Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
v CITY OF TIGARD BUILDING PERMIT 111 COMMUNITY DEVELOPMENT Permit#: BUP2022-00106 Date Issued: 5/10/2022 'TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S126DC00902 Jurisdiction: Tigard Site address: 9500 SW GREENBURG RD Project: Crown Oaks Apartments-Building 2 Subdivision: LEHMANN ACRE TRACT Lot: 5 Project Description: Replace siding, roofing,windows&decks.Convert(3)existing laundry room to(3)new units.Replace interior finishes. Contractor: ERIN ISLE CONSTRUCTION INC Owner: OREGON SUNSHINE LLC 11120 SW INDUSTRIAL WY BLDG 9 BAY 2 BY CARPENTER, HARRIET TUALATIN, OR 97062 15435 SW WOODWIND CT BEAVERTON, OR 97007 PHONE: 503-691-9096 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 05/10/2022 $1,673.71 Occupancy Grp: R-2 Occupancy Load: 24 Demolition 12/o State Surcharge-Building 05/10/2022 $200.85 Dwelling Units: 0 Plan Review 04/21/2022 $1,087.91 Stories: 0 Height: 0 ft DC Provision Review, COM TI-Ping 05/10/2022 $434.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 05/10/2022 $669.48 Value: $193,400 Metro CET 05/10/2022 $232.08 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $4,298.03 Required: Required Items and Reports(Conditions) 1 Special Inspection(see plans) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ' Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE ONL1 City of Tigard RECEIVED Received , za 1022 P p2o� (0(:)Permit No.: I ' " 13125 SW Hall Blvd.,Tigard,OR 97223 APR 1 9 2022 Plan Review—.0, , Related Permit: Phone: 503-718-2439 Fax: 503-598-1960 Date/By: '�'22 II t_A K 1) Inspection Line: 503-639-4175 Date Ready/By: Juris MI See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD . fied/Method:r/60/. Supplemental Information BUILDING DIVISION , / _,, TYPE OF WORK REQUIRED DA A:l-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 0-Addition/alteration/replacement Other: R ( equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ 1-and 2-family dwelling ❑Commercial/industrial 0 Accessory building Multi-family Number of bedrooms: Ili Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 950040 C9YteV1 )1 New dwelling area: square feet City/State/ZIP: Ti Ct W'1'� q7� r/` ti Garage/carport area: square feet Suite/bldg./apt.#: v Project name: =E1 � " t Covered porch area: square feet Cross street/directions to job site: / q:2...�. Deck area: square feet �� j(/A Q) S �` 1", (1 R• Other structure area: square feet v W ��-�`ttt REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: ( Lot#:q02_, Permit fees*are based on the value of the work performed. Tb Ac T #'J2•3c630c Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF �WORK .e (' /0�-1 work indicated on this application. 4016 � � 1 w 1 1� "tr`�N• "o"•�I'?G C Valuation: /9 ' I . r o eA rj 1C Y} t �5 le* J 1.104:` • Existing building area: [�'square feet NVO�,JJ L I �1��i1��r'YYVYhhh fly C h,�V 1u • New building area: square feet PROPERTY OWNER 0 TENANT Number of stories: 2/ Name: \V'5 • :fp, LL Type of construction: 47e, V-vienrettil D 7 if of l 4vc Occupancy groups: ''- �i y R City/Statee//Z1P: 7p re rt.-A-r,i> 7 t °7 '7 Z p 9' Existing: RZ, Phone:(5b3) 70 Z,.073 3 '- Fax:( ) New: R2. g APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name: pVN A�,r�1nl "/LIZ, (Please referrofeeschedw[e) Structural plan review fee(or deposit): 1 o87,Cif Contact name: FLS plan review fee(if applicable): Address: City/State/ZIP:paC4' elk q 194 3 Total fees due upon application: �Phone:(0111) 0 43b v,_ Fax: :( ) Amount received: E-mail: Sicrar titc r a�q c PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* `,/ Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name: t11 n I sw cbt�S-�`IN1�N l h, Submit two(2)sets of roof plan with connection details n and fire department access,along with the 2010 Oregon Address: t 1 1 ;LQ SIN i, u5' '`i/1 �/Gt Solar Installation Specialty Code checklist. City/State/ZIP:'l rrl!( t 1 h © WW 70 Permit fee(includes plan review $l 80.00 v Vl and administrative fees Phone:(S° 1D�).- 0% Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.: 107 9292 , Authorized signature: P/P/L3 Total fee due upon application: $201.60 4 :,,it►'� 'A f This permit application expires if a permit is not obtained ,� within 180 days after it has been accepted as complete. Print name: V{VbV►i, ,W" '"! Date: LIA, If• /' * Fee methodology set by Tri-County Building Industry Service Board. l:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard Illr COMMUNITY DEVELOPMENT DEPARTMENT TAD Building Permit Review — Commercial - With Land Use a E: y2p=03,, t• ram+ _a--z,axxx.aar., vs xM..f it._ 3'i . t �..<<.r., �. S., ^saO ,x.4is,�.:zstiilpi,.;+tti aY.`. m�c" u Building Permit #: 3,P2O22-0Q 10(o Site Address: '5(1) S\ 6 i" v\too rei Y.6i Suite/Bldg#: 2_. k Project Name: C -0 Uv VI Qc�`(Sjc k h Ov ckl-)d v (Name of commercial business occupying the space. If vacant,enter P Spec Space.) Planning Review (( A Proposal: rk sl ►'UCH r, Iv )i'rI GG Uti,U, � �S. (G�v e Kt I r\a roc) ►V .S � n-e v ) 0111 , 4, p TCL 1I-100c( " s,i Si,'Qi i /Verify site address/suite#exists and active in permit system. ❑ River Terrace Neighborhood: ❑ Yes VNo •Z and Use Case#: M Ir ) U-7•©2 i L-[ 1 4 6 1 Plans,Match Approved Land Use: Site Plan �Landscape Plan ❑ Other: Urban Forestry Plan 71 Elevation Plan �}r VI/Building Height: Maximum Height Z r' 4` Actual Height '7 .e . CConditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance ,tiOtt40 Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application 4El Public Facilities Improvement (PFI)Permit: Required: ❑ Yes,applicant was notified ❑ No Applied For: ❑ Yes ❑ No,stop intake Notes: Approved by Planning: •11(1 (()I I/nl Date: 4/1 4 iz U Z. Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: Oi/(c/o22 Site Plans: # 3 Building Plans: # 3 Building Permit#: [ Enter building permit#above. Workflow Routing: IJ�Planning 0-Engineering [Permit Coordinator [Building Workflow Sign-off: P.-Sign-off for Planning(include notes from planning review) Route Application Documents: Ilk-Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: 0(// 22-- I:\Building\Forms\BldgPerniitRvw_COM_WithLandUse_111819.docx Engineering Review lope at building pad: hL rA LJ PFI Permit#: n/a, [ Conditions "Met"prior to issuance of building permit ilk, 27/Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) 41// Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes [KNo Assess Water Quantity Fee in-lieu: ❑ Yes 27No LIDA Facility on lot: ❑ Yes CY No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: 7 i4 f v-)L k,tti Date: 41241 Zo?7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review NtConditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes I7 N/A Tigard Trans SDC: ❑ Yes V N/A Parks SDC: ❑ Yes N/A LIDA Fee: ❑ Yes yr N/A 21/ OK to Issue Permit Approved by Permit Coordinator: Date: I2:002/17 I:\Building\Fonns\BldgPennitRvw COM WithLandUse_111819.docx