Loading...
Permit CITY OF TIGARD BUILDING PERMIT 1111 COMMUNITY DEVELOPMENT Permit#: FPS2022-00069 Date Issued: 5/12/2022 T[GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S135AB01002 Jurisdiction: Tigard Site address: 10220 SW GREENBURG RD 225 Project: Furniss, Shearer, &Leinweber Subdivision: METZGER, TOWN OF Lot: 9 Project Description: Fire sprinkler permit: Relocating(6)and adding(1)sprinkler head. Affidavit submitted. Contractor: MCKINSTRY COMPANY LLC Owner: LINCOLN CENTER LLC 16790 NE MASON STREET SUITE 100 BY SHORENSTEIN PROPERTIES LLC PORTLAND, OR 97230 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-331-0234 PHONE: FAX: 503-331-6907 Specifics: FEES Description Date Amount Type of Use: COM Permit Fee Class of Work: ALT Type of Const: COM 05/12/2022 $64.54 12%State Surcharge-Building 05/12/2022 $7.74 Occupancy Grp: Occupancy Load: Plan Review-Fire Life Safety-MF 05/12/2022 $25.82 Dwelling Units: Info Process/Archiving-Sm$0.50(up to 05/12/2022 $0,50 Stories: Height: ft 11x17) Bedrooms: Bathrooms: Value: $1,000 Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $98.60 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notificaton enter. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 2 987 or 1.800.332.2344, Issued By: 1, 01.rtp Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Fire Protection System FOR OFFICE USE°NL't E C E I V E D Received City of Tigard DateB y. Permit No.:/• r 13125 SW Hall Blvd.,Tigard,OR 97 2 Plan Review Phone: 503.718.2439 Fax: 503.598.1960 Date/B : J Other Permit: ,J4 T I G A R D Inspection Line: 503.639.4175 MAY 1 1 2022 Date Ready/By: o See Page 2 for Internet: www.tigard-or.gov Notified/Method: 1 EN Supplemental Information nrr TYPE OF WORK 1I.1; O1 k/!!c lON11 REQUIRED DATA: 1-AND 2-FAMILY DWELLING ❑New construction ❑ Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all E1 Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONST t dCTION work indicated on this application. El 1-and 2-family dwelling ,A. Commercial/industrial Valuation: $ ..�Q Q n n n ❑Accessory building El Multi-familyNumber of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 10220 SW G r e e n b u r g Rd. New dwelling area: square feet City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: �2.5- Project name: F S L Suite 225 Covered porch area: square feet Cross street/directions to job site: )-S5 S " Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax ma parcel no. Indicate the value(rounded to the nearest dollar)of all P p` equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Relocate (6) and Add (1) fire sprinkler head Valuation: $ 1y ` Existing building area: square feet New building area: square feet ❑ PROPERTY OWNER 0 TENANT Number of stories: Name: Shorenstein Realty Services Type of construction: Address: 5335 Meadows Road, Suite 275 Occupancy groups: Cityistate/zIP: Lake Oswego, OR 97035 Existing: Phone:( ) Fax:( ) New: ❑ APPLICANT ❑ CONTACT PERSON NOTICE Business name: McKinstry C o . LLC All contractors and subcontractors arc required to be Contact name: Alex For ke r licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 16790 NE Mason S t . Suite 100 jurisdiction in which work is being performed.If the City/State/ZIP: P O rt l and, OR 97230 applicant is exempt from licensing,the following reasons apply: Phone:(971)-420-7550 Fax: :( ) E-mail: alexf@mckinstry . com CONTRACTOR BUILDING PERMIT FEES* fee schedule Business name: McKinstry Co . LLC (Please refer to ermit fee:Permit Address:16790 NE Mason St . Suite 100 City/State/ZIP:P o rt l an d, OR 97230 State surcharge(12%of permit fee): FLS plan review(40%of permit fee): Phone:(9 71)-4 2 0—7 5 5 0 Fax:( ) (Due upon application submittal.) CCBlic.: 172811 Total permit fees: Authorized signature: Amount received: 6/� This permit application expires if a permit is not obtained Print name: Alex F o r ke r Date: within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board. is Building'Permits FPS-PermitApp_031016.doc 440-4613T(I 1 02 COM WEB) City of Tigard: Fire Protection Permit Checklist Page 2- Supplemental Information Describe work to be done: 1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices: El New system Number of sprinkler heads: 7 Number of alarm devices: X❑ Addition or [3 1-10 heads: Affidavit required and El 1-5 devices: Affidavit required and Alteration (3) copies of sketch showing area (3) copies of sketch showing area to existing of work within building structure of work within building structure system El 11+ heads: Plan review required and El 6+ devices: Plan review required and (3) sets of plans. (3) sets of plans. Additional description of work: Type of System (Co plete A, B, C or D as applicable): A.) Commercial Sprinkler Sprinkler Type [t Wet ❑ Dry Additional Standpipes Information: Sprinkler Supply Line _ ❑ Yes El No Hazard Group Light Density 1 Design Area 2 2 5 K. Factor 5 . 6 Sprinkler Project Valuation: $ 10 0 0 . 0 0 B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations El Yes include: Individual Component ❑ Yes Cut Sheets Fire Alarm Project Valuation: $ D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 7,201 and greater $404.39 Sprinkler Project Square Footage: sq. ft. Fire Protection Permit Fees Project valuation subtotal (see A, B & C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12%of permit fee): $ FLS Plan Review (40% of permit fee): $ TOTAL: $ I:\Building\Permits\FPS_PermitApp_031016.doc 2 City of Tigard Permit No.: FAY a-Mk, • 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 Date Received: —,//%t Inspection Line: 503.639.4175 TIGARD Internet: www.tigard-or.gov By: FIRE SPRINKLER AFFIDAVIT FOR ALTERATIONS vv OR TENANT IMPROVEMENTS RECEIVED (1 to 10 SPRINKLER HEADS WITHOUT PLANS) NAY 11 202Z CITY OF TIGARD BUILDING DIVISION Project Name: Furniss Shearer & Leinweber Suite 225 Occupancy: B Job Address: 10220 SW Greenburg Rd. Type of Construction: 1-B Suite: 225 Contractor: McKinstry Phone: 971-420-7550 Number of Proposed or Altered Heads: 7 Type: Hazard: Light Density: 1 I Alex Forker/McKinstry Oregon Construction Contractors Board No. 172811 certify the following is true and reasonably defines the scope of work for this project: a) All work is limited to drops and armovers in a light-hazard occupancy. b) Positions of sprinkler heads relative to architectural features such as soffits, beams, partitions, walls, etc. complies with current adopted edition of NFPA 13. c) The proposed work does not require hydraulic calculations. d) Only one sprinkler head will be installed from one drop (exception: up to two heads from one drop may be installed when each head is in a separate fire area). e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13. f) Tenant improvements in a new building shall be equipped with Quick Response heads (see 2002 NFPA 13, Section 8.3.3.1 for exceptions). g) The installation shall comply with the requirements of the current adopted edition of NPFA 13. h) Piping shall not be concealed until hangers and bracing are inspected. i) Final approval shall be subject to onsite tests and inspections. In addition, I understand the following is required: • Submit (3) copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • A copy of this ocument with a copy of the sketch attached shall be available for all inspections. Signature: — Date: 05/09/2022 Print Name: Alex Forker I:\Building\Forms\FireSprinklerAffidavit_071514.docx Page 1 of 1