Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT ■ COMMUNITY DEVELOPMENT Permit#: MEC2022-00258 T t f A I<',I) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/4/2022 Parcel: 1 S134AA01900 Jurisdiction: Tigard Site address: 10115 SW NIMBUS AVE 150 Project: Mugen Noodle Bar Subdivision: IKOLL BUSINESS CENTER,TIGARD Lot: B Project Description: Remove and replace RTU Contractor: JNB MECHANICAL INC Owner: ROBINSON,JERRY CHRISTOPHER TRUST 3315 NE 112TH AVE A40-41 DIETRICH, NANCY BISHOP VANCOUVER,WA 98684 9701 SE MCLOUGHLIN BLVD MILWAUKIE,OR 97222 PHONE: 360-433-9439 PHONE: FAX: 360-433-9439 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 04/22/2022 $383.27 Class of Work: ALT Type of Const: VB Plan Review 04/22/2022 $95.82 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 04/22/2022 $45.99 Stories: 1 Info Process/Archiving-Sm$0.50(up to 04/22/2022 $26.00 11x17) Project Valuation: $11,357.00 Fuel Air Handlers Fuel Types: Natural Gas Units< 10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $551.08 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you t• folio' the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. Y. .\\,obtain . copy of the rut l ,Issued By: ,4r Permittee Signature: vide& , .E i. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of th project. Approved plans are required on the job site at the time of each inspection. S-3/2S122. Mechanical Permit Applicatio ioiz("icy,Ilse.ONLY City of Tigard 'R EC E��/�E Da« y 03 / lvl2 �•� � o�-ram 25-8 111 Permit No.: 't 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Revie �. Phone: 503.718.2439 Fax: 503.598.1960 MAR 2022 t-) - 6- Other Permit: Date.R7 T I G A R D Inspection Line: 503.639.4175 Date Ready/By: tfi luris: ®Sec Page 2 far Internet: www.tigard-or.gov CITY/ OF 1 I Ultra) Notified Method: / /u/) �/'_ Supplemental Information BUILDING DIVISIO kaa �„ (� TYPE OF WORK COMMERCI :' FEE* SCHEDULE-USE CHECKLIST — — Mechanical permit fees*are based on the value of the work 0 New construction 1st Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all 0 Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$,th�ijS' CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑1-and 2-family dwelling Commercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family 0 Master builder 0 Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: 1 Air conditioning 46.75 b Job site address: IQ 'S SW 0\m loos hQed. Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:-VN(a(1 d OR 01`62-9, / Furnace 100,000+BTU(ducts vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.:S `G�I Project name:M ell �� `� p ct 2 Duct work 23.32 Cross street/directions to job site: ,epl otc e,meh* Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other:ibC tQ e o i 4- \ 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 Flue vent for water heater or gas v)e)ylbve, eit .3 V ) alai replace, u,,.\1- \new . 2,1v. fire lace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 0PROPERTY OWNER I 0 TENANT Other: 23.32 Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33,39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawispace fans 23.32 ® APPLICANT 0 CONTACT PERSON Other: 23.32 Business name:�N'Q, k an'\�1 "��G Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: (,,ov,(ne, G.--i Furnace,etc. Gas heat pump Address:J3\5 UG ,i?"'i^ twe, ._,At., S-1n LAO..,41___-_______ WalUsuspended/unitheater City/State/ZIP:\}UYl�,pltver- wpi ct v{o.� Water heater 2( ) 133_GIp ti ( ) Fireplace Phone: ✓ <✓ 19' C. Fax: Range E-mail: Barbecue CONTRACTOR Clothes dryer(gas) Business name: �V..) Med\U\n,en\. � i Other: MECHANICALPERMTf FEES* Address:' \CJ �G (t0-- me,. alb-U1t Subtotal City/State/ZIP:v�tfic o - 1 .3� Gy ga. Minimum permit fee($90.00) W Plan review(25%of permit fee) Phone:(4060 L43-5.-Ci06;I ,- Fax:( ) State surcharge(12%of permit fee) CCB lic.: % L TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 6/1/1/ days after it has been accepted as complete. Authorized signature:(1_,04/ • Fee methodology set by Tri-County Building industry Service Board Print name:ecky kne ( fa A Date:SI 2-a.-1�Q c}.?— 1:10uitding\Purmits\MEC_PcrmitApp 0401t7'doc 440-4617r(I1/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 -Supplemental Information Commercial &Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\suilding\Permits\MEC PermitApp_040113.doc 2 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT 111 Tl Building Permit Review — Commercial - N o Land Use Building Permit #: ME(',202.2.-Q0258 Site Address: 0((C S.) k) Itia(A AVr Suite/Bldg#: Project Name: M ij i r1/41Coi (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: P,T"V (2-. e cAC icft Existing Business Activity: K fi4 Proposed Business Activity: N 12 Verify site address/suite# exists and active in permit system. E River Terrace Neighborhood: ❑ Yes II No .toning. tAi/V. y1 P mitted Use: , -Yes ❑ No ❑ Spec Space Confirm no land use required. Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: _.. Date: 3/3r.)/2 Revisions (after Building Submi al only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 00 949 2. Site Plans: # - Building Plans: # ?— Building Permit#: tenter building permit#above. Workflow Routing: Er-Planning ❑ Permit Coordinator wilding Workflow Sign-off: Cl-Sign-off for Planning(include notes from planning review) Route Application Documents: R..-Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: Date: DO V2O2 I:\Building\Forms\BldgPermitRvw_COM NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BldgPermitRvw_COM NoLandUse_111819.docx