Plans Mc instry
For Th ife Of Your Building
SCOPE OF WORK McKINSTRY Co, LLC
. . ^— _______ 1. RELOCATE AND/OR ADD PENDENT ARE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENTS. PORTLAND:
J
2. NEW FIRE SPRINKLERS ARE TO MATCH EXISTING FIRE SPRINKLERS'INCLUDING RESPONSE TYPE' 16790 NE MASON STREET
{t` K-FACTOR&TEMPERATURE RATING.SEE LEGEND.
I
I 111 3. All AREAS OUTSIDE SCOPE OF WORK ARE TO REMAIN AS IS AND UNAFFECTED BY TENANT SUITE 100
- IMPROVEMENT. PORTLAND, OR 97230
fi GENERAL NOTES 503-331-0234
— _ _ 1_ THE FIRE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED,INSTALLED,HUNG,BRACED AND
TESTED IN ACCORDANCE WITH NFPA-13(2013 EDITION).
/,, I • • C • 2. ALL MATERIALS SHALL BE NEW AND U.L.USTED. www.mckinstry.com
•+'�� 1 `J 3. WHERE SUBJECT TO FREEZING CONDITIONS,IT IS THE OWNERS RESPONSIBILITY TO PROVIDE HEATING
—� FIRE SPTERI TOL PREVENTE THE FREEZING INSTAL OF WATER-FILLEDCLUDI PIPE FOR0R APIPE, WHERE WET-PIPE
I FIRE SPRINKLER SYSTEMS ARE INSTALLED; OTHER ENCLOSURES DRY PIPE.PREACTICN,PAD PROJECT:
E FIRE SPRINKLERS SYSTEMS AND ALL OTHER VALVES CONTROUJNG WATER SUPPLIES TO
SPRINKLER SYSTEMSPROTECTION
F U rn A S S Shearer &
4. THE FIRE PROTECTION CONTRACTOR SHALL NOT BE RESPONSIBLE FOR THE ABILITY OF THE STRUCTURE 1 f
�- TO ADEQUATELY SUPPORT THE FIRE SPRINKLER STSILM.
M I 5. ALL ELECTRICAL,PAINTING OF PIPE,FURRING,CUTTING,OR PATCHING SHALL EE BY OTHERS. L e I n V V e b e r Suite
R1 / 6. NEW AND RELOCATED UPRIGHT FIRE SPRINKLER HEADS SHALL BE INSTALLED ON BE ON I'SCHEDULE AR ^^r
40 M-OVERS,PENDENT FIRE SPRINKLER HEADS SHALL BE INSTALLED ON, L L A`•.1/AO OM-USERS
• • • , • • • • • • I (X) I•FTEXUBLI'SCHEDUEFIRE SPRINKLER DROPS
t{( Z, NEW MAINS ANO BRANCH LINES SHALL MATCH THE EXISTNG PIPE SIZING SCHEDULE WHERE HYDRAULIC
{ -Li ='iL
J I — I I I I • I..,. I I 4 CALCULATIONS ARE NOT REQUIRED.
J + 8. FIRE SPRINKLER HEADS HAVE BEEN COED AND RELOCATED TO ACCOMMODATE TENANT IMPROVEMENTS.
"' I•-••• I � z f z ( $9 i-I AREAS OUTSIDE THE SCOPE OF WORK AND/OR NOT IN CONTRACT SHALL REMAIN AS IS. {
_ OFFICE COPY
�''^' 9. THE OWNER IS RESPONSIBLE FOR THE PERIODIC INSPECTION,TESTING,AND MAINTENANCE OF THESE
f I� I-• I �• �� � . - • I FIRE SPRINKLER SnILMS IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 25(LATEST EDITION.)
—� THIS WORK SHALL BE DONE BY QUALIFIED PERSONNEL STARTING AFTER THE WARRANTY PER100 HAS
EXPIRED.THE COMPANY THAT DESIGNED AND INSTALLED THIS STSILM IS THE BEST QUALIFIED TO
PROVIDE THE ONGOING LONG TERM TESTING,SERVICING.AND MAINTENANCE OF THIS SYSTEM(S).
r
- 10220 Greenburg Rd.
I • I I ��—�--e • Tigard, OR 97223
STRUCTURE
t�--�� • REGISTRATION:
— SDEQBEMEBB RECEIVED
• ° '/ 4.L •J — — A. - T�� ,. NTYRA MAY 11 2022
..�.•' .� II:.:,T•••1.�A•L; ., �.•••l• � II '..<� _ _ .__ --III) ADJUSTABLE NUB
9 'L , RMOVER
: 0 0 10' 0
�,. `. ::, .:: • �:: CITY OF TIGARD
090�
' . •• ,• ' ••• . BUILDING DIVISION
1f •• .t` A A:•. •~K- • •: } ..` —• • SUSPENDED CEIRIG--J
•,- :A••• ',h,, It••.• ,:r A•• • 5 "EME TYPE SPRII4E25 IRE NST!LLEa
r FLEXIBLE SPRINKLER HEAD DETAIL
, i L:
moiimin
(26-0ISSUES:
1�
TYP NO DATE DESCRIPTION
CITY OF TIGARD /
Approved ('.
Contitionally Approved [ J
For only the work as described in: DESIGNED:
PERMIT NO. /.-fi', -A*- a-00 # DRAWN: AF
See Letter to: Follow I I CHECKED:
FIRE SPRINKLER SCHEDULE Attach t r JOB NO.
SYMBOL QUANTITY MAKE MODEL SIN RESP. K-Factor THRD TEMP COLOR TYPE NOTE Job Address: �Q TNr.9Z' s-,Al E;i ,2J SHEET TITLE
• I. RASCO G5-56 RA3415 By; Date: �j�/� Fire Sprinkler
QR 5.6 1/2" 155 White Concealed Cover
6 RASCO G5-56 RA3415 White
�rt QR 5.6 1/21 155 White Concealed Cover
7 TOTAL NUMBER OF SPRINKLERS FOR THESE PLANS
SHEET NUMBER:
FP- 101