Loading...
Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT III _ COMMUNITY DEVELOPMENT Permit#: FPS2022-00068 Date Issued: 5/26/2022 T I G A RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S101 DA00104 Jurisdiction: Tigard Site address: 13333 SW 68TH PKWY, STE#220 Project: Total Quality Logistics Subdivision: VARNS ACRES Lot: 9 Project Description: Fire sprinkler permit-Add and relocate(8)sprinkles to accommodate new tenant.AFFIDAVIT SUBMITTED. Contractor: PATRIOT FIRE PROTECTION INC Owner: TRIANGLE POINTE TWO LLC 4708 NE MINNEHAHA ST 901 NE GLISAN ST, STE 100 VANCOUVER, WA 98661 PORTLAND, OR 97232 PHONE: 360-699-4403 PHONE: FAX: 360-699-4485 FEES Description Date Amount Specifics: Permit Fee-COM 05/12/2022 $69.92 12%State Surcharge-Building 05/12/2022 $8.39 Type of Use: COM Plan Review-Fire Life Safety-COM 05/12/2022 $27.97 Class of Work: ALT Type of Const: IIA Info Process/Archiving-Lg$2.00(over 05/12/2022 $2.00 Occupancy Grp: B Height: ft 11x17) Stories: Commercial Sprinkler System: Sprinkler Required: Yes Sprinkler Type: Wet Standpipe Required: No Hazard: LT Density: 0.1 Design Area: K Factor: 5.6 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $108.28 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: S1,173.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: itb(•f�� n 9-)� (�C,�� Permittee Signature: M �(T Vei�i^t Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Fire Protection System FOR OFFICE USE ONLY RECEIVED h �) City of Tigard Date Byd U `Q " Permit No.. 2OZ2- ✓61r 13125 SW Hall Blvd.,Tigard,OR 97223 MAY 1 Q 2022 Plan Review Phone: 503.718.2439 Fax: 503.598.1960 Date/By: ,:k OtherPennit: T IGAR I7 Inspection Line: 503.639.4175 CITY Date Ready/By 7n,1� Juris: li See Page 2 for Internet: www.tigard-or.gov OF TIGHHI� Notified�'Metho•/ 0/ LL�vi7j� Supplemental Information BUILDING DIVISION oNeareC gx;07- .J]/_ TYPE OF WORK REQUIRED DATA: I-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Per ' fees*are based on the value of the work perfo r ed. Indicat-• e value(rounded to the nearest dollar)o II ®Addition/alteration/replacement ❑Other: equipment, • aterials,labor,overhead,and the p .fit for the CATEGORY OF CONSTRUCTION work indicate, on this application. 0 1-and 2-family dwelling ElCommercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedroom 0 Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION 4411111 Total number of floors: lob site address: 13 3 33 SW 6 8 th Pkwy New dwelling are:: •uare feet City/State/ZIP: Tigard, OR 97223 Garage/carpo• area: squ:.a feet Suite/bldg./apt.no.: 220 Project name: TQL Expansion Covered.•rch area: square >i Cross street/directions to job site: SW 68th Pkwy and SW 66th Ave De area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Add and relocate (8) sprinklers to accommodate Valuation: $ 1173 a new tenant expansion. Existing building area: square feet New building area: same as square feet ® PROPERTY OWNER ❑ TENANT Number of stories: 3 Name: Deacon Development LLC Type of construction: 2-A Address: 901 NE Glisan St Occupancy groups: City/State/ZIP: Portland, OR 97232 Existing: B Phone:( 5 03) 297 8791 Fax:( ) New: B I APPLICANT ❑ CONTACT PERSON NOTICE Business name: Patriot Fire Protection, Inc All contractors and subcontractors are required to be Contact name: Joseph Plattner licensed with the Oregon Construction Contractors Board 470E NE Minnehaha Street under ORS 701 and may be required to be licensed in the Address: jurisdiction in which work is being performed.If the City/State/ZIP: Vancouver, WA 98661 applicant is exempt from licensing,the following reasons y apply Phone:(360) 699 4403 Fax::(360 ) 699 4485 E-mail: joseph.plattner@patriotfire.com CONTRACTOR BUILDING PERMIT FEES* Business name: same as above (Please refer to fee schedule) Permit fee: Address: State surcharge(12%of permit fee): City/State/ZIP: FLS plan review(40%of permit fee): Phone:( ) Fax.( ) (Due upon application submittal.) CCB lie.: 70822 Total permit fees: `,'. 2e Authorized signature: pi Amount received: This permit application expires if a permit is not obtained Print name: Joseph Plattner Date: 5-3-22 within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board. I:Tending\Pemdts\FPS-PemtitApp_071514.doc 440-4613T(11/02/COMIWEB) City of Tigard: Fire Protection Permit Checklist Page 2-Supplemental Information Describe work to be done: 1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices: ❑ New system Number of sprinkler heads: 8 Number of alarm devices: ❑ Addition or 1:1 1-10 heads: Affidavit required and ❑ 1-5 devices: Affidavit required and Alteration (3)copies of sketch showing area (3)copies of sketch showing area to existingof work within buildingstructure of work within buildingstructure system ❑ 11+ heads: Plan review required and ❑ 6+ devices: Plan review required and (3)sets of plans. (3) sets of plans. Additional description of work: Type of System (Complete A, B, C or D as applicable): A.) Commercial Sprinkler ® Wet ❑ Dry Additional Standpipes no Information: Hazard Group light Density .10 Design Area N/A K.Factor 5.6 Sprinkler Project Valuation: $ 1173 B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations ❑ Yes include: Individual Component ❑ Yes Cut Sheets Fire Alarm Project Valuation: $ D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 7,201 and greater $404.39 Sprinkler Project Square Footage: sq. ft. Fire Protection Permit Fees Project valuation subtotal(see A,B&C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge(12%of permit fee): $ FLS Plan Review(40%of permit fee): $ TOTAL: $ \\patriotfire.local\dfs\VAN Profiles\ted.baker\Downloads\FPS_PemutApp.doc 2 City of Tigard13125 AECEIVEDpemtitNo.: PSZaz2 OOOC28 Internet: S Hall Blvd.,Tigard,OR03 98 23 19 Date Received: �S 1 Z0 Phone: 503.718.2439 Fax: 503.598.1960 MAY 10 2022 Ac Inspection Line: 503b39.4175 22 l_..L I L O F �C1 N 0 www.tigard-or.gov CITY OF TIGARD Bv: l_..L rTI�L.J BUILDING DIVISION FIRE SPRINKLER AFFIDAVIT FOR ALTERATIONS OR TENANT IMPROVEMENTS �+,,��tt cQ� (1 to 10 SPRINKLER HEADS WITHOUT PLANS) ViCr'° Project Name: TQL Expansion Occupancy: ]3 Job Address: 13333 SW 68th Pkwy, Tigard 97223 Type of Construction: IIA Suite: 2 2 0 Contractor: Patriot Fire Protection, Inc Phone: 360 699 4403 Number of Proposed or Altered Heads: 8 Type: SSP Hazard: light Density:• 10 Joseph Plattner 70822 1, Oregon Construction Contractors Board No. certify the following is true and reasonably defines the scope of work for this project: a) All work is limited to drops and armovers in a light-hazard occupancy. b) Positions of sprinkler heads relative to architectural features such as soffits,beams, partitions,walls,etc. complies with current adopted edition of NFPA 13. c) The proposed work does not require hydraulic calculations. d) Only one sprinkler head will be installed from one drop(exception: up to two heads from one drop may be installed when each head is in a separate fire area). e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13. f) Tenant improvements in a new building shall be equipped with Quick Response heads(see 2002 NFPA 13, Section 8.3.3.1 for exceptions). g) The installation shall comply with the requirements of the current adopted edition of NPFA 13. h) Piping shall not be concealed until hangers and bracing are inspected. i) Final approval shall be subject to onsite tests and inspections. In addition,I understand the following is required: • Submit(3)copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • A copy of this document with a copy of the sketch attached shall be available for all inspections. Signature: Plk_ Date: 5-3-22 Print Name: Joseph Plattner I:1Building\Forms\FiresprinklerAffidavit 071514.docx Page 1 of 1