Loading...
Plans (2) rra2107o-co Markup Legend SPRINKLER SYMBOL DEFINITION , COLOR/LINETYPE LEGEND Ilimi / � O XXX-XX SENJU Model RC-RES Residential Flat Concealed Pendent SS8464 BLUE LINES=FEED TO FIXTURES(BATH,SHOWER,ETC.). o Delete Line / / f 0 - - - 17 K=4.9, 162F°,7/16"Orifice,Maximum Spacing 16'x16' GREEN LINES=INTERLEVEL CONNECTIONS/SUPPLY. 0 J z Sprinkler head demand: 13 BLACK LINES=SPRINKLER HEAD TO SPRINKLER HEAD. o MAXIMUM SPACING(TYP) RC-RES-16 P gpm @ 7.04 ^z Add Line — — — — — = 1/2"PIPE SIZE w SPRINKLER MODEL(TYP) .-,.O HEAD SYMBOL(TYP) SENJU Model RC-RES Residential Flat Concealed Pendent SS8464 — — =3/4"PIPE SIZE a u Add TeeI 0 - - - 2 K=4.9,162F°,7/16"Orifice,Maximum Spacing 18'x18' —— = 1"PIPE SIZE ,o'u F I RC-RES-18 Sprinkler head demand: 17 gpm @ 12 _ _ O N;,� = 1-1/4"PIPE SIZE tivLL N°z Add Elbow 1-1 SENJU Model RC-RES205 Residential Flat Concealed Pendent SS8464 ` J 4:11 5 i 2 0 _ _ s,nn'° 1 K=4.9,205F°,7/16"Orifice,Maximum Spacing 14'x14' w H Sprinkler head demand: 13gpm 7. M a L 8 W 3 Add Coupling RC-RES-14-205 P @ 04 z a,° 3 SENJU Model RC-RES205 Residential Flat Concealed Pendent SS8464 m m°I m Add Head -€--€ --CI- 0 - - - 1 K=4.9,205F°,7/16"Orifice,Maximum Spacing 16'x16' o F-w 3 Sprinkler head demand: 14 gpm @ 8.2 RC-RES-16-205 P Delete Head - - _ i s ll-C 5 2ndFlorRECEIVED �N =� F�= 5 2nd Floor " F �RU�10-yx ���" ] 3rd Floor '�wxq��o �mz=w Move Head 4 34thrd Floor p gauzy" q 4' O O p ZZ 21 TOTAL �p r:' "9P.1iq�`1 E w w y t,2 `. 1 8 Note:All revisions must be reviewed by Uponor J'i fr`IY 4: 1 :33- �'i'= o . ¢�xv�Uw z-�U Table FOO2-1 -,:2a1 =', ET < 11.4 Multipurpose Fire Safety Systems CITY OF TIGARD $E?�.--: q3 i_o 40 The Uponor Residential Fire Safety System is a residential fire protections a r. C q q o; = system installed in combination with the cold side of the domestic potable ce°W g a 9 g' og Fo-.<a, water system. Only licensed contractors trained by Uponor can install this BUILDING DIVISION W Q q z H z 4 3i o y a:q; O system. '�d��' o_ . Q dz"�ozoo!���h �r� Y qsprinkler r _(• ' .LT.-1 --__._�LSS I N QV Fq�? .0 y� � What to do if Changes are Required I I r 1. UELR AIIUOL ¢`F ,11 If an features or obstructions require the addition or deletion of -_ -- heads,or significant relocation of sprinkler heads,contact the Uponor Design - �� 7 n a°x< z e v,m' Department to determine if observed changes require a redesign l I-P�. I '' 6i� I I `{ °'z s o z x o o Q ;,zj z��+ (888.594.7726). II r Deck I e © Patio e, , o<1 AA o o g o a , z ,..a MOST HYDRAULICALLY REMOTE HEADS I 17`0 a6Josl g3F7 yg .�e'`2< � HEAD# GPM PRESSURE REQ'D AT STREET s _ 4 r EGRESS 1 ,. A ,r y z�o s o m o o s-06- SGD s-0d4si. - O q p 1 HEAD H.9 17 55.12 •• _:\--1 _ ''` P4, maw2 HEAD H.4&H.3 26.0764 74.34 WALL ABOVE "' i 1 ` �, o�' j oamd U f 1"AQUAPEX INTERLEVEL i rH 1 I zc. p:s 5 -1I- CONNECTIONS FROM FIRST I f 410/RC-RES-16 '\ Ci-RE '��'7'Fo oV �v6�jp� —I- UUUFyi'6ICI en FLOOR TO SECOND FLOOR I�ICfiFIt�I r{ ` L�4+} 7 \$1"AQUAPEX INTERLEVEL D3T CR_ I -ft, `p{�,EI.FZ-\2 .j �` j �T.59ettel " CONNECTIONS FROM I I 1 r /rnv_ ). ' M.I.L. sssss�������a wwwww SECOND FLOOR TO THIRD �, /fn�r�grvyjT.;,6 ' -1 \•CITY OF D FLOOR \\� r �I v �' ' i L�� L I \K\ I Suite 411\ l N I here by certify that this plan,specification, AIL\ w / yi;- I ? / i ; 1 3- or report was prepared by me or under my \ � 'i -!/ �/_ / i \� s 2T•b�Y ' direct supervision and that I am NICET Approved [ I I /1 ; Certified. Contitionally Approved \ I \I' t� I T. m Date: Ii V`' RI T. - FRT ply x4F'� • G;C 1•. \; 20 A , T. a.a� I _ I 1,1, 11 ' ! ` �\ �. �C-R ':- T' W McDonald D[ For only ttlt' Nnrk as described in. Ii -^ -�� - ,�' -sue I F.1o ! H,2O1 W•I•�••, SYSTEMQUAPEX TO NICET Cert ficatlon No.150393 g. [ F n• - y. -" t'-~ -- 1 - �, ,' RE ly. 'yl Water-Based Systems Layout-Level III F.131 •I p(` p PERMIT NO MS T V o�O - 00 34414 \II .le�, T T 3 , i ' 6v' Certification Expires:June 1,2022 4 -- [ TOWEL I `-' -'m See Letter t0 Follow21 n= T.4 — -�,—. F 1!, �' at -di, ti D,��,. 58P RING ili. l~" " T.43 IT 1 • -__ I .-1 71. H p Attach I J �r (� \ F.O r.9 O x 0 61ER ,�N 4 S 4 I ,, , LU 7 75 • ��77 ' 13 1'- SW L.Art t o pi_ R * T.4• . �, L- S•1 U Z 3 }:';) {I,I l((,Srj, 0 , �tN d/1�I iP IF F 1 MAIN SHUTOFF ry Date:, 7 .Li I I��_ f�_ 2 -.. 10 Dining/ F3 } I� F.4 t `I { (_■ u.-t _..._W=........ _. VALVE LOCATION 'Eli 7 11" I ♦ 'r I FLU ff I I I I•$tuf•f P'e--/ �., 5 Mlc" Ce -i m - ��Il� R F � RC RES I6 3J5 I i` ..' PIP I !'. WOOG TREAD.MAX. ? '^.a ry m L� 1 i p I -j �Ee,I..�34\ all ��_ ' Y 1[:... RISER B"(ACD OR ¢cal :;',1 0 \I I AS LII I%! • IIII '- \ t.R S A!R % r I '� pµjAvi ' REQt11RED PE REMOVE 8 SITE ry .. CONDi7fON) I �,C _� f• T. i $ \ el Ice MAX 2 TREADS f 0 1-1/4"AQUAPEX I ! �. _ ^."_ :.mow -- o w z w 1 1/4"AQUAPEX RISER ELEv-toer TO SYSTEM MT. - --J :: SIM m W - x J CURRENT STATIC - � ' _ _ j.i �T._. F u O ail WATER PRESSURE IN r �Y \\ �� - i �!f 1a Fs2. _ .• 0 0 ¢a¢Q o 1 STATIC: 9Rpsi PRESSURE GAUGE TO HOT WATER T \\ \ 'r'" • Ot j f "\ 1-Car Garage LU o O o a i m'^ I It1•�� �i' 1 i WALL FINISH 3;"G.W.B u u u¢a rn Z p'" 1 1/4"PRV CASH ACME HEATER \ � R v (OR EQUIVALENT) 11F._ I l LOW 7/a' \ • TI 6PSI LOSS FLOWING 26 GPM �', ;a'A U`.fE \ ItnULATE� -1 3-p i+''� n q� CEILING FINISH. O FLOOR OYE �'�. iYi( p�,6-1---4 TYPE X GW.a. UNHEATEp I I C RE 16 FIRETAPE ALL G.W B. I'�l N w °' 80 psi I I S \E� :.�r.:e _ \\ L ACE/ 'I// '1 •' WRAP BEAMS BEURN IU � z c PRV Set Pressure + T 57 \\ I 1I \ o CEILING LEVEL (rI o !I ' y` "'I INSULATE FLOOR ABOVE v �/ 1"WATER METER I �Y H.16 Living ���-, / 9 ���a® 0 12 O LL o o NFPA 13D STANDARD LOSS - -- c 3PSI LOSS FLOWING 26GPM S. " -T- 8 _ S 6 Gr2 I iO ( O o 0 o r` RC RES 16 RC RES 16 �t es o_ a I I r '— '.- 3/4"AQUAPEX INTERLEVEL/ 2 Bya. 3'-ttjy i q_�. - 8-O7-0 SOHD /^ 1 p Y a•d ni o SHUT OFF VALVE I \ i I__y ( �o z>m 1n = CURB STOP JI S.1 I I I FLUOR OVER'. I FLOOR BEL<<M- - 1 i CONNECTIONS FROM FIRST ---- - �- Q -.f 1PSI LOSS . FLOOR TO SECOND FLOOR i - ® m F w M N `rF , UNHEATED - - r I Porchrisi OSTREET - -� lvrv7 -wy.'.-. I SPACE Iy ! 4 _ ' er F=m In y= . i / /` �.. p�p� ! ..- _.___- _.__ j... a. - ___FLOORI�BOVE._-_..__._ - mid~ CORPORATION ( =u�i - "I #+•'_. .BB _lie'( I m o F LL f} ll y Q ` N m STOP IPSI LOSS .� 1 ICI ®� I s0¢65L �. tAE9 xOr. -_ - T /� z u+s S w WATER � �0 y�_-_NI!.�• I ... I �i� V/ l- a u d z MAIN S E _s 100'OF SECOND FLOOR (-1---�\ FIRST FLOOR =WE rv=95' 1 1/4"AQUAPEX SHEET DESCRIPTION FIRST FLOOR AND 3s PE \100/ 1/^n _ 1t_On 1oc/ 1/4" = 11_0n SECOND FLOOR 1"COPPER-Kri / `t SHEET NUMBER d 3� WATER SERVICE DETAIL 5 — — _ 15 F100 t F100) NTS © UPONOR - CONFIDENTIAL • 74 Markup Legend SPRINKLER SYMBOL DEFINITION , COLOR/LINETYPE LEGEND BLUE LINES=FEED TO FIXTURES(BATH,SHOWER,ETC.). f o Delete Line 77/^\� �� OO XXX-XX GREEN LINES=INTERLEVEL CONNECTIONS/SUPPLY. S u t BLACK LINES=SPRINKLER HEAD TO SPRINKLER HEAD. O o MAXIMUM SPACING(TYP) > Add Line — — SPRINKLER MODEL(TYP) = 1/2"PIPE SIZE C j HEAD SYMBOL(TYP) J =3/4"PIPE SIZE ' g I = = 1"PIPE SIZE O f i v 9 Add TeeII v 1-1/4"PIPE SIZE W�LLwO u asAdd Elbow LI C c nO� Add Coupling I---I = rh. 'd 3 =pNo3 y�maW Add Head 1 ' '3 0 ~m; a _�(rX-y�)- w a o W Delete Head -M o w F i z ?',N'x Move Head = r2No �oz ,O O aN"zay'wE ¢aG yoyw022,%1cC Note:All revisions must be reviewed by Uponor o o m @ j q o 5 Table F002-1 z; F°w'��dl�z zya� Multipurpose Fire Safety Systems ?LL o 9 m a c u�i m y 2' The Uponor Residential Fire SafetySystem is a residential fireprotections S o z B z°2 z-F pono Y 21i1' wo.2.,,, system installed in combination with the cold side of the domestic potable yWj m o m h°g F z n 7,3<W water system. Only licensed contractors trained by Uponor can install this Y o.z x= a S a ' . Lad;., e-.� a V1- S,..f62w system. Q zFzzz�o� a�3z What to do if Changes are Required fJ2=m amNwwv��y a 0)z`LL o zC''i'z o Ana uu If any features or obstructions require the addition or deletion of sprinkler r.4 m,�i _ heads,or significant relocation of sprinkler heads,contact the Uponor Design '-5".o 2 o y K°_s Department to determine if observed changes require a redesign e F�'-s d w ii o (888.594.7726). 4�E W'�54,1$� P- 'Ofle,w�yu =2z°z I L f 7.0441XOX I �x""w'SW SiN T Il wl. 1 ,,V Oymo UO of»w { ..••••--. I1.�.-.......I...JJJ ! u.v� wo 6w>�>4 . J :- EGRSS °8" F-Mw I S&P ® _ cc fii a� z3S'y5coam a TYP, / ozou0z""" 5 6 SL Co —t f I- (ATTIC) ( 7- /IyL,Master RCS EGInS,. 14 ( n Ot Bedroom ' BELOW / 30SFIN 30"MIN . ';'(..,...Ps, CLEARANCE t , �..1.6` ..0 ' I here by certify that this plan,specification, (ATTIC) / 22x30 TYP. �� i\ W.I.C. or report was prepared by me or under my ATTK: PER RBOi 1 1/2"COLD WATER AQUAPEX Y �'1 '� RC-P�ES-18 direct supervision and that I am NICET rc,� I / INTERLEVEL CONNECTION ��f•��''` R�q Y ACCESS . �. / FROM THIRD FLOOR TO ATTIC I 5'-3' _ 3-7}4` 7• 3- 4' S'4J/4` Certified. AL., t ' D9RMEF l S / I 2-4 hlcW 1 t I R?JOF� t _ _. �_ — I 1 H) e� ELOW /'04 j N T ' I a fi $Ii I Tim W McDonald Date: \L II� �+ • „• , ,„•,,, NICET Certification No.150393 ,I - /— t \� ). '' nevEX Water-Based Systems Layout-Level III n 'i H.1 1 1 I `J dun ry ' kt", 1"AQUAPEX INTERLEVEL Certification Expires:June 1,2022 `I T.22 RC-RES 16 4 (7 r- j CONNECTIONS FROM S j H.2 �» I '„ Y9Yp ; i SECOND FLOOR TO THIRD 11 rl / �' "� 'a� n F ` _ - r �_!l WASHER/—ay FLOOR RGRES 16 trait, t uo I s bie Atti bl �� .1�: _4 W 2 ;I -I :Tn(I I `o i r' I: r 'C"E; r , 9fi" T.25 II' '� v mi 2 •„;,. It -,r �_. 39"�ABOVE T.24 A M 1 _- - (441r—iiic.. .. '-t,,�! c -' Q VII w o _• N9F! 0 T. l IN. - - . \�/ FOR" - ) /a I' -4 CW TOWEL /f_ /'c HLI P. I 1 io RC-RES:�6fi //' ~I�� si��//��.kk��pp W a �" / \ Lo�o' V A / 1 I m IIy SHC�JWEIap y \ . 1 _ .-µ- _AT 72 / : - Iry i�'„ _ • w O -,-.' di- : .. 4' ��\f\ // -T l R. ■ICJ t i M .f�4#S&P - ' t O ..a O re e ---- - .--_-- 0 22x30J$TIC H.4 �� / t7A \ �. z _ aQ_,wrN -" 1 pe) -ACCESS HATCH '\ 1"AQUAPEX INTERLEVEL Y 1 1 - - .. - *- 12 ry F -J{p typ{ Z O } tl CONNECTIONS FROM THIRD - q m 1 itfl RC RES 16 d 1 _�� 1 aRtPA55r�77, � ��/� cp o o 8 a w w I SIM.RADON— 6 FLOOR TO ATTIC h 5 0 B1P4S5 45'�i;, r'\ " 8'-"'� �// O , , REDUCTION ' 1 '(ATTIC) L�i� J ry \ u u H a j o 4IL�/t'a�• 4 J u/ �""I 0 4 SF AT rn i SYSTEM (Arm !� 30'MIN f ,S, y 3�9� /�_.'' \,• v ~I W Y I CLEARANCE: I 3-T1B' ,F--FI./ (i ,! A� Q _.�� ;5/H + li al o \ L ACCESS ,I®I /RC-RES-16 1,11 a o DO - PER R8071 I pedroom 3 �Rf room 2 a`o ( DORMER EGRESS -�-- R -REJ a li.. ^p ri • i I E5 O O LL �muLin lil O ) L.L o i U E 5 .1.-..... 5'S O SL Ii..............r u m i LL 7 N I_�rr�tt 5-01-0SL I ROOF BELOW T I^ z y s 7 o K x R O O i D4 2 ATTIC PLAN 1 THIRD FLOOR SHEET DESCRIPTION 61 THIRD FLOOR AND ATTIC PLAN C 01 „ , u F101 „ „ l/4 = 1 -0 1/4 = 1 -0 SHEET NUMBER • 5MN mi O S 15 HIM — I• © UPONOR - CONFIDENTIAL F101 Senju RC-RES:Open Web Truss/TJI Construction Insulation Recommendations TM See General Notes 8.2.5.8 for Architectural Aqua SAFE GENERAL NOTES: In areas subject to freezing,care should be taken in unheated attic spaces N ProPEX LF Brass Fire to cover Uponor AquaPEX tubing completely with insulation. Insulation Feature Requirements Sprinkler Adapter Tee should follow the guidelines of the insulation manufacturer. See Uponor 1. THIS SYSTEM IS DESIGNED AS PER NFPA 13D 2019 EDITION AS A RESIDENTIAL MULTIPURPOSE SYSTEM Fire Sprinkler Adapter Document SECTION 3.3.12.3. Blocking Maybe _ _ _. "Uponor AquaSAFE Attic Insulation Guidli s for attic /fj W u ---N Required.If -Push-on Nut installation guidelines(Provided in Contractors Documents package or online -!Y///// Blocking is Used, ' . 1 Min, a[www.Uponorpro.com). 1 i 5: ^Z 2. UPONOR COMPANY RESERVES THE EXCLUSIVE RIGHTS TO ALL DETAILS AND DRAWINGS AS SHOWN ON _ Ya" THIS SHEET- THESE DETAILS AND DRAWINGS ARE PROPRIETARY INFORMATION OF UPONOR COMPANY AND Use The 2 Top j 1 "Max. w a g Screw Holes. 1Y Planter Box Window,Bay Window or Similar Feature. a p UNAUTHORIZED USE MAY BE SUBJECT TO PROSECUTION TO THE FULL EXTENT OF THE LAW. -1 Bottom of Mounting Extreme Temperature Installations 3. THE DESIGN OF THIS SYSTEM IS DICTATED BY SPECIFIC CEILING HEIGHTS AND ROOM SIZES. IT IS THESprinkler - ¢racket to Face of TrussI AquaSAFE Residential Fire Safety systems are often installed in attics or If no additinal floor area is created No Additional Sprinkler is Required. a q W Q Fire SDrink ra Ada to other areas exposed to temperature extremes of heat and/or cold. Follow 8'-0"or less O N`-i RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT THE CONDITIONS SHOWN ON THESE Mounting Bracket the recommended extreme weather installation instructions to isolate and / qj m a z PLANS ARE EXACTLY AS THEY EXIST IN THE FIELD. DEVIATIONS FROM THE DESIGN MAY CAUSE THE I I Iq v u.w O SYSTEM TO BE UNABLE TO CONTROL A FIRE.IF THE BUILDING CONSTRUCTION DIFFERS FROM THE FIRE i1 protect system components from extreme temperatures. Because this orRC less 16 y m z SPRINKLER PLAN,CONTACT THE SYSTEM DESIGNER IMMEDIATELY. YVTa-1 •� system also delivers domestic cold water directly to plumbing fixtures, 9'-0"or less ® L >12 W,Z 2 3-#10 x 1 1/2" -�-� } Uponor highly recommends that you protect the tubing with adequate / • w Mai` Full Course L I - u1 ^In 3 4. THIS SYSTEM AND THE ACCOMPANYING HYDRAULIC CALCULATIONS ARE DESIGNED IN COMPLIANCE WITHrews 1.�---r� 1.r insulation in warm weather areas to minimize heating of the cold water `o H£v w In Bottom<Holes u._J� U .a+u' 3 NFPA 13D 2019 EDITION. supply. o a'"i o 5. "STAND-ALONE"OR"MULTIPURPOSE,WET PIPE"SYSTEMS ARE PERMITTED TO ONLY USE ANTI-FREEZE .- J \ Installation methods Include,but are not limited to: n`o 'Co eE n m<W LISTED FOR USE IN NEW SPRINKLER SYSTEMS- - • Tenting over the fire sprinkler piping- G ~m 3 Lead-Free Flat-- �` -} • Additional layers of bait insulation. If additional floor area Is created.Cannot exceed 18 ft.,be more than 2'-0" 6. MODIFICATIONS ARE PROHIBITED.SPRINKLERS THAT HAVE BEEN PAINTED,CAULKED,MODIFIED OR Concealer Senju L. ni r- 5° Concealed Flat •DAMAGED MUST BE REPLACED. Sprinkler Head Cover Plate Increased depth of blown-in insulation. sprinkler.No Additional Sprinkler is Regmred.�erage area of the o r z a z i 2' 7. A SINGLE CONTROL VALVE ARRANGED TO SHUT OFF BOTH THE DOMESTIC SYSTEM AND THE SPRINKLER Caution: If you will be installing spray foam insulation,make sure to x. c r is,zj o o F Pr all components during application.Consult with the spray foam m° o o N3SYSTEM SHALL BE INSTALLED- Senju RC-RES:Traditional Wood Framing Construction NFPA 13D Table 7.5.6.3 Distances From d u wmanufacturer to ensure compatibility with all products before application. hFzdf a zv8. OWNERS MANUAL MUST BE PROVIDED TO THE OWNER. Heat SOUrcesooOS i g ioConsultation with local building officials is encouraged to ensure compliance f. Pi„'V owith local building codes. u .w9- AT THE MAIN SHUT OFF VALVE,A TAG OR A SIGN STATING THE FOLLOWING IS REQUIRED;"WARNING:THE ProPEX LF Brass Fire Ordinary Intermediate b° r u�'oWATER SYSTEM FOR THIS HOME SUPPLIES FIRE SPRINKLERS THAT REQUIRE CERTAIN FLOWS AND Sprinkler adapter Tee ,i fire Sprinkler AdapterNeat Source Temp. Temp. dz°zaou-;R:- H c t:PRESSURES TO FIGHT A FIRE.DEVICES THAT RESTRICT THE FLOW OR DECREASE THE PRESSURE OR i, G Push-on Nut135°-170° 375°-235° zm '�''� ,.zAUTOMATICALLY SHUT OFF THE WATER TO THE FIRE SPRINKLER SYSTEM,SUCH AS WATER SOFTENERS, i °w z gFILTRATION SYSTEMS AND AUTOMATIC SHUT OFF VALVES,SMALL NOT BE ADDED TO THIS SYSTEM _ Bending PEX Tubing Side of Fireplace 36" 12" S000rt1 7�-� lI�' 1 I/4"Min. The minimum bend radius of U onor PEX[ubin n an direRion is six times �'`�9 ° B"ra aoWITHOUT REVIEW OF THE FIRE SPRINKLER SYSTEM BY A FIRE PROTECTION SPECIALIST.DO NOT REMOVE 'lL., ,"J J D g y Front of ruing ce 60" 36" Wmo moa y 3 pwTHIS SIGN", JJLII IILIJJJ1 'Max. the outside diameter(6 x e forWood Burning Stove 42" 12" M 0dFire Sprin der Adapter - Bottom<f Mounting Bend supports are available for 3/8",1/2",3/4"and 1"Uponor AquaPEX QF zz " a 3yq g Bracket to=ace of Truss g egree rigid bends. Kitchen Range 18" 9" J z aoo �do10. ALL INTERIOR PIPING TO BE UPONOR"A uaPEXO"UNLESS NOTED. Mountin Bracket J Lubin to facilitate 90-tl �t` uGF u_ f= ��YJWall Oven18" 9" Va�-Ra �mm_:°z'Fa11. UPONOR"AquaPEX"TUBING TO BE SUPPORTED PER NFPA 13D AND MANUFACTURER'S RECOMMENDATIONS. 2-#10 x 1 1/2" `©• S \ Recommended Tubin Len th Between Fittin s 18" 9" �'o i°°u r))) 9 9 9 Hot Air Flues 1'1 ioadmpa,IL,g "=Full Course �}_( } Fitdng Size Minimum Tubing LengthUninsulated Heat Ducts 18" 9" G°sm moz 5 9 4 o Z m 12.MINIMUM SPACING BETWEEN SPRINKLERS IS 8'-0" REFER TO SPACING CHARTS FOR MAXIMUM SPACING Thread Si rews �7r �r __ °� p°d+�N r BETWEEN SPRINKLERS AND FROM WALLS.SPRINKLER HEAD MANUFACTURERS MAY HAVE MORE In To Hdes (, V�II (� Uninsulatetl Hot Water Pipes 12" 6" y�0 fF6 o QmD 3/8"PrOPEX Fitting 2^ zRESTRICTIVE SPACING LIMITATIONS- - Side of Hot Air Diffuser 24" 12" o¢ cm F i °1/2"ProPEX FittingFront of Hot Air Diffuser 36" 18" a'a`°w .S o u 13-SPRINKLERS ARE NOT NECESSARILY CENTERED IN ROOMS DUE TO LIGHT FIXTURES OR OTHER CEILING 3° e.)n S`x c i a o MOUNTED OBSTRUCTIONS- - :� 3/4"ProPEX Fitting 3" Hot Water Heater 6" 3" p z m ° o 9-9 Lead-Free Flat - °S' z`din m o' v° ° Concealer Senju N.'` r,, '. - Concealed1"ProPEX Fitting 3 1/2" Furnace 6" 3" p O1,m m°a-''�'-`a.ern- u 14. THE PLUMBING TIE IN CONNECTIONS ARE SCHEMATIC IN NATURE AND CAN BE INSTALLED OFF THE Plate Flat v°u x�. c 'U z x_w SPRINKLER LOOP ANYWHERE BETWEEN SPRINKLER TO SPRINKLER CONNECTION. Sprinkler Head Cover 1 1/4"ProPEX Fitting 4 1/2" SOW-250W Light Fixture 6" 3" n,;, > u j mW n o m 250W-499W Light Fixture 12" 6" N= �i 3 m 5 z a u LI 15. THIS SUGGESTED LAYOUT IS BASED UPON INFORMATION PROVIDED BY OTHERS. CHANGES IN 9 v,9 ti °ci 9'#o 9> w CONSTRUCTION OR FIELD CONDITIONS MAY OCCUR WHICH MAY REQUIRE CHANGES TO THE LAYOUT. IT IS ins', S o b`�F o�'a Exposed Installation Requirements. LU THE RESPONSIBILITY OF THE INSTALLER TO NOTIFY UPONOR TECHNICAL SERVICES OF SUCH CHANGES. \Uponor AquaPEXTB tubing(white)and ProPEXm EP Fittings and ProPEXTM I 16. NFPA 13D 8.2.5.OBSTRUCTIONS TO RESIDENTIAL SPRINKLERS Brass Fittings are approved for exposed installation where the following • 8.2.5.7° SHADOW AREAS SHALL BE PERMITTED IN THE PROTECTION AREA OF A SPRINKLER AS LONG AS conditions are met.(UL 1821 Approved) THE CUMULATIVE DRY AREAS DO NOT EXCEED 15 FT.PER SPRINKLER- / p m• 8.2.5.8 SMALL AREAS CREATED BY ARCHITECTURAL FEATURES,SUCH AS PLANTER BOX WINDOWS,BAY Exposed Wood Joist Ceiling Assemblies. :2n V I here by certify that this plan,specification, U ^ WINDOWS,AND SIMILAR FEATURES,SHALL BE EVALUATED AS FOLLOWS: 1. Joists are of dimensional lumber,engineered wood or wood I-joist. ri o® or report was prepared by me or under my (1)WHERE NO ADDITIONAL FLOOR AREA IS CREATED BY THE ARCHITECTURAL FEATURE,NO 2. Joist are of depths from 6-16 inches(152-204 mm). ® direct supervision and that I am NICET ADDITIONAL SPRINKLER PROTECTION IS REQUIRED. 3. Joist are of spacing from 12-24 inches(305-610 mm)on center- ❑ Certified. (2)WHERE ADDITIONAL FLOOR AREA I5 CREATED BY AN ARCHITECTURAL FEATURE,NO ADDITIONAL 4. Joists can be exposed after installation. Q SPRINKLER PROTECTION IS REQUIRED,PROVIDED ALL OF THE FOLLOWING CONDITIONS ARE MET; 5. Metal pipe hangers spaced at maximum 24 inches(610 mm)on center (a)THE FLOOR AREA SHALL NOT EXCEED 18 FT.(1.7 Mz) are used. 1.55" * 1.66" (b)THE FLOOR AREA SHALL NOT BE GREATER THAN 24 INCHES IN DEPTH AT THE DEEPEST POINT OF 6. Listed residential automatic sprinklers of maximum activation Tim W McDonald Date: THE ARCHITECTURAL FEATURE TO THE PLANE OF THE PRIMARY WALL WHERE MEASURED temperature rating of 155°F(68°C). Zn-in Hanger 1"Hanger NICET Certification No.150393 n (c)THE THE FINISHED FLOOR. Water-Based Systems Layout-Level III HE FLOOR SHALL NOT BE GREATER THAN 9FT IN LENGTH WHERE MEASURED ALONG THE Certification Expires:June 1,2022 ‘n PLANE OF THE PRIMARY WALL. Metal Tubing Support. Tubing SupportSpacing: (d)MEASURED FROM THE DEEPEST POINT OF THE ARCHITECTURAL FEATURE TO THE SPRINKLER (Anchor AquaPEX Tubing Securely Enough to Support the Tubing,Yet Relaxed a 1. Metal tubing supports designed for plastic tubing shall be used. Enough to Allow the Tubing to Expand and Contract) SHALL NOT EXCEED THE MAXIMUM LISTED SPACING OF THE SPRINKLER. 2. Do not use supports that will damage the tubing.Inspect metal (3)THE HYDRAULIC DESIGN SHALL NOT BE REQUIRED TO CONSIDER THE AREA CREATED BY THE supports for sharp edges. 1. Along Horizontal Runs,Install Supports Every 32",if Horizontal Runs are 1 1 1 2 ARCHITECTURAL FEATURE. 3. Do not rigidly anchor Uponor A uaPEXTM tubingwith supports.Allow L1.1,^', 9 Y P 9 PP Continuously Supported,Place Tubing Supports at Six-Foot Intervals. 17.NFPA 13D 8.3 LOCATION OF SPRINKLERS. enough tubing for freedom of movement to expand and contract. 2. Along Vertical Runs,Install Supports Every Four to Five Feet,at Each o • 8.3,1 SPRINKLERS SHALL BE INSTALLED IN ALL AREAS EXCEPT WHERE OMISSION IS PERMITTED BY 8.3,2 Floor and at a Mid-story Guide. U V oTHROUGH 8.3.8. m m o • 8.3.2 SPRINKLERS SHALL NOT BE REQUIRED IN BATHROOMS OF 55 FT.(5.1 Mz)AND LESS In-line Flow Test i • 8.3.3 SPRINKLERS SHALL NOT BE REQUIRED IN CLOTHES CLOSETS,LINEN CLOSETS,AND PANTRIES THAT The In-line Flow Test can be constructed on site. It performs a flow test to �/ u o m �, MEET ALL OF THE FOLLOWING CONDITIONS: High Upstream Pressure L.L s'O o (1)THE AREA OF THE SPACE DOES NOT EXCEED 24 FT.(2.2 Mz). P ensure proper system operation and flow(see Figure F001-B). o If the upstream pressureexceedsj 80 psi a pressure reducing valve uci z>ri m it m (2)THE WALLS AND CEILINGS ARE SURFACED WITH NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE need to be installed. Some jurisdictions may require a pressure reducing � �>ri 3 m- m MATERIALS AS DEFINED IN NFPA 220,STANDARD ON TYPES OF BUILDING CONSTRUCTION. 3 0 3 valve regardless of upstream pressure. Tub AquaPEX ¢ ,,,n • SPRINKLERS SHALL NOT BE REQUIRED IN GARAGES,OPEN ATTACHED PORCHES,CARPORTS,AND jLLI I- SIMILAR STRUCTURES Tubing i • 8.3.5 SPRINKLERS SHALL NOT BE REQUIRED IN ATTICS WITH OR WITHOUT STORAGE,PENTHOUSE ' "'j m EQUIPMENT ROOMS,ELEVATOR MACHINE ROOMS,CONCEALED SPACES DEDICATED EXCLUSIVELY TO AND z m CONTAINING ONLY DWELLING UNIT VENTILATION EQUIPMENT,FLOOR/CEILING SPACES,ELEVATOR SHAFTS, " / z o CRAWL SPACES,AND OTHER CONCEALED SPACES THAT ARE NOT USED OR INTENDED FOR LIVING u 2 w PURPOSES- i z�i u a _--4 W Q z o 8.3.5.1 SUCH SPACES THAT CONTAIN FUEL-FIRED EQUIPMENT SHALL ALSO COMPLY WITH 8.3.5.1.1 OR - ----- ¢a A 8.3.5.1.2. �} O O o a x ut m N • 8.3.5.1.1 WHERE THE FUEL-FIRED EQUIPMENT IS ABOVE ALL OF THE OCCUPIED AREAS OF THE DWELLING I^ �L Male Threaded Coupling ProPEX Fire V/ w u 5 4 J ut 0z p UNIT,NO SPRINKLER PROTECTION SHALL BE REQUIRED IN THE CONCEALED SPACE. Sprinkler Adapter N V • 8.3.5.1.2 WHERE FUEL-FIRED EQUIPMENT IS BELOW OR ON THE SAME LEVEL AS OCCUPIED AREAS OF THE p L 'e DWELLING UNIT,AT LEAST ONE QUICKRESPONSE INTERMEDIATE TEMPERATURE SPRINKLER SHALL BE 1"Ball Valve ~i1"..Lii ^ z rn INSTALLED ABOVE THE EQUIPMENT OR AT THE WALL SEPARATING THE SPACE WITH THE FUEL-FIRED To Hot Water Heater Male Threaded Coupling Qh EQUIPMENT FROM THE OCCUPIED SPACE. lih Female Threaded k.-+ /� o • 8.3.6 SPRINKLERS SHALL NOT BE REQUIRED IN UNHEATED ENCLOSURES AT THE BUILDING AT Tee with Water �+ 0 ENTRANCES/EXITS AS LONG AS THE DWELLING UNIT HAS ANOTHER ENTRANCE/EXIT. - y O g `o Pressure Gauge ¢9 o • 8.3.7 SPRINKLERS SHALL NOT BE REQUIRED FOR CEILING POCKETS THAT MEET THE FOLLOWING w C ,- 0 m z '\ Pressure Gauge Sprinkler Orifice (Optional) o O F- L CONDITIONS: n in' C/' o p Y o (1)THE TOTAL 00 FOa(L VOLfU'E OF ALL UNPROTECTED CEILING POCKETS IN A COMPARTMENT DOES NOT EXCEED w c j• \ } Q i>m d r Y Flow Test 0 m m N (2)THE ENTIRE FLOOR UNDER THE UNPROTECTED CEILING POCKET IS PROTECTED BY THE SPRINKLERS To ensure the system provides enough water for proper fire sprinkler O 0 Ce m F m vr"i-AT THE LOWER CEILING ELEVATION- performance,you should conduct a flow verification test. .. (3).THE INTERIOR FINISH OF THE UNPROTECTED CEILING POCKET EXCLUDING DECORATIVE Q w d 5 w TREATMENTS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL _ iL J Uponor Warning Signs �r�L m, w a ,,TiI� Note: The NFPA 13D Installation Standard does not require flow N V 2> z w o (4)SKYLIGHTS NOT EXCEEDING 32 FT.(2.97 Mz)SHALL BE PERMITTED TO HAVE A PLASTIC COVER. •- verification. m w: • 8.3.8 SPRINKLERS SHALL NOT BE REQUIRED IN CLOSETS IN GARAGES AND EXTERIOR CLOSETS �, T l""l z x s K ae REGARDLESS OF SIZE LOCATED ON EXTERIOR BALCONIES,EXTERIOR BREEZEWAYS CORRIDORS,OR _ a Pressure Reducing y H El w m g a ( ) / Before performing a flow verification test,confirm the water pressures by 13 ACCESSED FROM OUTDOORS WHERE THE CLOSET DOES NOT HAVE DOORS OR UNPROTECTED z �QQ• Valve contacting the Water and Sewer Department of your local city. Ensure the s PENETRATIONS DIRECTLY INTO THE DWELLING UNIT. available water pressure matches the pressure used in the system design. t • 8.3.9 SPRINKLERS SHALL BE INSTALLED IN ANY CLOSET USED FOR HEATING AND/OR AIR-CONDITIONING EQUIPMENT,WASHERS AND/OR DRYERS,OR WATER HEATERS EXCEPT AS ALLOWED BY 8.3.8. •I, Note: The sprinkler plan indicates the most hydraulically SHEET DESCRIPTION p y y remote sprinkler w 18. INSULATION GUIDE LINES PER NFPA 13D. - Main Fire Sprinkler youor r local code.air of for test requirements on other sprinklers,consul[ GENERAL NOTES&DETAILS e • 9.1.1*WET PIPE SYSTEMS. A WET PIPE SYSTEM SHALL BE PERMITTED TO BE TO BE USED WHERE ALL a Shut-off Valve PIPING IS INSTALLED IN AREAS NOT SUBJECT TO FREEZING,INCLUDING AREAS PROPERLY INSULATED TO Note: It is a good idea to notify the fire inspector at least 24 hours prior to rmmi MAINTAIN 40°F. pertormi and a flow verification test.This may speed up[he inspection •• A.9.1.1 IN AREAS SUBJECT TO FREEZING,CARE SHOULD BE TAKEN IN UNHEATED ATTIC SPACES TO process eliminate the need to repeat the test for the inspector. SHEET NUMBER N COVER SPRINKLER PIPING COMPLETELY WITH INSULATION. INSTALLATION SHOULD FOLLOW THE Note: See"AquaSAFE Flow Test Instruction Sheet"(Provided in Z. GUIDELINES OF THE INSULATION MANUFACTURER.FIGURE A.9.1.1(A)THROUGH FIGURE A.9.1.1(F) ' Contractors Documents package or online at www.Uponorpro.com)for SHOW SEVERAL METHODS THAT CAN BE CONSIDERED- THESE ARE FOR ILLUSTRATIVE PURPOSES ONLY. ---- - -"__I more information on Flow Test Setup,Assembly,Performing the Test and `SiONSULTATION WITH THE GENERAL CONTRACTOR AND/OR OWNER IS RECOMMENDED TO ENSURE Troubleshooting. If there are any questions please contact Uponor. r PROPER METHODS AND MATERIALS ARE USED TO MAKE SURE 40°F WILL BE MAINTAINED. E. 80 psi © UPONOR - CONFIDENTIAL FO 0 1 i PRV Set Pressure 1-