speed, without noise, firmly to
Jai close and latch doors. Verify that door arms of closers are straight out when doors are closed.
3.6 INSTALLATION-- PLATES, DOOR STOPS, AND HOLDERS
ilig
A. If specified on the drawings, install door stops as per manufacturer's instructions. Install stops of
correct type and in correct positions to fully protect adjacent surfaces.
B. Install push-,pull-, and kickplates according to door manufacturer's instructions.
ois
3.7 INSTALLATION--PANIC BARS AND FLUSH BOLTS
A. Install exit hardware as per manufacturer's instructions. Exit cross bars: Level with both arms
securely attached. Bars move simultaneously when pressed and released.
3.8 INSTALLATION--MISCELLANEOUS HARDWARE AND ACCESSORIES
A. Install hanging, folding, bifold door hardware as per approved samples. Install suspended and
hanging door tracks level and secure into supportive framing. Install sliding door tracks level and secure
into supportive framing.
B. Adjust sliding door wheels for smooth level glide, easy opening, and secure closure.
C. Install weatherstripping as per manufacturer's instructions to create a secure seal against air
infiltration. Provide and install acoustic strips to create a secure sound seal.
4.0
D. Keep hardware clean. After installation, protect finishes from physical and chemical damage. Clean
and protect all hardware as recommended by manufacturers. Replace or make undetectable repairs to
damaged materials or finishes.
END OF SECTION
fTDI Chip Bldg. Job No. 1209-31 Div. 08
,411 DIVISION 09 --FINISHES
CONTENTS
09 21 16 GYPSUM WALLBOARD
09 22 16 NON-STRUCTURAL METAL FRAMING
09 91 00 PAINTING
r
II
tr fTDI Chip Bldg. Job No. 1209-31 Div. 09
GYPSUM WALLBOARD 09 21 16
PART 1 -- GENERAL
1.1 WORK
A. Provide everything required to complete the work as shown on the Drawings and specified herein.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Design Consultant, provide all related products and accessories from one
Aim manufacturer.
C. Use products and accessories:
From a manufacturer who specializes in making, installing, and servicing systems of this type. From a
manufacturer specified or approved by the Design Consultant.
+W+ D. All work shall comply with manufacturer's instructions and governing building and safety codes.
1.3 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
B. Deliver, store, and transport materials to avoid damage to the product or to any other work. Return
any products or materials delivered in a damaged or unsatisfactory condition. Materials and products
delivered will be certified by the manufacturer to be as specified.
C. Store materials in a safe, secure location,protected from dirt, moisture, contaminants, and weather.
1.4 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Confirm
there is no conflict between this work and governing building and safety codes. Confirm there are no
conflicts between this work and work of other trades. Confirm that work of other trades that must
4,0 precede this work has been completed. Meet all requirements to secure any applicable warranty.
B. Notify Design Consultant when work is scheduled to be started and completed.
PART 2 -- MATERIALS
ISM
2.1 GYPSUM WALLBOARD
""" A. Gypsum wallboard shall be manufactured by:
USG or approved.
Provide boards in 8 foot or other lengths to minimize construction joints.
B. Gypsum wallboard shall be as per Federal Specification SS-L-30D, in 48" widths.
C. Gypsum wallboard sheathing as per Federal Specification SS-L-30D, Type II, Grade W, Class 2.
fTDI Chip Bldg. Job No. 1209-31 Div. 09
44.
a
D. Use types and thicknesses specified below except where shown otherwise in the Drawings.
Standard wallboard: Type III, Grade R, Class 1, 5/8" thick.
Water-resistant wallboard: Type VII, Grade W or X as required, Class 2, 5/8" thick. Provide at all wet
wall locations.
ea
Provide seals for sound insulation at: restoom walls.
Ail
2.2 METAL TRIM AND ACCESSORIES
A. Metal Trim: Zinc-coated steel 26 gauge min., as per Federal Specification QQ-S-775, Class d or e.
B. Casing beads: Channel-shapes with exposed wing, and concealed wing not less than 7/8" wide.
C. Corner beads: Angle shapes with wings not less than 7/8" wide: Perforated for nailing and joint a
treatment. Or use paper/metal combination bead suitable for joint treatment.
D. Edge beads at ceiling perimeter: Angle shapes with wings 3/4" wide minimum.
Concealed wing perforated for nailing, exposed wing edge folded flat.
r
2.3 JOINTING
A. Jointing system with reinforcing tape and compound as supplied or recommended by the gypsum
wallboard manufacturer.
2.4 FASTENINGS
A. For gypsum wallboard attached to metal framing and channels: Flat-head screws, 1" long minimum. r:.
Self-tapping threads and self-drilling points. Specifically designed for use with power-driven tools.
B. For gypsum wallboard attached to wood: 1-1/4" type W bugle-head screws.
Alternate: Annular ring nails complying with ASTM C514.
Nail sizes as required by governing building code.
r
PART 3 -- CONSTRUCTION AND INSTALLATION
r
3.1 PREPARATION
A. Preparation and coordination: Install blocking and backups to support all edges of wallboard. Verify a
that wood framing to receive wallboard is dry and not subject to shrinkage.
B. Keep wallboard materials dry and protected from.moisture. Store wallboard materials so they are a
protected from damage to surfaces and edges. Maintain interior work environment closed in, not
exposed to weather, clean, dry, well-ventilated, well-lighted, and comfortable in temperature.
C. Keep work of trades such as conduit,pipe, and ducts clear of the inside faces of wall panels.
a
fTDI Chip Bldg. Job No. 1209-31 Div. 09
3.2 INSTALLATION
A. Install as per manufacturer's instructions, trade association standards, and governing building code.
B. If there is a conflict between instructions, standards, code, etc., install as instructed by the Design
Consultant.
C. For walls and ceilings: Hold wallboard 3/8 inch to 1/2 inch up from floor. Install wall panels
horizontally unless otherwise required. Stagger panel joints vertically.
D. Nailing and screw attachment as per manufacturer's instructions. Do not position conduit and piping
where it can be damaged by nailing. Do not proceed with nailing into wood framing that has over 16%
of moisture content.
Auk
E. Thoroughly seal penetrations in fire-rated walls. Box in recesses in fire-rated walls. Make cutouts
for electrical outlets, switch boxes,pipe, etc., tightly to size.
F. Taping and spackling must follow applicable trade standards and manufacturer's instructions
throughout. Keep temperature above specified minimum (usually 55 degrees). Do not track gypsum and
spackle dust to clean areas.
4W
G. Joint treatment must follow applicable trade standards and manufacturer's instructions throughout.
Gypsum wallboard must fit completely snuggly against supporting framework. Joint work shall be at a
minimum of 55 degrees F. for 24 hours prior to work.
3.3 METAL TRIM
A. Provide all metal trim as required to complete the work. Securely nail corner beads with required
type and size nails starting 2 inches from each end. Space and stagger as required by wallboard system
err manufacturer.
I=
3.4 CLEANING AND REPAIR
A. Don't allow tracking of gypsum and finishing compounds onto floor surfaces. At completion of each
segment of work in a room, clean thoroughly and remove all debris. Frequently remove all debris from
site. Make a final check to determine that there are no penetrations through fire-rated walls.
B. Recheck work for necessary repairs that may be required before painting or other added work.
Complete repairs as directed by the Design Consultant.
END OF SECTION
fTDI Chip Bldg. Job No. 1209-31 Div. 09
tit METAL STUD WALLS AND PARTITIONS 09 22 16
PART 1 -- GENERAL
1.1 WORK
A. Provide everything required to complete the work as shown on the Drawings and specified herein.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Design Consultant, provide all related products and accessories from one
manufacturer.
we
C. Use products and accessories:
From a manufacturer who specializes in making, installing, and servicing systems of this type. From a
manufacturer specified or approved by the Design Consultant.
'' D. All work shall comply with manufacturer's instructions and governing building and safety codes.
1.3 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
B. Deliver, store, and transport materials to avoid damage to the product or to any other work. Return
any products or materials delivered in a damaged or unsatisfactory condition. Materials and products
delivered will be certified by the manufacturer to be as specified.
C. Store materials in a safe, secure location,protected from dirt, moisture, contaminants, and weather.
taw1.4 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Confirm
there is no conflict between this work and governing building and safety codes. Confirm there are no
conflicts between this work and work of other trades. Confirm that work of other trades that must
precede this work has been completed. Meet all requirements to secure any applicable warranty.
B. Notify Design Consultant when work is scheduled to be started and completed.
PART 2 --MATERIALS
2.1 METAL STUDS, CHANNELS AND ACCESSORIES
wit A. Steel as per ASTM A446, A568, or A611. Galvanized coating as per ASTM A525.
18 gauge steel studs for non-load-bearing partitions.
Steel studs and channels as per Federal specification QQ-S-775 Type 1, Class E.
fTDI Chip Bldg. Job No. 1209-31 Div. 09
PART 3 -- CONSTRUCTION AND INSTALLATION
3.1 WORK CONDITIONS AND COORDINATION
A. Examine the job site, and correct any conditions that might interfere with speedy and acceptable I
work.
B. Coordinate electrical stub-ups with the wall and partition framing plan. Align floor-mounted electric
outlet boxes with finish wall lines. Coordinate stud walls with plumbing. 111
C. Do not allow HVAC ducts in wall framing to protrude beyond face of framing. Supply and
coordinate in-wall fixture and equipment supports.
D. Provide in-wall blocking, anchors, brackets, grounds, and other supports for wall-supported fixtures
and equipment.
3.2 INSTALLATION
A. Install studs of the sizes and spacings shown on the Drawings. '
B. Install studs as per manufacturer's instructions, applicable trade standards, and governing building
code. Provide solid continuous support under floor runners. Stud spacings as required by manufacturer I
to firmly support facing materials. Install heavy gauge studs and extra stiffeners at jambs. Provide
cushioned space at top plate at slab to allow for slab deflection/movement.
C. Install backing and anchors for door frames and wall-mounted fixtures and equipment.
D. Tolerances: Make framing surfaces flush within a tolerance of 1/8" in 10' in any direction. Align
and plumb studs to a tolerance of 1/8" per 10' horizontally and vertically. Make top plate level within
1/8" per 10 linear feet.
E. For sound attenuation, set runners on continuous beads of sealant or other cushion as per
manufacturer's instructions. Stagger with plate separations. Caulk thoroughly to prevent air transfer of
sound.
3.3 CLEANUP AND REPAIR
A. After installation, inspect all work for improper installation or damage. Repair or replace any work
damaged during installation as directed by the Design Consultant. Repair work will be undetectable.
END OF SECTION
ogi
a
fTDI Chip Bldg. Job No. 1209-31 Div. 09
a
PAINTING 09 91 00
PART 1 -- GENERAL
1.1 WORK
A. Provide everything required to complete the work as shown on the Drawings and specified herein.
1.2 QUALITY STANDARDS
A. Provide experienced,well-trained workers competent to complete the work as specified.
B. Unless approved by the Design Consultant, provide all related products and accessories from one
manufacturer.
C. Use products and accessories:
From a manufacturer who specializes in making, installing, and servicing systems of this type. From a
manufacturer specified or approved by the Design Consultant.
D. All work shall comply with manufacturer's instructions and governing building and safety codes.
1.3 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
B. Deliver, store, and transport materials to avoid damage to the product or to any other work. Return
any products or materials delivered in a damaged or unsatisfactory condition. Materials and products
delivered will be certified by the manufacturer to be as specified.
C. Store materials in a safe, secure location,protected from dirt, moisture, contaminants, and weather.
1.4 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Confirm
there is no conflict between this work and governing building and safety codes. Confirm there are no
conflicts between this work and work of other trades. Confirm that work of other trades that must
precede this work has been completed. Meet all requirements to secure any applicable warranty.
B. Notify Design Consultant when work is scheduled to be started and completed.
11116
1.5 SUBMITTALS
A. Provide manufacturer's specifications and other data to prove compliance with specified
requirements.
B. Following selection of colors by the Owner, submit samples for the Owner's review and approval.
Provide samples of each color and gloss for each material. Samples shall be on the material the finish is
specified to be applied. Samples shall be approximately 8" x 10" in size. Do not start finish painting
until samples are approved and available at job site.
1.6 JOB CONDITIONS
A. Strictly follow paint manufacturer's requirements as to temperature, humidity, and condition of work
surfaces.
fTDI Chip Bldg. Job No. 1209-31 Div. 09
PART 2 -- MATERIALS Ww
2.1 PAINT AND RELATED MATERIALS tgai
A. Provide all materials and tools required for the work
B. Paints shall be as per Room Finish schedule and Owner's direction or specifications.
2.2 MATERIALS -- LIMITATIONS ON USE
A. Undercoat must be from the same manufacturer as the finish coat. Thinners must be as
recommended by the paint manufacturer and used only as recommended. The undercoat, finish coat and la
thinner are integrated parts of a total paint finish.
B. Do not use latex primer on bare wood. Do not use alkyd primer on gypsum board. Apply primer or
sealer to knots and pitch pockets on wood that is to be painted.
2.3 MATERIALS DELIVERY AND STORAGE
A. All paint materials shall be delivered new, in labeled, unopened containers. Material quality shall be
verified as necessary by onsite or laboratory tests.
B. Do not use mixed brands or partial substitutions. Have materials delivered in a timely sequence as
required to expedite the work flow. Store all paint materials with ample ventilation, in fire-protected
space, secure from damage. Keep paint storage areas clean and clear of spilled material, empty
containers,rags and scrap.
a
2.4 APPLICATION EQUIPMENT
A. Use painting tools and equipment only as recommended by the paint manufacturer. Prior to work,
verify that proposed equipment is compatible with material to be applied.
2.5 WORKING CONDITIONS
A. Maintain a proper work environment, dry, clean, well ventilated, free of airborne construction dust,
well lighted, in temperature and humidity ranges required by paint manufacturer. Keep humidity low al
enough to prevent moisture condensation on work surfaces. Never apply paint to damp or wet surfaces.
2.6 MATERIALS PREPARATION
A. Handle and mix paint materials strictly according to manufacturer's instructions. Store paint
materials in tightly covered containers when not in use. Maintain paint storage and mix containers clean 1.6
and free from dirt or paint residue.
2.7 SURFACE PREPARATION
A. Test areas with paint, and match dried paint to approved color and texture samples. Keep color
samples on hand, and use them continuously for comparisons.
a
fTDI Chip Bldg. Job No. 1209-31 Div. 09
B. Prepare and clean working surfaces as per paint manufacturer's instructions. Remove or protect
items attached to work surfaces which are not to be painted After painting in each area, reinstall
removed items using workers competent in the related trades. Remove oil and grease with clean cloths.
Igo Cleaning must not contaminate adjacent freshly-painted surfaces. Cleaning solvent must meet safety
standards of governing building and safety codes.
C. Clean wood of dirt, oil, and any other material that may interfere with painting. Sand exposed wood
wes
to smooth uniform surface. Do not paint wood having moisture content of 12% or higher. Measure
moisture content of wood with an approved moisture meter.
D. Clean metal of dirt, oil, and any other material that might interfere with painting. Clean and etch
galvanized metal with phosphoric acid as required for painting.
PART 3 --APPLICATION
3.1 PREPARATION AND COORDINATION
A. Handle and store materials as per manufacturer's instructions. Remove or fully protect adjacent or
related work that might be marred by painting.
B. Touch up and repair any damaged shop-applied prime coats. Touch up bare areas prior to start of
finish coat application. Finish coat materials must be compatible with prime coats. Review other
Sections of these Specifications to determine prime coatings on various materials. Do not allow paint
gaps or overlaps at edges of hardware, fixtures, or trim.
3.2 PAINT APPLICATION
A. Mix and apply materials strictly as per manufacturer's instructions. Apply paint to thoroughly cover
undercoat, and do not allow show-through, lap or brush marks or any other defects. Vary the hue of
succeeding coats slightly to clearly show coats are applied as required. Only coats of paint inspected and
approved by the Design Consultant will be counted as completed. Sand defects smooth between coats.
Defects are defined as irregularities visible to the unaided eye at a five foot distance.
B. Keep approved samples on hand for comparison with work.
C. Allow drying time between coats as instructed by the paint manufacturer . Work and smooth out
brush coats onto surface in an even film. Where spraying, apply each coat to provide the hiding
equivalent of brush coats. Do not double back with spray equipment to build up film thickness of two
coats in one pass. Match applied work with approved samples as to texture, color, and coverage.
Aim
,y, 3.3 PAINTING AND CLEANING SPECIAL SURFACES
A. Paint ventilation registers, panels, access doors, ducts, etc. to match adjacent surfaces. Paint back
sides of access panels to match exposed sides. Paint visible duct surfaces behind vents, registers, and
Elf' grilles as directed bythe DesignConsultant. Exposed vents: Apply two coats of heat-resistant paint.
p pp Y
B. Wash metal to be painted with solvent recommended by paint manufacturer. Add prime coat
followed by two coats of alkyd enamel.
fTDI Chip Bldg. Job No. 1209-31 Div. 09
C. Exposed pipe and duct insulation: Apply one coat of latex on insulation which has been sized or oti
primed under another Section. Apply two coats on such surfaces when unprimed. Remove pipe or duct
bands before painting, and replace after painting.
D. Hardware: Paint prime-coated hardware to match adjacent surfaces. Allow no paint to come in
contact with hardware that is not to be painted.
E. Damp spaces: In toilet rooms and other damp rooms add approved fungicide to paints.
3.4 CLEANING AND EXTRA STOCK
A. Maintain thorough dust and dirt control throughout the painting process. Thoroughly protect all
surfaces that won't be painted with clean, undamaged drop cloths and masking tape. Immediately clean
any spilled materials and do not allow dirt or spilled materials to be tracked in a work area or to other
work areas. Allow absolutely no paint smears or splatters to remain on adjacent surfaces.
B. Upon completion of painting work, deliver to the Owner an extra stock of 10% or more of each
color, type, and gloss of paint used in the work. Tightly seal and clearly label each container with notes
on contents and location used.
3.5 INSPECTION, TOUCH UP AND REPAIRS
rie
A. Tests will be made at random to confirm paint coat thicknesses and paint work quality.
Unacceptable work includes surface imperfections such as spotting, laps,brush marks, and runs.
B. Remove, refinish, or repaint work not in compliance with specified requirements. Replace or repair
all non-conforming work as directed by the Design Consultant. Do repairs and touch-ups so they are
undetectable. '
1
END OF SECTION
1
1
a
a
fTDI Chip Bldg. Job No. 1209-31 Div. 09
a
DIVISION 10 -- SPECIALTIES
TOILET SPECIALTIES 10 80 00
PART 1 -- GENERAL
1.1 WORK
A. Provide:
New grab bars
New toilet tissue holders
New toilet seat tissue holders
New mirrors
New soap dispensers
New paper towel dispensers
New ADA compliant shower
B. Provide everything required to complete the work as shown on the Drawings and specified herein.
C. Other related work:
New paper towel and soap dispensers at hand sink locations.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Design Consultant, provide all related products and accessories from one
+�• manufacturer.
C. All work shall comply with manufacturer's instructions and governing building and safety codes.
1.3 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
Deliver, store, and transport materials to avoid damage to the product or to any other work. Return any
products or materials delivered in a damaged or unsatisfactory condition. Materials and products
Wit delivered will be certified by the manufacturer to be as specified.
B. Store materials in a safe, secure location,protected from dirt,moisture, contaminants, and weather.
1.4 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain
and use up-to-date trade standards and manufacturer's instructions. Confirm there is no conflict between
this work and governing building and safety codes. Meet all requirements to secure warranty.
r�r
B. Confirm there are no conflicts between this work and work of other trades. Confirm that work of
other trades that must precede this work has been completed.
C. Notify Architect when work is scheduled to be installed. If required by the Architect, a
preconstruction meeting will be held with all concerned parties. Use agreed schedule for installation and
for field observation by Architect.
fTDI Chip Bldg. Job No. 1209-31 Div. 10
PART 2 --MATERIALS
2.1 GENERAL
A. Product shall be as manufactured by:
Bradley Corporation or approved or specified elsewhere.
PART 3 -- CONSTRUCTION AND INSTALLATION
3.1 WORK CONDITIONS
A. Correct any conditions not in compliance with Section 1.4.A. noted above.
B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work.
C. All work conditions shall be as per manufacturer's instructions, trade association standards, and la
governing building and safety codes.
3.2 INSTALLATION
A. Install products as per Drawings and these Specifications. jib
Follow manufacturer, trade association, or consultant's specifications for this subsection.
B. Upon completion, secure all required tests, inspections, and approvals of the completed system.
Make all required adjustments and corrections at no added cost to the Owner.
C. Provide for maintenance of this work for one year following final acceptance by Owner.
Maintenance includes all work required in manufacturer's instructions including inspection and
adjustment, and repair and replacement of parts as required.
am
3.4 REPAIR AND CLEANUP
A. After installation, inspect all work for improper installation or damage.
B. Operating hardware must perform smoothly. Repair or replace any defective work. Repair work will
be undetectable. Redo repairs if work is still defective, as directed by the Design Consultant.
C. Clean the work area and remove all scrap and excess materials from the site.
END OF SECTION
fTDI Chip Bldg. Job No. 1209-31 Div. 10
DIVISION 22 -- PLUMBING
pri
gh CONTENTS
22 00 00 PLUMBING
.0
lilt
WU
+MS
4*
, NM
1 E 1 '
,
, w ii
Li
fTDI Chip Bldg. Job No. 1209-31 Div. 22
41111 PLUMBING 22 00 00
PART 1 -- GENERAL
tiiii
1.1 WORK
A. Provide and install plumbing as shown on the Drawings and as specified herein.
B. Plumbing includes:
Hot and cold water distribution systems.
Waste drains and vents.
Gas piping where it exists.
Plumbing fixtures including grease interceptors/traps where required by local jurisdictions.
C. Plumbing fixtures shall be as shown on the Drawings. Work includes trim and related construction
as required.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Architect,provide related products and accessories from one manufacturer.
C. All work shall comply with manufacturer's instructions and governing building and safety codes.
1.3 SUBMITTALS
A. Submit the following within 21 calendar days after receiving the Notice to Proceed.
Submit samples of proposed exposed finishes and fixtures to the Owner for approval prior to ordering.
At the close of this work, provide copies of manufacturer's installation, maintenance, and warranty
information.
1.4 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
Deliver, store, and transport materials to avoid damage to the product or to any other work. Reject and
return any products or materials delivered in a damaged or unsatisfactory condition. Materials and
products delivered will be certified by the manufacturer to be as specified.
B. Store materials indoors,protected from dirt, moisture, contaminants, and weather.
1.5 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain
and use up-to-date trade standards and manufacturer's instructions.
fTDI Chip Bldg. Job No. 1209-31 Div. 22
B. Confirm there is no conflict between this work and governing building and safety codes. Confirm "
there are no conflicts between this work and work of other trades. Confirm that work of other trades that
must precede this work has been completed. Meet all requirements to secure warranty.
C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for
field observation by Owner.
PART 2 -- MATERIALS 1
2.1 SANITARY SEWER PIPES 1
A. Match existing pipes and lines if possible and if in compliance with State and local codes. If this
is not possible, use the best quality materials accepted by State and local codes for durability, noise
reduction, longevity, etc.
B. Verify accptance by local building codes, inspectors, and landlords prior to ordering or ,
installation. t�
it
2.3 PLUMBING FIXTURES
A. Provide and install plumbing fixtures, trim and related construction as per Drawings and iii
specifications, if any, on the drawings. All toilet fixtures must comply with applicable ADA Accessibilty
Codes and regulations.
B. Install 1.6 or less GPF toilets. Mfr.: TOTO or approved.
C. Install hot water line and drain line protection at restroom sinks and other sink locations subject
to accessibility by wheelchairs.
D. Install ADA compliant faucet levers at sinks.
Yri
PART 3 -- CONSTRUCTION AND INSTALLATION
3.1 WORK CONDITIONS
A. Correct any conditions not in compliance with Section 1.5.A. noted above.
B. Correct any conditions that might interfere with speedy, well-coordinated execution of the work.
C. All work conditions shall be as per manufacturer's instructions, trade association standards, and
governing building and safety codes.
3.2 PREPARATION
A. Vents and related support construction for plumbing and mechanical equipment must be as required rr►
by the building department.
3.3 INSTALLATION
A. Install products as per Drawings and these Specifications.
mitt
fTDI Chip Bldg. Job No. 1209-31 Div. 22
a
mai B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed
system. Make all required adjustments and corrections at no added cost to the Owner. Sterilize the
water system and provide copies of a Certificate of Performance.
C. Provide for maintenance of this work for one year following final approval by governing agencies.
Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment,
repair and replacement of parts as required.
3.4 REPAIR AND CLEANUP
trek
A. After installation, inspect all work for improper installation or damage.
B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will
be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing safety
regulatory agency.
C. Clean the work area and remove all scrap and excess materials from the site.
END OF SECTION
gib
1
1
1
fTDI Chip Bldg. Job No. 1209-31 Div. 22
DIVISION 23 --HEATING, VENTILATING,AND AIR-CONDITIONING
CONTENTS
23 00 00 HEATING, VENTILATION AND AIR CONDITIONING
e1N1
11N
li1i1
faH1
itAk
1
I
1
I
fDI Chip Bldg. Job No. 1209-31 Div. 23
mto HEATING, VENTILATION AND AIR CONDITIONING 23 00 00
PART 1 -- GENERAL
1.1 WORK
A. Provide and install heating, ventilation, and air conditioning systems as required by Federal, State,
and Local codes, including ductwork, and as specified.
B. Mechanical equipment and fittings shall be required to copmly with all codes (bidder designed).
Work includes trim and related construction as required.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Owner,provide related products and accessories from one manufacturer.
C. All work shall comply with manufacturer's instructions and governing building and safety codes.
1.3 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
Deliver, store, and transport materials to avoid damage to the product or to any other work. Reject and
} return any products or materials delivered in a damaged or unsatisfactory condition. Materials and
products delivered will be certified by the manufacturer to be as specified.
B. Store materials indoors,protected from dirt, moisture, contaminants, and weather.
1.4 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain
and use up-to-date trade standards and manufacturer's instructions.
i
B. Confirm there is no conflict between this work and governing building and safety codes. Confirm
there are no conflicts between this work and work of other trades. Confirm that work of other trades that
must precede this work has been completed. Meet all requirements to secure warranty.
,, it
rW C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for
field observation by Owner.
ail PART 2 -- MATERIALS
2.1 RE-DISTRIBUTION OF EXISTING HEATING AND COOLING SYSTEM
A. Re-distribution of ductwork as required for new design. Location, size, termination, materials,
supports, grilles, diffusers, and all other related work and equipment shall be designed and provided by
HVAC contractor.
ffDI Chip Bldg. Job No. 1209-31 Div. 23
PART 3 -- CONSTRUCTION AND INSTALLATION
3.1 WORK CONDITIONS
A. Correct any conditions not in compliance with Section 1.5.A. noted above.
B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work. dui
C. All work conditions shall be as per manufacturer's instructions, trade association standards, and
governing building and safety codes.
3.2 PREPARATION
A. Vents and related support construction for mechanical equipment must be as required by the building
department.
3.3 INSTALLATION
A. Install products as per Drawings and these Specifications.
B. Upon completion, secure all required tests, inspections, and approvals of the completed system.
Make all required adjustments and corrections at no added cost to the Owner.
C. Provide for maintenance of this work for one year following final approval by governing agencies.
Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment,
lubrication,repair and replacement of parts as required, and emergency call-back service.
3.4 REPAIR AND CLEANUP
A. After installation, inspect all work for improper installation or damage. I
B. Operating hardware must perform smoothly. Repair or replace any defective work. Repair work will
be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing safety I
regulatory agency.
C. Clean the work area and remove all scrap and excess materials from the site.
1
1
END OF SECTION
1
1
fTDI Chip Bldg. Job No. 1209-31 Div. 23
1
wiii DIVISION 26 --ELECTRICAL
CONTENTS
26 00 00 ELECTRICAL POWER DISTRIBUTION
sari
26 50 00 LIGHTING
ili
Nir
Mc
kk
NiJi
WU
atii
e:r
lU
fi
III
fin
fTDI Chip Bldg. Job No. 12090-31 Div. 26
n
ELECTRICAL POWER DISTRIBUTION 26 00 00
PART 1 -- GENERAL
1.1 WORK
"" A. Provide and install complete electrical service, power and lighting as shown on the Drawings and
specified herein. Verify all switch locations with Owner for approval prior to any rough-in.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
B. Unless approved by the Owner,provide all related products and accessories from one manufacturer.
C. Use products and accessories from manufacturers who specialize in making, installing, and servicing
systems of this type. From a manufacturer specified or approved by the Owner.
D. All work shall comply with manufacturer's instructions and governing building and safety codes.
ati 1.3 SUBMITTALS
A. At the close of this work,provide three copies of operations and warranty information to Owner.
1.4 MATERIALS HANDLING
A. Provide all materials required to complete the work as shown on Drawings and specified herein.
Deliver, store, and transport materials to avoid damage to the product or to any other work. Reject and
return any products or materials delivered in a damaged or unsatisfactory condition. Materials and
products delivered will be certified by the manufacturer to be as specified.
B. Store materials indoors, protected from dirt, moisture, contaminants, and weather.
MAW
1.5 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain
and use up-to-date construction documents on site. Maintain and use up-to-date trade standards and
manufacturer's instructions.
B. Confirm there is no conflict between this work and governing building and safety codes. Confirm
there are no conflicts between this work and work of other trades. Confirm that work of other trades that
WAY
precede this work has been completed. Meet all requirements to secure warranty.
C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for
field observation by Owner.
a
bit PART 2 --MATERIALS
2.1 GENERAL
fTDI Chip Bldg. Job No. 12090-31 Div. 26
A. All materials must be new and of the type and quality specified. Materials must be delivered in a
labeled, unopened containers. All electrical products must bear the Underwriters Laboratory label.
a
2.2 TEMPORARY POWER
A. Not Required.
2.3 ELECTRICAL SERVICE
a
A. Provide complete electrical service as shown on the drawings and specified herein.
B. Conduit, junction boxes, and electrical wire connectors shall be as required by the local building a
code.
C. Circuits will be diagrammed by the Electrical Contractor.
rri
2.4 SWITCHES,RECEPTACLES AND WALL PLATES
a
A. Provide complete switches, receptacles, wall plates and related materials as shown on the drawings
and specified herein.
r i
B. Wall switches, quiet operating switch rated 20 amperes and 110-220 volts AC. Color and switch
type as selected by the Tenant. Wall Dimmers, if any, linear slide type. Color selected by Tenant.
Rated for 600 Watts minimum, size as per circuit.
C. Receptacles, Type 5-20 R, plastic face, color as selected by the Tenant. Specific purpose receptacles
as shown on the Drawings.
D. Exterior weatherproof cover plates shall be gasketed cast metal with hinged gasketed covers.
PART 3 -- CONSTRUCTION AND INSTALLATION
3.1 WORK CONDITIONS Oki
A. Correct any conditions not in compliance with Section 1.5.A. noted above.
B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work.
C. All work conditions shall be as per manufacturer's instructions, trade association standards, and
governing building and safety codes.
3.2 PREPARATION
A. Straps and other support Ponstruction for electrical equipment must be as required by the building
department.
3.3 INSTALLATION
A. Install products as per Drawings and these Specifications.
fTDI Chip Bldg. Job No. 12090-31 Div. 26 a
a
B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed
system. Make all required adjustments and corrections at no added cost to the Owner.
C. Provide for maintenance of this work for one year following final approval by governing agencies.
Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment,
repair and replacement of parts as required.
3.4 REPAIR AND CLEANUP
A. After installation, inspect all work for improper installation or damage.
B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will
be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing regulatory
agency.
C. Clean the work area and remove all scrap and excess materials from the site.
}
END OF SECTION
rw
fTDI Chip Bldg. Job No. 12090-31 Div. 26
LIGHTING 26 50 00
PART 1 -- GENERAL
1.1 WORK
A. Provide and install all interior and exterior lighting fixtures and lamps as shown on the Drawings and
specified herein.
1.2 PRECONSTRUCTION AND PREPARATION
A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain
, and use up-to-date construction documents on site. Maintain and use up-to-date trade standards and
manufacturer's instructions.
B. Confirm there is no conflict between this work and governing building and safety codes. Confirm
imi
there are no conflicts between this work and work of other trades. Confirm that work of other trades that
must precede this work has been completed. Meet all requirements to secure warranty.
C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for
field observation by Owner.
PART 2 -- MATERIALS
2.1 GENERAL
A. All materials must be new and of the type and quality specified. Materials must be delivered in
labeled,unopened containers. All electrical products must bear the Underwriters Laboratory label.
B. Products and requirements for lamps and lampholders are shown in the Lighting Fixture Schedule.
C. Provide and install all required accessories for mounting and operation of each fixture.
mai
PART 3 -- CONSTRUCTION AND INSTALLATION
3.1 WORK CONDITIONS
A. Correct any conditions not in compliance with Section 1.2.A. noted above.
B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work.
C. All work conditions shall be as per manufacturer's instructions, trade association standards, and
`A" governing building and safety codes.
3.2 PREPARATION
A. Straps and other support construction for electrical equipment must be as required by the building
department.
fTDI Chip Bldg. Job No. 12090-31 Div. 26
3.3 INSTALLATION a
A. Install products as per Drawings and these Specifications.
B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed
system. Make all required adjustments and corrections at no added cost to the Owner.
C. Provide for maintenance of this work for one year following final approval by governing agencies.
Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment,
repair and replacement of parts as required.
3.4 REPAIR AND CLEANUP
A. After installation, inspect all work for improper installation or damage.
B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will
be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing regulatory
agency.
a
C. Clean the work area and remove all scrap and excess materials from the site.
END OF SECTION
a
fTDI Chip Bldg. Job No. 12090-31 Div. 26
DIVISION 27 COMMUNICATIONS
CONTENTS
27 00 00 COMMUNICATIONS
kkb
tb$/+
f E
M1
1
l9,p
fTDI Chip Bldg. Job No. 1209-31 Div. 27
COMMUNICATIONS 27 00 00
PART 1 -- GENERAL
1.1 WORK
A. Provide and install all equipment necessary as directed by Owner and as shown on the drawings and
specified herein for a complete, functional communications system.
1.2 QUALITY STANDARDS
A. Provide experienced, well-trained workers competent to complete the work as specified.
fat
B. Unless approved by the Owner,provide all related products and accessories from one manufacturer.
C. Use products and accessories from manufacturers who specialize in making, installing, and servicing
systems of this type. From a manufacturer specified or approved by the Owner.
D. All work shall comply with manufacturer's instructions and governing building and safety codes.
PART 2 --MATERIALS
2.1 GENERAL
A. All materials must be new and of the type and quality specified. Materials must be delivered in
labeled, unopened containers. All electrical or low voltage products must bear the Underwriters
Laboratory label.
2.2 COMMUNICATIONS
A. Provide complete telephone, internet/server, and video cable service as shown on the drawings and
specified herein.
B. Telephone service includes equipment not provided by the phone company and may include service
entrance equipment, outlets, terminal boards and other items shown on the drawings or required for a
complete operating telephone service.
C. Data / internet service includes equipment not provided by the internet provider company and may
include outlets, terminal boards and other items shown on the drawings or required for a complete
operating data service. Verify all specifications,work, related work, and Products with Owner.
C. Coordinate installation of items provided by the telephone company.
D. Satellite or Cable television includes equipment not provided by the satellite or cable company and
may include service entrance equipment, outlets, and other items shown on the drawings or required for
a complete operating cable service.
E. Coordinate installation of materials provided and installed by the cable company.
PART 3 -- CONSTRUCTION AND INSTALLATION
fTDI Chip Bldg. Job No. 1209-31 Div. 27
rr
3.1 WORK CONDITIONS
A. Correct any conditions not in compliance Section 1.2. above.
rid
B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work.
C. All work conditions shall be as per manufacturer's instructions, trade association standards, and
governing building and safety codes.
3.2 PREPARATION a
A. Straps and other support construction for electrical equipment must be as required by the building
department. r
3.3 INSTALLATION
A. Install products as per Drawings and these Specifications.
B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed al
system. Make all required adjustments and corrections at no added cost to the Owner.
C. Provide for maintenance of this work for one year following final approval by governing agencies. y„y
Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment,
repair and replacement of parts as required.
a
3.4 REPAIR AND CLEANUP
A. After installation, inspect all work for improper installation or damage.
B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will 111
be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing regulatory
agency.
C. Clean the work area and remove all scrap and excess materials from the site.
a
mai
END OF SECTION
imi
a
frDI Chip Bldg. Job No. 1209-31 Div. 27