Report fTDI Chip Building TABLE OF CONTENTS mai DIVISION 00 DOCUMENTS Not Included DIVISION 01 GENERAL REQUIREMENTS 01 11 00 SUMMARY OF WORK 01 23 00 ALTERNATES City of Tigard 01 26 00 CONSTRUCTION PROCEDURES Approved Plans 01 26 57 CHANGE ORDER PROCEDURES 01 33 00 SUBMITTAL PROCEDURES By Date 01 50 00 TEMPORARY FACILITIES 01 62 00 PRODUCTS AND SUBSTITUTIONS OFFICE COPY 01 73 29 CUTTING AND PATCHING kafi 01 74 00 CLEANING AND WASTE MANAGEMENT 01 77 00 CLOSEOUT PROCEDURES mok DIVISION 02 SITE WORK Not Included- Refer to Drawings for specifications. DIVISION 03 CONCRETE Not Included kit DIVISION 04 MASONRY Not Included DIVISION 05 METALS Not Included DIVISION 06 WOOD , sir 06 20 00 FINISH CARPENTRY AND MILLWORK ` '`* el5 ,// DIVISION 07 THERMAL AND MOISTURE PROTECTION W I,0 GO' 07 90 00 JOINT PROTECTION fTDI Chip Bldg. DIVISION 08 OPENINGS ` 08 14 00 WOOD DOORS 08 41 00 ENTRANCES AND STOREFRONTS 08 71 00 DOOR HARDWARE DIVISION 09 FINISHES 09 21 16 GYPSUM WALLBOARD 09 22 16 NON-STRUCTURAL METAL FRAMING 09 91 00 PAINTING DIVISION 10 SPECIALTIES 10 80 00 TOILET ACCESSORIES DIVISION 11 -EQUIPMTNT Not Included DIVISION 12 FURNISHINGS Not Included DIVISION 13 SPECIAL CONSTRUCTION Not Included DIVISION 14 CONVEYING Not Included DIVISION 21 FIRE SUPPRESSION Not Included DIVISION 22 PLUMBING 22 00 00 BASIC PLUMBING MATERIALS AND METHODS so AND AIR-CONDITIONING (HVAC) DIVISION 23 HEATING, VENTILATING, ( ) 23 00 00 HEATING, VENTILATING, AND MR CONDITIONING fTDI Chip Bldg. 1 weN DIVISION 26 ELECTRICAL 26 00 00 ELECTRIC POWER DISTRIBUTION 26 50 00 LIGHTING DIVISION 27 COMMUNICATIONS 27 00 00 COMMUNICATIONS AIM END OF TABLE OF CONTENTS IMO tOg fTDI Chip Bldg. DIVISION 01 -- GENERAL REQUIREMENTS CONTENTS 01 11 00 SUMMARY OF WORK 01 23 22 ALTERNATES IAN 01 26 00 CONSTRUCTION PROCEDURES 01 26 57 CHANGE ORDER PROCEDURES 01 33 00 SUBMITTAL PROCEDURES 01 50 00 TEMPORARY FACILITIES 01 62 00 PRODUCTS AND SUBSTITUTIONS Mit 01 73 29 CUTTING AND PATCHING 01 74 00 CLEANING AND WASTE MANAGEMENT 01 77 00 CONTRACT CLOSEOUT IAA fTDI Chip Bldg. Job No. 1209-31 Div. 01 01010 -- SUMMARY OF WORK GENERAL 1.1 SUMMARY A. Project: fTDIC Chip owner-occupied building improvements. B. Project summary: Interior improvements including partitions, finishes, plumbing, and lighting demolition; new framing, plumbing, electrical, equipment, casework, finishes, glazing, minor landscaping, and HVAC re-distribution. Alternate bid includes storefront replacement and new storefront window system replacement. trani C. Project requirements: Verify with Owner as required. Existing site conditions and restrictions: Verify with Owner. Requirements for construction schedule, and sequence of work: Coordinate with Owner. Previous or concurrent work by Owner or others: Possible security system or other low voltage wiring by Owner. Verify. Pre-purchased items: See drawings, if any. Previous asbestos or hazardous waste abatement by Owner or others: None identified. Items provided and/or installed by the Owner: See Drawings, if any. Items provided by Owner, installed by Contractor: See Drawings, if any. Early occupancy by Owner: N/A. itmo D. Obtain and pay for all permits required for the work. Submit two copies each of all permits to Owner and to Architect. E. Comply with all applicable building codes and rules of other governing regulatory agencies. Submit two copies each of permits, inspection reports, and certificates of compliance to Owner and Architect. F. Verify field dimensions before ordering fabrications or products to fit in place. Notify Architect of existing conditions and dimensions that differ from those shown in the Drawings. G. Unless noted otherwise, the subject of all imperative sentences in the Specifications is the Contractor. For example, "Provide and install . . ." means "Contractor shall provide and install . . ." END OF SECTION fTDI Chip Bldg. Job No. 1209-31 gam Div. 01 01 23 00 -- ALTERNATES PART 1 -- GENERAL 1.1 SUMMARY law A. List the price for each Alternate in the Bid Form. Include the cost of modifications to other work to accommodate each Alternate. Include related costs such as overhead and profit. B. The Owner will determine which Alternates, if any, will be included in the Contract. C. Alternates are listed on the Drawings. D. Coordinate Alternates with related work to ensure that work affected by each selected Alternate is properly executed. PART 2 -- PRODUCTS (Not applicable.) PART 3 -- EXECUTION (Not applicable) END OF SECTION Imo fTDI Chip Bldg. Job No. 1209-31 Div. 01 fi ILLY► 01 26 00 -- CONSTRUCTION PROCEDURES PART 1 -- GENERAL 1.1 SUMMARY A. Provide administrative coordination of all work, including trained, qualified employees and subcontractors, and supervisory personnel. B. Arrange and conduct preconstruction and construction meetings with design principals, consultants, and construction trades when required by the Architect. rr C. Submit progress schedule, bar-chart type, updated monthly. Provide submittal schedule, coordinated with progress schedule. Submit schedule of required tests including payment and responsibility. D. Submit payment request procedures to Owner. E. Provide to the Architect and post at the construction site, a phone and address list of individuals to be contacted in case of emergency. F. Maintain and update record drawings and specifications as work progresses. Submit a complete, updated set of record documents upon conclusion of the work. G. Keep all work clean and well protected from dirt, weather, theft, and damage. END OF SECTION {IP d f IP iWr ff4YtY, fTDI Chip Bldg. Job No. 1209-31 Div. 01 aft 01 26 57 -- CHANGE ORDER PROCEDURES PART 1 -- GENERAL 1.1 SUMMARY A. Changes in the work may be required which will be authorized by a Change Order. B. Change Orders, signed by the Owner and Architect, to authorize changes in the work will include equivalent changes in the Contract Sum and/or Time of Completion. Ali C. Change orders will be numbered in sequence and dated. D. A request for estimates for possible changes is not a Change Order or a direction to proceed with the proposed changes. That can only be authorized through a signed Change Order. END OF SECTION oho rr fTDI Chip Bldg. Job No. 1209-31 tala Div. 01 lai 01 33 00 -- SUBMITTAL PROCEDURES w, PART 1 -- GENERAL 1.1 SUMMARY km A. Provide all submittals as specified. Provide four copies where multiple copies are specified but the number is not stated. am B. Provide re-submittals when submittals are not approved. Oki C. Samples and shop drawings shall be prepared specifically for this project. Shop drawings shall include dimensions and details, including adjacent construction and related work. Note special coordination required. Note any deviations from requirements of the Contract Documents. taill D. Provide warranties as specified. Warranties shall be signed by supplier or installer responsible for performance. Warranties shall not limit liability for negligence or non-compliance with documents. Submit manufacturer's specifications required to prove compliance with these specifications. wg Submit manufacturer's installation instructions. Submit Shop Drawings as required with complete details and assembly instructions. Submit Shop Drawings showing relationship and interface with adjacent or related work. L END OF SECTION L r '! t 1 Oil iiitN W ,r fTDI Chip Bldg. Job No. 1209-31 imst Div. 01 4 rt a 01 50 00 -- TEMPORARY FACILITIES PART 1 -- GENERAL 1.1 REQUIREMENTS A. Provide temporary services and utilities, including utility costs, for all services required for construction. B. Provide construction facilities, including protected storage for building materials. AtiN C. Provide construction access road and walkways as required. D. Provide security and protection requirements including fire extinguishers as required by the local Fire ,, Marshal, site enclosure fence, barricades, warning signs, security lighting, building enclosure, locking, di security, and pest control. E. Provide personnel support facilities including field office if required by the Architect, sanitary facilities (including portable toilet), and drinking water. F. Install and maintain project identification sign as designed and provided by the Architect. Wit END OF SECTION aim fTDI Chip Bldg. Job No. 1209-31 Div. 01 01 62 00 -- PRODUCTS AND SUBSTITUTIONS GENERAL 1.1 REQUIREMENTS A. Provide products from one manufacturer for each type or kind as applicable. Provide secondary materials as recommended by manufacturers of primary materials. B. Provide products selected or approved equal. Products submitted for substitution shall be submitted with acceptable documentation, and include costs of substitution including related work. C. Conditions for substitution include: An'or equal'phrase in the specifications. Specified material cannot be coordinated with other work. Specified material is not acceptable to authorities having jurisdiction. Substantial advantage is offered Owner in terms of cost, time, or other valuable consideration. D. Substitutions shall be submitted prior to award of contract, unless otherwise acceptable. Approval of shop drawings, product data, or samples is not a substitution approval unless clearly presented as a substitution at the time of submittal. END OF SECTION fTDI Chip Bldg. Job No. 1209-31 ido Div. 01 01 73 29 -- CUTTING AND PATCHING PART 1 -- GENERAL 1.1 SUMMARY A. Cut and patch as required to complete the work for: Visual quality as directed by the Architect and/or Owner. Plumbing, HVAC, electrical, and communication systems. Fire resistance ratings. Inspection, preparation, and performance. Cleaning. See Section 01 74 00 on Cleaning and Waste Management. Irr B. Cut and patch with care to avoid damage to work, safety hazards, violation of warranty requirements, building code violations, or maintenance problems. PART 2 -- MATERIALS AND PRODUCTS 2.1 MATERIALS A. Match existing materials with new materials so that patching work is undetectable. mr PART 3 -- EXECUTION 3.1 INSTALLATION A. Inspect field conditions to identify all work required. B. Notify Architect of work that might disrupt building operations. C. Perform work with workmen skilled in the trades involved. Prepare sample area of each type of work for approval. Protect adjacent work from damage and dirt. D. For cutting work, use proper cutting tools, not chopping tools. Make neat holes. Minimize damage to adjacent work. Check for concealed utilities and structure before cutting. E. Make patches, seams, and joints durable and inconspicuous. Tolerances for patching shall be the wit same as for new work. F. Clean work areas and areas affected by cutting and patching operations as described in Section 01 74 ma' 00 - Cleaning and Waste Management. fTDI Chip Bldg. Job No. 1209-31 Div. 01 4d END OF SECTION ' 1 1 1 1 1 1 fTDI Chip Bldg. Job No. 1209-31 ' Div. 01 1 wr 01 74 00 -- CLEANING AND WASTE MANAGEMENT GENERAL Igo 1.1 SUMMARY A. Keep the buildings and site well-organized and clean throughout the construction period. B. Provide general clean up daily and complete weekly pickup and removal of all scrap and debris from the site. Exception: Reusable scrap shall be stored in a neatly maintained, designated storage area. Jima C. Weekly pickup shall include a thorough broom-clean sweep of all interior spaces. Also, each week, sweep paved areas on the site and public paved areas adjacent to the site. Completely remove swept dirt and debris. Daily and weekly cleanings will not replace required clean up after the work of specific trades such as specified herein. D. At completion of the Work, remove from the job site all tools and equipment, surplus materials, th" equipment, scrap and debris. E. Exterior of building: Inspect exterior surfaces and remove all waste materials, paint droppings, spots, stains or dirt. F. Interior of building: Inspect interior surfaces and remove all waste materials, paint droppings, spots, stains or dirt. !, G. Glass: Clean inside and outside so there are no spots or dirt, and no smudges or streaks remain from ita the cleaning process. H. Schedule final cleaning as approved by the Owner to enable Owner to accept a completely clean Work. I. Final cleaning will be comparable to that provided by professional, skilled cleaners using commercial grade cleaning materials. Cleaning materials will be used with care and will be compatible with building materials and finishes. Final cleaning will include removal of scraps or waste in landscaped areas and thorough cleaning of walkways, desks,paved areas and public paved areas adjacent to the site. After installation, inspect all work for improper installation or damage. Operating hardware must perform smoothly. Repair or replace any defective work. Repair work will be undetectable. Redo repairs if work is still defective, as directed by the Architect. Clean the work area and remove all scrap and excess materials from the site. END OF SECTION fTDI Chip Bldg. Job No. 1209-31 Div. 01 rw 01 77 00 -- CLOSEOUT PROCEDURES a GENERAL 1.1 SUMMARY A. The following are prerequisites to substantial completion. Provide the following: Completed punch list and supporting documentation. Signed warranties. Certifications as specified. Occupancy permit from governing agencies and utility companies as required. Testing and start up of building systems. Change and transfer of locks and keys as specified. B. Provide the following prior to final acceptance: Final payment request with supporting affidavits. Completed punch list and supporting documentation. C. Provide sets of record drawings showing original design and all changes made during construction. D. Provide the following closeout procedures: Submit record documents. Submit maintenance manuals. Complete all repairs, call-backs, corrections, re-adjustments of equipment, final cleaning, and final touch- up. Remove all temporary facilities, equipment, tools and supplies. END OF SECTION lug fTDI Chip Bldg. Job No. 1209-31 Div. 01 DIVISION 06 -- WOOD CONTENTS 06 20 00 FINISH CARPENTRY AND MILLWORK (rw tag Eak fTDI Chip Bldg. Job No. 1209-31 Div. 06 a FINISH CARPENTRY AND MILLWORK 06 20 00 PART 1 -- GENERAL 1.1 WORK A. Provide and install wood framing and finish carpentry as shown on the Drawings and as specified herein. Work includes all connectors, and related hardware and materials. B. Where additional instructions are required, work shall be as directed by the Design Consultant. 1.2 QUALITY STANDARDS AND TOLERANCES A. Provide a work force that is sufficient in number for the quantity of work and time schedule. Workers shall be skilled, trained, experienced, and competent to do the work as specified. B. Unless otherwise directed by the Design Consultant, all work shall be as per building code and the Manual for Wood Frame Construction, American Forest and Paper Association (NFPA), National DesignSpecifications for Wood Construction of the NFPA, Plywood Specifications and Grade guide of P �' p the American Plywood Association. C. Tolerances: Vertical framing shall be plumb within 1/4" per 10 linear feet and horizontal framing shall be level within 1/4" per 10 linear feet. vt D. Moisture content of framing lumber shall be 15% or less by weight. Tests will be conducted on all newly shipped lumber to confirm moisture content. Kiln-dried or other lumber requiring lower moisture content shall be as specified. E. Follow applicable lumber grading agency standards in accepting or rejecting delivered lumber. Reject special, required lumber that is not marked and certified as preservative-treated or kiln-dried. 1.3 MATERIALS HANDLING AND STORAGE A. Reject any delivered framing lumber that is not grade-stamped and certified by a bona fide grading agency. Identify framing lumber by grade, and store each grade separately. B. Do not accept or use lumber that deviates from grade standards or has excessive moisture content or other defects. Remove unstamped or defective lumber from the job site. C. Handle lumber to avoid damage during transport, unloading, and moving on the job site. Handle chemically treated lumber and panels strictly according to manufacturer's instructions. D. Store framing lumber and wood panels to prevent damage and moisture absorption. Store metal connectors that are subject to damage in weathertight wrapping and in safe locations away from traffic or other sources of damage. Store chemically treated lumber and wood panels outdoors until installation. Keep chemically treated lumber and wood panels well ventilated if moved indoors. fI'DI Chip Bldg. Job No. 1209-31 Div. 06 Nil PART 2 --MATERIALS AND PRODUCTS rr 2.1 WOOD AND ACCESSORIES A. Provide and install materials as per detail drawings, applicable trade standards, or approved samples. Provide wood free of significant defects or deviations from grade standards. PART 3 -- CONSTRUCTION AND INSTALLATION a 3.1 PREPARATION A. Reject any wood that is not certified as to grade. Test and certify moisture content. Provide all tests, +r certificates, and affidavits as required to verify quality of materials. Do not have finish materials delivered until after the building is closed in. B. Do not install finish panels with defects or deviations from grade standards. C. Handle and store wood with care to avoid damage. Store wood as required to prevent damage and moisture absorption. D. Properly ventilate wood treated with preservatives; store away from work areas. E. Store kiln-dry materials to assure compliance with temperature and humidity restrictions. 3.2 CONSTRUCTION: INTERIOR FINISH WORK mai A. Coordinate with finish carpentry, furnishings, fixtures, and equipment to be installed by others. Protect finish work from damage by other trades. Prepare sub-surfaces to receive finish materials. B. Keep working environment clean, free of airborne construction dust, dry, and at comfortable working temperature. C. Make wood joints so as to minimize or conceal shrinkage. D. Perform all work per details and applicable trade standards; saw cuts straight and clean, tight fits without gaps, splices tight and staggered (never side by side). Align and exactly match miter joints at edges and corners. Install running trim in maximum lengths; do not use short pieces or splicing of 0+ scraps. E. Keep number of joints to a minimum by consistently using maximum size material. Install tight " joints without gaps. Thoroughly sand finish work smooth. F. Fasten all pieces straight, true, and secure. Coordinate backing and blocking with other trades with interfacing work. fTDI Chip Bldg. Job No. 1209-31 Div. 06 lei uW G. Where sanding is required, sand with grain to totally smooth, unblemished surface. Set finish nails before painting or staining. ism H. Reject as nonconforming any work showing visible damage or defects. Protect finish work from construction damage. Make repairs so they are undetectable. I. Vacuum clean all work surfaces where sawdust accumulates each day. Remove scraps frequently. Completely vacuum clean the work area frequently and upon completion of final work. END OF SECTION ,rr fTDI Chip Bldg. Job No. 1209-31 Div. 06 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION tam CONTENTS 07 90 00 JOINT PROTECTION air fTDI Chip Bldg. Job No. 1209-31 Div. 07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION 07 90 00 PART 1 -- GENERAL 1.1 WORK A. Provide everything required to complete the work as shown on the Drawings and specified herein. B. Extent of Work: Window Frames,Door Frames, and other Openings in Exterior Walls with Exterior Sealant. Caulk Joints around Window Frames, Door Frames, and other Openings in Interior Walls with Interior Sealant. 4,0 Caulk Spaces around Utility Penetrations through Walls. Where subject to Air Infiltration, caulk Spaces between Wall Framing Members and Windows,Door, and other Openings in Exterior Walls. Caulk with Exterior Sealant and Interior Sealant where shown on Drawings or as required to fill spaces between dissimilar materials. team 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by The Architect, provide all related products and accessories from one manufacturer. 1.3 SUBMITTALS gib A. Submit the following within 30 calendar days after receiving the Notice to Proceed. mai Submit list of materials to be provided for this work; manufacturer's data required to prove compliance with these Specifications, manufacturer's installation instructions; shop drawings as required with complete details and assembly instructions. Submit samples as required for approval by the Architect and Owner. 1.4 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on drawings and specified herein. Deliver, store, and transport materials to avoid damage to the products or to any other work and as per the General Conditions. B. Have on hand and ready for installation in coordination with roofing, all accessories such as skylights, hatches, relief vents, expansion joints, etc. 1.5 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. ITDI Chip Bldg. Job No. 1209-31 Div. 07 PART 2 -- MATERIALS 2.1 JOINT SEALANTS INTERIOR SEALANT Where caulking is indicated and at interior doorframes. Manufacturer & Brand: Gibson-Homans Latex Acrylic, Pecora AC-20, Sonneborn Sonolac Acrylic Latex Calk, or approved. Where sealant is indicated and at damp location. Manufacturer: GE,Dow,Trimco or approved. Type: Silicone. Color: To match adjacent material. AT EXTERIOR WINDOW FRAMES r Manufacturer: Sonneborn "NP 1". Type: Moisture curing h-performance polyurethane sealant. Color: Match adjacent window frames. B. Provide tapes, fastenings, and other related materials as instructed by insulation manufacturer. PART 3 -- CONSTRUCTION AND INSTALLATION rY 3.1 APPLICATION A. Construct vertical and horizontal joints at locations and sizes shown in the Drawings. Clean and prepare work surfaces strictly as instructed by the sealant manufacturer. Clean mortar or other debris from movement joints prior to application of backing and sealant. B. Apply materials strictly as instructed by the sealant manufacturer. C. Use only a primer approved by the sealant manufacturer. Apply exactly as instructed by the primer manufacturer. D. Use only a bond breaker approved or manufactured by the sealant manufacturer. Apply exactly as a instructed by the primer manufacturer. E. Apply strictly as per instructions of the manufacturer. Apply sealant under pressure as required to completely fill the joints. Carefully mask around joints where sealant might discolor or stain finish surfaces. Tool joints to a smooth, consistent profile. 3.2 CLEANUP AND REPAIR A. Remove masking immediately after joints are tooled. Clean adjacent surfaces as instructed by the sealant manufacturer. Remove all debris and empty containers from the job site. B. Repair or reseal defective work as directed by the Architect. END OF SECTION fTDI Chip Bldg. Job No. 1209-31 Div. 07 DIVISION 08 -- OPENINGS CONTENTS 08 14 00 WOOD DOORS 08 40 00 ENTRANCES AND STOREFRONTS 08 71 00 HARDWARE a fTDI Chip Bldg. Job No. 1209-31 Div. 08 410 WOOD DOORS 08 14 00 PART 1 -- GENERAL 1.1 WORK A. Provide wood doors, complete with hardware where shown on the Drawings and as specified herein. Provide and install all door hardware as shown on schedules and as specified herein. 1.2 QUALITY STANDARDS A. Provide experienced,well-trained workers competent to complete the work as specified. B. Unless approved by the Design Consultant, provide all related products and accessories from one taw manufacturer. C. Comply with standards of the Architectural Woodwork Institute for the grades specified. 1.3 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. Deliver and transport materials to avoid damage to the product or to any other work. Return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. B. Deliver after interior finish materials are dry and after building reaches average long-term interior humidity. Packaging must be sealed with clear manufacturer and identification markings. Seal all edges of unfinished doors. 16. C. Store materials safely to avoid damage and locate to expedite the work. Store flat on 2x4's spaced at 12" centers, and safely protected from damage, weather, and moisture. D. Comply with recommendations and standards of the Architectural Woodwork Institute. PART 2 -- MATERIALS AND PRODUCTS 2.1 WOOD DOORS A. Provide wood doors as per Drawings and Door Schedule. See Door Schedule for selected wood door grades, species, interior construction, and veneer. B. Doors shall be manufactured by: Pacific Door or approved. C. Provide doors that are straight, free of defects and blemishes, and that have correct finish material thickness. D. Verify that factory preparation and prefitting follow required hardware templates. Hollow-core doors must have core construction as required to receive finish hardware. E. Provide door glazing with stops as required and labeled safety glass. fTDI Chip Bldg. Job No. 1209-31 Div. 08 uw F. Provide fire-rated doors that comply with all building code and fire code requirements. PART 3 -- INSTALLATION 3.1 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. B. Do not allow door swings to conflict with electrical switches or outlets, wall guards or rails. 3.2 INSTALLATION A. Mount frames and doors plumb, straight, and securely braced. B. Mounting tolerances: Bottom clearance, 1/2" maximum; top clearance, 1/8" maximum; lock and hinge edge,bevel at 1/8" in 2" maximum. a C. Hang doors straight, plumb, smooth in opening and closing. Provide clearances below doors as necessary to allow for thresholds, weatherstripping, etc. a D. Do not cut fire-rated doors so as to negate fire rating. E. Seal or re-seal doors whenever they are cut. Seal, stain, or paint exterior doors before or immediately a. after installing them. F. Install fastenings and hardware as per Hardware Schedule and instructions of manufacturer. U 3.3 INSPECTION, REPAIR, AND TOUCH-UP A. After installation, inspect all doors and frames to find and repair damaged surfaces. Repair or replace any damaged materials or improperly hung doors as directed by the Design Consultant. Repair or replace any other materials damaged during installation. Any costs for replacing doors for non- " compliance will be paid by the Contractor. B. Final door mounts shall be square, smooth operating, and plumb when doors are closed, partially U open, and fully open. 1 END OF SECTION 1 fTDI Chip Bldg. Job No. 1209-31 Div. 08 . ENTRANCES AND STOREFRONTS 08 41 00 PART 1 -- GENERAL 1.1 WORK(THIS IS AN ADDITIVE ALTERNATE BID) A. Provide metal frame storefronts and entrances where shown on the Drawings and as specified herein. B. Frame types and sizes shall match existing types, sizes, finishes, and configurations. Unless approved by the Architect,provide all products from one manufacturer. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Architect, provide all related products and accessories from one manufacturer. 1.3 SUBMITTALS A. Submit the following within 30 calendar days after receiving the Notice to Proceed. Submit a sample of each frame component. Samples should show the maximum range of light to dark and color difference. Approved samples will be retained by the Architect to verify that final work matches samples. Submit list of materials to be provided for this work. Submit manufacturer's data required to prove compliance with these Specifications. Submit manufacturer's installation instructions. Submit manufacturer's written warranty information. Submit Shop Drawings with complete details and assembly instructions. 1.4 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. Deliver and transport materials to avoid damage to the product or to any other work. Return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. tam B. Store materials safely to avoid damage and locate to expedite the work. Store delivered doors and frames consistently vertical or flat. Lift and carry doors and frames with care to avoid damage. 1.5 WARRANTY A. Provide to the Owner a warranty guaranteeing to replace defective work. Defective work includes but is not limited to: Failure of, or difficulty in operation of movable components, air infiltration, defective finish. fIDI Chip Bldg. Job No. 1209-31 Div. 08 B. Time limit of the warranty is 5 years from the Date of Substantial Completion. 1 PART 2 -- MATERIALS AND PRODUCTS 2.1 ENTRANCES AND STOREFRONTS A. Provide storefronts complete with glazing as per Drawings. 1 B. Storefront and entrance assemblies shall be as manufactured by: C.L. Laurence or approved. MATERIAL GAUGES FINISHES aii Entry door: Match existing Match existing Bronze Annod. Windows: Match existing Match existing Bronze Annod. 2.2 FINISH HARDWARE A. Provide hardware as per Drawings, Section 08 71 00, and related sections of these Specifications. i rYi PART 3 -- CONSTRUCTION AND INSTALLATION 3.1 PRECONSTRUCTION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. B. Store materials safely to avoid damage, and locate to expedite the work. I 3.2 INSTALLATION Install in accordance with specific manufacturer's recommended specifications. 1 END OF SECTION 1 1 1 fTDI Chip Bldg. Job No. 1209-31 Div. 08 a 40, HARDWARE 08 71 00 IMO PART 1 -- GENERAL 1.1 WORK gag A. Provide and install finish hardware where shown on the Drawings and as specified herein. B. Provide and deliver finish hardware as required to be factory installed. Unless approved by the Design Consultant,provide all products from one manufacturer. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Design Consultant, provide all related products and accessories from one manufacturer. gigg 1.3 SUBMITTALS gag A. Submit the following within 14 calendar days after receiving the Notice to Proceed. Submit manufacturer's data required to prove compliance with these Specifications. ggig 1.4 MATERIALS HANDLING Mit A. Provide all materials required to complete the work as shown on Drawings and specified herein. Deliver and transport materials to avoid damage to the product or to any other work. Return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products gog delivered will be certified by the manufacturer to be as specified. B. Store materials safely to avoid damage or exposure to dust or moisture and locate to expedite the work. PART 2 --MATERIALS AND PRODUCTS 2.1 HARDWARE A. Provide and install hardware as per Hardware Schedule. B. Hardware shall be as manufactured by: Refer to Drawings. tag C. Provide these hardware groups in quantities as shown on the Drawings: HARDWARE GROUPS - Refer to Drawings. gigg fTDI Chip Bldg. Job No. 1209-31 Div. 08 2.2 KEYING a A. After confirming with Owner, provide complete locks and key system as shown on Hardware Schedule and specified herein. B. Provide factory key and masterkey locks and cylinders. Number of keys for each lock: Three Number of masterkeys: Two Number of grand masterkeys: Two a C. Provide construction masterkey system. Upon Substantial Completion, change all construction locks, and install finish keying. Factory stamp keys: DO NOT DUPLICATE. Tag permanent keys, and provide certified delivery to the Owner. Provide a complete set of tools and maintenance manuals for all a locks and operable hardware. a PART 3 -- CONSTRUCTION AND INSTALLATION a 3.1 PRECONSTRUCTION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. B. Store materials safely to avoid damage or loss. a 3.2 INSTALLATION REQUIREMENTS -- GENERAL A. Temporarily remove or cover exposed hardware when painting or cleaning adjacent materials. B. Attach all hardware securely with fasteners made specifically for that hardware, without damage to hardware or fasteners. C. Match hardware type, size, and finish, all sets of fastenings, such as screws on hinge butts. Match all required screws to all screw-attached hardware, such as hinges. D. Set all flush-set hardware such as hinge butts so they are truly flush without any protrusion. E. Install doors to open and close easily, without binding, quietly, with secure fit at latches and tight fit at frames. dee 3.3 INSTALLATION --BUTTS AND HINGES A. Provide and install butts and hinges as shown in Hardware Schedule and as specified herein. .rr B. Hardware shall be as manufactured by: Refer to Drawings. C. Install as per manufacturer's instructions. Where butt hinges will swing 180 degrees, use hinges with .r adequate throw to clear the door trim. 3.4 INSTALLATION -- LOCKSETS, LATCHES, AND KEYS A. Install locksets as per manufacturer's instructions. Install cylinder cores with tumblers set upward. ' fTDI Chip Bldg. Job No. 1209-31 Div. 08 a B. Carefully guard master keys during construction. Remove construction locks, and install permanent locks. Match up locks and tagged keys after installing all units. Verify that all keys and locks operate smoothly without effort. C. Deliver keys and instructions to owner, all checked with door locks. 3.5 INSTALLATION -- DOOR CLOSERS A. If specified on the drawings, install per manufacturer's instructions, with special attachments as required for wood or aluminum doors. Install closer fasteners straight, true, and undamaged. B. After adjustment, verify that door closers operate smoothly at correct speed, without noise, firmly to Jai close and latch doors. Verify that door arms of closers are straight out when doors are closed. 3.6 INSTALLATION-- PLATES, DOOR STOPS, AND HOLDERS ilig A. If specified on the drawings, install door stops as per manufacturer's instructions. Install stops of correct type and in correct positions to fully protect adjacent surfaces. B. Install push-,pull-, and kickplates according to door manufacturer's instructions. ois 3.7 INSTALLATION--PANIC BARS AND FLUSH BOLTS A. Install exit hardware as per manufacturer's instructions. Exit cross bars: Level with both arms securely attached. Bars move simultaneously when pressed and released. 3.8 INSTALLATION--MISCELLANEOUS HARDWARE AND ACCESSORIES A. Install hanging, folding, bifold door hardware as per approved samples. Install suspended and hanging door tracks level and secure into supportive framing. Install sliding door tracks level and secure into supportive framing. B. Adjust sliding door wheels for smooth level glide, easy opening, and secure closure. C. Install weatherstripping as per manufacturer's instructions to create a secure seal against air infiltration. Provide and install acoustic strips to create a secure sound seal. 4.0 D. Keep hardware clean. After installation, protect finishes from physical and chemical damage. Clean and protect all hardware as recommended by manufacturers. Replace or make undetectable repairs to damaged materials or finishes. END OF SECTION fTDI Chip Bldg. Job No. 1209-31 Div. 08 ,411 DIVISION 09 --FINISHES CONTENTS 09 21 16 GYPSUM WALLBOARD 09 22 16 NON-STRUCTURAL METAL FRAMING 09 91 00 PAINTING r II tr fTDI Chip Bldg. Job No. 1209-31 Div. 09 GYPSUM WALLBOARD 09 21 16 PART 1 -- GENERAL 1.1 WORK A. Provide everything required to complete the work as shown on the Drawings and specified herein. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Design Consultant, provide all related products and accessories from one Aim manufacturer. C. Use products and accessories: From a manufacturer who specializes in making, installing, and servicing systems of this type. From a manufacturer specified or approved by the Design Consultant. +W+ D. All work shall comply with manufacturer's instructions and governing building and safety codes. 1.3 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. B. Deliver, store, and transport materials to avoid damage to the product or to any other work. Return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. C. Store materials in a safe, secure location,protected from dirt, moisture, contaminants, and weather. 1.4 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Confirm there is no conflict between this work and governing building and safety codes. Confirm there are no conflicts between this work and work of other trades. Confirm that work of other trades that must 4,0 precede this work has been completed. Meet all requirements to secure any applicable warranty. B. Notify Design Consultant when work is scheduled to be started and completed. PART 2 -- MATERIALS ISM 2.1 GYPSUM WALLBOARD """ A. Gypsum wallboard shall be manufactured by: USG or approved. Provide boards in 8 foot or other lengths to minimize construction joints. B. Gypsum wallboard shall be as per Federal Specification SS-L-30D, in 48" widths. C. Gypsum wallboard sheathing as per Federal Specification SS-L-30D, Type II, Grade W, Class 2. fTDI Chip Bldg. Job No. 1209-31 Div. 09 44. a D. Use types and thicknesses specified below except where shown otherwise in the Drawings. Standard wallboard: Type III, Grade R, Class 1, 5/8" thick. Water-resistant wallboard: Type VII, Grade W or X as required, Class 2, 5/8" thick. Provide at all wet wall locations. ea Provide seals for sound insulation at: restoom walls. Ail 2.2 METAL TRIM AND ACCESSORIES A. Metal Trim: Zinc-coated steel 26 gauge min., as per Federal Specification QQ-S-775, Class d or e. B. Casing beads: Channel-shapes with exposed wing, and concealed wing not less than 7/8" wide. C. Corner beads: Angle shapes with wings not less than 7/8" wide: Perforated for nailing and joint a treatment. Or use paper/metal combination bead suitable for joint treatment. D. Edge beads at ceiling perimeter: Angle shapes with wings 3/4" wide minimum. Concealed wing perforated for nailing, exposed wing edge folded flat. r 2.3 JOINTING A. Jointing system with reinforcing tape and compound as supplied or recommended by the gypsum wallboard manufacturer. 2.4 FASTENINGS A. For gypsum wallboard attached to metal framing and channels: Flat-head screws, 1" long minimum. r:. Self-tapping threads and self-drilling points. Specifically designed for use with power-driven tools. B. For gypsum wallboard attached to wood: 1-1/4" type W bugle-head screws. Alternate: Annular ring nails complying with ASTM C514. Nail sizes as required by governing building code. r PART 3 -- CONSTRUCTION AND INSTALLATION r 3.1 PREPARATION A. Preparation and coordination: Install blocking and backups to support all edges of wallboard. Verify a that wood framing to receive wallboard is dry and not subject to shrinkage. B. Keep wallboard materials dry and protected from.moisture. Store wallboard materials so they are a protected from damage to surfaces and edges. Maintain interior work environment closed in, not exposed to weather, clean, dry, well-ventilated, well-lighted, and comfortable in temperature. C. Keep work of trades such as conduit,pipe, and ducts clear of the inside faces of wall panels. a fTDI Chip Bldg. Job No. 1209-31 Div. 09 3.2 INSTALLATION A. Install as per manufacturer's instructions, trade association standards, and governing building code. B. If there is a conflict between instructions, standards, code, etc., install as instructed by the Design Consultant. C. For walls and ceilings: Hold wallboard 3/8 inch to 1/2 inch up from floor. Install wall panels horizontally unless otherwise required. Stagger panel joints vertically. D. Nailing and screw attachment as per manufacturer's instructions. Do not position conduit and piping where it can be damaged by nailing. Do not proceed with nailing into wood framing that has over 16% of moisture content. Auk E. Thoroughly seal penetrations in fire-rated walls. Box in recesses in fire-rated walls. Make cutouts for electrical outlets, switch boxes,pipe, etc., tightly to size. F. Taping and spackling must follow applicable trade standards and manufacturer's instructions throughout. Keep temperature above specified minimum (usually 55 degrees). Do not track gypsum and spackle dust to clean areas. 4W G. Joint treatment must follow applicable trade standards and manufacturer's instructions throughout. Gypsum wallboard must fit completely snuggly against supporting framework. Joint work shall be at a minimum of 55 degrees F. for 24 hours prior to work. 3.3 METAL TRIM A. Provide all metal trim as required to complete the work. Securely nail corner beads with required type and size nails starting 2 inches from each end. Space and stagger as required by wallboard system err manufacturer. I= 3.4 CLEANING AND REPAIR A. Don't allow tracking of gypsum and finishing compounds onto floor surfaces. At completion of each segment of work in a room, clean thoroughly and remove all debris. Frequently remove all debris from site. Make a final check to determine that there are no penetrations through fire-rated walls. B. Recheck work for necessary repairs that may be required before painting or other added work. Complete repairs as directed by the Design Consultant. END OF SECTION fTDI Chip Bldg. Job No. 1209-31 Div. 09 tit METAL STUD WALLS AND PARTITIONS 09 22 16 PART 1 -- GENERAL 1.1 WORK A. Provide everything required to complete the work as shown on the Drawings and specified herein. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Design Consultant, provide all related products and accessories from one manufacturer. we C. Use products and accessories: From a manufacturer who specializes in making, installing, and servicing systems of this type. From a manufacturer specified or approved by the Design Consultant. '' D. All work shall comply with manufacturer's instructions and governing building and safety codes. 1.3 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. B. Deliver, store, and transport materials to avoid damage to the product or to any other work. Return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. C. Store materials in a safe, secure location,protected from dirt, moisture, contaminants, and weather. taw1.4 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Confirm there is no conflict between this work and governing building and safety codes. Confirm there are no conflicts between this work and work of other trades. Confirm that work of other trades that must precede this work has been completed. Meet all requirements to secure any applicable warranty. B. Notify Design Consultant when work is scheduled to be started and completed. PART 2 --MATERIALS 2.1 METAL STUDS, CHANNELS AND ACCESSORIES wit A. Steel as per ASTM A446, A568, or A611. Galvanized coating as per ASTM A525. 18 gauge steel studs for non-load-bearing partitions. Steel studs and channels as per Federal specification QQ-S-775 Type 1, Class E. fTDI Chip Bldg. Job No. 1209-31 Div. 09 PART 3 -- CONSTRUCTION AND INSTALLATION 3.1 WORK CONDITIONS AND COORDINATION A. Examine the job site, and correct any conditions that might interfere with speedy and acceptable I work. B. Coordinate electrical stub-ups with the wall and partition framing plan. Align floor-mounted electric outlet boxes with finish wall lines. Coordinate stud walls with plumbing. 111 C. Do not allow HVAC ducts in wall framing to protrude beyond face of framing. Supply and coordinate in-wall fixture and equipment supports. D. Provide in-wall blocking, anchors, brackets, grounds, and other supports for wall-supported fixtures and equipment. 3.2 INSTALLATION A. Install studs of the sizes and spacings shown on the Drawings. ' B. Install studs as per manufacturer's instructions, applicable trade standards, and governing building code. Provide solid continuous support under floor runners. Stud spacings as required by manufacturer I to firmly support facing materials. Install heavy gauge studs and extra stiffeners at jambs. Provide cushioned space at top plate at slab to allow for slab deflection/movement. C. Install backing and anchors for door frames and wall-mounted fixtures and equipment. D. Tolerances: Make framing surfaces flush within a tolerance of 1/8" in 10' in any direction. Align and plumb studs to a tolerance of 1/8" per 10' horizontally and vertically. Make top plate level within 1/8" per 10 linear feet. E. For sound attenuation, set runners on continuous beads of sealant or other cushion as per manufacturer's instructions. Stagger with plate separations. Caulk thoroughly to prevent air transfer of sound. 3.3 CLEANUP AND REPAIR A. After installation, inspect all work for improper installation or damage. Repair or replace any work damaged during installation as directed by the Design Consultant. Repair work will be undetectable. END OF SECTION ogi a fTDI Chip Bldg. Job No. 1209-31 Div. 09 a PAINTING 09 91 00 PART 1 -- GENERAL 1.1 WORK A. Provide everything required to complete the work as shown on the Drawings and specified herein. 1.2 QUALITY STANDARDS A. Provide experienced,well-trained workers competent to complete the work as specified. B. Unless approved by the Design Consultant, provide all related products and accessories from one manufacturer. C. Use products and accessories: From a manufacturer who specializes in making, installing, and servicing systems of this type. From a manufacturer specified or approved by the Design Consultant. D. All work shall comply with manufacturer's instructions and governing building and safety codes. 1.3 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. B. Deliver, store, and transport materials to avoid damage to the product or to any other work. Return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. C. Store materials in a safe, secure location,protected from dirt, moisture, contaminants, and weather. 1.4 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Confirm there is no conflict between this work and governing building and safety codes. Confirm there are no conflicts between this work and work of other trades. Confirm that work of other trades that must precede this work has been completed. Meet all requirements to secure any applicable warranty. B. Notify Design Consultant when work is scheduled to be started and completed. 11116 1.5 SUBMITTALS A. Provide manufacturer's specifications and other data to prove compliance with specified requirements. B. Following selection of colors by the Owner, submit samples for the Owner's review and approval. Provide samples of each color and gloss for each material. Samples shall be on the material the finish is specified to be applied. Samples shall be approximately 8" x 10" in size. Do not start finish painting until samples are approved and available at job site. 1.6 JOB CONDITIONS A. Strictly follow paint manufacturer's requirements as to temperature, humidity, and condition of work surfaces. fTDI Chip Bldg. Job No. 1209-31 Div. 09 PART 2 -- MATERIALS Ww 2.1 PAINT AND RELATED MATERIALS tgai A. Provide all materials and tools required for the work B. Paints shall be as per Room Finish schedule and Owner's direction or specifications. 2.2 MATERIALS -- LIMITATIONS ON USE A. Undercoat must be from the same manufacturer as the finish coat. Thinners must be as recommended by the paint manufacturer and used only as recommended. The undercoat, finish coat and la thinner are integrated parts of a total paint finish. B. Do not use latex primer on bare wood. Do not use alkyd primer on gypsum board. Apply primer or sealer to knots and pitch pockets on wood that is to be painted. 2.3 MATERIALS DELIVERY AND STORAGE A. All paint materials shall be delivered new, in labeled, unopened containers. Material quality shall be verified as necessary by onsite or laboratory tests. B. Do not use mixed brands or partial substitutions. Have materials delivered in a timely sequence as required to expedite the work flow. Store all paint materials with ample ventilation, in fire-protected space, secure from damage. Keep paint storage areas clean and clear of spilled material, empty containers,rags and scrap. a 2.4 APPLICATION EQUIPMENT A. Use painting tools and equipment only as recommended by the paint manufacturer. Prior to work, verify that proposed equipment is compatible with material to be applied. 2.5 WORKING CONDITIONS A. Maintain a proper work environment, dry, clean, well ventilated, free of airborne construction dust, well lighted, in temperature and humidity ranges required by paint manufacturer. Keep humidity low al enough to prevent moisture condensation on work surfaces. Never apply paint to damp or wet surfaces. 2.6 MATERIALS PREPARATION A. Handle and mix paint materials strictly according to manufacturer's instructions. Store paint materials in tightly covered containers when not in use. Maintain paint storage and mix containers clean 1.6 and free from dirt or paint residue. 2.7 SURFACE PREPARATION A. Test areas with paint, and match dried paint to approved color and texture samples. Keep color samples on hand, and use them continuously for comparisons. a fTDI Chip Bldg. Job No. 1209-31 Div. 09 B. Prepare and clean working surfaces as per paint manufacturer's instructions. Remove or protect items attached to work surfaces which are not to be painted After painting in each area, reinstall removed items using workers competent in the related trades. Remove oil and grease with clean cloths. Igo Cleaning must not contaminate adjacent freshly-painted surfaces. Cleaning solvent must meet safety standards of governing building and safety codes. C. Clean wood of dirt, oil, and any other material that may interfere with painting. Sand exposed wood wes to smooth uniform surface. Do not paint wood having moisture content of 12% or higher. Measure moisture content of wood with an approved moisture meter. D. Clean metal of dirt, oil, and any other material that might interfere with painting. Clean and etch galvanized metal with phosphoric acid as required for painting. PART 3 --APPLICATION 3.1 PREPARATION AND COORDINATION A. Handle and store materials as per manufacturer's instructions. Remove or fully protect adjacent or related work that might be marred by painting. B. Touch up and repair any damaged shop-applied prime coats. Touch up bare areas prior to start of finish coat application. Finish coat materials must be compatible with prime coats. Review other Sections of these Specifications to determine prime coatings on various materials. Do not allow paint gaps or overlaps at edges of hardware, fixtures, or trim. 3.2 PAINT APPLICATION A. Mix and apply materials strictly as per manufacturer's instructions. Apply paint to thoroughly cover undercoat, and do not allow show-through, lap or brush marks or any other defects. Vary the hue of succeeding coats slightly to clearly show coats are applied as required. Only coats of paint inspected and approved by the Design Consultant will be counted as completed. Sand defects smooth between coats. Defects are defined as irregularities visible to the unaided eye at a five foot distance. B. Keep approved samples on hand for comparison with work. C. Allow drying time between coats as instructed by the paint manufacturer . Work and smooth out brush coats onto surface in an even film. Where spraying, apply each coat to provide the hiding equivalent of brush coats. Do not double back with spray equipment to build up film thickness of two coats in one pass. Match applied work with approved samples as to texture, color, and coverage. Aim ,y, 3.3 PAINTING AND CLEANING SPECIAL SURFACES A. Paint ventilation registers, panels, access doors, ducts, etc. to match adjacent surfaces. Paint back sides of access panels to match exposed sides. Paint visible duct surfaces behind vents, registers, and Elf' grilles as directed bythe DesignConsultant. Exposed vents: Apply two coats of heat-resistant paint. p pp Y B. Wash metal to be painted with solvent recommended by paint manufacturer. Add prime coat followed by two coats of alkyd enamel. fTDI Chip Bldg. Job No. 1209-31 Div. 09 C. Exposed pipe and duct insulation: Apply one coat of latex on insulation which has been sized or oti primed under another Section. Apply two coats on such surfaces when unprimed. Remove pipe or duct bands before painting, and replace after painting. D. Hardware: Paint prime-coated hardware to match adjacent surfaces. Allow no paint to come in contact with hardware that is not to be painted. E. Damp spaces: In toilet rooms and other damp rooms add approved fungicide to paints. 3.4 CLEANING AND EXTRA STOCK A. Maintain thorough dust and dirt control throughout the painting process. Thoroughly protect all surfaces that won't be painted with clean, undamaged drop cloths and masking tape. Immediately clean any spilled materials and do not allow dirt or spilled materials to be tracked in a work area or to other work areas. Allow absolutely no paint smears or splatters to remain on adjacent surfaces. B. Upon completion of painting work, deliver to the Owner an extra stock of 10% or more of each color, type, and gloss of paint used in the work. Tightly seal and clearly label each container with notes on contents and location used. 3.5 INSPECTION, TOUCH UP AND REPAIRS rie A. Tests will be made at random to confirm paint coat thicknesses and paint work quality. Unacceptable work includes surface imperfections such as spotting, laps,brush marks, and runs. B. Remove, refinish, or repaint work not in compliance with specified requirements. Replace or repair all non-conforming work as directed by the Design Consultant. Do repairs and touch-ups so they are undetectable. ' 1 END OF SECTION 1 1 a a fTDI Chip Bldg. Job No. 1209-31 Div. 09 a DIVISION 10 -- SPECIALTIES TOILET SPECIALTIES 10 80 00 PART 1 -- GENERAL 1.1 WORK A. Provide: New grab bars New toilet tissue holders New toilet seat tissue holders New mirrors New soap dispensers New paper towel dispensers New ADA compliant shower B. Provide everything required to complete the work as shown on the Drawings and specified herein. C. Other related work: New paper towel and soap dispensers at hand sink locations. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Design Consultant, provide all related products and accessories from one +�• manufacturer. C. All work shall comply with manufacturer's instructions and governing building and safety codes. 1.3 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. Deliver, store, and transport materials to avoid damage to the product or to any other work. Return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products Wit delivered will be certified by the manufacturer to be as specified. B. Store materials in a safe, secure location,protected from dirt,moisture, contaminants, and weather. 1.4 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain and use up-to-date trade standards and manufacturer's instructions. Confirm there is no conflict between this work and governing building and safety codes. Meet all requirements to secure warranty. r�r B. Confirm there are no conflicts between this work and work of other trades. Confirm that work of other trades that must precede this work has been completed. C. Notify Architect when work is scheduled to be installed. If required by the Architect, a preconstruction meeting will be held with all concerned parties. Use agreed schedule for installation and for field observation by Architect. fTDI Chip Bldg. Job No. 1209-31 Div. 10 PART 2 --MATERIALS 2.1 GENERAL A. Product shall be as manufactured by: Bradley Corporation or approved or specified elsewhere. PART 3 -- CONSTRUCTION AND INSTALLATION 3.1 WORK CONDITIONS A. Correct any conditions not in compliance with Section 1.4.A. noted above. B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work. C. All work conditions shall be as per manufacturer's instructions, trade association standards, and la governing building and safety codes. 3.2 INSTALLATION A. Install products as per Drawings and these Specifications. jib Follow manufacturer, trade association, or consultant's specifications for this subsection. B. Upon completion, secure all required tests, inspections, and approvals of the completed system. Make all required adjustments and corrections at no added cost to the Owner. C. Provide for maintenance of this work for one year following final acceptance by Owner. Maintenance includes all work required in manufacturer's instructions including inspection and adjustment, and repair and replacement of parts as required. am 3.4 REPAIR AND CLEANUP A. After installation, inspect all work for improper installation or damage. B. Operating hardware must perform smoothly. Repair or replace any defective work. Repair work will be undetectable. Redo repairs if work is still defective, as directed by the Design Consultant. C. Clean the work area and remove all scrap and excess materials from the site. END OF SECTION fTDI Chip Bldg. Job No. 1209-31 Div. 10 DIVISION 22 -- PLUMBING pri gh CONTENTS 22 00 00 PLUMBING .0 lilt WU +MS 4* , NM 1 E 1 ' , , w ii Li fTDI Chip Bldg. Job No. 1209-31 Div. 22 41111 PLUMBING 22 00 00 PART 1 -- GENERAL tiiii 1.1 WORK A. Provide and install plumbing as shown on the Drawings and as specified herein. B. Plumbing includes: Hot and cold water distribution systems. Waste drains and vents. Gas piping where it exists. Plumbing fixtures including grease interceptors/traps where required by local jurisdictions. C. Plumbing fixtures shall be as shown on the Drawings. Work includes trim and related construction as required. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Architect,provide related products and accessories from one manufacturer. C. All work shall comply with manufacturer's instructions and governing building and safety codes. 1.3 SUBMITTALS A. Submit the following within 21 calendar days after receiving the Notice to Proceed. Submit samples of proposed exposed finishes and fixtures to the Owner for approval prior to ordering. At the close of this work, provide copies of manufacturer's installation, maintenance, and warranty information. 1.4 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. Deliver, store, and transport materials to avoid damage to the product or to any other work. Reject and return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. B. Store materials indoors,protected from dirt, moisture, contaminants, and weather. 1.5 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain and use up-to-date trade standards and manufacturer's instructions. fTDI Chip Bldg. Job No. 1209-31 Div. 22 B. Confirm there is no conflict between this work and governing building and safety codes. Confirm " there are no conflicts between this work and work of other trades. Confirm that work of other trades that must precede this work has been completed. Meet all requirements to secure warranty. C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for field observation by Owner. PART 2 -- MATERIALS 1 2.1 SANITARY SEWER PIPES 1 A. Match existing pipes and lines if possible and if in compliance with State and local codes. If this is not possible, use the best quality materials accepted by State and local codes for durability, noise reduction, longevity, etc. B. Verify accptance by local building codes, inspectors, and landlords prior to ordering or , installation. t� it 2.3 PLUMBING FIXTURES A. Provide and install plumbing fixtures, trim and related construction as per Drawings and iii specifications, if any, on the drawings. All toilet fixtures must comply with applicable ADA Accessibilty Codes and regulations. B. Install 1.6 or less GPF toilets. Mfr.: TOTO or approved. C. Install hot water line and drain line protection at restroom sinks and other sink locations subject to accessibility by wheelchairs. D. Install ADA compliant faucet levers at sinks. Yri PART 3 -- CONSTRUCTION AND INSTALLATION 3.1 WORK CONDITIONS A. Correct any conditions not in compliance with Section 1.5.A. noted above. B. Correct any conditions that might interfere with speedy, well-coordinated execution of the work. C. All work conditions shall be as per manufacturer's instructions, trade association standards, and governing building and safety codes. 3.2 PREPARATION A. Vents and related support construction for plumbing and mechanical equipment must be as required rr► by the building department. 3.3 INSTALLATION A. Install products as per Drawings and these Specifications. mitt fTDI Chip Bldg. Job No. 1209-31 Div. 22 a mai B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed system. Make all required adjustments and corrections at no added cost to the Owner. Sterilize the water system and provide copies of a Certificate of Performance. C. Provide for maintenance of this work for one year following final approval by governing agencies. Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment, repair and replacement of parts as required. 3.4 REPAIR AND CLEANUP trek A. After installation, inspect all work for improper installation or damage. B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing safety regulatory agency. C. Clean the work area and remove all scrap and excess materials from the site. END OF SECTION gib 1 1 1 fTDI Chip Bldg. Job No. 1209-31 Div. 22 DIVISION 23 --HEATING, VENTILATING,AND AIR-CONDITIONING CONTENTS 23 00 00 HEATING, VENTILATION AND AIR CONDITIONING e1N1 11N li1i1 faH1 itAk 1 I 1 I fDI Chip Bldg. Job No. 1209-31 Div. 23 mto HEATING, VENTILATION AND AIR CONDITIONING 23 00 00 PART 1 -- GENERAL 1.1 WORK A. Provide and install heating, ventilation, and air conditioning systems as required by Federal, State, and Local codes, including ductwork, and as specified. B. Mechanical equipment and fittings shall be required to copmly with all codes (bidder designed). Work includes trim and related construction as required. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Owner,provide related products and accessories from one manufacturer. C. All work shall comply with manufacturer's instructions and governing building and safety codes. 1.3 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. Deliver, store, and transport materials to avoid damage to the product or to any other work. Reject and } return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. B. Store materials indoors,protected from dirt, moisture, contaminants, and weather. 1.4 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain and use up-to-date trade standards and manufacturer's instructions. i B. Confirm there is no conflict between this work and governing building and safety codes. Confirm there are no conflicts between this work and work of other trades. Confirm that work of other trades that must precede this work has been completed. Meet all requirements to secure warranty. ,, it rW C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for field observation by Owner. ail PART 2 -- MATERIALS 2.1 RE-DISTRIBUTION OF EXISTING HEATING AND COOLING SYSTEM A. Re-distribution of ductwork as required for new design. Location, size, termination, materials, supports, grilles, diffusers, and all other related work and equipment shall be designed and provided by HVAC contractor. ffDI Chip Bldg. Job No. 1209-31 Div. 23 PART 3 -- CONSTRUCTION AND INSTALLATION 3.1 WORK CONDITIONS A. Correct any conditions not in compliance with Section 1.5.A. noted above. B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work. dui C. All work conditions shall be as per manufacturer's instructions, trade association standards, and governing building and safety codes. 3.2 PREPARATION A. Vents and related support construction for mechanical equipment must be as required by the building department. 3.3 INSTALLATION A. Install products as per Drawings and these Specifications. B. Upon completion, secure all required tests, inspections, and approvals of the completed system. Make all required adjustments and corrections at no added cost to the Owner. C. Provide for maintenance of this work for one year following final approval by governing agencies. Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment, lubrication,repair and replacement of parts as required, and emergency call-back service. 3.4 REPAIR AND CLEANUP A. After installation, inspect all work for improper installation or damage. I B. Operating hardware must perform smoothly. Repair or replace any defective work. Repair work will be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing safety I regulatory agency. C. Clean the work area and remove all scrap and excess materials from the site. 1 1 END OF SECTION 1 1 fTDI Chip Bldg. Job No. 1209-31 Div. 23 1 wiii DIVISION 26 --ELECTRICAL CONTENTS 26 00 00 ELECTRICAL POWER DISTRIBUTION sari 26 50 00 LIGHTING ili Nir Mc kk NiJi WU atii e:r lU fi III fin fTDI Chip Bldg. Job No. 12090-31 Div. 26 n ELECTRICAL POWER DISTRIBUTION 26 00 00 PART 1 -- GENERAL 1.1 WORK "" A. Provide and install complete electrical service, power and lighting as shown on the Drawings and specified herein. Verify all switch locations with Owner for approval prior to any rough-in. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Owner,provide all related products and accessories from one manufacturer. C. Use products and accessories from manufacturers who specialize in making, installing, and servicing systems of this type. From a manufacturer specified or approved by the Owner. D. All work shall comply with manufacturer's instructions and governing building and safety codes. ati 1.3 SUBMITTALS A. At the close of this work,provide three copies of operations and warranty information to Owner. 1.4 MATERIALS HANDLING A. Provide all materials required to complete the work as shown on Drawings and specified herein. Deliver, store, and transport materials to avoid damage to the product or to any other work. Reject and return any products or materials delivered in a damaged or unsatisfactory condition. Materials and products delivered will be certified by the manufacturer to be as specified. B. Store materials indoors, protected from dirt, moisture, contaminants, and weather. MAW 1.5 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain and use up-to-date construction documents on site. Maintain and use up-to-date trade standards and manufacturer's instructions. B. Confirm there is no conflict between this work and governing building and safety codes. Confirm there are no conflicts between this work and work of other trades. Confirm that work of other trades that WAY precede this work has been completed. Meet all requirements to secure warranty. C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for field observation by Owner. a bit PART 2 --MATERIALS 2.1 GENERAL fTDI Chip Bldg. Job No. 12090-31 Div. 26 A. All materials must be new and of the type and quality specified. Materials must be delivered in a labeled, unopened containers. All electrical products must bear the Underwriters Laboratory label. a 2.2 TEMPORARY POWER A. Not Required. 2.3 ELECTRICAL SERVICE a A. Provide complete electrical service as shown on the drawings and specified herein. B. Conduit, junction boxes, and electrical wire connectors shall be as required by the local building a code. C. Circuits will be diagrammed by the Electrical Contractor. rri 2.4 SWITCHES,RECEPTACLES AND WALL PLATES a A. Provide complete switches, receptacles, wall plates and related materials as shown on the drawings and specified herein. r i B. Wall switches, quiet operating switch rated 20 amperes and 110-220 volts AC. Color and switch type as selected by the Tenant. Wall Dimmers, if any, linear slide type. Color selected by Tenant. Rated for 600 Watts minimum, size as per circuit. C. Receptacles, Type 5-20 R, plastic face, color as selected by the Tenant. Specific purpose receptacles as shown on the Drawings. D. Exterior weatherproof cover plates shall be gasketed cast metal with hinged gasketed covers. PART 3 -- CONSTRUCTION AND INSTALLATION 3.1 WORK CONDITIONS Oki A. Correct any conditions not in compliance with Section 1.5.A. noted above. B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work. C. All work conditions shall be as per manufacturer's instructions, trade association standards, and governing building and safety codes. 3.2 PREPARATION A. Straps and other support Ponstruction for electrical equipment must be as required by the building department. 3.3 INSTALLATION A. Install products as per Drawings and these Specifications. fTDI Chip Bldg. Job No. 12090-31 Div. 26 a a B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed system. Make all required adjustments and corrections at no added cost to the Owner. C. Provide for maintenance of this work for one year following final approval by governing agencies. Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment, repair and replacement of parts as required. 3.4 REPAIR AND CLEANUP A. After installation, inspect all work for improper installation or damage. B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing regulatory agency. C. Clean the work area and remove all scrap and excess materials from the site. } END OF SECTION rw fTDI Chip Bldg. Job No. 12090-31 Div. 26 LIGHTING 26 50 00 PART 1 -- GENERAL 1.1 WORK A. Provide and install all interior and exterior lighting fixtures and lamps as shown on the Drawings and specified herein. 1.2 PRECONSTRUCTION AND PREPARATION A. Examine and verify that job conditions are satisfactory for speedy and acceptable work. Maintain , and use up-to-date construction documents on site. Maintain and use up-to-date trade standards and manufacturer's instructions. B. Confirm there is no conflict between this work and governing building and safety codes. Confirm imi there are no conflicts between this work and work of other trades. Confirm that work of other trades that must precede this work has been completed. Meet all requirements to secure warranty. C. Notify Owner when work is scheduled to be installed. Use agreed schedule for installation and for field observation by Owner. PART 2 -- MATERIALS 2.1 GENERAL A. All materials must be new and of the type and quality specified. Materials must be delivered in labeled,unopened containers. All electrical products must bear the Underwriters Laboratory label. B. Products and requirements for lamps and lampholders are shown in the Lighting Fixture Schedule. C. Provide and install all required accessories for mounting and operation of each fixture. mai PART 3 -- CONSTRUCTION AND INSTALLATION 3.1 WORK CONDITIONS A. Correct any conditions not in compliance with Section 1.2.A. noted above. B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work. C. All work conditions shall be as per manufacturer's instructions, trade association standards, and `A" governing building and safety codes. 3.2 PREPARATION A. Straps and other support construction for electrical equipment must be as required by the building department. fTDI Chip Bldg. Job No. 12090-31 Div. 26 3.3 INSTALLATION a A. Install products as per Drawings and these Specifications. B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed system. Make all required adjustments and corrections at no added cost to the Owner. C. Provide for maintenance of this work for one year following final approval by governing agencies. Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment, repair and replacement of parts as required. 3.4 REPAIR AND CLEANUP A. After installation, inspect all work for improper installation or damage. B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing regulatory agency. a C. Clean the work area and remove all scrap and excess materials from the site. END OF SECTION a fTDI Chip Bldg. Job No. 12090-31 Div. 26 DIVISION 27 COMMUNICATIONS CONTENTS 27 00 00 COMMUNICATIONS kkb tb$/+ f E M1 1 l9,p fTDI Chip Bldg. Job No. 1209-31 Div. 27 COMMUNICATIONS 27 00 00 PART 1 -- GENERAL 1.1 WORK A. Provide and install all equipment necessary as directed by Owner and as shown on the drawings and specified herein for a complete, functional communications system. 1.2 QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. fat B. Unless approved by the Owner,provide all related products and accessories from one manufacturer. C. Use products and accessories from manufacturers who specialize in making, installing, and servicing systems of this type. From a manufacturer specified or approved by the Owner. D. All work shall comply with manufacturer's instructions and governing building and safety codes. PART 2 --MATERIALS 2.1 GENERAL A. All materials must be new and of the type and quality specified. Materials must be delivered in labeled, unopened containers. All electrical or low voltage products must bear the Underwriters Laboratory label. 2.2 COMMUNICATIONS A. Provide complete telephone, internet/server, and video cable service as shown on the drawings and specified herein. B. Telephone service includes equipment not provided by the phone company and may include service entrance equipment, outlets, terminal boards and other items shown on the drawings or required for a complete operating telephone service. C. Data / internet service includes equipment not provided by the internet provider company and may include outlets, terminal boards and other items shown on the drawings or required for a complete operating data service. Verify all specifications,work, related work, and Products with Owner. C. Coordinate installation of items provided by the telephone company. D. Satellite or Cable television includes equipment not provided by the satellite or cable company and may include service entrance equipment, outlets, and other items shown on the drawings or required for a complete operating cable service. E. Coordinate installation of materials provided and installed by the cable company. PART 3 -- CONSTRUCTION AND INSTALLATION fTDI Chip Bldg. Job No. 1209-31 Div. 27 rr 3.1 WORK CONDITIONS A. Correct any conditions not in compliance Section 1.2. above. rid B. Correct any conditions that might interfere with speedy,well-coordinated execution of the work. C. All work conditions shall be as per manufacturer's instructions, trade association standards, and governing building and safety codes. 3.2 PREPARATION a A. Straps and other support construction for electrical equipment must be as required by the building department. r 3.3 INSTALLATION A. Install products as per Drawings and these Specifications. B. Upon completion, secure all required pressure tests, inspections, and approvals of the completed al system. Make all required adjustments and corrections at no added cost to the Owner. C. Provide for maintenance of this work for one year following final approval by governing agencies. y„y Maintenance includes all work required in manufacturer's instructions such as inspection, adjustment, repair and replacement of parts as required. a 3.4 REPAIR AND CLEANUP A. After installation, inspect all work for improper installation or damage. B. Operating fixtures must perform smoothly. Repair or replace any defective work. Repair work will 111 be undetectable. Redo repairs if work is still defective, as directed by the Owner or governing regulatory agency. C. Clean the work area and remove all scrap and excess materials from the site. a mai END OF SECTION imi a frDI Chip Bldg. Job No. 1209-31 Div. 27