PFI2022-00193 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
s COMMUNITY DEVELOPMENT Permit#: PF12022-00193
Date Issued: 06/08/2022
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG2406
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job#M3050479
Project Description: SEG2406I PGE to replace Pole-2900. PGE to perform overhead work on Pole-2897. PGE to
install/remove facilities. PGE to pull wire through already existing conduit
Class of Work: FEES
Description Date Amount
Type 1 -Utilities(gas, electric,data)
PFI Permit Fee 06/01/2022 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
JEREMY SPRAGUE
2213 SW 153RD DR
BEAVERTON, OR 97003
PHONE: 5036725446
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00193
Tvoe: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit,
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area
wide Emergency Services:503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and
503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the
City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules maybe obtained from the Center by calling 503-246-1987. If
you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI—Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the pen-nit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,
and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City,in advance of work
performance.
PFI—Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector.
PFI—Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s)from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
M
City Of Tigard PFI#: PF12022-00193
ENGINEERING DEPARTMENT
Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
TYPE OF WORD
Project name: PGE Job# M3050479
1ecB TYPE 1—Franchise L'tilih•Fork
Brief description of project: PGE to replace Pole-2900. PGE to perform performed byNWN,PGE, or ntility
ten•
overhead work on Pole-2897. PGE to install/remove facilities. ❑ TYPE 2—ROWSide"WDrioeway/Sewer
PGE to pull wire through already existing conduit. wbdLperformed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral instavation and
Location (address if available):
7871 SW Alder St main line tap
❑ TYPE 3—Full Scale Development Work
Tigard, OR 97224 performed with land use approyalwludr
includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION • Streetwidemng
Name: PGE [Submitted by Jeremy Sprague] • Hurilirre installation for sanitary sewer,
storm sewer, '15gard water, and Tigard
Filing address: 2213 SW 153rd Dr water service area
City/State: Beaverton, OR Zip: 97003 ❑ TYPE 4—Small cenTechnology
Phone:
(503) 672-5446 ❑ TYPE 5—T,gardTnangle
crewcoordi nation-westemt�pgn.co m
Email: Phone: NOTE: Type 1 and 2 applications may be
Contact name:
John Guerry emailed to rowpermits rni tigard-or.gov.
Phone: (503) 844-5411 Email: crewcoordination-western@pgn.com
CONTRACTOR INFORMATION R1 Same as applicant
Name: PGE Crew CCB Number:
Mailing address: City/State: Zip:
Phone: (503) 464-7777 Email: crewcoordination-western@pgn.com
ENGINEER INFORMATION
Name:
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? [ ]Yes E]No Case number.
City of Tigard • 13125 S\C'Hall Blvd. • Tigard,Oregon 97223 «-",w ard-or.gov • 503-718-2421 • Pdge 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to ThIC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise of license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant,certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
4- gqe!� Jeremy Sprague 05/09/2022
Applic it's or a thorized agent's signature Print name Date
Property owner's signature (f required) Print name Date
Case No: PF12022-00193 Permit fee: 300- Ott Received by: NT Date: 5/9/22
Approved by: 7260 WO Date: V1211Zu2Z Notified bv Po-- Date: S
City of Tigard • 13125 S\g'Hall Blvd. • Tigard,Oregon 97223 • wwcvtigard-orgov 503-718-2421 Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 1(a/o of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FORSTAFFUSEONLY FOR ONLY
TYPE 4: SMALL WIRELESS
CHECKLIST
Does applicant have a right-of-way-license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Alacro ❑ Street Name
How many install sites are proposed as part of this permit [3 Site Address
application?
TYPE 3- Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on Rauch of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Server,etc)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Fater Provider Approval
City of Tigard 13125 SW Hall 131vd. Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 3 of 4
Edge of Pavement
Streetlight Ditch
.
n etlight I —•—•—•—•—•—•—•—r—•—
T r a R �•
iRl•--
° 1
Existing House
Existing
1'-• '� �� Dnvcv,aY
�.
al
vl I TI
iL
o� ^
al o
/� I I ar 1
I � e
y, V1 I
OI
I � Existing Shap j
J
CM
Powerpole
95' 1
L..
( O doper •Une------
Fire Hytl rant(FH)
I I 1
Scale'. 1-=30'
I I
MINIUM SKErCH la,-QUIREMEN'I'S (Put N/A if not
I I I
I I
i ; I
applicable)
North arrow Property lutes&dimensions Existing utilities locations
(sewer,storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility& street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard a 13125 S\\'Hall Blvd. • Tigard,Oregon 97223 a wu•uctigard-or.gov • 503-718-2421 • Pdge 4 of 4
POLE.{N Ms rvw r� M] /N[.uON LEGEND
7NORTH r1aWDa
92, 1 aYtLOCNOw
�� ez
........ NNIAl wmq..Av
29/PVC Cp20 UNR WA2'6KTS
(21GN PIC CONOUR WR i, _RellMbuebraau+ra)�MtlqullJllPr
711112 CIO F l00T ON TAP �kl°vrmNRraR°^"^"I'L'I°°^I°",Lx,mmF
112=FIMl1GTAP
1P 26(VL0H 120.210]2 NTICD SW/pyo 7 °°�r-POLE CLASS It,2,2,A Ni,W.S)
1A 01.11IT
-CL
126 K%% �In Gu Da MI
Al 110-IMNMP `POLENEIGHT
016-PRI-8,010E
GIS-NELR-T,TSM PRAMNG aulr,mv,eaaXIOM MU
e6aN
TlanW: r DIN_ERNETOEFIN05714WTKMMIS) MU 01N
STREETLIGHT Yt CONDUCTORS OE FeERaUNaI
RB
POLL a4 f - 'r ES.IXYr[AlI1f DIN«RMAMifNa
WIN! ANSII.AAAA.AlNl.AMAA1...
291 PVC OOND UNIT Wn2.6KTS —�---
(2)3NPVCCMDURWR leen new R� emwr-v nw,m
U1112Ce0Fl00TOHTAP VO.1.01% •Rsl - rrID aexuve,gq n,l era�rivrwxaRr
IQ CA]FIWT UG TAP EQUIPMENT
iP25KMOH 120210T.2NT1C8
Al a RIILa RrYN iT
ReNRarux wet
mefwawa
roromrrmrwmroroLroL]mrxNc
I
s fm C GUM,
G
G_
191, Iws
:es
+6r
626116 imT 20M
,21Wi O
b E
ma
1
O b
IN 1 PL-2000:
iib, >tiJ CLEAR AREA
AROUND POLE
/ G
ATOltta/M II; VICINITY MAP
nu-rR
r
RON=WI_ - -- .seoAl-Tx ASD F]TO`.
'9n ROAD-]r I gu--'- .WATe •L` T -•,-._'I• 'T
2`� giN DPP 11, N
� « ALN.
.a
- s
W PD-163:
(,,Aa k
.Hi EL80W KR-JKIOGSLE-/211L SWAIOeEK
I ELBOW KIR./OLI CARIE-/2AL
�� ss^ tI ANo"aNAara
Po-le _
t!A ; . sw Rrnn sit
J taw xn I
A25w SF pY yr qa
Nl N
12 p1
A2AL IV1.]PL9tll: {b
b1Pe:
142 000 FAOT W TM f...,..,I
Z� 112 dOF10F{K]TAP V-a{
nn,
-SfLTDxTnIR
1l]1
------------- ------------------- ----------------------
.� c:rus
-- r -•• Swb,cnresp Ean ,MoDMAMIO INCREMENTP NR ,,
ce
2-14111"T
Javan IAET,Esn CJline lHarD KD^0)
RacwarNAYc Es.l Koree.E«i(ThalanS)NGCC,NI
'AiC RPA[
GIsU meHJaPcvninpuera aM 1K
-. 'efi1NAIC _ � nlR N GIS U.Commxn
me0 ISR b geFe AK NIS 1R{ 'NOaq
V, I I' -112eT r� It 0.«:
INMFewm.r. INN:
�Muwww ,9f<r fGYllfafNF0.
PRIMARY CABLE&CONDUIT TABLE vDEvur6aaiRa2TNaoEs2WIMLSTVAl2D2l I Y,• D DDD1 176011443 NS 0179
cvnwn FNNaPerAetl AseNL2mrMNY]1ul APPRIDV®BVTNEP'(fPROM7MArAG9P K �r,SR]PeY 2900 ra. al,a
Ivel N yzz aTY LFNGPN I[NGTH Plxl Ml WLF MNOT" "KEN. mlpq. uaL rli/rFGrr Ww GN �` DUIHAN-0RNGEPOIfT
I...c«r�1ee ux«RruNRml,xrs+w ry r«IAYIron Rvvrrto iT•h
unl DFe1GN ARAN NLV D1(AT Afi1Ml /
rRa« TO I I'U Inl Ilwl imsi era aryPe IKI MI xorET THINK nne d[mYu«rrYxNxtRnWttxrtA ` ISBN 9W iafHAVETgARD OR 822N
nrau Ru a R x s n rw m r a.wa«aeN
PISJm PD ltl INk S1 NG(ONWII x ]n RJPL 1N .i PINSE IN,NAI,H2IPI.I, WA...1 Of
_ SAFETY ra... aN EAANanvNu«In N`!1
FIRST "n`rrN,MR a,?A,DISEATN ,IME nSON
P,iCO PLN2] IN W6RN000MWN N De i.RaL J)`n a4/PHA][ WA6HNGTp1 Q111C lOF1
TeLI 1 ]8C IO REPu[Si unlnil R[O6 C«-1NIMFGON peNrKYKa61�0R r
u10.1M1 xOiRr[IfOaL2NTER,tll Ol[Aaf .N IgIw RAI/ urn JOHN GIIEfaly ].]1n.iae U
'.S'
oars verge ro nunnar erAl man=
www.invarion.com
Lane Closure at Intersection with Flagging Diagram 620
ROAD
WORK
HEA
ONE LANE 1
(OMlarNt) ROAD
:CC
AMGD
B
BE
PREPARED
TO STDP
. B
A
Provide'e""t(s)to
assist pedestrian tnaffic `DO n.Ma,
safely around work area,L
when a safe detour route o
Is not available.
Biu^= O
� G
0 0 0 0
O IIIA O
aa*
K K K K
,ten ria='�
C B B AT T
ROAD sE j
WORK PREPARED
AHEAD TO STOP 'D). be.
ONE LANE
ROAD
AHEAD
It A
(DDllonall
A �
B
BE
PREPARED
TD STOP
B fOpbonall
ONE LAME
1 ROAD
AHEAD
C
ROAD
WORK
AHEAD
www.invarion.com
Lane Closure at Intersection with Flagging Diagram 6270
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1 . During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance (see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections (fewer than 400
entering vehicles per day), one flagger may be used.
4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths (feet)
Posted Spacing Between Signs Buffer
Speed A B C Space ERRATA:
20 50
25 100 100 100 75 Supplement Table
30 100
35 350 350 350 125 Updated: February 12,
40 150 2016
45 180 By:ODOT Traffic•Raodway
50 500 500 500 210 Section
55 250
Signs Spacing and Buffer Lengths (feet) Supplement
Posted S acing Between Signs "Buffer"
Speed A B C Space
60 285
65 700 700 700 325
70 365
www.invarion.com
Bicycle Accomodation Diagram 5-6
I
NOTES:
- Bicycles on Roadway (CW11-1) sign should not
interrupt standard sequences. For example:
- BE PREPARED TO STOP/Flagger Symbol
- _ LANE CLOSED AHEAD/Lane Ends
Work Symbol
- Bicycles on Roadway sign typically follows ROAD
Area WORK AHEAD sign and used as general warning.
I
I A
I
A
I
I
I B
I
It ON
ROADWAY
I
C
ROAD
WORK
AHEAD
www.invarion.conn
Bicycle Accomodation Diagram 5-6
Bicycle Accommodation Principles:
1 . If a significant volume of bicycles can be expected and work closes a
marked bicycle facility, or requires bicycles to share a travel lane,
install a "(Bicycle) ON ROADWAY" sign (CW11-1 ) or the Bicycle
symbol (W11-1 ) sign with an "ON ROADWAY" (OBW1-5) rider, in
advance of the work area.
2. Install temporary signing off the paved shoulder, within the planter
(buffer) strip, or share the width needed between the shoulder and the
sidewalk, as available.
3. Signs are to remain in place until the surface is restored and the width
made available for bicycle use. See Diagram 5-6 for typical bicycle
signing placement.
Sign Spacing and Buffer Lengths (feet)
Posted Spacing Between Signs Buffer
Speed A B C Space
20 50
25 100 100 100 75 ERRATA:
30 100 1 Supplement Table
35 350 350 350 125
40 1 150 Updated:February 12,
45 180 2ot6
50 500 500 500 210 ODOT Traffic-Roadway
Se '
�Section
55 250 L
Sign Spacing and Buffer Lengths (feet) Supplement
Posted S acin Between Signs "Buffer"
Speed A B C Space
60 285
65 700 700 700 325
70 365