October 31, 2016 ' •:• • •
Project: New Apartments
9580 SW Greenburg Road
Tigard, OR 97202
Subject: Building 5 plan orientation
To whom it may concern:
The following is a modification to the permitted plans:
• Due to the Civil plans and Architectural Building plans showing Building 5 in a mirrored
fashion, and the plumbing at the foundation level has been built to the orientation of the
Civil plans, we propose the following rectification: The building plans have been
mirrored to match the Civil plans, so that plumbing in place does not need to be
changed at this point. This does not affect the structural building plans or calculations
in any way as far as the engineered design.
• Sheets affected by this design:
• A26
• A27
• A28
• A29
• S30
• M10 o PROPe
• M11 c� iNE' -42i
65469PE
6At%e:te,
Sincerely, OREGON tb
Julie Havelka, PE ;tS'
Summit Engineering, LLCM' - HAS