Loading...
Plans RECEIVE[ CITY OF TIGARD. 4Si2o2� 6o67Y Approv b Ironing -Z�-{ �� Mr 9. 1 Z027 Date: 3 ZA 202� / / / J h'- (��'�/(� �illtl�hi. O ELEV is N 89`54'46" E cn — — ANGLE FILTER`'1~ alit TIGARD I __ — ��cr — — — — — — — — — w 21' 6 3 4" ELEV lag FENCE TO AULIE�I CM eD�PPED < / I / 83.64 / i u) th\ I / / ! jill \ \ \ \ IIO FRO OF GA'AGE I i / \tWIDEBY]6.VEGETATED TOWATERAL2 N E TANCE W/ / FI ASHED ROC PROPOSED NEW ADS: \ / FILTER STRIP(80 SF) TYPE.,2 �. 1,530 SF LIVING 247 SF GARAG\ FACILITIES PER LOT.SEE CWS ., ADDRESS: DWG 770 ON SHEET C7 AND INTERLOCKED O 16 -0 15768 SW 7-. h AVE. \ / „ , ST RMWATERREPORTFO PLAN VIEW �, Q R 2"X 2" POSTS SE ER / TIGARD, 0' GON 97223 1 - 5/8 i 1 MORE DETAILS NTS ZI ,� • 1LTERAL ,r' t AND ATTACH ( -0 , — �_..__ FF. = 5.5' 1 I' i P USE STITCHED LOOPS 3' minimum -I OVER "x 2" POSTS / I —L 1 2' 17 5/8" I , LOT / I from toe slope. ■ O �/ I N-) I rsT4mNOTES: I4172 SF 1 '�� p 1. BURY BOTTOM OF FILTER FABRIC 6" \ I \ LATF�PAL ' N I VERTICALLY BELOW FINISHED GRADE. 1 �� \ I L_ ____ -'-- FENCE 0/ =`fi 2. 1 _POSTS. 1 `'I—`= 3. POSTS TO BE INSTALLED ON / 1 -0 a\\+" PROPOSED NEW PRIMARY DWELLING UNIT: \ I I ' I N��' UPHILL SIDE OF SLOPE. CONGRA TR 1,885 SF LIVING +345 SF GARAGE \ I CON TRUCTIO ADDRESS: \ I I 4. COMPACT BOTH SIDES OF FILTER FABRIC ENTRANCE / 15766 SW 76th AVE. .I „ I ' TIGARD, OREGON 97223 PROFILE TRENCH. � I WASHED RO K � I 14 7 /8 I 5. PANELS MUST BE PLACED \ „ „N„.,„. �4 NTS ACCORDING TO SPACING ON 20 0 � FF. =155.5' DETAIL NO.940 / }TO f RONT OF V ARApE .1k �� \,*,, \\ cn \ 0' I II \ e _ I I I- co I .... ..........................•.............. .. /R ,. N 8954 46 E LA/ ti - - - - - - ' - - - ir Oe �.• .•.....•..•.........•••.•••.•••.•••...•.• •• 75.68 ELEV 149' ❖:•i •••••••:44 •:❖•:❖:•i:•••:•••:4•:4•••••••:4.•.•.•...�...�.�.v... .. / EI_E Vim' iiO•• .❖iiiiiiiiiii•�•iiiiiiiiii•�ii ii ii0 i•.•i iiiii ❖: ♦•.. ........••...••.•....•••...••..•..•.....• I I I / FILTER FABRIC MATERIAL - / \ �\ 6'MAXIMUM SPACING u 36" WIDE ROLLS / !/ FRONT VIEW /// NTS REQUIRED BASE MEASURES ADDITIONAL CONSTRUCTION SITE BMPS FOR FURTHER INFORMATION * PERIMETER SEDIMENT CONTROL * SWEEP STREET AND/OR HARD SURFACES DAILY AND ON DESIGN CRITERIA SEE * SITE INFO: CHAPTER 4 OF CLEAN WATER * *CONSTRUCTION SITE ENTRANCE PROPERLY DISPOSED OF ALL MATERIALS. LOT SIZE 4172 SF SERVICES EROSION PREVENTION STORM DRAIN INLET PROTECTION REMOVED TEMPORARY CONTROL MEASURES WHEN NO 80% ALLOWABLE COVERAGE=3,338 SF AND SEDIMENT CONTROL * LONGER NEEDED PROPOSED COVERAGE= 2,230 SQ 53.5% NON-STORMWATER POLLUTION CONTROL BMPS INSTALL GUTTERS AND DOWNSPOUTS AS EARLY AS POSSIBLE PLANNING AND DESIGN MANUAL. TO CAPTURE RUNOFF TO PREVENT ADDITIONAL ONSITE BUILDER;: • * STORE ALL PAINTS,STAINS,SOLVENTS AND HAZARDOUS EROSION E.G SWALES,RAIN GARDEN,FRENCH DRAIN. CBG SW 76th AVENUE, LLC MATERIALS IN A COVERED STORAGE AREA IF EXISTING VEGETATION IN RIGHT OF WAY IS DISTURBED Y DISPOSED OF ALL TRASH AND/OR DEBRIS THAT COULD AND SOIL IS EXPOSED,INSTALL PERIMETER SEDIMENT ADDRESS: OFFICE CENTER STORM SYSTEM IN A DUMPSTER OR TRASH CAN. CONTROL TO PREVENT MATERIAL FROM ENTERING 1 51 10 SQ BOONES FERRY ROAD, SUITE 500 CLEAN UP SPILLS PROMPTLY USING DRY CLEANUP ROADWAY LAKE OSWEGO, OREGON 97035 METHODS. „ , ,> * DISPOSE OF CONCRETE WASHOUT IN APPROVED scale= 1 =10 —0 LOCATIONS TO REDUCE POTENTIAL FOR DISCHARGE FROM CONSTRUCTION SITE 32.000 oEl L I