Loading...
Report (59) • �U ';/. i (a- 0033 '1 / • •• •• • • • • • • •• • •• •• 1A • • •• •• • • • •• • • ••• • • •• • • • • • • •• • ••• . . . • . 5 8o Sw SUMMITENGINEEII G L.L.C;: • • • ;•, • •• • • •• • • • ••• ••• •• • •• •• • • • • •• •• • • ••• ••• •• • • October 31, 2016 ' •:• • • Project: New Apartments 9580 SW Greenburg Road Tigard, OR 97202 Subject: Building 5 plan orientation To whom it may concern: The following is a modification to the permitted plans: • Due to the Civil plans and Architectural Building plans showing Building 5 in a mirrored fashion, and the plumbing at the foundation level has been built to the orientation of the Civil plans, we propose the following rectification: The building plans have been mirrored to match the Civil plans, so that plumbing in place does not need to be changed at this point. This does not affect the structural building plans or calculations in any way as far as the engineered design. • Sheets affected by this design: • A26 • A27 • A28 • A29 • S30 • M10 o PROPe • M11 c� iNE' -42i 65469PE 6At%e:te, Sincerely, OREGON tb Julie Havelka, PE ;tS' Summit Engineering, LLCM' - HAS 971-251-0194 PCP �' 3c 001/ Julie@summitengineeringllc.com