Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
IN CITY OF TIGARD BUILDING PERMIT • COMMUNITY DEVELOPMENT Permit#: BUP2022-00111 Date Issued: 5/10/2022 T(GAR.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 1 S126DC00902 Jurisdiction: Tigard Site address: 9500 SW GREENBURG RD Project: Crown Oaks Apartments-Building 6 Subdivision: LEHMANN ACRE TRACT Lot: 5 Project Description: Replace siding,roofing,windows&decks.Convert(3)existing laundry room to(3)new units. Replace interior finishes. Contractor: ERIN ISLE CONSTRUCTION INC Owner: OREGON SUNSHINE LLC 11120 SW INDUSTRIAL WY BLDG 9 BAY 2 BY CARPENTER, HARRIET TUALATIN, OR 97062 15435 SW WOODWIND CT BEAVERTON, OR 97007 PHONE: 503-691-9096 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 05/10/2022 $2,253.55 Occupancy Grp: R-2 Occupancy Load: 24 Demolition 12%State Surcharge-Building 05/10/2022 $270.43 Dwelling Units: 0 Plan Review 04/21/2022 $1,464.81 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 05/10/2022 $434.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 05/10/2022 $901.42 Value: $290,000 Metro CET 05/10/2022 $348.00 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $5,672.21 Required: Required Items and Reports(Conditions) 1 Special Inspection(see plans) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain o p of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial RECEIVED Cityof Tigard Received z/Z Permit No: � � -�/ g DateBy: : " 13125 SW Hall Blvd.,Tigard,OR 97223 APR 1 9 2022 Plan Review' _�Z Phone: 503-718-2439 Fax: 503-598-1960 Date/By. Related Permit: A Ft Inspection Line: 503-639-4175 CITY OF TIGARD Date Ready/By: / 7 Iuris: 6ii See Page 2 for Internet: www.tigard-or.gov BUILDING DIVISION ified/Method: 8/ Supplemental Information TYPE OF WORK REQUIRED DATA:I-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 07iddition/alteration/replacement Other: katfrAie equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ [:11-and 2-family dwelling ElCommercial/industrial ElAccessory building Multi-family Number of bedrooms: ❑Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 950040 t New dwelling area: square feet City/State/ZIP: T) a er e� t�S Garage/carport area: square feet 4(� Suite/bldg./apt.#: v Project name: Covered porch area: square feet Cross street/directions to job site: 13/ {?,' (L/ Deck area: square feet ( fin �y (f+"_ S147 7/W�` 1 &&�/i,r�j Ip4. Other structure area: square feet �V! I REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#:COI, Permit fees*are based on the value of the work performed. Tax map/parcel#: )( Acc r 4• 3143O Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the ,,,.J,,�� may, DESCRIPTION OF WORK (� /O,�- work indicated on this application. g 1- S� I W� �j W NICKS �'i`'�/IV• conve 4C3) Valuation: Z, c)pp 1_ ��qq14 v�i Existing building area: g ''"'square feet vivivne •i oish {- . New building area: square feet �`"'f� VVVVVV►►►►►► f "'�r' PROPERTY OWNER 0 TENANT Number of stories: 2/ Name: W15 . J"-/. LL '�, Type of construction: T v— 1 Address: D 7 /f of %v Occupancy groups: g /i y R City/State/ZIP: �p ez r--`,.0_,,,r] p al '7 z D q Existing: 12.42. Phone:(53) 70 Z.•d,-3 5- Fax:( ) New: 122 g APPLICANT y 0 CONTACT PERSON BUILDING PERMIT FEES* Business name: _ `pll V l'te f.tr/ (Please referee schedule) 1 Structural plan review fee(orr deposit): 4 g� . Contact name: g .eApzfr (��D'NJi /�� &' FLS plan review fee(if applicable): Address: City/State/ZIP: itr•Ftor R q 12-1 3 Total fees due upon application: Amount received: Phone:(En) 5 , 74. b Fax: :( ) E-mail: S ir'o►r'c lri i rec 1111a i 1 .C� PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: t11 ill 1 S lv 't.+yNi iVN I lei v Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: i 1 1 .0 &'A/ t 4i tf'ta wA Solar Installation Specialty Code checklist. City/State/ZIP:Two t 1 h ~1 © N 70 Permit fee(includes plan review $180.00 ( � �� � ( ) and administrative fees): Phone: S ) ! ` Fax: State surcharge(12%of permit fee): $21.60 CCB Lic.: 107-1a Z% ' , Rh.)/:-2--3Total fee due upon application: $201.60 Authorized signature: it qk►�1'rir This permit application expires if a permit is not obtained within(.14 f, within 180 days after it has been accepted as complete. Print name: S Itgf g ,W" •Z)'1 Date: y/.((j.W * Fee methodology set by Tr-County Building Industry {{{ Service Board. 1:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(1 I/02/COM/WEB) City of Tigard 1114 r COMMUNITY DEVELOPMENT DEPARTMENT T c►t rz Building Permit Review — Commercial - With Land Use tt num=+ n',_ EP F;3 +a .-,..wit,' .�,^�.--rxat•*1f2Tra tt€riti'' 3a'�i>Sk. alnr +'ffi?S i.`$" 'g;It urns.,,:y f a + iin,f 7t=FS[2i1 3,4LEW'TEc:2 Building Permit #: JP2,022-0O(t Site Address: `i5CO S\ 6► (Abu r f CI Suite/Bldg#: cp Project Name: -,O IN it OciVS _ p cr kS h Ov d�Ad el (Name of commercial business occupy: g the space. If vacant,enter Spec Space.) Planning Review Proposal: p CGI S l�� 1 b , VJ i' d 0, M ( V , Cove,G'rt. 3 la o'\C�Yv1 roc) -tV -- nt t,•.s 11 I , k `ii ' IA/Verify site address/suite# exists and active in permit system. El River Terrace Neighborhood: ❑ Yes No gc and Use Case#: MIll U7.n2-2 - D . 6 Ai laus,Match Approved Land Use: Site Plan Landscape Plan ❑ Other: .:'k Urban Forestry Plan Tlf Elevation Plan V/ uilding Height: Maximum Height Z - Actual Height '7 q I4- Conditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance 4C] Business License: Exists: ❑ Yes El No,applicant was provided a business license application \\ i Public Facilities Improvement(PFI)Permit: Required: ❑ Yes,applicant was notified ❑ No Applied For: ❑ Yes ❑ No,stop intake Notes: Approved by Planning: •OA C(1)I 6n1� J Date: ` /167 (z ozz _ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved 77. Building Permit Submittal Original Submittal Date: /q/ZOZZ- Site Plans: # Building Plans: # Building Permit#: [VEnter building permit#above. Workflow Routing: [Planning [VEngineering [ 'Permit Coordinator [Building Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: [Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: - Date: 0 Zd L122_ I:\BuildingForms\BldgPermitRvw COM_WithLandUse_111819.docx Engineering Review C' Slope at building pad: 72A R'PFI Permit#: A (C— VConditions "Met"prior to issuance of building permit P1/b- 2Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) AN- [2/Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ViNo Assess Water Quantity Fee in-lieu: ❑ Yes No LIDA Facility on lot: ❑ Yes [ "No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: f / ►72.11e0 Date: /2.6 2 Z Revisions (afterBuilding Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review NIA Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes gr N/A Tigard Trans SDC: ❑ Yes � N/A Parks SDC: ❑ Yes 7f N/A LIDA Fee: ❑ Yes ,eJ N/A ;Z/ OK to Issue Permit Approved by Permit Coordinator: /6V0(-4 Date: 4 I Z 1 iv 22 I:\Building\Fonns\BldgPennitRvw COM WithLandUse_111819.docx