PFI2022-00172 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PFI2022-00172
Date Issued: 06/01/2022
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: 1 S133CC00700
Jurisdiction: Tigard
Site address: 14124 SW SPRINGBROOK LN
Subdivision: PEBBLECREEK Lot: 1
Project: Finau Lolohea Sidewalk Repair
Project Description: Sidewalk repair occuring at 14124 SW Springbrook Ln
Class of Work: FEES
Type 2-Sidewalk/Driveway Approach Description Date Amount
PFI Permit Fee 05/28/2022 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tioard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
DENNIS CASTAGNOLA
11882 SW TALLWOOD DR
PORTLAND, Portland 97223
PHONE:
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: .See application
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00172
Type: Condition Name: Status: Severity:
PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI—Sidewalk/1 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up.
PFI—Sidewalk/1 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc.shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Sidewalk/[ 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Sidewalk/[ 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices,Flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI_Sidewalk/[ 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area
wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and
503431-2345(Tigard School District)and other service providers impacted by such closure.
PFI—Sidewalk/1 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Sidewalk/[ 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City
approval of any access closures.
PFI_Sidewalk/[ 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Sidewalk/[ 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the
City Engineer.
PFI_Sidewalk/[ 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Sidewalk/[ 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property,public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080.Copies of said rules maybe obtained from the Center by calling 503-246-1987. If
you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense
PFI—Sidewalk/1 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI—Sidewalk/1 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI—Sidewalk/1 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI—Sidewalk/1 18-SEWER SYSTEM TEST Applied Notice
A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval.
PFI_Sidewalk/[ 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI—Sidewalk/1 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,
and after completing work covered by the permit.
PFI_Sidewalk/[ 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Sidewalk/[ 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector.
PFI—Sidewalk/1 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property comers,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Sidewalk/[ 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacylcompliance. Such tests/reports shall be provided at the applicant's expense.
PFI—Sidewalk/1 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI—Sidewalk/1 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PFI—Sidewalk/1 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI—Sidewalk/1 28-AS-BUILT DRAWING Applied Notice
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
PFI—Sidewalk/1 31 -OTHER Applied Notice
Other
City of Tigard PFI#: PF12022-00172
s ENGINEERING DEPARTMENT
Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION TYPE OF WORK
Project name: Finau Lolohea
O TYPE 1—Franchise Utility Work
Sidewalk re
Brief description of project: air performed byNWN,PGE, or utility_ P
Agency
Z TYPE 2—ROW Sidewalk/Driveway/Server
Work performed for the purpose of
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Please see attached for pinpoint main line tap
Location (address if available): P p ❑ TYPE 3—Full Scale Development Work
14124 SW Springbrook Ln performed with land use approvalwhich
includes any of the following:
• Subdivisions or partitions
APPLICANT INFORMATION • Street widening
Name: Dennis Castagnola • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 1 1882 SW Tallwood Dr water service area
City/State: Portland, OR Zip: 97223 ❑ TYPE 4—Small Cell Technology
Phone:
5033864664 ❑ TYPE 5-Tigard Triangle
Email: Dacdennis@aol.com Plione: NOTE: Type 1 and 2 applications may be
emailed to rowpermits tigard-orgov.
Contact name:
Phone: Email:
CONTRACTOR INFORMATION [3 Same as applicant
Nance: Finau Lolohea CCB Ntunber: 237363
1lfailing address:1411 SE Roberts Dr City/State, Gresham, OR Zip: 97080
Phone: 5033172818 Email: Concretelifellc21 @gmail.com
ENGINEER INFORMATION
Name:
Nailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (witluti the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes M No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wvvw.dgard-orgov • 503-718-2421 • Page 1 of'4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide Financial assurance for
work,if required by the city pursuant to TALC 15.04.140.
* Wriith the exception of a utility operating pursuant to a valid franchise or license with the Cin•of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or licensed Utilities are not required to obtain the owner's signature on the application.
I.die applicant, certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all die
conditions and limitations of the approval.
/Z -
Finau Lolohea 4/15/22
ipp cant's or authorized agent's signature Print name Date
) Dennis Castagnola 4/15/22
Property owners signature (if required) Print name Date
5
Case No: PF12022-00172 Permit fee: Sao Received by: NL Date: 4W/22
pp,, Z Zpv2
Approved by: 13:a Date: J- e2-02 Notified by: +1✓ Date:
City of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • wcvtvtigard-or.gov 503-718-2421 Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 101/a of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR STAFF USE ONLY • ONLY
TWE 4: SNULL WIRELESS 1 SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-wap license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal
❑ Dimensions
considered? (check all that apply): ❑Small Cell ❑Alacro ❑ Street Name
How many install sites are proposed as part of this permit El Site Address
application?
TYPE 3- Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineers Construction Estimate
Additional Submittals
(her land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.t4ard-orgov • 503-718-2421 • Page 3 of 4
Edge of Pavement
1
Ditch ———
Streetlight . .r
I Ii
T'�rop'os elTiiiN"
i I i
"1 I
Existing House
Existing
Driveway
=1 1i
I 1
w I VI �•
u ..
of I
� v
Existing Shop i
Powerpole95,
I 1 0 \ 1
'rropertyLine— —.— —.
a
I O I Fin Hyarant(FH)
I I I
I
I I Scale: 1"=30'
� I I
MINIUM SKE'rCH REQUIREMEN'rS (Put N/A if
I I I
I I I
� � I
not rr
North arrow Property fines&dimensions Existing utilities locations
(sewer,storm,water)
Street& street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/\\'or D/W apron Slope of propem• Trees
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4
22' of
T sidewalk to
replace in '
e I I ow R� MCI ,a,
Y Lbw
MEW / B
3s